MALAWI COAL TO POWER MALAWI GROWTH

6

Click here to load reader

description

MALAWI COAL TO POWER MALAWI GROWTH. www.intraenergycorp.com.au. Malawi Trade & Investment Forum March 2013. IEC Mining and Exploration C oncessions. Bringing International Standard Coal Mining Practices to Malawi. Malawi Electricity Grid. Proposed Power Station Site. - PowerPoint PPT Presentation

Transcript of MALAWI COAL TO POWER MALAWI GROWTH

Page 1: MALAWI  COAL TO POWER MALAWI GROWTH

www.intraenergycorp.com.au

MALAWI COAL TO POWER MALAWI GROWTH

www.intraenergycorp.com.auMalawi Trade & Investment ForumMarch 2013

Page 2: MALAWI  COAL TO POWER MALAWI GROWTH

2www.intraenergycorp.com.au

IEC Mining and Exploration Concessions

Page 3: MALAWI  COAL TO POWER MALAWI GROWTH

3www.intraenergycorp.com.au

Bringing International Standard Coal Mining Practices to Malawi

Page 4: MALAWI  COAL TO POWER MALAWI GROWTH

4www.intraenergycorp.com.au

Malawi Electricity Grid

Page 5: MALAWI  COAL TO POWER MALAWI GROWTH

5www.intraenergycorp.com.au

Proposed Power Station Site

Page 6: MALAWI  COAL TO POWER MALAWI GROWTH

6www.intraenergycorp.com.au

DisclaimerAll statements in this presentation, other than statements of historical facts, that address future production, reserve or resource potential, exploration drilling, exploitation activities and events or developments that Intra Energy Corporation Limited (the “Company”) expects to occur, are forward-looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Factors that could cause actual results to differ materially from those in forward looking statements include market prices, exploitation and exploration successes, and continued availability of capital and financing and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. The Company does not assume any obligation to update or revise its forward-looking statements, whether as a result of new information, future events or otherwise.

To the extent permitted by law, Intra Energy Corporation Limited accepts no responsibility or liability for any losses or damages of any kind arising out of the use of any information contained in this presentation.