Maharastra PWD 2012-13
-
Upload
chiranjeeviyarla -
Category
Documents
-
view
70 -
download
1
description
Transcript of Maharastra PWD 2012-13
Sd/-
Nagpur
APPLICABLE FOR NAGPUR & AMRAVATI REGION
MAHARASHTRA JEEVAN PRADHIKARAN
Approved by the Chief Engineer , Maharashtra Jeevan Pradhikaran, Water management,
Thane vide L.No.TB-3/CR-46-C/3774 dated 31/12/2012
Countersigned For The Year 2012-2013
Superintending Engineer
Maharashtra Jeevan Pradhikaran (Urban & Rural), Cirlce
MAHARASHTRA JEEVAN PRADHIKARAN
( Government of Maharashtr Undertaking )
SCHEDULE OF RATES FOR THE YEAR - 2012-2013
NAGPUR & AMRAVATI REGION
(Effective from 24th
Dec. 2012)
From To
Government Resolutions for Hilly Areas I IX
General Notes 1 6
A Materials 7 8
B Labour and Machinery 9 10
C Transportation & Standard weights of pipes 11 25
D Cement Consumption 26 27
E Excavation 28 32
F Iron & Structural Steel Work 33 34
G Plain Cement Concrete and Reinforced Cement Concrete 35 41
H Misellaneous 42 46
I Pipes and Specials
I C.I. / D.I.Pipes 47 57
II A.C. Pipes 58 62
III P.V.C. Pipes 63 69
IV G.I. Pipes 70 72
V Stoneware Pipes 73 73
VI R.C.C. Pipes 74 78
VII P.S.C. Pipes 79 85
VIII B.W.S.C. Pipes 86 92
IX G.R.P. / F.R.P. Pipes 93 99
X H.D.P.E. Pipes 100 106
XI M.D.P.E. Pipes 107 116
XII P.C.C.P. Pipes 117 124
XIII Pipe Appurtenances 125 144
XIV Mechanical Joints / Fittings 145 153
XV M.S. Pipes 154 176
XVI Fabrication of M.S. Pipes and Specials 177 185
XVII M.S. Pipes Laying 186 208
XVIII Treatment Plants (WTP / STP) 209 240
XIX R.C.C. G.S.R's and Sumps 241 243
XX R.C.C., E.S.R's 244 249
XXI Chambers, Manholes and Drainage Drops 250 257
J Well Sinking and River Infiltration Works 258 262
K Ancillary item for Reservoirs 263 266
L Trial Run 267 267
M Type Designs 268 293
MAHARASHTRA JEEVAN PRADHIKARAN
Nagpur & Amravati Region
SCHEDULE OF RATES
FOR THE YEAR - 2012-2013
INDEX
Section No Name of SectionPage Nos.
Government Resolution Annex.I Page I
¿ÖÖÃÖÖ ×Ö�ÖÔµÖ, �ÖÏÖ´Ö ×¾Ö�úÖÃÖ ×¾Ö³ÖÖ�Ö �Îú. �ÖÏÖ¯ÖÖ¯Öã 1090/ÃÖ߆ָü-163/39-†, פü. 7 ×›üÃÖë²Ö¸ü 1990
“Öê ÃÖÆü Ö¡Ö
¯Ö׸ü׿Ö™ü - 1
¸üÖ•µÖÖŸÖᯙ ›üÖë�Ö¸üß ×¾Ö³ÖÖ�ÖÖ“Öê �Öê¡Ö ¤ü¿ÖÔ×¾Ö�ÖÖ¸êü ×¾Ö¾Ö¸ü�Ö¯Ö¡Ö
וֻÆüÖ ŸÖÖ»Öã�úÖ •µÖÖ ›üÖë�Ö üß
³ÖÖ�ÖÖŸÖ †ÖÆêü ŸµÖÖ ›üÖë�Ö üÖ“Öê ÖÖ¾Ö
¯Öæ�ÖÔ �Ö™ü •µÖÖ ŸÖÖ»Ö㌵ÖÖŸÖ 50
™üŒ�êú ¯Öê�ÖÖ •ÖÖÃŸÖ �Öê¡Ö †ÖÆêü ŸÖÖê ¯Öæ�ÖÔ
�Ö™ü
ˆ¯Ö�Ö™ü •µÖÖ ŸÖÖ»Ö㌵ÖÖŸÖ 20 ™üŒ�êú¯Öê�ÖÖ •ÖÖÃŸÖ ¾Ö 50 ™üŒ�êú
¯Öê�ÖÖ �ú´Öß †ÖÆêü ŸÖÖê ˆ¯Ö �Ö™ü
¿Öê üÖ
1 šüÖ�Öê ¾ÖÃÖ‡Ô
1. ´ÖÖê�ÖÖ›üÖ ÃÖÆüµÖÖ¦üß ¯Ö¾ÖÔŸÖ üÖ Ó�ÖÖ
¯Öæ�ÖÔ �Ö™ü (1)
2. ¾ÖÖ›üÖ ¯ÖÛ¿“Ö´Ö ‘ÖÖ™ü ¯Öæ�ÖÔ �Ö™ü (2)
3. ¿ÖÆüÖ¯Öæ ü -- " -- ¯Öæ�ÖÔ �Ö™ü (3)
4. ´Öã ü²ÖÖ›ü -- " -- ¯Öæ�ÖÔ �Ö™ü (4)
5. •Ö¾ÆüÖ ü -- " -- ¯Öæ�ÖÔ �Ö™ü (5)
6. ¾ÖÃÖ‡Ô -- " -- - ˆ¯Ö�Ö™ü (1) ¯Öæ¾ÖÔ ³ÖÖ�Ö ˆ¢Ö ü ¯ÖÛ¿“Ö´Ö ³ÖÖ�Ö 7. ׳־ÖÓ›üß -- " -- - ˆ¯Ö�Ö™ü (2)
2. üÖµÖ�Ö›ü 8. �ú•ÖÔŸÖ -- " -- ¯Öæ�ÖÔ �Ö™ü (6)
9. �ÖÖ»ÖÖ¯Öæ ü -- " -- ¯Öæ�ÖÔ �Ö™ü (7)
10. ÃÖã¬ÖÖ�Ö›ü -- " -- ¯Öæ�ÖÔ �Ö™ü (8)
11. üÖêÆüÖ -- " -- ¯Öæ�ÖÔ �Ö™ü (9)
12. ´ÖÖ�Ö�ÖÖÓ¾Ö -- " -- ¯Öæ�ÖÔ �Ö™ü (10)
13. ´ÖÆüÖ›ü -- " -- ¯Öæ�ÖÔ �Ö™ü (11)
14. ¯ÖÖê»ÖÖ¤ü¯Öæ ü -- " -- ¯Öæ�ÖÔ �Ö™ü (12)
15. ¯Öê�Ö -- " -- ¯Öæ�ÖÔ �Ö™ü (13)
16. ´Öã¹ý›ü -- " -- ¯Öæ�ÖÔ �Ö™ü (14)
17. ´ÆüÃÖôûÖ -- " -- ¯Öæ�ÖÔ �Ö™ü (15)
18. ¯ÖÖ¾Öê»Ö -- " -- ˆ¯Ö�Ö™ü (3) ¤ü×�Ö�Ö ³ÖÖ�Ö
3. üŸÖÖ×�Ö üß 19. �Öê›ü -- " -- ¯Öæ�ÖÔ �Ö™ü (16)
20. ד֯Öôæû�Ö -- " -- ¯Öæ�ÖÔ �Ö™ü (17)
[Type text] Page II
וֻÆüÖ ŸÖÖ»Öã�úÖ •µÖÖ ›üÖë�Ö üß
³ÖÖ�ÖÖŸÖ †ÖÆêü ŸµÖÖ ›üÖë�Ö üÖ“Öê ÖÖ¾Ö
¯Öæ�ÖÔ �Ö™ü •µÖÖ ŸÖÖ»Ö㌵ÖÖŸÖ 50
™üŒ�êú ¯Öê�ÖÖ •ÖÖÃŸÖ �Öê¡Ö †ÖÆêü ŸÖÖê ¯Öæ�ÖÔ
�Ö™ü
ˆ¯Ö�Ö™ü •µÖÖ ŸÖÖ»Ö㌵ÖÖŸÖ 20 ™üŒ�êú¯Öê�ÖÖ •ÖÖÃŸÖ ¾Ö 50 ™üŒ�êú
¯Öê�ÖÖ �ú´Öß †ÖÆêü ŸÖÖê ˆ¯Ö �Ö™ü
¿Öê üÖ
21. ÃÖÓ�Ö´ÖêÀ¾Ö ü -- " -- ¯Öæ�ÖÔ �Ö™ü (18)
22. »ÖÖÓ•ÖÖ -- " -- ¯Öæ�ÖÔ �Ö™ü (19)
23. üÖ•ÖÖ¯Öæ ü -- " -- ¯Öæ�ÖÔ �Ö™ü (20)
24. ´ÖÓ›ü�Ö�Ö›ü -- " -- - ˆ¯Ö�Ö™ü (4) ˆ¢Ö êü�ú›üᯙ ³ÖÖ�Ö
4. ØÃÖ¬Öã¤ãü�ÖÔ 25. �ú�Ö�ú¾Ö»Öß -- " -- ¯Öæ�ÖÔ �Ö™ü (21)
26. ÃÖÖ¾ÖÓŸÖ¾ÖÖ›üß -- " -- ¯Öæ�ÖÔ �Ö™ü (22)
27. ¤êü¾Ö�Ö›ü -- " -- ¯Öæ�ÖÔ �Ö™ü (23)
28. �ãú›üÖôû -- " -- ¯Öæ�ÖÔ �Ö™ü (24)
29. ¾Öî³Ö¾Ö¾ÖÖ›üß -- " -- ¯Öæ�ÖÔ �Ö™ü (25)
30. ´ÖÖ»Ö¾Ö�Ö -- " -- - ˆ¯Ö�Ö™ü (5) ¯Öæ¾ÖÔ ³ÖÖ�Ö
5. ÖÖ׿Ö�ú 31. ‡�ÖŸÖ¯Öã üß -- " -- ¯Öæ�ÖÔ �Ö™ü (27)
32. ÖÖ׿Ö�ú -- " -- ¯Öæ�ÖÔ �Ö™ü (28)
33. ؤü›üÖê üß -- " -- ¯Öæ�ÖÔ �Ö™ü (29)
34. ¯Öêšü -- " -- ¯Öæ�ÖÔ �Ö™ü (30)
35. ÃÖã ü�Ö�ÖÖ -- " -- ¯Öæ�ÖÔ �Ö™ü (31)
36. �úôû¾Ö�Ö -- " -- ¯Öæ�ÖÔ �Ö™ü (32)
37. ²ÖÖ�Ö»ÖÖ�Ö (ÃÖ™üÖ�ÖÖ)
-- " -- ¯Öæ�ÖÔ �Ö™ü (32)
38. ×ÃÖ®Ö ü -- " -- ¯Öæ�ÖÔ �Ö™ü (33)
6. †Æü´Ö¤üÖ�Ö ü 39. †�úÖê»ÖÖ -- " -- ¯Öæ�ÖÔ �Ö™ü (34)
40. ÃÖÓ�Ö´ÖÖê ü ¯Öæ�ÖÔ �Ö™ü (35)
7. ¯Öã�Öê 41. •Öã®Ö ü ÃÖÆüµÖÖ¦üß ¯Ö¾ÖÔŸÖ üÖ Ó�ÖÖ
¯Öæ�ÖÔ �Ö™ü (36)
42. †ÖÓ²Öê�ÖÖÓ¾Ö -- " -- ¯Öæ�ÖÔ �Ö™ü (37)
43. �Öê›ü ( üÖ•Ö�Öã¹ýÖ�Ö ü)
-- " -- ¯Öæ�ÖÔ �Ö™ü (38)
44. ´ÖÖ¾Öôû -- " -- ¯Öæ�ÖÔ �Ö™ü (39)
45. Æü¾Öê»Öß -- " -- ¯Öæ�ÖÔ �Ö™ü (40)
46. ´Öãôêû¿Öß -- " -- ¯Öæ�ÖÔ �Ö™ü (41)
[Type text] Page III
וֻÆüÖ ŸÖÖ»Öã�úÖ •µÖÖ ›üÖë�Ö üß
³ÖÖ�ÖÖŸÖ †ÖÆêü ŸµÖÖ ›üÖë�Ö üÖ“Öê ÖÖ¾Ö
¯Öæ�ÖÔ �Ö™ü •µÖÖ ŸÖÖ»Ö㌵ÖÖŸÖ 50
™üŒ�êú ¯Öê�ÖÖ •ÖÖÃŸÖ �Öê¡Ö †ÖÆêü ŸÖÖê ¯Öæ�ÖÔ
�Ö™ü
ˆ¯Ö�Ö™ü •µÖÖ ŸÖÖ»Ö㌵ÖÖŸÖ 20 ™üŒ�êú¯Öê�ÖÖ •ÖÖÃŸÖ ¾Ö 50 ™üŒ�êú
¯Öê�ÖÖ �ú´Öß †ÖÆêü ŸÖÖê ˆ¯Ö �Ö™ü
¿Öê üÖ
47. ¾Öê»Æêü -- " -- ¯Öæ�ÖÔ �Ö™ü (42)
48. ³ÖÖê ü -- " -- ¯Öæ�ÖÔ �Ö™ü (43)
49. ¯Öã Óü¤ü ü -- " -- ¯Öæ�ÖÔ �Ö™ü (44)
8. ÃÖÖŸÖÖ üÖ 50. ÃÖÖŸÖÖ üÖ -- " -- ¯Öæ�ÖÔ �Ö™ü (45)
51. ¾ÖÖ‡Ô -- " -- ¯Öæ�ÖÔ �Ö™ü (46)
52. ¯ÖÖ™ü�ÖÖ -- " -- ¯Öæ�ÖÔ �Ö™ü (47)
53. •ÖÖ¾Öôûß -- " -- ¯Öæ�ÖÔ �Ö™ü (48)
54. ´ÖÆüÖ²ÖôêûÀ¾Ö ü -- " -- ¯Öæ�ÖÔ �Ö™ü (49)
55. �Ö™üÖ¾Ö -- " -- ¯Öæ�ÖÔ �Ö™ü (50)
56. �ÖÓ›üÖôûÖ -- " -- ¯Öæ�ÖÔ �Ö™ü (51)
57. �úÖê êü�ÖÖÓ¾Ö -- " -- ¯Öæ�ÖÔ �Ö™ü (52)
58. �ú üÖ›ü -- " -- ¯Öæ�ÖÔ �Ö™ü ˆ¯Ö�Ö™ü (6) ¯Öæ¾Öì�ú›üᯙ ¯ÖÛ¿“Ö´Ö ³ÖÖ�Ö
ˆ¯Ö�Ö™ü (7) ¯Öæ¾Öì�ú›üᯙ �úÖÆüß ³ÖÖ�Ö,
¤ü×�Ö�Öê�ú›üᯙ �úÖÆüß ³ÖÖ�Ö,
ˆ¢Ö êü�ú›üᯙ �úÖÆüß ³ÖÖ�Ö,
¯ÖÛ¿“Ö´Öê�ú›üᯙ �úÖÆüß ³ÖÖ�Ö.
60. ±ú»Ö™ü�Ö -- " -- ¯Öæ�ÖÔ �Ö™ü ˆ¯Ö�Ö™ü (8) ¤ü×�Ö�Öê�ú›üᯙ ¾Ö ¯Öæ¾Öì�ú›üᯙ ³ÖÖ�Ö
9. ÃÖÖÓ�Ö»Öß 61. ×¿Ö üÖôûÖ -- " -- ¯Öæ�ÖÔ �Ö™ü (53)
10. �úÖê»ÆüÖ¯Öæ ü 62. ¿ÖÖÆæü¾ÖÖ›üß -- " -- ¯Öæ�ÖÔ �Ö™ü (54)
63. ¯ÖÆüÖôûÖ -- " -- ¯Öæ�ÖÔ �Ö™ü (55)
64. �ú ü¾Öß ü -- " -- ¯Öæ�ÖÔ �Ö™ü (56)
65. �Ö�ÖÖ²ÖÖ¾Ö›üÖ -- " -- ¯Öæ�ÖÔ �Ö™ü (57)
66. üÖ¬ÖÖÖ�Ö üß -- " -- ¯Öæ�ÖÔ �Ö™ü (58)
67. �úÖ�Ö»Ö -- " -- ¯Öæ�ÖÔ �Ö™ü (59)
[Type text] Page IV
וֻÆüÖ ŸÖÖ»Öã�úÖ •µÖÖ ›üÖë�Ö üß
³ÖÖ�ÖÖŸÖ †ÖÆêü ŸµÖÖ ›üÖë�Ö üÖ“Öê ÖÖ¾Ö
¯Öæ�ÖÔ �Ö™ü •µÖÖ ŸÖÖ»Ö㌵ÖÖŸÖ 50
™üŒ�êú ¯Öê�ÖÖ •ÖÖÃŸÖ �Öê¡Ö †ÖÆêü ŸÖÖê ¯Öæ�ÖÔ
�Ö™ü
ˆ¯Ö�Ö™ü •µÖÖ ŸÖÖ»Ö㌵ÖÖŸÖ 20 ™üŒ�êú¯Öê�ÖÖ •ÖÖÃŸÖ ¾Ö 50 ™üŒ�êú
¯Öê�ÖÖ �ú´Öß †ÖÆêü ŸÖÖê ˆ¯Ö �Ö™ü
¿Öê üÖ
68. ³Öã¤ü ü�Ö›ü -- " -- ¯Öæ�ÖÔ �Ö™ü (60)
69. †Ö•Ö üÖ -- " -- ¯Öæ�ÖÔ �Ö™ü (61)
70. “ÖÓ¤ü�Ö›ü -- " -- ¯Ö æ�ÖÔ �Ö™ü (62)
71. �Ö›ü×Æü�»ÖÓ•Ö -- " -- ¯Öæ�ÖÔ �Ö™ü (63)
11. ¬Öãôêû 72. ÃÖÖ�Îúß -- " -- ¯Öæ�ÖÔ �Ö™ü (64)
73. Ö¾ÖÖ¯Öæ üß -- " -- ¯Öæ�ÖÔ �Ö™ü (65)
74. †Œ�ú»Ö�ãú¾ÖÖ ÃÖÖŸÖ¯Öãã›üÖ ›üÖë�Ö êü ¯Öæ�ÖÔ �Ö™ü (66)
75. †�úÖ�Öß -- " -- ¯Öæ�ÖÔ �Ö™ü (67)
76. ×¿Ö ü¯Öæ ü -- " -- ¯Öæ�ÖÔ �Ö™ü (68)
77. ¿ÖÆüÖ¤üÖ -- " --
ˆ¯Ö�Ö™ü (9) ¯Öæ¾Öì�ú›üᯙ ¾Ö £ÖÖê›üÖ ˆ¢Ö ê-�ú›üᯙ ³ÖÖ�Ö
78. ŸÖôûÖê¤üÖ -- " -- ˆ¯Ö�Ö™ü (10) ˆ¢Ö êü�ú›üᯙ ³ÖÖ�Ö
12. •Öôû�ÖÖÓ¾Ö 79. “ÖÖê Ö›üÖ -- " -- ˆ¯Ö�Ö™ü (11) ˆ¢Ö êü�ú›üᯙ ³ÖÖ�Ö
80. µÖê¾Ö»ÖÖ -- " -- ˆ¯Ö�Ö™ü (12) -- " --
81. üÖ¾Öê ü -- " -- ˆ¯Ö�Ö™ü (13) -- " --
82. ‹ê¤ü»ÖÖ²ÖÖ¤ü -- " -- ˆ¯Ö�Ö™ü (14) �úÖÆüß ³ÖÖ�Ö ¯Öæ¾Öì�ú›üᯙ ¾Ö �úÖÆüß ³ÖÖ�Ö ˆ¢Ö êü�ú›üß»Ö
13. †´Ö üÖ¾ÖŸÖß 83. ¬ÖÖ ü�Öß -- " -- ¯Öæ�ÖÔ�Ö™ü (69)
84. דÖ�Ö»Ö¤ü üÖ -- " -- ¯Öæ�ÖÔ�Ö™ü (70)
14. µÖ¾ÖŸÖ´ÖÖôû 85. ¯ÖãÃÖ¤ü ÃÖŸÖ´ÖÖôûÖ üÖÓ�ÖÖ ¯Öæ�ÖÔ�Ö™ü ˆ¯Ö�Ö™ü (15) ˆ¢Ö üü ¯ÖÛ¿“Ö´Öê�ú›üᯙ ³ÖÖ�Ö, £ÖÖê›üÖ ´Ö¬µÖ´Ö³ÖÖ�Ö
86. ˆ´Ö ü�Öê›ü -- " -- ˆ¯Ö�Ö™ü (16) ˆ¢Ö êü�ú›üᯙ ¾Ö ¯Öæ¾Öì�ú›üᯙ ³ÖÖ�Ö
15. ÖÖÓ¤êü›ü 87. ×�úÖ¾Ö™ü -- " -- ¯Öæ�ÖÔ�Ö™ü (71)
16. †�úÖê»ÖÖ 88. ¯ÖÖŸÖæ ü †Ø•ÖšüÖ“Öê ›üÖë�Ö ü - ˆ¯Ö�Ö™ü (17) ¤ü×�Ö�Ö ¾Ö ¯Öæ¾ÖÔ
[Type text] Page V
וֻÆüÖ ŸÖÖ»Öã�úÖ •µÖÖ ›üÖë�Ö üß
³ÖÖ�ÖÖŸÖ †ÖÆêü ŸµÖÖ ›üÖë�Ö üÖ“Öê ÖÖ¾Ö
¯Öæ�ÖÔ �Ö™ü •µÖÖ ŸÖÖ»Ö㌵ÖÖŸÖ 50
™üŒ�êú ¯Öê�ÖÖ •ÖÖÃŸÖ �Öê¡Ö †ÖÆêü ŸÖÖê ¯Öæ�ÖÔ
�Ö™ü
ˆ¯Ö�Ö™ü •µÖÖ ŸÖÖ»Ö㌵ÖÖŸÖ 20 ™üŒ�êú¯Öê�ÖÖ •ÖÖÃŸÖ ¾Ö 50 ™üŒ�êú
¯Öê�ÖÖ �ú´Öß †ÖÆêü ŸÖÖê ˆ¯Ö �Ö™ü
¿Öê üÖ
17. ²Öã»ÖœüÖ�ÖÖ 89. �ÖÖ´Ö�ÖÖÓ¾Ö -- " -- - ˆ¯Ö�Ö™ü (18) ˆ¢Ö ü ¾Ö ¯Öæ¾Öì�ú›üᯙ ³ÖÖ�Ö
18. †Öî Óü�ÖÖ²ÖÖ¤ü 90. �ú®Ö›ü -- " -- - ˆ¯Ö�Ö™ü (19) ˆ¢Ö üêü ¾Ö ¯Öæ¾Öì�ú›üᯙ ³ÖÖ�Ö
91. �Öã»ÖŸÖÖ²ÖÖ¤ü -- " -- - ˆ¯Ö�Ö™ü (20) ´Ö¬Ö»ÖÖ ¾Ö ¤ü×�Ö�Öê�ú›üᯙ ³ÖÖ�Ö
92. ÃÖÖêµÖ�ÖÖÓ¾Ö †Ø•ÖšüÖê ›üÖë�Ö¸Ö“µÖÖü
¯Öæ�ÖÔ�Ö™ü (72) - -
93. ×ÃÖ»»ÖÖê›ü -- " -- - ˆ¯Ö�Ö™ü (21) ˆ¢Ö êü�ú›üᯙ ¾Ö £ÖÖê›üÖ ¤ü×�Ö�Ö
¯ÖÛ¿“Ö´Öê�ú›üᯙ ³ÖÖ�Ö
19. ¯Ö ü³Ö�Öß 94. ØÆü�ÖÖê»Öß -- " -- - ˆ¯Ö�Ö™ü (22) ¤ü×�Ö�Öê�ú›üᯙ ³ÖÖ�Ö
95. �ú»Ö´ÖÖæ üß -- " -- - ˆ¯Ö�Ö™ü (23) ¤ü×�Ö�Öê�ú›üᯙ ³ÖÖ�Ö
Government Resolution Annex. II Page VI
¿ÖÖÃÖÖ ×Ö�ÖÔµÖ, �ÖÏÖ´Ö ×¾Ö�úÖÃÖ ×¾Ö³ÖÖ�Ö �Îú. �ÖÏÖ¯ÖÖ¯Öã 1090/ÃÖß†Ö ü-163/39-†, פü. 7 ×›üÃÖë²Ö ü 1990
“Öê ÃÖÆü¯Ö¡Ö
¯Ö× ü׿Ö™ü - 2 ŸÖÖ»Öã�úÖ¾ÖÖ¸ü µÖÖ¤üߟÖᯙ ˆ¯Ö�Ö™ü ´Æü�ÖæÖ ‘ÖÖê×ÂÖŸÖ �êú»Ö껵ÖÖ ŸÖÖ»Ö㌵ÖÖŸÖß»Ö
�ÖÖ¾ÖÖÓ“Öß µÖÖ¤üß ¤ü¿ÖÔ×¾Ö�ÖÖ¸êü ×¾Ö¾Ö¸ü�Ö¯Ö¡Ö
וֻÆüÖ ´Æü�ÖæÖ ‘ÖÖê×ÂÖŸÖ �êú»Öê»ÖÖ ŸÖÖ»Öã�úÖ
ˆ¯Ö�Ö™ü ŸÖÖ»Ö㌵ÖÖŸÖᯙ �ÖÖ¾ÖÖÓ“Öß ÖÖ¾Öê
1) šüÖ�Öê ¾ÖÃÖ‡Ô
1) “ÖÖÓ¤ü•Ö 2) ן֯Ö×»ÖµÖÖ 3) ׿־ÖÖÖÃÖÖ 4) ¯ÖÖÖÃÖÖ 5) ˆÃÖ�ÖÖÓ¾Ö 6) ¯ÖÖ üÖêôû 7) ×¿Ö ü¾Ö»Öß 8) •Öôû�úßµÖÖ 1) ¾ÖÃÖ‡Ô 9) ÃÖÖ ü¾Ö�Ö 10) ‘ÖÖ™êü‘Ö ü 11) ³ÖÖ¾Ö�Ö»Ö 12) ¯Öê»ÖÖ™ü 13)ÃÖÖו־ֻÖß 14) ¤üÖ¯Öê¾Ö»Öß 15) �úÖ•ÖãÔ üÖ 16) �ÖÖ›êü�ú ü 17) ׳֛üÖ 18) �ÖÖê»ÖÃÖ™ü 19)�Öî êü 20) ÃÖÓ¤üÖ 21) “Öã›üÖ»Ö 22) ןֻÆêüÃÖ 23) ÃÖÖ¾Ö™ü 24) ´Ö üŸÖÖ¸üß 25) ײֻ־Öæ›üÖ 26) �ÖµÖÖ 27) ¤ü›ü×¾Ö üÖ 28) ÃÖÖן־ֻÖß 29) �ÖÖ›üß 30) ¤ïü›üÖ 31) ¤ü›üß¯Ö 32) ¾ÖÖ´ÖÖ 33) �úÖ•Öæ 34) �úÖê»Æüß 35) �úÖêôûÖ 36) Ø“Ö“ÖÖ™üß 37) ÆüÖê¾ÖÖ‰úÖ
2) ׳־ÖÓ›üß 1) �Ö�Öê¿Ö¯Öæ üß 2) ¾Ö›ü¾Ö»Öß 3) ˆÃÖ�ÖÖÓ¾Ö 4) ¬ÖÖ›ü�ÖÖÓ¾Ö 5) †ÖÓ¤ü߯ÖÖ›üÖ 6) �ÖÖê²ÖÖ™üÖ 7) ´ÖÖê×Æü»Öß 8) ²ÖÖ¾Ö“Öß 9) ´ÖÖ»Ö×¾ÖµÖÖê ü 10) ²Öê»ÖÖê»Öß 11) ˆÃÖ¯ÖÖ›üß ¯ÖÖ›üÖ 12) †ÖÓ²Ö üÖ‡Ô ¯ÖÖ›üÖ 13) ‘µÖÖ ü 14) �Ö›ü�úß �Öã¤Ôü 15) د֯Öôû¿ÖêŸÖ 16) �Ö›ü�úß ²Öã¦ãü�ú 17) ³ÖÖ‰ú¯ÖÖêôû 18) �ãúÆüÖ¯ÖÖ›üÖ 19) �ãúÆüÖ 20) †ÖÓ²ÖÖ¯ÖÖ›üÖ 21) ¤êü¾Ö¯ÖÖ›üÖ �ãú»Ö‡Ô ÖÖ›üÖ 29) ¯ÖÖµÖ�ÖÖÓ¾Ö 30)¯ÖÖµÖÖ 31) ¯Öê¹ýÖ¯ÖÖ›üÖ 32) ³ÖÖ¾Ö›ü߯ÖÖ›üÖ 33) �ÖÖ ü ³ÖÖ¾Ö 35) �ÖÖÖÖ 36) »ÖÖ�êú¾Ö»Öß 37) Ø“Ö“Ö¯ÖÖ›üÖ 38) �ÖÖî ü߯ÖÖ›üÖ 39) ›üÖê�ú ü¯ÖÖ›üÖ 40) †»Ö�úÖî† üß
üÖµÖ�Ö›ü 3) ¯ÖÖ¾Öê»Ö
1) ´ÖÖ×�Ö�ú‘Ö ü 2) ‘ÖÖê›üÃÖÖ¾ÖÖÖ 3) ÃÖÖ¾ÖÖÖ 4) ²ÖÖ´Ö�ÖÖê üß 5)®ÖÖ´Ö¤êü¾Öß 6) ¤êü¾Ö»ÖÖêôûß 7) ”ûÖ¾ÖÖÖ 8) �úÖ»Öê¾Ö»Öß 9) ÃÖÖ üÃÖÖ‡Ô 10) †Ö¯Ö™üÖ 11) �úÖÃÖ¾Ö 12) �úÖ ü›üÖ 13) ¤êü¾Ö™üß 14) ²Öã»ÖÃÖã›üÖ 15) †�æú¾Ö›üß 16) ‘Öã üÖ›üÖ¾Ö 17) ¾ÖÖ¾Öê‘Ö ü 18) �úÖê™üß 19) ¤üÖ¯ÖÖê¾Ö»Öß 20)¤êü¾ÖŸÖã»ÖÖ 21) ÃÖÖ¾Ö»ÖÖ 22) �ú üÖÖÆüÖ 23) �ú»ÖÖ 24) ¾ÖÓ›üÖÖÖ 25) �úÖ ü»Ö 26)¤ãü»Ö‘Ö™ü 27) �úÖÃÖ³ÖÖ™ü 28) פü‘ÖÖ üß 29) ÆüÖŸÖ¾ÖÓ›üß
üŸÖÖ×�Ö üß 4) ´ÖÓ›ü�Ö�Ö›ü
1) †Ó²ÖÖ¾ÖÖÖ ²Öã¦ãü�ú 2) �ëú•ÖÖ»Ö‘Ö ü 3) »ÖÖê üß 4) Æêü»™üß 5) �ÖÖ ü߯ÖÖ›üÖ 6) ¯Öê¾ÖÖ 7) ¯ÖÖÓ›êü üß 8) ¯ÖÖ›ü¾ÖÖ 9) †Ó²Ö üÃÖë™ü 10) ™üß ¾ÆêüÃÖÖ‡Ô 11) ™êü üß 12) »ÖÖê�ú ü¾ÖÖ 13) ´ÖÆüÖ¯ÖÏŸÖ 14)Æü›ü‘Ö¸ü 15) ŸÖÖÓ³Öß 16) »ÖÖêÆü üÖ 17) �ÖÖî ü•Ö 18) �ãÓú³ÖÖ ü 19) �ÖÖê¾Öêôêû 20) ¯ÖÆüÖ»Öß 21) ¬Öã üß 22)ŸÖÖ ü¾Ö»Öß 23) †ÖÓ²Öê�Ö�Ö 24) ¬ÖÖ�Ö ü 25) ÃÖÖ üôû 26) †›ü�Öôû 27) ¾ÆêüÃÖÖ‡Ô 28) ¯ÖÖ™ü 29) †êÓ•Ö»ÖÖ 30) ÃÖÖê›ü»Öß ŸÖ±ìú ¾ÆêüÃÖÖ‡Ô 31) ²Öã›üôû 32) �Öã¤Ôü 33) ׿Ö�ÖÖ¾Ö 34)ÃÖÖ›üÖ 35)ŸÖôû‘Ö ü 36) ™üÖ�êú›üß 37) ¯ÖÖ“Ö üÖê»Ö 38) ¬ÖÖ´Ö�Öß 39) ¾ÖÖê ü�Ö™ü 40) �ÖÖê¾ÖÖ 41)¬Ö´Ö�Ö‘Ö¸ü 42) ÃÖÖ´ÖÖê™üß 43) ×Ö�Ö›üß
Government Resolution Annex. II Page VII
וֻÆüÖ ´Æü�ÖæÖ ‘ÖÖê×ÂÖŸÖ �êú»Öê»ÖÖ ŸÖÖ»Öã�úÖ
ˆ¯Ö�Ö™ü ŸÖÖ»Ö㌵ÖÖŸÖᯙ �ÖÖ¾ÖÖÓ“Öß ÖÖ¾Öê
ØÃÖ¬Öæ¤æü�ÖÔ 5) ´ÖÖ»Ö¾Ö�Ö
1) �ãúÃÖßÃÖ 2) †ÃÖ¹ý›üß 3) ³Ö¾ÖÖÖß 4) ¾ÖÓ•Ö�úÖ ü 5) ™üÖ™üÖ ü³ÖÖ¾Ö 6) ³ÖÖ™ü¯ÖÖ¾Ö�Öß 7)×¿Ö üÖ¾Ö›êü 8) üÖ™üß¾Ö›êü 9) †Ö•Ö�Ö�Öß 10) ²ÖÎÖ´Æü�Ö 11) ×Æü¾ÖÖôêû 12) †Öê¾Ö»ÖßµÖê 13)�ÖÖ™ü»Öê 14)›ãÓüÓ›ãü»Ö 15) ¾ÖÖµÖÓÖ�ÖÖ¾Ö›êü 16) ¾ÖÖµÖ üÖ 17) ¯ÖÖê‡Ô Ö 18) ÖêÃÖæ êü 19) ¾ÖÖ›êü“µÖÖ ¯ÖÖ™ü 20) Ö¾ÖÖ¯ÖÖ™ü 21) �ÖÖê»Ö¾Ö�Öê 22) ›üß�ú¾Öôû 23) “ÖÖ¯Öê�ÖÖê»Ö 24) �ãú´ÖÖ´Öê 25) ÖÖÓ¤üÖêÃÖÖ 26) ×ŸÖ üÖ¾Ö›êü 27)¯ÖÖ üÃÖ 28) ›êüÆæü»Ö
ÃÖÖŸÖÖ üÖ 6) �ú üÖ›ü
1) ´Ö üôûß 2) “ÖÖê ü•Ö¾ÖÖ›üß 3) �úÖê üß¾Öôêû 4) ²Öê»Ö¤üÖ êü 5) ´ÆüÖê ÖÏê 6) ³ÖÖêôêû¾ÖÖ›üß 7) ÃÖÖ�ãú›üß 8) µÖê�Ö�êú 9) �úÖêôêû 10) �ãúÃÖæ ü 11) ŸÖãôû¾Ö�Ö 12) ÃÖ¾ÖÖ¤êü 13) »ÖÖ™ü�êú¾ÖÖ›üß 14)Æü¾Öê»Ö¾ÖÖ›üß 15) ´ÆüÖÃÖÖêôûß 16) ¿Ö êôû�êú¾ÖÖ›üß 8) ´ÖÖã 19) µÖê¾ÖŸÖß 20) ‘Ö üÖôû¾ÖÖ›üß 21)Æü�Ö´ÖÓŸÖ¾ÖÖ›üß 22) ™üÖôû�ÖÖÓ¾Ö 23) µÖêôû�ÖÖÓ¾Ö 24) �ÖÖî êü¾ÖÖ›üß 25) �Ö�Öê¿Ö¾ÖÖ›üß 26)³Ö êü¾ÖÖ›üß 27)ÃÖÖêôû×¿Ö ü³Öê 28) ´ÖÆüÖ ü�Ö›êü¾ÖÖ›üß 29) ו֟Öß 30) †Œ�úÖ‡Ô¾ÖÖ›üß 31)�úÖÃÖÖ ü×¿Ö ü´Öê 32)×Ö�Ö›üß 33)¬ÖÖê»Ö¯ÖÖ¾ÖÖ›üß 34) ×�ú¾Öôû 35) �ÖÖê›üŸÖÖ‡Ô¾ÖÖ›üß 36) ´ÖÃÖæ ü 37)Æü�Ö²Ö ü¾ÖÖ›üß 38)¾ÖÖ�µÖÖ“Öß ¾ÖÖ›üß 39) ´ÖÖ»Ö¾ÖÖ›üß 40) �úÖÓ²Öß�ÖÖ›üß 41) ×¿Ö ü�ÖÖ¾Ö 42)ŸÖãôûß 43)¯ÖÖ»Ö 44) Æü ü¯Öôû¾ÖÖ›üß 45) × üÃÖ¾Ö›ü 46) ¾ÖßÖß ÃÖÖ�ú›üß 47) ÃÖÖÓ•Öæ ü 48)ŸÖÖ²Ö¾Öê 49)†Ö êü¾ÖÖ›üß 50) �Ö´Öê¾ÖÖ›üß 51) ´ÖÖêôû¾ÖÖ›üß 52) ›üÖêôêû¾ÖÖ›üß 53) ¯ÖÖÓœü üß¾ÖÖ›üß 54) †Ö�Öê 55) †Ó²Ö¾Ö›êü 56) ŸÖÖ¹ý�Ö 66) ³Ö¾ÖÖ-Ö¯ÖÖ›üÖ 67) ׿ֻ֟־ÖÖ›üß 68) ×“Ö ü¾Ö»Öß 69) ‘Ö ü“ÖãÓ¤ü 70) �úÖ´Ö£Öß 71) ¾ÖÖ‘Öê üß 72) �ú ü¾Ö›üß 73) Æü•Ö üÖ ü ´ÖÖ“Öß 74) ¾ÖÖÖ ü´ÖÖ“Öß 75)¾ÖÖ¾ÖÖÃÖ´ÖÖ“Öß 76) üÖ•Ö´ÖÖ“Öß 77) ™ëü³Öæ 78) ³ÖµÖÖ¯Öæ ü 79) �úÖê êü�ÖÖ¾Ö 80) �úÖ¾Öì 81)¾Ö›ü�ÖÖÓ¾Ö Æü¾Ö»Öê»Öß 82)¿Öê ÖÖê»Öß �úÖ»Ö¾Ö›êü
ÃÖÖŸÖÖ üÖ 7) ±ú»Ö™ü�Ö
1) ÃÖÖ»Ö¯Öê 2) †Ö¤ü�úß�Öã¤Ôü 3) †Öôû•ÖÖ¯Öæ ü 4) �úÖê üÖôêû 5) ¾ÖÖ‘ÖÖê¿Öß 6) »ÖÖ£Ö¾Ö›üÖ 7) ´ÖÖÖê¾ÖÖ›üß 8) —ÖÖ›ü�ú²ÖÖ‡Ô¾ÖÖ›üß 9) ¾Öê»ÖÖê¿Öß 10) ˆ•Ö»Ö¾Öê 11) ¤üÖ¾Ö¾ÖÖ›üß 12) ³Öß êü¾ÖÖ›üß 13) ×�Ö ü¾Öß 14) ¬Öã ÖÖôû¾ÖÖ›üß 15) ²Öê›ü�êú¾ÖÖ›üß 16) ÃÖÖ�úôû 17) ³ÖÖ›üôûß �Öã¤Ôü 18)¤ãü¬Öê³ÖÖ¾Öß 19) •ÖÖ¾Ö»Öß 20) †ÖÓ¤ãü›ü 21) �ãú ü¾ÖÖ»Öß ²Öã.
