MANCHESTER LID STORMWATER RETROFITManchester, Washington
Pre l iminary “Top 10” Si tes - October 2011
A L A S K A
S P R I N G
3 R D
ALDER
Location: E Main Street at Colchester (SE
Typology: Detention Pond Pocket Parks
Project Type: County
Description of Retrofit :
Excavat ion of exist ing pr ivate parcel to create a sur face detent ion
faci l i ty that can funct ion as publ ic open space dur ing the dry season.
The depth of the adjacent storm dra in inf rast ructure requi res an up to
10-foot excavat ion to provide f low control wi thou t backwater ing the
exist ing publ ic storm dra in system. The bottom of the detent ion faci l i ty
may be designed to provide water qual i ty t reatment for low f lows pr ior
to discharge. Project provides f low control as an of f- l ine system.
Addit ional Benefit:
Communi ty - New downtown publ ic open space to f aci l i ta te•
communi ty gather ing and events
Educat ion - Highly v is ible opportuni ty to edu cate publ ic on impacts•
of urban stormwater runoff
Construction Elements (does not include soft costs) :
Costs include:•
excavat ion and haul-
reta ining wal ls and seat wal ls for per imeter of faci l i ty-
storm dra in inf rast ructure and f low control-
hardscape, landscape and s i te furnishings-
consider a l ternat ive covered detent ion due to depth of system-
construct ion cont ingency-
E x i s t i n g S i t e
K e y M a p
T a n n e r
S p r i n g s P a r k , P o r t l a n d , O R
M a d i s o n
V a l l e y S t o r m w a t e r P r o j e c t ,
S e a t t l e , W
A
p h o t o : B e n j a m i n L u k o f f
Site 3
8/3/2019 Manchester Stormwater Sites
http://slidepdf.com/reader/full/manchester-stormwater-sites 3/14
MANCHESTER LID STORMWATER RETROFITManchester, Washington
Pre l iminary “Top 10” Si tes - October 2011
A L A S K A
S P R I N G
3 R D
ALDER
Description of Retrofit :
Street improvements a long downtown main st reet to faci l i ta te
complete st reet concepts and integrate bioretent ion faci l i t ies
and permeable pavements. Streetscape improvements requi re a
par tnership wi th adjacent proper ty owners to the west to a l low for
publ ic walkway and ameni t ies zone wi thin the exist ing park ing area
that l ies outs ide the r ight-of-way. Permeable pavement to reduce
runoff and bioretent ion to provide water qual i ty t reatment pr ior to
discharge to the downstream system. Water qual i ty t reatment is
l imi ted to sur rounding pavement areas, however improvements may
intercept of f-s i te f lows f rom parcels.
Addit ional Benefit:Mobi l i ty - Complete Street st reet elements provide formal ized and•
control led access to downtown businesses
Communi ty - Wide walkways a l low opportuni ty to integrate st reet•
furnishings to promote pedestr ian act iv i ty and create a v ibrant
downtown center
Communi ty - Improvements mainta in exist ing dr iveway access for •
adjacent parcels
Safety - provides t ra f f ic ca lming and access control•
Construction Cost Range (does not include soft costs) :
Costs include:•
pavement demol i t ion and excavat ion and haul-
permeable pavement for park ing areas-
storm dra in inf rast ructure-
bioretent ion soi l and plant ings- walkway and furnishings for pedestr ian zone-
construct ion cont ingency-
E x i s t i n g S i t e
S t o r m w
a t e r p l a n t e r s o n W a t e r S t r e e t ,
P o r t T o
w n s e n d , W A
W i n s l o w
W a y , C i t y o f B a i n b r i d g e
I s l a n d ,
W A
Site 5
Location: Colchester Dr ive E
Typology: Commercial ROW Flat Streets
Project Type: Partnership
8/3/2019 Manchester Stormwater Sites
http://slidepdf.com/reader/full/manchester-stormwater-sites 4/14
MANCHESTER LID STORMWATER RETROFITManchester, Washington
Pre l iminary “Top 10” Si tes - October 2011
A L A S K A
S P R I N G
3 R D
ALDER
Description of Retrofit :
Formal izat ion of intersect ion wi th curb and walkway improvements to
improve pedestr ian connect ions and a l low integrat ion of bioretent ion
for water qual i ty t reatment of road runoff . A long the steeper s lopes of
E Main St bioretent ion faci l i t ies wi l l be cascading stormwater planters.
At E Colchester St ra in gardens wi l l be used between the intersec t ion
and adjacent on-st reet park ing. Water qual i ty l imi ted benef i t to
sur face runoff wi thin project boundary.
