Man Hour Estimate

8
4.8.2.P Piping Engineering Company Man Hours Index Drawings/Documents List P R 200 Line Index/Piping Line list P R 150 Tie-in Schedule F A 250 Specification F A 120 F A 120 P A 60 F A 60 Data Sheet P R 60 P R 60 Procurement Related Documents P R 160 Calculations F R 400 P I 400 p R 300 Engineering Dwg & 3-D Model Overall Plot Plan F A 100 Contractor’s Deliverables Phase 5 Piping Material Selection Specification/Line class index Piping Material Specification (Pipe Class) Heat Tracing/Jacketing Specifications (If applicable) Insulation specification & Thickness Table (Job Specification) Special Piping Item Schedule & Data Sheets (Strainers, Traps, etc..) (if applicable) Spring Support Schedule and Data sheets (If applicable) Long Lead Item List & Material Requisitions, TBE, POR/PO (if applicable) Piping Wall thickness Calculation Sheets (All Line Classes) Material Take Off (1 st , 2 nd , 3 rd or final) Stress Reports along with Stress isometrics for critical lines including executable CAESAR-II input (If applicable)

description

man-hour

Transcript of Man Hour Estimate

Page 1: Man Hour Estimate

4.8.2.P Piping Engineering Company

Man Hours

Index

Drawings/Documents List P R200 50000

Line Index/Piping Line list P R 150 37500

Tie-in Schedule F A 250 62500Specification

F A120 30000

F A120 30000

P A60 15000

F A60 15000

Data Sheet

P R

60 15000

P R

60 15000

Procurement Related Documents

P R

160 40000

Calculations

F R

400 100000

P I400 100000

p R

300 75000

Engineering Dwg & 3-D Model

Overall Plot Plan F A100 25000

Contractor’s Deliverables

Phase 5Cost $ 250/Hr

Piping Material Selection Specification/Line class index

Piping Material Specification (Pipe Class)

Heat Tracing/Jacketing Specifications (If applicable)

Insulation specification & Thickness Table (Job Specification)

Special Piping Item Schedule & Data Sheets (Strainers, Traps, etc..) (if applicable)

Spring Support Schedule and Data sheets (If applicable)

Long Lead Item List & Material Requisitions, TBE, POR/PO (if applicable)

Piping Wall thickness Calculation Sheets (All Line Classes)

Material Take Off (1st , 2nd, 3rd or final)

Stress Reports along with Stress isometrics for critical lines including executable CAESAR-II input (If applicable)

Page 2: Man Hour Estimate

F A

100 25000

P R

250 62500

Underground piping layout Plan P A300 75000

P A300 75000

P A300 75000

TOTAL 3690 922500

Unit Area Plot Plan/Equipment Layout plan, elevation and sectional elevation

Piping Study Drawings (Critical Piping only)

Eye wash/ Safety shower location Drawings

Tie-in Location Plan & Detailed Drawings

Page 3: Man Hour Estimate

4.8.2.G Machinery Company Man Hours

Critical and Long lead equipment List F A 200

Drawings/Document List F A 500

F(LLE) A

500

General/ Project Specifications F A 250

Equipment Data Sheets F A 700

F(LLE) A200

F(LLE) A500

Requisitions for Packaged Units F A 500

Vendor Deviations / Exceptions F(LLE) A 125

F(LLE) A600

Machinery Painting Specification F I 150

Machinery Insulation Specification F R 150

P A0

Machine Monitoring System Scope F A 300

F(LLE) R300

F(LLE) A300

List of Special Tools F(LLE) A 300

F(LLE) A300

TOTAL 5875

Contractor’s Deliverables

Phase 5

Complete List of Vendor Data and Drawings in accordance with the Vendor Data section of all applicable Standards / SES.

Rotating Machinery Final Selection Document

Rotating Equipment Requisitions including completed Data Sheets

Technical Bid Tabulation/ Evaluation & Recommendations

Rotating Machinery Protective Instrumentation (Instrumentation)

Electrical Motors/ Generators Mechanical Details

List of Capital, Pre-commissioning, Commissioning & Start-up and Operational Spare parts.

Inspection and Testing surveillance plan, procedures and third party inspection scope

Page 4: Man Hour Estimate

50000125000

12500062500

175000

50000

12500012500031250

1500003750037500

075000

75000

7500075000

750001468750

Cost $ 250/Hr

Page 5: Man Hour Estimate

4.8.2.Q Stationary Company

General

Equipment List F R 200

F A

600

F R

500

F A400

Identification of two-year operational spare parts P R100

Specification

Mechanical Data Sheets (for Critical items / LLE) F A700

Mechanical Data Sheets (for other equipment) P A 200

Project Specifications (for Critical items / LLE) F R 400

Project Specifications (for all other equipment) P R 200

Equipment Internals specifications (for Critical items / LLE) F R800

P R

300

P R300

Fireproofing Specification P R150

Rust Prevention Specification P R150

P R150

Technical specification for equipment modification F R

500

F R

500

TOTAL 7200

Contractor’s Deliverables

Phase 5

Man Hours

Technical bid evaluation & tabulation for Critical items (based on service and MOC) & LLE 1

Purchase Inquiry Specifications (RFQ/ MR for equipment vendors) - for Critical items / LLE 1

Purchase Specification – “Ready for order” stage for Critical items / LLE 1

Refractory Specifications (including MOC and types of anchors with spacing details)

Painting Specifications (for special applications not covered by SES, if any)

Internal lining specification (ex. elastomers/GRP/FRP/glass etc.)

A complete Inspection Report addressing the current condition of the pressure components and attachments

Page 6: Man Hour Estimate

General

50000

150000

125000

100000

25000Specification

175000

50000

10000050000

200000

75000

75000

37500

37500

37500

125000

1250001800000

Cost $ 250/Hr