ÃÖÖŸÖÖ üÖ 8) ´ÖÖÖ
1) �úôûÃÖ�ú ü ¾ÖÖ›üß 2) �ÖÖ›êü¾ÖÖ›üß 3) س֛üß ²Öã¦ãü�ú 4) ¯ÖÖôû¾Ö�Ö 5) ŸÖÖë›ü»Öê 6) ˆ�Öôêû¾ÖÖ›üß 7) Ø¿Ö¤üß ²Öã¦ãü�ú 8) Ø¿Ö�Ö�ÖÖ¯Öæ ü 9) ³ÖÖÓ›üôûß 10) ‡Ó•ÖŸÖÖŸÖ 11) �úôû“ÖÖÓ›üß 12) ×¾Ö üôûß 13)¾Öôû‡Ô 14) �ãúŒ�ú›ü¾ÖÖ›ü 15) ´Ö�Ö�Öê 16) �úÖôêû¾ÖÖ›üß 17) ²ÖÖê ü�Öê¾ÖÖ›üß 18)×�ú ü�úÃÖÖ›ü 19) ×Æü´ÖÖÖ�Ö›ü 20) פü¾Ö›üß 21) ¯ÖÖÓœü üß¾ÖÖ›üß 22) Ã¾Ö ü¯Ö¾ÖÖÖ¾ÖÖ›üß 23) Ø¿Ö¤üß ²Öã¦ãü�ú 24)²ÖÖê£Öê
¬Öãôêû 9) ¿ÖÖÆü¤üÖ
1) �úÖ�ú êü¤êü �Öã¤Ôü 2) �úÖ�ú êü¤êü ²Öã¦ãü�ú 3) �úÖëœüÖ¾Öôû 4) “ÖÖÓ¤üÃÖê»Öß 5) Ø“Ö ü›êü 6) ¾Ö¹ý›ü ²Öã¦ãü�ú 7) ´Öôû�ÖÖ¾Ö 8) ³Öã»ÖÖÖÖ 9) ¤ü üÖ 10) üÖ�Ö߯Öæ üß 11) †Ö�úÃÖ¯Öæ ü 12) ´ÖÖÖ´ÖÖê›üµÖÖ 13) ÖÖ�Ö—Ö üß 14) »ÖÓ�Ö›üß ³Ö¾ÖÃÖÖß 15) �ãúŒ�ú›ü¾ÖÖ›ü 16) ´Ö�Ö�Öê 17) †Ö³ÖÖ›ü¯Öæ ü �Öã¤Ôü 18) ™ü ü²ÖÖ 19) ÖÖµÖ�ÖÖÓ¾Ö 20) ×ÃÖÃÖã üÖ 21) ¯Öê™üÖ 22) ±úÖê±úÖ üÖôêû 23) “ÖÖÓ¤ü¯Öæ ü 24) �Öã¤üÖ 25) ‡�ú üÖÃÖ 26) �úÖ™ü‘Ö ü 27) ×¯Ö ü¯Öæ ü
¬Öãôêû 10) ŸÖôûÖê¤üÖ
1) ÃÖÖê•Öæ ü¾ÖÖ›üÖ 2) ´ÖÖôû�Öã¤Ôü 3) “ÖÖî�ÖÖ¾Ö �Öã¤Ôü 4) »ÖÖ�ãú›ü ¿Öê™ü 5) �Ö›üá �Öã¤Ôü 6) �úÖšüÖê ü 7) ²ÖÓ¬ÖÖ üÖ 8) �Ö›üß ²Öã¦ãü�ú 9) •Öã¾ÖÖ�Öß 10) »ÖÖ�ÖÖ¯Öæ ü 11) ´ÖÖôû 12) ´ÖÖê üÖ´ÖÖôû 13)†ÖÓ²ÖÖ �Ö¾ÆüÖ�Ö 14) ÃÖßŸÖ ¯ÖÖ¾Öôûß 15) ²ÖÖ´ÖÖß 16) ´Ö»Öã¾ÖÖ 17) üÖ•ÖÖ¯Öæ ü
•Öôû�ÖÖÓ¾Ö 11) “ÖÖê Ö›üÖ
1) ´Ö üÖšüÖ 2) ÃÖ¡ÖÖÃÖêÖ 3) �ÖÖÓ›ü üÖ 4) ³ÖÖê üד֛üÖ 5) ˆ´Ö¸ü™üß 6) �ÖÖê¾ÖÖ¯ÖÖ›üÖ 7) �éúÂ�ÖÖ¯Öæ ü 8) �ÖÖ·µÖÖ¯ÖÖ›üÖ 9) ×¾Ö•ÖÖ¯Öæ ü 10) ´Öã�µÖÖ¾ÖŸÖÖ ü 11) ¿ÖêŸÖ¯ÖÖ�Öß 12) ²ÖÖê† ü†ÓÖŸÖß 13)´ÖÖ»ÖÖ¯Öæ ü 14) ×¾ÖÂÖ�ÖÖ¯Öæ ü 15) ²ÖÖê ü´Öôûß 16) �ú•ÖÖÔ�ÖÖ 17) ´Öê»ÖÖÖÖ 18) ¤êü¾ÆüÖ üß
Government Resolution Annex. II Page VIII
וֻÆüÖ ´Æü�ÖæÖ ‘ÖÖê×ÂÖŸÖ �êú»Öê»ÖÖ ŸÖÖ»Öã�úÖ
ˆ¯Ö�Ö™ü ŸÖÖ»Ö㌵ÖÖŸÖᯙ �ÖÖ¾ÖÖÓ“Öß ÖÖ¾Öê
•Öôû�ÖÖÓ¾Ö 12) µÖê¾Ö»ÖÖ
1) ´ÖÖã²ÖÖ‡Ô ¤êü¾ÖãÖÖÖ 2) »ÖÓ�Ö›üµÖÖ †ÖÓ²ÖÖ 3) �Öœæü·µÖÖ 4) •ÖÖ´ÖµÖÖ 5) ˆÃÖ´Öôûß 6) Æü¸ü߯Öæ üß 7)ÖÖ�Ö¤êü¾Öß 8) ¾ÖÖ‘Ö—Öß ü 9) †ÖÃÖ üÖ ¾ÖÖ üß
•Öôû�ÖÖÓ¾Ö 13) üÖ¾Öê ü
1) ן֛üµÖÖ 2) †Ó¬ÖÖ ü´ÖÖôûß 3) ´ÖÖêÆü´ÖÖê›üß 4) ד֓ÖÖ›üß 5) דִ֛üµÖÖ 6) �ÖÖ ü�Öê›üÖ 7)´ÖÖêÆü´ÖÖÓ›ü»Öß ÃÖæÖ 8) د֯֙ü �ãÓú›ü 9) ¯ÖÖ»Ö 10) ´ÖÖê ü¾ÆüÖ»Ö 11) וÖÃÖß 12)�ÖÖ ü�Öê›ü 13)ÃÖÆüÃÖØ»Ö�Ö 14) »ÖÖ»Ö´ÖÖŸÖß
•Öôû�ÖÖÓ¾Ö 14) ‹ê¤ü»ÖÖ²ÖÖ¤ü
1) ¤ãü‡Ô 2) ÃÖã�ú»Öß 3) ÃÖÖê Ö�Ö�ÖÖÓ¾Ö 4) ›üÖê»Ö ü�Öê›ü 5) ÖÖë¤ü¾Öê»Ö 6) ¾ÖÖµÖ»Ö 7) “ÖÖ üšüÖ�Öê 8)¤êü¾Öß ´ÖÓפü ü 9) ´ÖÖê ü×—Ö üÖ 10) •ÖÖêÖ¬Ö�Öê›ü 11) »ÖÖ»Ö�ÖÖê›üÖ 12) Æü»Ö�ÖëÓ›üÖ
²Öã»ÖœüÖ�ÖÖ 15) �ÖÖ´Ö�ÖÖÓ¾Ö
1) ×�Ö üÖêôûß 2) ‡ÃÖÖ»Ö¾ÖÖ›üß 3) Ø“Ö“Ö�Öê›üÖÖ£Ö 4) �úšü›êü�ÖÖÓ¾Ö 5) Ø“Ö“Ö�Öê›ü²ÖÓ›ü 6) ¿Öë¦üß 7)´ÖÖÓ›ü�Öß 8) ²ÖÖê£ÖÖ 9) �Öê›üá 10) ¾ÖÖ�úß 11) �ÖÖ ü�Öê›ü 12) �ÖÖ üÖê›üß 13) ¬ÖÖ¸ü 14)´ÖÖ™ü ü�ÖÖÓ¾Ö 15) Ø“Ö“Ö�Öê›ü 16) �úÖ™üß 17) �ú—Ö ü 18) Ø¯Ö¯Ö üß 19) ¬ÖÖ�Ö ü 20)»ÖÖ�Ö-Ö¾ÖÖ›üß �Öã¤Ôü 21) ¯Ö¢Öê Öæ ü 21) ×Ö´Ö�Öê›üÖ 22) ×Æü¾Ö ü�Öê›üÖ 23) ×Ö üÖê›üÖ
†�úÖê»ÖÖ 16) ¯ÖÖŸÖæ ü
1) †Ó²ÖÖ üß 2) ³ÖÖÖÖêÃÖÖ 3) ²Öê»Ö¾Öôû 4) ²Ö»Ö�úÖ¯Öæ ü 5) ³ÖÖê�ú¤ü �Óú¤üÖê»Öß 6) ²Ö›üß†Ö´Ö üÖ‡Ô 7)²ÖÖê›üÃÖÖ 8) �ÖÖÖÖ¯Öæ ü 9) �úÖ�ú›ü¤üÖ üß 10) �úÖêšüÖ üß ²Öã¦ãü�ú 11) ¯ÖÖÃÖ™ü»Ö 12) �úÖêÃÖ�ÖÖÓ¾Ö 13) ´ÖÖôû üÖ•Öæ üÖ 14) ÃÖÖ¾Ö ü�Öê›ü 15) Ø“Ö“Ö�Öê›ü ¯ÖÖŸÖæ ü 16) ¿Öê�úÖ¯Öæ ü 17) �úÖ»ÖÖÔ 18)“ÖÖ ü´Öãôûß 19) ¬Ö ü´Ö 20) ¯ÖÖÓ¤ãü�ÖÖÔ 21) ÃÖÖêÖãÖÖ 22) דÖ�Ö»Ö¯ÖÖ¾Æüôû 23) “ÖÖë›üß 24)•ÖÖÓ²Ö 25) Ø“Ö“Ö�Öê›ü 26) �ÖÖêôêû�ÖÖÓ¾Ö 27) †Ö¬ÖÖ ü ÃÖÖ¾ÖÓ�Öß 28) �ÖÖ¾Ö›ü�ÖÖ¾Ö 29)ÃÖÖ¾Ö ü�ÖÖÓ¾Ö
µÖ¾ÖŸÖ´ÖÖôû 17) ¯ÖãÃÖ¤ü
1) د֯Öôû�ÖÖÓ¾Ö 2) ÆüÖîÃÖÖ¯Öæ ü 3) ²ÖÖ´ÖÖ¾ÖÖ›üß 4) �úÖê·ÆÖêôû 5) �ÖÆæüôûß 6) “ÖÖê›üß 7) Ø“Ö“Ö‘ÖÖ™ü 8) ¤êü¾Ö�Ö¾ÆüÖ�Ö 9) ²Öê»Ö�Ö¾ÆüÖ�Ö 10) •ÖÖ´ÖÖß ¬Öã¤ü 11) ´ÖÖê ü�Ö›ü 12) ˆ›üÖ�Öß 13) ¯ÖÖ ü¾ÖÖ 14) ¯ÖÖÓ¤æü�Öß �Öã¤Ôü 15) �Ö™ü�úÖê»ÖÖ 16) ¯ÖÆüÖôûÖ 17) ´ÖÖÓ•Ö ü•Ö¾ÖôûÖ �Öã¤üÖÔ 18)´ÖÖÓ•Ö ü•Ö¾ÖôûÖ 19) ÃÖÖ¾ÖŸÖ´ÖÖôû 20) ÆüÖ¾ÖÓŸÖ�Öê›ü 21) ´ÖÖ ü¾ÖÖ›üß 22) †´ÖéŸÖÖ�Ö ü 23) ¬ÖÖŸÖôû 24)†Ö•Öôû 25) ˆ¯Ö¾ÖÖ¾ÖÖ›üß 26) üÖ´Ö¯Öæ®üÖ�Ö ü 27) ¤ãü¬Ö×�Ö üß 28) †ÖØÃÖ�Ö 29)•ÖÖÓ²ÖÖÖ‡�ú ü 30)׿ֻÖÖêÖÖ
µÖ¾ÖŸÖ´ÖÖôû 18) ˆ´Ö ü�Öê›ü
1) פü›üÖôûÖ 2) ¯ÖÖ›üß 3) Ø¯Ö ü•Öß 4) �ÖÖê×¾Ö¤ü Öæ ü 5) �ãú üôûß 6) •ÖÖ´Ö 7) †�úÖê»Öß 8)ÃÖÖŸÖÖ üÖ 9) ´ÖÃÖôû�Ö 10) ¯ÖÖ›üß 11) •Öê¾Öôûß 12) د֯Öôû�ÖÖÓ¾Ö 13) ²ÖÖê›ü�ÖÖ 14) ¯Öê¬ÖÖ 15)ˆ¤üÖ¯Öæ ü 16) ÃÖÖ¾Ö ü�ÖÖÓ¾Ö 17) ¯Ö üÖê™üß 18) ÖÖÖß 19) ²ÖÖê üß 20) ¬Öê ü›üß 21) ¯Ö¾ÖÖÖôûÖ 22)ÃÖÖêÖ¤üÖ´Öß 23) µÖê�Óú²ÖÖ 24) ´ÖÖê ü“ÖÓ›üß 25) �úÖêÃÖÓ²Öß 26) דÖ�Ö»Öß 27) ¸üÖ´Ö¯Öæ ü 28)²ÖÖê ü�ÖÖÓ¾Ö 29)›üÖë�Ö ü�ÖÖ¾Ö 30) ¬Ö›üÖê»Öß 31) ³ÖÖê‡Ô ü 32) Ö¾Öê»ÖÖ»Ö¯Öæ ü 33) פü�ÖÏÃÖ 34)�úÖ™üß 35)�ú¾ÖšüÖ 36) ¾ÖÆêü»Öß 37) ¾ÖÖÖÖê üÖ 38) ׿־ÖÖ•ÖßÖ�Ö ü 39) •Ö¾Ö üÖôûÖ 40)ˆ´Ö üß 41)†ÃÖÖê»Öß 42)ÃÖê¾ÖÖ»ÖÖ»ÖÖ�Ö ü 43) ¾Ö›ü�ÖÖÓ¾Ö 44) ¤üÖ´ÖÃÖ üß 45) £ÖÖ ü ²Öã. 46)ÃÖê Óü›üß 47)¤ü üÖ üß 48)´Ö¬Öã üÖÖ�Ö ü
†Öî Óü�ÖÖ²ÖÖ¤ü 19) ×ÃÖ»»ÖÖê›ü
1) ¬ÖÖ׿Ö�Ö¾ÖÖ›üß 2) ²ÖÖ³Öãôû�ÖÖ¾Ö 3) ¯ÖÖê�Ö üß 4) ²ÖÖ¾Ö üÖ 5) ´ÖÖê ÖÖêÖÖ²ÖÖ¤ü 6) »ÖêÆüÖ 7)²ÖÖ¬Öê�ÖÖ¾Ö ²Öã. 8) †Ó¬ÖÖ üß 9) •ÖÖŸÖ¾ÖÖ 10) †´Ö üÖ¾ÖŸÖß 11) ‘ÖÖ™üÖÖÓ¤üÖ 12)¯Ö ü¤êü¿Öß¾ÖÖ›üß 13)“ÖÖ üÖê ü 14) ¬ÖÖ¾Ö›üÖ 15) †Ó¬ÖÖ ü¾ÖÖ›üß 16) �ú›êü�ÖÖ¾Ö 17) ×ÃÖ üÃÖÖ´Ö 18)ÖÖŸÖê�ÖÖ¾Ö 19)‘ÖÖ™ü´Ö�Öêôû 20) ÆüÖ»Ö¤üÖ 21) د֯Öôû¤ü üß 22) ´Öã�Ö²ÖÖ ü 23) ¾ÖÖ‘Ö üÖ 24) üÖÓÓ•Ö�Öß 25)†Ø•ÖšüÖ 26)†ÖÖ›ü 27) †Ö´ÖÃÖ üß 28) ÖÖ ü¾Öß 29) ¾Ö›üÖôûß
Government Resolution Annex. II Page IX
וֻÆüÖ ´Æü�ÖæÖ ‘ÖÖê×ÂÖŸÖ �êú»Öê»ÖÖ ŸÖÖ»Öã�úÖ
ˆ¯Ö�Ö™ü ŸÖÖ»Ö㌵ÖÖŸÖᯙ �ÖÖ¾ÖÖÓ“Öß ÖÖ¾Öê
¯Ö ü³Ö�Öß 20) ØÆü�ÖÖê»Öß
1) Ö üÃÖß 2) »ÖÖêÆü�ÖÖÓ¾Ö 3) ÃÖê¾Ö»Öß 4) د֯Öôûß 5) ²ÖÖê üôûÖ 6) •Öôû�ÖÖÓ¾Ö 7) ¿Öê»Öê�ÖÖÓ¾Ö 8)ÃÖÖê-Öê�ÖÖÓ¾Ö 9) Ø¯Ö¯Ö ü�Öê›ü 10) ¤êü¾ÖôûÖ 11) †Ö¯ÖÖ¾ÖÖ›üß 12) ÃÖÃÖãôûÖ¯Öæ ü 13)´ÖÖ£ÖÖ 14)´ÖæÙŸÖ•ÖÖ¯Öæ ü 15) �êúÆü üØ¯Ö¯Ö üß 16) ×ÃÖ¬¤êüÀ¾Ö ü 17) פü‘Öãôû 18)™ãü›ü“ÖÖÖ 19)²Ö›ü“ÖãÖÖ 20)†ÖêœüÖ 21)ÆüÖã ÖÖ-Ö¤ü üß 22) ׿־Ö�úÖ ü 23) •ÖÖ´Ö»ÖÖ 24) •ÖÖ´Ö¤üÖ 25)²Öî•ÖÖ¯Öæ ü 26)�ÖÓ²ÖÖôûÖ 27) ±úÖÃÖê»Öê 28) ŸÖ²Ö»Öß�Ö¾ÆüÖ�Ö 29) ´ÖÖÓ›êü�ÖÖÓ¾Ö 30) üÖ�Ö 31)•ÖÖ´Ö üß �Öã¤Ôü 32)¯ÖÖÓ�Ö üß 33)²ÖÖê üÖôûÖ 34) ÖÖÓ¤æü üÖ 35) �ú›ü¾Öß 36) †Ö´ÖÖ�Öê›ü 37)²ÖÎ Æü¯Öæ üß 38)�Öôû�ÖÖÓ¾Ö 39) •ÖÖ´ÖÃÖÖ 40) ¯ÖÖ ü›üß 41) �Öôû�ÖÖÓ¾Ö 42) × ü¬ÖÖêÃÖ 43) ŸÖê•Ö�ÖÖÓ¾Ö 44)�úÖêôÓû²Ö 45)ÃÖæ�ú»Öß ²Öã. 46) ÃÖã�ú»Öß 47) Ø¿Ö¤êü¯Öôû 48) ¬ÖÖ�Ö ü¾ÖÖ›üß 49) ÃÖ²Öôû�Öê›ü 50)²ÖÖ³Öãôû�ÖÖÓ¾Ö 51) �ÖÖê êü�ÖÖ¾Ö 52) ¯ÖÖë›üß�Öã¤Ôü 53) ²ÖÎ Æü�Ö¾ÖÖ›üß 54) Ø¯Ö¯Ö üß ¯ÖÖ£Ö²Öôû 55)²ÖÖê ü�Öê›ü 56) ‹�ú¾ÖÖ 57) �ÖÓ›üÖôûÖ 58) Ø“Ö“ÖÖêôûß 59) ²Öê»Ö üÖ 60) †Ö›ü�ÖÖÓ¾Ö 61)¤êü¾ÖšüÖ�Ö 62) �úÖôêû�ÖÖÓ¾Ö 63) �ú»ÖÖê�Öê›ü 64) �ú¯Ö�ãú»Öß 65) “ÖÖ™üÖêÖÖ 66)¤êü¾ÖšüÖ�Ö
†Öî Óü�ÖÖ²ÖÖ¤ü 21) �ú®Ö›ü
1) ŸÖÖÓ¤æüôû¾ÖÖ›üß 2) ¯Öê¾Ö»Öß 3) ´Öã ÖÃÖÖ¯Öæ ü 4) ¯Öê�ú›ü¾ÖÖ›üß 5) �úÖë›ü¾ÖÖ›üß 6) �ú»µÖÖ�Öß 7)¾Ö›üÖê ü 8) †Ó²ÖÖ»ÖÖ 9) †ÖÓ²ÖÖ 10) •ÖÖ´Ö›üß 11) êüôû 12)�ãÓú•Ö�Öê›ü 13)ÖÖÓ¤ü×�Ö ü¾ÖÖ›üß 14)×Æü¾Ö ü�Öê›ü 15) ¾Ö›üÖôûß 16) •ÖêŸÖ�Öê›ü 17) ´ÖÖ»Öê�ÖÖÓ¾Ö œüÖë�úôû 18)³ÖÖ ü¾ÖÖ 19)´ÖÖ»Öê�ÖÖÓ¾Ö »ÖÖ�ÖÖë›êü 20) ´ÖÖêÆüÖ›üß 21) ÆüßÖÖ 22) ´ÖÖÆêü�ÖÖÓ¾Ö 23) “Öê›üÃÖ¸ü 24)¯Öôû¿Öß �Öã¤Ôü 25)�úÖÓ²Öôûß 26) ׳ֻ֤ü üß 27) �ÖÖê ü Ø¯Ö¯Ö üß 28) ÃÖ¾Ö�Öê›ü ²Öã. 29) Ø¯Ö¯Ö ü�ÖÖê›üÖ 30)ÃÖ±úßµÖÖ²ÖÖ¤ü 31)�Ö›ü�úß 32) ׯֿÖß ü 33) ³ÖÖŸÖ¾ÖÖ›üß 34) ¾ÖÖÃÖ›üß 35) ØÖ³ÖÖê üÖ 36)ˆ´Ö ü�Öê›ü 37)ÃÖÖ¾Ö ü�ÖÖÓ¾Ö 38) ¬ÖÖ´Ö�Öß 39) †ÖÓ²Öê¾ÖÖ›üß ²Öã. 40) ´ÖêÆãü�Ö 41)ÆüÖ êü¾ÖÖ›üß 42)¾Ö›ü�ÖÖÓ¾Ö 43)»ÖÖê—ÖÖ 44) ¯ÖÖÓ�Öê üß 45) ³ÖÖ¯Öê¾ÖÖ›üß 46) ÃÖÖêÖ¾ÖÖ›üß 47) ׿־֑ÖÖ™ü 48)דִÖ�ÖÖ¯Öæ ü 49)ÖÖ�ÖÖ¯Öæ ü 50) �ú Óü•Ö�Öê›ü 51) êü›üôû�ÖÖÓ¾Ö 52) Öê¾Öæ Öæ ü 53)‘ÖÖ™ü¿Öë™üÖ 54)™üÖ�úôûß 55)†ÓŸÖæ ü 56) »ÖÖêÆü�ÖÖÓ¾Ö
†Öî Óü�ÖÖ²ÖÖ¤ü 22) �Öã»ÖÖŸÖÖ²ÖÖ¤ü
1) ¾Ö›ü�ÖÖÓ¾Ö 2) ¯ÖÖ›üôûß 3) ×¿Ö üÖêôû ²Öã. 4) ÃÖÖ¾Ö ü�Öê›üÖ 5) »ÖÖê¬Öß 6) ²ÖÖê›ü�ú 7) �Öã»ÖŸÖÖ²ÖÖ¤ü 8) ¬ÖÖ´Ö�Ö�ÖÖÓ¾Ö 9) †²¤ãü»ÖÖ¯Öæ ü 10) ×Ö ü�Öã›üß ²Öã. 11) Ø¯Ö¯Ö üß 12) •Ö´ÖÖ»Ö¾ÖÖ›üß 13)´ÆîüÃÖ´ÖÖôû 14) ×¿Ö üÃÖ´ÖÖôû 15) ™üÖ�úôûß �Öã¤Ôü 16) †Ö�ÖŸÖ¾ÖÖ›ü 17) ¾Öê¹ýôû 18)´ÖÓ¡ÖÖ¯Öæ ü 19) �Öã»ÖŸÖÖ²ÖÖ¤ü 20) ÃÖ üÖ‡Ô 21) ²Ö¤ü»ÖÖ²ÖÖ‡Ô 22) ÖÓ¤ãü²ÖÖ¤ü 23) ´ÖÖ¯ÖÃÖÖôûÖ 24) üÃÖã»Ö¯Öæ ü 25) ¿ÖÓ�ú ü¯Öæ ü¾ÖÖ›üß 26) ÃÖÖ²Öã�Öê›üÖ 27) ×�Ö›üá 28) ÃÖÖêÖ�Öê›üÖ 29) ³Ö™ü•Öß 30)»ÖÖ´ÖÖ�ÖÖÓ¾Ö 31) �ÖÖêŸÖêÖÖ¯Öæ ü 32) ×¾Ö ü Ö�ÖÖÓ¾Ö
¯Ö ü³Ö�Öß 23) �úôû´ÖÖã üß
1) �Öê›ü 2) ¬ÖÖÖÖ¯Öæ ü 3) ¬ÖÖêŸÖ üÖ 4) †´Ö ü�ÖÖê•ÖÖ 5) ×¿Ö üÃÖ�Öã¤Ôü 6) ×¿Ö üÃÖ ²Öã¦ãü�ú 7)×›ü�ÖÏÃÖ ¾ÖÖ¯Öß 8) د֯Öôûß 9) ÃÖÖÓ›üÃÖ 10) êü™ü�ú ü 11) ¾Ö üÖ›üß 12) �Ö›ü�úŸÖ ²ÖÎã¦ãü�ú 13)�Ö›ü�úÃÖ �Öã¤Ôü 14) ´ÖÓ¤üÖ üß 15) �ÖÖ ü�Öê›ü 16) ´ÖÆü üß �Öã¤Ôü 17) �Ö›ü�êúŸÖ 18) ²Öî•Ö 19) ¤ãü¬Öê üß 20)Ø“Ö“ÖÖêôûß 21) �ÖÖê›üŸÖ»ÖÖ 22) ¯Öê›ü�ÖÖÓ¾Ö 23) ›üÖë�Öß 24) ÖÖÓ¤ãü üÖ 25) ²ÖÖê»ÖÖ¯Öæ üß 26)ŸÖôêû�ÖÖÓ¾Ö 27) •ÖÖ¾ÖÖ 28) ×´ÖÃÖê ²Öã¦ãü�ú 29) �úÖ¯ÖÃÖ 30) ׿֯Ö�Öß 31) ´ÖÖôû¾ÖÖ›üß 32)¤üÖ›êü�ÖÖÓ¾Ö 33) ´ÖÖêŸÖß“ÖÖê ü 34) ×¾Ö÷ü»Ö¾ÖÖ›üß 35) Ø¯Ö¯Ö üß �Öã¤Ôü 36) �úÖÖê�ÖÖ¾Ö 37)±úÖ™ü�ÖÖ 38) ¤üÖ³ÖÖ›üß 39) ¯ÖãÓ“ÖÖ 40) ´ÖÖê ü�ÖÖÓ¾Ö
1
2
3
4
5
6
Capacity of ESR Staging (M) Quantity of
Concrete in
cum
Reinforcement Qty (MT
)
20,000 12 27.40 2.14
30,000 12 32.70 2.55
40,000 12 37.80 2.95
50,000 12 41.90 3.27
MAHARASHTRA JEEVAN PRADHIKARAN NAGPUR & AMRAVATI REGION
SHEDULE OF RATES FOR THE YEAR 2012-2013
GENERAL NOTES
These rates are applicable to all MJP works in the NAGPUR AND AMRAVATI
REGION with effect from 24-12-2012.
Item of excavation is inclusive of normal manual dewatering, however,
seperate item for dewatering shall be proposed in the estimate where
underground water is anticipated in significant magnitude.
The rates of excavation for O & M works where limited working space is
available and work is required to be carried out on emergency basis,
the rate should be adopted as per the actual rate analysis which shall
be approved by concerned S.E. for that particular work only.
Rates for all items are inclusive of all taxes, levied by Central, state govt. and
local bodies. Labour rates are inclusive of EPF 12.5 % These rates are
applicable only for tendered works, these rates should be reduced by 12.50% of
labour part when works are to be carried out on piecemeal works and other
small works without tendering.
As per Govt. notification No.25/2012/service tax dt. 20 June 2012 point No.12-
E Service Tax is exempted for pipeline, conduit or plant for (i) water supply, (ii)
water treatment or (iii) sewage treatment or disposal. Hence service tax is not
considered in rate analysis.
For all completed items, initial lead of 5 kms. is considered for
collection of materials like sand, bricks, metal, stone etc. Appropriate
addition for lead charges excluding loading, unloading,for these materials
shall be done while estimation.
Following quantities shall be considered for additional lead charges beyond 5
km for material required for concrete and reinforcement for structures.
General-Note 1
Capacity of ESR Staging (M) Quantity of
Concrete in
cum
Reinforcement Qty (MT
)
60,000 12 46.40 3.62
70,000 12 51.20 3.99
75,000 12 53.00 4.13
80,000 12 56.00 4.37
90,000 12 62.40 4.87
125,000 25 107.40 8.38
150,000 12 89.80 7.00
160,000 12 94.30 7.36
175,000 16 117.60 9.17
200,000 20 143.60 11.20
200,000 25 157.00 12.25
250,000 25 177.00 13.81
300,000 25 206.00 16.07
Concrete Qty Reinforcement Qty (MT 25,000 13.58 0.94550,000 18.45 1.586
75,000 30.45 2.095
1,00,000 39.31 2.707
1,50,000 54.699 3.778
2,00,000 73.313 11.900
3,00,000 95.092 6.577
5,00,000 143.277 9.874
10,00,000 222.441 15.418(For WTP & STP works, the quantities of completed / ongoing works shall be
considred
7
Note: Spiral staircase not considered. Above quantities shall be considered for
all type of foundation (SBC) and all type of Seismic Zone.
For RCC GSR
Capacity ( Lit)
All the concrete Items for water retaining structures are taken as M-300 grade.
Hence aggregate quantity shall be 0.90 cum/cum of concrete and sand
quantity shall be 0.45 cum/cum of concrete for RCC GSR, ESR, All Treatment
Plants
These rates are applicable to water supply and sewerage schemes
and its allied works only. Items required for general construction, buildings,
roads, Irrigation Works etc. shall be adopted from the current schedule of
rates of P.W.D. or Irrigation Deptt. in respective areas. For bore wells,
CSR. of GSDA shall be followed. Increase in percentage over normal
schedule of rates will also be as per norms of respective C.S.R.
General-Note 2
8
9
Area % Increase
a Works in Corporation area 5%
b Works in Municipal areas 2%
c Works in tribal area / hilly and inaccesible areas 10%
d Suger cane area 5%
e Prison / Jail area 15%
f Defence area 20%
g Rajbhavan 20%
h Excavation for pipeline work along National Highway 10%
i Excavation for Dist.system pipe lines, Sewerage 10%
system in towns
j 10%
Naxalite Areas District wise
1) GADCHIROLI : Whole District.
2) CHANDRAPUR : Chandrapur, Gondpipri, Rajura, Korapana, Jiwati,
Ballarpur, Pobhurna, Mul & Sawli Tahsil
3) GONDIA : Tiroda, Goregaon, SadakArjuni, Salekasa, Deori,
Arjuni Morgaon, Amagaon, Gondia Tahsil
4) BHANDARA : Sakoli, Lakhani & Lakhandur Tahsil.
5) YAVATMAL : Pandharkawda, Wani, Zari, Zamani, Ghatanji &
Arni Tahsil.
10
For mechanical and electrical items related to water supply and
sewerage schemes, CSR for 2012-2013 prepared by Superintending
Engineer (Mechanical), Maharashtra Jeevan Pradhikaran shall be adopted.
Following increase in % over normal schedule of rates of M.J.P. for 2012-
2013 will be applicable. (Ref. PWD GR. No. DSR / 1091 / CR-6577 / Planning-
3, dated 08/07/2003)
For Naxalite Area (As listed below)
NOTE: The 10% increase in rates for NAXAL affected areas will be the
additional rates applicable for that areas over and above 'a' to 'i' as applicable.
This additional percentage is only on completed item of work and not
applicable to items of providing of materials like steel, pipes, valves, specials
and other supply of materials etc.
In any case more than one percentage increase on basic rates becomes
admissible, instead of adding both, the higher percentage only be taken.
(e.g. if any Municipal Council falls in hilly area, then additional percentage
in rates will be with only 10 % and not with 2 % + 10 %). This additional
percentage is only on completed item of work and not applicable to
items of providing of materials likesteel, pipes, valves, specials etc.
General-Note 3
11
12
13
14
Material Rate in Rs. Per MT.
a Cement Rs. 6000.00
b Mild Steel Rs. 46000.00
c Tor Steel/CTD bars Rs. 46000.00
d Structural Steel Rs. 47150.00
e Corrosion Resistant Steel (Fe 500) Rs. 48350.00
15
16
17
18
For hilly and inaccessible areas / Tribal areas approved by Government,
Planning Department's Circular Nos.(1)1089/CR-66/Plan-19, DT.
23/11/1990 and (2) 1094 / P-36 / K-1455 dt.02/09/1994, shall be followed
(refer pages 347 onwords). In addition to amendment notified by the planning
deptt. time to time.
For Action Plan Notified Area, Government's Circular in force from time
to time shall be followed.
Whenever basic rates of completed items are increaed by percentage given
at Sr. No. 9, the issue rates of materials to be supplied by the
Department (if any) for these items shall be increased by same percentage.
This schedule of rates is based on following basic rates for important
Details of standard cement consumption and standard weight of various
pipes are incorporated in this CSR .
Rates for supply of various types of pipes, specials and valves are
inclusive of excise duty, central sales tax and VAT, third party inspection
charges, storage charges, overhead charges and transportation of materials
upto divisional stores, site and stacking.
Cost of carting of pipes and valves from departmental stores to site of
work is not considered in rate analysis, hence this item must be
incorporated in each scheme. While inviting tenders if supply is from
departmental store, then this item shall appear in the tender, and if
the supply is by contractor then this item shall not appear in the
tender, even though same is provided in sanctioned scheme, because
the contractor is supposed to bring the pipes and valves directly at site.
Though the contractor is required to do refilling before hydraulic testing
to avoid traffic hurdle, no payment for refilling of the trenches of
pipeline shall be payable till satisfactory hydraulic testing is given. Re-excavation required if any, during testing, shall be done by the
contractor at his own cost.
General-Note 4
19
20
21
22
23
24
25
26
27
For Dams , Balancing Tanks , Aerated Lagoons and similar structures, the
rates for Film membranes as per prevailing rates for Irrigation
Department will be followed.
10 % of cost of items of water retaining structures, such as
GSR/ESR/MBR shall be retained till satisfactory hydraulic testing as per
IS code.
10 % of cost of total sub-work of pipeline work shall be retained till
satisfactory hydraulic testing is given as per IS code.
In case of supply of pipes / valves etc. by contractor, only 85%
payment shall be released after supply and 15% after satisfactory
hydraulic testing.
AC / PVC pipes shall not to be used in Urban Areas with reference to the
Circular No. 130 dated 09/03/2009 of M.S., MJP. HDPE pipes may be used in
Distribution system of Urban areas with diameter restricted upto 300 mm dia
only, provided that the area where these pipes are to be laid shall not be a
rocky area.
Capacity of ESR / GSR to be constructed shall be rounded to nearest
1000 litres always on higher side i.e. if required capacity is 1,23,570
litre, it shall be rounded to 1,24,000 litre. Similarly, if required capacity
is 8,26,070 litre, it shall be rounded to 8,27,000 litre.
Capacity of Unconventional / conventional Treatment Plants shall be
rounded to nearest 0.5 Mld- always on higher side i.e. if WTP of 2.37
Mld is required; it shall be rounded to 2.5 Mld. For WTP having
capacity less than 0.5 mld, package type WTP should be considered.
Provision for octroi charges for pipes,specials and valves is not considered
in the CSR 2012-2013. Provision of 4 % of cost of pipes ,specials and
valves to be used in corporation area shall be made while framing the
estimate for works included in corporation limit. Octroi charges shall be
reimbursed to contractor on production of receipt for payment for
materials actully to be used in corporation area, if there specific
provision to that effect in the contract.
For use of ready mix cement concrete, prior permission of the Chief
Engineer must be obtained.
General-Note 5
28
29
30
31
32
33
Provision for insurance @ 1% is considered in Rate analysis of CSR 2012-2013.
These rates are applicable only for tendered work, these rates shall be reduced
by 1% of total rate when works are to be carried out on piecemeal works and
other small works without tendering.
Rates given in this CSR are for estimation purpose only.
As per Govt. circular No. DSR-1090 / CR- 6453 / PLN-3 dated 14/7/1993 1%
for labour amenities is not considered in the DSR except concrete items while
arriving the rates
The Royalty Charges are considered in the rate analysis of CSR 2012-13 as per
Govt. circular revenue & Forest Deptt. No. Gaukhani-10/1009/CR-309/ dt.
11/02/2010.
The makes of Sluice / Butterfly valves etc. to be used for inlet / outlets of
ESRs / GSRs / MBRs / WTP Pumping main / Rising main shall be from
approved makes of M.J.P .
Excise duty is exempted for equipments (Gears, Motors, Tube settlers) used for
WTP as per Notification No. 26/2009 - Central Excise dated 4/12/2009.
a) Pipes needed for deliveray of water from its source to the plant (including the
clear treated water reservoir if any thereof) and from there to first storage
point.
b) Pipes of outer dimeter exceeding 100 mm when such pipes are internal part
of water supply projects.
c) All the items of machinary, including instruments, appertanances and
appliances auxillary equipments and their componenets / parts required for
setting up of water treatment plant.
General-Note 6
Sr.No. Description Unit
Rate
(in Rs.)
2012-13
Rate
(in Rs.)
2013-2014
1 Acetylene Gas Nos 600.00
2 Alum Grade I Ex-factory Mt 8200.00
3 Binding Wire Kg 60.00
4 Black enemal paint Anti corrosive Ltr 200.00
5 Bricks No 4.25
6 Bullies, Struts (125 mm dia 1.5 M long) rmt 180.00
7 C.C.Teak wood planks(3" X 6") Cum 72000.00
8 Cement (Bags) Bag 300.00
9 Cement (M.T.) Mt 6000.00
10 Cement Sulphar Resistant M.T. 6600.00
11 Charcoal Kg 24.20
12 Coarse sand Cum 1100.00
13 Corrosion Resistant steel Mt 48300.00
14 Diesel Lit 51.75
15 Epoxy paint Kg 425.00
16 Fuse No 17.60
17 Gun Powder Kg 160.00
18 Kasarde sand (for mortar lining work) @ source cum 1092.00
19 Liquid chlorine 100 kg Deptt Containor . No. 2800.00
20 Liquid chlorine 900 kg Supplier Containor No. 16000.00
21 LubricantOil lit 224.25
22 M.S.angle(50x50x6mm) Kg 47.15
23 M.S.Bars (Delivery at site) Mt 46000.00
24 M.S.Bars (in kgs) Kg 46.00
25 M.S.Flats (40 mm x 3 mm) Kg 48.30
26 M.S.plate Kg 49.00
27 Mild steelGrill ready Kg 69.00
28 Mildsteel grill railing mt 69.00
29 Mobile oil Lit 218.00
30 Murum cum 200.00
31 Nails Kg 65.00
32 Nutbolts Kg 85.00
33 Oxygen Gas (Refill) Cylinder 350.00
34 Plywood Coomercial 12 mm thick Waterproof for
centering
sqm 730.00
35 Polling board cum 18500.00
36 R.S.Joist channel etc MT 47150.00
37 Rapid sand Gravity filter Gravel At Source Cum 1500.00
38 Rapid sand Gravity filter Gravel At Source (Godhara,
Gokak, Vainganga, Yesagi sand)
Cum 1500.00
39 Ready mix oil paint Ltr 231.00
40 Ready mix primer for steel Ltr 160.00
41 Ready mix synthetic enamel paint Lit 239.00
42 Ready mixed lead/zinc paint Ltr 210.00
43 Rubber Gasket (8 mm thick) Kg 86.00
SECTION - A : MATERIALS
Section-A-Material 7
Sr.No. Description Unit
Rate
(in Rs.)
2012-13
Rate
(in Rs.)
2013-2014
SECTION - A : MATERIALS
44 Rubble cum 405.00
45 Sand cum 1150.00
46 Spun Yarn Kg 100.00
47 Stone Aggregate 10 mm cum 850.00
48 Stone Aggregate 20 mm cum 800.00
49 Stone Aggregate 40 mm cum 750.00
50 Structural Steel M.T. 47150.00
51 T.C.L.(bleaching poweder Gr.I) (10kg pack) Kg 20.00
52 T.C.L.(bleaching poweder Gr.I) (25kg pack) Kg 22.00
53 T.C.L.(bleaching poweder Gr.I) (5kg pack) Kg 22.00
54 Teak wood Cum 72000.00
55 Tor Steel Mt 46000.00
56 Walling ( 100x100mm) cum 16500.00
57 Welding Rod Having weight 5.25 kg Box 1500.00
58 White cement Kg 33.00
59 White lead Kg 165.00
60 Wire Kg 75.00
Section-A-Material 8
Sr.No. Description Unit Rate
(in Rs.)
2012-13
Rate
(in Rs.)
2013-2014
1 Asst Fitter No. 275.00
2 Bhandhani No. 303.00
3 Bhisti with pakahal No. 260.00
4 Blacksmith IInd class No. 303.00
5 Breaker No. 303.00
6 Carpainter 1st class No. 363.00
7 Carpainter 2nd class No. 303.00
8 Chiseller No. 303.00
9 Excavator No. 242.00
10 Fitter 1st class No. 327.00
11 Glazier No. 303.00
12 Helper No. 260.00
13 Hole Driller No. 303.00
14 Mason 1st class No. 363.00
15 Mason 2nd class No. 303.00
16 MAZDOOR (FEMALE) No. 260.00
17 Mazdoor(Heavy) No. 303.00
18 Mazdoor (Light) No. 260.00
19 MAZDOOR (MALE) No. 260.00
20 Maistry No. 303.00
21 Mukadam No. 303.00
22 Painter (for coloring) No. 303.00
23 Painter No. 303.00
24 Polisher No. 303.00
25 Pump Driver No. 303.00
26 StoneCutter or dresser No. 303.00
27 Tile layer No. 303.00
28 Welder No. 363.00
29 Welder for pipe line No. 363.00
30 WhiteWasher No. 303.00
31 TileTurner No. 303.00
32 L.M.V. Driver No. 303.00
33 Electrician No. 363.00
34 Plumber (Building) No. 363.00
35 Mali No. 260.00
36 Wireman No. 303.00
37 Computer Operator (data entryoperator) No. 424.00
SECTION - B : LABOUR AND MACHINERY
Section-B-Labour Machinery 9
Sr.No. Description Unit Rate
(in Rs.)
2012-13
Rate
(in Rs.)
2013-2014
1 Rent for chain pully block with tripod Day 450.00
2 Rent charges for pump excluding
operator & excluding fuel
BHP-Day 180.00
3 Rent for Mech.Mixer with fuel & crew Day 2300.00
4 Rent for vibrator with fuel and crew Day 900.00
5 Plate Bender Day 900.00
6 Rent for welding set with Electric set Day 1100.00
7 Rent for welding set with Generator Day 2400.00
8 Rent for Compressor with fuel Day 2500.00
9 Rent for Concrete breaker & Compressor Day 2500.00
10 Rent for poclain Hour 2000.00
11 Rent for Crane Hour 1300.00
12 Rent for JCB Hour 1000.00
13 Truck hire charges upto 20 km Day 2300.00
14 Truck hire charges for 20 km to 50 km Day 2100.00
15 Truck hire charges for 50 km & above Day 1600.00
16 Pipe cutter with opertor Day 1250.00
17 Desludging/ Desilting pump Day 2400
18 Jeep hire charges with driver and fuel
(Upto 300 KM.)
Day 3000
MACHINERY
Section-B-Labour Machinery 10
STATEMENT -I 2012-2013
Sr.N
o.Item of work Unit
Collecting the
railway receipt
etc & unloading
the
consignment
from railway
wagon &
keeping on
railway
platform
consignment
booked in.
Lifting the
material
from
railway
platform,
loading
Unloading
into truck.
Loading the
material into
truck from
departmental
store or site of
work.
Unloading the
material from
truck including
stacking in
departmental
stores or site of
work.
1 2 3 4 5 6 7
(A) MANUAL HANDLING
(Weight upto & including 300 kg.)
1 C.I. / D.I. /M.S./H.D.P.E. pipes of all
classes upto & including 200 mm dia.
Pipes of any length.
M.T. 276.70 337.60 88.00 88.00
2 R.C.C. pipes of all classes upto &
including 350 mm dia.
M.T. 276.70 337.60 88.00 88.00
3 A.C. pipes of all classes & dia. M.T. 145.50 206.40 52.70 52.70
4 P.V.C. pipes of all classes & dia. M.T. 145.50 206.40 52.70 52.70
5 All other materials such as C.I.
Specials of individual weight upto 300
kg.
M.T. 276.70 337.60 88.00 88.00
6 Mild steel / for steel / R.S.J. M.T. 174.40 235.20 132.75 132.75
7 Cement / bleaching powder / alum. M.T. 84.70 128.00 67.10 67.10
(B) CRANE HANDLING
(Materials having individual weight above
300 kg.)
1 C.I./D.I./B.W.S.C./ M.S./ R.C.C. pipes of
all classes having individual weight more
than 300 kg. & alsoother heavy materials,
valves, machinery having individual
weight more than 300 kg.
M.T. 195.10 247.90 177.50 177.50
SECTION - C : TRANSPORTATION
1) The above rates in col. 1 to 5 are apploicable only for Railway clearence purpose and not for other carting.
2) The rates given in col. 6 to 7 shall be adopted for estimate purpose only, however actual quotations / D- tender will
prevail.
3) Irrespective of supply of C.I./D.I. Pipes as per rate contract when pipes are directly supplied by the firms by road
railway freight upto destination station and carting as per schedule from Railway Station to work site is allowed In
such cases rate of Mathadi Kamgar shall not be applicable for carting and normal loading, unloading carting shall be
allowed.
Section-C-Transportation 11
Lead in
kms. (L)
Average
speed
(S)
No.of
Trips N =
8
(2(L/S)+1)
kms.done
(2NL + 6)
Litres of
diesel
consumed
Cost of
diesel @
Rs 51.75
per lit.
Litres of
mobile oil
consumed
Cost of
mobile oil
@ Rs 218
per lit.
Cost of 6
mazd.@
Rs340.88
per day
Hire
charges
of Truck
Rs.per
day
Total Cost
= (6)+(8)+
(9)+(10)
Add 10%
overhead
charges
Total
(11)+(12)
Cost per
trip (13)/(3)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
0.50 15.00 7.50 13.50 4.50 232.88 0.10 20.93 2045.25 2300.00 4599.06 459.91 5058.97 674.53
1.00 16.00 7.11 20.22 6.74 348.80 0.14 31.39 2045.25 2300.00 4725.44 472.54 5197.98 731.08
1.50 16.50 6.77 26.31 8.77 453.85 0.19 40.98 2045.25 2300.00 4840.08 484.01 5324.09 786.42
2.00 17.00 6.48 31.92 10.64 550.62 0.23 49.70 2045.25 2300.00 4945.57 494.56 5440.13 839.53
2.50 17.25 6.20 37.00 12.33 638.08 0.26 57.55 2045.25 2300.00 5040.88 504.09 5544.97 894.35
3.00 17.50 5.96 41.76 13.92 720.36 0.30 64.96 2045.25 2300.00 5130.57 513.06 5643.63 946.92
3.50 17.75 5.74 46.18 15.39 796.43 0.33 71.94 2045.25 2300.00 5213.62 521.36 5734.98 999.13
4.00 18.00 5.54 50.32 16.77 867.85 0.36 78.26 2045.25 2300.00 5291.36 529.14 5820.50 1050.63
4.50 18.25 5.36 54.24 18.08 935.64 0.39 84.37 2045.25 2300.00 5365.26 536.53 5901.79 1101.08
5.00 18.50 5.19 57.90 19.30 998.78 0.41 90.25 2045.25 2300.00 5434.28 543.43 5977.71 1151.77
6.00 18.75 4.88 64.56 21.52 1113.66 0.46 100.50 2045.25 2300.00 5559.41 555.94 6115.35 1253.15
7.00 19.00 4.61 70.54 23.51 1216.64 0.50 109.87 2045.25 2300.00 5671.76 567.18 6238.94 1353.35
8.00 19.18 4.36 75.76 25.25 1306.69 0.54 117.94 2045.25 2300.00 5769.88 576.99 6346.87 1455.70
9.00 19.60 4.17 81.06 27.02 1398.29 0.58 126.22 2045.25 2300.00 5869.76 586.98 6456.74 1548.38
10.00 20.00 4.00 86.00 28.67 1483.67 0.61 133.85 2045.25 2300.00 5962.77 596.28 6559.05 1639.76
15.00 25.00 3.64 115.20 38.40 1987.20 0.82 179.41 2045.25 2300.00 6511.86 651.19 7163.05 1967.87
20.00 25.00 3.08 129.20 43.07 2228.87 0.92 201.21 2045.25 2300.00 6775.33 677.53 7452.86 2419.76
25.00 25.00 2.67 139.50 46.50 2406.38 1.00 217.13 2045.25 2100.00 6768.76 676.88 7445.64 2788.63
30.00 25.00 2.35 147.00 49.00 2535.75 1.05 228.90 2045.25 2100.00 6909.90 690.99 7600.89 3234.42
35.00 30.00 2.40 174.00 58.00 3001.50 1.24 270.97 2045.25 2100.00 7417.72 741.77 8159.49 3399.79
40.00 30.00 2.18 180.40 60.13 3111.73 1.29 281.00 2045.25 2100.00 7537.98 753.80 8291.78 3803.57
45.00 30.00 2.00 186.00 62.00 3208.50 1.33 289.72 2045.25 2100.00 7643.47 764.35 8407.82 4203.91
50.00 30.00 1.85 191.00 63.67 3294.92 1.36 297.35 2045.25 2100.00 7737.52 773.75 8511.27 4600.69
60.00 30.00 1.60 198.00 66.00 3415.50 1.41 308.25 2045.25 1600.00 7369.00 736.90 8105.90 5066.19
70.00 30.00 1.41 203.40 67.80 3508.65 1.45 316.75 2045.25 1600.00 7470.65 747.07 8217.72 5828.17
80.00 30.00 1.26 207.60 69.20 3581.10 1.48 323.29 2045.25 1600.00 7549.64 754.96 8304.60 6590.95
90.00 30.00 1.14 211.20 70.40 3643.20 1.51 328.96 2045.25 1600.00 7617.41 761.74 8379.15 7350.13
100.00 40.00 1.33 272.00 90.67 4692.17 1.94 423.57 2045.25 1600.00 8760.99 876.10 9637.09 7245.93
125.00 40.00 1.10 281.00 93.67 4847.42 2.01 437.53 2045.25 1600.00 8930.20 893.02 9823.22 8930.20
150.00 40.00 0.94 288.00 96.00 4968.00 2.06 448.43 1922.54 1600.00 8938.97 893.90 9832.87 10460.50
175.00 40.00 0.82 293.00 97.67 5054.42 2.09 456.27 1677.11 1600.00 8787.80 878.78 9666.58 11788.51
200.00 40.00 0.73 298.00 99.33 5140.33 2.13 464.12 1493.03 1600.00 8697.48 869.75 9567.23 13105.79
250.00 40.00 0.59 301.00 100.33 5192.08 2.15 468.70 1206.70 1600.00 8467.48 846.75 9314.23 15786.83
300.00 45.00 0.56 342.00 114.00 5899.50 2.44 532.57 1145.34 1600.00 9177.41 917.74 10095.15 18027.05
420.00 45.00 0.41 350.40 116.80 6044.40 2.50 545.65 838.55 1600.00 9028.60 902.86 9931.46 24223.07
540.00 45.00 0.32 351.60 117.20 6065.10 2.51 547.40 654.48 1600.00 8866.98 886.70 9753.68 30480.25
660.00 45.00 0.26 349.20 116.40 6023.70 2.49 543.69 531.77 1600.00 8699.16 869.92 9569.08 36804.15
780.00 45.00 0.22 349.20 116.40 6023.70 2.49 543.69 449.96 1600.00 8617.35 861.74 9479.09 43086.77
900.00 45.00 0.20 366.00 122.00 6313.50 2.61 569.85 409.05 1600.00 8892.40 889.24 9781.64 48908.20
1020.00 45.00 0.17 352.80 117.60 6085.80 2.52 549.36 347.69 1600.00 8582.85 858.29 9441.14 55536.12
1140.00 45.00 0.15 348.00 116.00 6003.00 2.49 541.95 306.79 1600.00 8451.74 845.17 9296.91 61979.40
STATEMENT II
Including Loading, unloading and stacking
SECTION-C : TRANSPORTATION 12
Lead in
kms. (L)
Average
speed
(S)
No.of
Trips N =
8
(2(L/S)+1)
kms.done
(2NL + 6)
Litres of
diesel
consumed
Cost of
diesel @
Rs 51.75
per lit.
Litres of
mobile oil
consumed
Cost of
mobile oil
@ Rs 218
per lit.