Addit ional Benefit:
Mobi l i ty - Formal ized intersect ion provides separate grade•
separated pedestr ian walkway
Mobi l i ty - Curb bulbs reduce crossing distances at intersect ion•
Communi ty - Curb bulbs a l low opportuni ty to integrate st reet•
furnishings to support pedestr ian t ra f f ic
Safety - provides t ra f f ic ca lming, access control and accessibi l i ty•
improvements
Construction Cost Range (does not include soft costs) :
Costs include:•
pavement demol i t ion and removal-
storm dra in inf rast ructure-
concrete curb and gut ter and walkway-
concrete wal ls at stormwater planters-
bioretent ion soi l and plant ing-
construct ion cont ingency-
E x i s t i n g S i t e
S t o r m w
a t e r p l a n t e r s , P o r t T o w n s e n d ,
W A
S t o r m w a t e r p l a n t e r s a t c o r n e r , P o r t
T o w n s e n d , W A
Site 6
Location: Inters ectio n o f Colchester Dr E &
Typology: Commercial ROW Flat Streets,
Commercial ROW Cascade
Project Type: County
8/3/2019 Manchester Stormwater Sites
http://slidepdf.com/reader/full/manchester-stormwater-sites 5/14
MANCHESTER LID STORMWATER RETROFITManchester, Washington
Pre l iminary “Top 10” Si tes - October 2011
A L A S K A
S P R I N G
3 R D
ALDER
Location: E Main Street
Typology: Commercia l ROW Cascade
Project Type: County
Description of Retrofit :
Cascading stormwater planters and pedestr ian improvements a long
the south road edge. Stormwater planters to provide water qual i ty
t reatment and f low at tenuat ion for f lows dra ining to and throu gh E
Main St. This s i te includes an opportuni ty to provide a control led
discharge to the cascading stormwater planters f rom 2nd Ave E, see
Si te 62.
Addit ional Benefit:
Mobi l i ty - Walkway provides separate grade separated pedestr ian•
faci l i ty
Mobi l i ty - Street edge improvements and plant ings nar row•
percept ion of road width and provide passive t ra f f ic ca lming for roadway
Communi ty - Area has been ident i f ied as having s igni f icant•
dra inage issues and is highly v is ible, maximizing educat iona l
benef i t
Construction Cost Range (does not include soft costs) :
Costs include:•
excavat ion and haul or stormwater planters-
concrete wal ls for storm water planters-
storm dra in inf rast ructure-
bioretent ion soi l and plant ings-
concrete curb and walkway-
pavement restorat ion-
construct ion cont ingency-
E x i s t i n g S i t e
S E A S t
r e e t c a s c a d i n g p l a n t e r , S e a t t l e ,
w A
G r o w i n
g V i n e S t r e e t c a s c a d i n g
s t o r m w
a t e r p l a n t e r , S e a t t l e , W A
Site 10
8/3/2019 Manchester Stormwater Sites
http://slidepdf.com/reader/full/manchester-stormwater-sites 6/14
MANCHESTER LID STORMWATER RETROFITManchester, Washington
Pre l iminary “Top 10” Si tes - October 2011
C A L I F O R N I A
A L A S K A
C H E S
T E R
Location: Madrone Ave E between Cheste
Alaska Ave E
Typology: Resident ia l ROW Flat Streets, R
Project Type: Pr ivate
Description of Retrofit :
Regrade and ra ise the gravel drop-of f area in f ron t of the church to
match adjacent publ ic roadway grades. Use exist ing depression as an
opportuni ty to insta l l below ground detent ion for upstream f lows f rom
Cedar St E. A new culver t across Cedar St E wi l l hydraul ica l ly connect
runoff to the detent ion faci l i ty. New paving for the church drop-of f
area to be constructed using permeable pavement. Provides water
qual i ty t reatment and f low control for l imi ted area.
