Maintenance Decision SupportMaintenance Decision SupportSystem (MDSS)System (MDSS)
The FHWA Road Weather Management Program forThe FHWA Road Weather Management Program forDecision SupportDecision Support
Gary G. NelsonMitretek Systems [email protected]
202 488 5718
To the Second MDSS Prototype Review
Hanover, NH June 21, 2001
FHWA/Mitretek2
ContentsContents
Federal Highway Administration(FHWA)
Road Weather Management Program
Surface Transportation WeatherDecision Support Requirements
(STWDSR) project
Maintenance DecisionSupport System(MDSS) project
Mitr
etek
Rol
e
FHWA/Mitretek3
Mitretek RoleMitretek Role•Mitretek Systems, Inc., is a non-profit,
non-competitive, government servicescorporation
Created from Mitre in 1996 to servenon-FFRDC* work.
* Federally Funded Research andDevelopment Corporation
•Mitre/Mitretek has supported the FHWAIntelligent Transportation System (ITS)program since inception:
Research, program development,procurement support.
FHWA/Mitretek4
Federal Road Weather Programs
Federal HighwayAdministration
FHWA
Operations CoreBusiness Unit
Christine Johnson
HOP
Office of TransportationOperations
Shelley Row
HOTO
Road WeatherManagement Program
Paul Pisano
HOTO
Highway Research
Gary Larsen
HRD
Highway Research--Operations
Rudy Persaud
HRDO
ITS Joint ProgramOffice
Jeff Paniatti
ITS-JPO
National WeatherService
NWS
Public and FireWeather and other
NWS offices
AmericanAssociation of
State Highway andTransportation
Officials
AASHTO
Office of theFederal
Coordinator forMeteorology
Sam Williamson
OFCM
FHWA
Road Weather Program
Other USDOTAgencies
FAA, FTA, FRA,RSPA, USCG
Stakeholders:
State DOTs
Private Vendors
National Labs
FHWA/Mitretek5
Road Weather Management Program Goals
1. Develop improved weather informationsystems that meet the demands of all usersand operators;
2. Develop improved maintenancetechnologies for winter mobility, and;
3. Develop traffic operations/incidentmanagement procedures under all weatherevents.
FHWA/Mitretek6
Road Weather Management Program Objectives
a. Build relations between meteorologistsand transportation professionals…to createa common vision and support state efforts;
b. Improved decision support systems...;
c. Advanced maintenance technologies…;
d. Road weather management practices fortraffic and incident managers…;
e. Develop outreach materials...
FHWA/Mitretek7
The ITS
ImproveTransportation
Impact(Goals)
Scope of Road Weather Management Program
ImproveHighway
Operationsto meetGoals
Promote and DevelopInformation Systems
to SupportHighway Operations
(with respect to weather threats)
Road WeatherInformation Systems
(RWIS)
EnvironmentalSensor
Stations (ESS)
Define WeatherThreats
Improve Interfaces toImprove Interfaces to
MeteorologicalMeteorological
ServicesServices
FHWA/Mitretek8
1970-1997 1997 1998 1999 2000 2001 2002
Road Weather Management Program Progress
Prior FHWAPrior FHWAresearch in RWISresearch in RWIS
FHWA WeatherTeam Formedfrom Rural ITS
ForetellProject launched
First RoadWeather
Symposium
Surface Transportation WeatherDecision Support Requirements