Cost of 6
mazd.@
Rs 0 per
day
Hire
charges
of Truck
Rs.per
day
Total Cost
= (6)+(8)+
(9)+(10)
Add 10%
overhead
charges
Total
(11)+(12)
Cost per
trip (13)/(3)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
0.50 15.00 7.50 13.50 4.50 232.88 0.10 20.93 0.00 2300.00 2553.81 255.38 2809.19 374.56
1.00 16.00 7.11 20.22 6.74 348.80 0.14 31.39 0.00 2300.00 2680.19 268.02 2948.21 414.66
1.50 16.50 6.77 26.31 8.77 453.85 0.19 40.98 0.00 2300.00 2794.83 279.48 3074.31 454.11
2.00 17.00 6.48 31.92 10.64 550.62 0.23 49.70 0.00 2300.00 2900.32 290.03 3190.35 492.34
2.50 17.25 6.20 37.00 12.33 638.08 0.26 57.55 0.00 2300.00 2995.63 299.56 3295.19 531.48
3.00 17.50 5.96 41.76 13.92 720.36 0.30 64.96 0.00 2300.00 3085.32 308.53 3393.85 569.44
3.50 17.75 5.74 46.18 15.39 796.43 0.33 71.94 0.00 2300.00 3168.37 316.84 3485.21 607.18
4.00 18.00 5.54 50.32 16.77 867.85 0.36 78.26 0.00 2300.00 3246.11 324.61 3570.72 644.53
4.50 18.25 5.36 54.24 18.08 935.64 0.39 84.37 0.00 2300.00 3320.01 332.00 3652.01 681.35
5.00 18.50 5.19 57.90 19.30 998.78 0.41 90.25 0.00 2300.00 3389.03 338.90 3727.93 718.29
6.00 18.75 4.88 64.56 21.52 1113.66 0.46 100.50 0.00 2300.00 3514.16 351.42 3865.58 792.13
7.00 19.00 4.61 70.54 23.51 1216.64 0.50 109.87 0.00 2300.00 3626.51 362.65 3989.16 865.33
8.00 19.18 4.36 75.76 25.25 1306.69 0.54 117.94 0.00 2300.00 3724.63 372.46 4097.09 939.70
9.00 19.60 4.17 81.06 27.02 1398.29 0.58 126.22 0.00 2300.00 3824.51 382.45 4206.96 1008.86
10.00 20.00 4.00 86.00 28.67 1483.67 0.61 133.85 0.00 2300.00 3917.52 391.75 4309.27 1077.32
15.00 25.00 3.64 115.20 38.40 1987.20 0.82 179.41 0.00 2300.00 4466.61 446.66 4913.27 1349.80
20.00 25.00 3.08 129.20 43.07 2228.87 0.92 201.21 0.00 2300.00 4730.08 473.01 5203.09 1689.31
25.00 25.00 2.67 139.50 46.50 2406.38 1.00 217.13 0.00 2100.00 4723.51 472.35 5195.86 1946.01
30.00 25.00 2.35 147.00 49.00 2535.75 1.05 228.90 0.00 2100.00 4864.65 486.47 5351.12 2277.07
35.00 30.00 2.40 174.00 58.00 3001.50 1.24 270.97 0.00 2100.00 5372.47 537.25 5909.72 2462.38
40.00 30.00 2.18 180.40 60.13 3111.73 1.29 281.00 0.00 2100.00 5492.73 549.27 6042.00 2771.56
45.00 30.00 2.00 186.00 62.00 3208.50 1.33 289.72 0.00 2100.00 5598.22 559.82 6158.04 3079.02
50.00 30.00 1.85 191.00 63.67 3294.92 1.36 297.35 0.00 2100.00 5692.27 569.23 6261.50 3384.59
55.00 30.00 1.71 194.10 64.70 3348.23 1.39 302.15 0.00 1600.00 5250.38 525.04 5775.42 3377.44
65.00 30.00 1.50 201.00 67.00 3467.25 1.44 313.05 0.00 1600.00 5380.30 538.03 5918.33 3945.55
75.00 30.00 1.33 205.50 68.50 3544.88 1.47 320.02 0.00 1600.00 5464.90 546.49 6011.39 4519.84
85.00 30.00 1.20 210.00 70.00 3622.50 1.50 327.00 0.00 1600.00 5549.50 554.95 6104.45 5087.04
95.00 40.00 1.39 270.10 90.03 4659.05 1.93 420.52 0.00 1600.00 6679.57 667.96 7347.53 5285.99
105.00 40.00 1.28 274.80 91.60 4740.30 1.96 427.93 0.00 1600.00 6768.23 676.82 7445.05 5816.45
130.00 40.00 1.07 284.20 94.73 4902.28 2.03 442.54 0.00 1600.00 6944.82 694.48 7639.30 7139.53
155.00 40.00 0.91 288.10 96.03 4969.55 2.06 448.64 0.00 1600.00 7018.19 701.82 7720.01 8483.53
180.00 40.00 0.80 294.00 98.00 5071.50 2.10 457.80 0.00 1600.00 7129.30 712.93 7842.23 9802.79
230.00 40.00 0.64 300.40 100.13 5181.73 2.15 467.83 0.00 1600.00 7249.56 724.96 7974.52 12460.19
280.00 45.00 0.60 342.00 114.00 5899.50 2.44 532.57 0.00 1600.00 8032.07 803.21 8835.28 14725.47
400.00 45.00 0.43 350.00 116.67 6037.67 2.50 545.00 0.00 1600.00 8182.67 818.27 9000.94 20932.42
520.00 45.00 0.33 349.20 116.40 6023.70 2.49 543.69 0.00 1600.00 8167.39 816.74 8984.13 27224.64
640.00 45.00 0.27 351.60 117.20 6065.10 2.51 547.40 0.00 1600.00 8212.50 821.25 9033.75 33458.33
760.00 45.00 0.23 355.60 118.53 6133.93 2.54 553.72 0.00 1600.00 8287.65 828.77 9116.42 39636.61
880.00 45.00 0.20 358.00 119.33 6175.33 2.56 557.43 0.00 1600.00 8332.76 833.28 9166.04 45830.20
1000.00 45.00 0.18 366.00 122.00 6313.50 2.61 569.85 0.00 1600.00 8483.35 848.34 9331.69 51842.72
1120.00 45.00 0.16 364.40 121.47 6286.07 2.60 567.45 0.00 1600.00 8453.52 845.35 9298.87 58117.94
STATEMENT III
Excluding Loading, unloading and stacking
SECTION-C : TRANSPORTATION 13
Lead in km Cost per trip Cement pay
load 9.00 MT
Steel pay load
9.00 MT
Bulk Asphalt
in Bouzer pay
load 4.50 MT
M.S.Bar 9.0
MT
Sand 5.75
cum
1 2 3 4 5 6 7
0.5 674.53 74.95 74.95 149.90 74.95 117.31
1 731.08 81.23 81.23 162.46 81.23 127.14
1.5 786.42 87.38 87.38 174.76 87.38 136.77
2 839.53 93.28 93.28 186.56 93.28 146.01
2.5 894.35 99.37 99.37 198.74 99.37 155.54
3 946.92 99.37 99.37 198.74 105.21 164.68
3.5 999.13 111.01 111.01 222.03 111.01 173.76
4 1050.63 116.74 116.74 233.47 116.74 182.72
4.5 1101.08 122.34 122.34 244.68 122.34 191.49
5 1151.77 127.97 127.97 255.95 127.97 200.31
6 1253.15 139.24 139.24 278.48 139.24 217.94
7 1353.35 150.37 150.37 300.74 150.37 235.37
8 1455.7 161.74 161.74 323.49 161.74 253.17
9 1548.38 172.04 172.04 344.08 172.04 269.28
10 1639.76 182.20 182.20 364.39 182.20 285.18
15 1967.87 218.65 218.65 437.30 218.65 342.24
20 2419.76 268.86 268.86 537.72 268.86 420.83
25 2788.63 309.85 309.85 619.70 309.85 484.98
30 3234.42 359.38 359.38 718.76 359.38 562.51
35 3399.79 377.75 377.75 755.51 377.75 591.27
40 3803.57 422.62 422.62 845.24 422.62 661.49
45 4203.91 467.10 467.10 934.20 467.10 731.11
50 4600.69 511.19 511.19 1022.38 511.19 800.12
60 5066.19 562.91 562.91 1125.82 562.91 881.08
70 5828.17 647.57 647.57 1295.15 647.57 1013.59
80 6590.95 732.33 732.33 1464.66 732.33 1146.25
90 7350.13 816.68 816.68 1633.36 816.68 1278.28
100 7245.93 805.10 805.10 1610.21 805.10 1260.16
125 8930.2 992.24 992.24 1984.49 992.24 1553.08
150 10460.5 1162.28 1162.28 2324.56 1162.28 1819.22
175 11788.51 1309.83 1309.83 2619.67 1309.83 2050.18
200 13105.79 1456.20 1456.20 2912.40 1456.20 2279.27
250 15786.83 1754.09 1754.09 3508.18 1754.09 2745.54
300 18027.05 2003.01 2003.01 4006.01 2003.01 3135.14
420 24223.07 2691.45 2691.45 5382.90 2691.45 4212.71
540 30480.25 3386.69 3386.69 6773.39 3386.69 5300.91
660 36804.15 4089.35 4089.35 8178.70 4089.35 6400.72
780 43086.77 4787.42 4787.42 9574.84 4787.42 7493.35
900 48908.2 5434.24 5434.24 10868.49 5434.24 8505.77
1020 55536.12 6170.68 6170.68 12341.36 6170.68 9658.46
1140 61979.4 6886.60 6886.60 13773.20 6886.60 10779.03
STATEMENT IV
Including loading, unloading and stacking
SECTION-C: TRANSPORTATION 14
Lead in km Cost per trip Cement pay load
9.00 MT
Steel pay load 9.00
MT
Bulk Asphalt in
Bouzer pay load
4.50 MT
1 2 3 4 5
0.5 374.56 41.62 41.62 83.24
1 414.66 46.07 46.07 92.15
1.5 454.11 50.46 50.46 100.91
2 492.34 54.70 54.70 109.41
2.5 531.48 59.05 59.05 118.11
3 569.44 59.05 59.05 118.11
3.5 607.18 67.46 67.46 134.93
4 644.53 71.61 71.61 143.23
4.5 681.35 75.71 75.71 151.41
5 718.29 79.81 79.81 159.62
6 792.13 88.01 88.01 176.03
7 865.33 96.15 96.15 192.30
8 939.7 104.41 104.41 208.82
9 1008.86 112.10 112.10 224.19
10 1077.32 119.70 119.70 239.40
15 1349.8 149.98 149.98 299.96
20 1689.31 187.70 187.70 375.40
25 1946.01 216.22 216.22 432.45
30 2277.07 253.01 253.01 506.02
35 2462.38 273.60 273.60 547.20
40 2771.56 307.95 307.95 615.90
45 3079.02 342.11 342.11 684.23
50 3384.59 376.07 376.07 752.13
55 3377.44 375.27 375.27 750.54
65 3945.55 438.39 438.39 876.79
75 4519.84 502.20 502.20 1004.41
85 5087.04 565.23 565.23 1130.45
95 5285.99 587.33 587.33 1174.66
105 5816.45 646.27 646.27 1292.54
130 7139.53 793.28 793.28 1586.56
155 8483.53 942.61 942.61 1885.23
180 9802.79 1089.20 1089.20 2178.40
230 12460.19 1384.47 1384.47 2768.93
280 14725.47 1636.16 1636.16 3272.33
400 20932.42 2325.82 2325.82 4651.65
520 27224.64 3024.96 3024.96 6049.92
640 33458.33 3717.59 3717.59 7435.18
760 39636.61 4404.07 4404.07 8808.14
880 45830.2 5092.24 5092.24 10184.49
1000 51842.72 5760.30 5760.30 11520.60
1120 58117.94 6457.55 6457.55 12915.10
STATEMENT V
Excluding loading, unloading and stacking
SECTION-C: TRANSPORTATION 15
Lead in
km
Cost / trip Lime murum
building
rubbish
Earth Manure or
sludge
Excavated
rock
Sand stone
aggregate
40 mm &
below
Aggregate
40 mm &
above
Soling stone Concrete
block (form)
Timber
1 2 3 4 5 6 7 8 9 10 11
Pay load 6.0 cum 4.8 cum 5.52 cum 3.0 cum 5.75 cum 5.5 cum 4.7 cum 6.0 cum 5.0 cum
0.5 674.53 112.42 140.53 122.20 224.84 117.31 122.64 143.52 112.42 117.31
1 731.08 121.85 152.31 132.44 243.69 127.14 132.92 155.55 121.85 127.14
1.5 786.42 131.07 163.84 142.47 262.14 136.77 142.99 167.32 131.07 136.77
2 839.53 139.92 174.9 152.09 279.84 146.01 152.64 178.62 139.92 146.01
2.5 894.35 149.06 186.32 162.02 298.12 155.54 162.61 190.29 149.06 155.54
3 946.92 157.82 197.28 171.54 315.64 164.68 172.17 201.47 157.82 164.68
3.5 999.13 166.52 208.15 181.00 333.04 173.76 181.66 212.58 166.52 173.76
4 1050.63 175.11 218.88 190.33 350.21 182.72 191.02 223.54 175.11 182.72
4.5 1101.08 183.51 229.39 199.47 367.03 191.49 200.20 234.27 183.51 191.49
5 1151.77 191.96 239.95 208.65 383.92 200.31 209.41 245.06 191.96 200.31
6 1253.15 208.86 261.07 227.02 417.72 217.94 227.85 266.63 208.86 217.94
7 1353.35 225.56 281.95 245.17 451.12 235.37 246.06 287.95 225.56 235.37
8 1455.7 242.62 303.27 263.71 485.23 253.17 264.67 309.72 242.62 253.17
9 1548.38 258.06 322.58 280.50 516.13 269.28 281.52 329.44 258.06 269.28
10 1639.76 273.29 341.62 297.06 546.59 285.18 298.14 348.89 273.29 285.18
15 1967.87 327.98 409.97 356.50 655.96 342.24 357.79 418.70 327.98 342.24
20 2419.76 403.29 504.12 438.36 806.59 420.83 439.96 514.84 403.29 420.83
25 2788.63 464.77 580.96 505.19 929.54 484.98 507.02 593.33 464.77 484.98
30 3234.42 539.07 673.84 585.95 1078.14 562.51 588.08 688.17 539.07 562.51
35 3399.79 566.63 708.29 615.90 1133.26 591.27 618.14 723.36 566.63 591.27
40 3803.57 633.93 792.41 689.05 1267.86 661.49 691.56 809.27 633.93 661.49
45 4203.91 700.65 875.81 761.58 1401.30 731.11 764.35 894.45 700.65 731.11
50 4600.69 766.78 958.48 833.46 1533.56 800.12 836.49 978.87 766.78 800.12
60 5066.19 844.37 1055.46 917.79 1688.73 881.08 921.13 1077.91 844.37 881.08
70 5828.17 971.36 1214.2 1055.83 1942.72 1013.59 1059.67 1240.04 971.36 1013.59
80 6590.95 1098.49 1373.11 1194.01 2196.98 1146.25 1198.35 1402.33 1098.49 1146.25
90 7350.13 1225.02 1531.28 1331.55 2450.04 1278.28 1336.39 1563.86 1225.02 1278.28
100 7245.93 1207.66 1509.57 1312.67 2415.31 1260.16 1317.44 1541.69 1207.66 1260.16
125 8930.2 1488.37 1860.46 1617.79 2976.73 1553.08 1623.67 1900.04 1488.37 1553.08
150 10460.5 1743.42 2179.27 1895.02 3486.83 1819.22 1901.91 2225.64 1743.42 1819.22
175 11788.51 1964.75 2455.94 2135.60 3929.50 2050.18 2143.37 2508.19 1964.75 2050.18
200 13105.79 2184.3 2730.37 2374.24 4368.60 2279.27 2382.87 2788.47 2184.30 2279.27
250 15786.83 2631.14 3288.92 2859.93 5262.28 2745.54 2870.33 3358.90 2631.14 2745.54
300 18027.05 3004.51 3755.64 3265.77 6009.02 3135.14 3277.65 3835.54 3004.51 3135.14
420 24223.07 4037.18 5046.47 4388.24 8074.36 4212.71 4404.19 5153.84 4037.18 4212.71
540 30480.25 5080.04 6350.05 5521.78 10160.08 5300.91 5541.86 6485.16 5080.04 5300.91
660 36804.15 6134.03 7667.53 6667.42 12268.05 6400.72 6691.66 7830.67 6134.03 6400.72
780 43086.77 7181.13 8976.41 7805.57 14362.26 7493.35 7833.96 9167.40 7181.13 7493.35
900 48908.2 8151.37 10189.21 8860.18 16302.73 8505.77 8892.40 10406.00 8151.37 8505.77
1020 55536.12 9256.02 11570.03 10060.89 18512.04 9658.46 10097.48 11816.20 9256.02 9658.46
1140 61979.4 10329.9 12912.38 11228.15 20659.80 10779.03 11268.98 13187.11 10329.90 10779.03
STATEMENT VI
Including loading, unloading and stacking
SECTION-C :TRANSPORTATION 16
Lead in
km
Cost / trip Cement
stone
block, GI CI
CC AC
Pipes
below 120
mm dia
Tar
bitumenn
Asphalt
roofing felt &
Flooring
Asphalt etc.
Steam coal Matting
thatching
bambu
ceiling
board
rubber PVC
pipes fittings
Sheet & plate
glass in
packs Paints
& Distempers
AC Sheets &
fittings iron
fittings and
iron sheets
Bricks
modular
bricks &
Traditional
bricks
Tiles half
round tiles &
Roofing tiles
cement
flooring tiles
Glass
blocks
(hollow)
200x200
x120 mm
Empty
cement bags
1 2 3 4 5 6 7 8 9 10 11
Pay load 7.0 Mt 4.5 MT 5.5 MT 3.0 MT 7.0 MT 3500 No. 3200 No. 1000 No. 2000 No.
Unit per 1 M.T. per 1 M.T. per 1 M.T. per 1 M.T. per 1 M.T. per 1000 Nos.per 1000 Nos.per 1000 Nos.per 1000 Nos.
0.5 674.53 96.36 149.90 122.64 224.84 96.36 192.72 210.79 67.45 337.27
1 731.08 104.44 162.46 132.92 243.69 104.44 208.88 228.46 73.11 365.54
1.5 786.42 112.35 174.76 142.99 262.14 112.35 224.69 245.76 78.64 393.21
2 839.53 119.93 186.56 152.64 279.84 119.93 239.87 262.35 83.95 419.77
2.5 894.35 127.76 198.74 162.61 298.12 127.76 255.53 279.48 89.44 447.18
3 946.92 135.27 210.43 172.17 315.64 135.27 270.55 295.91 94.69 473.46
3.5 999.13 142.73 222.03 181.66 333.04 142.73 285.47 312.23 99.91 499.57
4 1050.63 150.09 233.47 191.02 350.21 150.09 300.18 328.32 105.06 525.32
4.5 1101.08 157.30 244.68 200.20 367.03 157.30 314.59 344.09 110.11 550.54
5 1151.77 164.54 255.95 209.41 383.92 164.54 329.08 359.93 115.18 575.89
6 1253.15 179.02 278.48 227.85 417.72 179.02 358.04 391.61 125.32 626.58
7 1353.35 193.34 300.74 246.06 451.12 193.34 386.67 422.92 135.34 676.68
8 1455.70 207.96 323.49 264.67 485.23 207.96 415.91 454.91 145.57 727.85
9 1548.38 221.20 344.08 281.52 516.13 221.20 442.39 483.87 154.84 774.19
10 1639.76 234.25 364.39 298.14 546.59 234.25 468.50 512.43 163.98 819.88
15 1967.87 281.12 437.30 357.79 655.96 281.12 562.25 614.96 196.79 983.94
20 2419.76 345.68 537.72 439.96 806.59 345.68 691.36 756.18 241.98 1209.88
25 2788.63 398.38 619.70 507.02 929.54 398.38 796.75 871.45 278.86 1394.32
30 3234.42 462.06 718.76 588.08 1078.14 462.06 924.12 1010.76 323.44 1617.21
35 3399.79 485.68 755.51 618.14 1133.26 485.68 971.37 1062.43 339.98 1699.90
40 3803.57 543.37 845.24 691.56 1267.86 543.37 1086.73 1188.62 380.36 1901.79
45 4203.91 600.56 934.20 764.35 1401.30 600.56 1201.12 1313.72 420.39 2101.96
50 4600.69 657.24 1022.38 836.49 1533.56 657.24 1314.48 1437.72 460.07 2300.35
60 5066.19 723.74 1125.82 921.13 1688.73 723.74 1447.48 1583.18 506.62 2533.10
70 5828.17 832.60 1295.15 1059.67 1942.72 832.60 1665.19 1821.30 582.82 2914.09
80 6590.95 941.56 1464.66 1198.35 2196.98 941.56 1883.13 2059.67 659.10 3295.48
90 7350.13 1050.02 1633.36 1336.39 2450.04 1050.02 2100.04 2296.92 735.01 3675.07
100 7245.93 1035.13 1610.21 1317.44 2415.31 1035.13 2070.27 2264.35 724.59 3622.97
125 8930.20 1275.74 1984.49 1623.67 2976.73 1275.74 2551.49 2790.69 893.02 4465.10
150 10460.50 1494.36 2324.56 1901.91 3486.83 1494.36 2988.71 3268.91 1046.05 5230.25
175 11788.51 1684.07 2619.67 2143.37 3929.50 1684.07 3368.15 3683.91 1178.85 5894.26
200 13105.79 1872.26 2912.40 2382.87 4368.60 1872.26 3744.51 4095.56 1310.58 6552.90
250 15786.83 2255.26 3508.18 2870.33 5262.28 2255.26 4510.52 4933.38 1578.68 7893.42
300 18027.05 2575.29 4006.01 3277.65 6009.02 2575.29 5150.59 5633.45 1802.71 9013.53
420 24223.07 3460.44 5382.90 4404.19 8074.36 3460.44 6920.88 7569.71 2422.31 12111.54
540 30480.25 4354.32 6773.39 5541.86 10160.08 4354.32 8708.64 9525.08 3048.03 15240.13
660 36804.15 5257.74 8178.70 6691.66 12268.05 5257.74 10515.47 11501.30 3680.42 18402.08
780 43086.77 6155.25 9574.84 7833.96 14362.26 6155.25 12310.51 13464.62 4308.68 21543.39
900 48908.20 6986.89 10868.49 8892.40 16302.73 6986.89 13973.77 15283.81 4890.82 24454.10
1020 55536.12 7933.73 12341.36 10097.48 18512.04 7933.73 15867.46 17355.04 5553.61 27768.06
1140 61979.40 8854.20 13773.20 11268.98 20659.80 8854.20 17708.40 19368.56 6197.94 30989.70
STATEMENT VII
Including loading, unloading and stacking
SECTION-C :TRANSPORTATION 17
100 mm 125 mm 150 mm 200 mm 250 mm 300 mm 300 & 400
mm
450 & 500
mm
600, 700 &
750 mm
800, 900 &
1000 mm
1200 & 1800
MM
Pay load
in Rmt
292.8 219.6 183 109.8 80.52 62.22 54.9 29.28 18.183 15 5
1 2 3 4 5 6 7 8 9 10 11 12 13
0.5 674.53 230.37 307.16 368.60 614.33 837.72 1084.10 1228.65 2303.72 3685.96 4496.87 13490.60
1 731.08 249.69 332.91 399.50 665.83 907.95 1174.99 1331.66 2496.86 3994.97 4873.87 14621.60
1.5 786.42 268.59 358.11 429.74 716.23 976.68 1263.93 1432.46 2685.86 4297.38 5242.80 15728.40
2 839.53 286.72 382.30 458.76 764.60 1042.64 1349.29 1529.20 2867.25 4587.60 5596.87 16790.60
2.5 894.35 305.45 407.26 488.72 814.53 1110.72 1437.40 1629.05 3054.47 4887.16 5962.33 17887.00
3 946.92 323.40 431.20 517.44 862.40 1176.01 1521.89 1724.81 3234.02 5174.43 6312.80 18938.40
3.5 999.13 341.23 454.98 545.97 909.95 1240.85 1605.80 1819.91 3412.33 5459.73 6660.87 19982.60
4 1050.63 358.82 478.43 574.11 956.86 1304.81 1688.57 1913.72 3588.22 5741.15 7004.20 21012.60
4.5 1101.08 376.05 501.40 601.68 1002.81 1367.46 1769.66 2005.61 3760.52 6016.83 7340.53 22021.60
5 1151.77 393.36 524.49 629.38 1048.97 1430.41 1851.13 2097.94 3933.64 6293.83 7678.47 23035.40
6 1253.15 427.99 570.65 684.78 1141.30 1556.32 2014.06 2282.60 4279.88 6847.81 8354.33 25063.00
7 1353.35 462.21 616.28 739.54 1232.56 1680.76 2175.10 2465.12 4622.10 7395.36 9022.33 27067.00
8 1455.70 497.17 662.89 795.46 1325.77 1807.87 2339.60 2651.55 4971.65 7954.64 9704.67 29114.00
9 1548.38 528.82 705.09 846.11 1410.18 1922.98 2488.56 2820.36 5288.18 8461.09 10322.53 30967.60
10 1639.76 560.03 746.70 896.04 1493.41 2036.46 2635.42 2986.81 5600.27 8960.44 10931.73 32795.20
15 1967.87 672.09 896.12 1075.34 1792.23 2443.95 3162.76 3584.46 6720.87 10753.39 13119.13 39357.40
20 2419.76 826.42 1101.89 1322.27 2203.79 3005.17 3889.04 4407.58 8264.21 13222.73 16131.73 48395.20
25 2788.63 952.40 1269.87 1523.84 2539.74 3463.28 4481.89 5079.47 9524.01 15238.42 18590.87 55772.60
30 3234.42 1104.65 1472.87 1767.44 2945.74 4016.92 5198.36 5891.48 11046.52 17674.43 21562.80 64688.40
35 3399.79 1161.13 1548.17 1857.81 3096.35 4222.29 5464.14 6192.70 11611.30 18578.09 22665.27 67995.80
40 3803.57 1299.03 1732.04 2078.45 3464.09 4723.76 6113.10 6928.18 12990.33 20784.54 25357.13 76071.40
45 4203.91 1435.76 1914.35 2297.22 3828.70 5220.95 6756.53 7657.40 14357.62 22972.19 28026.07 84078.20
50 4600.69 1571.27 2095.03 2514.04 4190.06 5713.72 7394.23 8380.13 15712.74 25140.38 30671.27 92013.80
60 5066.19 1730.26 2307.01 2768.41 4614.02 6291.84 8142.38 9228.03 17302.56 27684.10 33774.60 101323.80
70 5828.17 1990.50 2653.99 3184.79 5307.99 7238.16 9367.04 10615.97 19904.95 31847.92 38854.47 116563.40
80 6590.95 2251.01 3001.34 3601.61 6002.69 8185.48 10592.98 12005.37 22510.08 36016.12 43939.67 131819.00
90 7350.13 2510.29 3347.05 4016.46 6694.11 9128.33 11813.13 13388.21 25102.90 40164.64 49000.87 147002.60
100 7245.93 2474.70 3299.60 3959.52 6599.21 8998.92 11645.66 13198.42 24747.03 39595.25 48306.20 144918.60
125 8930.20 3049.93 4066.58 4879.89 8133.15 11090.66 14352.62 16266.30 30499.32 48798.91 59534.67 178604.00
150 10460.50 3572.58 4763.43 5716.12 9526.87 12991.18 16812.12 19053.73 35725.75 57161.20 69736.67 209210.00
175 11788.51 4026.13 5368.17 6441.81 10736.35 14640.47 18946.50 21472.70 40261.30 64418.09 78590.07 235770.20
200 13105.79 4476.02 5968.03 7161.63 11936.06 16276.44 21063.63 23872.11 44760.21 71616.34 87371.93 262115.80
250 15786.83 5391.68 7188.90 8626.68 14377.81 19606.10 25372.60 28755.61 53916.77 86266.83 105245.53 315736.60
300 18027.05 6156.78 8209.04 9850.85 16418.08 22388.29 28973.08 32836.16 61567.79 98508.47 120180.33 360541.00
420 24223.07 8272.91 11030.54 13236.65 22061.08 30083.30 38931.32 44122.17 82729.06 132366.50 161487.13 484461.40
540 30480.25 10409.92 13879.90 16655.87 27759.79 37854.26 48987.87 55519.58 104099.21 166558.74 203201.67 609605.00
660 36804.15 12569.72 16759.63 20111.56 33519.26 45708.08 59151.64 67038.52 125697.23 201115.57 245361.00 736083.00
780 43086.77 14715.43 19620.57 23544.68 39241.14 53510.64 69249.07 78482.28 147154.27 235446.83 287245.13 861735.40
900 48908.20 16703.62 22271.49 26725.79 44542.99 60740.44 78605.27 89085.97 167036.20 267257.92 326054.67 978164.00
1020 55536.12 18967.25 25289.67 30347.61 50579.34 68971.83 89257.67 101158.69 189672.54 303476.07 370240.80 1110722.40
1140 61979.40 21167.83 28223.77 33868.52 56447.54 76973.92 99613.31 112895.08 211678.28 338685.25 413196.00 1239588.00
STATEMENT VIII
Including loading, unloading and stacking
Cost / trip R.C.C. STEEL CYLINDER, R.C PIPES, C.I. PIPES,, UNREINFORCED CEMENT PIPES, PRECAST COCRETE PIPESLead in
km
UNIT PER 100 RMT
SECTION-C :TRANSPORTATION 18
Lead in
km
Cost/trip 100 mm 150 mm 200 mm 230 mm 250 mm 300 mm 350 mm 400 mm
480 m 240 m 135 m 105 m 84 m 66 m 43 m 27 m
1 2 3 4 5 6 7 8 9 10
0.5 674.53 140.53 281.05 499.65 642.41 803.01 1022.02 1568.67 2498.26
1 731.08 152.31 304.62 541.54 696.27 870.33 1107.7 1700.19 2707.7
1.5 786.42 163.84 327.68 582.53 748.97 936.21 1191.55 1828.88 2912.67
2 839.53 174.9 349.8 621.87 799.55 999.44 1272.02 1952.4 3109.37
2.5 894.35 186.32 372.65 662.48 851.76 1064.7 1355.08 2079.88 3312.41
3 946.92 197.28 394.55 701.42 901.83 1127.29 1434.73 2202.14 3507.11
3.5 999.13 208.15 416.3 740.1 951.55 1189.44 1513.83 2323.56 3700.48
4 1050.6 218.88 437.76 778.24 1000.6 1250.75 1591.86 2443.33 3891.22
4.5 1101.1 229.39 458.78 815.61 1048.65 1310.81 1668.3 2560.65 4078.07
5 1151.8 239.95 479.9 853.16 1096.92 1371.15 1745.11 2678.53 4265.81
6 1253.2 261.07 522.15 928.26 1193.48 1491.85 1898.71 2914.3 4641.3
7 1353.4 281.95 563.9 1002.48 1288.9 1611.13 2050.53 3147.33 5012.41
8 1455.7 303.27 606.54 1078.3 1386.38 1732.98 2205.61 3385.35 5391.48
9 1548.4 322.58 645.16 1146.95 1474.65 1843.31 2346.03 3600.88 5734.74
10 1639.8 341.62 683.23 1214.64 1561.68 1952.1 2484.48 3813.4 6073.19
15 1967.9 409.97 819.95 1457.68 1874.16 2342.7 2981.62 4576.44 7288.41
20 2419.8 504.12 1008.23 1792.41 2304.53 2880.67 3666.3 5627.35 8962.07
25 2788.6 580.96 1161.93 2065.65 2655.84 3319.8 4225.2 6485.19 10328.26
30 3234.4 673.84 1347.68 2395.87 3080.4 3850.5 4900.64 7521.91 11979.33
35 3399.8 708.29 1416.58 2518.36 3237.9 4047.37 5151.2 7906.49 12591.81
40 3803.6 792.41 1584.82 2817.46 3622.45 4528.06 5762.98 8845.51 14087.3
45 4203.9 875.81 1751.63 3114.01 4003.72 5004.65 6369.56 9776.53 15570.04
50 4600.7 958.48 1916.95 3407.92 4381.61 5477.01 6970.74 10699.28 17039.59
60 5066.2 1055.46 2110.91 3752.73 4824.94 6031.18 7676.05 11781.84 18763.67
70 5828.2 1214.2 2428.4 4317.16 5550.64 6938.3 8830.56 13553.88 21585.81
80 6591 1373.11 2746.23 4882.19 6277.1 7846.37 9986.29 15327.79 24410.93
90 7350.1 1531.28 3062.55 5444.54 7000.12 8750.15 11136.56 17093.33 27222.7
100 7245.9 1509.57 3019.14 5367.36 6900.89 8626.11 10978.68 16851 26836.78
125 8930.2 1860.46 3720.92 6614.96 8504.95 10631.19 13530.61 20767.91 33074.81
150 10461 2179.27 4358.54 7748.52 9962.38 12452.98 15849.24 24326.74 38742.59
175 11789 2455.94 4911.88 8732.23 11227.15 14033.94 17861.38 27415.14 43661.15
200 13106 2730.37 5460.75 9707.99 12481.7 15602.13 19857.26 30478.58 48539.96
250 15787 3288.92 6577.85 11693.95 15035.08 18793.85 23919.44 36713.56 58469.74
300 18027 3755.64 7511.27 13353.37 17168.62 21460.77 27313.71 41923.37 66766.85
420 24223 5046.47 10092.95 17943.01 23069.59 28836.99 36701.62 56332.72 89715.07
540 30480 6350.05 12700.1 22577.96 29028.81 36286.01 46182.2 70884.3 112889.81
660 36804 7667.53 15335.06 27262.33 35051.57 43814.46 55763.86 85591.05 136311.67
780 43087 8976.41 17952.82 31916.13 41035.02 51293.77 65282.98 100201.79 159580.63
900 48908 10189.21 20378.42 36228.3 46579.24 58224.05 74103.33 113740 181141.48
1020 55536 11570.03 23140.05 41137.87 52891.54 66114.43 84145.64 129153.77 205689.33
1140 61979 12912.38 25824.75 45910.67 59028 73785 93908.18 144138.14 229553.33
STONEWARE PIPES
STATEMENT IX
Including loading, unloading and stacking
Unit Per 100 Rmt
Pay Load
SECTION-C :TRANSPORTATION 19
I) C.I.Pipes (IS:1536-1989)
LA A B
80 16.00 17.38 18.46
100 19.82 21.82 23.27
125 25.82 28.18 30.36
150 32.10 35.27 38.00
200 47.09 51.09 55.27
250 63.45 69.09 74.73
300 81.82 89.45 96.91
350 103.09 111.82 121.27
400 125.45 137.09 140.00
450 151.27 166.10 179.27
500 177.09 192.91 208.73
600 236.00 257.64 335.01
700 304.55 335.73 359.45
750 341.09 372.91 404.55
800 381.00 416.00 450.00
900 465.09 507.45 549.80
1000 558.73 610.36 659.64
STATEMENT SHOWING STANDARD WEIGHTS OF PIPES TO BE FOLLOWED FOR
CARTING OF VARIOUS DIAMETERS AND TYPES OF PIPES
Diameter of pipes
in mm
Class of pipes and its weights in kg. per meter length
SECTION-C :tRANSPORTATION 20
II) D.I. PIPES
1) Barrel Mass as per IS : 8329-1994
2) Socket Mass as per IS : 8329-1994
3) Cement Mortar Lining Weights as per ISO : 4179-1985
4M 5M 5.50M 6M
80 mm wt. of D.I. pipe / M 13.00 13.00 12.91 12.67
weight morter / m 1.56 1.56 1.56 1.56
Total wt. / M 14.56 14.56 10.47 14.23
100 mm wt. of D.I. pipe / M 16.25 16.00 16.00 15.86
weight morter / m 1.93 1.93 1.93 1.93
Total wt. / M 18.18 17.93 17.93 17.76
125 mm wt. of D.I. pipe / M 20.50 20.00 20.00 19.83
weight morter / m 2.45 2.42 2.42 2.42
Total wt. / M 22.92 22.42 22.42 22.25
150 mm wt. of D.I. pipe / M 24.75 24.20 24.18 24.00
weight morter / m 2.90 2.90 2.90 2.90
Total wt. / M 27.65 27.10 27.08 26.90
200 mm wt. of D.I. pipe / M 33.25 32.60 33.54 32.33
weight morter / m 3.88 3.88 3.88 3.88
Total wt. / M 37.13 36.48 36.42 36.21
250 mm wt. of D.I. pipe / 43.75 43.00 42.73 42.50
M weight morter / m 4.84 4.84 4.84 4.84
Total wt. / M 88.59 47.84 47.57 47.34
300 mm wt. of D.I. pipe / M 55.50 54.60 54.18 53.83
weight morter / m 5.80 5.80 5.80 5.80
Total wt. / M 61.30 60.40 59.98 59.63
350 mm wt. of D.I. pipe / M 69.25 68.00 67.45 67.17
weight morter / m 12.12 12.12 12.12 12.12
Total wt. / M 81.37 80.12 79.57 79.29
400 mm wt. of D.I. pipe / M 82.75 81.40 80.91 80.33
weight morter / m 13.82 13.82 13.82 13.82
Nominal dia meterWeight / M Length of D.I. K-9 Pipes of
STATEMENT SHOWING THE TOTAL WEIGHTS OF VARIOUS DIA D.I.K-9 PIPES
INCLUDING WEIGHT OF MORTER LINING PER LENGTH
SECTION-C :TRANSPORTATION 21
4M 5M 5.50M 6M
Total wt. / M 96.57 95.22 94.73 94.15
450 mm wt. of D.I. pipe / M 98.75 97.00 96.36 95.83
weight morter / m 15.53 15.53 15.53 15.53
Total wt. / M 114.28 112.53 111.89 111.36
500 mm wt. of D.I. pipe / M 115.00 112.80 112.00 111.50
weight morter / m 17.26 17.26 17.26 17.26
Total wt. / M 132.26 130.06 129.26 128.76
600 mm wt. of D.I. pipe / M 152.00 149.00 147.82 147.00
weight morter / m 320.75 20.75 320.75 320.75
Total wt. / M 172.73 169.73 168.55 167.73
700 mm wt. of D.I. pipe / M 193.75 189.80 188.36 187.70
weight morter / m 29.45 29.45 29.45 29.45
Total wt. / M 223.20 219.25 217.81 217.25
750 mm wt. of D.I. pipe / M 217.50 213.00 211.45 210.00
weight morter / m 31.56 31.56 31.56 31.56
Total wt. / M 249.06 244.56 243.01 241.56
800 mm wt. of D.I. pipe / M 240.75 235.80 233.82 232.33
weight morter / m 33.69 33.69 33.69 33.69
Total wt. / M 274.44 269.49 267.51 265.92
900 mm wt. of D.I. pipe / M 292.75 286.20 283.82 281.83
weight morter / m 37.89 37.89 37.89 37.89
Total wt. / M 330.64 324.09 321.71 319.72
1000 mm wt. of D.I. pipe / M 3495.75 341.60 338.55 336.17
weight morter / m 42.08 42.08 42.08 42.08
Total wt. / M 391.83 383.68 380.63 378.25
Note:
These weights are as per the circular issued by Superintending Engineer, (HQ) vide
Nominal dia meterWeight / M Length of D.I. K-9 Pipes of
SECTION-C :TRANSPORTATION 22
III) M.S. Pipes
IV) A.C. Pressure Pipes (ISO-160)
Class 5 Class 10 Class 15 Class 20
80 6.00 6.20 6.40 6.80
100 7.60 7.70 8.20 10.30
125 9.57 9.80 11.00 13.30
150 11.87 12.20 15.30 19.00
200 15.57 19.30 25.60 32.70
250 19.25 25.20 32.70 41.50
300 24.97 32.30 45.10 58.10
350 39.77 47.52 55.27 71.42
400 49.20 60.20 71.36 93.10
450 56.92 70.27 83.63 111.37
500 72.84 89.54 104.25 136.52
600 102.50 137.32 148.35 193.16
Diameter of pipes in
mm
Class of pipes and its weights in kg per meter length
STATEMENT SHOWING STANDARD WEIGHTS TO BE FOLLOWED FOR CARTING OF
VARIOUS DIAMETERS AND TYPES OF PIPES
Note: Weight of M.S. pipes is to be computed by considering density of steel as 7850
kg/cum considering the diameter and thickness of plate used for manufacturing of M.S.
pipes
SECTION-C :TRANSPORTATION 23
V) P.V.C. Pipes (IS:4985-1988)
63
75
90
110
140
160
180
200
225
250
280
315
VI) R.C.C. Pipes
P-1 P-2 P-3 NP-2 NP-3 NP-4
100 23.56 23.56 23.56 21.20 21.20 21.20
150 33.00 33.00 33.00 29.40 29.40 29.40
200 42.10 42.10 42.10 37.90 37.90 37.90
250 51.84 63.40 75.18 57.10 67.60 77.20
300 74.64 102.50 117.10 92.25 105.40 119.10
350 92.28 134.30 168.10 120.80 151.30 170.20
400 104.16 169.60 208.10 152.60 187.30 212.40
450 127.92 188.70 235.23 169.90 211.70 240.80
500 141.36 229.90 261.37 206.90 235.23 270.50
600 192.96 305.70 313.64 275.10 282.27 320.20
700 225.59 325.80 365.92 293.20 329.32 370.90
800 257.82 345.19 418.19 310.60 376.30 425.40
900 290.00 389.58 470.47 350.60 423.00 482.30
1000 322.28 443.98 510.00 399.80 459.00 531.40
Diameter of pipe
in mm
Class of pipes and its weights in kg per meter length
8.34 12.16 19.80
10.55 15.37 25.00
5.48 7.84 12.56
6.63 10.19 15.31
3.56 5.07 8.10
4.26 7.00 10.20
2.13 3.10 4.99
2.78 3.92 6.56
1.44
0.92 1.33 2.05
1.32 1.89 3.08
Diameter of pipe
in mm
Class of pipes and its weights in kg per meter length
4.00 sq.cm 6.00 sq.cm 10.00 sq.cm
0.47 0.67 1.01
0.67 0.93
SECTION-C :tRANSPORTATION 24
VII) P.S.C. Pipes of all classes and B.W.S.C. Pipes of all classes
VIII) Stoneware Pipes
IX) G.I. Pipes
Light (Blue) Medium (Yellow) Heavy (Red)
15 0.96 1.23 1.46
20 1.42 1.59 1.91
25 2.03 2.40 2.99
32 2.61 3.17 3.97
40 3.29 3.65 4.47
50 4.18 5.16 6.24
65 5.92 6.63 8.02
80 6.98 8.64 10.30
100 10.20 12.40 14.70
125 -- 16.70 18.30
150 -- 19.70 21.80
Diameter of pipes in
mm
Class of pipes and its weights in kg per meter length
225 23.70 kg/each
250 27.57 kg/each
300 43.60 kg/each
100 8.70 kg/each
150 15.00 kg/each
200 20.85 kg/each
1800 2205.50 kg/km
Diameter of pipes in mm Weight of 0.60 M long pipe in kg per pipe
Diameter of pipes in mm Weight of pipe per meter length for all classes
350 197.50 kg/km
400 240.00 kg/km
450 257.50 kg/km
1600 1767.50 kg/km
1700 1987.50 kg/km
1400 1370.00 kg/km
1500 1560.00 kg/km
1200 1115.00 kg/km
1300 1190.00 kg/km
1000 825.00 kg/km
1100 947.50 kg/km
800 582.50 kg/km
900 705.00 kg/km
600 375.00 kg/km
700 432.50 kg/km
500 292.50 kg/km
SECTION-C :tRANSPORTATION 25
SECTION-D- CEMENT CONSUMPTION
Sr. No. Item of Works Unit
Standard
Cement
Consumption
A. P.C.C. & R.C.C. Works
1:½:1 (M-300) with finishing in CM 1:3 proportion Cum 9.20 bags
1:½:2 (M-250) with finishing in CM 1:3 proportion Cum 8.50 bags
1:1½:3 (M-200) with finishing in CM 1:3 proportion Cum 6.90 bags
1:1½:3 (M-200) without finishing Cum 6.80 bags
1:2:4 (M-150) without finishing in CM 1:3 proportion Cum 5.90 bags
1:2:4 (M-150) without finishing Cum 5.80 bags
B. Brick Masonry Works
B.B. Masonry - IInd sort in CM 1:6 proportion Cum 1.44 bags
B.B. Masonry - IInd sort in CM 1:5 proportion Cum 1.62 bags
B.B. Masonry - IInd sort in CM 1:4 proportion Cum 2.30 bags
Half brick walls in CM 1:4 proportion Cum 0.22 bags
C. Half brick walls in CM 1:4 proportion
Stone Masonry Works
U.C.R. Masonry - IInd sort in CM 1:6 proportion Cum 1.77 bags
U.C.R. Masonry - IInd sort in CM 1:4 proportion Cum 2.65 bags
Ramdom Rubble Masonry - IInd sort in CM 1:6 proportionCum 1.77 bags
Ramdom Rubble Masonry - IInd sort in CM 1:4 proportionCum 2.65 bags
C.R. Masonry - IInd sort in CM 1:4 proportion Cum 2.45 bags
C.R. Masonry - IInd sort in CM 1:6 proportion Cum 1.50 bags
D. Water Proofing Works
1Damp-proof course 50 mm thick in 1:2:4 proportion with
bituman layer W.P. compoundSqm. 0.35 bags
Integral finishing to newly laid slab in CM 1:3 proportion with
W.P. CompoundSqm. 0.06 bags
Water Proofing treatment over old slab with W.P. cement
slurry as tack coat 12 mm thick, W.P. plaster in CM 1:3
proportion, brick bat coba average 9.50 cm thick in CM 1:6
proportion and 20 mm thick W.P. cement plaster over it in CM
1:3 proportion and finishing with cement slurry with novelling
Sqm. 0.37 bags
STANDARD CEMENT CONSUMPTION TO BE FOLLOWED FOR VARIOUS ITEMS OF
WORKS
Section-D-Cement Consumption 26
Sr. No. Item of Works Unit
Standard
Cement
Consumption
E. Plastering and Pointing Works
i) 12 mm thick plaster
CM 1:2 proportion Sqm. 0.16 bags
CM 1:3 proportion Sqm. 0.12 bags
CM 1:4 proportion Sqm. 0.10 bags
ii) 20 mm thick plaster
CM 1:2 proportion Sqm. 0.27 bags
CM 1:3 proportion Sqm. 0.19 bags
CM 1:4 proportion Sqm. 0.15 bags
iii) 25 mm thick plaster
CM 1:2 proportion Sqm. 0.34 bags
CM 1:3 proportion Sqm. 0.25 bags
CM 1:4 proportion Sqm. 0.19 bags
iv) Cement pointing in CM 1:3 proportion Sqm. 0.03 bags
v) Tuck cement pointing in CM 1:3 proportion Sqm. 0.05 bags
vi) Sand faced plaster in CM 1:4 proportion including base
coat 15 mm thick in CM 1:4 proportion with W.P.
compound
Sqm. 0.22 bags
vii) Rough cast cement plaster in CM1:4 proportion in two
coats.Sqm. 0.22 bags
F. Flooring Works
i) I.P.S. flooring - 40 mm thick Sqm. 0.30 bags
i) I.P.S. flooring - 50 mm thick Sqm. 0.37 bags
i) Rough Shahabad - any other similar flooring in CM 1:4
proportion bedding Sqm. 0.15 bags
iv) All types of cement / kadappa / polished / mosaic tiles
flooring or skirting / dado set on CM 1:4 proportion bedding Sqm. 0.18 bags
v) Glazed / Ceramic tiles flooring or skirting / dado fixed with
plain cement slurrySqm. 0.22 bags
Section-D-Cement Consumption 27
Sr No Item Description Unit Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
1 Excavation for foundation / pipe trenches in
earth, soils of all types, sand, gravel and soft
murum, including removing the excavated
material upto a distance of 50 metres and lifts as
below, stacking and spreading as directed, manual
dewatering, preparing the bed for foundation and
excluding backfilling, etc. complete.
(Bd-A-1/259)
Lift 0 to 1.5 M Cu.m 128.00 127.00
2 Excavation for foundation / pipe trenches in hard
murum including removing the excavated material
upto a distace of 50 M and lifts as below, stacking
and spreading as directed by Engineer-in-charge,
normal dewatering, preparing the bed for
foundation and excluding backfilling, etc.
complete.
(Bd-A2/259)
Lift 0 to 1.5 M Cu.m 143.00 142.20
3 Excavation for foundation / pipe trenches in hard
murum and boulders, W.B.M. road including
removing the excavated material upto a distance of
50 M beyond the area and lifts as below, stacking
and spreading as directed by Engineer-in-charge,
normal dewatreing, preparing the bed for
foundation and excluding backfilling, etc.
complete.
(Bd-A-3/259)
Lift 0 to 1.5 M Cu.m 160.00 157.20
4 Add for every additional lift of 1.5 M beyond initial
lift of 1.5 M for Item Nos. 1 to 3
Cu.m 11.75 11.75
5 Excavation for foundation / pipe trenches in soft
rock and old cement and lime masonry
foundation asphalt road by all means including
removing the excavated material upto a distance of
50 M beyond area and lifts as below, stacking as
directed by Engineer-in-charge, normal
dewatering, preparing the bed for foundation and
excluding backfilling, etc. complete.
( Bd-A-4/259)
Lift 0 to 1.5 M Cu.m 449.00 398.50
Section - E- Excavation
Section-E- Excavation 28
Sr No Item Description Unit Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
6 Excavation for foundation / pipe trenches in hard
rock by controlled blasting, including trimming
and levelling the bed by chiselling where necessary
and removing the excavated material and stacking
it in measurable heaps within a distance of 50
metres from the area and lifts as below, normal
dewatering, excluding backfilling, etc. complete.
(Bd-A-5/259)
Lift 0 to 1.5 M Cu.m 599.00 501.80
7 Excavation for foundation / pipe trenches in hard
rock and concrete road by chiselling, wedging,
line drilling, by mechanical means or by all means
other than blasting including trimming and
levelling the bed, removing the excavated material
upto a distance of 50 metres beyond the area and
lifts as below, stacking as directed by Engineer-in-
charge, normal dewatering, excluding backfilling,
etc. complete by all means.
(Bd-A-1/259)
Lift 0 to 1.50 M Cu.m 838.00 829.60
8 Excavation for foundation /pipe trenches in Slush
Muddy/ Marshy /Slushy /Soil including use of
poclain, labour for dewatering during execution
including removing the excavated material upto a
distance of 50 metres and lifts as below, stacking
and spreading as directed, preparing the bed by
cleaning the mud, labour required for execution for
shutterng item but excluding back filling etc.
complete. Providing and fixing shuttering shall be
paid separately.