Addit ional Benefit:
Mobi l i ty - Formal izat ion of drop-of f area improves and faci l i ta tes•
access to the church
Educat ion - Highly v is ible opportuni ty to edu cate publ ic on impacts•
of urban stormwater
Habi tat - Mainta in la rge, exist ing t ree and improve growing•
condi t ion through soi l amendments and soi l condi t ioning
Construction Cost Range (does not include soft costs) :
Costs include:•
storm dra ins, detent ion pipes and f low control st ructure-
permeable pavement-
soi l amendment and seeding-
construct ion cont ingency-
E x i s t
i n g S i t e
P o r o u s
p a v i n g i n p a r k i n g d r i v e a n d
w a l k w a
y , S e a t t l e , W A
P o r o u s p
a v e m e n t d r i v e w a y a n d f i r e
l a n e , M e d i n a , W A
Site 15
8/3/2019 Manchester Stormwater Sites
http://slidepdf.com/reader/full/manchester-stormwater-sites 7/14
MANCHESTER LID STORMWATER RETROFITManchester, Washington
Pre l iminary “Top 10” Si tes - October 2011
C A L I F O R N I A
VAN BUR
TRUMAN
POLK
PATRICI
MANCHE
Site 29 (Typical Pla n)
Description of Retrofit :
Modi fy the st reet edge and reduce pavement to a l low expansion of
exist ing di tches and integrate bioretent ion. Bioretent ion faci l i t ies wi l l
provide water qual i ty t reatment and at tenuate sur face runoff be fore
discharging to the downstream wet pond. Expansion of the exist ing
underground detent ion is a lso proposed to increase on-s i te detent ion
capaci ty. Increased at tenuat ion and water qual i ty t reatment wi l l
improve funct ion of wet pond and Duncan Creek.
Addit ional Benefit:
Communi ty - L imi ts disturbance to adjacent landscaping and•
pr ivate ameni t ies of adjacent parcels
Mobi l i ty - Traf f ic ca lming through reduct ion of exist ing roadway•
width (us ing chicanes)
Construction Cost Range (does not include soft costs) :
Costs include:•
pavement demol i t ion-
excavat ion and haul-
bioretent ion soi l and plant ings-
expansion of underground detent ion-
construct ion cont ingency-
Location: E Raint ree Lane
Typology: Resident ia l ROW Flat Streets, R
Project Type: County
E x i s t
i n g S i t e
B i o r e t e n t i o n r e t r o f i t i n r o a d w a y ,
P o r t l a n d , O R
W i d e n e d d i t c h a n d s w a l e f a c i l i t y ,
S e a t t l e
, W A
8/3/2019 Manchester Stormwater Sites
http://slidepdf.com/reader/full/manchester-stormwater-sites 8/14
MANCHESTER LID STORMWATER RETROFITManchester, Washington
Pre l iminary “Top 10” Si tes - October 2011
C A L I F O R N I A
VAN BUR
TRUMAN
POLK
PATRICI
MANCHE
Location: Cal i fornia Ave E south of Van Bu
Typology: Detent ion Pond Pocket Park
Project Type: County
E x i s t i n g S i t e
S t r e e t s i d e r a i n g a r d e n , S e a t t l e , W A
B i o r e t e n t i o n f a c i l i t y w i t h p o c k e t p a r k ,
P o r t l a n d , O R
Site 32
Description of Retrofit :
Replace exist ing, wide pavement shoulder at bu s stop wi th bioreten-
t ion area. Bioretent ion to provide water qual i ty t reatment for sur face
runoff and f low at tenuat ion pr ior to discharge to the exist ing wet pond
to the south. Improvements to the wet pond parcel include landscape
enhancements and construct ion of a new UIC wel l to improve water
qual i ty t reatment and inf i l t ra t ion.
Addit ional Benefit:
Mobi l i ty - Improved pedestr ian faci l i t ies to/f rom bus stop•
Mobi l i ty - Traf f ic ca lming through formal st reet edge adjacent to•
bus stop
Mobi l i ty - Traf f ic ca lming as bus mainta ins control of t ravel lane•
dur ing stops instead of pul l ing out of roadway
Habi tat - Improved landscape and t ree canopy wi thin wet pond•
parcel
Communi ty - Opportuni ty to improve seat ing area at bus stop•
Construction Cost Range (does not include soft costs) :
Costs include:•
Pavement removal and excavat ion-
Bioretent ion soi l and plant ing-
Concrete walkway, curb and bus stop improvements-
Increased t ree canopy and landscape enhancements wi thin-
pond
UIC wel l to improved inf i l t ra t ion potent ia l-
construct ion cont ingency-
8/3/2019 Manchester Stormwater Sites
http://slidepdf.com/reader/full/manchester-stormwater-sites 9/14
MANCHESTER LID STORMWATER RETROFITManchester, Washington
Pre l iminary “Top 10” Si tes - October 2011
C A L I F O R N I A
VAN BUR
TRUMAN
POLK
PATRICI
MANCHE
Location: East of A laska Ave E, between H
and Polk
Typology: Detent ion Pond Pocket Park
Project Type: County
E x i s t i n g S i t e
D e t e n t
i o n p o n d w i t h p e d e s t r i a n / p a r k
a m e n i t i e s , S e a t t l e , W A
D e t e n t i o n p o n d w i t h p e d e s t r i a n / p a r k
a m e n i t i e s , S e a t t l e , W A
Site 39
Description of Retrofit :
Expand capaci ty of exist ing wet pond by excavat ing and regrading
the southwestern s ides of the pon d. Insta l l UIC wel ls to improve in-
f i l t ra t ion pr ior to discharge f rom the pond. Landscape enh ancement
of pond edge to improve water qual i ty t reatment. O ther s i te improve-
ments to a l low for wet pond parcel to be used as a pocket park wi th-
out compromis ing the funct iona l i ty of the wet pond. Improvements
focus on water qual i ty, f low control and reduct ion of peak f low in
Duncan Creek.
