MAINSTREAMING RENEWABLES...Add presentation information via View/Header and Footer To add...
Transcript of MAINSTREAMING RENEWABLES...Add presentation information via View/Header and Footer To add...
![Page 1: MAINSTREAMING RENEWABLES...Add presentation information via View/Header and Footer To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint](https://reader034.fdocuments.us/reader034/viewer/2022042018/5e75ddd5230582740d018411/html5/thumbnails/1.jpg)
Title slide/end slide image dimensions:
Title slide images must always fit this size:
Height: 10.6 cm; Width: 25.4 cm
Title slide images must always follow this position:
Horizontal: 0 cm; Vertical: 0 cm
To change title slide/end slide image:
Contact Communication Support
Tip:
Vestas drawing guides will help you position and
crop images and objects. Images and objects will
snap to drawing guides when repositioned or
cropped.
To add drawing guides:
• Right-click on next to slide
• Select ‘Grid and Guides…’
• Check ‘Display drawing guides on screen’
• Press ‘OK’
MAINSTREAMING RENEWABLES Renewable Energy Leaders
From early-stage to global players 25th May St Gallen
Maistreaming Renewables May 2012 1
![Page 2: MAINSTREAMING RENEWABLES...Add presentation information via View/Header and Footer To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint](https://reader034.fdocuments.us/reader034/viewer/2022042018/5e75ddd5230582740d018411/html5/thumbnails/2.jpg)
Introduction • Vestas – A Brief History
• An Overview of the Wind Market
• EU Energy Investment
• Finance – a Key Ingredient
Maistreaming Renewables May 2012 2
![Page 3: MAINSTREAMING RENEWABLES...Add presentation information via View/Header and Footer To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint](https://reader034.fdocuments.us/reader034/viewer/2022042018/5e75ddd5230582740d018411/html5/thumbnails/3.jpg)
Add presentation information via
View/Header and Footer
To add pre-formatted bullets please
use the increase/decrease indent
buttons found in the PowerPoint menu
- a brief History
1898 Founded by H.S. Hansen in Lem, Denmark making steel windows
1945 VEstjyskSTålteknik A/S – making household appliances & agricultural equipment. 1979 Vestas delivers first wind turbines. 1987 Vestas pioneering the wind industry, staff of around 60 2004 Merged with NEG Micon A/S
2007 No. 1 in Modern Energy, over 33,500 wind turbines in 63 countries 2012 50 GW, 46,000 turbines in 69 countries
• Nearly 25% of total global wind capacity
• Enough clean energy to power 19 million European households
• Avoiding 55 million tonnes of CO2 emissions every year.
Maistreaming Renewables May 2012 3
![Page 4: MAINSTREAMING RENEWABLES...Add presentation information via View/Header and Footer To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint](https://reader034.fdocuments.us/reader034/viewer/2022042018/5e75ddd5230582740d018411/html5/thumbnails/4.jpg)
Add presentation information via
View/Header and Footer
To add pre-formatted bullets please
use the increase/decrease indent
buttons found in the PowerPoint menu
Vestas - a brief History
Maistreaming Renewables May 2012 4
V164-7.0 MW turbine
![Page 5: MAINSTREAMING RENEWABLES...Add presentation information via View/Header and Footer To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint](https://reader034.fdocuments.us/reader034/viewer/2022042018/5e75ddd5230582740d018411/html5/thumbnails/5.jpg)
Add presentation information via
View/Header and Footer
To add pre-formatted bullets please
use the increase/decrease indent
buttons found in the PowerPoint menu
An Overview of the Wind Market
Maistreaming Renewables May 2012
Source : GWEC
5
![Page 6: MAINSTREAMING RENEWABLES...Add presentation information via View/Header and Footer To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint](https://reader034.fdocuments.us/reader034/viewer/2022042018/5e75ddd5230582740d018411/html5/thumbnails/6.jpg)
Add presentation information via
View/Header and Footer
To add pre-formatted bullets please
use the increase/decrease indent
buttons found in the PowerPoint menu
Maistreaming Renewables May 2012
Global Wind Energy Market Forecasts 2011 – 2025
Global Wind Total : Base case Scenario by Region
An Overview of the Wind Market
6
![Page 7: MAINSTREAMING RENEWABLES...Add presentation information via View/Header and Footer To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint](https://reader034.fdocuments.us/reader034/viewer/2022042018/5e75ddd5230582740d018411/html5/thumbnails/7.jpg)
Add presentation information via
View/Header and Footer
To add pre-formatted bullets please
use the increase/decrease indent
buttons found in the PowerPoint menu
Annual Wind Installations by Region (2003 – 2011)
Maistreaming Renewables May 2012
Source : GWEC Global Wind Statistics
An Overview of the Wind Market
7
![Page 8: MAINSTREAMING RENEWABLES...Add presentation information via View/Header and Footer To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint](https://reader034.fdocuments.us/reader034/viewer/2022042018/5e75ddd5230582740d018411/html5/thumbnails/8.jpg)
Add presentation information via
View/Header and Footer
To add pre-formatted bullets please
use the increase/decrease indent
buttons found in the PowerPoint menu
A Tale of Three Regions
China
USA
Presidential Election year
PTCs ??