Lift 0 to 1.5 M Cu.m 320.00 187.60
9 Add for every additional lift of 1.5 M beyond initial
lift of 1.5 M for Item Nos 5 to 9
Cu.m 21.40 21.40
HEAD WORKS
10 Excavation in general in soft material comprising
of soft soil, soft murum, sand, hard murum with
boulders in wet or dry condition for Head Works
i.e. Intake Well, Connecting Pipe, Jack Well, Pump
House, Supply Well, etc. for lift 0 to 1.5 M and lead
of 150 M including baricating, gurading, disposing
off surplus excavated stuff within a radius of 0.5
km. as
Section-E- Excavation 29
Sr No Item Description Unit Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
directed by Engineer-in- charge, etc. complete
excluding refilling.
a) For Head Works on river or dam submergence for
initial lift of 0 to 1.5 M
Cu.m 369.00 364.20
b) For Head works on nalla or any other site of GSDA
for initial Lift of 0 to 1.5M
Cum 259.00 256.10
c) Add for every additional lift of 1.5 M beyond initial
lift of 1.5 M
Cu.m 21.40 21.40
11 Excavation in general in hard material comprising
of soft rock, hard rock, Manjara rock, etc, by
blasting / controlled blasting, chiselling as
required in wet or dry condition for Head Works
i.e. Intake Well, Connecting Pipe, Jack Well, Pump
House, supply Well, etc. for lift 0 to 1.5 M and lead
of 150 M including baricading, guarding, disposing
off surplus excavated stuff within a radius of 0.5
km. as directed by Engineer-in-charge, excluding
refilling.
a) For Head Works on river or dam sub mergence for
initial lift of 0 to 1.5 M
Cu.m 790.00 618.80
b) For Head Works on nalla or any other site of GSDA
for initial lift of 0 to 1.5 M
Cum 545.00 397.40
c) Add for each additional lift to 1.5 M beyond initial
lift of 1.5 M
Cu.m 21.40 21.40
12 Excavation in general in soft material comprising
of soft soil, soft murum, sand, hard murum with
boulders in wet or dry condition for Head Works
and allied works by well sinking process for
average depth of 12 M and lead of 150 M including
shoring, barricading, guarding, refilling, disposing
of surplus excavated stuff as directed by Engineer-
in-charge, etc. complete.
a) Diameter upto and including 3 M Cu.m 712.00 675.50b) Diameter more than 3 M Cu.m 599.00 567.90
13 Desilting the Supply Well, Intake Well / Head
Works, sump of water supply/ sewerage works etc.
in wet or dry condition including lifts upto 10.5 M
and lead upto 150 M as required beyond the work
site, stacking, spreading, including necessary
guarding, etc. complete, as directed by Engineer-in-
charge. Cu.m 640.00 606.70
Add for every additional lift of 1.5 M beyond initial
lift of 10.50 M
Cu.m 19.25 18.30
Section-E- Excavation 30
Sr No Item Description Unit Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
14 Dewatering the excavated trenches and pools of
water in the building trenches / pipeline trenches,
well works by using pumps and other devices
including disposing off water to safe distance as
directed by Engineer-in-charge (including cost of
machinery, labour, fuel), etc. complete. Bhp/Hr 59.90 10.60
i) The contractor at his request may allowed to
start construction of masonary steining so as not
to allow silting of well in oncoming mansoon and
while paying masonary, 25% amount shall be
withheld and released only when excavation to the
full depth is completed.
ii) Dewatering : Total dewatering charges are to be
proposed in tender as lumpsum amount and 75%
is payable for excavation and 25% is payable for
construction of well / gallery. Out of 75%
excavation breakup shall be as under
25% for last 1 Mtr. Depth.
20% for 2 M depth which just above last 1 M
depth.
15% for 2 M depth which just above last 3 M
depth.
15% for the rest of depth from water table level
The above conditions will restrict the tendancy of
agencies to avoid deeping of wells etc. to the
required depths.
15 Refilling the trenches with available excavated stuff
with soft material first over pipeline and then hard
material in 15 cm layers with all leads and lifts
including consolidation, surcharging, etc.
complete. Cu.m 59.00 57.20
16 Filling in plinth and floors murum bedding in
trenches with approved murum from excavated
materials from foundation 15cm to 20cm layers
including watering and compaction complete.
Cu.m 59.00 57.20
17 Filling in plinth and floors / trenches with
contractor’s murum for bedding in 15cm to 20cm
layers including watering and compaction
complete. Cu.m 548.00 60.60
Section-E- Excavation 31
Sr No Item Description Unit Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
18 Providing dry trap / granite / quartzite / gneiss,
rubble stone soling in 15cm to 20 cm thick layers
(including hand packing and compacting), etc.
complete. Cu.m 838.00 185.90
19 Providing and filling in sand boxing in pipeline or
for foundation with sand of approved quality
including watering compaction, etc. complete.
Cu.m 875.00 146.20
20 Open timbering in trenches of depth more than 1.5
m for shoring and strutting including use of and
waste of all necessary timber works including
walling, strutts, open polling boards/ horizontal
sheeting, runners, etc. as may be necessary and
fixing and removal complete. (Measurements to be
taken of the face/area timbered)(NBO Item No. 4-
15 page No.59 )
a) Lift 0 to 1.5 M [ for non-water logged area ] Sq.m 202.00 3.10
Additional per Sqm. for further lifts of 1.5M each. Sq.m 27.00 12.00
b) Lift for 0 to 1.5 M [ For water logged area.] Sq.m 208.00 10.30
Additional per Sqm. for further lifts of 1.5M each Sq.m 20.30 5.80
Note:- For the trenches with more than 1.5 M
depth shoring if required from G.L. is to be done
and is payable from GL.
Section-E- Excavation 32
Sr No Item Description Unit
Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
1 Providing and fixing mild steel grill work for
windows/ventilators of 20 Kg./Sqm. as per
drawings including necessary welding and painting
with one coat of anticorrosive paint and two coats
of oil painting, etc. complete.
(Bd-U-1/537) Sq.m 1613.00 80.40
2 Providing and fixing mild steel grill railing of 20
Kg./Sqm. with teak wood hand railing, still and
newel posts for staircase and including fabricating,
fixtures, erecting, painting the grill work with
approved oil paint and polishing the hand rail and
newel posts with French polish two coats, etc.
complete.
(Bd-U-2 /537) Sq.m 2355.00 218.50
3 Providing structural steel work in rolled
stanchions fixed with connecting plates or angle
cleats as in main and cross beams, hip and jack
rafters, purlins connecting to truss members and
like as per detailed desings and drawings or as
directed by Engineer-in-charge including cutting,
fabricating, hoisting, erecting, fixing in position,
making riveted / bolted /welded connections and
one coat of anticorrosive paints and over it two
coats of oil painting, etc. complete.
(Bd-C-3 /275) M.T 59054.00 5471.80
4 Providing stuctural steel work in single
stanchions composed of RSJ, channel, etc, with
caps, bases, mild steel plates, angles, brackets,
cleats, gusset plates, anchor bolts, etc. as per
detailed design and drawing or as directed by
Engineer-in-charge including cutting, fabrication,
hoisting, erecting, fixing in position, making
riveted/ bolted / welded connections and one coats
of anticorrosive paint and over it two coats of oil
painting, etc. complete.
(Bd-C-6 /277) M.T 57877.00 5087.60
Section - F- Iron And Structural Steel Work.
Section-F-Iron Structural Steel Work 33
Sr No Item Description Unit
Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
5 Providing structural steel work in rolled sections
like joists, channels, angles, tees, etc. as per
detailed designs and drawings including fixing in
position without connecting plates, braces, etc.
and one coat of anticorrosive paint and over it two
coats of oil painting, of approved quality and
shade, etc. complete.
(Bd-C-2 /275) M.T 60320.00 5652.40
6 Providing structural steel work in trusses, other
similar trussed purlins and members with all
bracing, gusset plates, etc. as per detailed design
and drawing or as directed by Engineer-in-charge
including cutting, fabricating, hoisting, erecting
and fixing in position, making reveted / bolted /
welded connections and one coat of anticorrosive
paint and over it two coat of oil painting, etc.
complete.
(Bd-C-8 /278) M.T 71547.00 12801.10
Section-F-Iron Structural Steel Work 34
Sr No Item Description Unit Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
1 Providing and laying in situ following grades of
Plain Cement concrete of trap/ granite/
quartzite/ gneiss metal for foundation and
bedding including normal dewatering, form work,
compaction and curing, etc, complete. Use of L &
T, A.C.C., Ambuja, Birla Gold, Manikgad,
Rajashree, etc. cement is permitted.)
(Bd-E-1 /287)
a In PCC M-100 Cu.m 3758.00 801.30b In PCC M-150 Cu.m 4233.00 802.50
2 Providing and laying in situ Cement concrete of
trap/granite/quartzite/ gneiss metal for RCC work
in foundation like raft, grillage, strip foundation
and footing of RCC columns and steel stanchions
including normal dewatering, 'plywood form work,
bully/steel propups, compaction, finishing and
curing, etc, complete. (By weigh batching and mix
design for M-250 and M-300 only. Use of L & T,
A.C.C., Ambuja, Birla Gold, Manikgad, Rajashree,
etc. cement is permitted.) (excluding M.S. or Tor a In RCC M-150 Cu.m 5122.00 979.40b In RCC M-200 Cu.m 5214.00 972.80c In RCC M-250 Cu.m 5722.50 965.50d In RCC M-300 Cu.m 5951.40 963.80
3 Providing and casting in situ Cement Concrete of
trap/granite/quartzite/ gneiss metal of approved
quality for RCC work as per detailed drawings and
designs or as directed by Engineer-in-charge
including normal dewatering, centering, 'plywood
formwork, bully/steel prop-ups, compaction,
finishing the formed surfaces with CM 1:3 of
sufficient minimum thickness if special finish is to
be provided and curing, etc. complete. (By weigh
batching and mix design for M-250 and M-300
only. Use of L&T, A.C. C., Ambuja, Birla Gold,
Manikgad, Rajashree, etc. cement is permitted)
(excluding M.S, or Tor reinforcement)
a For RCC M-150 grade - all types of columns Cu.m 6524.00 963.40
b For RCC M-200 grade - all types of columns. Cu.m 6867.00 968.60
c For RCC M-250 grade - all types of columns. Cu.m 7439.00 972.00
d For RCC M-300 grade - all types of columns. Cu.m 7668.00 970.90
4 Providing and casting in situ Cement Concrete of
trap/granite/quartzite/ gneiss metal of approved
quality for RCC work as per detailed drawings and
Section - G- Plain and Reinforced Cement Concrete
Section-C-Plain and Reinforced Cement Concrete 35
Sr No Item Description Unit Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
designs or as directed by Engineer-in-charge
including normal dewatering, centering, 'plywood
formwork, bully/steel prop-ups, compaction,
finishing the formed surfaces with CM 1:3 of
sufficient minimum thickness if special finish is to
be provided and curing, etc. complete. (By weigh
batching and mix design for M-250 and M-300
only. Use of L&T, A.C. C., Ambuja, Birla Gold,
Manikgad, Rajashree, etc. cement is permitted)
(excluding M.S, or Tor reinforcement)
a For RCC M-150 grade Beams/Braces/Lintels Cu.m 6558.00 972.50
b For RCC M-200 grade Beams/Braces/Lintels Cu.m 6867.00 968.40
c For RCC M-250 grade Beams/Braces/Lintels Cu.m 7325.00 960.60
d For RCC M-300 grade Beams/Braces/Lintels Cu.m 7668.00 974.20
5 Providing and casting in situ Cement Concrete of
trap/granite/quartzite/ gneiss metal of approved
quality for RCC work as per detailed drawings and
designs or as directed by Engineer-in-charge
including normal dewatering, centering, 'plywood
formwork, bully/steel prop-ups, compaction,
finishing the formed surfaces with CM 1:3 of
sufficient minimum thickness if special finish is to
be provided and curing, etc. complete. (By weigh
batching and mix design for M-250 and M-300
only. Use of L&T, A.C. C., Ambuja, Birla Gold,
Manikgad, Rajashree, etc. cement is permitted)
(excluding M.S, or Tor reinforcement)
a For RCC M-150 grade Slabs / Landings / Vertical
Walls / Waist Slabs / Steps for Staircase
Cu.m 6981.00 928.80
b For RCC M-200 grade Slabs / Landings / Vertical
Walls / Waist Slabs / Steps for Staircase
Cu.m 7439.00 972.10
c For RCC M-250 grade Slabs / Landings / Vertical
Walls / Waist Slabs / Steps for Staircase
Cu.m 8012.00 975.20
d For RCC M-300 grade Slabs / Landings / Vertical
Walls / Waist Slabs / Steps for Staircase
Cu.m 8240.00 974.00
6 Providing and casting in situ Cement Concrete of
trap/granite/quartzite/ gneiss metal of approved
quality for RCC work as per detailed drawings and
designs or as directed by Engineer-in-charge
including normal dewatering, centering, 'plywood
formwork, bully/steel prop-ups, compaction,
finishing the formed surfaces with CM 1:3 of
sufficient minimum thickness if special finish is to
be provided and curing, etc. complete. (By weigh
batching and mix design for M-250 and M-300
Section-C-Plain and Reinforced Cement Concrete 36
Sr No Item Description Unit Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
only. Use of L&T, A.C. C., Ambuja, Birla Gold,
Manikgad, Rajashree, etc. cement is permitted)
(excluding M.S, or Tor reinforcement)
a For RCC M-150 grade Chajjas / Parapets /
Curtain Walls / Partition Walls / Pardies
Cu.m 6981.00 938.10
b For RCC M-200 grade Chajjas / Parapets /
Curtain Walls / Partition Walls / Pardies
Cu.m 7439.00 958.20
c For RCC M-250 grade Chajjas / Parapets /
Curtain Walls / Partition Walls / Pardies
Cu.m 8012.00 962.40
d For RCC M-300 grade Chajjas / Parapets /
Curtain Walls / Partition Walls / Pardies
Cum 8240.00 961.50
7 Providing and casting in situ Cement Concrete of
trap/granite/quartzite/ gneiss metal of approved
quality for RCC work as per detailed drawings and
designs or as directed by Engineer-in-charge
including normal dewatering, centering, 'plywood
formwork, bully/steel prop-ups, compaction,
finishing the formed surfaces with CM 1:3 of
sufficient minimum thickness if special finish is to
be provided and curing, etc. complete. (By weigh
batching and mix design for M-250 and M-300
only. Use of L&T, A.C. C., Ambuja, Birla Gold,
Manikgad, Rajashree, etc. cement is permitted)
(excluding M.S, or Tor reinforcement)
a For RCC M-150 grade - Domes Cu.m 7554.00 971.10
b For RCC M-200 grade - Domes Cu.m 7668.00 946.70
c For RCC M-250 grade - Bottom Domes only Cu.m 8355.00 964.70
d For RCC M-300 grade - Bottom Domes only Cu.m 8584.00 963.90
8 Providing and fixing in position steel bar
reinforcement of various diameters for RCC piles,
caps, footings, foundations, slabs, beams,
columns, canopies, staircases. newels, chajjas,
lintels, pardies, copings, fins, arches, etc. as per
detailed designs, drawings and schedules;
including cutting, bending, hooking the bars,
binding with wires or tack welding and supporting
as required, etc. complete.
(including cost of binding wire).
a Mild Steel M.T. 58568.00 5321.00
b Tor Steel M.T 58568.00 5321.00
c Corrosion Resistant steel (Fe 500) M.T 63558.00 8140.20
d Only Fabrication ( Labour ) For all types of steel M.T 7722.00 7722.00
9 Providing fusion bonded epoxy coating to
reinforcement bars as per IS-13620-1993
Section-C-Plain and Reinforced Cement Concrete 37
Sr No Item Description Unit Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
specificaion for a thickness of 175 (+50) microns
including extra cost on account of careful
handling, extra cost on account of using PVC
coated binding wire instead of G. I. wire, extra cost
on account of touch-up material supplied by
coating agency and repair work extra cost on
account of transportation , loading, unloading,
including all taxes (Central and Local), etc.
complete.
(a) For reinforcement Diameterwise rates.
1 8 mm dia. M.T 18160.00
2 10 mm dia. M.T 16022.00
3 12 mm dia. M.T 14618.00
4 16 mm dia. M.T 14084.00
5 20 mm dia. M.T 12947.00
6 25 mm dia. M.T 11744.00
7 28 mm dia. M.T 11209.00
8 32 mm dia. M.T 10407.00
(b) Average rates ( for estimation only)
1 For 8mm to 20mm dia M.T. 15166.00
2 For above 20mm dia M.T. 11120.00
Notes for Estimations
1
2 All the rates of Reinforced Cement Concete Items
from 2 to 7 shall be increased by 2% for every floor
height above ground floor for building works.
3 These rates are applicable for R. C. C. well works
also.These rates shall be increased by 10% for
every 5 M depth below initial 5 M depth.
4 Rates for Item Nos. 8 and 9 shall be increased by
5% for each brace height above first brace for
R.C.C.E.S.Rs. By 5% for every ring beam below
first ring beam for R. C. C. wells. By 1% building
works for every floor height.
All the rates of Reinforced Cement Concrete Items
From 2 to 7 shall be increased by 10% for each
brace height above 1st brace for R.C.C. E. S.
R.s.e.g. For a R.C.C. E.S. R. with 7 M staging and
first brace at 3.50 M above ground, the concrete
in columns above first brace, concrete of ring
beam and bottom slab is entitled for 10%
increase, concrete of vertical wall, roof slab and
roof beams, columns in container are entitled for
20% increase.
Section-C-Plain and Reinforced Cement Concrete 38
Sr No Item Description Unit Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
5 Volumetric mix as per 1: 11/2 :3 shall be adopted
with 56.5 kg. of cement for RCC-250 and 59.5 kg.
of cement for RCC- 300, per load of mixer of 1bag
capacity.
6 Fusion bonded epoxy coating to be proposed only
in Coastal Area with prior approval of the Chief
Engineer.
7 For estimation purpose,average rates as per item
no. 8 b shall be considered wherever necessary.
READY MIX CONCRETE
10 Providing and laying in situ Ready Mix Cement
Concrete grade of trap/granite/quartzite/ gneiss
metal for RCC work in foundation like raft, grillage,
strip foundation and footing of RCC column and
steel stanchions including normal dewatering,
form work, compaction, finishing and curing
including transporting from mixing plant upto
distance of 25 km., pouring the concrete at work
site for 1.5 M lift above G. L. and 5.0 M lift below
G. L., etc. complete. (Excluding reinforcement and
structural steel)a) In RCC M-200 Cu.m 6425.00 983.10
b) In RCC M-250 Cu.m 6712.00 995.40
c) In RCC M-300 Cu.m 6815.00 1001.50
11 Providing and casting in situ Ready Mix Cement
Concrete grade of trap/granite/quartzite/ gneiss
metal of approved quality for RCC work as per
detailed drawings and designs or as directed by
Engineer-in-charge including normal dewatering
centering, form work, compaction, finishing the
formed surfaces with CM 1:3 of sufficient
minimum thickness to give a smooth and even
surface wherever necessary or roughening if
special finish is to be provided and curing
including transporting from mixing plant upto
distance of 25 km., pouring the concrete at work
site for 1.5 M lift above G. L. and 5.0 M lift below
G. L., etc. complete.(Excluding reinforcement and structural steel)
a) In RCC M-200 - all types of columns Cu.m 7941.00 3599.00
b) In RCC M-250 - all types of columns Cu.m 8212.00 3617.50
c) In RCC M-300 - all types of columns Cu.m 8222.00 3547.10
12 Providing and casting in situ Ready Mix Cement
Concrete grade of trap/granite/quartzite/ gneiss
metal of approved quality for RCC work as per
Section-C-Plain and Reinforced Cement Concrete 39
Sr No Item Description Unit Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
detailed drawings and designs or as directed by
Engineer-in-charge including normal dewatering,
centering, form work compaction, finishing the
formed surfaces with CM 1:3 of sufficient
minimum thickness to give a smooth and even
surface wherever nesessary or roughening if
special finish is to be provided and curing
including transporting from mixing plant upto
distance of 25 km., pouring the concrete at work
site for 1.5 M lift above G. L. and 5.0 M lift below
G. L., etc. complete.
(Excluding reinforcement and structural steel)
a) In RCC M-200 - Beams / Braces / Lintels Cu.m 7911.00 3174.80
b) In RCC M-250 - Beams / Braces / Lintels Cu.m 8183.00 3185.40
c) In RCC M-300 - Beams / Braces / Lintels Cu.m 8191.00 3107.70
13 Providing and casting in situ Ready Mix Cement
Concrete grade of trap/granite/quartzite/ gneiss
metal of approved quality for RCC work as per
detailed drawings and designs or as directed by
Engineer-in-charge including normal dewatering
centering, form work, compaction, finishing the
formed surfaces with CM 1:3 of sufficient
minimum thickness to give a smooth and even
surface wherever necessary or roughening if
special finish is to be provided and curing
including transporting from mixing plant upto
distance of 30 km., pouring the concrete at work
site for 1.5 M lift above G. L. and 5.0 M lift below
G. L., etc. complete.
(Excluding reinforcement and structural steel)
a) In RCC M-200 Slabs / Landings / Vertical
Walls / Waist Slabs / Steps for Staircase
Cu.m 8319.00 4262.40
b) In RCC M-250 Slabs / Landings / Vertical
Walls / Waist Slabs / Steps for Staircase
Cu.m 8586.00 4286.90
c) In RCC M-300 Slabs / Landings / Vertical
Walls / Waist Slabs / Steps for Staircase
Cu.m 8595.00 4221.80
14 Providing and casting in situ Ready Mix Cement
Concrete grade of trap/granite/quartzite/ gneiss
metal of approved quality for RCC work as per
detailed drawings and designs or as directed by
Engineer-in-charge including normal dewatering,
centering, form work compaction, finishing the
formed surfaces with CM 1:3 of sufficient
Section-C-Plain and Reinforced Cement Concrete 40
Sr No Item Description Unit Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
minimum thickness to give a smooth and even
surface wherever nesessary or roughening if
special finish is to be provided and curing
including transporting from mixing plant upto
distance of 25 km., pouring the concrete at work
site for 1.5 M lift above G. L. and 5.0 M lift below
G. L., etc. complete.
(Excluding reinforcement and structural steel)
a) For RCC M-200 Chajjas / Parapets / Curtain
Walls / Partition Walls / Pardies
Cu.m 8551.00 4192.90
b) For RCC M-250 Chajjas / Parapets / Curtain
Walls / Partition Walls / Pardies
Cu.m 8817.00 4208.80
c) For RCC M-300 Chajjas / Parapets / Curtain Walls / Partition Walls / PardiesCu.m 8920.00 4223.50
15 Providing and casting in situ Ready Mix Cement
Concrete grade of trap/granite/quartzite/ gneiss
metal of approved quality for RCC work as per
detailed drawings and designs or as directed by
Engineer-in-charge including normal dewatering,
centering, form work compaction, finishing the
formed surfaces with CM 1:3 of sufficient
minimum thickness to give a smooth and even
surface wherever nesessary or roughening if
special finish is to be provided and curing
including transporting from mixing plant upto
distance of 25 km., pouring the concrete at work
site for 1.5 M lift above G. L. and 5.0 M lift below
G. L., etc. complete.
(Excluding reinforcement and structural steel)
a) For RCC M-200 - Domes Cu.m 8862.00 4810.40
b) For RCC M-250 - Domes Cu.m 9123.45 4832.90
c) For RCC M-300 - Domes Cu.m 9132.90 4767.80
Note :
1) Add Rs.10/- per Cum for transportation beyond
25 km. for every additional lead of 1 km.
2) Beyond 1.5 M above G.L. and 5.0 M below G. L.,
concreting is to be done by pumping by the
Company.
3) Additional rate of pumping
a) Static pump Rs. 175/- per Cum
b) Mobile pump Rs. 250/- per Cum
4) For Ready Mix Concrete, prior permission from
Chief Engineer shall be obtained.
Section-C-Plain and Reinforced Cement Concrete 41
Sr No Item Description Unit
Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
1 Providing and fixing G.I. pipe railing having 1.0
M height consisting 50 x 50 x 6 mm thick M. S.
angles as verticals at 1.5 M c/c, and additional
posts at every corner with 3 rows of 25 mm dia G.I.
pipes of medium class variety as horizontal and
painting 3 coats of oil paint over 1 coat of
anticorrosive paint of approved colour and shade
including cost of all labour, transporting bends to
curved shape, etc. complete.RMT 918.00 52.00
1A As above but with only 2 rows RMT 698.00 35.00
2 Dismantling of ESRs of various capacities and
heights using crane (10 MT capacity) and handing
over M.S./ C.I./ G.I. pipes, valves, bends, etc. to
the Department However taking steel
reinforcement by the dismantling agency including
removing dismantled materials from site and
disposing them at suitable place as directed,
etc.complete.
a Capacity of E.S.R. upto 2 lakh litres and stagging
upto 12.00 M height
i) conjusted area. Litres 2.00 0.20
ii) Open Area Litres 1.19 0.80
b Capacity of ESR above 2 lakh ltrs. and staging
upto 12 M hieght
i) Conjusted area Litres 1.57 0.10
ii) Open Area Litres 1.08 0.10
3 Providing and fixing M.S. gate 2.5 M wide for
compound with 40 mm dia M.S.black pipe medium
class, approved grill work, RCC M - 150 side pillars
of 25 cm x 40 cm x 2.5 M height, its foundation,
finishing, painting etc. complete. No. 27324.0 3169.10
4 Proividing and fixing Wicket gate 1.0 M wide for
compound with 40 mm dia M.S.black pipe medium
class, approved grill work, RCC M-150 side pillars
of 25 cm x 40 cm x 2.5 M height, its foundiaion,
finishing painting, etc. complete. No. 15954.00 2143.60
5 Taking Trial Bore (Core Bore Sampling) by Calyxe
machine with TCT/NX bits together undisturbed
strata samples for investigation in all types of
strata soft soil, murum, hard murum with
Section - H- Miscellaneous Works
Section-H-Miscellaneous Works 42
Sr No Item Description Unit
Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
boulders, soft rock hard rock & quartizite etc. The
item includes all Hire & running cost of Callyx
Machine conveying all materials to site of work
excluding conveyance of callyx, machine and back
sampling all over burden strata in glass jar and
core samples serially numbered at site in a wooden
Core Box, Samples to be taken at 1.0 m interval
and conveying to the place as directed by Engineer-
in-charge, The diameter of bore in overburden
shall be 100 mm and of NX size (50mm) in other
strata. The item shall also include M.S. casing pipe
of 2.5 mm thick plate in overburdern only and
shall be 1.0 m above GL with cap over it.
a In Overburden (Soft soil, murum) RMT 1614.00 210.30
b In Weathered rock with boulders RMT 4828.00 1264.30
c In Weathered rock / Soft rock RMT 2480.00 645.50
d In Hard rock other than quartzite RMT 3257.00 851.10
e In Hard rock quartzite RMT 7781.00 1976.60
6 Providing pressure grouting at a pressure of
0.56 kg./sqcm in required row/zigzag fashion as
specified at 1.5 M interval as per site conditions to
stop leakages through water retaining structures
to the entire satisfaction of the Engineer-in-charge
including material compound, hardening
materials, compressor equipment including
scaffolding smooth finishing, etc. complete.
a For masonry structure Bag 891.00 58.60
b For Concrete strcture Bag 879.00 54.20
7 Drilling 40 mm dia holes in masonry or
concrete structure with providing and fixing 0.5
M long G. I. pipe line for perssure grouting
including all Material labour cost and machinery
charges, etc. complete. RMT 731.00 59.30
8 Providing and casting ferrocrate water tank at
site inculding all cost of labour and material, etc,
complete. upto 25,000 literes (for foundation and
providing and fixing taps, etc. shall be considered
spearately). Litre 4.30
9 Providing and applying two coat of Gamma
coating or equivalent such as Dr. Bake, Krishna
conchem, Asian Paint, Atul ltd. Burger Paints,
Epoxy primer 50 to 60 microns thick and
Section-H-Miscellaneous Works 43
Sr No Item Description Unit
Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
covering two coat of Gamma coating or equivalent
such as Dr. Bake, Krishna conchem, Asian Paint,
Atul ltd. Burger Paints, 30 micron thick is to new
M.S. pipe and structural steel or concrete surface
including preparing the surface by finishing by
solvent degreasing and derusting by applying
chemical method and sacffolding of necessary etc.
complete as manufcaturer's specifications. sqm 291.60 144.80
10 Making cross connection to existing
distribution main of any type including
excavation, breaking and removing exiting pipes,
lowering, laying of specials and pipes in their
position, refilling, closing the water supply in that
area, dewatering and restarting the water supply,
etc. complete as directed by Engineer-in-charge for
following diameters of existing pipeline,
irrespective of diameter of branch line (the number
of joints involved will be paid separately depending
upon the nature of joints and required pipes,
valves and specials will be supplied free of cost at
stores).80 mm No 1622.00 1378.80
100 mm No 1837.00 1561.50
125 mm No 2020.00 1716.70
150 mm No 2272.00 1931.20
200 mm No 2398.00 2038.30
250 mm No 2883.00 2450.10
300 mm No 3374.00 2867.90
350 mm No 3970.00 3374.50
400 mm No 4768.00 4052.80
450 mm No 5343.00 4541.60
500 mm No 6584.00 5596.40
600 mm No 11694.00 9939.90
700 mm No 14372.00 12216.20
750 mm No 18126.00 15407.10
800 mm No 23349.00 19847.00
900 mm No 30467.00 25897.10
1000 mm No 42457.00 36088.70
Note : Only 75% rate shall be payable till satisfactory hydraulic testing is given.
11 Dismantling dead pipeline of M.S./R.C.C./ C.I./
P.S.C. and G.I./ A. C. / P. V. C. / S. W. / H. D. P.
E. pipe including cost of necessary excavation and
refilling of trenches, breaking the joints, lifting the
pipes and stacking to the place as directed by
Engineer-in-
Section-H-Miscellaneous Works 44
Sr No Item Description Unit
Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
charge with all leads and lifts including cleaning
the surface, etc. complete.
A For M.S./R. C. C./ C.I./ P. S. C.
80 mm RMT 122.00 26.30
100 mm RMT 135.00 38.60
125 mm RMT 138.00 41.50
150 mm RMT 140.00 44.10
200 mm RMT 156.00 52.40
250 mm RMT 171.00 61.40
300 mm RMT 187.00 70.20
350 mm RMT 210.00 86.80
400 mm RMT 228.00 98.80
450 mm RMT 258.00 108.90
500 mm RMT 271.00 114.30
600 mm RMT 332.00 145.00
700 mm RMT 388.00 168.70
750 mm RMT 436.00 191.40
B For G.I./AC/PVC/S. W. / H.D.P.E.
80 mm RMT 73.00 15.90
100 mm RMT 81.00 23.00
125 mm RMT 83.00 25.10
150 mm RMT 84.00 26.50
200 mm RMT 94.00 31.60
250 mm RMT 104.00 37.50
300 mm RMT 111.00 41.80
350 mm RMT 126.00 52.50
400 mm RMT 137.00 59.40
450 mm RMT 154.00 64.90
500 mm RMT 163.00 68.70
600 mm RMT 199.00 86.90
700 mm RMT 233.00 101.70
750 mm RMT 261.00 114.40
12 Providing and constructing two taps standpost
as per type design wih excavation 15 cm thick PCC
1:3:6 bedding 20 mm thick PCC 1:2:4 concrete for
platform of 1.75 M dia. with side curb and bucket
rest, 80 mm dia, heavy duty GI pipe central post
duly filled therein with C. C. 1:2:4, 5 M long, 20
mm dia. medium G.I. pipe from point of tapping to
standpost additional 20 mm dia G.I. pipe fixed
vertically upto 15 mm dia self closing water taps,
one brass ferrule etc. complete together with all
labour and material charges as per drawing and
Section-H-Miscellaneous Works 45
Sr No Item Description Unit
Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
as directed by Engineer-in-charge when good
foundation is available. Rate includes draining
arrangemment by excavating open gutters.No 7789.00 1035.40
a As above but when R.C.C. platform or Precast
standpost issued free of cost.No. 4310.00 455.80
13 Providing and constructing two taps standpost
as per type design wih excavation 15cm thick
boulder filling,15 cm thick PCC 1:3:6 bedding 20
mm thick PCC 1:2:4 concrete for platform of 1.75
M dia. with side curb and bucket rest, 80 mm dia,
heavy duty GI pipe central post duly filled therein
with C. C. 1:2:4, 5 M long, 20 mm dia. medium
G.I. pipe from point of tapping to standpost
additional 20 mm dia G.I. pipe fixed vertically upto
15 mm dia self closing water taps, one brass
ferrule etc. complete together with all labour and
material charges as per drawing and as directed by
Engineer-in-charge when B.C.Soil is available.
Rate includes draining arrangemment by
excavating open gutters.No 7841.00 992.70
a As above but when R.C.C. platform or Precast
standpost issued free of cost.No 4871.00 541.80
14 Pushing of M.S. pipe of following dia for road
crossing and Railway crossing by push through
method in all types of strata by using hydraulic
jack and drilling machine of required diameter,
elow 3.0 m depth including lowering, laying,
jointing of M.S. casing pipe including cost of labour
fuels and material, required welding machinary,
tripod, chain pulley block, vrane, blower etc.
transportation and dewatering etc. complete as
diredeted by Engineer-in-charge but excluding cost
of M.S. pipe
a) 200 mm dia to 499 mm dia M.S. Pipe Rmt 22748.00 --
b) 500 mm dia to 1000 mm dia M.S. Pipe Rmt 28435.00 --
Section-H-Miscellaneous Works 46
Sr No Item Description Unit
1 Providing and supplying ISI mark
C.I S&S pipes (push on joints
pressure pipes of C.I of following
class and diameters confirming to
the I.S.specification inclusive cost
of jointing materials(Rubber gasket
of EPDM Quality) including all
statutary duties and taxes levied
by GoI and GoM in all respect,
Education Cess, VAT, Third party
inspection charges of TPI Agency
approved by MJP including Transit
insurance, Railway Freight,
Unloading from railway wagon,
Loading into Truck, Transportation
to departmental store/site of
work,unloading, stacking etc.
completed as directed by Engineer
–in-charge (IS 1536/2001 for pipes
and IS 158/1969 and IS
12820/1989 or latest edition /
revision with amendments for
Rubber Gaskets. With E.D.
Without
E.D. With E.D.
Without
E.D.
a) Class "LA"
i) 80mm Rmt. 900.00 844.00
ii) 100mm Rmt. 1128.00 1058.00
iii) 125 mm Rmt. 1425.00 1270.00
iii) 150mm Rmt. 1831.00 1718.00
iv) 200mm Rmt. 2636.00 2484.00
v) 250mm Rmt. 3555.00 3348.00
vi) 300mm Rmt. 4594.00 4317.00
vii) 350 mm Rmt. 4537.00 3948.00
viii) 400 mm Rmt. 5522.00 4806.00
ix) 450 mm Rmt. 6658.00 5794.00
x) 500 mm Rmt. 7696.00 6698.00
xi) 600 mm Rmt. 10253.00 8921.00
xii) 700 mm Rmt. 13232.00 11514.00
xiii) 750 mm Rmt. 14820.00 12897.00
xiv) 800 mm Rmt. 16589.00 14435.00
xv) 900 mm Rmt. 20206.00 17582.00
xvi) 1000mm Rmt. 24274.00 21122.00
Section - I- (I) - C.I. / D.I. PIPES
Rate (in Rs.)
2012-2013
Rate in Rs. 2013-
2014
Section-I-C.I./D.I. PIPES 47
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs. 2013-
2014
b) Class "A"
i) 80mm Rmt. 956.00 852.00
ii) 100mm Rmt. 1193.00 1063.00
iii) 125mm Rmt. 1552.00 1383.00
iv) 150mm Rmt. 1912.00 1703.00
v) 200mm Rmt. 2763.00 2461.00
vi) 250mm Rmt. 3735.00 3327.00
vii) 300mm Rmt. 4833.00 4306.00
viii) 350 mm Rmt. 6043.00 5384.00
ix) 400 mm Rmt. 7410.00 6602.00
x) 450 mm Rmt. 8976.00 7998.00
xi) 500 mm Rmt. 10292.00 9170.00
xii) 600 mm Rmt. 13744.00 12245.00
xiii) 700 mm Rmt. 17911.00 15958.00
xiv) 750 mm Rmt. 19896.00 17725.00
xv) 800 mm Rmt. 22241.00 19815.00
xvi) 900 mm Rmt. 27072.00 24119.00
xvii) 1000mm Rmt. 32562.00 29010.00
c) Class "B"
i) 80mm Rmt. 1016.00 905.00
ii) 100mm Rmt. 1272.00 1134.00
iii) 125mm Rmt. 1670.00 1489.00
iv) 150mm Rmt. 2058.00 1834.00
v) 200mm Rmt. 2987.00 2661.00
vi) 250mm Rmt. 4039.00 3598.00
vii) 300mm Rmt. 5237.00 4666.00
viii) 350 mm Rmt. 6554.00 5840.00
ix) 400 mm Rmt. 7567.00 6742.00
x) 450 mm Rmt. 9689.00 8631.00
xi) 500 mm Rmt. 11136.00 9921.00
xii) 600 mm Rmt. 14671.00 13070.00
xiii) 700 mm Rmt. 19165.00 17085.00
xiv) 750 mm Rmt. 21583.00 19229.00
xv) 800 mm Rmt. 24058.00 21435.00
xvi) 900 mm Rmt. 29330.00 26132.00
xvii) 1000mm Rmt. 35189.00 31352.00
Section-I-C.I./D.I. PIPES 48
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs. 2013-
2014
Note: This pipe rates mentioned
here shall be used when supply is
from M.J.P. In case of Turnkey
Projects, the rates shall be
increased by 2.5%
2 Lowering laying and jointing with
SBR ruber gaskets C.I. S/S pipes/
D.I. K-7/ D.I. K-9 of various
classes with CI / MS specials of
following diameter in proper
position, grade and alignment as
directed by Engineer-in-charge including
conveyance of material from stores
to site of work, including cost of
jointing materials and rubber rings
labour, giving hydraulic testing
etc. complete.
Note : Only SBR Rubber gaskets to
be used as per IS-5382 and IS-
12820.
a) C.I. L.A. Class/ Mortar line D.I.K-
9/ K-7
Without
Rubber
Ring
With
Rubber
Ring
LABOUR
INVOLVED
i) 80 mm Rmt. 44.00 50.00 38.30
ii) 100 mm Rmt. 53.00 59.00 47.30
iii) 125 mm Rmt. 66.00 73.00 58.50
iv) 150 mm Rmt. 70.00 79.00 60.80
v) 200 mm Rmt. 94.00 104.00 79.00
vi) 250 mm Rmt. 123.00 135.00 104.10
vii) 300 mm Rmt. 133.00 152.00 107.10
viii) 350 mm Rmt. 166.00 186.00 134.60
ix) 400 mm Rmt. 199.00 230.00 160.70
x) 450 mm Rmt. 199.00 243.00 155.20
xi) 500 mm Rmt. 230.00 280.00 178.30
xii) 600 mm Rmt. 303.00 373.00 233.90
xiii) 700 mm Rmt. 390.00 525.00 301.40
xiv) 750 mm Rmt. 437.00 574.00 337.90
xv) 800 mm Rmt. 535.00 674.00 420.70
xvi) 900 mm Rmt. 639.00 846.00 507.80
xvii) 1000mm Rmt. 756.00 1026.00 613.50
Section-I-C.I./D.I. PIPES 49
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs. 2013-
2014
b) C.I. "A" Class
i) 80 mm Rmt. 46.00 56.00 40.30
ii) 100 mm Rmt. 56.00 66.00 48.50
iii) 125 mm Rmt. 71.00 79.00 61.90
iv) 150 mm Rmt. 78.00 86.00 66.90
v) 200 mm Rmt. 102.00 110.00 85.00
vi) 250 mm Rmt. 133.00 146.00 112.40
vii) 300 mm Rmt. 145.00 163.00 117.10
viii) 350 mm Rmt. 179.00 200.00 144.30
ix) 400 mm Rmt. 201.00 231.00 162.20
x) 450 mm Rmt. 211.00 245.00 160.50
xi) 500 mm Rmt. 249.00 298.00 192.10
xii) 600 mm Rmt. 329.00 398.00 254.70
xiii) 700 mm Rmt. 423.00 556.00 326.10
xiv) 750 mm Rmt. 475.00 610.00 367.30
xv) 800 mm Rmt. 561.00 698.00 438.90
xvi) 900 mm Rmt. 676.00 882.00 536.10
xvii) 1000mm Rmt. 789.00 1058.00 633.10
c) C.I. "B" Class
i) 80 mm Rmt. 50.00 59.00 44.20
ii) 100 mm Rmt. 60.00 71.00 52.50
iii) 125 mm Rmt. 77.00 86.00 67.60
iv) 150 mm Rmt. 87.00 96.00 75.40
v) 200 mm Rmt. 110.00 124.00 91.40
vi) 250 mm Rmt. 144.00 164.00 121.60
vii) 300 mm Rmt. 157.00 175.00 127.40
viii) 350 mm Rmt. 193.00 225.00 156.20
ix) 400 mm Rmt. 225.00 255.00 182.80
x) 450 mm Rmt. 228.00 262.00 177.10
xi) 500 mm Rmt. 268.00 316.00 205.90
xii) 600 mm Rmt. 355.00 423.00 273.80
xiii) 700 mm Rmt. 457.00 588.00 352.90
xiv) 750 mm Rmt. 516.00 650.00 398.60
xv) 800 mm Rmt. 602.00 737.00 467.80
xvi) 900 mm Rmt. 714.00 918.00 569.30
xvii) 1000mm Rmt. 814.00 1082.00 646.90
Section-I-C.I./D.I. PIPES 50
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs. 2013-
2014
3 Providing and supplying ISI mark
DI S&S pipes (push on joints
pressure pipes of D.I of following
class and diameters confirming to
the I.S. specification inclusive cost
of jointing materials (Rubber
gasket of EPDM Quality) including
all statutary duties and taxes
levied by GOI and GOM in all
respect, Education Cess, VAT,
Third party inspection charges of
TPI Agency approved by MJP
including Transit insurance,
Railway Freight, Unloading from
railway wagon, Loading into Truck,
Transportation to departmental
store / site of work, unloading,
stacking etc. completed as directed
by Engineer –in-charge (IS 1536 /
2001 for pipes and IS 158 / 1969
and IS 12820 / 1989
or latest edition / revision with
amendments for Rubber Gaskets.
With E.D.
Without
E.D. With E.D.
Without
E.D.
D.I. K-9
i) 100 mm Rmt. 1145.00 1041.00
ii) 150 mm Rmt. 1670.00 1518.00
iii) 200 mm Rmt. 2076.00 1888.00
iv) 250 mm Rmt. 2768.00 2516.00
v) 300 mm Rmt. 3519.00 3200.00
vi) 350 mm Rmt. 4405.00 4010.00
vii) 400 mm Rmt. 5208.00 4730.00
viii) 450 mm Rmt. 6288.00 5716.00
ix) 500 mm Rmt. 7308.00 6644.00
x) 600 mm Rmt. 9664.00 8773.00
xi) 700 mm Rmt. 12403.00 11276.00
xii) 750 mm Rmt. 14102.00 12819.00
xiii) 800 mm Rmt. 15339.00 13949.00
xiv) 900 mm Rmt. 18933.00 17212.00
xv) 1000mm Rmt. 22098.00 20089.00
Section-I-C.I./D.I. PIPES 51
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs. 2013-
2014
D.I. K-7
i) 100 mm Rmt. 977.00 888.00
ii) 150 mm Rmt. 1434.00 1304.00
iii) 200 mm Rmt. 1692.00 1538.00
iv) 250 mm Rmt. 2242.00 2038.00
v) 300 mm Rmt. 2826.00 2569.00
vi) 350 mm . Rmt. 3480.00 3164.00
vii) 400 mm Rmt. 4143.00 3766.00
viii) 450 mm Rmt. 5000.00 4545.00
ix) 500 mm Rmt. 5859.00 5326.00
x) 600 mm Rmt. 7717.00 7015.00
xi) 700 mm Rmt. 10409.00 9463.00
xii) 750 mm Rmt. 12097.00 10997.00
xiii) 800 mm Rmt. 13989.00 12717.00
xiv) 900 mm Rmt. 16779.00 15264.00
xv) 1000 mm Rmt. 19646.00 17860.00
4 Providing and making lead caulked
joint with molten lead to Cast Iron
pipes and / or specials of all
classes and fitting of following dia
including cost of lead and all
jointing material, labour, hydraulic
testing etc. complete.LABOUR
INVOLVED
i) 80mm Rmt. 657.00 255.50
ii) 100 mm Rmt. 812.00 319.00
iii) 125 mm Rmt. 968.00 382.60
iv) 150 mm Rmt. 1200.00 446.00
v) 200 mm Rmt. 1750.00 637.00
vi) 250 mm Rmt. 2126.00 764.60
vii) 300 mm Rmt. 2564.00 955.80
viii) 350 mm Rmt. 2906.00 1019.60
ix) 400 mm Rmt. 3389.00 1243.40
x) 450 mm Rmt. 4707.00 1592.30
xi) 500 mm Rmt. 5060.00 1719.60
xii) 600 mm Rmt. 6501.00 2230.50
xiii) 700 mm Rmt. 7637.00 2677.40
xiv) 750 mm Rmt. 8675.00 3059.20
xv) 800 mm Rmt. 9316.00 3088.10
xvi) 900 mm Rmt. 9936.00 3100.00
Section-I-C.I./D.I. PIPES 52
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs. 2013-
2014
xvii) 1000 mm Rmt. 10594.00 3144.80
NOTE: Only 85%payment shall be payable till satisfactory hydraulic testing is given
5 Providing and supplying ISI
standard CI double flanged pipes
including all taxes (Central and
local), railway freight, insurance,
unloading from railway wagon,
loading into truck transport to
stores / site, unloading etc.
complete as directed by Engneer-in-
charge.
i) 80mm Rmt. 1419.00
ii) 100 mm Rmt. 1753.00
iii) 125 mm Rmt. 2284.00
iv) 150 mm Rmt. 2849.00
v) 200 mm Rmt. 4371.00
vi) 250 mm Rmt. 5890.00
vii) 300 mm Rmt. 7573.00
viii) 350 mm Rmt. 9885.00
ix) 400 mm Rmt. 12053.00
x) 450 mm Rmt. 14473.00
xi) 500 mm Rmt. 16986.00
xii) 600 mm Rmt. 24162.00
xiii) 700 mm Rmt. 32371.00
xiv) 750 mm Rmt. 35221.00
6 Providing and supplying ISI
standard CI flanged / S& S
specials including all taxes
(Central and local), railway freight,
insurance, unloading from railway
wagon, loading into truck
transport to departmental store
/site, unloading stacking etc.
complete.
a) D/F Specials
i) 80 to 300 mm dia. Kg. 73.60
ii) 350 to 600 mm dia Kg. 78.20
iii) above 600 mm dia Kg. 83.90
Section-I-C.I./D.I. PIPES 53
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs. 2013-
2014
b) S/S Specials
i) 80 to 300 mm dia. Kg. 71.30
ii) 350 to 600 mm dia Kg. 75.90
iii) above 600 mm dia Kg. 80.50
c) Plain ended
i) 80 to 300 mm dia. Kg. 69.00
ii) 350 to 600 mm dia Kg. 75.90
iii) above 600 mm dia Kg. 80.50
7 Providing and supplying ISI
standard MS specials of required
thickness with 3 coats of approved
make epoxy paint (Shalimar, Ciba
or Mahindra & Mahindra make)
from inside and outside including
all taxes (Central and local), octroi,
inspection charges, transportation
to stores / site, and stacking, etc.
complete.
a) Machine endssuitable for PSCpipes
of all diameters as perdetailed
drawing with 10 mmthick x 0.7 M
long barrel Kg. 76.50
b) Only flanges withmachining
anddrilling holes, etc. complete
more than40 mm thick Kg. 74.30
c) Double flanged specials of all Kg. 72.10
d) All socktted specialsor socketed
branchflanged specials ofall
diameters Kg. 72.10
e) Plain endedspecials or plain ended
branchflanged specials ofall
diameters Kg. 72.10
f) MS barrels (pipepieces) ocally
manufactured (forsmall quantities)
Kg. 70.00
8 Providing and making flanged
joints to flanged C.I./M.S. pipes of
all classes/specials etc. including
cost of all jointing materials
(rubber packing, nut bolts, etc.),
labour, hydraulic testing etc.
