Managing Relationships-Presentation

89
MANAGING RELATIONSHIPS IN FEDERAL GOVERNMENT CONTRACTS

description

MANAGING RELATIONSHIPS IN FEDERAL GOVERNMENT CONTRACTS GOVERNMENT CONTRACTING IS SERIOUS BUSINESS 2 Prime Contractor is liable for total performance regardless of what is subcontracted [See FAR 9.604(3)] Subcontractor’s violation of laws or ethics can put Prime Contractor at Risk 3 Government’s Remedies 1. Contractual 2. Administrative 3. Civil Litigation 4. Criminal Litigation 4 Contractual 5 Administrative 6 Civil Litigation 7 Criminal Litigation 8 Potential Penalties 9 Company Liability 10

Transcript of Managing Relationships-Presentation

Page 1: Managing Relationships-Presentation

MANAGING RELATIONSHIPS IN

FEDERAL GOVERNMENT CONTRACTS

Page 2: Managing Relationships-Presentation

2

GOVERNMENT CONTRACTING IS

SERIOUS BUSINESS

Page 3: Managing Relationships-Presentation

3

Prime Contractor Is Liable for Subcontractor’s Failures

Prime Contractor is liable for total performance regardless of what is subcontracted [See FAR 9.604(3)]

Subcontractor’s violation of laws or ethics can put Prime Contractor at Risk

Page 4: Managing Relationships-Presentation

4

Government’s Remedies

1. Contractual

2. Administrative

3. Civil Litigation

4. Criminal Litigation

Page 5: Managing Relationships-Presentation

5

ContractualReduce Payments (Deductions)

Withhold Payments

Deductive Change

Termination for Convenience

Termination for Default

Page 6: Managing Relationships-Presentation

6

Administrative• Poor Contractor Performance

Assessment Report (CPAR)

• Finding of Non-Responsibility

• Suspension

• Debarment

Page 7: Managing Relationships-Presentation

7

Civil LitigationCivil False Claims

Contract Disputes Act

Page 8: Managing Relationships-Presentation

8

Criminal LitigationMonetary Fines

Imprisonment

Page 9: Managing Relationships-Presentation

9

Potential PenaltiesCompany

Individual

Page 10: Managing Relationships-Presentation

10

Company LiabilityFines

Damages

Reduction of Payment (Contract Amount, Change Order, Claim)

Forfeiture of Claim

Disqualified from Contract Award

Page 11: Managing Relationships-Presentation

11

Annulment of Contract

Termination of Contract

Suspension

Debarment

Criminal Liability

Page 12: Managing Relationships-Presentation

12

Individual LiabilityLose Job

Personal Debarment

Fines

Damages

Prison

Page 13: Managing Relationships-Presentation

13

MAKE CAREFUL CHOICES UPFRONT

Page 14: Managing Relationships-Presentation

14

Find Out All You Can

Do It Before Becoming “Wedded” to Partner

Page 15: Managing Relationships-Presentation

15

What You Learn Could AffectRisks You Are Willing to Take

Contract Terms You Are Willing to Accept

Price You Quote (Commensurate with Risk)

Page 16: Managing Relationships-Presentation

16

Personnel AssignmentsQualities and Experience

Staffing Levels

Staffing Mix

Page 17: Managing Relationships-Presentation

17

ADVANTAGES TO PRIME OF COMPETING SUBCONTRACTS

Page 18: Managing Relationships-Presentation

18

Optimum Benefits from Competitive Negotiation

Page 19: Managing Relationships-Presentation

19

Best ValueInvestment Required in Solicitation for Proposals

Complexity of Scope Guides RFP Requirements

Only Ask for What You Are Prepared and Able to Evaluate

Page 20: Managing Relationships-Presentation

20

Entertain Discussions Wherever Appropriate

Timing

Resources

Page 21: Managing Relationships-Presentation

21

Introduction to New CompaniesBetter Deal

Challenge Incumbent Complacency

Resource for Future Needs

Keep Selected Source in Line

Page 22: Managing Relationships-Presentation

22

Learn About Improved MethodsSeek Technical Proposals

Encourage Innovation in Evaluation Factors

Page 23: Managing Relationships-Presentation

23

Helps Ensure Competitive Pricing

Creates Leverage for Acceptance of Favorable Contract Terms

Page 24: Managing Relationships-Presentation

24

DEVELOP EFFECTIVE CONTRACT DOCUMENTS

Page 25: Managing Relationships-Presentation

25

Beware of “Agreements to Agree”

Page 26: Managing Relationships-Presentation

26

Do You Have a Deal (or Only a Lawsuit?)

