  • Electronics & Sofiware Development -Software Development Dept 2441

    ECS-Software lnstallation lnstallation Guide

    This installation guide will assist the user in installing the ECS-Software on a MOP unit. This document includes both, installation on a Windows 2000 operating system as well as a Windows XP Embedded operating system. If installing the ECS-Software on a Windows XP Embedded operating system the section "lnstallation on Windows 2000" is irrelevant and the same goes for the "lnstallation on Windows XP Embedded" section when installing the ECS-Software on Windows 2000.

    lnstallation on Windows 2000 This section starts with a brief introduction that will hopefully assist the user in case of installation failure. But the bulk of the section is dedicated to the main installation procedure that should typically succeed.

    Introduction This procedure will install the ECS-Software on the local hard drive of the MOP. The installation script will go through the following sequence:

    lnstallation of MySQL: MySQL is the database engine used by the MOP application for recording incoming events from the connected control system.

    lnstallation of MOP application: The MOP application is installed to the 'Program Files' folder of the local machine. Beyond merely copying the files, the installation script will update the registry with a number of keys required by the MOP application. Note that the MOP application also contains the programs for the MPC units in the system.

    MOP user account creation: The MOP application will be executed from an isolated separate MOP user account: 'mop-user' (password: 'mop-user'). When the ECS-Software has been properly installed, logging on to this user account will cause the MOP application to be started automatically. The installation script will create this MOP user account and configure it for automatic start of the MOP application.

    lnstallation of administrative tools: The installation script will create a shortcut on the Desktop of installing user account. This shortcut will reference a folder with miscellaneous administrative tools, e.g. enabling and disabling of auto-logon as 'mop-user'.

    The ECS-Software is installed using either the install mopA W2K. b a t or i n s t a l l mopB W2iCw. ba t file. These batch files will call the installation script and install a MOP- A or MOP-B respectively.

    Preconditions The procedure is based on a MOP unit that has been prepared with a restored OS Ghost image and is thus running Windows 2000.

    The ECS-Software itself may any kind of media, but typically it will be located on a CD-ROM. In such cases, it is required that the PC unit has a CD-ROM drive attached.

    NO.: 309041 2-0 Title: ECS Distribution Installation Jonas SkougaardlMBD-C12441 Subject: Installation Guide Last saved: 05.08.29 File: F:\Binder ME ATUC W947EB - SW Update 309041 2-O.doc Page 1 of 6

  • -

    MAN B&W Operational Specification I lnh No.: ldent No.: 9 393826 1 Connection and Fuilction Test of Electrical 0743565-2.

    -.

    M T -

    Q N 0 .

    All MPC (Multi - Purpose Controller) - print cards must be nlouilted in the respective mouilting boxes on the engine.

    $ g

    I Measurements for earth fault must be made, with multi-meter on all cable con~~ections. All cables mounted on plugs for MPC must be marked with plug ilunlber and tein~inal number, and all cables mounted according to actual plant electrical diagram.

    Scale:

    Date: 1 Des. 1 Chk. I A. C'. I Revision change I C ~ E . Not. I Rev.

    I All cables/plugs to be mounted on MPC-print must be disconnected.

    Replsrement for Ident. No.:

    System for ME & ME-C Engines Size: A4

    20080717 1 AAJ I SAG I

    Battery mounted on MPC board (See chapter 2.1.1)

    Page NO.: 4 (60)

    I

    Tools according to appendix 1 1.3

    1. Power Supply Check

    On all MPC units check polarity and voltage on plug J1: (A power): A = - 1 B = + (B power): A = - / C= +, the voltage must be in the range 20-30Vdc. On Main Operating Panel (MOP A), check the polarity and voltage. The voltage must be in the range 20-30Vdc. On Main Qperating Pallel (MOP B), check that the 22011 1 OVAC switch is set according to the power supply. If Main Operating Panel (MOP B) is for 24 volt (type PCM 4) check the polarity and voItage. The voltage must be in the range 20-30Vdc. MOP A to be connectede to Main power supply A and MOP B to be connectede to Main power supply B. 1.1 MPC fuse- and plug-specification In Appendix 11 -4 explanation of MPC fbse specification and MPC plugs function.

    2. ID-key Boot Loader Program

    The co~ltrol network on the ME Engine contains several MPC units called nodes. Each MPC has a corresponding ID-key attached to it(se page xxxx). This ID-key contains a unique ID. which identifies what type of controller it is associated with. When the ID-key is plugged illto its corresponding sub-D connector (5206) on the MPC, the controller reads the ID-key, ID lumber to determine what type of software it should contain. Each ID-key, ID number is matched to specific coiltroller software. If the MPC determines that it does not contain the correct software image it will not boot. The ID-key, ID is also used by the MPC to determine what type of software it should upload from the MOP.

  • I MAN B&W Operational Specification

    3. Network Test

    E . CJ)

    5 'D

    The network must not be crossed, i.e. net A terminated in plug 65 and net B in plug 66. Check

    ldent No.: 0743565-2. Page NO.:

    11 (60)

    2 ' 9 6'. 2 0 P4

    - . .

    '. Fb&mmm for Idcnt.,po.: .- ' 1 Ian, 1A.C. 1 Revision change I ChkNot. I Re\. : 10080717 1 AAJ 1 SAG I

    ., I I I

    all cable connections visually and inount the terminating resistor to net A and B as shown below.

    8; I Ifi.kCU A & B, a 120 ohm terminating resistor must I be mounted at the end of the arcnet line A and B I I --A I

    Connection and Function Test of Electrical System for ME & ME-C Engines

    Info NO.: 393 826

    resistor, net B plug No.

    scale:

    be mounted at the end of the arcnet tine A and B net in the SUB-D9 plug.

    . . Screen for network cable

    Terminating resistor.

    size:

    - A4

  • MAN B&W Operational Specification

    Network status on the MOP screen

    E? -0 Y - 8' 2 Scale: Size: System for ME & ME-C Engines 0 N A4

    The nehvork status screen contains information on the accessibility of the nodes on the nettvork and on the status of the cabling of the individual nodes.

    Page NO.: 12 (60)

    The nehvork connection can also be checked using a service terminal, i.e. portable PC with

    0 Rqbtmnmt lor ldent. No.:

    ~ r r . 1 CIIL 1 A. C. 1 Re\ ision change 1 Chg. Not. I M. 1 I

    m

    Windows HyperTerminal program that is connected to the service terminal plug J67 on an MPC using a zero modem cable.

    Ident No.: 0743565-2. Info NO.: 393826

    3.1 Access to Service Terminal

    Connection and Function Test of Electrical

    Opening and setting up the Hyper Terminal program (see appendix 1 1.1 ) * Connect a PC to the service terminal plug 567

    Type and press enter.

    Use the keyboard arrows to remove the cursor to 'Control Network Management' and press enter.

    ET 6 m

    Use the keyboard arrows to remove the cursor to 'Vietv Network Map Segment 0 a u Y

    (Arcnet A).

  • MAN Diesel

  • MAN B&W ME ECS TRAINING COURSEINDEXVARIOUS INFORMATIONSOFTWARE UPGRADEPARAMETERSVIRUS CHECKSYSTEM TESTSERVICE TERMINAL & ArcEditEXERCISESDIESELPORTPMI & CoCoS APPLICATIONSAPPENDIX

    Text1: