Mandatory Reliability Standards – Workshop: Assessment Report 14 Planning Coordinator Assessment Report Presented by: BCUC BC Hydro January 13, 2021

Transcript of Mandatory Reliability Standards –Workshop: Assessment ......Jan 13, 2021  · Assessment Reports....

Page 1: Mandatory Reliability Standards –Workshop: Assessment ......Jan 13, 2021  · Assessment Reports. 3. Feedback. • B.C. has a separate assessment process and timeline subsequent

Mandatory Reliability Standards – Workshop:Assessment Report 14Planning Coordinator Assessment Report

Presented by: BCUCBC Hydro

January 13, 2021

Page 2: Mandatory Reliability Standards –Workshop: Assessment ......Jan 13, 2021  · Assessment Reports. 3. Feedback. • B.C. has a separate assessment process and timeline subsequent

Safety Moment – Are you ready for winter weather?

• Keep your feet on the ground

• Winter footwear and clothing

• Be aware of your surroundings

• Plan your travel

• Winter tires

• Adjust your driving

Page 3: Mandatory Reliability Standards –Workshop: Assessment ......Jan 13, 2021  · Assessment Reports. 3. Feedback. • B.C. has a separate assessment process and timeline subsequent

• Speakers:• BCUC – Nicole Manalili• BC Hydro – Patricia Robertson

• Participant protocol:• To reduce bandwidth, please turn off your video• If voice quality over computer is poor, please use dial-in number• Participants will be muted. We will unmute during question periods.• Ask questions throughout the workshop via “Chat” or during question

periods

• Webex Support:• Corina – [email protected]• Amy – [email protected]

Remote Meeting Details

Page 4: Mandatory Reliability Standards –Workshop: Assessment ......Jan 13, 2021  · Assessment Reports. 3. Feedback. • B.C. has a separate assessment process and timeline subsequent

AgendaSection Topic Duration

1 Introductions 15 min

2 Reliability Regulations Landscape in BC 20 min

3 Assessment Reports• Assessment Report 14• Planning Coordinator

20 min

4 How to Provide Feedback 40 min

5 Q&A and Closing 20 min

Note: Today’s workshop is process oriented. Other questions, e.g. registration/ technical details/ interpretation of standard, etc.

should be directed to the appropriate contact.

Page 5: Mandatory Reliability Standards –Workshop: Assessment ......Jan 13, 2021  · Assessment Reports. 3. Feedback. • B.C. has a separate assessment process and timeline subsequent

Reliability Regulations Landscape in BCNicole Manalili, British Columbia Utilities Commission

Page 6: Mandatory Reliability Standards –Workshop: Assessment ......Jan 13, 2021  · Assessment Reports. 3. Feedback. • B.C. has a separate assessment process and timeline subsequent

Standard Development & Compliance

BCUC6

1. Regulation 2. Assessment Reports

3. Feedback

Western Electricity Coordinating Council (WECC)

• Coordinating and promoting system reliability • Development of regional standards• Administrator for the BCUC: Registration and

compliance monitoring including audits

British Columbia Utilities Commission (BCUC)

• Compliance and enforcement of legislation in British Columbia. North American Electric

Reliability Corporation (NERC)

• Developing reliability standards• Oversees U.S. compliance

enforcement.

Federal Energy Regulatory Commission (FERC)

• Oversees compliance legislation with NERC/WECC standards in the U.S and approves US reliability standards.

Page 7: Mandatory Reliability Standards –Workshop: Assessment ......Jan 13, 2021  · Assessment Reports. 3. Feedback. • B.C. has a separate assessment process and timeline subsequent

MRS Legislation 2007 British Columbia Energy Plan

o Included a Policy Action to “ensure that the province remains consistent with North American transmission reliability standards”

Utilities Commission Acto Section 125.2 establishes the adoption of MRS in B.C., gives the BCUC jurisdiction for

MRS application in B.C., and assigns BC Hydro the responsibility to review each MRS and report on their suitability for adoption in B.C.

o Recent amendments to the Act and MRS Regulation shifted the applicability of the reliability standards from the Regulation to the Act

o MRS standards may only be fully adopted or rejected by the BCUC and may not be altered or revised. However, the BCUC may specify a BC effective date that would differ from the US effective date.