Memorandum of Understanding

Letter of Intent

Teaming Agreement

Page 27: Managing Relationships-Presentation

27

Get Binding Agreements to Extent Possible

Essential Elements

Scope

Price

Term

Page 28: Managing Relationships-Presentation

28

TimingBefore Committing to Project

Before Agreeing on Price

Before Getting Married

Page 29: Managing Relationships-Presentation

29

Limitations on Promissory Estoppel (Detrimental Reliance)If Required, Make Agreement Subject to Conditions

Objective

Few in Number

Page 30: Managing Relationships-Presentation

30

Subcontractor Protections of Data in Proposal

Prevent Bid Shopping

Page 31: Managing Relationships-Presentation

31

Advance Confidentiality Agreements

Intellectual Property

Technical Data

Pricing

Proprietary and Business Sensitive Information

Page 32: Managing Relationships-Presentation

32

Limited LicenseQuid Pro Quo for Award

Cannot Be Used to Subcontractor’s Disadvantage

Page 33: Managing Relationships-Presentation

33

RemediesInjunction for Actual or Threatened Misappropriation

Damages

Royalties

Page 34: Managing Relationships-Presentation

34

Points Agreed upon Cannot Be Changed during Negotiations

Seat at the Table

Prior Written Authorization to Change

Page 35: Managing Relationships-Presentation

35

Focus on Key Provisions

Page 36: Managing Relationships-Presentation

36

What Are You Going to Do?

How Are You Going to Do It?

Page 37: Managing Relationships-Presentation

37

When and Under What Conditions Are You Going to Get Paid?

Prime Contractor: Pay If Paid

Only What Government Pays

Only If Government Pays

Page 38: Managing Relationships-Presentation

38

Subcontractor: “X” Days after InvoicePrime Must Pay Even If Government Hasn’t (or Won’t)

Not Subject to Problems Caused by Others

Timing

Amounts

Pay When Paid

Page 39: Managing Relationships-Presentation

39

Who Has What Risks?

Page 40: Managing Relationships-Presentation

40

Risk Shifting ProvisionsFlow Down Clause

“Remedy” Granting Clauses

Page 41: Managing Relationships-Presentation

41

DisputesForum

Duty to Proceed

Recovery Limitations

Page 42: Managing Relationships-Presentation

42

Risk Mitigation/ProtectionsInsurance

Indemnity

Bonds or Other Guarantees

Page 43: Managing Relationships-Presentation

43

ABILITYONE CONSIDERATIONS

Page 44: Managing Relationships-Presentation

44

Prime ContractEducate Government Early

Incorporate Protections into Prime Contract

Page 45: Managing Relationships-Presentation

45

Subcontracting Procurement List

Services

Page 46: Managing Relationships-Presentation

46

SPECIAL PROVISIONS FOR ABILITYONE CONTRACTS

Committee JurisdictionPursuant to the Javits-Wagner-O’Day Act, 41 U.S.C. §§46-48c (“JWOD Act”) and implementing regulations, particularly 41 C.F.R. §51,the Subcontracted Services have been set aside on the Procurement List by the Committee for Purchase from People Who Are Blind or Severely Disabled (“Committee”).

Page 47: Managing Relationships-Presentation

47

Notwithstanding anything to the contrary in the Prime Contract, in the Federal Acquisition Regulation, or any other document, the Committee has exclusive and plenary jurisdiction and authority over all aspects of the Subcontracted Services, , including but not limited to scope of work, all issues of performance, pricing, Subcontract terms, Subcontract administration, modifications, and disputes between the Prime Contractor and the Subcontractor with respect to the Subcontracted Services. By way of example and not limitation, the Committee’s jurisdiction and authority over the Subcontracted Services control over and supersede the Prime Contract clauses concerning Changes, Disputes, and Termination.