Shale Gas
EU
Greece (and Portugal, Ireland, Spain etc) ?
Economic outlook for 2012/13 ?
Maistreaming Renewables May 2012
The wind Turbine market in 2011 is up from 2010 !!
An Overview of the Wind Market
8
![Page 9: MAINSTREAMING RENEWABLES...Add presentation information via View/Header and Footer To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint](https://reader034.fdocuments.us/reader034/viewer/2022042018/5e75ddd5230582740d018411/html5/thumbnails/9.jpg)
Add presentation information via
View/Header and Footer
To add pre-formatted bullets please
use the increase/decrease indent
buttons found in the PowerPoint menu
EU Support Levels for Renewables
Maistreaming Renewables May 2012
An Overview of the Wind Market
9
![Page 10: MAINSTREAMING RENEWABLES...Add presentation information via View/Header and Footer To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint](https://reader034.fdocuments.us/reader034/viewer/2022042018/5e75ddd5230582740d018411/html5/thumbnails/10.jpg)
Add presentation information via
View/Header and Footer
To add pre-formatted bullets please
use the increase/decrease indent
buttons found in the PowerPoint menu
EU Energy Investment
Maistreaming Renewables May 2012 10
![Page 11: MAINSTREAMING RENEWABLES...Add presentation information via View/Header and Footer To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint](https://reader034.fdocuments.us/reader034/viewer/2022042018/5e75ddd5230582740d018411/html5/thumbnails/11.jpg)
Add presentation information via
View/Header and Footer
To add pre-formatted bullets please
use the increase/decrease indent
buttons found in the PowerPoint menu
EU Energy Investment
How much Balance Sheet capacity is there for EU Utilities ?
Ongoing Country and Utility downgrades
October 2011
Ratings of EU’s top Utilities
Maistreaming Renewables May 2012 11
![Page 12: MAINSTREAMING RENEWABLES...Add presentation information via View/Header and Footer To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint](https://reader034.fdocuments.us/reader034/viewer/2022042018/5e75ddd5230582740d018411/html5/thumbnails/12.jpg)
Add presentation information via
View/Header and Footer
To add pre-formatted bullets please
use the increase/decrease indent
buttons found in the PowerPoint menu
EU Energy Investment
Bridging the EU electricity finance gap
Maistreaming Renewables May 2012 12
EU Electricity CAPEX
Need to 2020
€ 0
€ 200
€ 400
€ 600
€ 800
€ 1,000
€ 1,200
1
€ B
illio
ns
€600bn
Funding Gap
€400bn
Utility Finance
Capacity
Source: Rothschild, KPMG, CitiGroup, Goldman
Sachs, HgCapital Research
![Page 13: MAINSTREAMING RENEWABLES...Add presentation information via View/Header and Footer To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint](https://reader034.fdocuments.us/reader034/viewer/2022042018/5e75ddd5230582740d018411/html5/thumbnails/13.jpg)
Add presentation information via
View/Header and Footer
To add pre-formatted bullets please
use the increase/decrease indent
buttons found in the PowerPoint menu
Maistreaming Renewables May 2012 13
terra firma
EU Energy Investment
![Page 14: MAINSTREAMING RENEWABLES...Add presentation information via View/Header and Footer To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint](https://reader034.fdocuments.us/reader034/viewer/2022042018/5e75ddd5230582740d018411/html5/thumbnails/14.jpg)
Add presentation information via
View/Header and Footer
To add pre-formatted bullets please
use the increase/decrease indent
buttons found in the PowerPoint menu
Maistreaming Renewables May 2012 14
EMEA PF Volumes – Sectorial Breakdown 2005 - 2011
Finance – a key ingredient
Source: Projectware
![Page 15: MAINSTREAMING RENEWABLES...Add presentation information via View/Header and Footer To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint](https://reader034.fdocuments.us/reader034/viewer/2022042018/5e75ddd5230582740d018411/html5/thumbnails/15.jpg)
Add presentation information via
View/Header and Footer
To add pre-formatted bullets please
use the increase/decrease indent
buttons found in the PowerPoint menu
Finance – a key ingredient
Maistreaming Renewables May 2012 15
2011 saw 19 “Jumbo” deals (above $ 2bn) financed, for an aggregate amount
of $ 67.7bn, including:
Barzan Gas Project - Qatar $ 9.8 bn
Tour-Bordeaux HSR - France $ 9.1 bn
Nord Stream Phase 1 Refinance - Russia $ 5.4 bn
Nord Stream Phase 2 - Russia $ 4.9 bn
Tullow Oil RB Facility - Ghana $ 3.0 bn
London Gateway Port - UK $ 2.2 bn
Volume up 23% from 2010 (14 jumbos) and 130% from 2009 (11 jumbos).
