Management Portfolio the Amazon Fund Report AMA/DEFAM · BNDES Portfolio Report December 31, 2010...
Transcript of Management Portfolio the Amazon Fund Report AMA/DEFAM · BNDES Portfolio Report December 31, 2010...
RR (1)
www.amazonfund.gov.br
Territorial Scope of the Projects(quantity)
TO (2)
RO (3)
AM (12)
MT (7)
AC (2)
PA (30)
SeveralAmazonStates (15)
Number of Projects
Total: 72 projects
Under AnalisysLevels 3 + 4
25 (36%)
ApprovedLevels 1 + 2 13 (17%)
Submitted Levels 5 + 6
33 (47%)
*Overview of the projects submitted to the Amazon Fund
In perspective (level 6):
Consultation-Letter (level 5):
Eligible (level 4):
Under analysis (level 3):
Approved (level 2):
Contracted (level 1):
First level to register the protocoled receipt of a Previous Consultation until all documentation needed for assessment of eligibility is made available.
Projects in perspective are promoted to this operational level when the Priorities Department of the Planning Division of the BNDES (DEPRI/AP) considers that all documentation needed for assessment of eligibility is available.
The project reaches this level when the Eligibility and Credit Committee of the BNDES (CEC) understands that the Previous Consultation is in accordance with the operational policies of the BNDES and with the guidelines and criteria of the Amazon Fund. At this level, the beneficiary must supply additional detailed information on the project.
At this stage, the Management Department of the Amazon Fund of the Environment Division (DEFAM/AMA) begins the detailed analysis of the entire project.
Once the analysis is completed, the DEFAM/AMA forwards the technical recommendation for financial support for the project to the BNDES’ Board of Directors. Once approved, the applicant is requested to send the additional documentation required for contracting.
Once the contract has been signed, the project begins its operational phase. According to the terms of the signed contract, disbursements of the resources are made in installments, according to the physical-financial timetables agreed upon and the progress of the project, of which evidence will be made available through technical monitoring carried out by the BNDES/ Amazon Fund team.
Operational LevelsInternal Flow of the Projects - BNDES
Management Department of the Amazon Fund AMA/DEFAM
PortfolioReport
December 31, 2010
RR (1%)TO (4%)
RO (8%)
AM (14%)
MT (11%)
AC (9%)
PA (19%)
Several Amazon States (35%)
Distribution of Requested Value by State
Municipal PublicAdministration (22%)
Legal Nature of the Applicants
Private Company (1%)State Owned Company/Mixed Cap.
Company (3%)
Federal PublicAdministration
(11%)
State PublicAdministration
(18%)
Third Sector (38%)
Others (7%)
* D
ata
extr
acte
d fro
m t
he o
pera
tional in
form
ation s
yste
m o
f th
e B
ND
ES (
OPE)
Operational Modalities - BNDES
F PA :
SPA:
S& T :
ID:
Fo r e s t s a nd P r o t e c t e d A r e a s
(Environmental Management and Services).
Sustainable Production Activities.
S c i e n t i f i c a nd Te chno l o g i c a l
Development applied to the sustainable use of
biodiversity.
Institutional Development and enhancing
of control mechanisms.
CommentsA project may include several efforts. Each one can be related to a different Area of Activity
or Operational Modality. Thus, the sum of the number of projects per area or operational
modality may deviate from the total of projects in the portfolio.
Areas of Activity
I
II
III
IV
V
VI
VII
Management of public forests and protected
areas;
Control, monitoring and environmental
inspection;
Sustainable forest management;
Economic activities developed through the
sustainable use of the forest;
Ecological and economic zoning, land-use
planning and land-title regularization;
Conservation and sustainable use of
biodiversity;
Recovery of deforested areas.
Level
1 - Contracted
2 - Approved
3 - Under Analysis
4 - Eligible
5 - Consultation Letter
6 - In Perspective
Sum of the levels 1, 2, 3 & 4
Totals
Amount of the Support/Requested
(in US$ thousand)
99.785
13.932
33.498
277.857
499.345
58.714
162.773
15.558
Total Value of the Projects
(in US$ thousand)
199.272
31.066
38.816
307.026
669.141
75.419
286.697
17.542
*Distribution per Operational Levels - BNDES
* The exchange rate is calculated and published by Central Bank of Brazil on www.bcb.gov.br
Number of Projects
5
8
16
30
72
3
39
10
BNDES December 31, 2010Portfolio Report
Number of projects per Area of ActivityDecree No. 6,527/2008
I II III IV V VI VII
0
10
20
30
40
50
Number of projects per Operational Modality - BNDES
FPA SPA S&T ID
30
25
20
15
10
5
0
35
40