MANAGING DIRECTOR, KPTCL

21
MANAGING DIRECTOR, KPTCL SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOMES

description

POWER GRID CORPORATION OF INDIA LIMITED. SOUTHERN REGIONAL LOAD DESPATCH CENTRE. WELCOMES. MANAGING DIRECTOR, KPTCL. SR STATES – POWER SYSTEM STATISTICS. KARNATAKA INSTALLED CAPACITY – 5857 MW MAX DEMAND MET – 5445 MW DAILY CONSUMPTION MAX – 107 MU DAILY CONSUMPTION AVG – 84 MU - PowerPoint PPT Presentation

Transcript of MANAGING DIRECTOR, KPTCL

MANAGING DIRECTOR, KPTCL

SOUTHERN REGIONAL LOAD DESPATCH CENTRE

POWER GRID CORPORATION OF INDIA LIMITED

WELCOMES

SR STATES – POWER SYSTEM STATISTICSANDHRA PRADESH

INSTALLED CAPACITY – 9531 MW

MAX DEMAND MET – 7441 MW

DAILY CONSUMPTION MAX – 166 MU

DAILY CONSUMPTION AVG – 130 MU

CONSUMER PROFILE –

DOM INDU AGRI COMML OTHERS

22% 29% 34% 5% 10% .

KARNATAKAINSTALLED CAPACITY – 5857 MW

MAX DEMAND MET – 5445 MW

DAILY CONSUMPTION MAX – 107 MU

DAILY CONSUMPTION AVG – 84 MU

CONSUMER PROFILE –

DOM INDU AGRI COMML OTHERS

37% 26% 33% 3% 1% .

KERALAINSTALLED CAPACITY – 2617 MW

MAX DEMAND MET – 2426 MW

DAILY CONSUMPTION MAX – 39 MU

DAILY CONSUMPTION AVG – 34 MU

CONSUMER PROFILE –

DOM INDU AGRI COMML

76% 2% 6% 16%.

TAMIL NADUINSTALLED CAPACITY – 7074 MW

MAX DEMAND MET – 7228 MW

DAILY CONSUMPTION MAX – 147 MU

DAILY CONSUMPTION AVG – 126 MU

CONSUMER PROFILE –

DOM INDU AGRI COMML OTHERS

21% 33% 27% 9% 10% .

INSTALLED CAPACITY IN SR

STATES HYDRO THERMAL NUCLEARDIESEL/

GAS WIND OTHERS TOTAL %

AP 3586 2993   272 2   6853 21%

KAR 3166 1470   128 5   4769 15%

KER 1808     235     2043 6%

TN 1996 3570   423 19   6008 19%

C.S   6990 830 360     8180 26%

IPP 229 794 0 2432 245 377 4078 13%

TOTAL 10785 15817 830 3851 271 377 31931  

% 34% 50% 3% 12% 1% 1%    

The above capacity does not includes

--- About 1344 MW of Wind Mill Capacity in Tamil Nadu.

--- Micro and Captive plants in different states.

OVER VIEW

CONSUMPTION PATTERN

HYDRO GENERATION

SCHEDULE VS DRAWAL PATTERN

LOAD CURVE

UTILISATION OF IPP’S TABLE

SCHEDULE Vs DRAWAL

LOAD PATTERN

0

500

1000

1500

2000

2500

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

TIME ---->

IN M

W -

--->

HYDRO PURCHASES ISGS

0

1000

2000

3000

4000

5000

6000

7000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

TIME ---->

IN M

W -

--->

HYDRO PURCHASES THERMAL ISGS

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

TIME ---->

IN M

W -

--->

HYDRO PURCHASES THERMAL ISGS

0

1000

2000

3000

4000

5000

6000

7000

8000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

TIME ---->

IN M

W --

-->

HYDRO PURCHASES THERMAL ISGS

1400

1500

1600

1700

1800

1900

2000

2100

00:1

5

01:1

5

02:1

5

03:1

5

04:1

5

05:1

5

06:1

5

07:1

5

08:1

5

09:1

5

10:1

5

11:1

5

12:1

5

13:1

5

14:1

5

15:1

5

16:1

5

17:1

5

18:1

5

19:1

5

20:1

5

21:1

5

22:1

5

23:1

5

TIME --->

DC

, SC

HE

DU

LE

& A

CT

UA

L (

MW

)