MRS Regulationo The provincial government issued the MRS Regulation which directs BC Hydro to

provide a report to the BCUC within one year after MRS are adopted by FERC

Mandatory Reliability Standards (MRS) in B.C.

7 BCUC

1. Regulation 2. Assessment Reports

3. Feedback

Page 8: Mandatory Reliability Standards –Workshop: Assessment ......Jan 13, 2021  · Assessment Reports. 3. Feedback. • B.C. has a separate assessment process and timeline subsequent

Mandatory Reliability Standards (MRS) in B.C.

Appendix 1 of the BCUC’s Rules of Procedure for Reliability Standards in BC contains the Registration Manual which establishes the requirements and process for MRS Entity Registration to confirm the functions that apply to an Entity.

Registration by function enables each Entity to identify Reliability Standards it must be compliant with and be prepared to demonstrate that compliance.

MRS Registration and Functional Types

8

Function Type Acronym

Balancing Authority BA

Distribution Provider DP

Underfrequency Load Shedding Distribution Provider

DPUF

Generator Operator GOP

Generator Owner GO

Planning Authority/Planning Coordinator PA/PC

Reliability Coordinator RC

Resource Planner RP

Transmission Owner TO

Transmission Operator TOP

Transmission Planner TP

Transmission Service Provider TSPBCUC

Page 9: Mandatory Reliability Standards –Workshop: Assessment ......Jan 13, 2021  · Assessment Reports. 3. Feedback. • B.C. has a separate assessment process and timeline subsequent

MRS Report Filing Process

Upon receipt of the assessment report, the BCUC makes the report available to the public for comment

The BCUC considers any comments received in reply to the publication and may issue Information Requests to BC Hydro to which BC Hydro must reply

MRS Adoption in B.C.

The BCUC adopts the MRS assessed in the report if the BCUC considers that the MRS are required to maintain or achieve consistency in B.C. with other jurisdictions that have adopted the MRS

The BCUC is not required to adopt an MRS if the BCUC determines, after a hearing, that the MRS is not in the public interest

Mandatory Reliability Standards (MRS) in B.C.

9 BCUC

1. Regulation 2. Assessment Reports

3. Feedback

Page 10: Mandatory Reliability Standards –Workshop: Assessment ......Jan 13, 2021  · Assessment Reports. 3. Feedback. • B.C. has a separate assessment process and timeline subsequent

MRS Compliance The B.C. government has vested the BCUC with the authority and the

responsibility for MRS compliance and enforcement

The BCUC has the ability to levy monetary penalties for confirmed MRS violations

The BCUC Rules of Procedure, which includes the Registration Manual, Compliance Monitoring Program and Penalty Guidelines, sets out the administrative framework for the monitoring of compliance with adopted MRS in B.C.

The BCUC has an administration agreement with WECC to assist with monitoring compliance and registration

Mandatory Reliability Standards (MRS) in B.C.

10 BCUC

1. Regulation 2. Assessment Reports

3. Feedback

Page 11: Mandatory Reliability Standards –Workshop: Assessment ......Jan 13, 2021  · Assessment Reports. 3. Feedback. • B.C. has a separate assessment process and timeline subsequent

Assessment ReportsPatricia Robertson, BC Hydro

Page 12: Mandatory Reliability Standards –Workshop: Assessment ......Jan 13, 2021  · Assessment Reports. 3. Feedback. • B.C. has a separate assessment process and timeline subsequent

1. Regular annual assessment process – Assessment Report 14

2. Planning Coordinator (PC) assessment process - Assessment Report PC

Assessment Report 14 & PCTwo concurrent assessments

12 BC Hydro

1. Regulation 2. Assessment Reports – 14

3. Feedback

Page 13: Mandatory Reliability Standards –Workshop: Assessment ......Jan 13, 2021  · Assessment Reports. 3. Feedback. • B.C. has a separate assessment process and timeline subsequent

Why? BC Hydro is required to provide an annual report to the BCUC assessing the suitability of new or revised reliability standards for adoption in B.C.

What? The Assessment Report 14 process will include all the reliability standards that the FERC has approved from December 1, 2019 through November 30, 2020.