Page 48: Managing Relationships-Presentation

48

Further in this regard, all price and price-related terms of the Subcontracted Services are subject to Committee review and approval on the following intervals: (1) for the initial performance period; (2) no less than annually thereafter; and (3) as requested by the Subcontractor. Any Committee-approved price change or economic adjustment to the Subcontracted Services shall be reflected in an amendment to this Subcontract, to be effective upon a date designated by the Committee.

Page 49: Managing Relationships-Presentation

49

AbilityOne ProgramThe Subcontractor is a qualified and participating non-profit agency within the meaning of the JWOD Act, implementing regulations, policies, and procedures, and in accordance with the requirements of the Committee and of NISH, including the AbilityOne Program.

Page 50: Managing Relationships-Presentation

50

The Contractor acknowledges and agrees that the Subcontractor has the responsibility and decision-making authority for ensuring that the requirements of the AbilityOne Program are met and that purposes and intent of the AbilityOne Program are satisfied with regard to performance of Subcontracted Services

Page 51: Managing Relationships-Presentation

51

Both parties agree to endeavor to create a harmonious work environment and cooperation among their respective employees and Subcontractor’s AbilityOne Workers.

Page 52: Managing Relationships-Presentation

52

“AbilityOne Workers”“AbilityOne Workers” are persons employed by the Subcontractor who meet the following criteria:

Have a documented disability within the meaning of applicable federal and state law, including but not limited to the JWOD Act and implementing regulations, policies, and guidelines;

Page 53: Managing Relationships-Presentation

53

Are considered participants of the Community Rehabilitative Program/ AbilityOne Program receiving services under such programs from the Subcontractor;

Are employed at the job site in a rehabilitative environment for rehabilitative purposes; and

May be employed under special certificates issued by the U.S. Department of Labor, Wage and Hour Division.

Page 54: Managing Relationships-Presentation

54

It is the intention and understanding of the parties to this Subcontract that (i) Subcontractor’s AbilityOne Workers will be employed and will work at the site of performance of Subcontracted Services under conditions which are primarily rehabilitative; (ii) Subcontractor will provide on-site supervisors to oversee the work of AbilityOne Workers and will provide other counseling and rehabilitative services in accordance with the AbilityOne Program and Subcontractor’s standard services; and (iii) Subcontractor may apply productivity and other permissible standards to AbilityOne Workers in accordance with subminimum wage requirements of the Department of Labor and as otherwise permitted by law.

Page 55: Managing Relationships-Presentation

55

Notwithstanding anything to the contrary in the Prime Contract or elsewhere, the Subcontractor shall have control over and full decision-making authority to all matters pertaining to or affecting AbilityOne Workers, subject to Committee jurisdiction and approval, including but not limited to employment, training, counseling, rehabilitative services, placement, work assignment, staffing levels and ratios, conflict or grievance procedures, discipline, and payments concerning AbilityOne Workers.

Page 56: Managing Relationships-Presentation

56

Modifications of Procurement List Services Subject to Committee Approval

The Contractor may not, without the Subcontractor’s prior written consent, make any modification to Subcontracted Services or execute or agree to any amendment, modification, or alteration of the Prime Contract which affects the Subcontracted Services, including but not limited to scope of services, statement of work, description of services to be performed, times or duration of performance, frequency of performance, place of performance, manner or method of performance, or in any other respect which makes the Subcontractor’s performance of Subcontracted Services more costly, more difficult, more time-consuming, or less efficient or which adversely affects the revenue or profitability derived by the Subcontractor from performance of Subcontracted Services.

Page 57: Managing Relationships-Presentation

57

The Prime Contractor shall equitably adjust the Subcontract price for all modifications to Subcontracted Services, including any increases in Subcontractor’s cost of performance, together with reasonable allowances for markup.

The substance, provisions, and pricing of any modification are subject to Committee approval.