Section-I-C.I./D.I. PIPES 54
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs. 2013-
2014
complete. LABOUR
INVOLVED
i) 80mm Joint 174.00 42.50
ii) 100 mm Joint 301.00 59.20
iii) 125 mm Joint 314.00 59.70
iv) 150 mm Joint 603.00 69.20
v) 200 mm Joint 626.00 69.20
vi) 250 mm Joint 897.00 85.80
vii) 300 mm Joint 931.00 85.80
viii) 350 mm Joint 1213.00 102.40
ix) 400 mm Joint 1511.00 102.60
x) 450 mm Joint 1848.00 119.10
xi) 500 mm Joint 1912.00 127.30
xii) 600 mm Joint 2052.00 143.70
xiii) 700 mm Joint 3093.00 160.50
xiv) 750 mm Joint 3179.00 168.70
xv) 800 mm Joint 4398.00 177.30
xvi) 900 mm Joint 4560.00 193.80
xvii) 1000 mm Joint 4721.00 210.20
NOTE: Only 85%payment shall be payable till satisfactory hydraulic testing is given
9 Erecting and hoisting in position
and jointing, testing M.S./ C.I.
D/F pipes and specials in vertical
position including cost of all
jointing materials (rubber packing,
nut bolts, etc.) labour, scaffolding,
hydraulic testing etc. complete. LABOUR
INVOLVED
i) 80mm Joint 193.00 58.70
ii) 100 mm Joint 326.00 82.70
iii) 125 mm Joint 344.00 87.00
iv) 150 mm Joint 640.00 105.80
v) 200 mm Joint 680.00 116.80
vi) 250 mm Joint 970.00 148.50
vii) 300 mm Joint 1025.00 161.70
viii) 350 mm Joint 1331.00 196.90
ix) 400 mm Joint 1655.00 214.60
x) 450 mm Joint 2022.00 253.80
xi) 500 mm Joint 2115.00 281.50
xii) 600 mm Joint 2323.00 343.20
Section-I-C.I./D.I. PIPES 55
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs. 2013-
2014
xiii) 700 mm Joint 3445.00 417.20
xiv) 750 mm Joint 3576.00 454.80
xv) 800 mm Joint 4843.00 498.60
xvi) 900 mm Joint 5098.00 577.40
xvii) 1000 mm Joint 5373.00 668.00
NOTE: Only 85%payment shall be payable till satisfactory hydraulic testing is given
10 Providing and supplying ISI
standard D. I. specials & fitting
with sealing rubber gasket of
S.B.R,complete with cast iron
follower gland and M. S. nut bolts
coated or otherwise protected from
rusting and suitable for D.I.pipes
including cost of labour
,materials, and transportation to
stores / site, loading and
unloading including all taxes etc.
complete as per IS-9523.
For all types of specials, bends
tees etc.
a) 80 to 300 mm dia. Kg 107.00
b) 350 mm & above dia. Kg 130.00
11 Providing and supplying ISI
standard welded DI double flanged
pipe including all taxes (central &
local) railway freight, insurance,
unloading from railway wagon,
loading into truck transport to
store / site, unloading, stacking
etc. complete as directed by
Engineer -in- cahrge. (for 2.75 m
bare pipe)
i) 100 mm Rmt. 1863.00
iii) 150 mm Rmt. 2530.00
iv) 200 mm Rmt. 3238.00
v) 250 mm Rmt. 4394.00
vi) 300 mm Rmt. 5531.00
vii) 350 mm Rmt. 7203.00
viii) 400 mm Rmt. 8720.00
ix) 450 mm Rmt. 10419.00
Section-I-C.I./D.I. PIPES 56
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs. 2013-
2014
x) 500 mm Rmt. 12110.00
xi) 600 mm Rmt. 15946.00
xii) 700 mm Rmt. 21457.00
xiv) 800 mm Rmt. 26228.00
xv) 900 mm Rmt. 32555.00
xvi) 1000 mm Rmt. 38225.00
Section-I-C.I./D.I. PIPES 57
Sr No Item Description Unit
1 Providing and supplying Asbestos
Cement pressure pipes
manufactured and tested as per
ISO-160 standards of following
class and diameter in standard
lengths including cost of all taxes
(Central and local) insurance,
railway fright, inspection charges,
unloading from railway wagon,
loading into truck, transporting to
departmental stores / site,
unloading, stacking, etc. complete.
With E.D.
Without
E.D. With E.D.
Without
E.D.
a) Class 15 (TestPressure 1.5 MPa)
i) 80 mm Rmt 139.00 126.00
ii) 100 mm Rmt 179.00 162.00
iii) 125 mm Rmt 214.00 194.00
iv) 150 mm Rmt 376.00 341.00
v) 200 mm Rmt 0.00 497.00
vi) 250 mm Rmt 0.00 719.00
vii) 300 mm Rmt 0.00 1052.00
b) Class 20 (TestPressure 2.0 MPa)
i) 80 mm Rmt 153.00 139.00
ii) 100 mm Rmt 229.00 208.00
iii) 125 mm Rmt 269.00 244.00
iv) 150 mm Rmt 475.00 431.00
v) 200 mm Rmt 0.00 612.00
vi) 250 mm Rmt 0.00 906.00
vii) 300 mm 0.00 1119.00
c) Class 25 (TestPressure 2.5 MPa)
i) 80 mm Rmt 173.00 190.00
ii) 100 mm Rmt 288.00 317.00
iii) 125 mm Rmt 334.00 367.00
iv) 150 mm Rmt 598.00 658.00
v) 200 mm Rmt 0.00 789.00
vi) 250 mm Rmt 0.00 1184.00
vii) 300 mm Rmt 0.00 1298.00
Section - I- (II) - A.C. PIPESS
Rate (in Rs.)
2012-2013
Rate in Rs. 2013-
2014
Section-I-(II)-A.C.PIPES 58
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs. 2013-
2014
2 Providing and supplying C.I.
detachable joints suitable for A.C.
pressure pipes manufactured as
per IS-1538-1993 standards of
following class and diameter
including cost of all taxes (Central
and local), insurance, railway
freight, inspection charges,
unloading from railway wagon,
loading into truck, transporting to
departmental store / site,
unloading, stacking and cost of
rubber rings, nut bolts, etc.
complete. ( IS-1538/1993)
a) Class 10 (Test Pressure 1.0 MPa)
1 80 mm No 255.00
2 100 mm No 323.00
3 125 mm No 408.00
4 150 mm No 519.00
5 200 mm No 790.50
6 250 mm No 1079.50
7 300 mm No 1360.00
8 350 mm No 2338.00
9 400 mm No 2678.00
10 450 mm No 3655.00
11 500 mm No 5185.00
12 600 mm No 8840.00
b) Class 15 (Test Pressure 1.5 MPa)
1 80 mm No 300.00
2 100 mm No 380.00
3 125 mm No 510.00
4 150 mm No 636.00
5 200 mm No 960.00
6 250 mm No 1204.00
7 300 mm No 1650.00
Section-I-(II)-A.C.PIPES 59
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs. 2013-
2014
c) Class 20 (Test Pressure 2.0 MPa)
1 80 mm No 325.00
2 100 mm No 425.00
3 125 mm No 550.00
4 150 mm No 659.00
5 200 mm No 886.00
6 250 mm No 1250.00
7 300 mm No 1790.00
3 Providing and supplying A. C.
pressure coupler suitable for A.C.
pressure pipes manufactured as
per ISO-160 standards of following
class and diameter including cost
of all taxes (Central and local)
insurance, railway fright,
inspection charges, and cost of
rubber rings, nuts bolts, etc.
complete. (supply at stores / site)
a) Class 15 (Test Pressure 1.5 MPa)
i) 80 mm No 39.00
ii) 100 mm No 50.00
iii) 125 mm No 69.00
iv) 150 mm No 84.00
b) Class 20 (Test Pressure 2.0 MPa)
i) 80 mm No 42.00
ii) 100 mm No 56.00
iii) 125 mm No 72.00
iv) 150 mm No 98.00
4 Lowering, laying and jointing with
C.I.D. joints, A. C. pressure pipes
and C.I. or M. S. specials of
following class and diameters
including conveyance from stores
to site of works, cost of labour and
material, giving satisfactory
Section-I-(II)-A.C.PIPES 60
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs. 2013-
2014
hydraulic testing, etc. as per ISI
code, etc. complete but excluding
cost of C. I. D. joints nut bolts,
rubber rings.
a) Class 15 (Test Pressure 1.5 MPa) LABOUR
INVOLVED
i) 80 mm Rmt 31.00 29.50
ii) 100 mm Rmt 43.00 40.90
iii) 125 mm Rmt 46.00 43.30
iv) 150 mm Rmt 57.00 53.40
v) 200 mm Rmt 73.00 67.00
vi) 250 mm Rmt 92.00 84.40
vii) 300 mm Rmt 113.00 102.70
b) Class 20 (Test Pressure 2.0 MPa)
i) 80 mm Rmt 32.00 30.30
ii) 100 mm Rmt 46.00 43.50
iii) 125 mm Rmt 50.00 46.80
iv) 150 mm Rmt 63.00 58.50
v) 200 mm Rmt 83.00 75.50
vi) 250 mm Rmt 104.00 94.50
vii) 300 mm Rmt 129.00 115.90
5 Lowering laying and jointing with
C. I. D. jointing with A. C. coupler
A.C. pressure pipes and C.I. or
M.S. specials of following class and
diameters including conveyance
from stores to site of works, cost of
labour and material, giving
satisfactory hydraulic testing, etc.
as per ISI code, etc. complete but
excluding cost of A. C. couplers
and rubber rings.
a) Class 15 (Test Presure 1.5 Mpa)
i) 80 mm Rmt 21.00 19.60
ii) 100 mm Rmt 28.00 26.10
iii) 125 mm Rmt 33.00 30.50
iv) 150 mm Rmt 42.00 38.50
Section-I-(II)-A.C.PIPES 61
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs. 2013-
2014
v) 200 mm Rmt 58.00 52.40
vi) 250 mm Rmt 74.00 66.80
vii) 300 mm Rmt 96.00 86.20
b) Class 20 (Test Presure 2.0 Mpa)
i) 80 mm Rmt 22.00 20.50
ii) 100 mm Rmt 33.00 30.70
iii) 125 mm Rmt 37.00 34.10
iv) 150 mm Rmt 48.00 43.90
v) 200 mm Rmt 69.00 61.90
vi) 250 mm Rmt 86.00 77.10
vii) 300 mm Rmt 113.00 100.50
Note :
1
2
3
85 % payment for lowering, laying, jointing shall be made till
satisfactory hydraulic testing is given.
Without any extra cost every pipe in the factory shall be
hydraulically tested for one higher class i.e. when Class-15 pipe is
ordered, every pipe shall be tested for 20 kg/cm2 at factory but
pipe shall be branded and paid as Class 15. This foot note shall
appear in tender conditions.
Whenever manufacturer is separate and contractor for lowering,
laying, jointing and testing is separate, the principal contractor
shall enter into an agreement with A.C. pipe manufacturer for
satisfactory manufacturing, transporting, lowering, laying,
jointing and testing of pipes. This foot note shall appear in the
tender con ditions.
Section-I-(II)-A.C.PIPES 62
Sr No Item Description Unit
1 Providing and supplying in
standard lengths ISI mark rigid
unplasticised PVC pipes suitable
for potable water with solvent
cement joints including cost of
couplers, as per IS specification
no. 4985 / 1988 including all local
and central taxes, transportation,
freight charges, inspection
charges, loading, unloading,
conveyance to the departmental
stores / site and stacking the same
in closed shed duly protected from
sun rays and rains including cost
of jointing material i.e. solvent
cement, etc. complete (selffit type
to be jointed with cement solvent).
With E.D.
Without
E.D. With E.D.
Without
E.D.
Note :
1) 10% of cost of pipes shall be
considered for cost of PVC specials
for estimate purpose only.
2) One coupler and required
cement solvent shall be provided
with each full length pipe cost of
which is
a) Working Pressure 4 Kg./Sq.cm.
63 mm Rmt 46.00 41.00
75 mm Rmt 65.00 58.00
90 mm Rmt 91.00 81.00
110 mm Rmt 124.00 110.00
140 mm Rmt 208.00 184.00
160 mm Rmt 274.00 243.00
180 mm Rmt 372.00 331.00
200 mm Rmt 460.00 408.00
225 mm Rmt 589.00 522.00
250 mm Rmt 719.00 638.00
280 mm Rmt 953.00 847.00
Section - I- (III) - P.V.C. PIPESS
Rate (in Rs.)
2012-2013
Rate in Rs. 2013-
2014
Section-I-(III)-P.V.C.PIPES 63
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs. 2013-
2014
315 mm Rmt 1213.00 1078.00
355 mm Rmt 1626.00 1445.00
400 mm Rmt 2074.00 1844.00
b) Working Pressure 6 Kg./Sq.cm.
63 mm Rmt 66.00 58.00
75 mm Rmt 93.00 83.00
90 mm Rmt 133.00 119.00
110 mm Rmt 185.00 164.00
140 mm Rmt 307.00 273.00
160 mm Rmt 397.00 353.00
180 mm Rmt 528.00 469.00
200 mm Rmt 673.00 599.00
225 mm Rmt 851.00 755.00
250 mm Rmt 1061.00 944.00
280 mm Rmt 1401.00 1244.00
315 mm Rmt 1786.00 1587.00
355 mm Rmt 2384.00 2118.00
400 mm Rmt 3046.00 2706.00
c) Working Pressure 8 Kg./Sq.cm.
63 mm Rmt 91.00 80.00
75 mm Rmt 129.00 114.00
90 mm Rmt 183.00 162.00
110 mm Rmt 257.00 229.00
140 mm Rmt 427.00 379.00
160 mm Rmt 557.00 496.00
180 mm Rmt 740.00 658.00
200 mm Rmt 931.00 827.00
225 mm Rmt 1181.00 1050.00
250 mm Rmt 1478.00 1313.00
280 mm Rmt 1946.00 1729.00
315 mm Rmt 2464.00 2191.00
355 mm Rmt 3315.00 2945.00
400 mm Rmt 4293.00 3814.00
d) Working Pressure 10 Kg./Sq.cm.
63 mm Rmt 108.00 96.00
Section-I-(III)-P.V.C.PIPES 64
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs. 2013-
2014
75 mm Rmt 154.00 138.00
90 mm Rmt 223.00 197.00
110 mm Rmt 315.00 278.00
140 mm Rmt 508.00 452.00
160 mm Rmt 666.00 590.00
180 mm Rmt 915.00 813.00
200 mm Rmt 1131.00 1005.00
225 mm Rmt 1445.00 1283.00
250 mm Rmt 1826.00 1621.00
280 mm Rmt 2294.00 2039.00
315 mm Rmt 2916.00 2590.00
355 mm Rmt 3920.00 3484.00
400 mm Rmt 4999.00 4442.00
e) Working Pressure 12.5
Kg./Sq.cm.63 mm Rmt 138.00 123.00
75 mm Rmt 195.00 173.00
90 mm Rmt 281.00 250.00
110 mm Rmt 399.00 354.00
140 mm Rmt 648.00 575.00
160 mm Rmt 851.00 757.00
180 mm Rmt 1164.00 1035.00
200 mm Rmt 1446.00 1284.00
225 mm Rmt 1837.00 1632.00
250 mm Rmt 2322.00 2063.00
280 mm Rmt 2920.00 2596.00
315 mm Rmt 3724.00 3310.00
355 mm Rmt 4977.00 4423.00
400 mm Rmt 6449.00 5730.00
2 Providing and supplying in
standard lengths ISI mark rigid
unplastised PVC for patable water
with rubber ring joints including
cost of rubber ring as per IS-4985-
1998, all local and central taxes,
transportation, freight charges,
transit insurance, inspection
charges, loading, unloading,
Section-I-(III)-P.V.C.PIPES 65
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs. 2013-
2014
conveyance to store/site and
stacking the same in closed shed
duly protected from sun rays and
rains, etc. complete ( with third
party inspection ) (socketed)
Note:- One Rubber rui\ng shall be
provided with full length pipe, cost
of which is included below.
a) Working Pressure 4 Kg./Sq.cm.
63 mm Rmt 48.00 43.00
75 mm Rmt 69.00 60.00
90 mm Rmt 96.00 85.00
110 mm Rmt 131.00 117.00
125 mm Rmt 181.00 161.00
140 mm Rmt 219.00 195.00
160 mm Rmt 291.00 257.00
180 mm Rmt 395.00 350.00
200 mm Rmt 487.00 434.00
225 mm Rmt 623.00 554.00
250 mm Rmt 763.00 678.00
280 mm Rmt 1011.00 899.00
315 mm Rmt 1287.00 1142.00
b) Working Pressure 6 Kg./Sq.cm.
63 mm Rmt 69.00 61.00
75 mm Rmt 98.00 88.00
90 mm Rmt 142.00 126.00
110 mm Rmt 197.00 173.00
125 mm Rmt 271.00 239.00
140 mm Rmt 325.00 290.00
160 mm Rmt 421.00 373.00
180 mm Rmt 560.00 498.00
200 mm Rmt 714.00 634.00
225 mm Rmt 902.00 800.00
250 mm Rmt 1126.00 1001.00
280 mm Rmt 1484.00 1319.00
315 mm Rmt 1892.00 1682.00
Section-I-(III)-P.V.C.PIPES 66
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs. 2013-
2014
c) Working Pressure 8 Kg./Sq.cm.
63 mm Rmt 95.00 84.00
75 mm Rmt 137.00 122.00
90 mm Rmt 193.00 171.00
110 mm Rmt 272.00 243.00
125 mm Rmt 376.00 334.00
140 mm Rmt 454.00 402.00
160 mm Rmt 591.00 526.00
180 mm Rmt 785.00 697.00
200 mm Rmt 988.00 877.00
225 mm Rmt 1252.00 1113.00
250 mm Rmt 1565.00 1390.00
280 mm Rmt 2063.00 1834.00
315 mm Rmt 2613.00 2323.00
d) Working Pressure 10 Kg./Sq.cm.
63 mm Rmt 114.00 103.00
75 mm Rmt 165.00 146.00
90 mm Rmt 236.00 209.00
110 mm Rmt 333.00 296.00
125 mm Rmt 460.00 406.00
140 mm Rmt 538.00 478.00
160 mm Rmt 705.00 626.00
180 mm Rmt 969.00 862.00
200 mm Rmt 1199.00 1065.00
225 mm Rmt 1531.00 1360.00
250 mm Rmt 1935.00 1720.00
280 mm Rmt 2432.00 2161.00
315 mm Rmt 3090.00 2746.00
e) Working Pressure 12.5 Kg./Sq.cm.
63 mm Rmt 146.00 129.00
75 mm Rmt 207.00 183.00
90 mm Rmt 297.00 265.00
110 mm Rmt 424.00 376.00
125 mm Rmt 584.00 518.00
140 mm Rmt 687.00 611.00
160 mm Rmt 903.00 801.00
Section-I-(III)-P.V.C.PIPES 67
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs. 2013-
2014
180 mm Rmt 1235.00 1097.00
200 mm Rmt 1531.00 1361.00
225 mm Rmt 1946.00 1730.00
250 mm Rmt 2462.00 2186.00
280 mm Rmt 3096.00 2751.00
315 mm Rmt 3946.00 3507.00
3 Lowering, laying and jointing with
P.V.C. pipes and specials of
following class and diameter
including cost of conveyance from
stores to site of works including
cost of all labour, material, except
cement solvent, rubber ring, giving
satisfactory hydraulic testing as
per IS code, etc. complete (with
cement solvent joint / ring fit
joint).LABOUR
INVOLVED
a) Working Pressure 4 Kg./Sq.cm.
i) 63 mm Rmt 16.00 15.80
ii) 75 mm Rmt 21.00 20.80
iii) 90 mm Rmt 25.00 24.80
iv) 110 mm Rmt 29.00 28.80
v) 140 mm Rmt 34.00 33.70
vi) 160 mm Rmt 38.00 37.70
vii) 180 mm Rmt 42.00 41.60
viii) 200 mm Rmt 46.00 45.60
ix) 225 mm Rmt 53.00 52.50
x) 250 mm Rmt 57.00 56.50
xi) 280 mm Rmt 63.00 62.40
xii) 315 mm Rmt 70.00 69.30
xiii) 355 mm Rmt 77.00 76.20
xiv) 400 mm Rmt 84.00 83.10
b) Working Pressure 6 & 12.5 Kg./Sq.cm.
i) 63 mm Rmt 22.00 21.80
ii) 75 mm Rmt 29.00 28.80
iii) 90 mm Rmt 33.00 32.60
iv) 110 mm Rmt 37.00 36.60
Section-I-(III)-P.V.C.PIPES 68
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs. 2013-
2014
v) 140 mm Rmt 44.00 43.50
vi) 160 mm Rmt 47.00 46.60
vii) 180 mm Rmt 53.00 52.50
viii) 200 mm Rmt 58.00 57.40
ix) 225 mm Rmt 63.00 62.30
x) 250 mm Rmt 69.00 68.30
xi) 280 mm Rmt 78.00 77.20
xii) 315 mm Rmt 87.00 86.20
xiii) 355 mm Rmt 96.00 95.00
xiv) 400 mm Rmt 106.00 104.90
1)
2) Third party inspecting agency shall invariably carry out.
I) Specific Gravity Test.
II) Weight / Rmt.
III)
3)
This conditions shall appear in tender conditions
After receipt of pipes at site, concerned Deputy Engineer shall confirm that
weight of pipe for every class and diameter is not less than the prescribed
standard weight as per IS-4985/1988 (Which is given in CSR), Under weight
pipes shall be rejected. This condition shall appear in the tender conditions.
Only 85% rate for lowering laying& jointing shall be payable till satisfactory
hydraulic testing is given.
Ash Content Test and confirm in writing that those are within prescribed
limits. This condition shall appear in tender conditions.
Section-I-(III)-P.V.C.PIPES 69
Sr No Item Description Unit
1 Providing ISI mark G.I. pipe of
following class and dia. including
all local and central taxes, octroi,
inspection charges, transportation
to stores, etc. complete as per IS-
1239/2004.
With E.D.
Without
E.D. With E.D.
Without
E.D.
Note :
One coupler shall be provided with
each full length of pipe cost of
which is included in rates below.
a) LIGHT
i) 15 mm Rmt 71.00 65.00
ii) 20 mm Rmt 106.00 95.00
iii) 25 mm Rmt 146.00 131.00
iv) 32 mm Rmt 183.00 166.00
v) 40 mm Rmt 229.00 208.00
vi) 50 mm Rmt 288.00 255.00
vii) 65 mm Rmt 397.00 349.00
viii) 80 mm Rmt 477.00 420.00
ix) 100 mm Rmt 680.00 596.00
b) MEDIUM
i) 15 mm Rmt 85.00 77.00
ii) 20 mm Rmt 108.00 98.00
iii) 25 mm Rmt 165.00 150.00
iv) 32 mm Rmt 209.00 189.00
v) 40 mm Rmt 240.00 218.00
vi) 50 mm Rmt 342.00 301.00
vii) 65 mm Rmt 424.00 384.00
viii) 80 mm Rmt 556.00 503.00
ix) 100 mm Rmt 820.00 719.00
x). 125 mm Rmt 1097.00 978.00
xi) 150mm Rmt 1311.00 1151.00
c) HEAVY
i) 15 mm Rmt 96.00 87.00
Section - I- (IV) - G.I. PIPESS
Rate (in Rs.)
2012-2013
Rate in Rs. 2013-
2014
Section-I-(IV)-G.I.PIPES 70
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs. 2013-
2014
ii) 20 mm Rmt 125.00 113.00
iii) 25 mm Rmt 196.00 177.00
iv) 32 mm Rmt 246.00 223.00
v) 40 mm Rmt 285.00 259.00
vi) 50 mm Rmt 395.00 359.00
vii) 65 mm Rmt 508.00 461.00
viii) 80 mm Rmt 649.00 589.00
ix) 100 mm Rmt 936.00 849.00
x). 125 mm Rmt 1159.00 1052.00
xi) 150mm Rmt 1396.00 1266.00
2 Lowering, laying and jointing G. I.
pipes and specials of following
class and diameter including
conveyance from stores to site of
works, all labour, giving
satisfactory hydraulic test, etc.
complete either underground or in
vertical position, as directed by
Engineer-in-charge.
a) LIGHT
i) 15 mm Rmt 23.00 20.60
ii) 20 mm Rmt 26.00 23.60
iii) 25 mm Rmt 32.00 28.90
iv) 32 mm Rmt 37.00 33.40
v) 40 mm Rmt 46.00 42.30
vi) 50 mm Rmt 55.00 50.50
vii) 65 mm Rmt 80.00 72.50
viii) 80 mm Rmt 89.00 81.00
ix) 100 mm Rmt 106.00 89.10
b) MEDIUM
i) 15 mm Rmt 25.00 22.20
ii) 20 mm Rmt 28.00 25.20
iii) 25 mm Rmt 34.00 30.50
iv) 32 mm Rmt 39.00 35.00
v) 40 mm Rmt 50.00 45.50
vi) 50 mm Rmt 59.00 53.70
vii) 65 mm Rmt 86.00 78.60
Section-I-(IV)-G.I.PIPES 71
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs. 2013-
2014
viii) 80 mm Rmt 97.00 88.00
ix) 100 mm Rmt 106.00 96.50
x) 125 mm Rmt 113.00 103.10
xi) 150 mm Rmt 119.00 107.60
c) HEAVY
i) 15 mm Rmt 27.00 24.90
ii) 20 mm Rmt 30.00 26.80
iii) 25 mm Rmt 36.00 33.10
iv) 32 mm Rmt 43.00 39.30
v) 40 mm Rmt 54.00 48.70
vi) 50 mm Rmt 67.00 61.20
vii) 65 mm Rmt 94.00 85.10
viii) 80 mm Rmt 113.00 102.20
ix) 100 mm Rmt 106.00 96.10
x) 125 mm Rmt 118.00 107.20
xi) 150 mm Rmt 128.00 116.60
Note: Only 85% Payment shall be payable till satisfactory hydraulic testing is given
Section-I-(IV)-G.I.PIPES 72
Sr No Item Description Unit
1 Providing ISI standard Stoneware
pipes including all taxes (Central
and local), inspection charges,
railway freight, unloading from
railway wagons, loading into
trucks, transport to departmental
stores, unloading, stacking etc.
complete as per IS-651.
With E.D.
Without
E.D. With E.D.
Without
E.D.
i) 100 mm Rmt 122.00
ii) 150 mm Rmt 167.00
iii) 200 mm Rmt 223.00
iv) 225 mm Rmt 269.00
v) 250 mm Rmt 300.00
vi) 300 mm Rmt 352.00
2 Lowering, laying and jointing in
proper grade and alignment
Stoneware pipes with cement
joints in C. M. (1:1) proportion of
following diameters including cost
of conveyance from stores to site of
work jointing material, labour,
giving satisfactory hydraulic
testing etc. complete as per IS-
1742.
i) 100 mm Rmt 63.80 46.30
ii) 150 mm Rmt 104.50 67.00
iii) 200 mm Rmt 130.90 70.40
iv) 225 mm Rmt 143.00 70.60
v) 250 mm Rmt 156.20 70.40
vi) 300 mm Rmt 182.60 75.70
Note: Only 85% Payment shall be payable till satisfactory hydraulic testing is given
Section - I- (V) - STONEWARE PIPESS
Rate (in Rs.)
2012-2013
Rate in Rs. 2013-
2014
Section-I-(V)-STONEWARE PIPES 73
1 Providing ISI standard R.C.C.
pipes in standard lengths of
following class and diameter
suitable for either collar joints or
rubber ring joints, including all
taxes (Central and local),
inspection charges, transport to
departmental stores/site,
unloading and stacking etc.
complete as per IS-458/1988.
Note: One collar should be
supplied with each full length
plain ended RCC pipe, cost of
collar included in rates below. One
rubber ring should be supplied
with each full length of socketed
pipe, cost included in rates below.
With E.D.
Without
E.D. With E.D.
Without
E.D.
a) Class " P-I "
i) 80 mm Rmt 309.00 281.00 273.00 247.00
ii) 100 mm Rmt 324.00 294.00 293.00 267.00
iii) 150 mm Rmt 339.00 309.00 304.00 275.00
iv) 200 mm Rmt 396.00 360.00 355.00 322.00
v) 225 mm Rmt 452.00 411.00 407.00 369.00
vi) 250 mm Rmt 494.00 449.00 443.00 403.00
vii) 300 mm Rmt 632.00 575.00 567.00 514.00
viii) 350 mm Rmt 681.00 619.00 613.00 556.00
ix) 400 mm Rmt 864.00 785.00 782.00 710.00
x) 450 mm Rmt 1064.00 966.00 962.00 873.00
xi) 500 mm Rmt 1280.00 1163.00 1153.00 1046.00
xii) 600 mm Rmt 1615.00 1466.00 1456.00 1322.00
xiii) 700 mm Rmt 2103.00 1910.00 1892.00 1719.00
xiv) 800 mm Rmt 2428.00 2205.00 2184.00 1983.00
xv) 900 mm Rmt 3056.00 2775.00 2751.00 2498.00
xvi) 1000 mm Rmt 3580.00 3252.00 3225.00 2928.00
xvii) 1100 mm Rmt 4068.00 3694.00 3662.00 3326.00
xviii) 1200 mm Rmt 4887.00 4438.00 4402.00 3998.00
Sr No Item Description Unit
Collar Joints Rubber Ring Joints
Section - I- (VI) - R.C.C. PIPESS
Rate (in Rs.)
2012-2013
Rate in Rs. 2013-
2014
Section-I-(VI)-R.C.C. PIPES 74
Sr No Item Description Unit
Collar Joints Rubber Ring Joints
Rate (in Rs.)
2012-2013
Rate in Rs. 2013-
2014
b) Class " P-II " Collar Joint Rubber Ring
i) 80 mm Rmt 329.00 299.00 293.00 265.00
ii) 100 mm Rmt 351.00 319.00 316.00 286.00
iii) 150 mm Rmt 420.00 381.00 379.00 344.00
iv) 200 mm Rmt 566.00 513.00 513.00 465.00
v) 225 mm Rmt 670.00 608.00 604.00 547.00
vi) 250 mm Rmt 725.00 659.00 658.00 598.00
vii) 300 mm Rmt 956.00 869.00 914.00 829.00
viii) 350 mm Rmt 1193.00 1084.00 1080.00 981.00
ix) 400 mm Rmt 1332.00 1210.00 1213.00 1101.00
x) 450 mm Rmt 1616.00 1467.00 1450.00 1317.00
xi) 500 mm Rmt 2256.00 2049.00 2056.00 1867.00
xii) 600 mm Rmt 2797.00 2541.00 2521.00 2290.00
xiii) 700 mm Rmt 3811.00 3461.00 3466.00 3148.00
xiv) 800 mm Rmt 4583.00 4163.00 4177.00 3794.00
xv) 900 mm Rmt 5163.00 4689.00 5202.00 4724.00
xvi) 1000 mm Rmt 6249.00 5675.00 5626.00 5109.00
c) Class " P-III " Collar Joint Rubber Ring
i) 80 mm Rmt 355.00 322.00 351.00 318.00
ii) 100 mm Rmt 383.00 348.00 379.00 343.00
iii) 150 mm Rmt 437.00 397.00 438.00 397.00
iv) 200 mm Rmt 594.00 540.00 595.00 540.00
v) 225 mm Rmt 709.00 643.00 709.00 643.00
vi) 250 mm Rmt 829.00 753.00 830.00 752.00
vii) 300 mm Rmt 1151.00 1046.00 1151.00 1045.00
viii) 350 mm Rmt 1502.00 1364.00 1502.00 1364.00
ix) 400 mm Rmt 2067.00 1878.00 2067.00 1878.00
x) 450 mm Rmt 2372.00 2155.00 2373.00 2156.00
xi) 500 mm Rmt 2895.00 2630.00 2896.00 2629.00
xii) 600 mm Rmt 3719.00 3378.00 3720.00 3378.00
xiii) 700 mm Rmt 5305.00 4819.00 5305.00 4818.00
xiv) 800 mm Rmt 6738.00 6119.00 6738.00 6119.00
Section-I-(VI)-R.C.C. PIPES 75
Sr No Item Description Unit
Collar Joints Rubber Ring Joints
Rate (in Rs.)
2012-2013
Rate in Rs. 2013-
2014
d) Class " NP-II " Collar Joint Rubber Ring
i) 80 mm Rmt 290.00 293.00
ii) 100 mm Rmt 298.00 304.00
iii) 150 mm Rmt 348.00 354.00
iv) 200 mm Rmt 407.00 415.00
v) 225 mm Rmt 454.00 463.00
vi) 250 mm Rmt 488.00 498.00
vii) 300 mm Rmt 652.00 665.00
viii) 350 mm Rmt 799.00 815.00
ix) 400 mm Rmt 928.00 947.00
x) 450 mm Rmt 1088.00 1110.00
xi) 500 mm Rmt 1272.00 1297.00
xii) 600 mm Rmt 1679.00 1713.00
xiii) 700 mm Rmt 2422.00 2470.00
xiv) 800 mm Rmt 2767.00 2822.00
xv) 900 mm Rmt 3545.00 3616.00
xvi) 1000 mm Rmt 4243.00 4328.00
xvii) 1100 mm Rmt 5327.00 5434.00
xviii) 1200 mm Rmt 5703.00 5817.00
xix) 1400 mm Rmt 6778.00 6914.00
xx) 1600 mm Rmt 7782.00 7938.00
xxi) 1800 mm Rmt 10901.00 11119.00
e) Class " NP-III " Collar Joint Rubber Ring
i) 80 mm Rmt 328.00 335.00
ii) 100 mm Rmt 372.00 379.00
iii) 150 mm Rmt 410.00 418.00
iv) 200 mm Rmt 612.00 624.00
v) 225 mm Rmt 713.00 727.00
vi) 250 mm Rmt 763.00 778.00
vii) 300 mm Rmt 868.00 885.00
viii) 350 mm Rmt 1537.00 1568.00
ix) 400 mm Rmt 1722.00 1756.00
x) 450 mm Rmt 2047.00 2088.00
xi) 500 mm Rmt 2274.00 2319.00
Section-I-(VI)-R.C.C. PIPES 76
Sr No Item Description Unit
Collar Joints Rubber Ring Joints
Rate (in Rs.)
2012-2013
Rate in Rs. 2013-
2014
xii) 600 mm Rmt 2996.00 3056.00
xiii) 700 mm Rmt 4072.00 4153.00
xiv) 800 mm Rmt 4851.00 4948.00
xv) 900 mm Rmt 5603.00 5715.00
xvi) 1000 mm Rmt 6855.00 6992.00
xvii) 1100 mm Rmt 7930.00 8089.00
xviii) 1200 mm Rmt 9304.00 9490.00
xix) 1400 mm Rmt 11180.00 11404.00
xx) 1600 mm Rmt 16292.00 16618.00
xxi) 1800 mm Rmt 21550.00 21981.00
f) Class " NP-IV " Collar Joint Rubber Ring
i) 80 mm Rmt 353.00 360.00
ii) 100 mm Rmt 414.00 422.00
iii) 150 mm Rmt 469.00 478.00
iv) 200 mm Rmt 655.00 668.00
v) 225 mm Rmt 774.00 789.00
vi) 250 mm Rmt 872.00 889.00
vii) 300 mm Rmt 1111.00 1133.00
viii) 350 mm Rmt 1687.00 1721.00
ix) 400 mm Rmt 1807.00 1843.00
x) 450 mm Rmt 2131.00 2174.00
xi) 500 mm Rmt 2604.00 2656.00
xii) 600 mm Rmt 3185.00 3249.00
xiii) 700 mm Rmt 4767.00 4862.00
xiv) 800 mm Rmt 5444.00 5553.00
xv) 900 mm Rmt 6376.00 6504.00
xvi) 1000 mm Rmt 9026.00 9207.00
xvii) 1100 mm Rmt 9792.00 9988.00
xviii) 1200 mm Rmt 9836.00 10033.00
xix) 1400 mm Rmt 15359.00 15666.00
xx) 1600 mm Rmt 19148.00 19531.00
xxi) 1800 mm Rmt 26249.00 26774.00
Section-I-(VI)-R.C.C. PIPES 77
Sr No Item Description Unit
Collar Joints Rubber Ring Joints
Rate (in Rs.)
2012-2013
Rate in Rs. 2013-
2014
2 Lowering, laying and jointing in
proper grade and alignment R.C.C.
pipes with collar joints in C.M.1:1
proportion or socketed R.C.C.
pipes with rubber joints (excluding
cost of rubber ring or R.C.C.
collar,) including cost of
conveyance from stores to site of
work, cost of jointing material,
labour, giving hydraulic testing
etc. complete as directed by
Engineer-in-charge (For all class of
pipes.) as per IS-783-1985.Collar
JointLabour
Involved
Rubber
ring
JointLabour
Involved
For All class of pipes
i) 80 mm Rmt 44.00 28.70 31.00 15.50
ii) 100 mm Rmt 52.80 35.20 37.00 18.70
iii) 150 mm Rmt 80.30 54.00 56.00 28.70
iv) 200 mm Rmt 105.60 71.60 75.00 38.60
v) 225 mm Rmt 124.30 79.90 88.00 42.40
vi) 250 mm Rmt 139.70 89.40 98.00 46.20
vii) 300 mm Rmt 168.30 106.60 118.00 54.80
viii) 350 mm Rmt 172.70 106.10 121.00 53.30
ix) 400 mm Rmt 220.00 142.20 155.00 74.80
x) 450 mm Rmt 266.20 159.60 185.00 78.20
xi) 500 mm Rmt 290.40 177.40 203.00 88.20
xii) 600 mm Rmt 367.40 212.60 254.00 100.50
xiii) 700 mm Rmt 415.80 248.10 289.00 121.80
xiv) 800 mm Rmt 481.80 283.90 334.00 136.70
xv) 900 mm Rmt 530.20 319.30 369.00 157.60
xvi) 1000 mm Rmt 579.70 355.50 404.00 178.00
xvii) 1100 mm Rmt 806.30 386.00 547.00 143.80
xviii) 1200 mm Rmt 855.80 421.90 582.00 185.50
xix) 1400 mm Rmt 953.70 493.20 652.00 202.00
xx) 1600 mm Rmt 1051.60 564.60 722.00 246.60
xxi) 1800 mm Rmt 1149.50 636.00 792.00 288.00
Note: Only 85% rate shall be payable till satisfactory hydraulic testing is given.
Section-I-(VI)-R.C.C. PIPES 78
Sr No Item Description Unit
1 Providing ISI standard Pre -
stressed Cement concrete pipes of
following class and diameter
including cost of all meterial and
labour required, cost of all
taxes(Central and local) ,
inspection charges, transportaion
to stores/ site, unloading and
stacking etc. complete as per IS-
784-2001.
Note: One rubber ring should be
supplied with each pipe, cost
included in rates below.
i)Factory test pressure-a)Site test pressure +
0.1N/mm2,For working Pressure
upto 1 N/mm2
b) Site test pressure +
0.2N/mm2,For working Pressure
above 1 N/mm2
ii) Site test pressure-1.5 times
working pressure pertaining to
the section or 1.1 times static
pressure,which ever is more
(such pressure is to be control
within 25% of pumphead incase
of pumping main)
iii) Working pressure-The
maximum sustained internal
pressure excluding surge to
which each portion of pipeline
may be subjected when
installed. With E.D.
Without
E.D.
a) Factory Test Pressure
2kg/Sq.cm
i) 350 mm Rmt 3400.00 3085.00
ii) 400 mm Rmt 3657.00 3318.00
iii) 450 mm Rmt 3837.00 3481.00
Section - I- (VII) - P.S.C. PIPES
Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
Section-I-(VII)-P.S.C. PIPES 79
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
iv) 500 mm Rmt 4225.00 3833.00
v) 600 mm Rmt 5078.00 4608.00
vi) 700 mm Rmt 5654.00 5130.00
vii) 800 mm Rmt 6983.00 6335.00
viii) 900 mm Rmt 8684.00 7878.00
ix) 1000 mm Rmt 10121.00 9184.00
x) 1100 mm Rmt 11560.00 10488.00
xi) 1200 mm Rmt 13358.00 12119.00
xii) 1300 mm Rmt 15447.00 14014.00
xiii) 1400 mm Rmt 16996.00 15419.00
xiv) 1500 mm Rmt 19452.00 17648.00
xv) 1600 mm Rmt 21575.00 19574.00
xVi) 1700 mm Rmt 23699.00 21501.00
xvii) 1800 mm Rmt 25823.00 23427.00
b) Factory Test Pressure 4
kg/Sq.cm
i) 350 mm Rmt 3400.00 3085.00
ii) 400 mm Rmt 3658.00 3319.00
iii) 450 mm Rmt 3837.00 3481.00
iv) 500 mm Rmt 4225.00 3833.00
v) 600 mm Rmt 5080.00 4609.00
vi) 700 mm Rmt 5656.00 5131.00
vii) 800 mm Rmt 6984.00 6336.00
viii) 900 mm Rmt 8685.00 7879.00
ix) 1000 mm Rmt 10124.00 9186.00
x) 1100 mm Rmt 11562.00 10490.00
xi) 1200 mm Rmt 13358.00 12120.00
xii) 1300 mm Rmt 15451.00 14017.00
xiii) 1400 mm Rmt 16998.00 15420.00
xiv) 1500 mm Rmt 19455.00 17651.00
xv) 1600 mm Rmt 21578.00 19577.00
xVi) 1700 mm Rmt 23703.00 21504.00
xvii) 1800 mm Rmt 25825.00 23430.00
c) Factory Test Pressure 6
kg/Sq.cm
i) 350 mm Rmt 3404.00 3089.00
Section-I-(VII)-P.S.C. PIPES 80
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
ii) 400 mm Rmt 3678.00 3338.00
iii) 450 mm Rmt 3847.00 3490.00
iv) 500 mm Rmt 4255.00 3861.00
v) 600 mm Rmt 5148.00 4670.00
vi) 700 mm Rmt 5851.00 5310.00
vii) 800 mm Rmt 7242.00 6570.00
viii) 900 mm Rmt 9027.00 8189.00
ix) 1000 mm Rmt 10529.00 9552.00
x) 1100 mm Rmt 11988.00 10877.00
xi) 1200 mm Rmt 13888.00 12599.00
xii) 1300 mm Rmt 16044.00 14555.00
xiii) 1400 mm Rmt 17652.00 16014.00
xiv) 1500 mm Rmt 20220.00 18344.00
xv) 1600 mm Rmt 22456.00 20373.00
xVi) 1700 mm Rmt 24693.00 22402.00
xvii) 1800 mm Rmt 26929.00 24432.00
d) Factory Test Pressure 8
kg/Sq.cm
i) 350 mm Rmt 3411.00 3094.00
ii) 400 mm Rmt 3705.00 3362.00
iii) 450 mm Rmt 3871.00 3513.00
iv) 500 mm Rmt 4315.00 3915.00
v) 600 mm Rmt 5321.00 4827.00
vi) 700 mm Rmt 6146.00 5577.00
vii) 800 mm Rmt 7548.00 6848.00
viii) 900 mm Rmt 9409.00 8537.00
ix) 1000 mm Rmt 11004.00 9983.00
x) 1100 mm Rmt 12590.00 11423.00
xi) 1200 mm Rmt 14576.00 13226.00
xii) 1300 mm Rmt 16861.00 15299.00
xiii) 1400 mm Rmt 18637.00 16909.00
xiv) 1500 mm Rmt 21355.00 19376.00
xv) 1600 mm Rmt 24097.00 21861.00
xVi) 1700 mm Rmt 26838.00 24348.00
xvii) 1800 mm Rmt 29579.00 26836.00
Section-I-(VII)-P.S.C. PIPES 81
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
e) Factory Test Pressure 10
kg/Sq.cm
i) 350 mm Rmt 3428.00 3110.00
ii) 400 mm Rmt 3757.00 3407.00
iii) 450 mm Rmt 4007.00 3635.00
iv) 500 mm Rmt 4489.00 4071.00
v) 600 mm Rmt 5550.00 5035.00
vi) 700 mm Rmt 6396.00 5802.00
vii) 800 mm Rmt 7933.00 7197.00
viii) 900 mm Rmt 9886.00 8969.00
ix) 1000 mm Rmt 11577.00 10505.00
x) 1100 mm Rmt 13285.00 12053.00
xi) 1200 mm Rmt 15392.00 13964.00
xii) 1300 mm Rmt 17821.00 16168.00
xiii) 1400 mm Rmt 20144.00 18275.00
xiv) 1500 mm Rmt 23092.00 20951.00
xv) 1600 mm Rmt 25733.00 23347.00
xVi) 1700 mm Rmt 28372.00 25742.00
xvii) 1800 mm Rmt 31012.00 28138.00
f) Factory Test Pressure 12
kg/Sq.cm
i) 350 mm Rmt 3512.00 3185.00
ii) 400 mm Rmt 3855.00 3498.00
iii) 450 mm Rmt 4134.00 3750.00
iv) 500 mm Rmt 4642.00 4211.00
v) 600 mm Rmt 5771.00 5235.00
vi) 700 mm Rmt 6683.00 6064.00
vii) 800 mm Rmt 8309.00 7539.00
viii) 900 mm Rmt 10333.00 9375.00
ix) 1000 mm Rmt 12105.00 10984.00
x) 1100 mm Rmt 13879.00 12592.00
xi) 1200 mm Rmt 16357.00 14842.00
xii) 1300 mm Rmt 18944.00 17089.00
xiii) 1400 mm Rmt 20960.00 19017.00
xiv) 1500 mm Rmt 24004.00 21777.00
xv) 1600 mm Rmt 26746.00 24266.00
xVi) 1700 mm Rmt 29490.00 26754.00
Section-I-(VII)-P.S.C. PIPES 82
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
xvii) 1800 mm Rmt 32232.00 29243.00
g) Factory Test Pressure 14
kg/Sq.cm
i) 350 mm Rmt 3598.00 3263.00
ii) 400 mm Rmt 3957.00 3591.00
iii) 450 mm Rmt 4262.00 3866.00
iv) 500 mm Rmt 4792.00 4348.00
v) 600 mm Rmt 5993.00 5437.00
vi) 700 mm Rmt 6972.00 6326.00
vii) 800 mm Rmt 8688.00 7882.00
viii) 900 mm Rmt 10827.00 9823.00
ix) 1000 mm Rmt 12915.00 11717.00
x) 1100 mm Rmt 14840.00 13464.00
xi) 1200 mm Rmt 17205.00 15610.00
xii) 1300 mm Rmt 19860.00 18018.00
xiii) 1400 mm Rmt 22633.00 20534.00
xiv) 1500 mm Rmt 25936.00 23531.00
xv) 1600 mm Rmt 29004.00 26315.00
xVi) 1700 mm Rmt 32072.00 29099.00
xvii) 1800 mm Rmt 35141.00 31883.00
h) Factory Test Pressure 16
kg/Sq.cm
i) 350 mm Rmt 3675.00 3335.00
ii) 400 mm Rmt 4064.00 3687.00
iii) 450 mm Rmt 4391.00 3985.00
iv) 500 mm Rmt 4950.00 4492.00
v) 600 mm Rmt 6213.00 5637.00
vi) 700 mm Rmt 7266.00 6592.00
vii) 800 mm Rmt 9063.00 8222.00
viii) 900 mm Rmt 12030.00 10915.00
ix) 1000 mm Rmt 13539.00 12283.00
x) 1100 mm Rmt 16249.00 14740.00
xi) 1200 mm Rmt 18754.00 17015.00
xii) 1300 mm Rmt 21585.00 19584.00
xiii) 1400 mm Rmt 23826.00 21617.00
xiv) 1500 mm Rmt 28302.00 25677.00
Section-I-(VII)-P.S.C. PIPES 83
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
xv) 1600 mm Rmt 31744.00 28800.00
xVi) 1700 mm Rmt 35186.00 31923.00
xvii) 1800 mm Rmt 38627.00 35044.00
i) Factory Test Pressure 18
kg/Sq.cm
i) 350 mm Rmt 3761.00 3412.00
ii) 400 mm Rmt 4176.00 3788.00
iii) 450 mm Rmt 4518.00 4099.00
iv) 500 mm Rmt 5105.00 4631.00
v) 600 mm Rmt 6434.00 5837.00
vi) 700 mm Rmt 7946.00 7210.00
vii) 800 mm Rmt 9916.00 8996.00
viii) 900 mm Rmt 12542.00 11378.00
ix) 1000 mm Rmt 14738.00 13371.00
x) 1100 mm Rmt 17008.00 15430.00
xi) 1200 mm Rmt 19658.00 17835.00
xii) 1300 mm Rmt 22642.00 20542.00
xiii) 1400 mm Rmt 29877.00 27107.00
xiv) 1500 mm Rmt 33689.00 30564.00
xv) 1600 mm Rmt 37971.00 34450.00
xVi) 1700 mm Rmt 42252.00 38334.00
xvii) 1800 mm Rmt 46533.00 42218.00
j) Factory Test Pressure 20
kg/Sq.cm
i) 350 mm Rmt 3849.00 3491.00
ii) 400 mm Rmt 4277.00 3881.00
iii) 450 mm Rmt 4649.00 4219.00
iv) 500 mm Rmt 5265.00 4776.00
v) 600 mm Rmt 6661.00 6044.00
vi) 700 mm Rmt 8803.00 7986.00
vii) 800 mm Rmt 11711.00 10624.00
viii) 900 mm Rmt 13843.00 12559.00
ix) 1000 mm Rmt 16654.00 15109.00
x) 1100 mm Rmt 19796.00 17961.00
xi) 1200 mm Rmt 24895.00 22588.00
xii) 1300 mm Rmt 27394.00 24853.00
Section-I-(VII)-P.S.C. PIPES 84
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
xiii) 1400 mm Rmt 32000.00 29033.00
xiv) 1500 mm Rmt 36169.00 32915.00
xv) 1600 mm Rmt 40452.00 36812.00
xVi) 1700 mm Rmt 44734.00 40708.00
xvii) 1800 mm Rmt 49015.00 44605.00
2 Lowering, laying and jointing in
proper grade and alignment Pre-
Stressed Cement Concrete Pipes
with rubber ring joints including
cost of conveyance from stores to
site of works, all lablour involved,
giving hydraulic testing, etc.
complete buexcluding cost of
rubber rings (for all class of pipes) LABOUR
INVOLVED
i) 350 mm Rmt 105.00 46.10
ii) 400 mm Rmt 148.00 71.40
iii) 450 mm Rmt 179.00 74.80
iv) 500 mm Rmt 203.00 87.90
v) 600 mm Rmt 270.00 105.10
vi) 700 mm Rmt 297.00 123.40
vii) 800 mm Rmt 334.00 134.90
viii) 900 mm Rmt 345.00 145.90
ix) 1000 mm Rmt 445.00 194.20
x) 1100 mm Rmt 585.00 191.70
xi) 1200 mm Rmt 626.00 210.40
xii) 1300 mm Rmt 743.00 227.50
xiii) 1400 mm Rmt 784.00 261.50
xiv) 1500 mm Rmt 989.00 253.20
xv) 1600 mm Rmt 1112.00 467.00
xVi) 1700 mm Rmt 1239.00 520.40
xvii) 1800 mm Rmt 1310.00 550.20
1)
2)
3)
Only 85% rate is payable till satisfactory hydraulic testing is given.