Addit ional Benefit:
Communi ty - A l lows communi ty access to new pocket park for •
outdoor, passive recreat ion act iv i t iesHabi tat - Improved plant ing and t ree canopy to faci l i ta te and•
encourage use of new park
Educat ion - Opportuni ty to educate pu bl ic on impacts and needs to•
manage urban stormwater runoff
Construction Cost Range (does not include soft costs) :
Costs include:•
regrading and improvements to access dr ive-
excavat ion to increase pond volume-
pedestr ian t ra i l and landscape enhancement around pond-
per imeter
increased t ree canopy-
UIC wel ls for improved inf i l t ra t ion potent ia l-
construct ion cont ingency-
8/3/2019 Manchester Stormwater Sites
http://slidepdf.com/reader/full/manchester-stormwater-sites 10/14
MANCHESTER LID STORMWATER RETROFITManchester, Washington
Pre l iminary “Top 10” Si tes - October 2011
C A L I F O R N I A
VAN BUR
TRUMAN
POLK
PATRICI
MANCHEDescription of Retrofit :
Expansion and enhancement of exist ing di tch network to integrate
bioretent ion faci l i t ies and provide water qual i ty t reatment. Layout and
conf igurat ion of bioretent ion areas based on exist ing dr iveways and
ut i l i ty inf rast ructure in the publ ic r ight-of-way. Water qual i ty and at-
tenuat ion to increase funct iona l i ty of downstream systems. Capture of
runoff f rom surrounding pavements and upstream parcel area.
Addit ional Benefit:
Communi ty - L imi ts disturbance to adjacent landscaping and•
pr ivate ameni t ies of adjacent parcels
Mobi l i ty - Street edge improvements and plant ings nar row•
percept ion of road width and provide passive t ra f f ic ca lming for roadway
Construction Cost Range (does not include soft costs) :
Costs include:•
excavat ion and haul-
bioretent ion soi l and plant ings-
dr iveway replacement-
construct ion cont ingency-
Location: Cal i fornia Ave E between Center
Truman St
Typology: Commercia l ROW Flat Streets
Project Type: County
E x i s t i n g S i t e
B i o s w a l e
i n R O W , S e a t t l e , W A
W i d e n e d d i t c h a n d s w a l e f a c i l i t y ,
S e a t t l e
, W A
Site 40 (Typical Pla n)
8/3/2019 Manchester Stormwater Sites
http://slidepdf.com/reader/full/manchester-stormwater-sites 11/14
MANCHESTER LID STORMWATER RETROFITManchester, Washington
Pre l iminary “Top 10” Si tes - October 2011
C A L I F O R N I A
VAN BUR
TRUMAN
PATRICI
MANCHE
POLK
Description of Retrofit :
Expansion and enhancement of exist ing di tch network to integrate
bioretent ion faci l i t ies and provide water qual i ty t reatment. Layout
and conf igurat ion of bioretent ion areas based on exist ing dr iveways
and ut i l i ty inf rast ructure in the publ ic r ight-of -way. Water qual i ty and
attenuat ion to increase funct iona l i ty of downstream systems. Capture
of runoff f rom l imi ted sur rounding pavements and large upstream
parcel areas.
Addit ional Benefit:
Communi ty - L imi ts disturbance to adjacent landscaping and•
pr ivate ameni t ies of adjacent parcels
Mobi l i ty - Street edge improvements and plant ings nar row•
percept ion of road width and provide passive t ra f f ic ca lming for
roadway
Construction Cost Range (does not include soft costs) :
Costs include:•
excavat ion and haul-
bioretent ion soi l and plant ings-
dr iveway replacement-
construct ion cont ingency-
Location: Alaska Ave E between E Patr icia
Truman St
Typology: Commercia l ROW Flat Streets
Project Type: County
E x i s t i n g S i t e
W i d e n
e d d i t c h a n d s w a l e f a c i l i t y ,
S e a t t l e , W A
B i o s w a l e i n R O W , S e a t t l e , W A
Site 41 (Typical Pla n)
8/3/2019 Manchester Stormwater Sites
http://slidepdf.com/reader/full/manchester-stormwater-sites 12/14
MANCHESTER LID STORMWATER RETROFITManchester, Washington
Pre l iminary “Top 10” Si tes - October 2011
A L A S K A
S P R I N G
3 R D
ALDER
Description of Retrofit :
Retrof i t of exist ing gravel dr ive lane wi th pe rmeable pavement
and subbase to provide storage for upstream dra inage areas that
f requent ly f lood the dr ive lane and adjacent proper t ies. Bioretent ion
faci l i t ies incorporated where space a l lows to increase storage
capaci ty of upstream f lows pr ior to s i te discharge.
