The Client
The client is a large Asian steel manufacturing organization with vertically
integrated facilities across India and North America.
Managed Sourcing Servicesfor Global Metals andMining Company
OVERVIEW
Industry: Steel Manufacturing Industry
Geographies: India and North America
Solutions:
- Strategic cost management visioning,
- Spend analytics
- Cross functional specification, sourcing and
management
- Closed loops spend control and command
center
Results:
- Improved capability of client cross functional
team
- Delivered Tangible savings
Managing Experience Case Study | Outsourcing | Steel Manufacturing Industry
Business ChallengeThe client acquired a large cold rolling mill to service the strategic market
of North America. However, the company acquired had issues with its
cash flow and higher operations cost. As part of overall turnaround plan,
the client required to identify a potential approach for improving the
existing cost portfolio and Aegis was selected to identify, recommend
and implement cost savings for its existing materials and services spend
of USD 300 million.
Solutions Delivered by AegisAegis worked with the group Chief Financial Officer (CFO) and Chief
Procurement Officer (CPO) to drive the key program steps as under:
- Strategic cost management visioning workshop: Through a
structured and agile method driven approach Aegis conducted a brief
visioning workshop facilitated by the CFO / CPO and involving all the
key stakeholders to create a unified and aligned understanding of the
program and the expected cross functional responsibilities from each
department
- Spend analytics and category level business project definition:
Aegis team deployed its comprehensive spend analytics expertise that
analyzed the existing organizational spend by conducting a cross
dimensional analytical cube using advanced tools based on Cognos /
Ariba / SAP / Excel functionality consisting of the client’s purchase
order, contracts, invoice, supplier, inventory and demand data. The
team then defined a set of key project / improvement hypothesis by
leveraging these analytics with the existing category level data
intelligence available with Aegis through its supplier cost database and
global market intelligence efforts.
2
Managing Experience Case Study | Outsourcing | Steel Manufacturing Industry
- Cross functional specification, demand alignment, supplier and
price discovery: Based on the identified projects, Aegis team identified
a phased implementation plan as shown in Figure 1: Representative
Project Configuration. For each of the projects, a cross functional team
was then established with the Aegis lead facilitating implementation with
support from client’s operations, finance, procurement, legal and supply
chain teams. Aegis team delivered a rationalized specification, the target
demand, list of key suppliers and the target market negotiation strategy
using it’s structured “Should be’ cost modeling technique.
- Strategic sourcing and RFx management: Having defined the key
requirements and the target potential to save costs, Aegis then led an
eSourcing phase where it managed the complete RFx cycle, supported
client through both online and offline negotiations and helped arrive at
the new target price of acquisition thereby delivering the identified
savings.
- Closed loops spend control and command center: For the savings
identified, Aegis team then coordinated with the clients cross functional
team the new contract and setup the contract in the underlying contract
management systems including SAP material module, SAP master data
management module. Further, the Aegis team deployed and managed a
quarter end reconciliation process to ascertain compliance to the new
contract and realization of the defined benefits to the client.
3
Managing Experience Case Study | Outsourcing | Steel Manufacturing Industry
FacilitiesManagement
ComputerTravel
Consumable Telecom
Marketing &Advertising
Building &Grounds
OSHC
Insurance
NonCAPEX
CAPEX
Fees
Retail
Lease
SWLicenses
Stationery
Postage&
Freight
MyExpense
Printing
Catering &Entertainment
Wave 2
Wave 3
Wave 1
Non Criitical
High
High
Low
Low Market / Supplier Complexity (Diversity / Perference / Change)
Busi
ness
Impa
ct (%
of t
otal
Spe
nd)
Bottlenecks
Leverage Strategic
Electricity &Gas
Figure 1: Representative Project Configuration
Key Results and BenefitsAegis delivered the following key benefits to the client:
- Improved the capability of the client cross functional team: Aegis
team ensured that through the duration of the program, the involved
client team members are adequately trained on the new methodologies,
tools and the processes to ensure that these team members can
support the process in a sustainable manner post Aegis’ exit
- Delivered tangible savings: Aegis team helped clients to reduce
sourcing and procurement costs in the range of 11-15% though cross
functional approach outlined above. Indicative savings delivered are as
per Figure 2
Figure 2: Commodity wise Savings Matrix
4
Managing Experience
Material Commodity Name ProjectStart Date
ProjectFinish Date
Spend2010-11USD Mn Total
Savingas % SpendAddressed
Fluids / Gases / Equip. Pipe / Fittings / Spools / 10 Nov’11 1 Dec’11 $ 1.56 18% Tube / Tube Fittings
Packing / Seals / Brgs. Bearings, Busing, 22 Nov’11 22 Dec’11 $ 3.34 11% Acessories Flangs
Material Handling Rigging / Wire Rope 1 Nov’11 28 Nov’11 $ 1.37 9%
Material Handling Fasteners Bolts, Nuts 1 Nov’11 25 Jan’12 $ 0.94 18% Screw etc.
Transportation Wheels / Tires 29 Jan’11 2 Sep’11 $ 2.85 3%
Travel Services Travel Tickets 27 Jan’11 7 Sep’11 $ 0.20 33%
Tools Abrasives 22 Nov’11 23 Dec’11 $ 0.94 5%
Tools Drill / Mill / Bore / Turn 15 Dec’12 30 Mar’12 $ 1.36 17%
Mech. Power Trans. U-joints / Drive Shaft/ 20 Jan’12 29 Mar’12 $ 3.90 8% Pulley etc.
Fluids / Gases / Equip. Water Treatment 5 Mar’11 13 Apr’12 $ 3.00 23% Chemicals
Fluids / Gases / Equip. Filtration 10 Nov’11 1 Dec’11 $ 1.04 13%
Safety / Medical / Lab Clothing, Safety Supply 22 Nov’11 22 Dec’11 $ 2.80 14%
Bldg / Fabricatng Matl Metal Stock / Structural 1 Dec’11 10 Feb’12 $ 2.72 9% Steel
Elec Ctrl Components Transformers - New 10 Feb’12 20 Apr’12 $ 1.02 19%
Elec Ctrl Components Six Categories of 20 Jan’12 28 Mar’12 $ 0.90 11% Electrical Item
Packing, Seals, Gaskets Packing, Seals, 3 Feb’12 8 May’12 $ 1.11 18% Gaskets, Ring
Fluids / Gases / Equip. House / Hose Assemblies 5 Apr’12 18 May’12 $ 1.12 9%
Fluids / Gases / Equip. Valves Complete 1 Mar’12 10 May’12 $ 2.49 9%
Case Study | Outsourcing | Steel Manufacturing Industry
- Reduced risks and improved process efficiency: A positive by
product of the Aegis approach was to assist the clients in improving
the overall process efficiency / risks by increasing the number of
categories being managed through contracts (reduced maverick /
adhoc buying). These led to less operational efforts involved in
managing procurement transactions and improved the overall contract
coverage and compliance.
About AegisAegis is a global outsourcing and technology company committed to
impacting clients’ business outcomes by focusing on enhancing
customer experience across all touch points and channels. Aegis was
founded 30 years ago in the US and now has operations in 56 locations
across 13 countries with more than 55,000 employees. Aegis services
over 300 clients from verticals such as Banking and Financial Services,
Insurance, Technology, Telecom, Healthcare, Travel & Hospitality,
Consumer Goods, Retail, and Energy & Utilities. The company is wholly
owned by the Essar Group, a USD 27 billion conglomerate.