Conditions on Amendments

This Subcontract sets forth the entire and integrated agreement and understanding between the parties hereto, and supersedes any prior and contemporaneous understandings and agreements, whether written or oral with respect to the subject matter herein. The terms and conditions of this Subcontract may be amended only (a) by written instrument executed by both parties hereto or (b) by direction of the Committee.

Page 58: Managing Relationships-Presentation

58

Restriction on Adverse ActionThe Contractor may not assert or take a deduction, withhold or reduce payments due the Subcontractor hereunder, or take any other action adverse to Subcontractor with respect to Subcontracted Services (“Adverse Action”) except (i) to the extent the Government has taken Adverse Action against the Contractor for which the Subcontractor is at fault, (ii) before such Adverse Action is taken, the Subcontractor had been given sufficient advance notice and reasonable opportunity to cure any alleged deficiency in Subcontracted Services giving rise to the Adverse Action, and (iii) the Committee approves the Adverse Action. Subcontractor shall not be liable to Contractor for delays or other problems in performance of Subcontracted Services which are occasioned by causes beyond Subcontractor’s reasonable control and without its negligence, including but not limited to acts of God, acts of a public authority in its sovereign capacity, or any other matters of force majeure.

Page 59: Managing Relationships-Presentation

59

Contractor and Subcontractor shall immediately report in writing to the other party any problems which could prevent it from performing its respective work in accordance with the requirements of this Subcontract. At a minimum, the report shall identify the problem, its potential impact on performance, proposed methods to remedy the problem, and when the proposed method is expected to remedy the problem. However, the reporting of problems shall not absolve the responsible party from complying with its obligations under this Subcontract.

Page 60: Managing Relationships-Presentation

60

The Contractor and Subcontractor shall keep each other timely informed of substantive communications with the Government pertaining to or affecting Subcontracted Services. Neither party shall make any response or commitment to the Government on any matter which affects the other party's performance without first obtaining the other party's consent.

Page 61: Managing Relationships-Presentation

61

Limitations on Incorporation by Reference

This Subcontract incorporates by reference the terms and conditions of the Prime Contract between the Government and Contractor, insofar as is applicable to the Subcontracted Services, except that (a) nothing in the Prime Contract shall limit, supersede, or nullify Committee jurisdiction and (b) this Subcontract controls over any conflict, discrepancy, or inconsistency between the Prime Contract and the Subcontract.

Page 62: Managing Relationships-Presentation

62

With respect to Subcontracted Services, Subcontractor assumes toward Contractor all the rights and obligations which, under the Prime Contract, Contractor assumes toward the Government, and Contractor assumes toward Subcontractor all the rights and obligations which, under the Prime Contract, the Government assumes toward Contractor, unless otherwise provided in this Subcontract and except to the extent of the Committee’s jurisdiction.

Page 63: Managing Relationships-Presentation

63

Special Disputes ProceduresAny claim, disagreement, assertion of right, matter of controversy, or dispute (collectively “dispute”) arising under, relating to, or existing with respect to this Subcontract or to the Subcontracted Services shall be resolved by the Contractor and Subcontractor as provided in this paragraph.

Page 64: Managing Relationships-Presentation

64

Contractor and Subcontractor agree to use their best efforts to resolve any dispute following these principles: (i) consistent with the intent of this Subcontract, (ii) at the lowest level of organization or management, (iii) as expeditiously as circumstances allow, (iv) as fairly as possible, (v) avoiding undue prejudice to the rights or interests of the other party, and (vi) minimizing damages to the maximum extent reasonable.

Page 65: Managing Relationships-Presentation

65

Contractor and Subcontractor agree that disputes should be resolved whenever possible at the project level and should therefore first be submitted to the parties’ most senior on-site representatives. If the dispute cannot be resolved at the project level, then either party may request that the dispute be presented to the chief executive officers of the respective parties for resolution. If the chief executive officers are unable to resolve the dispute within five business days after submission to them or as otherwise mutually agreed, either party may seek determination by the Committee, in accordance with the procedure prescribed in 41 CFR 51-6.15, for disputes between contracting activities and non-profit agencies, of any dispute which involves or affects Subcontracted Services, and such determination shall be final and binding upon both Contractor and Subcontractor. If the Committee determines it does not have jurisdiction over the dispute, either party may seek redress of the dispute by filing an action but only in a court of competent jurisdiction located in the [Name of State].