49.0

49.5

50.0

50.5

51.0

51.5

52.0

52.5

FR

EQ

UE

NC

Y IN

HZ

---

>

Declared Capacity Schedule Actual Frequency

Schedule Vs Injection by NTPC, Ramagundam

Declared Capacity ά Capacity

ChargesSchedule ά

Energy Charges

Actual Injection

Frequency

U I

THE COST OF GENERATION AT SHARAVATHY IS LESS THAN 20 Ps /UNIT

AVERAGE SELLING UI RATE OF KARNATAKA IS 372 Ps/UNIT

PLANT OPERATORS AT SHARAVATHY THINK OF THE RESERVOIR LEVEL IN RUPEES

RATHER THAN IN FEET!!!

Rs. Rs.

Rs.

Rs.

Rs.

Rs.Rs.

Rs.

Rs.

Rs.

Rs.

Rs.

Rs.

Rs.

Rs.Rs.

OPTIMAL RESERVOIR UTILISATIONSHARAVATHY IN KARNATAKA

0

100

200

300

400

500

600

700

800

900

1000

0 2 4 6 8 10 12 14 16 18 20 22 0

HOURS ---->

GE

NE

RA

TIO

N IN

MW

---

>

48.80

49.00

49.20

49.40

49.60

49.80

50.00

50.20

50.40

FR

EQ

IN H

Z--

->

SHARAVATHI GENERATION – TYPICAL DAY

FREQ

MW

ENTITLEMENT OF KARNATAKA FROM ISGS

Station Name Entitlement (MW)

NTPC,Ramagundam 417

Neyveli TPS 2 Stage 1 145

Neyveli TPS 2 Stage 2 196

Neyveli TPS 1 (Exp) 114

Madras APS 26

Kaiga GS 132

Talcher Stage 2 360

Total 1390

WR ER

Net Energy Transaction

82 MU

IMPORT BY SR

707 MU

IMPORT BY SR

Amount Due to

SR Constituents

Rs. 36.07 Cr. Rs. 2.36 Cr.

Amount Credited TO SR

Constituents

Rs. 36.07 Cr. Rs. 2.36 Cr.

INTER-REGIONAL EXCHANGES DETAILS UPTO 105 WKS (Till 26.12.04)

OD UD & UI RATE OF CONSTITUENTS

247

180 177

228198

372

260

148

050

100150200250300350400450

AP KAR KER TN

RA

TE (P

AIS

A/U

NIT

)

OVER DRAWAL (PURCHASED) UNDER DRAWAL (SOLD)

3704 MU

52 MU

6 MU

82MU

459 MU

3325MU

1170MU

1357 MU

0

1

2

3

4

5

6

7

8

9

10N

UM

BE

R O

F D

IST

UR

BA

NC

ES

---

----

->

1994

-95

1995

-96

1996

-97

1997

-98

1998

-99

1999

-00

2000

-01

2001

-02

2002

-03

2003

-04

2004

-05

YEAR ->

MAJOR MINOR

NO DISTURBANCES DESPITE LOSING ENTIRE SUPER GENERATING PLANTS LIKE

RAMAGUNDAM,VIJAYAWADA,KOTHAGUDEM, NORTH CHENNAI, SHARAVATHY ETC

MAJOR AND MINOR DISTURBANCES SINCE 1994

-200

0

200

400

600

800

1000

1200

1400

00:1

5

01:1

5

02:1

5

03:1

5

04:1

5

05:1

5

06:1

5

07:1

5

08:1

5

09:1

5

10:1

5

11:1

5

12:1

5

13:1

5

14:1

5

15:1

5

16:1

5

17:1

5

18:1

5

19:1

5

20:1

5

21:1

5

22:1

5

23:1

5

TIME --->

DC

, SC

HE

DU

LE

& A

CT

UA

L (

MW

)