Addit ional Benefit:
Mobi l i ty - Improves access to adjacent parcels and formal izes•
exist ing gravel dr ive
Habi tat - Ra in garden provides opportuni ty for communi ty•
part icipat ion in plant ing events and garden maintenance
Construction Cost Range (does not include soft costs) :
Costs include:•
excavat ion and haul-
permeable pavement-
pavement pr ivate lane-
storm dra in inf rast ructure-
bioretent ion soi l and plant ing-
construct ion cont ingency-
Location: Denniston Lane
Typology: Resident ia l ROW Flat Streets, R
GI, Detent ion Pond Pocket Park
Project Type: Pr ivate
E x i s t i n g S i t e
B i o r e t e n
t i o n f a c i l i t y w i t h p o c k e t p a r k ,
P o r t l a n d
, O R
P r i v a t e d r i v e / a l l e y w i t h p e r m e a b l e u n i t
p a v e r s
, S e a t t l e , W A
Site 58
8/3/2019 Manchester Stormwater Sites
http://slidepdf.com/reader/full/manchester-stormwater-sites 13/14
MANCHESTER LID STORMWATER RETROFITManchester, Washington
Pre l iminary “Top 10” Si tes - October 2011
C A L I F O R N I A
A L A S K A
C H E S
T E R
Description of Retrofit :
Expansion and enhancement of exist ing di tch network on the uphi l l
(west ) s ide to integrate bioretent ion faci l i t ies and provide water qual i ty
t reatment. Bioretent ion to a lso at tenuate f lows pr ior to discharge to
downstream system. Layout and conf igurat ion of bioretent ion areas
based on exist ing dr iveways and ut i l i ty inf rast ructure in the publ ic
r ight-of-way.
Addit ional Benefit:
Communi ty - L imi ts disturbance to adjacent landscaping and•
pr ivate ameni t ies of adjacent parcels
Mobi l i ty - Street edge improvements and plant ings nar row•
percept ion of road width and provide passive t ra f f ic ca lming for
roadway
Construction Cost Range (does not include soft costs) :
Costs include:•
excavat ion and haul-
storm dra in inf rast ructure-
bioretent ion soi l and plant ings-
dr iveway restorat ion-
construct ion cont ingency-
Location: Val ley Ave E between Main and
Typology: Resident ia l ROW Flat Streets, R
Project Type: County
E x i s
t i n g S i t e
B i o s w a l e i n R O W , S e a t t l e , W A
G r a s s y b i o s w a l e i n R O W , S e a t t l e , W A
Site 67
8/3/2019 Manchester Stormwater Sites
http://slidepdf.com/reader/full/manchester-stormwater-sites 14/14
MANCHESTER LID STORMWATER RETROFITManchester, Washington
Pre l iminary “Top 10” Si tes - October 2011
C A L I F O R N I A
A L A S K A
C H E S
T E R
Description of Retrofit :
Reconstruct ion of the exist ing st reet to di rect sur face runoff to the
south and into cascading stormwater planters. Stormwater planters
to provide water qual i ty t reatment for road runoff and at tenuate f lows
pr ior to discharge to the downstream system. Downstream system has
been ident i f ied to have f looding concerns and l imi ted inf rast ructure
due to proximi ty to water f ront.
Addit ional Benefit:
Communi ty - L imi ts disturbance to adjacent landscaping and•
pr ivate ameni t ies of adjacent parcels
Construction Cost Range (does not include soft costs) :
Costs include:•
excavat ion and haul-
storm dra in inf rast ructure-
new roadway pavement and walkway-
concrete stormwater planter wal ls-
bioretent ion soi l and plant ings-
construct ion cont ingency-
Location: E Spruce St between Val ley and
Typology: Resident ia l ROW Cascades
Project Type: County
E x i s
t i n g S i t e
C a s c a
d i n g s t o r m w a t e r p l a n t e r s i n R O W ,
S e a t t l e , W A
C a s c a
d i n g s t o r m w a t e r p l a n t e r s i n R O W ,
S e a t t l e , W A
Site 68