Page 66: Managing Relationships-Presentation

66

Both parties shall continue performance of their respective obligations pursuant to this Subcontract during the pendency of any dispute, with the exception that if Contractor fails to pay Subcontractor without justification amounts as and when due under this Subcontract, Subcontractor has the right (but not the obligation) to suspend its performance until such time as such payments are made, provided Subcontractor delivers written notice of the proposed suspension at least 5 days in advance of the date of suspension.

Page 67: Managing Relationships-Presentation

67

Nothing in this Subcontract shall limit the authority of the Committee (or NISH as the Committee’s authorized agent) to take actions regarding disputes between the Contractor and Subcontractor to ensure proper performance of Subcontracted Services and preservation of the Subcontract.

Page 68: Managing Relationships-Presentation

68

Limitation on Forum Selection Clause

This Subcontract shall be construed and governed in accordance with the laws of the [Name of State], excluding its choice of law rules, and in accordance with the Federal Government contracting law, including the authority of the Committee, as appropriate.

Page 69: Managing Relationships-Presentation

69

APPRECIATE LIMITATIONS ON AUTHORITY

Page 70: Managing Relationships-Presentation

70

Contracting OfficerAll Powerful

Page 71: Managing Relationships-Presentation

71

Sole AuthorityChangesSuspension of WorkStop WorkTerminations

ConvenienceDefault

Page 72: Managing Relationships-Presentation

72

Warrant LimitationsSubject to Availability of Funds

Anti-Deficiency Act

Appropriation Data on Documents

Page 73: Managing Relationships-Presentation

73

Contracting Officer’s Representative

Authority Limited by Letter of Appointment

Scope of Authority Specified

What COR Can Order

Dollar Limit

Page 74: Managing Relationships-Presentation

74

Commanders, Technical Advisors, Inspectors

Tend to Want to Run the Show

No Authority to Go Outside Contract

Page 75: Managing Relationships-Presentation

75

Maintain Positive, Regular Communications During Performance

Make “Marriage” WorkWork on Relationship

Page 76: Managing Relationships-Presentation

76

Hallmarks of Good RelationshipCandor

Trust

Mutual Respect

Politeness

Page 77: Managing Relationships-Presentation

77

Cooperation

Positive Attitude

“Collegeality”

Page 78: Managing Relationships-Presentation

78

Partnering Principles

Goals Are the Same

Efficient Performance

Good Results

Minimum Problems

Page 79: Managing Relationships-Presentation

79

Problems Are Inevitable

Strike Quickly

Lowest Levels First

Elevate as Needed

Page 80: Managing Relationships-Presentation

80

Inherent Government Limitations

Authority

Notice Requirements

Lesson: Pick Your Spots

Page 81: Managing Relationships-Presentation

81

No Surprises!

Page 82: Managing Relationships-Presentation

82

Trust, But Verify (Ronald Reagan)

Page 83: Managing Relationships-Presentation

83

Nip It in the Bud (Barney Fife)Problems Seldom Get Better Over Time

Page 84: Managing Relationships-Presentation

84

Early Recognition Systems

Develop Disclosure Culture

Performance Problems

Dividends for Ethics Problems

Page 85: Managing Relationships-Presentation

85

Quality Assurance Inspections

Frequent Meetings

Open Dialogue with Upstream and Downstream Partners

Page 86: Managing Relationships-Presentation

86

Deal with Problems Promptly and Effectively

Solve Problems Rather than Fix Blame

Cure Causes as Well as Symptoms

Devote Appropriate Resources

Follow the Contract

Page 87: Managing Relationships-Presentation

87

Art of Giving Effective Notice

Factual

Timely

Compliance with Contract

“I expect you to pay for it”

Page 88: Managing Relationships-Presentation

88

Top-Down Commitment

If Top Management Does Not Believe in It, Success Is Unlikely

Make Employee Acceptance a Priority

Page 89: Managing Relationships-Presentation

SESSION TITLE: Relationships

SESSION CODE: CRP-W1045

Session Evaluation Information