(STWDSR) Project
FHWA OperationsFHWA OperationsUnit formedUnit formed
MDSS ProjectLaunched
STWDSRMeetings
1 and 2
MDSSReviews1, 2 and 3
First OFCMWIST
Symposium
Second OFCMWIST
Symposium
FHWA/Mitretek9
STWDSR Scope
TheDecision
Maker
DecisionDecisionSupportSupportSystemSystem
(WIST(WIST--DSS)DSS)
The IntelligentTransportationSystem (ITS)
GoalsGoals
TheTheHighwayHighwaySystemSystem
++WeatherWeather
Outcomes/Goals
System Input
Safety
Mobility
Productivity
Environment
National SecurityNeeds (decisions)
Requirements
Computer-HumanInterface (CHI)
OperationalTechniques
(Output)
Environmental Conditions
State of the Highway System
State of Deployed Resources
FHWA/Mitretek10
MDSS
Major STWDSR DocumentsFHWA Weather
Team WhitePaper
1997-98
STWDSRV1.0 Needs
1999
StakeholderMeetings
Feb, May 2000
STWDSR V2.0 OperationalConcept Definition (OCD)
July, 2000
STWDSR V2.0 PreliminaryInterfaces Requirements (PIR)
October, 2000
STWDSR V3.0/V4.0
TM/EM/Traveler Needs
Impacts/Benefits
Operational Test Requirements
FHWA/Mitretek11
STWDSR DocumentationSTWDSR Documentation
• Electronic Documents Library
www.its.dot.gov/welcome.htm
• White Paper (1998)
• STWDSR V1.0
• STWDSR V2.0: Operational Concept Definition (OCD)
• STWDSR V2.0 Preliminary Interface Requirements (PIR)
• STWDSR V2.0 Executive Summary
• Contact: [email protected]
FHWA/Mitretek12
STWDSR Needs
Needs Matrix
44U
ser
Gro
up
s
ScalesWarning Operational Planning
426 decisions10 decisions
Operational ScaleWinter Road Maintenance
StakeholderMeetings:
Value Added Met.Services (VAMS)
Maintenance Managers(28 states)
National Labs (6)
53 Decisions
16Clustersby Time
Lead
STWDSR V1.0
STWDSR V2.0
FHWA/Mitretek13
Needs(Risk
Decisions)NeedsRisk
(Decisions)
STWDSR Operational Concept
External Information ResourcesTransportation, Environmental, Treatment Assets
Tailored Decision SupportTailored Decision SupportApplicationsApplications
(Filtering, Fusion, Presentation)(Filtering, Fusion, Presentation) Needs(Risk
Decisions)
Highway
Performance
Goals
Learning Feedback
Col
labo
rativ
eR
isk
Dec
isio
ns
FHWA/Mitretek14
System
Evolution
Open System ConceptOpen System Concept
A Road WeatherInformation System
(RWIS)
Stovepipe
A display
A display
RoadwayEnvironment
Some EnvironmentalSensor Station (ESS)
Observations
Some RoadWeather
Processes
A display
Swivel-chair
integration!!!
Open System
Other ITS info
*EnvironmentalInformationApplication
DecisionSupport
Application
Air/SeaEnvironment
Collection &Assimilation
EIA*
EIA*
EIA*
EIA*
ManyObservations
TreatmentAction!
FHWA/Mitretek15
The Scale Concept
ScalesTime Horizon
FunctionsCorrespondingWeatherScale
WinterRoadMaintenanceExample
Planning months +Provides resources.
Climatic Buyingequipment orchemicalstocks; Hiring and trainingstaff.
Operational hours to daysManages thedeployment ofresources.
Synoptic/meso Calling up crews, readyingvehicles, dispatchingtreatmentbeats.
Warning sub-seconds tominutesOperates theresources.
Micro Operating a treatment vehicle(snowplowand spreader);Controlof automaticequipment.