Whenever manufacturer is separated and contractor for lowering, laying,
jointing and testing is separate, the principal contractor shall enter into an
agreement with P.S.C. pipe manufacturer for satisfactory manufacturing,
transporting, lowering, laying jointing and testing of pipes.
This foot note shall appear into the tender conditions.
Section-I-(VII)-P.S.C. PIPES 85
Sr No Item Description Unit
1 Providing and supplying European
Standard EN 639/1994 and EN
641/1994 or AWWA C-303
standard and reinforced concrete
pressure pipes cylinder type as per
IS-15155-2002 (Bar wrapped steel
cylinder pipes suitable for
overlaping steel welded joint or
butt welded steel joints) of
following class and diameter
including cost of all material and
labour required, cost of all taxes
(Central and State Govt.),
inspection charges, transportation
to stores/ site, transit insurance,
loading and unloding and stacking
etc. complete.
Note: 1) Class mentioned below
represents the working pressure of
pipe.
2) For external coating at site to
the joints, necessary polythene
wrapping for pouring cement
slurry shall also be given free with
each pipe.
i)Factory test pressure-a)Site test pressure +
0.1N/mm2,For working Pressure
upto 1 N/mm2
b) Site test pressure +
0.2N/mm2,For working Pressure
above 1 N/mm2
ii) Site test pressure-1.5 times
working pressure pertaining to
the section or 1.1 times static
pressure,which ever is
more (such pressure is to be
control within 25% of pumphead
incase of pumping main)
Section - I- (VIII) - B.W.S.C. PIPES
Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
Section-I-(VIII)-B.W.S.C. PIPES 86
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
iii) Working pressure-The
maximum sustained internal
pressure excluding surge to
which each portion of pipeline
may be subjected when installedWith E.D.
Without
E.D.
a) Facory Test Pressure 4 kg/Sqcm
i) 350 mm Rmt 3706.00 3366.00
ii) 400 mm Rmt 4064.00 3691.00
iii) 450 mm Rmt 4499.00 4086.00
iv) 500 mm Rmt 5006.00 4546.00
v) 600 mm Rmt 6510.00 5912.00
vi) 700 mm Rmt 7522.00 6831.00
vii) 800 mm Rmt 8168.00 7418.00
viii) 900 mm Rmt 11414.00 10367.00
ix) 1000mm Rmt 13155.00 11947.00
x) 1100mm Rmt 18907.00 17171.00
xi) 1200mm Rmt 21085.00 19149.00
xii) 1300mm Rmt 24621.00 22362.00
xiii) 1400mm Rmt 26410.00 23986.00
xiv) 1500mm Rmt 28184.00 25598.00
xv) 1600mm Rmt 30364.00 27577.00
xvi) 1700mm Rmt 32213.00 29256.00
xvii) 1800mm Rmt 34393.00 31237.00
b) Factory Test Pressure 6
kg/Sqcm
i) 350 mm Rmt 3710.00 3369.00
ii) 400 mm Rmt 4068.00 3694.00
iii) 450 mm Rmt 4501.00 4089.00
iv) 500 mm Rmt 5013.00 4554.00
v) 600 mm Rmt 6517.00 5920.00
vi) 700 mm Rmt 7528.00 6838.00
vii) 800 mm Rmt 8175.00 7425.00
viii) 900 mm Rmt 11421.00 10373.00
ix) 1000mm Rmt 13160.00 11953.00
x) 1100mm Rmt 18913.00 17179.00
Section-I-(VIII)-B.W.S.C. PIPES 87
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
xi) 1200mm Rmt 21090.00 19157.00
xii) 1300mm Rmt 24627.00 22367.00
xiii) 1400mm Rmt 26416.00 23992.00
xiv) 1500mm Rmt 28192.00 25604.00
xv) 1600mm Rmt 30370.00 27584.00
xvi) 1700mm Rmt 32219.00 29262.00
xvii) 1800mm Rmt 34399.00 31243.00
c) FactoryTest Pressure 8
kg/Sqcm
i) 350 mm Rmt 3713.00 3373.00
ii) 400 mm Rmt 4071.00 3698.00
iii) 450 mm Rmt 4506.00 4092.00
iv) 500 mm Rmt 5025.00 4564.00
v) 600 mm Rmt 6528.00 5928.00
vi) 700 mm Rmt 7540.00 6847.00
vii) 800 mm Rmt 8186.00 7434.00
viii) 900 mm Rmt 11432.00 10383.00
ix) 1000mm Rmt 13172.00 11964.00
x) 1100mm Rmt 18925.00 17187.00
xi) 1200mm Rmt 21102.00 19165.00
xii) 1300mm Rmt 24638.00 22378.00
xiii) 1400mm Rmt 26427.00 24002.00
xiv) 1500mm Rmt 28203.00 25614.00
xv) 1600mm Rmt 30382.00 27594.00
xvi) 1700mm Rmt 32230.00 29272.00
xvii) 1800mm Rmt 34411.00 31253.00
d) Factory Test Pressure 10
kg/Sqcm
i) 350 mm Rmt 3717.00 3375.00
ii) 400 mm Rmt 4075.00 3702.00
iii) 450 mm Rmt 4509.00 4095.00
iv) 500 mm Rmt 5040.00 4577.00
v) 600 mm Rmt 6544.00 5943.00
vi) 700 mm Rmt 7555.00 6862.00
vii) 800 mm Rmt 8202.00 7449.00
viii) 900 mm Rmt 11437.00 10398.00
Section-I-(VIII)-B.W.S.C. PIPES 88
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
ix) 1000mm Rmt 13187.00 11978.00
x) 1100mm Rmt 18941.00 17202.00
xi) 1200mm Rmt 21117.00 19180.00
xii) 1300mm Rmt 24653.00 22392.00
xiii) 1400mm Rmt 26443.00 24016.00
xiv) 1500mm Rmt 28218.00 25629.00
xv) 1600mm Rmt 30397.00 27608.00
xvi) 1700mm Rmt 32245.00 29286.00
xvii) 1800mm Rmt 34426.00 31268.00
e) Factory Test Pressure 12
kg/Sqcm
i) 350 mm Rmt 3720.00 3379.00
ii) 400 mm Rmt 4079.00 3704.00
iii) 450 mm Rmt 4513.00 4099.00
iv) 500 mm Rmt 5059.00 4597.00
v) 600 mm Rmt 6564.00 5961.00
vi) 700 mm Rmt 7575.00 6880.00
vii) 800 mm Rmt 9368.00 8507.00
viii) 900 mm Rmt 11448.00 10398.00
ix) 1000mm Rmt 14231.00 12925.00
x) 1100mm Rmt 18960.00 17221.00
xi) 1200mm Rmt 21138.00 19200.00
xii) 1300mm Rmt 24675.00 22411.00
xiii) 1400mm Rmt 26464.00 24036.00
xiv) 1500mm Rmt 28538.00 25921.00
xv) 1600mm Rmt 31570.00 28673.00
xvi) 1700mm Rmt 34171.00 31036.00
xvii) 1800mm Rmt 38004.00 34516.00
f) Factory Test Pressure 14
kg/Sqcm
i) 350 mm Rmt 3724.00 3383.00
ii) 400 mm Rmt 4083.00 3707.00
iii) 450 mm Rmt 4526.00 4110.00
iv) 500 mm Rmt 5152.00 4679.00
v) 600 mm Rmt 6683.00 6069.00
vi) 700 mm Rmt 8695.00 7898.00
Section-I-(VIII)-B.W.S.C. PIPES 89
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
vii) 800 mm Rmt 10196.00 9259.00
viii) 900 mm Rmt 12574.00 11420.00
ix) 1000mm Rmt 15138.00 13750.00
x) 1100mm Rmt 19037.00 17291.00
xi) 1200mm Rmt 21130.00 19191.00
xii) 1300mm Rmt 25286.00 22965.00
xiii) 1400mm Rmt 28572.00 25951.00
xiv) 1500mm Rmt 31792.00 28874.00
xv) 1600mm Rmt 35451.00 32197.00
xvi) 1700mm Rmt 38923.00 35351.00
xvii) 1800mm Rmt 42585.00 38678.00
g) Factory Test Pressure 16
kg/Sqcm
i) 350 mm Rmt 3728.00 3386.00
ii) 400 mm Rmt 4087.00 3712.00
iii) 450 mm Rmt 4684.00 4255.00
iv) 500 mm Rmt 5525.00 5018.00
v) 600 mm Rmt 7173.00 6515.00
vi) 700 mm Rmt 9254.00 8407.00
vii) 800 mm Rmt 11090.00 10073.00
viii) 900 mm Rmt 13717.00 12458.00
ix) 1000mm Rmt 16673.00 15143.00
x) 1100mm Rmt 20080.00 18238.00
xi) 1200mm Rmt 23418.00 21269.00
xii) 1300mm Rmt 27896.00 25337.00
xiii) 1400mm Rmt 31490.00 28601.00
xiv) 1500mm Rmt 35119.00 31896.00
xv) 1600mm Rmt 39052.00 35470.00
xvi) 1700mm Rmt 43349.00 39371.00
xvii) 1800mm Rmt 48369.00 43932.00
h) Factory Test Pressure 18
kg/Sqcm
i) 350 mm Rmt 3732.00 3391.00
ii) 400 mm Rmt 4148.00 3767.00
iii) 450 mm Rmt 4833.00 4389.00
iv) 500 mm Rmt 5691.00 5168.00
Section-I-(VIII)-B.W.S.C. PIPES 90
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
v) 600 mm Rmt 7444.00 6761.00
vi) 700 mm Rmt 9785.00 8888.00
vii) 800 mm Rmt 11550.00 10491.00
viii) 900 mm Rmt 14275.00 12966.00
ix) 1000mm Rmt 17415.00 15817.00
x) 1100mm Rmt 20957.00 19033.00
xi) 1200mm Rmt 24417.00 22177.00
xii) 1300mm Rmt 28992.00 26333.00
xiii) 1400mm Rmt 33132.00 30092.00
xiv) 1500mm Rmt 36595.00 33237.00
xv) 1600mm Rmt 41512.00 37703.00
xvi) 1700mm Rmt 46039.00 41816.00
xvii) 1800mm Rmt 50958.00 46283.00
i) Factory Test Pressure 20
kg/Sqcm
i) 350 mm Rmt 3719.00 3379.00
ii) 400 mm Rmt 4380.00 3979.00
iii) 450 mm Rmt 5004.00 4544.00
iv) 500 mm Rmt 6065.00 5509.00
v) 600 mm Rmt 7935.00 7207.00
vi) 700 mm Rmt 10317.00 9371.00
vii) 800 mm Rmt 12595.00 11439.00
viii) 900 mm Rmt 15551.00 14125.00
ix) 1000mm Rmt 19029.00 17282.00
x) 1100mm Rmt 22835.00 20741.00
xi) 1200mm Rmt 26549.00 24114.00
xii) 1300mm Rmt 31538.00 28644.00
xiii) 1400mm Rmt 36348.00 33012.00
xiv) 1500mm Rmt 40934.00 37179.00
xv) 1600mm Rmt 45721.00 41525.00
xvi) 1700mm Rmt 51075.00 46389.00
xvii) 1800mm Rmt 56537.00 51351.00
Notes:
1) For lowering, laying & pouring of cement mortar in the field on joints (
after laying and welding ), rates as per P. S. C. pipes lowering, laying and
jointing shall be adopted.
Section-I-(VIII)-B.W.S.C. PIPES 91
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
2) For field welding rates applicable for similar welding in M. S. pipes given in
that section shall be abopted.
3) Whenever manufacturer is separate and contractor for lowering laying,
jointing and testing is separate, the pricipal contractor shall be enter into an
agreement with B. W. S. C. pipe manufacturer for satisfactory manufacturing
transporting, lowering, laying, jointing and testing of pipes.
4) No negative tolerance shall be accepted for the M. S. Shell thickness of B.
W. S. C. pipes over the thickness mentioned in E. N. 641 of AWWA AC 303.
Section-I-(VIII)-B.W.S.C. PIPES 92
Sr No Item Description Unit
1 Providing and supplying Glass
fibre reinfor ced polyester pipes
conforming to BIS - 12709 / BIS
14402 with double bell REKA GRP
coupling EPDM rubber gaskets for
sealing of following pressure
diameter and stiffness class
including cost of all material and
labour required cost of all taxes
(Central and State Govt.),
insurance, transportation to site of
work / store unloading and
stacking etc. complete.
With E.D.
Without
E.D.
A Class(SN) 2500
a) 3 Kg/Sq.cm.
i) 300 mm Rmt 1371.00 1229.00
ii) 350 mm Rmt 1586.00 1422.00
iii) 400 mm Rmt 1745.00 1565.00
iv) 450 mm Rmt 1965.00 1761.00
v) 500 mm Rmt 2222.00 1992.00
vi) 600 mm Rmt 2855.00 2559.00
vii) 700 mm Rmt 3548.00 3181.00
viii) 800 mm Rmt 4357.00 3906.00
ix) 900 mm Rmt 5324.00 4773.00
x) 1000mm Rmt 6315.00 5662.00
xi) 1100mm Rmt 7677.00 6883.00
xii) 1200mm Rmt 8938.00 8013.00
xiii) 1300mm Rmt 10121.00 9074.00
xiv) 1400mm Rmt 11685.00 10477.00
xv) 1500mm Rmt 13280.00 11907.00
xvi) 1600mm Rmt 15466.00 13867.00
xvii) 1700mm Rmt 18269.00 16573.00
xviii) 1800mm Rmt 19935.00 18085.00
xviv) 1900mm Rmt 22284.00 20216.00
xx 2000mm Rmt 24092.00 21856.00
xxi) 2100mm Rmt 26923.00 24424.00
xxii) 2200mm Rmt 28899.00 26217.00
xxiii) 2300mm Rmt 31232.00 28333.00
Section - I- (IX) - GRP PIPES
Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
Section-I-(IX)-GRP PIPES 93
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
xxiv) 2400mm Rmt 33384.00 30286.00
b) 6 kg/Sq.cm.
i) 300 mm Rmt 1422.00 1275.00
ii) 350 mm Rmt 1626.00 1458.00
iii) 400 mm Rmt 1827.00 1638.00
iv) 450 mm Rmt 2029.00 1819.00
v) 500 mm Rmt 2307.00 2068.00
vi) 600 mm Rmt 2988.00 2679.00
vii) 700 mm Rmt 3715.00 3331.00
viii) 800 mm Rmt 4552.00 4081.00
ix) 900 mm Rmt 5545.00 4972.00
x) 1000mm Rmt 6595.00 5913.00
xi) 1100mm Rmt 7992.00 7166.00
xii) 1200mm Rmt 9249.00 8293.00
xiii) 1300mm Rmt 10583.00 9489.00
xiv) 1400mm Rmt 12109.00 10857.00
xv) 1500mm Rmt 13814.00 12385.00
xvi) 1600mm Rmt 16111.00 14445.00
xvii) 1700mm Rmt 19038.00 17271.00
xviii) 1800mm Rmt 20715.00 18793.00
xviv) 1900mm Rmt 23181.00 21029.00
xx 2000mm Rmt 25033.00 22710.00
xxi) 2100mm Rmt 27987.00 25389.00
xxii) 2200mm Rmt 30159.00 27360.00
xxiii) 2300mm Rmt 32504.00 29488.00
xxiv) 2400mm Rmt 34710.00 31489.00
c) 9 kg/Sq.cm.
i) 300 mm Rmt 1468.00 1316.00
ii) 350 mm Rmt 1706.00 1530.00
iii) 400 mm Rmt 1902.00 1705.00
iv) 450 mm Rmt 2157.00 1933.00
v) 500 mm Rmt 2445.00 2192.00
vi) 600 mm Rmt 3171.00 2843.00
vii) 700 mm Rmt 3949.00 3541.00
viii) 800 mm Rmt 4919.00 4410.00
ix) 900 mm Rmt 6009.00 5387.00
Section-I-(IX)-GRP PIPES 94
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
x) 1000mm Rmt 7114.00 6378.00
xi) 1100mm Rmt 8598.00 7708.00
xii) 1200mm Rmt 9983.00 8950.00
xiii) 1300mm Rmt 11527.00 10335.00
xiv) 1400mm Rmt 13245.00 11875.00
xv) 1500mm Rmt 15044.00 13488.00
xvi) 1600mm Rmt 17564.00 15747.00
xvii) 1700mm Rmt 20797.00 18867.00
xviii) 1800mm Rmt 22744.00 20633.00
xviv) 1900mm Rmt 25266.00 22921.00
xx 2000mm Rmt 27416.00 24872.00
xxi) 2100mm Rmt 30510.00 27678.00
xxii) 2200mm Rmt 32799.00 29755.00
xxiii) 2300mm Rmt 35415.00 32129.00
xxiv) 2400mm Rmt 38193.00 34649.00
d) 12 kg/Sq.cm.
i) 300 mm Rmt 1556.00 1395.00
ii) 350 mm Rmt 1796.00 1610.00
iii) 400 mm Rmt 2000.00 1793.00
iv) 450 mm Rmt 2613.00 2342.00
v) 500 mm Rmt 2264.00 2029.00
vi) 600 mm Rmt 3407.00 3054.00
vii) 700 mm Rmt 4225.00 3788.00
viii) 800 mm Rmt 5234.00 4693.00
ix) 900 mm Rmt 6418.00 5754.00
x) 1000mm Rmt 7650.00 6859.00
xi) 1100mm Rmt 9377.00 8406.00
xii) 1200mm Rmt 10936.00 9805.00
xiii) 1300mm Rmt 12378.00 11097.00
xiv) 1400mm Rmt 14246.00 12772.00
xv) 1500mm Rmt 16289.00 14604.00
xvi) 1600mm Rmt 18892.00 16938.00
xvii) 1700mm Rmt 22414.00 20334.00
xviii) 1800mm Rmt 24573.00 22293.00
xviv) 1900mm Rmt 27200.00 24676.00
xx 2000mm Rmt 29580.00 26835.00
xxi) 2100mm Rmt 32976.00 29916.00
Section-I-(IX)-GRP PIPES 95
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
xxii) 2200mm Rmt 35587.00 32284.00
e) 15 kg/Sq.cm.
i) 300 mm Rmt 1620.00 1452.00
ii) 350 mm Rmt 1871.00 1677.00
iii) 400 mm Rmt 2080.00 1865.00
iv) 450 mm Rmt 2398.00 2150.00
v) 500 mm Rmt 2756.00 2471.00
vi) 600 mm Rmt 3642.00 3265.00
vii) 700 mm Rmt 4543.00 4073.00
viii) 800 mm Rmt 5669.00 5082.00
ix) 900 mm Rmt 6987.00 6264.00
x) 1000mm Rmt 8292.00 7434.00
xi) 1100mm Rmt 10173.00 9121.00
xii) 1200mm Rmt 11804.00 10583.00
xiii) 1300mm Rmt 13549.00 12147.00
xiv) 1400mm Rmt 15595.00 13982.00
xv) 1500mm Rmt 17692.00 15862.00
xvi) 1600mm Rmt 20527.00 18404.00
xvii) 1700mm Rmt 24695.00 22403.00
xviii) 1800mm Rmt 26988.00 24483.00
xviv) 1900mm Rmt 30134.00 27338.00
xx 2000mm Rmt 32796.00 29752.00
B Class (SN) 5000
a) 3 Kg/Sq.cm.
i) 300 mm Rmt 1470.00 1317.00
ii) 350 mm Rmt 1724.00 1546.00
iii) 400 mm Rmt 1965.00 1761.00
iv) 450 mm Rmt 2234.00 2004.00
v) 500 mm Rmt 2472.00 2216.00
vi) 600 mm Rmt 3222.00 2889.00
vii) 700 mm Rmt 4033.00 3616.00
viii) 800 mm Rmt 4999.00 4482.00
ix) 900 mm Rmt 6155.00 5519.00
x) 1000mm Rmt 7321.00 6564.00
xi) 1100mm Rmt 8874.00 7956.00
xii) 1200mm Rmt 10401.00 9325.00
Section-I-(IX)-GRP PIPES 96
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
xiii) 1300mm Rmt 11843.00 10618.00
xiv) 1400mm Rmt 13612.00 12204.00
xv) 1500mm Rmt 15533.00 13926.00
xvi) 1600mm Rmt 18058.00 16190.00
xvii) 1700mm Rmt 21385.00 19400.00
xviii) 1800mm Rmt 23454.00 21277.00
xix) 1900mm Rmt 26105.00 23682.00
xx) 2000mm Rmt 28394.00 25758.00
xxi) 2100mm Rmt 31611.00 28677.00
xxii) 2200mm Rmt 34120.00 30954.00
b) 6 Kg/Sq.cm.
i) 300 mm Rmt 1492.00 1338.00
ii) 350 mm Rmt 1753.00 1572.00
iii) 400 mm Rmt 1938.00 1737.00
iv) 450 mm Rmt 2209.00 1980.00
v) 500 mm Rmt 2545.00 2282.00
vi) 600 mm Rmt 3292.00 2952.00
vii) 700 mm Rmt 4136.00 3708.00
viii) 800 mm Rmt 5119.00 4589.00
ix) 900 mm Rmt 6305.00 5653.00
x) 1000mm Rmt 7485.00 6711.00
xi) 1100mm Rmt 9154.00 8208.00
xii) 1200mm Rmt 10641.00 9540.00
xiii) 1300mm Rmt 12160.00 10902.00
xiv) 1400mm Rmt 13952.00 12509.00
xv) 1500mm Rmt 15896.00 14252.00
xvi) 1600mm Rmt 18502.00 16589.00
xvii) 1700mm Rmt 21907.00 19874.00
xviii) 1800mm Rmt 24020.00 21791.00
xix) 1900mm Rmt 26757.00 24274.00
xx) 2000mm Rmt 29152.00 26446.00
xxi) 2100mm Rmt 32429.00 29420.00
xxii) 2200mm Rmt 35057.00 31804.00
c) 9 Kg/Sq.cm.
i) 300 mm Rmt 1547.00 1387.00
ii) 350 mm Rmt 1813.00 1625.00
Section-I-(IX)-GRP PIPES 97
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
iii) 400 mm Rmt 2040.00 1829.00
iv) 450 mm Rmt 2323.00 2082.00
v) 500 mm Rmt 2657.00 2382.00
vi) 600 mm Rmt 3650.00 3273.00
vii) 700 mm Rmt 4334.00 3886.00
viii) 800 mm Rmt 5582.00 5005.00
ix) 900 mm Rmt 6590.00 5909.00
x) 1000mm Rmt 7861.00 7049.00
xi) 1100mm Rmt 12694.00 11381.00
xii) 1200mm Rmt 14442.00 12948.00
xiii) 1300mm Rmt 16271.00 14588.00
xiv) 1400mm Rmt 18213.00 16330.00
xv) 1500mm Rmt 20866.00 18707.00
xvi) 1600mm Rmt 23703.00 21252.00
xvii) 1700mm Rmt 28204.00 25586.00
xviii) 1800mm Rmt 30732.00 27880.00
d) 12 Kg/Sq.cm.
i) 300 mm Rmt 1591.00 1426.00
ii) 350 mm Rmt 1887.00 1692.00
iii) 400 mm Rmt 2086.00 1870.00
iv) 450 mm Rmt 2415.00 2165.00
v) 500 mm Rmt 2758.00 2473.00
vi) 600 mm Rmt 3642.00 3265.00
vii) 700 mm Rmt 4591.00 4116.00
viii) 800 mm Rmt 5666.00 5080.00
ix) 900 mm Rmt 7076.00 6344.00
x) 1000mm Rmt 8322.00 7461.00
xi) 1100mm Rmt 10229.00 9170.00
xii) 1200mm Rmt 11886.00 10657.00
xiii) 1300mm Rmt 13623.00 12214.00
xiv) 1400mm Rmt 15698.00 14074.00
xv) 1500mm Rmt 17831.00 15986.00
xvi) 1600mm Rmt 20607.00 18476.00
xvii) 1700mm Rmt 24516.00 22241.00
xviii) 1800mm Rmt 26951.00 24450.00
xix) 1900mm Rmt 29866.00 27095.00
Section-I-(IX)-GRP PIPES 98
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
e) 15 Kg/Sq.cm.
i) 300 mm Rmt 1647.00 1477.00
ii) 350 mm Rmt 1962.00 1758.00
iii) 400 mm Rmt 2193.00 1966.00
iv) 450 mm Rmt 2533.00 2271.00
v) 500 mm Rmt 2890.00 2591.00
vi) 600 mm Rmt 3836.00 3439.00
vii) 700 mm Rmt 4827.00 4328.00
viii) 800 mm Rmt 6040.00 5415.00
ix) 900 mm Rmt 7450.00 6679.00
x) 1000mm Rmt 8882.00 7963.00
xi) 1100mm Rmt 10802.00 9685.00
xii) 1200mm Rmt 12657.00 11348.00
xiii) 1300mm Rmt 14463.00 12967.00
xiv) 1400mm Rmt 16688.00 14962.00
xv) 1500mm Rmt 18981.00 17018.00
xvi) 1600mm Rmt 21975.00 19703.00
xvii) 1700mm Rmt 26079.00 23659.00
xviii) 1800mm Rmt 28722.00 26057.00
Notes:
1) For lowering, laying & jointing rates of GRP pipes 50 % rates for lowering,
laying & jointing of PSC pipes of corresponding diameter shall be adopted.
2) Where manufacturer is seperate & contractor for lowering,laying jointing
&testing is seperate the principal controctor shall enter into an aggrement
with G.R.P. pipe manufacture for safisfactory manufacturing, transporiting,
lowering, laying, jointing & testing of pipe.
3) Only 85 % Payment shall be payable till satisfactory hydraulic testing is
given.
This foot Note shall appear in tender conditions.
Section-I-(IX)-GRP PIPES 99
Sr No Item Description Unit
1 Providing and supplying in
standard lengths Polyethelene
Pipes, confirming to IS 4984 /
14151 / 12786 / 13488 with
nesessary jointing material like
mechanical connector i. e. thread /
insert joint / quick release coupler
joint / compression fitting joint or
flanged joint, including all local &
central taxes, transportation and
fright charges inspection charges,
loading / unloading charges,
conveyance to the departmental
stores / site & stacking the same
in closed shade duly protecting
from sunrays & rains, etc.
complete.
With E.D.
Without
E.D.
A) PE-100
a) 6kg/sq,cm
i) 63mm Rmt 91.00 84.00
ii) 75mm Rmt 132.00 119.00
iii) 90mm Rmt 184.00 167.00
iv) 110mm Rmt 267.00 242.00
v) 125mm Rmt 364.00 330.00
vi) 140mm Rmt 457.00 415.00
vii) 160mm Rmt 592.00 538.00
viii) 180mm Rmt 746.00 678.00
ix) 200mm Rmt 876.00 794.00
x) 225mm Rmt 1129.00 1024.00
xi) 250mm Rmt 1385.00 1257.00
xii) 280mm Rmt 1737.00 1576.00
xiii) 315mm Rmt 2201.00 1997.00
xiv) 355mm Rmt 2790.00 2531.00
xv) 400mm Rmt 3654.00 3315.00
xvi) 450 mm Rmt 4814.00 4368.00
xvii) 500 mm Rmt 5953.00 5400.00
xviii) 560 mm Rmt 7451.00 6760.00
Section - I- (X) - H.D.P.E. PIPES
Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
Section-I-(X)-HDPE PIPES 100
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
xix) 630 mm Rmt 9385.00 8509.00
xx) 710 mm Rmt 11891.00 10986.00
xix) 800 mm Rmt 14336.00 13244.00
xx) 900 mm Rmt 18161.00 16778.00
xix) 1000 mm Rmt 22394.00 20690.00
b) 8kg/sq,cm
i) 63mm Rmt 116.00 105.00
ii) 75mm Rmt 172.00 156.00
iii) 90mm Rmt 231.00 209.00
iv) 110mm Rmt 340.00 308.00
v) 125mm Rmt 461.00 418.00
vi) 140mm Rmt 576.00 524.00
vii) 160mm Rmt 750.00 680.00
viii) 180mm Rmt 945.00 857.00
ix) 200mm Rmt 1113.00 1010.00
x) 225mm Rmt 1430.00 1297.00
xi) 250mm Rmt 1762.00 1598.00
xii) 280mm Rmt 2210.00 2004.00
xiii) 315mm Rmt 2794.00 2536.00
xiv) 355mm Rmt 3537.00 3209.00
xv) 400mm Rmt 4645.00 4215.00
xvi) 450 mm Rmt 6212.00 5635.00
xvii) 500 mm Rmt 7663.00 6951.00
xviii) 560 mm Rmt 9618.00 8725.00
xix) 630 mm Rmt 12109.00 10978.00
xx) 710 mm Rmt 15344.00 14176.00
xix) 800 mm Rmt 18509.00 17100.00
xx) 900 mm Rmt 23430.00 21646.00
xix) 1000 mm Rmt 22868.00 21127.00
c) 10kg/sq,cm
i) 63mm Rmt 145.00 131.00
ii) 75mm Rmt 204.00 185.00
iii) 90mm Rmt 290.00 264.00
iv) 110mm Rmt 428.00 389.00
v) 125mm Rmt 552.00 501.00
vi) 140mm Rmt 690.00 625.00
Section-I-(X)-HDPE PIPES 101
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
vii) 160mm Rmt 895.00 813.00
viii) 180mm Rmt 1136.00 1031.00
ix) 200mm Rmt 1331.00 1208.00
x) 225mm Rmt 1704.00 1547.00
xi) 250mm Rmt 2129.00 1931.00
xii) 280mm Rmt 2628.00 2385.00
xiii) 315mm Rmt 3376.00 3062.00
xiv) 355mm Rmt 4236.00 3843.00
xv) 400mm Rmt 5643.00 5118.00
xvi) 450 mm Rmt 7509.00 6811.00
xvii) 500 mm Rmt 9280.00 8418.00
xviii) 560 mm Rmt 11161.00 10124.00
xix) 630 mm Rmt 14659.00 13289.00
xx) 710 mm Rmt 18618.00 16880.00
xix) 800 mm Rmt 22441.00 20346.00
xx) 900 mm Rmt 22710.00 20589.00
xix) 1000 mm Rmt 28067.00 25445.00
d) 12.5kg/sq,cm
i) 63mm Rmt 169.00 154.00
ii) 75mm Rmt 239.00 217.00
iii) 90mm Rmt 345.00 314.00
iv) 110mm Rmt 508.00 461.00
v) 125mm Rmt 656.00 595.00
vi) 140mm Rmt 822.00 746.00
vii) 160mm Rmt 1070.00 971.00
viii) 180mm Rmt 1354.00 1228.00
ix) 200mm Rmt 1591.00 1443.00
x) 225mm Rmt 2053.00 1862.00
ix) 250mm Rmt 2525.00 2290.00
x) 280mm Rmt 3166.00 2872.00
ix) 315mm Rmt 4007.00 3636.00
x) 355mm Rmt 5089.00 4617.00
ix) 400mm Rmt 6688.00 6068.00
x) 450 mm Rmt 8938.00 8108.00
ix) 500 mm Rmt 11015.00 9994.00
x) 560 mm Rmt 13808.00 12528.00
ix) 630 mm Rmt 17623.00 15978.00
Section-I-(X)-HDPE PIPES 102
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
x) 710 mm Rmt 18175.00 16478.00
ix) 800 mm Rmt 21902.00 19857.00
x) 900 mm Rmt 27748.00 25156.00
ix) 1000 mm Rmt 33795.00 30639.00
e) 16 kg/cm2
i) 63mm Rmt 205.00 185.00
ii) 75mm Rmt 288.00 262.00
iii) 90mm Rmt 414.00 375.00
iv) 110mm Rmt 612.00 554.00
v) 125mm Rmt 790.00 717.00
vi) 140mm Rmt 986.00 894.00
vii) 160mm Rmt 1293.00 1173.00
viii) 180mm Rmt 1627.00 1476.00
ix) 200mm Rmt 2808.00 2549.00
x) 225mm Rmt 3550.00 3221.00
xi) 250mm Rmt 4379.00 3973.00
xii) 280mm Rmt 5493.00 4983.00
xiii) 315mm Rmt 6943.00 6300.00
xiv) 355mm Rmt 8809.00 7990.00
xvii) 400mm Rmt 11410.00 10352.00
xvi) 450 mm Rmt 14463.00 13120.00
xvii) 500 mm Rmt 17835.00 16180.00
xviii) 560 mm Rmt 13650.00 12375.00
xix) 630 mm Rmt 17294.00 15679.00
xx) 710 mm Rmt 22006.00 19951.00
xix) 800 mm Rmt 26511.00 24035.00
xx) 900 mm Rmt 33558.00 30424.00
xix) 1000 mm Rmt 41199.00 37353.00
2 Providing and Supplying in
standard length Polyethylene (PE)
pipes for non pressure
underground drainage and
sewerage with smooth internal and
corrugated (profiled) external
surface with Anti rodent property
confirming to ISO -21138- 3:2007
Section-I-(X)-HDPE PIPES 103
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
with ecessary jointing material like
mechanical connector i.e. thread/
insert joint/ quick release coupler/
compression fitting joint/ or
flanged joint including all local and
central taxes, transportation and
freight charges, inspection
charges, loading and unloading
charges, conveyance to the
departmental stores /site and
stacking the same in closed shade
duly protecting from sunrays and
rains etc complete
HDPE PIPES FOR DRAINAGE
Class SN4 SN4
i) 160 mm (OD) Rmt 280.00
ii) 175 mm(OD) Rmt 320.00
iii) 200 mm(OD) Rmt 400.00
iv) 250 mm(OD) Rmt 592.00
v) 315 mm(OD) Rmt 840.00
Class SN8 SN8
i) 160 mm (OD) Rmt 304.00
ii) 175 mm(OD) Rmt 365.00
iii) 200 mm(OD) Rmt 440.00
iv) 250 mm(OD) Rmt 840.00
v) 315 mm(OD) Rmt 1056.00
3 Lowering laying and jointing HDPE
/MDPE pipes in proper position
including all specials by
Compression fitting / Electrofusion
and But fusion jointing procedure
including hydraulic testing as per
relevent IS Code complete with all
materials for jointing procedures
like Electrofusion machine,
Electric mirror/
Section-I-(X)-HDPE PIPES 104
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
heater / But fusion welding
machine with hydraulic jack, top
laoding clamp etc pump and
accessories for hydraulic testing
and all labours as directe by
engineer incharge as per IS - 7634
Part II.
i) 20mm Rmt 10.00
ii) 25mm Rmt 15.00
iii) 32mm Rmt 20.00
iv) 40mm Rmt 25.00
v) 50mm Rmt 30.00
vi) 63mm Rmt 37.00
vii) 75mm Rmt 40.00
viii) 90mm Rmt 55.00
ix) 110mm Rmt 58.00
x) 125mm Rmt 66.00
xi) 140mm Rmt 89.00
xii) 160mm Rmt 95.00
xiii) 180mm Rmt 95.00
xiv) 200mm Rmt 106.00
xv) 225mm Rmt 136.00
xvi) 250mm Rmt 141.00
xvii) 280mm Rmt 174.00
xvi) 315mm Rmt 191.00
xvii) 355mm Rmt 209.00
xvi) 400mm Rmt 211.00
xvii) 450mm Rmt 238.00
xvi) 500mm Rmt 308.00
xvii) 560mm Rmt 345.00
xvi) 630mm Rmt 388.00
4 Lowering ,Laying and jointing
HDPE Double Wall Corrugated
Pipes for non pressure
Underground drainage and
Sewerage applications and
specials of following class and
diameter including cost of
conveyance from stores to site of
Section-I-(X)-HDPE PIPES 105
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
works including cost of all labour
material except O ring coupler
giving satisfactory hydraulic testing
as per relevant ISO etc complete
i) 160MM (OD) Rmt 32.00
ii) 175MM (OD) Rmt 36.00
iii) 200MM (OD) Rmt 39.00
iv) 250MM (OD) Rmt 49.00
v) 315MM (OD) Rmt 60.00
Section-I-(X)-HDPE PIPES 106
Sr No Item Description Unit
1 Providing and Supplying Blue
MDPE pipes conforming to ISO
4427:1996 manufactured from
virgin resin PE 80 Food grade
compounded Raw Material having
Blue Colour only assurance
certificate from quality agencies
like WRC / CIPET (India) / DVGM
/ KIWA / SPGN etc. for usage in
Drinking Water with quality
system The cost shall include
testing of all materials, all taxes
Central,Sate , Municipal,
Inspection charges, transportation
up to site, transit insurance,
loading, as specified and directed.
unloading, stacking etc. complete
as specified and directed.
With E.D.
Without
E.D.
A) PN 16 (SDR 9)
i) 20 mm Rmt 28.00 26.00
ii) 25 mm Rmt 40.00 36.00
iii) 32 mm Rmt 66.00 59.00
iv) 40 mm Rmt 97.00 87.00
v) 50 mm Rmt 148.00 132.00
vi) 63 mm Rmt 218.00 194.00
vii) 75 mm Rmt 295.00 262.00
viii) 90 mm Rmt 426.00 379.00
ix) 110 mm Rmt 633.00 563.00
x) 125 mm Rmt 817.00 727.00
xi) 140 mm Rmt 1027.00 914.00
vii) 160 mm Rmt 1361.00 1211.00
viii) 180 mm Rmt 1722.00 1533.00
ix) 200 mm Rmt 2129.00 1895.00
x) 225 mm Rmt 2697.00 2400.00
xi) 250 mm Rmt 3316.00 2952.00
xii) 280 mm Rmt 4169.00 3711.00
315 mm Rmt 5362.00 4772.00
Section - I- (XI) - M.D.P.E. PIPES
Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
Section-I-(XI)-MDPE PIPES 107
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
B) PN 12.5 (SDR 11)
i) 25 mm Rmt 37.00 33.00
ii) 32 mm Rmt 62.00 55.00
iii) 40 mm Rmt 90.00 84.00
iv) 50 mm Rmt 130.00 116.00
v) 63 mm Rmt 175.00 158.00
vi) 75 mm Rmt 245.00 219.00
vii) 90 mm Rmt 359.00 316.00
viii) 110 mm Rmt 526.00 468.00
ix) 125 mm Rmt 684.00 609.00
x) 140 mm Rmt 854.00 760.00
xi) 160 mm Rmt 1118.00 995.00
xii) 180 mm Rmt 1439.00 1291.00
vii) 200 mm Rmt 1778.00 1581.00
viii) 225 mm Rmt 2248.00 2001.00
ix) 250 mm Rmt 2770.00 2479.00
x) 280 mm Rmt 3471.00 3089.00
xi) 315 mm Rmt 4400.00 3916.00
C) PN 10 (SDR 13.6)
i) 63 mm Rmt 150.00 134.00
ii) 75 mm Rmt 212.00 189.00
iii) 90 mm Rmt 305.00 272.00
iv) 110 mm Rmt 450.00 401.00
v) 125 mm Rmt 579.00 516.00
vi) 140 mm Rmt 727.00 647.00
vii) 160 mm Rmt 951.00 846.00
viii) 180 mm Rmt 1205.00 1072.00
ix) 200 mm Rmt 1483.00 1320.00
x) 225 mm Rmt 1881.00 1673.00
xi) 250 mm Rmt 2315.00 2060.00
xii) 280 mm Rmt 2900.00 2581.00
vii) 315 mm Rmt 3662.00 3259.00
D) PN 8 (SDR 17)
i) 63 mm Rmt 122.00 108.00
ii) 75 mm Rmt 171.00 152.00
iii) 90 mm Rmt 247.00 220.00
Section-I-(XI)-MDPE PIPES 108
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
iv) 110 mm Rmt 367.00 327.00
v) 125 mm Rmt 470.00 418.00
vi) 140 mm Rmt 589.00 524.00
vii) 160 mm Rmt 771.00 686.00
viii) 180 mm Rmt 977.00 870.00
ix) 200 mm Rmt 1203.00 1071.00
x) 225 mm Rmt 1528.00 1360.00
xi) 250 mm Rmt 1875.00 1705.00
xii) 280 mm Rmt 2399.00 2135.00
xiii) 315 mm Rmt 3040.00 2705.00
E) PN 6 (SDR 21)
i) 63 mm Rmt 94.00 84.00
ii) 75 mm Rmt 136.00 121.00
iii) 90 mm Rmt 190.00 169.00
iv) 110 mm Rmt 284.00 258.00
v) 125 mm Rmt 374.00 326.00
vi) 140 mm Rmt 460.00 410.00
vii) 160 mm Rmt 602.00 536.00
viii) 180 mm Rmt 756.00 672.00
ix) 200 mm Rmt 939.00 836.00
x) 225 mm Rmt 1189.00 1058.00
xi) 250 mm Rmt 1452.00 1293.00
xii) 280 mm Rmt 1836.00 1634.00
xiii) 315 mm Rmt 2309.00 2055.00
2 Providing & Supply of Electro
Fusion Fittings in accordance with
BS EN12201: Part-3 suitable for
drinking water with in black / blue
colour manufactured from compo-
unded PE80 / PE100 virgin
polymer and compatible with PE80
/ PE100 pipes, in pressure rating
SDR11 with min PN12.5 rated for
water application and shall be
inclusive of all cost such as
testing, all taxes related to
Section-I-(XI)-MDPE PIPES 109
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
central, state & municipal,
inspection charges, transporta-
tion up to site, transit insurance,
loading, unloading, stacking etc.
complete.
