Managing with Metrics The Saga of a Test Effort!
XBOSoft info
• Founded in 2006 • Dedicated to software quality
• Software QA consulting • Software testing services
• Offices in Santa Clara,CA Beijing, Oslo and Amsterdam
About the Speakers
Shaun Bradshaw VP Consulting Services Zenergy Technologies
Philip Lew CEO and Founder XBOSoft
The Metric
What is Measurement?
• �Measurement is the process by which numbers or symbols are assigned to attributes of entities in the real world in such a way as to characterize them according to clearly defined rules.��[1]
• �Measurement is the empirical, objective assignment of numbers, according to a rule derived from a model or theory, to attributes of objects or events with the intent of describing them.��[2]
Rayleigh Cumulative Distribution
• �In probability theory and statistics, the Rayleigh distribution is a continuous probability distribution. As an example of how it arises, the wind speed will have a Rayleigh distribution if the components of the two-dimensional wind velocity vector are uncorrelated and normally distributed with equal variance. The distribution is named after Lord Rayleigh.�[1]
What is the Rayleigh Cumulative Distribution?
Rayleigh Cumulative Distribution
• Test execution starts slowly as the team works through configuration issues and major blocking defects.
• Once the initial issues are resolved a larger variety of tests can be executed, increasing execution velocity.
• As testing nears release, there are fewer tests to be executed and only a few defects remain outstanding, leveling out the speed of execution.
Why does it have an �S� shape?[2]
Data Requirements
• The curve can be tracked for two main purposes with similar data requirements: – Test Execution Progress
• Total tests to be executed • Total number of tests in a �Passed� state • Total number of days in the test effort
– Application Stability Tracking • Total tests to be executed • Historical fail rates (to derive the anticipated number of
failures) • Total number of failures • Total number of days in the test effort
What data is required to generate the curve?
The Graph
Actual vs Theoretical
By plotting the actual cumulative number of passed tests and comparing it to the theoretical curve we are able to identify potential issues and make adjustments to the effort ensuring testing is as successful as possible.
The Saga
• Team – No professional testers – 30-40 SMEs in the areas of:
• Supply Chain Planning, Supply Chain Management, Manufacturing, Operations, Sales (divided by product category), Accounting, etc.
• Test effort – Complete manual test execution of 370 E2E, 390
functional, and 600 process flow test cases in 15 days
– Daily stand-up held to review metrics and adjust test execution strategy
Interpreting the Curve
Day 1
Interpreting the Curve
Good start, as expected. Since this is a regression test effort most environmental issues should be taken care of, as well as the few, if any major blocking issues
Pass rate at this point indicates a possible early completion. Process flow execution and passes have been high since the accounting group shifted resources to test execution. The best news is that the team is about 2 days ahead of schedule. Manager verifies with team that they are execut- ing high priority tests first.
Interpreting the Curve
Day 5
Execution has become anemic. Accounting is not completing process flow validations because of issues with taxes and a known problem with VAT. Next week is focused on defect correction and re-testing. Devel- opment indicates the custom manu- facturing issue will be corrected by the end of the week and VAT should be correct- ed as well.
Interpreting the Curve
Day 10
Although the team did not achieve 100% completion, fewer than 40 tests were outstanding. Furthermore, specific acceptance criteria were established prior to test execution and all criteria were met or exceeded.
Interpreting the Curve
Day 15
Questions