• New standards: 1

• Revised standards: 16

• Retired standards: 6

Assessment Report 14Annual Process

13 BC Hydro

1. Regulation 2. Assessment Reports – 14

3. Feedback

Page 14: Mandatory Reliability Standards –Workshop: Assessment ......Jan 13, 2021  · Assessment Reports. 3. Feedback. • B.C. has a separate assessment process and timeline subsequent

Assessment Report - PC

14 BC Hydro

1. Regulation 2. Assessment Reports – PC

3. Feedback

Why? The reliability standards referencing the PC function have been held in abeyance to date. The BCUC has indicated a need to have the Planning Coordinator function filled in B.C.

What? The PC Assessment process will include all the reliability standards that FERC has approved through November 30, 2020 that reference the PC and/or reference other functional entities that may be impacted by a requirement referencing the PC.

• Total standards: 24

One-time Process

Page 15: Mandatory Reliability Standards –Workshop: Assessment ......Jan 13, 2021  · Assessment Reports. 3. Feedback. • B.C. has a separate assessment process and timeline subsequent

• In August 2020 the BCUC and BC Hydro held a workshop to outline the PC function, the applicable standards and next steps

• BCUC has asked BC Hydro to begin the PC Assessment process assuming:

• BC Hydro as the Planning Coordinator for its footprint and for those MRS Registered Entities interconnected to its footprint, aside from FortisBC

• FortisBC as the Planning Coordinator for its footprint

• BC Hydro and FortisBC are also exploring the possibility of one PC for the Province

Assessment Report PCTwo PC Approach

15 BC Hydro

1. Regulation 2. Assessment Reports – 14

3. Feedback

Page 16: Mandatory Reliability Standards –Workshop: Assessment ......Jan 13, 2021  · Assessment Reports. 3. Feedback. • B.C. has a separate assessment process and timeline subsequent

Where to find more information? New standards, glossary of terms and redlines can be found on the BC Hydro Reliability website. (https://www.bchydro.com/energy-in-bc/operations/transmission/transmission-system/reliability.html)

When?

All feedback is due by end of day on February 28, 2021 (Sunday).Feedback received after this time will not be considered.

Assessment Report 14 & PCTwo processes with independent timelines

16 BC Hydro

1. Regulation 2. Assessment Reports – 14 &

PC

3. Feedback

Page 17: Mandatory Reliability Standards –Workshop: Assessment ......Jan 13, 2021  · Assessment Reports. 3. Feedback. • B.C. has a separate assessment process and timeline subsequent

How to Provide FeedbackPatricia Robertson, BC Hydro

Page 18: Mandatory Reliability Standards –Workshop: Assessment ......Jan 13, 2021  · Assessment Reports. 3. Feedback. • B.C. has a separate assessment process and timeline subsequent

• Adverse Reliability Impacts: Less stringent requirements than currently adopted standards or practices otherwise mandated in utility tariffs or business practices approved or endorsed by the BCUC.

• Suitability Assessment (Technical/Administrative):

a) Issues with requiring NERC Approval/Participation in order to implement.

b) Issues with ongoing provision of information to NERC or WECC due to a lack of clarity on

reporting instructions, references to undefined processes or reporting tools, etc.

c) References to standards/glossary terms that are not yet FERC/BCUC approved or otherwise

under BCUC assessment.

d) Any other issues that would affect an entity’s ability to implement the requirements of a

standard/glossary term (i.e. Planning Authority/Planning Coordinator input required for which

the role(s)/responsibilities are under consideration by the BCUC).

Registered Entity’s FeedbackComments are evaluated against the following criteria:

18 BC Hydro

1. Regulation 2. Assessment Reports

3. FeedbackCriteria

Page 19: Mandatory Reliability Standards –Workshop: Assessment ......Jan 13, 2021  · Assessment Reports. 3. Feedback. • B.C. has a separate assessment process and timeline subsequent

• Only Adverse Reliability Impact or Suitability Assessment comments will be considered as part of BC Hydro’s recommendations, as only they fall under the scope of the established Assessment Report process

• Examples of issues NOT falling under the criteria of Adverse Reliability Impact or Suitability Assessment comments include:

o Issues with entity functional registrations

o Requests to change standard language or glossary terms/definitions – the BCUC does not have the authority to change standards or glossary terms

• Other issues should be discussed with the BCUC separately

Registered Entity’s FeedbackComments are evaluated against the following criteria (Cont.):

19 BC Hydro

1. Regulation 2. Assessment Reports

3. FeedbackCriteria

Page 20: Mandatory Reliability Standards –Workshop: Assessment ......Jan 13, 2021  · Assessment Reports. 3. Feedback. • B.C. has a separate assessment process and timeline subsequent

In the Assessment Report, BC Hydro will:

• Aggregate and summarize all provided costs.