A) Couplers
i) Couplers 20 No. 100.00
ii) Couplers 25 No. 100.00
iii) Couplers 32 No. 100.00
iv) Couplers 40 No. 173.00
v) Couplers 50 No. 217.00
vi) Couplers 63 No. 257.00
vii) Couplers 75 No. 435.00
viii) Couplers 90 No. 476.00
ix) Couplers 110 No. 664.00
x) Couplers 125 No. 675.00
xi) Couplers 140 No. 1446.00
xii) Couplers 160 No. 1569.00
xiii) Couplers 180 No. 2254.00
xiv) Couplers 200 No. 2530.00
xv) Couplers 225 No. 3189.00
xvi) Couplers 250 No. 4973.00
xvii) Couplers 280 No. 5600.00
xviii) Couplers 315 No. 6116.00
B) Equal Tee
i) Equal Tee 20 No. 210.00
ii) Equal Tee 25 No. 210.00
iii) Equal Tee 32 No. 210.00
iv) Equal Tee 40 No. 463.00
v) Equal Tee 50 No. 473.00
vi) Equal Tee 63 No. 775.00
vii) Equal Tee 75 No. 1135.00
viii) Equal Tee 90 No. 1620.00
ix) Equal Tee 110 No. 2250.00
x) Equal Tee 125 No. 3104.00
xi) Equal Tee 160 No. 5380.00
xii) Equal Tee 180 No. 6758.00
Section-I-(XI)-MDPE PIPES 110
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
xiii) Equal Tee 200 No. 10832.00
xiv) Equal Tee 225 No. 12215.00
xv) Equal Tee 250 No. 17895.00
C) Elbow 90 Deg.
i) Elbow 90 Deg. 20 No. 112.00
ii) Elbow 90 Deg. 25 No. 112.00
iii) Elbow 90 Deg. 32 No. 113.00
iv) Elbow 90 Deg. 40 No. 153.00
v) Elbow 90 Deg. 50 No. 181.00
vi) Elbow 90 Deg. 63 No. 252.00
vii) Elbow 90 Deg. 75 No. 394.00
viii) Elbow 90 Deg. 90 No. 465.00
ix) Elbow 90 Deg. 110 No. 641.00
x) Elbow 90 Deg. 125 No. 816.00
xi) Elbow 90 Deg. 160 No. 1786.00
xii) Elbow 90 Deg. 180 No. 2070.00
xiii) Elbow 90 Deg. 200 No. 2679.00
xiv) Elbow 90 Deg. 225 No. 5840.00
xv) Elbow 90 Deg. 250 No. 10943.00
D) Elbow 45 Deg.
i) Elbow 45 Deg. 32 No. 120.00
ii) Elbow 45 Deg. 40 No. 145.00
iii) Elbow 45 Deg. 50 No. 172.00
iv) Elbow 45 Deg. 63 No. 240.00
v) Elbow 45 Deg. 75 No. 374.00
vi) Elbow 45 Deg. 90 No. 442.00
vii) Elbow 45 Deg. 110 No. 641.00
viii) Elbow 45 Deg. 125 No. 816.00
ix) Elbow 45 Deg. 160 No. 1503.00
x) Elbow 45 Deg. 180 No. 1970.00
xi) Elbow 45 Deg. 200 No. 2070.00
xii) Elbow 45 Deg. 225 No. 2679.00
xiii) Elbow 45 Deg. 250 No. 5840.00
E) Reducer
i) Reducer 25X20 No. 150.00
Section-I-(XI)-MDPE PIPES 111
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
ii) Reducer 32X20 No. 158.00
iii) Reducer 32X25 No. 165.00
iv) Reducer 40X32 No. 179.00
v) Reducer 50X32 No. 179.00
vi) Reducer 50X40 No. 179.00
vii) Reducer 63X32 No. 217.00
viii) Reducer 63X40 No. 217.00
ix) Reducer 63X50 No. 217.00
x) Reducer 90X63 No. 536.00
xi) Reducer 110X75 697.00
xii) Reducer 110X90 No. 697.00
xiii) Reducer 125X90 No. 774.00
xiv) Reducer 160X110 No. 1369.00
xv) Reducer 180X125 No. 1705.00
xvi) Reducer 200X160 No. 2020.00
xvi) Reducer 225X160 No. 2955.00
xvii) Reducer 250X160 No. 4082.00
xviii) Reducer 250X200 No. 4465.00
G) End Cap
i) End Cap 20 No. 40.00
ii) End Cap 25 No. 40.00
iii) End Cap 32 No. 55.00
iv) End Cap 40 No. 60.00
v) End Cap 50 No. 64.00
vi) End Cap 63 No. 84.00
vii) End Cap 75 No. 308.00
viii) End Cap 90 No. 351.00
ix) End Cap 110 No. 493.00
x) End Cap 125 No. 624.00
xi) End Cap 140 No. 1021.00
xii) End Cap 160 No. 1106.00
xiii) End Cap 180 No. 1286.00
xiv) End Cap 200 No. 2055.00
xv) End Cap 225 No. 3530.00
xvi) End Cap 250 No. 4550.00
xvi) End Cap 315 No. 7527.00
H) Ferrule tapping tee
i) Ferrule tapping tee 63 x 1/2" No. 757.00
ii) Ferrule tapping tee 63 x 3/4" No. 757.00
iii) Ferrule tapping tee 63 x 1" No. 757.00
Section-I-(XI)-MDPE PIPES 112
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
iv) Ferrule tapping tee 75 x 1/2" No. 757.00
v) Ferrule tapping tee 75 x 3/4" No. 757.00
vi) Ferrule tapping tee 75 x 1" No. 757.00
vii) Ferrule tapping tee 90 x 1/2" No. 757.00
viii) Ferrule tapping tee 90 x 3/4" No. 757.00
ix) Ferrule tapping tee 90 x 1" No. 757.00
x) Ferrule tapping tee 90 x 11/4" No. 982.00
xi) Ferrule tapping tee 90 x 11/2" No. 982.00
xii) Ferrule tapping tee 90 x 2" No. 982.00
xiii) Ferrule tapping tee 110 x 1/2" No. 757.00
xiv) Ferrule tapping tee 110 x 3/4" No. 757.00
xv) Ferrule tapping tee 110 x 1" No. 757.00
xvi) Ferrule tapping tee 110 x 11/4" No. 982.00
xvi) Ferrule tapping tee 110 x 11/2" No. 982.00
xvii) Ferrule tapping tee 110 x 2" No. 982.00
xviii) Ferrule tapping tee 160 x 1/2" No. 757.00
xix) Ferrule tapping tee 160 x 3/4" No. 757.00
xxi) Ferrule tapping tee 160 x 1" No. 757.00
xxii) Ferrule tapping tee 160 x 11/4" No. 1070.00
xxiii) Ferrule tapping tee 160 x 11/2" No. 1070.00
xxiv) Ferrule tapping tee 160 x 2" No. 1070.00
xxv) Ferrule tapping tee 200 x 1/2" No. 1068.00
xxvi) Ferrule tapping tee 200 x 3/4" No. 1068.00
xxvii) Ferrule tapping tee 200 x 1" No. 1068.00
xxviii) Ferrule tapping tee 200 x 11/4" No. 1540.00
xxix) Ferrule tapping tee 200 x 11/2" No. 1540.00
xxx) Ferrule tapping tee 200 x 2" No. 1540.00
xxxi) Ferrule tapping tee 250 x 1/2" No. 1068.00
xxxii) Ferrule tapping tee 250 x 3/4" No. 1068.00
xxxiii) Ferrule tapping tee 250 x 1" No. 1068.00
xxxiv) Ferrule tapping tee 250 x 11/4" No. 1540.00
xxxv) Ferrule tapping tee 250 x 11/2" No. 1540.00
xxxvi) Ferrule tapping tee 250 x 2" No. 1540.00
xxxvii) Ferrule tapping tee 315 x 1/2" No. 1271.00
xxxviii) Ferrule tapping tee 315 x 3/4" No. 1271.00
xxxix) Ferrule tapping tee 315 x 1" No. 1271.00
xxxx) Ferrule tapping tee 315 x 11/4" No. 1726.00
xxxxi) Ferrule tapping tee 315 x 11/2" No. 1726.00
xxxxii) Ferrule tapping tee 315 x 2" No. 1726.00
3 Providing & Supply of Compression
fittings, PN16 rated in
conformation to ISO:14236-2000
and shall be tested as per
ISO:3459,
Section-I-(XI)-MDPE PIPES 113
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
ISO:3501 & ISO:3503, suitable for
drinking water & approved by
WRAS, UK/ KIWA etc, in food
grade polypropylene and shall be
inclusive of all cost such as
testing, all taxes related to central,
state & unicipal, inspection
charges, transportation up to site,
transit insurance, loading,
unloading, stacking etc. complete.
A) Male Adaptor
i) Male Adaptor 20x1/2" No. 68.00
ii) Male Adaptor 25x3/4" No. 78.00
iii) Male Adaptor 32x1" No. 100.00
iv) Male Adaptor 40x1 1/4" No. 184.00
v) Male Adaptor 50x1 1/2" No. 241.00
vi) Male Adaptor 63x2" No. 344.00
i) Female Adaptor 20x1/2" No. 73.00
ii) Female Adaptor 25x3/4" No. 86.00
iii) Female Adaptor 32x1" No. 108.00
iv) Female Adaptor 40x1 1/4" No. 202.00
v) Female Adaptor 50x1 1/2" No. 259.00
vi) Female Adaptor 63x2" No. 365.00
B) Coupling
i) Coupling 20x20 No. 70.00
ii) Coupling 25x25 No. 77.00
iii) Coupling 32x32 No. 98.00
iv) Coupling 40x40 No. 187.00
v) Coupling 50x50 No. 240.00
vi) Coupling 63x63 No. 347.00
C) Reducing Coupling
i) Reducing Coupling 25x20 No. 128.00
ii) Reducing Coupling 32x20 No. 169.00
iii) Reducing Coupling 32x25 No. 169.00
iv) Reducing Coupling 40x25 No. 289.00
v) Reducing Coupling 40x32 No. 289.00
vi) Reducing Coupling 50x32 No. 374.00
vii) Reducing Coupling 50x40 No. 374.00
viii) Reducing Coupling 63x50 No. 530.00
Section-I-(XI)-MDPE PIPES 114
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
D) 90 Deg. Elbow
i) 90 Deg. Elbow 20 No. 130.00
ii) 90 Deg. Elbow 25 No. 155.00
iii) 90 Deg. Elbow 32 No. 190.00
iv) 90 Deg. Elbow 40 No. 312.00
v) 90 Deg. Elbow 50 No. 443.00
vi) 90 Deg. Elbow 63 No. 600.00
E) 90 Deg. Elbow threaded male off take
i) 90 Deg. Elbow threaded male off
take 20x1/2"
No. 78.00
ii) 90 Deg. Elbow threaded male off
take 25x3/4"
No. 95.00
iii) 90 Deg. Elbow threaded male off
take 32x1"
No. 123.00
iv) 90 Deg. Elbow threaded male off
take 40x11/4"
No. 197.00
v) 90 Deg. Elbow threaded male off
take 50x11/2"
No. 269.00
vi) 90 Deg. Elbow threaded male off
take 63x2"
No. 374.00
F) 90 Deg. Elbow threaded female off take 0.00
i) 90 Deg. Elbow threaded female off
take 20x1/2"
No. 89.00
ii) 90 Deg. Elbow threaded female off
take 25x3/4"
No. 110.00
iii) 90 Deg. Elbow threaded female off
take 32x1"
No. 132.00
iv) 90 Deg. Elbow threaded female off
take 40x11/4"
No. 257.00
v) 90 Deg. Elbow threaded female off
take 50x11/2"
No. 337.00
vi) 90 Deg. Elbow threaded female off
take 63x2"
No. 443.00
G) Equal Tee
i) Equal Tee 20x20x20 No. 155.00
ii) Equal Tee 25x25x25 No. 204.00
iii) Equal Tee 32x32x32 No. 264.00
iv) Equal Tee 40x40x40 No. 436.00
v) Equal Tee 50x50x50 No. 590.00
vi) Equal Tee 63x63x63 No. 839.00
Section-I-(XI)-MDPE PIPES 115
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
H) End Cap
i) End Cap 20 No. 40.00
ii) End Cap 25 No. 40.00
iii) End Cap 32 No. 55.00
iv) End Cap 40 No. 60.00
v) End Cap 50 No. 64.00
vi) End Cap 63 No. 84.00
Section-I-(XI)-MDPE PIPES 116
Sr No Item Description Unit
1 Providing and Supplying
Prestressed Concrete Cylinder
Pipes as per IS 784-2001 suitable
for sliding ovrelap weld joint or
confined rubber ring joint with
necessary rubber ring of following
class and diameter including cost
of all taxes (central & local)
transporatation, inspection
charges to site of work / store,
transit insurance, unloading and
stacking etc. complete.
With E.D.
Without
E.D.
Note: 1) Class mentioned below
represents the working pressure of
pipe.
2) For external coating at site to
the joints, necessary polythene
wrapping for pouring cement
slurry shall also be given free with
each pipe.
i)Factory test pressure-
a)Site test pressure +
0.1N/mm2,For working Pressure
upto 1 N/mm2
b) Site test pressure +
0.2N/mm2,For working Pressure
above 1 N/mm2
ii) Site test pressure-1.5 times
working pressure pertaining to the
section or 1.1 times static
pressure,which ever is
more (such pressure is to be
control within 25% of pumphead
incase of pumping main)
iii) Working pressure-The
maximum sustained internal
pressure excluding surge to which
each portion of pipeline may be
subjected when installed
Section - I- (XII) - P.C.C. PIPES
Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
Section-I-(XII)-P.C.C. PIPES 117
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
a) Factory Test Pressure - 4 kg/Sq.cm.
i) 350 mm Rmt 4464.00 4054.00
ii) 400 mm Rmt 4909.00 4457.00
iii) 450 mm Rmt 5390.00 4896.00
iv) 500 mm Rmt 5965.00 5417.00
v) 600 mm Rmt 7213.00 6551.00
vi) 700 mm Rmt 8334.00 7569.00
vii) 800 mm Rmt 9382.00 8522.00
viii) 900 mm Rmt 11499.00 10445.00
ix) 1000 mm Rmt 13280.00 12062.00
x) 1100 mm Rmt 14870.00 13505.00
xi) 1200 mm Rmt 16349.00 14849.00
xii) 1300 mm Rmt 18890.00 17156.00
xiii) 1400 mm Rmt 20511.00 18628.00
xiv) 1500 mm Rmt 21993.00 19975.00
xv) 1600 mm Rmt 23476.00 21321.00
xvii) 1700mm Rmt 24958.00 22668.00
xviii) 1800mm Rmt 26440.00 24014.00
b Factory Test Pressure - 5.5 kg/Sq.cm.
i) 350 mm Rmt 4464.00 4054.00
ii) 400 mm Rmt 4930.00 4479.00
iii) 450 mm Rmt 5417.00 4923.00
iv) 500 mm Rmt 6000.00 5449.00
v) 600 mm Rmt 7262.00 6596.00
vi) 700 mm Rmt 8400.00 7629.00
vii) 800 mm Rmt 9493.00 8621.00
viii) 900 mm Rmt 11606.00 10542.00
ix) 1000 mm Rmt 13412.00 12181.00
x) 1100 mm Rmt 15040.00 13661.00
xi) 1200 mm Rmt 17157.00 15584.00
xii) 1300 mm Rmt 19169.00 17409.00
xiii) 1400 mm Rmt 20866.00 18952.00
xiv) 1500 mm Rmt 22350.00 20298.00
xv) 1600 mm Rmt 23832.00 21646.00
xvii) 1700mm Rmt 25315.00 22992.00
xviii) 1800mm Rmt 26797.00 24339.00
Section-I-(XII)-P.C.C. PIPES 118
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
c) Factory Test Pressure - 7.0 kg/Sq.cm.
i) 350 mm Rmt 4475.00 4063.00
ii) 400 mm Rmt 4951.00 4496.00
iii) 450 mm Rmt 5445.00 4945.00
iv) 500 mm Rmt 6032.00 5478.00
v) 600 mm Rmt 7312.00 6641.00
vi) 700 mm Rmt 8479.00 7701.00
vii) 800 mm Rmt 9629.00 8745.00
viii) 900 mm Rmt 11756.00 10677.00
ix) 1000 mm Rmt 13613.00 12366.00
x) 1100 mm Rmt 15289.00 13886.00
xi) 1200 mm Rmt 17455.00 15853.00
xii) 1300 mm Rmt 19518.00 17728.00
xiii) 1400 mm Rmt 21450.00 19483.00
xiv) 1500 mm Rmt 22384.00 20329.00
xv) 1600 mm Rmt 23867.00 21676.00
xvii) 1700mm Rmt 25349.00 23023.00
xviii) 1800mm Rmt 26831.00 24369.00
d) Factory Test Pressure - 8.5 kg/Sq.cm.
i) 350 mm Rmt 4492.00 4080.00
ii) 400 mm Rmt 4976.00 4520.00
iii) 450 mm Rmt 5473.00 4970.00
iv) 500 mm Rmt 6067.00 5510.00
v) 600 mm Rmt 7376.00 6700.00
vi) 700 mm Rmt 8578.00 7790.00
vii) 800 mm Rmt 9765.00 8869.00
viii) 900 mm Rmt 11923.00 10828.00
ix) 1000 mm Rmt 13819.00 12550.00
x) 1100 mm Rmt 15537.00 14112.00
xi) 1200 mm Rmt 17903.00 16261.00
xii) 1300 mm Rmt 20032.00 18194.00
xiii) 1400 mm Rmt 21859.00 19853.00
xiv) 1500 mm Rmt 22789.00 20699.00
xv) 1600 mm Rmt 24273.00 22045.00
xvii) 1700mm Rmt 25755.00 23392.00
xviii) 1800mm Rmt 27237.00 24738.00
Section-I-(XII)-P.C.C. PIPES 119
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
e) Factory Test Pressure - 10 kg/Sq.cm.
i) 350 mm Rmt 4508.00 4095.00
ii) 400 mm Rmt 4995.00 4539.00
iii) 450 mm Rmt 5506.00 5002.00
iv) 500 mm Rmt 6117.00 5555.00
v) 600 mm Rmt 7449.00 6764.00
vi) 700 mm Rmt 8677.00 7880.00
vii) 800 mm Rmt 9913.00 9003.00
viii) 900 mm Rmt 12087.00 10978.00
ix) 1000 mm Rmt 14024.00 12736.00
x) 1100 mm Rmt 15926.00 14465.00
xi) 1200 mm Rmt 18207.00 16536.00
xii) 1300 mm Rmt 20390.00 18520.00
xiii) 1400 mm Rmt 22276.00 20233.00
xiv) 1500 mm Rmt 23209.00 21079.00
xv) 1600 mm Rmt 24692.00 22427.00
xvii) 1700mm Rmt 26175.00 23773.00
xviii) 1800mm Rmt 27657.00 25120.00
f) Factory Test Pressure - 11.5 kg/Sq.cm.
i) 350 mm Rmt 4527.00 4111.00
ii) 400 mm Rmt 5027.00 4567.00
iii) 450 mm Rmt 5550.00 5039.00
iv) 500 mm Rmt 6169.00 5602.00
v) 600 mm Rmt 7523.00 6833.00
vi) 700 mm Rmt 8774.00 7968.00
vii) 800 mm Rmt 10188.00 9254.00
viii) 900 mm Rmt 12254.00 11131.00
ix) 1000 mm Rmt 14228.00 12922.00
x) 1100 mm Rmt 16181.00 14696.00
xi) 1200 mm Rmt 18513.00 16814.00
xii) 1300 mm Rmt 20751.00 18848.00
xiii) 1400 mm Rmt 22699.00 20617.00
xiv) 1500 mm Rmt 23631.00 21462.00
xv) 1600 mm Rmt 25113.00 22809.00
xvii) 1700mm Rmt 26596.00 24155.00
xviii) 1800mm Rmt 28078.00 25502.00
Section-I-(XII)-P.C.C. PIPES 120
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
g) Factory Test Pressure - 13.0 kg/Sq.cm.
i) 350 mm Rmt 4562.00 4143.00
ii) 400 mm Rmt 5069.00 4604.00
iii) 450 mm Rmt 5594.00 5081.00
iv) 500 mm Rmt 6220.00 5649.00
v) 600 mm Rmt 7595.00 6898.00
vi) 700 mm Rmt 8874.00 8058.00
vii) 800 mm Rmt 10356.00 9407.00
viii) 900 mm Rmt 12421.00 11281.00
ix) 1000 mm Rmt 14526.00 13193.00
x) 1100 mm Rmt 16438.00 14930.00
xi) 1200 mm Rmt 18823.00 17095.00
xii) 1300 mm Rmt 21120.00 19181.00
xiii) 1400 mm Rmt 23116.00 20995.00
xiv) 1500 mm Rmt 24047.00 21841.00
xv) 1600 mm Rmt 25530.00 23188.00
xvii) 1700mm Rmt 27012.00 24534.00
xviii) 1800mm Rmt 28494.00 25871.00
h) Factory Test Pressure - 14.5 kg/Sq.cm.
i) 350 mm Rmt 4601.00 4179.00
ii) 400 mm Rmt 5116.00 4646.00
iii) 450 mm Rmt 5649.00 5131.00
iv) 500 mm Rmt 6279.00 5703.00
v) 600 mm Rmt 7672.00 6968.00
vi) 700 mm Rmt 9456.00 8588.00
vii) 800 mm Rmt 10525.00 9559.00
viii) 900 mm Rmt 12706.00 11541.00
ix) 1000 mm Rmt 14739.00 13386.00
x) 1100 mm Rmt 16696.00 15163.00
xi) 1200 mm Rmt 19130.00 17374.00
xii) 1300 mm Rmt 21479.00 19507.00
xiii) 1400 mm Rmt 24161.00 21944.00
xiv) 1500 mm Rmt 25092.00 22789.00
xv) 1600 mm Rmt 26575.00 24137.00
xvii) 1700mm Rmt 28057.00 25483.00
xviii) 1800mm Rmt 29539.00 26830.00
Section-I-(XII)-P.C.C. PIPES 121
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
i) Factory Test Pressure - 17.0 kg/Sq.cm.
i) 350 mm Rmt 4636.00 4212.00
ii) 400 mm Rmt 5162.00 4689.00
iii) 450 mm Rmt 5707.00 5183.00
iv) 500 mm Rmt 6347.00 5765.00
v) 600 mm Rmt 7771.00 7057.00
vi) 700 mm Rmt 9076.00 8244.00
vii) 800 mm Rmt 10728.00 9745.00
viii) 900 mm Rmt 12889.00 11705.00
ix) 1000 mm Rmt 14955.00 13581.00
x) 1100 mm Rmt 16964.00 15408.00
xi) 1200 mm Rmt 19440.00 17656.00
xii) 1300 mm Rmt 21844.00 19840.00
xiii) 1400 mm Rmt 24628.00 22367.00
xiv) 1500 mm Rmt 25558.00 23214.00
xv) 1600 mm Rmt 27041.00 24560.00
xvii) 1700mm Rmt 28524.00 25907.00
xviii) 1800mm Rmt 30006.00 27253.00
j) Factory Test Pressure - 18.5 kg/Sq.cm.
i) 350 mm Rmt 4674.00 4245.00
ii) 400 mm Rmt 5209.00 4731.00
iii) 450 mm Rmt 5765.00 5236.00
iv) 500 mm Rmt 6417.00 5828.00
v) 600 mm Rmt 7870.00 7148.00
vi) 700 mm Rmt 9189.00 8347.00
vii) 800 mm Rmt 11082.00 10064.00
viii) 900 mm Rmt 13113.00 11910.00
ix) 1000 mm Rmt 15211.00 13814.00
x) 1100 mm Rmt 17231.00 15649.00
xi) 1200 mm Rmt 19752.00 17940.00
xii) 1300 mm Rmt 22892.00 20793.00
xiii) 1400 mm Rmt 25266.00 22948.00
xiv) 1500 mm Rmt 25671.00 23314.00
xv) 1600 mm Rmt 27153.00 24662.00
xvii) 1700mm Rmt 28635.00 26009.00
xviii) 1800mm Rmt 30119.00 27355.00
k) Factory Test Pressure - 20 kg/Sq.cm.
i) 350 mm Rmt 4711.00 4278.00
ii) 400 mm Rmt 5257.00 4775.00
Section-I-(XII)-P.C.C. PIPES 122
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
iii) 450 mm Rmt 5822.00 5288.00
iv) 500 mm Rmt 6489.00 5894.00
v) 600 mm Rmt 7968.00 7237.00
vi) 700 mm Rmt 9416.00 8552.00
vii) 800 mm Rmt 11349.00 10306.00
viii) 900 mm Rmt 13415.00 12182.00
ix) 1000 mm Rmt 15564.00 14135.00
x) 1100 mm Rmt 17638.00 16019.00
xi) 1200 mm Rmt 20785.00 18878.00
xii) 1300 mm Rmt 23387.00 21241.00
xiii) 1400 mm Rmt 25824.00 23453.00
xiv) 1500 mm Rmt 26227.00 23821.00
xv) 1600 mm Rmt 27710.00 25168.00
xvii) 1700mm Rmt 29192.00 26514.00
xviii) 1800mm Rmt 30674.00 27861.00
l) Factory Test Pressure - 21.5 kg/Sq.cm.
i) 350 mm Rmt 4750.00 4316.00
ii) 400 mm Rmt 5302.00 4817.00
iii) 450 mm Rmt 5880.00 5340.00
iv) 500 mm Rmt 6559.00 5957.00
v) 600 mm Rmt 8084.00 7342.00
vi) 700 mm Rmt 9879.00 8973.00
vii) 800 mm Rmt 11528.00 10469.00
viii) 900 mm Rmt 13711.00 12453.00
ix) 1000 mm Rmt 15918.00 14457.00
x) 1100 mm Rmt 18527.00 16827.00
xi) 1200 mm Rmt 21302.00 19347.00
xii) 1300 mm Rmt 23929.00 21733.00
xiii) 1400 mm Rmt 27241.00 24741.00
xiv) 1500 mm Rmt 27647.00 25109.00
xv) 1600 mm Rmt 29129.00 26457.00
xvii) 1700mm Rmt 30611.00 27803.00
xviii) 1800mm Rmt 32094.00 29150.00
m) Factory Test Pressure - 23 kg/Sq.cm.
i) 350 mm Rmt 4787.00 4349.00
ii) 400 mm Rmt 5350.00 4859.00
iii) 450 mm Rmt 5939.00 5394.00
iv) 500 mm Rmt 6628.00 6020.00
v) 600 mm Rmt 8254.00 7497.00
vi) 700 mm Rmt 10190.00 9256.00
vii) 800 mm Rmt 11880.00 10790.00
viii) 900 mm Rmt 14008.00 12723.00
ix) 1000 mm Rmt 16270.00 14778.00
Section-I-(XII)-P.C.C. PIPES 123
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
x) 1100 mm Rmt 19017.00 17272.00
xi) 1200 mm Rmt 21825.00 19823.00
xii) 1300 mm Rmt 24612.00 22353.00
xiii) 1400 mm Rmt 27747.00 25200.00
xiv) 1500 mm Rmt 28150.00 25567.00
xv) 1600 mm Rmt 29632.00 26915.00
xvii) 1700mm Rmt 31116.00 28261.00
xviii) 1800mm Rmt 32598.00 29607.00
n) Factory Test Pressure - 24.5 kg/Sq.cm.
i) 350 mm Rmt 4825.00 4382.00
ii) 400 mm Rmt 5398.00 4902.00
iii) 450 mm Rmt 5997.00 5447.00
iv) 500 mm Rmt 6699.00 6084.00
v) 600 mm Rmt 8586.00 7798.00
vi) 700 mm Rmt 10331.00 9383.00
vii) 800 mm Rmt 12097.00 10986.00
viii) 900 mm Rmt 14244.00 12938.00
ix) 1000 mm Rmt 17036.00 15472.00
x) 1100 mm Rmt 19508.00 17718.00
xi) 1200 mm Rmt 22354.00 20305.00
xii) 1300 mm Rmt 26559.00 24122.00
xiii) 1400 mm Rmt 28276.00 25682.00
xiv) 1500 mm Rmt 28677.00 26045.00
xv) 1600 mm Rmt 30159.00 27392.00
xvii) 1700mm Rmt 31642.00 28738.00
xviii) 1800mm Rmt 33124.00 30085.00
Note :
1)
2)
3)
This foot notes shall appear in the tender conditions.
For PCCP pipes lowering, laying, and pouring of cement mortar in
the field on joints (after laying and welding), rates as per PSC
pipes lowering, laying and jointing shall be adopted.
For field welding rates applicable for similar welding in MS pipes
given in that section shall be adopted.
Whenever manufacturer is separate and contractor for lowering,
laying, jointing and testing is separate the principal contractor
shall enter into an agreement with PCCP pipe manufacturer for
satisfactory manufacturing transporting, lower-ing, laying,
jointing and testing of pipes.
Section-I-(XII)-P.C.C. PIPES 124
Sr No Item Description Unit
1 Providing and supplying ISI mark
CI D/F reflux valves (non-return
valves ) of following dia including
all taxes (Central and Local),
railway freight, inspection charges
unloding from railway wagon,
loading into truck, transportation
upto departmental stroes/ site,
unloading, stacking etc. complete.
Reflux valves as per I.S.5312 Part I
(1984)
With E.D.
Without
E.D.
a) Without by pass arrangement -PN -1
i) 50 mm No 3308.0
ii) 65 mm No 3873.0
iii) 80 mm No 4078.0
iv) 100 mm No 5694.0
v) 125 mm No 8130.0
vi) 150 mm No 9844.0
vii) 200 mm No 17694.0
viii) 250 mm No 30194.0
ix) 300 mm No 41374.0
x) 350 mm No 68478.0
xi) 400 mm No 94273.0
xii) 450 mm No 111059.0
xiii) 500 mm No 181880.0
xiv) 600 mm No 266900.0
xv) 700 mm No 468495.0
b) With by pass arrangement - PN-1
i) 80 mm No 4709.0
ii) 100 mm No 6708.0
iii) 125 mm No 9134.0
iv) 150 mm No 10848.0
v) 200 mm No 20224.0
vi) 250 mm No 33057.0
vii) 300 mm No 44373.0
Section - I- (XIII) - PIPE APPURTENANCES
Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
Section-I-(XIII)-PIPES APPURTENANCES 125
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
viii) 350 mm No 72752.0
ix) 400 mm No 97627.0
x) 450 mm No 114222.0
xi) 500 mm No 185408.0
xii) 600 mm No 270477.0
xiii) 700 mm No 709220.0
xiv) 750 mm No 776307.0
xv) 800 mm No 843396.0
xvi) 900 mm No 920068.0
xvii) 1000 mm No 1073413.0
c) Without by pass
arrangement - PN -1.6
i) 50 mm No 3227.0
ii) 65 mm No 3486.0
iii) 80 mm No 5718.0
iv) 100 mm No 7323.0
v) 125 mm No 10203.0
vi) 150 mm No 11419.0
vii) 200 mm No 24284.0
viii) 250 mm No 38986.0
ix) 300 mm No 54474.0
x) 350 mm No 93820.0
xi) 400 mm No 108424.0
xii) 450 mm No 127927.0
xiii) 500 mm No 207834.0
xiv) 600 mm No 305384.0
xv) 700 mm No 369010.0
xvi) 750 mm No 423608.0
xvii) 800 mm No 481972.0
xviii) 900 mm No 609995.0
xix) 1000 mm No 753081.0
xx) 1100 mm No 911227.0
xxi) 1200 mm No 1084436.0
d) With by pass arrangement - PN-1.6
i) 50 mm No 3312.0
ii) 65 mm No 3727.0
Section-I-(XIII)-PIPES APPURTENANCES 126
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
iii) 80 mm No 5484.0
iv) 100 mm No 7092.0
v) 125 mm No 9911.0
vi) 150 mm No 12030.0
vii) 200 mm No 24298.0
viii) 250 mm No 36715.0
ix) 300 mm No 51028.0
x) 350 mm No 85713.0
xi) 400 mm No 112272.0
xii) 450 mm No 131355.0
xiii) 500 mm No 213216.0
xiv) 600 mm No 311049.0
xv) 700 mm No 375853.0
xvi) 750 mm No 431463.0
xvii) 800 mm No 490910.0
xviii) 900 mm No 621308.0
xix) 1000 mm No 767046.0
xx) 1100 mm No 928125.0
xxi) 1200 mm No 1104545.0
2 Providing double flange sluice
valve confirming for IS-
2906/14846 including worn gear
arrangements as per test pressure
stainless steel spindle, caps
including all taxes transportation
etc. complete.
a) Sluice valves - PN -1 without byepass arrangement
i) 50 mm No 4391
ii) 65 mm No 4985
iii) 80 mm No 5116
iv) 100 mm No 6812
v) 125 mm No 8521
vi) 150 mm No 10217
vii) 200 mm No 19333
viii) 250 mm No 29913
ix) 300 mm No 37695
x) 350 mm No 53477
xi) 400 mm No 72101
Section-I-(XIII)-PIPES APPURTENANCES 127
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
xii) 450 mm No 88187
xiii) 500 mm No 113477
xiv) 600 mm No 167606
xv) 700 mm No 300430
xvi) 750 mm No 342603
xvii) 800 mm No 427239
xviii) 900 mm No 550860
xix) 1000 mm No 814189
xx) 1100 mm No 1078533
xxi) 1200 mm No 1280269
With byepass arrangement
b) Sluice valves - PN -1.0
i) 50 mm No 4391
ii) 65 mm No 4985
iii) 80 mm No 5116
iv) 100 mm No 6812
v) 125 mm No 8521
vi) 150 mm No 12374
vii) 200 mm No 21854
viii) 250 mm No 33263
ix) 300 mm No 40982
x) 350 mm No 58087
xi) 400 mm No 77248
xii) 450 mm No 93275
xiii) 500 mm No 120104
xiv) 600 mm No 174198
xv) 700 mm No 310617
xvi) 750 mm No 351996
xvii) 800 mm No 437316
xviii) 900 mm No 561585
xix) 1000 mm No 826615
xx) 1100 mm No 1093680
xxi) 1200 mm No 1293675
c) Sluice valve - PN - 1.6
without byepass arrangement
i) 50 mm No 5803
Section-I-(XIII)-PIPES APPURTENANCES 128
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
ii) 65 mm No 6371
iii) 80 mm No 7265
iv) 100 mm No 9636
v) 125 mm No 12024
vi) 150 mm No 11893
vii) 200 mm No 24101
viii) 250 mm No 37382
ix) 300 mm No 49699
x) 350 mm No 72811
xi) 400 mm No 99720
xii) 450 mm No 123737
xiii) 500 mm No 160146
xiv) 600 mm No 243982
xv) 700 mm No 524772
xvi) 750 mm No 579078
xvii) 800 mm No 672599
xviii) 900 mm No 813137
xix) 1000 mm No 1183325
xx) 1100 mm No 1285723
xxi) 1200 mm No 1721030
d) Sluice valve - PN - 1.6
with byepass arrangement
i) 50 mm No 5803
ii) 65 mm No 6371
iii) 80 mm No 7265
iv) 100 mm No 9636
v) 125 mm No 12024
vi) 150 mm No 14014
vii) 200 mm No 26755
viii) 250 mm No 40969
ix) 300 mm No 53299
x) 350 mm No 77866
xi) 400 mm No 105441
xii) 450 mm No 129463
xiii) 500 mm No 167602
xiv) 600 mm No 251533
xv) 700 mm No 538550
Section-I-(XIII)-PIPES APPURTENANCES 129
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
xvi) 750 mm No 589319
xvii) 800 mm No 682470
xviii) 900 mm No 823468
xix) 1000 mm No 1195568
xx) 1100 mm No 1297614
xxi) 1200 mm No 1734270
3 Providing, double flanged short
body pattern type manually
operated Butterfly Valve having
body, disc and end cover in graded
cast iron to IS-210 Gr.CF 200
generally confirming in to IS-
13095-1991, Synthetic rubber
faced ring secured on disc by
retaining ring with stainless steel
screw stub shaft of stainless steel
riding in teflon bearing excluding
C.C. foundation /structural steel
support.
a) Butterfly valves - PN -1 with byepass arrangement
iii) 80 mm No 5808
iv) 100 mm No 7424
v) 125 mm No 8467
vi) 150 mm No 10944
vii) 200 mm No 14586
viii) 250 mm No 18230
ix) 300 mm No 28844
x) 350 mm No 58665
xi) 400 mm No 63023
xii) 450 mm No 72811
xiii) 500 mm No 79947
xiv) 600 mm No 98727
xv) 700 mm No 159784
xvi) 750 mm No 198334
xvii) 800 mm No 218214
xviii) 900 mm No 301378
xix) 1000 mm No 358723
xx) 1100 mm No 581758
xxi) 1200 mm No 550499
xxii) 1400 mm No 839367
xxiii) 1500 mm No 1042954
Section-I-(XIII)-PIPES APPURTENANCES 130
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
b) Butterfly valves - PN -1.6
Without byepass arrangement
iii) 80 mm No 6444
iv) 100 mm No 8537
v) 125 mm No 9317
vi) 150 mm No 12585
vii) 200 mm No 16776
viii) 250 mm No 20965
ix) 300 mm No 33171
x) 350 mm No 67464
xi) 400 mm No 72476
xii) 450 mm No 83733
xiii) 500 mm No 91939
xiv) 600 mm No 113537
xv) 700 mm No 183751
xvi) 750 mm No 228084
xvii) 800 mm No 249867
xviii) 900 mm No 346586
xix) 1000 mm No 448404
xx) 1100 mm No 727199
xxi) 1200 mm No 688125
xxii) 1400 mm No 1049209
xxiii) 1500 mm No 1294878
4 Lowering, laying and jointing in
position following C.I.D/F Reflex
valves, Butterfly valves and Sluice
valves including cost of all labour
jointing material, including nut
bolts and giving satisfactory
hydraulic testing etc. complete.
(Rate for all class of valves.)
i) 50 mm No 689.00
ii) 65 mm No 1036.00
iii) 80 mm No 1440.00
iv) 100 mm No 1881.00
v) 125 mm No 2342.00
vi) 150 mm No 2957.00
vii) 200 mm No 3076.00
viii) 250 mm No 4008.00
ix) 300 mm No 4158.00
x) 350 mm No 5124.00
xi) 400 mm No 6182.00
xii) 450 mm No 7354.00
Section-I-(XIII)-PIPES APPURTENANCES 131
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
xiii) 500 mm No 7616.00
xiv) 600 mm No 8083.00
xv) 700 mm No 8714.00
xvi) 750 mm No 9598.00
xvii) 800 mm No 11438.00
xviii) 900 mm No 12136.00
xix) 1000 mm No 14307.00
xx) 1100 mm No 16521.00
xxi) 1200 mm to 1500 mm No 18153.00
5 Providing and supplying Air Valves
as per IS -14845 - 2000 and MJP’s
standard specifications of approved
make and quality of following
diameters including all taxes
(Central and local), railway freight,
inspection charges, unloding from
railway wagons, loading into truck,
transportation upto departmental
stores / site, unloding and
stacking etc. complete.
a) Air Valve Single Ball Flanged / Screwed Type - PN -1
i) 12/15 mm No 615.00
ii) 20 mm No 741.00
iii) 25 mm No 1022.00
iv) 32 mm No 1116.00
v) 40 mm No 1228.00
vi) 50 mm No 1349.00
b) Air Valve Single Ball Flanged /Screwed Type -PN -1.6
i) 12/15 mm No 719.00
ii) 20 mm No 1022.00
iii) 25 mm No 1228.00
iv) 32 mm No 1324.00
v) 40 mm No 1418.00
vi) 50 mm No 1851.00
6 Providing and supplying Air Valves
as per IS-10845 and MJP’s
standard specifications double
orifice type combined with screw
down isolating valve, small orifice
elastic ball
Section-I-(XIII)-PIPES APPURTENANCES 132
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
resting on a gun metal orifice
nipple, large orifice vulcanite ball
seating on moulded seat ring, inlet
face and drilled, including all taxes
(Central and local), insurance,
third party inspection charges,
loading, unloding, transporta-toin
upto departmental stores / site,
etc. complete.
a) Double Ball Flanged Type - PN -
1 With small Orifice
i) 50 mm No 5673
ii) 65 mm No 6619
iii) 80 mm No 7561
b) Double Ball Flanged Type - PN -
1.6 With small Orifice
i) 50 mm No 7515
ii) 65 mm No 8509
iii) 80 mm No 10530
7 Providing and supplying Air Valves
as per IS-14845-2000 and MJP’s
standard specifications double
orifice type combined with isolating
sluice valve, mounted in horzontal
position and operated by wheel
gearing, small orifice elastic ball
resting on a gun metal orifice
nipple, large orifice vulcanite ball
seating on moulded seat ring, inlet
face and drilled, including all taxes
(Central and local), insurance,
third party inspection charges,
loading, unloading, transporta-tion
upto departmental storer / site,
etc. complete.
a) Double Ball Flanged Type - PN -
1.0
i) 100 mm No 9561
ii) 150 mm No 17425
iii) 200 mm No 29304
Section-I-(XIII)-PIPES APPURTENANCES 133
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
b) Double Ball Flanged Type - PN -
1.6
i) 100 mm No 14617
ii) 150 mm No 20593
iii) 200 mm No 34633
8 Providing and supplying Kinetic
Double Orifice type Air Valves as
per MJP’s standard specifications
combined with screw down
isolating valve, small orifice elastic
ball resting on a gun metal orifice
nipple, large orifice vulcanite ball
seating on moulded seat ring, inlet
face and drilled, including all taxes
(Central and local), insurance,
third party inspection charges,
loading, unloading, transportation
upto departmental stores / site,
etc. complete.
a) Kinetic Air Valve Flanged Type P-
1
i) 40 mm No 9516
ii) 50 mm No 11729
iii) 80 mm No 15304
b) Kinetic Air Valve Flanged Type P-
1.6
i) 40 mm No 11280
ii) 50 mm No 13903
iii) 80 mm No 18176
9 Providing and supplying Kinetic
Double Orifice type Air Valves as
per MJP’s standard specifications
having small orifice elastic ball
resting on a gun metal orifice
nipple, large orifice vulcanite ball
seating on moulded seat ring,with
built-in Kinetic features, isolatintg
sluice valve mounted in
Section-I-(XIII)-PIPES APPURTENANCES 134
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
horizontal position and operated
by wheel gearing, inlet face and
drilled, including all taxes (Central
and local), insurance, third party
inspection charges, loading,
unloding, transportation upto
departmental stores / site, etc.
complete.
a) Kinetic Air Valve Flanged Type P-
1
i) 100 mm No 20610
ii) 150 mm No 38804
iii) 200 mm No 56659
b) Kinetic Air Valve Flanged Type P-
1.6
i) 100 mm No 24427
ii) 150 mm No 45993
iii) 200 mm No 67161
10 Lowering, laying and fixing in
proper alignment and position all
types of C.I. air valves as directed
by Engineer-in-charge including
cost of conveyance from stores to
site of work, cost of all material
and giving satisfactory hydraulic
testing, etc. complete. (for all class
of valves).
a) Air Valve Single Ball (PN-1 and PN - 1.6)
i) 15 mm No 110
ii) 20 mm No 140
iii) 25 mm No 180
iv) 32 mm No 199
v) 40 mm No 213
vi) 50 mm No 231
vii) 65 mm No 243
viii) 80 mm No 255
ix) 100 mm No 285
x) 125 mm No 345
xi) 150 mm No 383
xii) 200 mm No 421
Section-I-(XIII)-PIPES APPURTENANCES 135
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
b) Air Valve Double Ball (PN-1 and PN - 1.6)
i) 15 mm No 120
ii) 20 mm No 149
iii) 25 mm No 180
iv) 32 mm No 205
v) 40 mm No 238
vi) 50 mm No 275
vii) 65 mm No 317
viii) 80 mm No 379
ix) 100 mm No 400
x) 125 mm No 441
xi) 150 mm No 603
xii) 200 mm No 664
c) Kinetic Air Valve (PN-1 and PN - 1.6)
i) 40 mm No 273
ii) 50 mm No 315
iii) 65 mm No 345
iv) 80 mm No 379
v) 100 mm No 417
vi) 125 mm No 455
vii) 150 mm No 652
viii) 200 mm No 711
11 Providing erecting Cast Steel/
Spheroidal Graphite (S.G) Iron D/F
Sluice Valves / Butterfly Valves
with jointing to pipe work
(including all hardware and
packing) water works quality,
having non-rising spindle with
hand wheel and without bypass
arrangement, spindle of stainless
steel as per requirement, excluding
C. C. foundation / structural steel
support.
For Rating Class 150 (Working
Pressure 20 kg/cm2 and Test
Pressure 30 kg/cm2)
a) Sluice Valves.
i) 80 mm No 14656
ii) 100 mm No 19540
iii) 150 mm No 29311
Section-I-(XIII)-PIPES APPURTENANCES 136
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
iv) 200 mm No 45713
v) 250 mm No 65786
vi) 300 mm No 84173
vii) 350 mm No 112230
viii) 400 mm No 187281
ix) 450 mm No 255524
x) 500 mm No 300616
xi) 600 mm No 343203
b) Butterfly Valves.
i) 300 mm No 105843
ii) 350 mm No 112835
iii) 400 mm No 126737
iv) 450 mm No 135014
v) 500 mm No 156289
vi) 600 mm No 175884
12 Providing erecting Cast Steel D/F
Sluice Valves / Butterfly Valves
with jointing to pipe work
(including all hardware and
packing) water works quality
having non-rising spindle with
hand wheel and without bypass
arrangement, spindle of stainless
steel as per requirement, excluding
C. C. foundation / structural steel
support.
For Rating Class 300 (Working
Pressure 52 kg/cm2 and Test
Pressure 78 kg/cm2)
a) Sluice Valves
i) 80 mm No 15776
ii) 100 mm No 24908
iii) 150 mm No 37976
iv) 200 mm No 59558
v) 250 mm No 64292
vi) 300 mm No 108382
vii) 350 mm No 182788
viii) 400 mm No 266657
ix) 450 mm No 321057
x) 500 mm No 500178
xi) 600 mm No 756005
Section-I-(XIII)-PIPES APPURTENANCES 137
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
b) Butterfly Valves
i) 300 mm No 129129
ii) 350 mm No 137659
iii) 400 mm No 154619
iv) 450 mm No 164717
v) 500 mm No 190673
vi) 600 mm No 214579
13 Providing erecting Cast Steel
/Spheroidal Graphite (S.G.) Iron
D/F Reflux Valves Single Door
with jointing to pipe work
(including all hardware and
packing) water works quality with
jointing to pipe without bypass
arrangement, with gunmental
seats excluding C. C. foundation /
structural steel support.
For Rating Class 150 (Working
Pressure 20 kg/cm2 and Test
Pressure 30 kg/cm2)
i) 80 mm No 10227
ii) 100 mm No 15661
iii) 150 mm No 26530
iv) 200 mm No 50442
v) 250 mm No 87831
vi) 300 mm No 115713
14 Providing erecting Cast Steel D/F
Reflux Valves Single door with
jointing to pipe work (including all
hardware and packing) water
works quality with jointing to pipe
without bypass arrangement, with
gunmetal seat excluding C. C.
foundation / structural steel
support.
For Rating Class 300 (Working
Pressure 52 kg/cm2 and Test
Pressure 78 kg/cm2)
i) 80 mm No 15237
ii) 100 mm No 21477
Section-I-(XIII)-PIPES APPURTENANCES 138
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
iii) 150 mm No 35717
iv) 200 mm No 63275
v) 250 mm No 114555
vi) 300 mm No 139478
15 Providing erecting Kinetic Double
Orifice Cast Steel Air Valves with
an isolating Sluice Valve mounted
in horizontal position operated by
wheel gear suitable for working
pressure of Class-150 rating (20
kg/cm2)
i) 80 mm No 29546
ii) 100 mm No 41185
iii) 150 mm No 78920
iv) 200 mm No 102014
16 Providing erecting Kinetic Double
Orifice Cast Steel Air Valves with
an isolating Sluice Valve mounted
in horizontal position operated by
wheel gear suitable for working
pressure of Class 300 rating (52
kg/cm2)
i) 80 mm No 35996
ii) 100 mm No 41148
iii) 150 mm No 96157
iv) 200 mm No 116071
17 Providing and fixing in position air
valve shaft including providing and
fixing GI Medium Class or 6 mm
thick M.S. pipe shaft 2.70 M long
over branch flange of air valve tee,
providing PCC block of M-150
concrete, 150 mm thick around
the air valve tee including encasing
of
Section-I-(XIII)-PIPES APPURTENANCES 139
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
vertical shaft in PCC M-150 as
shown in type design together with
providing and making flanged
joints wherever required and fixing
of air valve tee, etc. complete as
per type design and as directed by
Engineer -in- charge for following
diameters of pipe lines (type design
attached.)
a) Foundation on Murum and Harder Strata.
i) upto 150mm No 4636
ii) 200 to 400 mm No 5431
iii) 450 to 900mm No 11045
iv) 1000 to 1200 mm No 13870
b) Foundation in B. C. Soil or Any Other Soil.
i) upto 150 mm No 5492
ii) 200 to 400 mm No 6625
iii) 450 to 900 mm No 12616
iv) 1000 to 1200 mm No 15821
18 Providing and supplying C.I. D/F
angle type spring loaded pressure
relief valves of approved make and
quality including all taxes (Central
and local), octroi, inspection
charges, transportatoin to
departmental stores, etc. complete.
a) Type PN-1
i) 25 mm No 4234
ii) 40 mm No 5517
iii) 50 mm No 7145
iv) 80 mm No 10837
v) 100 mm No 15170
vi) 125 mm No 20684
vii) 150 mm No 23635
viii) 200 mm No 52194
ix) 250 mm No 73367
x) 300 mm No 96757
b) Type PN-1.6
i) 25 mm No 5294
ii) 40 mm No 6893
Section-I-(XIII)-PIPES APPURTENANCES 140
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
iii) 50 mm No 8914
iv) 80 mm No 13543
v) 100 mm No 18958
vi) 125 mm No 25849
vii) 150 mm No 29544
viii) 200 mm No 65238
ix) 250 mm No 91707
x) 300 mm No 121226
19 Lowering, laying and fixing in
proper alignment and position all
types of C.I. D/F angle type spring
loaded pressure relief valves
including cost of all material,
labour, cost of conveyance from
stores to site of work and giving
satisfactory hydraulic testing, etc.
complete. (For all class of valves.)
i) 25 mm No 206
ii) 40 mm No 273
iii) 50 mm No 316
iv) 80 mm No 378
v) 100 mm No 415
vi) 125 mm No 462
vii) 150 mm No 652
viii) 200 mm No 712
ix) 250 mm No 831
x) 300 mm No 949
Note : Only 85% rate is payable till
satisfactory hydraulic testing is
given.