FHWA/Mitretek16
Needs (Decision) ClustersCluster ID, Name Confidence
%Time Lead
hrs.2.A Monitor Conditions 29.0
Aware 46 49.0Detect 95 3.8
2.B Prepare 40 41.02.C Get Ready 72 16.02.D Prepare Expendables 56 14.02.E Select Strategy 70 12.02.F Assign Crews 60 33.02.G Prepare Equipment 75 14.02.H Activate Staff 73 15.02.I Initial Dispatching 77 9.02.J Contracting 85 2.02.K Primary Dispatching 96 0.02.L Remedial Dispatching2.M Mid-Storm Management2.N Discretionary Dispatching2.O Termination2.P Cleanup
FHWA/Mitretek17
Maintenance Decision Support System (MDSS) Project
• The MDSS is one realization of the STWDSROperational Concept Definition (OCD)
–For a set of functions and operational-scaledecisions of winter road managers
• Continues STWDSR stakeholder alliance
– National Labs will develop non-exclusivecomponents
– State DOTs will operate
– Vendors will provide and integrate into RoadWeather Information System (RWIS)
FHWA/Mitretek18
MDSS DocumentationMDSS Documentation
• FHWA Road Weather Management Website
www.ops.fhwa.dot.gov/weather/mdss.pdf
• MDSS Project Plan
•...with Labs’ contacts
FHWA/Mitretek19
Federal Highways Administration (FHWA)Office of Transportation Operation (HOTO)
Paul PisanoRudy Persaud
Mitretek Systems
Gary Nelson
Maintenance Decision Support System (MDSS) Project
Cold Regions Research & Engineering Lab (CRREL)MDSS Programmatic Lead Lab
George Blaisdell (Project Mgr.)
National Centerfor Atmospheric Research (NCAR)
MDSS Technical Lead Lab
Bill Mahoney (Project Mgr.)Rich Wagoner (Oversight)
Multiple Contracts
Single Contract
MITLincoln Lab
Bob Hallowell
NOAANational Severe
Storm Lab
John Cortinas
NOAAForecast Systems
Lab
Paul Schultz
NOAAEnvironmentalTechnologies
Lab
Dan Wolfe
Federal Highway Administration (FHWA)
PaulPisano, HOTO-1
AOTR: Rudy Persaud, HRDO-04Mitretek Systems
Gary Nelson
Maintenance Decision Support System (MDSS) Project
Cold Regions Research & Engineering Lab (CRREL)MDSS Programmatic Lead Lab
George Blaisdell (Project Mgr.)
National Centerfor Atmospheric Research (NCAR)
MDSS Technical Lead Lab
Bill Mahoney (Project Mgr.)Rich Wagoner (Oversight)
Multiple Contracts
Single Contract
MITLincoln Lab
Bob Hallowell
NOAANational Severe
Storm Lab
John Cortinas
NOAAForecast Systems
Lab
Paul Schultz
NOAAEnvironmentalTechnologies
Lab
Dan Wolfe
FHWA/Mitretek20
Map to WIST-DSS Components
External Information Resources
* Letters refer to Appendicesof MDSS Project Plan
Generate Scenario Monitor Conditions Present/Make Decision
Update Context
ETLObserving System
Assessment
NumericalModels
Existing EnvironmentalObserving Systems
VideoProcessing
NSSLI
MIT/LLG
FSLH
Ensembles
PrecipitationAlgorithms
Transportation andTreatment Asset Data
NCARD
MDSS Road WeatherForecasting System(Environmental ThreatFusion)
CRRELE
CRRELD
CRRELF
RoadConditions
ChemicalConc.
SnowDrift
CRRELC
CRRELB
MDSS GISDisplay System
MDSS DecisionSupport Concepts
FHWA/Mitretek21
MDSS: BenchmarksMDSS: Benchmarks• Prototype Phase
First Prototype Review, January at NCAR
Second Prototype Review, now
Prototype demonstration (September)
• Further Development Phase
Notice of Intent (Federal Register, April)
Next presentation
FHWA/Mitretek22
Mitretek SupportMitretek Support• DOT representative travel funding
Submit original receipts!!!
• Needs, OCD and PIR tracking
• Monitor progress for FHWA
• Work for recognition/support within surfacetransportation community
Our job was to match expertise (National Labs)
with user needs and vendor opportunities.
From here on, this development track is up to the stakeholders.