49.0

49.3

49.6

49.9

50.2

50.5

50.8

51.1

51.4

FR

EQ

UE

NC

Y IN

HZ

---

>

Entitlement Schedule Actual Frequency

Schedule Vs Actual Drawal by AP

Entitlement ά

Capacity Charges

Schedule ά

Energy Charges

Actual Drawal

Frequency

U I

0

500

1000

1500

2000

2500

00:1

5

01:1

5

02:1

5

03:1

5

04:1

5

05:1

5

06:1

5

07:1

5

08:1

5

09:1

5

10:1

5

11:1

5

12:1

5

13:1

5

14:1

5

15:1

5

16:1

5

17:1

5

18:1

5

19:1

5

20:1

5

21:1

5

22:1

5

23:1

5

TIME --->

DC

, SC

HE

DU

LE

& A

CT

UA

L (

MW

)

49.0

49.5

50.0

50.5

51.0

51.5

FR

EQ

UE

NC

Y IN

HZ

---

>

Entitlement Schedule Actual Frequency

Schedule Vs Actual Drawal by KAR

Entitlement ά

Capacity Charges

Schedule ά

Energy Charges

Actual Drawal

Frequency

U I

0

100

200

300

400

500

600

700

800

900

00:1

5

01:1

5

02:1

5

03:1

5

04:1

5

05:1

5

06:1

5

07:1

5

08:1

5

09:1

5

10:1

5

11:1

5

12:1

5

13:1

5

14:1

5

15:1

5

16:1

5

17:1

5

18:1

5

19:1

5

20:1

5

21:1

5

22:1

5

23:1

5

TIME --->

DC

, SC

HE

DU

LE

& A

CT

UA

L (

MW

)

49.0

49.5

50.0

50.5

51.0

51.5

FR

EQ

UE

NC

Y IN

HZ

---

>

Entitlement Schedule Actual Frequency

Schedule Vs Actual Drawal by KER

Entitlement ά

Capacity Charges

Schedule ά

Energy Charges

Actual Drawal

Frequency

U I

1000

1200

1400

1600

1800

2000

2200

2400

00:1

5

01:1

5

02:1

5

03:1

5

04:1

5

05:1

5

06:1

5

07:1

5

08:1

5

09:1

5

10:1

5

11:1

5

12:1

5

13:1

5

14:1

5

15:1

5

16:1

5

17:1

5

18:1

5

19:1

5

20:1

5

21:1

5

22:1

5

23:1

5

TIME --->

DC

, SC

HE

DU

LE

& A

CT

UA

L (

MW

)

49.0

49.3

49.6

49.9

50.2

50.5

50.8

51.1

51.4

FR

EQ

UE

NC

Y IN

HZ

---

>

Entitlement Schedule Actual Frequency

Schedule Vs Actual Drawal by TN

Entitlement ά

Capacity Charges

Schedule ά

Energy Charges

Actual Drawal

Frequency

U I

0

1000

2000

3000

4000

5000

6000

7000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

TIME ---->

IN M

W -

--->

HYDRO PURCHASES THERMAL ISGS

LOAD PATTERN OF ANDHARA PRADESH

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

TIME ---->

IN M

W -

--->

HYDRO PURCHASES THERMAL ISGS

LOAD PATTERN OF KARNATAKA

0

500

1000

1500

2000

2500

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

TIME ---->

IN M

W -

--->

HYDRO PURCHASES ISGS

LOAD PATTERN OF KERALA

0

1000

2000

3000

4000

5000

6000

7000

8000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

TIME ---->

IN M

W -

--->

HYDRO PURCHASES THERMAL ISGS

LOAD PATTERN OF TAMIL NADU