Strong growth in financing demand - increased flow of “Jumbo” projects
… there is global Competition for Long Term funding !!!
Source : LMA Presentation 2012
![Page 16: MAINSTREAMING RENEWABLES...Add presentation information via View/Header and Footer To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint](https://reader034.fdocuments.us/reader034/viewer/2022042018/5e75ddd5230582740d018411/html5/thumbnails/16.jpg)
Add presentation information via
View/Header and Footer
To add pre-formatted bullets please
use the increase/decrease indent
buttons found in the PowerPoint menu
Finance – a key ingredient
Maistreaming Renewables May 2012
• Subprime crisis
• Risk Caution
• Regulatory Requirements
• Sovereign Debt Issues
• Bank Ratings and Capital
There is still finance for ‘good projects’
16
![Page 17: MAINSTREAMING RENEWABLES...Add presentation information via View/Header and Footer To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint](https://reader034.fdocuments.us/reader034/viewer/2022042018/5e75ddd5230582740d018411/html5/thumbnails/17.jpg)
Add presentation information via
View/Header and Footer
To add pre-formatted bullets please
use the increase/decrease indent
buttons found in the PowerPoint menu
Finance – a key ingredient
Maistreaming Renewables May 2012 17
Large pool of long term Funds/Assets looking for a good home ….
![Page 18: MAINSTREAMING RENEWABLES...Add presentation information via View/Header and Footer To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint](https://reader034.fdocuments.us/reader034/viewer/2022042018/5e75ddd5230582740d018411/html5/thumbnails/18.jpg)
Add presentation information via
View/Header and Footer
To add pre-formatted bullets please
use the increase/decrease indent
buttons found in the PowerPoint menu
Summary
• Wind very much a Global Business
• EU requires significant energy upgrade investment
• Developing Renewable activity in Emerging Markets
• Government support variable
• Bank liquidity issues remain
• Competition for Bank funding from other Infrastructure
• Involve wider universe of Investors and debt providers
• Solid track record of sustained Wind growth
Maistreaming Renewables May 2012 18
![Page 19: MAINSTREAMING RENEWABLES...Add presentation information via View/Header and Footer To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint](https://reader034.fdocuments.us/reader034/viewer/2022042018/5e75ddd5230582740d018411/html5/thumbnails/19.jpg)
Title slide/end slide image dimensions:
Title slide images must always fit this size:
Height: 10.6 cm; Width: 25.4 cm
Title slide images must always follow this position:
Horizontal: 0 cm; Vertical: 0 cm
To change title slide/end slide image:
Contact Communication Support
Tip:
Vestas drawing guides will help you position and
crop images and objects. Images and objects will
snap to drawing guides when repositioned or
cropped.
To add drawing guides:
• Right-click on next to slide
• Select ‘Grid and Guides…’
• Check ‘Display drawing guides on screen’
• Press ‘OK’
Copyright Notice
The documents are created by Vestas Wind Systems A/S and contain copyrighted material, trademarks, and other proprietary information. All rights reserved. No part of the documents may be reproduced or copied in any form or by any
means - such as graphic, electronic, or mechanical, including photocopying, taping, or information storage and retrieval systems without the prior written permission of Vestas Wind Systems A/S. The use of these documents by you, or
anyone else authorized by you, is prohibited unless specifically permitted by Vestas Wind Systems A/S. You may not alter or remove any trademark, copyright or other notice from the documents. The documents are provided “as is” and
Vestas Wind Systems A/S shall not have any responsibility or liability whatsoever for the results of use of the documents by you.
Thank you!
Maistreaming Renewables May 2012 19