Management review Phoenix Branch 711 February 12, 2010.
-
Upload
skylar-pyatt -
Category
Documents
-
view
218 -
download
1
Transcript of Management review Phoenix Branch 711 February 12, 2010.
![Page 1: Management review Phoenix Branch 711 February 12, 2010.](https://reader035.fdocuments.us/reader035/viewer/2022062511/5516904e550346f6208b466b/html5/thumbnails/1.jpg)
Management review
Phoenix Branch 711
February 12, 2010
![Page 2: Management review Phoenix Branch 711 February 12, 2010.](https://reader035.fdocuments.us/reader035/viewer/2022062511/5516904e550346f6208b466b/html5/thumbnails/2.jpg)
Results of Audits
• WE HAD NO AUDITS IN JANUARY
• Prior ISO audit that was done on our location we scored an 80 we have dramatically improved this total but we need to stay on coarse.
![Page 3: Management review Phoenix Branch 711 February 12, 2010.](https://reader035.fdocuments.us/reader035/viewer/2022062511/5516904e550346f6208b466b/html5/thumbnails/3.jpg)
CUSTOMER FEEDBACK
• Out of 89 sent out we have only got 6 back
• All gave us high marks over all
• We need to have more contact with customer feedback starting at job site and person to person
![Page 4: Management review Phoenix Branch 711 February 12, 2010.](https://reader035.fdocuments.us/reader035/viewer/2022062511/5516904e550346f6208b466b/html5/thumbnails/4.jpg)
Supplier Performance &Conformity
• This month no problems
![Page 5: Management review Phoenix Branch 711 February 12, 2010.](https://reader035.fdocuments.us/reader035/viewer/2022062511/5516904e550346f6208b466b/html5/thumbnails/5.jpg)
Measurable Objectives
• We are below bench mark and on target great work everybody
Measurable Objective - Start Oct 09
0
20
40
60
80
100
120
AUG 09
SEP 09
OCT 09
NOV 09
DEC 09
JAN 10
FEB 10
MAR 10
APR 10
MAY 10
JUNE 10
JULY 10
Months
Qu
an
tity
RESULTS TARGET
BENCH MARK
![Page 6: Management review Phoenix Branch 711 February 12, 2010.](https://reader035.fdocuments.us/reader035/viewer/2022062511/5516904e550346f6208b466b/html5/thumbnails/6.jpg)
Key PERFORMANCE INDICATORS
• REVIEW MEASURABLE OBJECTIVE• REVIEW INCIDENT REPORTS • REVIEW SAFETY ISSUES
![Page 7: Management review Phoenix Branch 711 February 12, 2010.](https://reader035.fdocuments.us/reader035/viewer/2022062511/5516904e550346f6208b466b/html5/thumbnails/7.jpg)
Corrective Actions /Incident Reporting
• WE ONLY HAD ONE REPORT ALL MONTH?• Ether this is great or there is not enough
participation in reporting
C-OO7-711 CANYON PIPE :Customer stated we fabricated incorrectly a F x F wrong length.
Upon investigation it was fabed correctly length checked with certified tape.
![Page 8: Management review Phoenix Branch 711 February 12, 2010.](https://reader035.fdocuments.us/reader035/viewer/2022062511/5516904e550346f6208b466b/html5/thumbnails/8.jpg)
Training & Resource Needs
• All associates need additional training in regard to ISO standards.
• All managers need to periodically quiz associates on ISO standards
![Page 9: Management review Phoenix Branch 711 February 12, 2010.](https://reader035.fdocuments.us/reader035/viewer/2022062511/5516904e550346f6208b466b/html5/thumbnails/9.jpg)
Quality Management System
• The house has had a change and a congratulations to be sent out.• Brian Strauch is now the regional operations manager for 1 & 2
regions• Danny Garcia is now the branch manager
![Page 10: Management review Phoenix Branch 711 February 12, 2010.](https://reader035.fdocuments.us/reader035/viewer/2022062511/5516904e550346f6208b466b/html5/thumbnails/10.jpg)
Opportunities for Improvement
• As we all know it has been slow with this slow down comes extra time to change things and improve things. Like change those racks move those cabinets the list goes on lets start a list.
•