• Recommend implementation timelines based on entity feedback in combination with FERC approved recommended implementation times.

• Implementation times for new glossary terms will typically be recommended to coincide with recommended implementation times of associated standards.

Registered Entity’s FeedbackMRS adoption recommendations are formed from your feedback

20 BC Hydro

1. Regulation 2. Assessment Reports

3. FeedbackThings to Consider

Page 21: Mandatory Reliability Standards –Workshop: Assessment ......Jan 13, 2021  · Assessment Reports. 3. Feedback. • B.C. has a separate assessment process and timeline subsequent

• All feedback comments will be kept verbatim

• If your feedback is unclear, BC Hydro will contact the entities and ask for revisions

• BC Hydro will NOT make changes to entity feedback –feedback forms are taken verbatim and appended to the Assessment Report for BCUC’s reference

Registered Entity’s FeedbackYour feedback is important in the evaluation process.

21 BC Hydro

1. Regulation 2. Assessment Reports

3. FeedbackThings to Consider

Page 22: Mandatory Reliability Standards –Workshop: Assessment ......Jan 13, 2021  · Assessment Reports. 3. Feedback. • B.C. has a separate assessment process and timeline subsequent

a. Walk through of the Assessment Report 14 feedback spreadsheet

b. Walk through of the Assessment Report PC feedback spreadsheet

How to Provide Feedback

Section contents:

22 BC Hydro

1. Regulation 2. Assessment Reports

3. Feedback

Page 23: Mandatory Reliability Standards –Workshop: Assessment ......Jan 13, 2021  · Assessment Reports. 3. Feedback. • B.C. has a separate assessment process and timeline subsequent

• B.C. has a separate assessment process and timeline subsequent to the U.S. adoption of standards

• Every year BC Hydro, with feedback from Registered Entities, reviews each MRS assessing the suitability for adoption in B.C. and files a report with the BCUC

• Deadline for feedback is end of the day February 28, 2021.Feedback received after this date will NOT be considered

• The BCUC must adopt the MRS assessed in the report unless after a hearing it determines that the MRS is not in the public interest

In Summary

23 BC Hydro

Page 24: Mandatory Reliability Standards –Workshop: Assessment ......Jan 13, 2021  · Assessment Reports. 3. Feedback. • B.C. has a separate assessment process and timeline subsequent

Questions

24

Page 25: Mandatory Reliability Standards –Workshop: Assessment ......Jan 13, 2021  · Assessment Reports. 3. Feedback. • B.C. has a separate assessment process and timeline subsequent

BCUC – [email protected]

BC Hydro – [email protected]

Thank you!

For more information or questions, please contact:

25 BC Hydro

Page 26: Mandatory Reliability Standards –Workshop: Assessment ......Jan 13, 2021  · Assessment Reports. 3. Feedback. • B.C. has a separate assessment process and timeline subsequent

• BCUC MRS website: http://www.bcuc.com/industry/mandatory-reliability-standards.html

• BCUC website for Current and archived MRS orders: https://www.bcuc.com/proceedings-orders-decisions/archived-proceedings/2019.html

• NERC website: www.nerc.com

• WECC website: www.wecc.biz

• NERC/WECC hosted standards drafting/implementation and compliance webinars

• WECC Compliance User Group meetings (CUG/CIPUG)

• Western Interconnection Forum (WICF): http://www.wicf.biz/

Information SourcesInformation shared in the workshop today are from:

26

Page 27: Mandatory Reliability Standards –Workshop: Assessment ......Jan 13, 2021  · Assessment Reports. 3. Feedback. • B.C. has a separate assessment process and timeline subsequent