Design Concept: The main goals for the mall court are to provide a welcoming, public
space that seems natural while still accentuating Monet’s and the Cosmetology Lab. The basic design concept for the Mall Court has undergone several iterations that all led to the final design. The first design ideas were very simplistic, with general ambient light that flooded the entire space and did not accent any certain areas in the mall court. This gave the space a public feeling, but was unsuccessful in drawing attention to the two main points of interest in the space, Monet’s and the Cosmetology Lab. The second design used aim able downlights placed in the lower ceiling areas on the perimeter to provide general illumination, while halogen spots accented the signage. Tree lighting was provided in this design by metal halides floods that were to be placed both above and below the trees so that a very large amount of light would reach the trees and help them to grow indoors. While the space still had a public atmosphere, and the important points were being highlighted, the tree lighting seemed unnatural due to the light coming from above and below the trees on all sides. These problems led to this final design:
Unobtrusive Linear Fluorescent fixtures the length of the space that give a feeling of linearity and length while making the space feel public.
Ceramic Metal Halide spots to accentuate the signage and give Monet’s and the Cosmetology Lab distinction in the space. Linear Fluorescent Wall Washers to illuminate the trees from above, only on the south side. This helps give the space the “natural” feel that was desired by the overall school design theme.
Design Criteria and Goals: The following design criteria are taken from the IESNA handbook, as well as the ideas of the designer.
• Appearance of Space – Many People from the community will enter through this space
• Color Appearance and Contrast – CRI at least 80, Cool Colors
• Daylight Integration – Luminaires need to dim when not needed
• Points of Interest – People should be guided to store fronts
• At Least 20 fc for egress on floor • ASHRAE 90.1 Allowance: 1.8 W/sq. ft
– Goal Power Density: 1.0 W/sq. ft.
Shane A. Semple - 14 - 4/8/2005
Final Report
Lighting Equipment: (Please refer to appendix for product cut sheets)
Luminaires
Fixture Symbol Type Manufacturer Catalog # Mounting Voltage Control
A 8' LinearDownlight
Selux' M1B1S-1T5-X-OD-X-008-WH-277-DM
Recessed 277 DaylightDimming
B 4' WallWash
Erco 65041.023 Recessed 277 DaylightDimming
C AimableSpot
Prescolite MH4A Recessed 277 Toggle(See Plan)
Lamps
Fixture Type Number Manufacturer Catalog # CRI CCT InitialLumens
LumenMaintenance
A 3' T5 3 Sylvania FP21835ECO 40/CS 1/SKU 82 3500 1890 0.93
B 4' T5HO 1 Sylvania FP54835HO 40/CS 1/SKU 82 3500 4450 0.93
C PAR-20 MH 1 GE CMH20PAR20/SP 81 3000 1000 NA
Ballasts
Fixture Type Lamps Manufacturer Catalog # InputWatts
BallastFactor
PowerFactor
A FluorescentDimming
2 Lutron E 3 T521 C 277 2 ?/48 0.05/1 ?
B FluorescentDimming
1 Advance VZT-154 13/63 0.03/1 0.98
C Metal Halide 1 Advance e-Vision 20 -- --
Light Loss Factors
Fixture BF MaintenanceCategory
CleaningInterval
RSDD LDD LLD Total LLF
A 1 VI Clean-12 Mo. 0.97 0.86 0.93 0.78
B 1 IV Clean-12 Mo. 0.97 0.89 0.93 0.80
C 1 IV Clean-12 Mo. 0.97 0.89 0.7 0.60
Shane A. Semple - 15 - 4/8/2005
Final Report
Lighting Plan:
Shane A. Semple - 16 - 4/8/2005
Final Report
Panelboard Data:
Circuit AWG BreakerSize
Load(KW)
LPC-6 #12 20 1.3
LPC-8 #12 20 1.1
Power Density:
Floor Area = 2176 ft2
Fixture A = 39 Ballasts x 48 W/Ballast = 1872 W Fixture B = 4 Ballasts x 63 W/Ballast = 252 W Fixture C = 2 Ballasts x 20 W/Ballast = 40 W
Total = 2164 W
Power Density = 2164 W/2176 ft2 = 0.99 W/ ft2 < 1 W/ft2
Shane A. Semple - 17 - 4/8/2005
Final Report
Calculations:
Shane A. Semple - 18 - 4/8/2005
Final Report
Shane A. Semple - 19 - 4/8/2005
Final Report
Shane A. Semple - 20 - 4/8/2005
Final Report
Renderings:
Shane A. Semple - 21 - 4/8/2005
Final Report
Shane A. Semple - 21 - 4/8/2005
Final Report
Shane A. Semple - 22 - 4/8/2005
Final Report
Shane A. Semple - 22 - 4/8/2005
Final Report
Shane A. Semple - 23 - 4/8/2005
Final Report
Shane A. Semple - 24 - 4/8/2005
Final Report