20 Cutting and champhering of pipes
of following diameters including
cost of all materials and labour
involved, etc. complete as directed
by Engineer-in-charge (for all class
of pipes).
a) C.I.Pipes
i) 80 mm 1 cut 33
ii) 100 mm 1 cut 39
iii) 150 mm 1 cut 59
Section-I-(XIII)-PIPES APPURTENANCES 141
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
iv) 200 mm 1 cut 76
v) 250 mm 1 cut 109
vi) 300 mm 1 cut 129
vii) 350 mm 1 cut 131
viii) 400 mm 1 cut 167
ix) 450 mm 1 cut 194
x) 500 mm 1 cut 232
xi) 600 mm 1 cut 283
xii) 700 mm 1 cut 333
xiii) 750 mm 1 cut 398
xiv) 800 mm 1 cut 435
xv) 900 mm 1 cut 479
xvi) 1000 mm 1 cut 521
b) A.C.Pipes
i) 80 mm 1 cut 11
ii) 100 mm 1 cut 13
iii) 150 mm 1 cut 21
iv) 200 mm 1 cut 22
v) 250 mm 1 cut 32
vi) 300 mm 1 cut 44
vii) 350 mm 1 cut 54
viii) 400 mm 1 cut 61
ix) 450 mm 1 cut 66
x) 500 mm 1 cut 75
xi) 600 mm 1 cut 86
21 Providing and supplying I.S.I.
mark rubber gasket suitable for
C.I. or D. I. pipe of all class for
tyton joints including all taxes
(Central and local) inspection
charges, transportation to
departmental stores / site, etc.
complete.
a) S.B.R. Gaskets for C. I. / D.I. Pipes
i) 80 mm No 39
ii) 100 mm No 43
III) 150 mm No 60
iv) 200 mm No 102
v) 250 mm No 133
vi) 300 mm No 187
vii) 350 mm No 214
Section-I-(XIII)-PIPES APPURTENANCES 142
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
viii) 400 mm No 298
ix) 450 mm No 325
x) 500 mm No 444
xi) 600 mm No 615
xii) 700 mm No 1095
xiii) 750 mm No 1138
xiv) 800 mm No 1179
xv) 900 mm No 1705
xvi) 1000 mm No 2190
b) Sealing ‘O’ Rings of SBR (for CID Joints)
i) 80 mm set 45
ii) 100 mm set 53
iii) 125 mm set 64
iv) 150 mm set 75
c) Flat Flanged Gaskets moulded out of SBR (ForFlanged Joints)
i) 80 mm set 82
ii) 100 mm No 109
iii) 125 mm No 129
iv) 150 mm No 177
v) 200 mm No 219
vi) 250 mm No 307
vii) 300 mm No 326
viii) 350 mm No 393
ix) 400 mm No 487
x) 450 mm No 532
xi) 500 mm No 623
xii) 600 mm No 838
Providing Rubber Gasket -
EPDM Gaskets for C. I. / D.I. Pipes
i) 80 mm. No 46
ii) 100 mm. No 48
iii) 150 mm. No 70
iv) 200 mm. No 117
v) 250 mm. No 160
vi) 300 mm. No 212
vii) 350 mm. No 247
viii) 400 mm. No 338
ix) 450 mm. No 378
x) 500 mm. No 500
xi) 600 mm. No 703
Section-I-(XIII)-PIPES APPURTENANCES 143
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
xii) 700 mm. No 1320
xiii) 750 mm. No 1383
xiv) 800 mm. No 1688
xv) 900 mm. No 2178
xvi) 1000 mm No 2530
22 Providing and fixing in position
and jointing high performance C. I.
Air valves for water combination
type ( Kinetic air valve along with
automatic air valves ) double ball,
double orifice with stainless steel
ball, tamper proof air vents rolling
seal mechanism for air release and
anti vacuum application designed
for 16 Kg. Per sq. cm. working
pressure and tested for 20 for kg
per sq. cm. pressure. ( Rate to
include cost of gaskets, bolt, nut
and any other material required for
jointing and its transportation etc.
including all taxes and duties
except octroi )
i) C. I. ARV FLFF PN 1.6 50mm Dia. No 9513
ii) 2. C. I. ARV FLFF PN 1.6 80mm Dia. No 13201
iii) 3. C. I. ARV FLFF PN 1.6 100mm Dia. No 21226
iv) 4. C. I. ARV FLFF PN 1.6 150mm Dia. No 35528
v) 5. C. I. ARV FLFF PN 1.6 200mm Dia. No 43035
Section-I-(XIII)-PIPES APPURTENANCES 144
Sr No Item Description Unit
1 Supply of C. I. Mechanical
Compression Flanged / Socket
Tailpiece(Popularly known as I TM
Flanged / Socket Tailpiece)
suitable for making flanged
connection with the plain barrel of
C. I. Spun Pipes ( as per - IS -
1536 /2001) and D. I. Pipes ( as
per IS: 8329 / 2000).The Tailpiec
to be supplied complete with
sealing rubber gasket of
S.B.R,.C.I.. Follower Glands and
M.S. Nut Bolts.The whole assembly
should be mechanically and
hydraulically tested to the
provisions as laid down in IS:1538
/1993. The rates are inclusive of
cost of material, forwarding
charges, sales tax, loading,
transportation and unloading at
departemental store etc. complete
as directed. Consignee but
exclusive of octroi.
1 80 mm No. 1302.00
2 100 mm No. 1419.00
3 125 mm No. 1786.00
4 150 mm No. 2555.00
5 200 mm No. 3310.00
6 250 mm No. 4993.00
7 300 mm No. 5589.00
8 350 mm No. 7372.00
9 400 mm No. 9623.00
10 450 mm No. 11295.00
11 500 mm No. 14193.00
12 600 mm No. 18200.00
13 700 mm No. 24823.00
14 750 mm No. 30164.00
Section - I- (XIV) - MECHANICAL JOINTS/FITTINGS
Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
Section-I-(XIV)-MECHANICAL JOINTS / FITTINGS 145
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
2 Supply of C. I. Mechanical
Compression Collar Coupling
(Popularly known as Jiffy TM
Collar Coupling ) suitable for C. I.
Spun Pipes ( as per - IS - 1536
/2001) and D. I. Pipes ( as per IS:
8329 / 2000). complete with
sealing rubber gasket of SBR,.C.I..
Follower Glands and M.S. Nut
Bolts.The whole assembly should
be mechanically and hydraulically
tested to the provisions as laid
down in IS:1538 /1993. The rates
are inclusive of cost of material,
forwarding charges, sales tax,
loading, transportation and
unloading at departemental store
etc. complete as directed.
Consignee but exclusive of octroi.
1 80 mm No No 784.00
2 100 mm No. 841.00
3 125 mm No. 1121.00
4 150 mm No. 1512.00
5 200 mm No. 1726.00
6 250 mm No. 2767.00
7 300 mm No. 3541.00
8 350 mm No. 4364.00
9 400 mm No. 6792.00
10 450 mm No. 7626.00
11 500 mm No. 10422.00
12 600 mm No. 13000.00
13 700 mm No. 16984.00
14 750 mm No. 19928.00
3 Supply of C. I. Mechanical Joint
Double Socket 90 deg. (1/4) Bends
as dimensionally described in
Table-14 of IS-
Section-I-(XIV)-MECHANICAL JOINTS / FITTINGS 146
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
13382/1992 complete with sealing
rubber gasket of SBR
(dimensionally described in IS-
12820/1989) with cast iron
follower gland and mild steel nut
bolts coated or otherwise protected
from rusting and suitable for C. I.
pipes.
1 80 mm No. 2231.00
2 100 mm No. 2587.00
3 125 mm No. 3022.00
4 150 mm No. 4751.00
5 200 mm No. 6305.00
6 250 mm No. 9385.00
7 300 mm No. 11422.00
8 350 mm No. 18911.00
9 400 mm No. 25775.00
10 450 mm No. 32899.00
11 500 mm No. 40940.00
12 600 mm No. 57862.00
13 700 mm No. 91333.00
14 750 mm No. 103733.00
4 Supply of CI Mechanical joint
Double Socket 45 deg. (1/8) Bends
as dimensionally described in
Table -15 of IS - 13382/1992
complete with sealing rubber
gasket of S.B.R.(dimensionally
described in IS-12820/1989) with
cast iron follower gland mild steel
nut bolts coated or otherwise
protected from rusting and
suitable for C. I. pipes.
1 80 mm No. 2071.00
2 100 mm No. 2306.00
3 125 mm No. 2914.00
4 150 mm No. 4002.00
5 200 mm No. 5271.00
6 250 mm No. 7733.00
Section-I-(XIV)-MECHANICAL JOINTS / FITTINGS 147
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
7 300 mm No. 9330.00
8 350 mm No. 15564.00
9 400 mm No. 19205.00
10 450 mm No. 26788.00
11 500 mm No. 29845.00
12 600 mm No. 41324.00
13 700 mm No. 58888.00
14 750 mm No. 77879.00
5 Supply of C. I. Mechanical Joint
Double Socket 22.50 deg. (1/6)
Bends as dimensionally described
in Table -16 of IS-13382/1992
complete with sealing rubber
gasket of SBR (dimensionally
described in IS-12820/1989) with
cast iron follower gland and mild
steel nut bolts coated or otherwise
protected from rusting and
suitable for C. I. pipes.
1 80 mm No. 1988.00
2 100 mm No. 2213.00
3 125 mm No. 2657.00
4 150 mm No. 3757.00
5 200 mm No. 4711.00
6 250 mm No. 7124.00
7 300 mm No. 8599.00
8 350 mm No. 13576.00
9 400 mm No. 17404.00
10 450 mm No. 22017.00
11 500 mm No. 25658.00
12 600 mm No. 33998.00
13 700 mm No. 51142.00
14 750 mm No. 56318.00
6 Supply of CI Mechanical joint
Double Socket 11.25 deg. (1/32)
Bends as dimensionally described
in Table -17 of IS - 13382/1992
complete with
Section-I-(XIV)-MECHANICAL JOINTS / FITTINGS 148
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
sealing rubber gasket of S.B.R.(
dimensionally described in IS-
12820/1989) with cast iron
follower gland and mild steel nut
bolts coated or otherwise protected
from rusting and suitable for C. I.
pipes.
1 80 mm No. 1969.00
2 100 mm No. 2162.00
3 125 mm No. 2348.00
4 150 mm No. 3672.00
5 200 mm No. 4522.00
6 250 mm No. 6685.00
7 300 mm No. 7407.00
8 350 mm No. 11689.00
9 400 mm No. 15834.00
10 450 mm No. 19985.00
11 500 mm No. 21784.00
12 600 mm No. 29863.00
13 700 mm No. 40258.00
14 750 mm No. 44912.00
7 Supply of CI Mechanical joint All
Socket Tees as dimenisonlly
described in Table -18 of IS -
13382/1992 complete with sealing
rubber gasket of S.B.R.
(dimensionally described in IS-
12820/1989) with cast iron
follower gland and mild steel nut
bolts coated or otherwise protected
from rusting and suitable for C. I.
pipes.
1 80x80x80 mm dia No. 3016.00
2 100x100x80 mm No. 3243.00
3 100x100x100 mm No. 3596.00
4 150x150x80 mm No. 5037.00
5 150x150x100 mm No. 5108.00
6 150x150x150 mm No. 6335.00
7 200x200x80 mm No. 6075.00
Section-I-(XIV)-MECHANICAL JOINTS / FITTINGS 149
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
8 200x200x100 mm No. 6142.00
9 200x200x150 mm No. 7316.00
10 200x200x200 mm No. 8050.00
11 250x250x80 mm No. 8555.00
12 250x250x100 mm No. 8744.00
13 250x250x150 mm No. 10435.00
14 250x250x200 mm No. 11025.00
15 250x250x250 mm No. 12366.00
16 300x300x80 mm No. 9381.00
17 300x300x100 mm No. 9591.00
18 300x300x150 mm No. 12301.00
19 300x300x200 mm No. 12708.00
20 300x300x250 mm No. 13455.00
21 300x300x300 mm No. 14849.00
8 Supply of CI Mechanical joint
Double Socket with branch
Flanged Tees dimenisonlly
described in Table -19 of IS -
13382/1992 complete with sealing
rubber gasket of S.B.R.(
dimensionally described in IS-
12820/1989) with cast iron
follower gland and mild steel nut
bolts galvanised coated or
otherwise protected from rusting
and suitable for C. I. pipes.
1 80x80x80 mm dia No. 2954.00
2 100x100x80 mm No. 3241.00
3 100x100x100 mm No. 3429.00
4 150x150x80 mm No. 4892.00
5 150x150x100 mm No. 5013.00
6 150x150x150 mm No. 5970.00
7 200x200x80 mm No. 5741.00
8 200x200x100 mm No. 6124.00
9 200x200x150 mm No. 7053.00
10 200x200x200 mm No. 8087.00
11 250x250x80 mm No. 8108.00
12 250x250x100 mm No. 8532.00
Section-I-(XIV)-MECHANICAL JOINTS / FITTINGS 150
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
13 250x250x150 mm No. 10125.00
14 250x250x200 mm No. 10595.00
15 250x250x250 mm No. 10970.00
16 300x300x80 mm No. 9519.00
17 300x300x100 mm No. 9705.00
18 300x300x150 mm No. 11205.00
19 300x300x200 mm No. 11300.00
20 300x300x250 mm No. 12470.00
21 300x300x300 mm No. 15283.00
22 350x350x80 mm No. 13314.00
23 350x350x100 mm No. 14159.00
24 350x350x150 mm No. 15234.00
25 350x350x200 mm No. 17752.00
26 350x350x300 mm No. 18187.00
27 350x350x350 mm No. 20812.00
28 400x400x80 mm No. 17404.00
29 400x400x100 mm No. 18449.00
30 400x400x150 mm No. 20541.00
31 400x400x200 mm No. 20955.00
32 400x400x300 mm No. 25253.00
33 400x400x400 mm No. 28915.00
34 450x450x80 mm No. 20758.00
35 450x450x100 mm No. 21805.00
36 450x450x200 mm No. 25573.00
37 450x450x300 mm No. 32269.00
38 450x450x350 mm No. 34049.00
39 450x450x450 mm No. 36984.00
40 500x500x100 mm No. 23355.00
41 500x500x250 mm No. 31936.00
42 500x500x300 mm No. 33086.00
43 500x500x400 mm No. 39892.00
44 500x500x500 mm No. 48162.00
45 600x600x100 mm No. 33376.00
46 600x600x300 mm No. 45831.00
47 600x600x400 mm No. 52215.00
48 600x600x500 mm No. 56505.00
49 600x600x600 mm No. 69377.00
50 700x700x100 mm No. 44235.00
Section-I-(XIV)-MECHANICAL JOINTS / FITTINGS 151
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
51 700x700x200 mm No. 51246.00
52 700x700x350 mm No. 61922.00
53 700x700x400 mm No. 66526.00
54 750x750x150 mm No. 52759.00
55 750x750x250 mm No. 60506.00
56 750x750x750 mm No. 116081.00
9 Supply of CI Mechaincal joint
Double Socket Reducers as
described in Table -21 of IS -
13382/1992 complete with sealing
rubber gasket of SBR(
dimensionally described in IS-
12820/1989) with cast iron
follower gland and mild steel nut
bolts coated or otherwise protected
from rusting and suitable for C. I.
pipes.
1 100x80 mm dia No. 2092.00
2 150x80 mm dia No. 3292.00
3 150x100 mm dia No. 3485.00
4 200x100 mm dia No. 4011.00
5 200x150 mm dia No. 4387.00
6 250x150 mm dia No. 5994.00
7 250x200 mm dia No. 5848.00
8 300x150 mm dia No. 7372.00
9 300x200 mm dia No. 7384.00
10 300x250 mm dia No. 7510.00
11 350x200 mm dia No. 10612.00
12 350x250 mm dia No. 10646.00
13 350x300 mm dia No. 10520.00
14 400x250 mm dia No. 16029.00
15 400x300 mm dia No. 14200.00
16 400x350 mm dia No. 14295.00
17 450x400 mm dia No. 17751.00
18 450x350 mm dia No. 17740.00
19 450x400 mm dia No. 17519.00
20 500x350 mm dia No. 21339.00
21 500x400 mm dia No. 21014.00
22 500x450 mm dia No. 20483.00
23 600x400 mm dia No. 30985.00
24 600x450 mm dia No. 30156.00
25 600x500 mm dia No. 28313.00
26 700x500 mm dia No. 42533.00
27 700x600 mm dia No. 38601.00
Section-I-(XIV)-MECHANICAL JOINTS / FITTINGS 152
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
28 750x600 mm dia No. 45846.00
29 750x700 mm dia No. 42377.00
30 800x450mm dia No. 63072.00
31 800x700mm dia No. 54144.00
Section-I-(XIV)-MECHANICAL JOINTS / FITTINGS 153
Sr No Item Description Unit
1 Manufacturing, providing and
supplying spirally welded / ERW/
SAW / fabricated M. S. pipes
including procurements of plates,
gas cutting to requried size rolling,
tack welding assembling in
suitable lengths to form pipes,
welding on automatic welding
machine and forming ‘V’ edge on
both ends of pipes including all
taxes (Central and local), railway
freight, insurance unloading from
railway wagon, loading into truck,
transport to stores / site,
unloading, stacking, etc, complete
as per IS - 3589 and IS-5504 as
applicable as per specifications (No
negative tolerance in thickness is
permissible).
Without
E.D.
a) Dia. of pipe 219.10 mm (O.D)
Thickness of pipe :
i) 4.80 mm Rmt 1527.00
ii) 5.60 mm Rmt 1775.00
iii) 6.40 mm Rmt 2021.00
iv) 7.00 mm Rmt 2204.00
v) 7.90 mm Rmt 2477.00
vi) 8.20 mm Rmt 2567.00
vii) 8.70 mm Rmt 2717.00
viii) 9.50 mm Rmt 2955.00
b) Dia. of pipe 273.10 mm (O.D)
Thickness of pipe :
i) 4.80 mm Rmt 1912.00
ii) 5.60 mm Rmt 2224.00
iii) 6.40 mm Rmt 2533.00
iv) 7.20 mm Rmt 2842.00
v) 7.80 mm Rmt 3071.00
Section - I- (XV) - M.S.PIPES
Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
Section-I-(XV)-M.S.PIPES 154
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
vi) 8.70 mm Rmt 3414.00
vii) 9.30 mm Rmt 3641.00
c) Dia. of pipe 323.9 mm (O.D)
Thickness of pipe :
i) 5.60 mm Rmt 2646.00
ii) 6.40 mm Rmt 3016.00
iii) 7.10 mm Rmt 3339.00
iv) 7.90 mm Rmt 3706.00
v) 8.40 mm Rmt 3934.00
vi) 8.70 mm Rmt 4071.00
vii) 9.50 mm Rmt 4433.00
d) Dia. of pipe 355.7 mm (O.D)
Thickness of pipe :
i) 5.60 mm Rmt 2909.00
ii) 6.40 mm Rmt 3317.00
iii) 7.10 mm Rmt 3672.00
iv) 7.90 mm Rmt 4077.00
v) 8.70 mm Rmt 4480.00
vi) 9.50 mm Rmt 4880.00
e) Dia. of pipe 406.0 mm (O.D)
Thickness of pipe :
i) 5.60 mm Rmt 3327.00
ii) 6.40 mm Rmt 3796.00
iii) 7.10 mm Rmt 4203.00
iv) 7.90 mm Rmt 4668.00
v) 8.70 mm Rmt 5130.00
vi) 9.50 mm Rmt 5590.00
vii) 10.00 mm Rmt 5878.00
f) Dia. of pipe 457.0 mm (O.D)
Thickness of pipe :
i) 5.60 mm Rmt 3751.00
ii) 6.40 mm Rmt 4280.00
iii) 7.10 mm Rmt 4741.00
iv) 7.90 mm Rmt 5267.00
Section-I-(XV)-M.S.PIPES 155
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
v) 8.70 mm Rmt 5788.00
vi) 9.50 mm Rmt 6310.00
vii) 10.00 mm Rmt 6635.00
g) Dia. of pipe 508.0 mm (O.D)
Thickness of pipe :
i) 5.60 mm Rmt 4177.00
ii) 6.40 mm Rmt 4765.00
iii) 7.10 mm Rmt 5278.00
iv) 7.90 mm Rmt 5864.00
v) 8.70 mm Rmt 6447.00
vi) 9.50 mm Rmt 7030.00
vii) 10.00 mm Rmt 7392.00
h) Dia. of pipe 559.0 mm (O.D)
Thickness of pipe :
i) 5.60 mm Rmt 4600.00
ii) 6.40 mm Rmt 5248.00
iii) 7.10 mm Rmt 5816.00
iv) 7.90 mm Rmt 6462.00
v) 8.70 mm Rmt 7105.00
vi) 9.50 mm Rmt 7748.00
vii) 10.00 mm Rmt 8148.00
i) Dia. of pipe 610.0 mm (O.D)
Thickness of pipe :
i) 5.60 mm Rmt 5024.00
ii) 6.40 mm Rmt 5734.00
iii) 7.10 mm Rmt 6353.00
iv) 7.90 mm Rmt 7059.00
v) 8.70 mm Rmt 7764.00
vi) 9.50 mm Rmt 8468.00
vii) 10.00 mm Rmt 8906.00
viii) 12.00 mm Rmt 10651.00
j) Dia. of pipe 660.0 mm (O.D)
Thickness of pipe :
i) 5.60 mm Rmt 5439.00
Section-I-(XV)-M.S.PIPES 156
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
ii) 6.40 mm Rmt 6209.00
iii) 7.10 mm Rmt 6881.00
iv) 7.90 mm Rmt 7646.00
v) 8.70 mm Rmt 8411.00
vi) 9.50 mm Rmt 9172.00
vii) 10.00 mm Rmt 9648.00
k) Dia. of pipe 711.0 mm (O.D)
Thickness of pipe :
i) 5.60 mm Rmt 5863.00
ii) 6.40 mm Rmt 6693.00
iii) 7.10 mm Rmt 7417.00
iv) 7.90 mm Rmt 8244.00
v) 8.70 mm Rmt 9069.00
vi) 9.50 mm Rmt 9892.00
vii) 10.00 mm Rmt 10405.00
viii) 12.00 mm Rmt 12449.00
l) Dia. of pipe 762.00. mm (O. D.)
Thickness of pipe :
i) 5.60 mm Rmt 6288.00
ii) 6.40 mm Rmt 7178.00
iii) 7.10 mm Rmt 7955.00
iv) 7.90 mm Rmt 8842.00
v) 8.70 mm Rmt 9727.00
vi) 9.50 mm Rmt 10610.00
vii) 10.00 mm Rmt 11161.00
m) Dia. of pipe 813.00. mm (O.D.)
Thickness of pipe :
i) 5.60 mm Rmt 6711.00
ii) 6.40 mm Rmt 7662.00
iii) 7.10 mm Rmt 8492.00
iv) 7.90 mm Rmt 9440.00
v) 8.70 mm Rmt 10387.00
vi) 9.50 mm Rmt 11330.00
vii) 10.00 mm Rmt 11919.00
viii) 12.00 mm Rmt 14266.00
Section-I-(XV)-M.S.PIPES 157
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
n) Dia. of pipe 864.00. mm (O. D.)
Thickness of pipe :
i) 5.60 mm Rmt 7135.00
ii) 6.40 mm Rmt 8146.00
iii) 7.10 mm Rmt 9030.00
iv) 7.90 mm Rmt 10038.00
v) 8.70 mm Rmt 11045.00
vi) 9.50 mm Rmt 12048.00
vii) 10.00 mm Rmt 12675.00
o) Dia. of pipe 914.00 mm (O. D.)
Thickness of pipe :
i) 5.60 mm Rmt 7550.00
ii) 6.40 mm Rmt 8622.00
iii) 7.10 mm Rmt 9558.00
iv) 7.90 mm Rmt 10624.00
v) 8.70 mm Rmt 11690.00
vi) 9.50 mm Rmt 12754.00
vii) 10.00 mm Rmt 13418.00
p) Dia. of pipe 965.00 mm (O. D.)
Thickness of pipe :
i) 5.60 mm Rmt 7975.00
ii) 6.40 mm Rmt 9107.00
iii) 7.10 mm Rmt 10095.00
iv) 7.90 mm Rmt 11223.00
v) 8.70 mm Rmt 12348.00
vi) 9.50 mm Rmt 13473.00
vii) 10.00 mm Rmt 14175.00
q) Dia. of pipe 1016.00 mm (O. D.)
Thickness of pipe :
i) 5.60 mm Rmt 8398.00
ii) 6.40 mm Rmt 9590.00
iii) 7.10 mm Rmt 10632.00
iv) 7.90 mm Rmt 11821.00
v) 8.70 mm Rmt 13008.00
vi) 9.50 mm Rmt 14193.00
Section-I-(XV)-M.S.PIPES 158
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
vii) 10.00 mm Rmt 14932.00
viii) 12.00 mm Rmt 17883.00
r) Dia. of pipe 1067.00 mm (O. D.)
Thickness of pipe :
i) 5.60 mm Rmt 8822.00
ii) 6.40 mm Rmt 10075.00
iii) 7.10 mm Rmt 11170.00
iv) 7.90 mm Rmt 12419.00
v) 8.70 mm Rmt 13666.00
vi) 9.50 mm Rmt 14911.00
vii) 10.00 mm Rmt 15689.00
s) Dia. of pipe 1118.00. mm (O. D.)
Thickness of pipe :
i) 5.60 mm Rmt 9247.00
ii) 6.40 mm Rmt 10559.00
iii) 7.10 mm Rmt 11706.00
iv) 7.90 mm Rmt 13016.00
v) 8.70 mm Rmt 14325.00
vi) 9.50 mm Rmt 15631.00
vii) 10.00 mm Rmt 16446.00
t) Dia. of pipe 1168.00. mm (O. D.)
Thickness of pipe :
i) 5.60 mm Rmt 9661.00
ii) 6.40 mm Rmt 11034.00
iii) 7.10 mm Rmt 12234.00
iv) 7.90 mm Rmt 13603.00
v) 8.70 mm Rmt 14970.00
vi) 9.50 mm Rmt 16335.00
vii) 10.00 mm Rmt 17188.00
u) Dia. of pipe 1219.00. mm (O. D.)
Thickness of pipe :
i) 6.40 mm Rmt 11519.00
ii) 7.10 mm Rmt 12772.00
iii) 7.90 mm Rmt 14201.00
Section-I-(XV)-M.S.PIPES 159
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
iv) 8.70 mm Rmt 15629.00
v) 9.50 mm Rmt 17055.00
vi) 10.00 mm Rmt 17945.00
vii) 12.00 mm Rmt 21498.00
v) Dia. of pipe 1296.00. mm (O. D.)
Thickness of pipe :
i) 9.50 mm Rmt 18141.00
ii) 9.98 mm Rmt 19049.00
iii) 10.00 mm Rmt 19087.00
w) Dia. of pipe 1321.00. mm (O. D.)
Thickness of pipe :
i) 6.40 mm Rmt 12487.00
ii) 7.10 mm Rmt 13846.00
iii) 7.90 mm Rmt 15397.00
iv) 8.70 mm Rmt 16946.00
v) 9.50 mm Rmt 18492.00
vi) 10.00 mm Rmt 19459.00
x) Dia. of pipe 1422.00. mm (O. D.)
Thickness of pipe :
i) 7.10 mm Rmt 14910.00
ii) 7.90 mm Rmt 16581.00
iii) 8.70 mm Rmt 18250.00
iv) 9.50 mm Rmt 19917.00
v) 10.00 mm Rmt 20957.00
vi) 12.00 mm Rmt 25114.00
y) Dia. of pipe 1473.00. mm (O. D.)
Thickness of pipe :
i) 9.50 mm Rmt 20637.00
ii) 9.98 mm Rmt 21672.00
z) Dia. of pipe 1524.00. mm (O. D.)
Thickness of pipe :
i) 7.10 mm Rmt 15986.00
Section-I-(XV)-M.S.PIPES 160
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
ii) 7.90 mm Rmt 17777.00
iii) 8.70 mm Rmt 19567.00
iv) 9.50 mm Rmt 21355.00
v) 10.00 mm Rmt 22472.00
vi) 11.90 mm Rmt 26708.00
vii) 12.00 mm Rmt 26930.00
aa) Dia. of pipe 1550.00. mm (O. D.)
Thickness of pipe :
i) 10.00 mm Rmt 22858.00
ii) 11.00 mm Rmt 25127.00
ab) Dia. of pipe 1576.00. mm (O. D.)
Thickness of pipe :
i) 9.50 mm Rmt 22089.00
ii) 10.00 mm Rmt 23243.00
ac) Dia. of pipe 1626.00. mm (O. D.)
Thickness of pipe :
i) 7.10 mm Rmt 17060.00
ii) 7.90 mm Rmt 18973.00
iii) 8.70 mm Rmt 20885.00
iv) 9.50 mm Rmt 22793.00
v) 10.00 mm Rmt 23985.00
vi) 12.00 mm Rmt 28748.00
ad) Dia. of pipe 1650.00. mm (O. D.)
Thickness of pipe :
i) 7.90 mm Rmt 19254.00
ii) 8.70 mm Rmt 21194.00
iii) 9.50 mm Rmt 23132.00
iv) 10.00 mm Rmt 24342.00
v) 12.00 mm Rmt 29175.00
ae) Dia. of pipe 1700.00. mm (O. D.)
Thickness of pipe :
i) 7.90 mm Rmt 19841.00
ii) 8.70 mm Rmt 21840.00
Section-I-(XV)-M.S.PIPES 161
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
iii) 9.50 mm Rmt 23837.00
iv) 10.00 mm Rmt 25084.00
v) 12.00 mm Rmt 30065.00
af) Dia. of pipe 1750.00. mm (O. D.)
Thickness of pipe :
i) 7.90 mm Rmt 20427.00
ii) 8.70 mm Rmt 22485.00
iii) 9.50 mm Rmt 24542.00
iv) 10.00 mm Rmt 25826.00
v) 12.00 mm Rmt 30956.00
ag) Dia. of pipe 1800.00. mm (O. D.)
Thickness of pipe :
i) 7.90 mm Rmt 21013.00
ii) 8.70 mm Rmt 23131.00
iii) 9.50 mm Rmt 25247.00
iv) 10.00 mm Rmt 26569.00
v) 12.00 mm Rmt 31846.00
ah Dia. of pipe 1850.00. mm (O. D.)
Thickness of pipe :
i) 7.90 mm Rmt 21599.00
ii) 8.70 mm Rmt 23777.00
iii) 9.50 mm Rmt 25951.00
iv) 10.00 mm Rmt 27310.00
v) 12.00 mm Rmt 32737.00
ai) Dia. of pipe 1900.00. mm (O. D.)
Thickness of pipe :
i) 7.90 mm Rmt 22186.00
ii) 8.70 mm Rmt 24422.00
iii) 9.50 mm Rmt 26658.00
iv) 10.00 mm Rmt 28053.00
v) 12.00 mm Rmt 33627.00
aj) Dia. of pipe 1950.00. mm (O. D.)
Thickness of pipe :
Section-I-(XV)-M.S.PIPES 162
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
i) 7.90 mm Rmt 22773.00
ii) 8.70 mm Rmt 25068.00
iii) 9.50 mm Rmt 27362.00
iv) 10.00 mm Rmt 28795.00
v) 12.00 mm Rmt 34517.00
ak) Dia. of pipe 2000.00. mm (O. D.)
Thickness of pipe :
i) 7.90 mm Rmt 23359.00
ii) 8.70 mm Rmt 25713.00
iii) 9.50 mm Rmt 28067.00
iv) 10.00 mm Rmt 29537.00
v) 12.00 mm Rmt 35408.00
al) Dia. of pipe 2050.00. mm (O. D.)
Thickness of pipe :
i) 7.90 mm Rmt 23946.00
ii) 8.70 mm Rmt 26359.00
iii) 9.50 mm Rmt 28771.00
iv) 10.00 mm Rmt 30279.00
v) 12.00 mm Rmt 36299.00
am) Dia. of pipe 2100.00. mm (O. D.)
Thickness of pipe :
i) 7.90 mm Rmt 24530.00
ii) 8.70 mm Rmt 27005.00
iii) 9.50 mm Rmt 29477.00
iv) 10.00 mm Rmt 31021.00
v) 12.00 mm Rmt 37190.00
an) Dia. of pipe 2150.00. mm (O. D.)
Thickness of pipe :
i) 7.90 mm Rmt 25117.00
ii) 8.70 mm Rmt 27651.00
iii) 9.50 mm Rmt 30181.00
iv) 10.00 mm Rmt 31763.00
v) 12.00 mm Rmt 38080.00
ao) Dia. of pipe 2200.00. mm (O. D.)
Thickness of pipe :
Section-I-(XV)-M.S.PIPES 163
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
i) 7.90 mm Rmt 25703.00
ii) 8.70 mm Rmt 28297.00
iii) 9.50 mm Rmt 30887.00
iv) 10.00 mm Rmt 32505.00
v) 12.00 mm Rmt 38970.00
ap) Dia. of pipe 2250.00. mm (O. D.)
Thickness of pipe :
i) 7.90 mm Rmt 26290.00
ii) 8.70 mm Rmt 28942.00
iii) 9.50 mm Rmt 31592.00
iv) 10.00 mm Rmt 33247.00
v) 12.00 mm Rmt 39861.00
aq) Dia. of pipe 2300.00. mm (O. D.)
Thickness of pipe :
i) 7.90 mm Rmt 26877.00
ii) 8.70 mm Rmt 29587.00
iii) 9.50 mm Rmt 32297.00
iv) 10.00 mm Rmt 33990.00
v) 12.00 mm Rmt 40751.00
ar) Dia. of pipe 2350.00. mm (O. D.)
Thickness of pipe :
i) 7.90 mm Rmt 27462.00
ii) 8.70 mm Rmt 30233.00
iii) 9.50 mm Rmt 33002.00
iv) 10.00 mm Rmt 34731.00
v) 12.00 mm Rmt 41643.00
as) Dia. of pipe 2400.00. mm (O. D.)
Thickness of pipe :
i) 7.90 mm Rmt 28049.00
ii) 8.70 mm Rmt 30879.00
iii) 9.50 mm Rmt 33707.00
iv) 10.00 mm Rmt 35474.00
v) 12.00 mm Rmt 42533.00
Section-I-(XV)-M.S.PIPES 164
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
at) Dia. of pipe 2450.00. mm (O. D.)
Thickness of pipe :
i) 7.90 mm Rmt 28635.00
ii) 8.70 mm Rmt 31525.00
iii) 9.50 mm Rmt 34413.00
iv) 10.00 mm Rmt 36215.00
v) 12.00 mm Rmt 43424.00
au) Dia. of pipe 2500.00. mm (O. D.)
Thickness of pipe :
i) 7.90 mm Rmt 29222.00
ii) 8.70 mm Rmt 32170.00
iii) 9.50 mm Rmt 35117.00
iv) 10.00 mm Rmt 36959.00
v) 12.00 mm Rmt 44314.00
vi) 16.00 mm Rmt 58990.00
2 Manufacturing, providing and
supplying spirally welded / ERW/
SAW / fabricated M. S. pipes
(Commercial Quality) including
procurements of plates, gas cutting
to required size rolling, tack
welding assembling in suitable
lengths to form pipes, welding on
automatic welding machine and
forming ‘V’ edge on both ends of
pipes including all taxes (Central
and local), railway freight,
insurance unloading from railway
wagon, loading into truck,
transport to stores / site,
unloading, stacking, etc, complete
as per IS - 3589 and IS-5504 as
applicable as per specifications (No
negative tolerance in thickness is
permissible).
a) Dia. of pipe 200.00 mm (I. D.)
Thickness of pipe :
i) 5.00 mm Rmt 1522.00
Section-I-(XV)-M.S.PIPES 165
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
ii) 6.00 mm Rmt 1829.00
iii) 7.00 mm Rmt 2151.00
iv) 8.00 mm Rmt 2470.00
v) 9.00 mm Rmt 2792.00
vi) 10.00 mm Rmt 3117.00
b) Dia. of pipe 250.00 mm (I. D.)
Thickness of pipe :
i) 5.00 mm Rmt 1892.00
ii) 6.00 mm Rmt 2280.00
iii) 7.00 mm Rmt 2670.00
iv) 8.00 mm Rmt 3063.00
v) 9.00 mm Rmt 3460.00
vi) 10.00 mm Rmt 3859.00
c) Dia. of pipe 300.00 mm (I. D.)
Thickness of pipe :
i) 5.00 mm Rmt 2264.00
ii) 6.00 mm Rmt 2725.00
iii) 7.00 mm Rmt 3190.00
iv) 8.00 mm Rmt 3657.00
v) 9.00 mm Rmt 4129.00
vi) 10.00 mm Rmt 4601.00
d) Dia. of pipe 350.00 mm (I. D.)
Thickness of pipe :
i) 5.00 mm Rmt 2634.00
ii) 6.00 mm Rmt 3170.00
iii) 7.00 mm Rmt 3709.00
iv) 8.00 mm Rmt 4250.00
v) 9.00 mm Rmt 4795.00
vi) 10.00 mm Rmt 5344.00
e) Dia. of pipe 400.00 mm (I. D.)
Thickness of pipe :
i) 5.00 mm Rmt 3006.00
ii) 6.00 mm Rmt 3616.00
iii) 7.00 mm Rmt 4229.00
Section-I-(XV)-M.S.PIPES 166
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
iv) 8.00 mm Rmt 4845.00
v) 9.00 mm Rmt 5464.00
vi) 10.00 mm Rmt 6085.00
f) Dia. of pipe 450.00 mm (I. D.)
Thickness of pipe :
i) 5.00 mm Rmt 3376.00
ii) 6.00 mm Rmt 4060.00
iii) 7.00 mm Rmt 4748.00
iv) 8.00 mm Rmt 5439.00
v) 9.00 mm Rmt 6131.00
vi) 10.00 mm Rmt 6828.00
g) Dia. of pipe 500.00 mm (I. D.)
Thickness of pipe :
i) 5.00 mm Rmt 3748.00
ii) 6.00 mm Rmt 4506.00
iii) 7.00 mm Rmt 5268.00
iv) 8.00 mm Rmt 6032.00
v) 9.00 mm Rmt 6800.00
vi) 10.00 mm Rmt 7570.00
h) Dia. of pipe 550.00 mm (I. D.)
Thickness of pipe :
i) 5.00 mm Rmt 4119.00
ii) 6.00 mm Rmt 4951.00
iii) 7.00 mm Rmt 5787.00
iv) 8.00 mm Rmt 6626.00
v) 9.00 mm Rmt 7468.00
vi) 10.00 mm Rmt 8313.00
i) Dia. of pipe 600.00 mm (I. D.)
Thickness of pipe :
i) 5.00 mm Rmt 4490.00
ii) 6.00 mm Rmt 5397.00
iii) 7.00 mm Rmt 6307.00
iv) 8.00 mm Rmt 7220.00
v) 9.00 mm Rmt 8135.00
Section-I-(XV)-M.S.PIPES 167
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
vi) 10.00 mm Rmt 9054.00
vii) 12.00 mm Rmt 10901.00
j) Dia. of pipe 650.00 mm (I. D.)
Thickness of pipe :
i) 5.00 mm Rmt 4862.00
ii) 6.00 mm Rmt 5841.00
iii) 7.00 mm Rmt 6826.00
iv) 8.00 mm Rmt 7813.00
v) 9.00 mm Rmt 8804.00
vi) 10.00 mm Rmt 9797.00
vii) 12.00 mm Rmt 11792.00
k) Dia. of pipe 700.00 mm (I. D.)
Thickness of pipe :
i) 5.00 mm Rmt 5232.00
ii) 6.00 mm Rmt 6288.00
iii) 7.00 mm Rmt 7346.00
iv) 8.00 mm Rmt 8408.00
v) 9.00 mm Rmt 9471.00
vi) 10.00 mm Rmt 10538.00
vii) 12.00 mm Rmt 12682.00
l) Dia. of pipe 750.00 mm (I. D.)
Thickness of pipe :
i) 5.00 mm Rmt 5604.00
ii) 6.00 mm Rmt 6734.00
iii) 7.00 mm Rmt 7866.00
iv) 8.00 mm Rmt 9001.00
v) 9.00 mm Rmt 10140.00
vi) 10.00 mm Rmt 11281.00
vii) 12.00 mm Rmt 13572.00
m) Dia. of pipe 800.00 mm (I. D.)
Thickness of pipe :
i) 5.00 mm Rmt 5974.00
ii) 6.00 mm Rmt 7179.00
iii) 7.00 mm Rmt 8384.00
Section-I-(XV)-M.S.PIPES 168
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
iv) 8.00 mm Rmt 9595.00
v) 9.00 mm Rmt 10807.00
vi) 10.00 mm Rmt 12024.00
vii) 12.00 mm Rmt 14463.00
n) Dia. of pipe 850.00 mm (I. D.)
Thickness of pipe :
i) 5.00 mm Rmt 6346.00
ii) 6.00 mm Rmt 7624.00
iii) 7.00 mm Rmt 8905.00
iv) 8.00 mm Rmt 10189.00
v) 9.00 mm Rmt 11475.00
vi) 10.00 mm Rmt 12765.00
vii) 12.00 mm Rmt 15353.00
o) Dia. of pipe 900.00 mm (I. D.)
Thickness of pipe :
i) 5.00 mm Rmt 6717.00
ii) 6.00 mm Rmt 8069.00
iii) 7.00 mm Rmt 9424.00
iv) 8.00 mm Rmt 10782.00
v) 9.00 mm Rmt 12143.00
vi) 10.00 mm Rmt 13508.00
vii) 12.00 mm Rmt 16244.00
p) Dia. of pipe 950.00 mm (I. D.)
Thickness of pipe :
i) 5.00 mm Rmt 7088.00
ii) 6.00 mm Rmt 8515.00
iii) 7.00 mm Rmt 9943.00
iv) 8.00 mm Rmt 11376.00
v) 9.00 mm Rmt 12811.00
vi) 10.00 mm Rmt 14249.00
vii) 12.00 mm Rmt 17134.00
q) Dia. of pipe 1000.00 mm (I. D.)
Thickness of pipe :
i) 5.00 mm Rmt 7458.00
Section-I-(XV)-M.S.PIPES 169
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
ii) 6.00 mm Rmt 8959.00
iii) 7.00 mm Rmt 10463.00
iv) 8.00 mm Rmt 11970.00
v) 9.00 mm Rmt 13479.00
vi) 10.00 mm Rmt 14992.00
vii) 12.00 mm Rmt 18026.00
r) Dia. of pipe 1050.00 mm (I. D.)
Thickness of pipe :
i) 5.00 mm Rmt 7830.00
ii) 6.00 mm Rmt 9405.00
iii) 7.00 mm Rmt 10983.00
iv) 8.00 mm Rmt 12563.00
v) 9.00 mm Rmt 14147.00
vi) 10.00 mm Rmt 15733.00
vii) 12.00 mm Rmt 18916.00
s) Dia. of pipe 1100.00 mm (I. D.)
Thickness of pipe :
i) 5.00 mm Rmt 8201.00
ii) 6.00 mm Rmt 9850.00
iii) 7.00 mm Rmt 11501.00
iv) 8.00 mm Rmt 13157.00
v) 9.00 mm Rmt 14815.00
vi) 10.00 mm Rmt 16476.00
vii) 12.00 mm Rmt 19808.00
t) Dia. of pipe 1150.00 mm (I. D.)
Thickness of pipe :
i) 5.00 mm Rmt 8572.00
ii) 6.00 mm Rmt 10296.00
iii) 7.00 mm Rmt 12021.00
iv) 8.00 mm Rmt 13751.00
v) 9.00 mm Rmt 15483.00
vi) 10.00 mm Rmt 17218.00
vii) 12.00 mm Rmt 20698.00
Section-I-(XV)-M.S.PIPES 170
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
u) Dia. of pipe 1200.00 mm (I. D.)
Thickness of pipe :
i) 5.00 mm Rmt 8942.00
ii) 6.00 mm Rmt 10740.00
iii) 7.00 mm Rmt 12541.00
iv) 8.00 mm Rmt 14344.00
v) 9.00 mm Rmt 16151.00
vi) 10.00 mm Rmt 17960.00
vii) 12.00 mm Rmt 21588.00
v) Dia. of pipe 1250.00 mm (I. D.)
Thickness of pipe :
i) 6.00 mm Rmt 11186.00
ii) 7.00 mm Rmt 13061.00
iii) 8.00 mm Rmt 14938.00
iv) 9.00 mm Rmt 16819.00
v) 10.00 mm Rmt 18702.00
vi) 12.00 mm Rmt 22479.00
w) Dia. of pipe 1300.00 mm (I. D.)
Thickness of pipe :
i) 6.00 mm Rmt 11632.00
ii) 7.00 mm Rmt 13579.00
iii) 8.00 mm Rmt 15531.00
iv) 9.00 mm Rmt 17487.00
v) 10.00 mm Rmt 19444.00
vi) 12.00 mm Rmt 23369.00
x) Dia. of pipe 1350.00 mm (I. D.)
Thickness of pipe :
i) 7.00 mm Rmt 14100.00
ii) 8.00 mm Rmt 16126.00
iii) 9.00 mm Rmt 18155.00
iv) 10.00 mm Rmt 20186.00
v) 12.00 mm Rmt 24260.00
Section-I-(XV)-M.S.PIPES 171
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
y) Dia. of pipe 1400.00 mm (I. D.)
Thickness of pipe :
i) 7.00 mm Rmt 14619.00
ii) 8.00 mm Rmt 16720.00
iii) 9.00 mm Rmt 18822.00
iv) 10.00 mm Rmt 20928.00
v) 12.00 mm Rmt 25150.00
z) Dia. of pipe 1450.00 mm (I. D.)
Thickness of pipe :
i) 7.00 mm Rmt 15138.00
ii) 8.00 mm Rmt 17313.00
iii) 9.00 mm Rmt 19490.00
iv) 10.00 mm Rmt 21672.00
v) 12.00 mm Rmt 26041.00
aa) Dia. of pipe 1500.00 mm (I. D.)
Thickness of pipe :
i) 7.00 mm Rmt 15659.00
ii) 8.00 mm Rmt 17907.00
iii) 9.00 mm Rmt 20159.00
iv) 10.00 mm Rmt 22414.00
v) 12.00 mm Rmt 26931.00
ab) Dia. of pipe 1550.00 mm (I. D.)
Thickness of pipe :
i) 7.00 mm Rmt 16178.00
ii) 8.00 mm Rmt 18501.00
iii) 9.00 mm Rmt 20826.00
iv) 10.00 mm Rmt 23156.00
v) 12.00 mm Rmt 27822.00
ac) Dia. of pipe 1600.00 mm (I. D.)
Thickness of pipe :
i) 7.00 mm Rmt 16697.00
ii) 8.00 mm Rmt 19094.00
iii) 9.00 mm Rmt 21495.00
iv) 10.00 mm Rmt 23898.00
v) 12.00 mm Rmt 28712.00
Section-I-(XV)-M.S.PIPES 172
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
ad) Dia. of pipe 1650.00 mm (I. D.)
Thickness of pipe :
i) 8.00 mm Rmt 19688.00
ii) 9.00 mm Rmt 22161.00
iii) 10.00 mm Rmt 24640.00
iv) 12.00 mm Rmt 29602.00
ae) Dia. of pipe 1700.00 mm (I. D.)
Thickness of pipe :
i) 8.00 mm Rmt 20281.00
ii) 9.00 mm Rmt 22830.00
iii) 10.00 mm Rmt 25382.00
iv) 12.00 mm Rmt 30493.00
af) Dia. of pipe 1750.00 mm (I. D.)
Thickness of pipe :
i) 8.00 mm Rmt 20875.00
ii) 9.00 mm Rmt 23499.00
iii) 10.00 mm Rmt 26124.00
iv) 12.00 mm Rmt 31384.00
ag) Dia. of pipe 1800.00 mm (I. D.)
Thickness of pipe :
i) 8.00 mm Rmt 21469.00
ii) 9.00 mm Rmt 24166.00
iii) 10.00 mm Rmt 26866.00
iv) 12.00 mm Rmt 32276.00
ah) Dia. of pipe 1850.00 mm (I. D.)
Thickness of pipe :
i) 8.00 mm Rmt 22062.00
ii) 9.00 mm Rmt 24835.00
iii) 10.00 mm Rmt 27609.00
iv) 12.00 mm Rmt 33166.00
ai) Dia. of pipe 1900.00 mm (I. D.)
Thickness of pipe :
i) 8.00 mm Rmt 22656.00
Section-I-(XV)-M.S.PIPES 173
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
ii) 9.00 mm Rmt 25502.00
iii) 10.00 mm Rmt 28350.00
iv) 12.00 mm Rmt 34057.00
aj) Dia. of pipe 1950.00 mm (I. D.)
Thickness of pipe :
i) 8.00 mm Rmt 23251.00
ii) 9.00 mm Rmt 26170.00
iii) 10.00 mm Rmt 29093.00
iv) 12.00 mm Rmt 34947.00
ak) Dia. of pipe 2000.00 mm (I. D.)
Thickness of pipe :
i) 8.00 mm Rmt 23844.00
ii) 9.00 mm Rmt 26837.00
iii) 10.00 mm Rmt 29834.00
iv) 12.00 mm Rmt 35838.00
v) 16.00 mm Rmt 47878.00
al) Dia. of pipe 2050.00 mm (I. D.)
Thickness of pipe :
i) 8.00 mm Rmt 24438.00
ii) 9.00 mm Rmt 27506.00
iii) 10.00 mm Rmt 30577.00
iv) 12.00 mm Rmt 36728.00
v) 16.00 mm Rmt 49066.00
am) Dia. of pipe 2100.00 mm (I. D.)
Thickness of pipe :
i) 8.00 mm Rmt 25032.00
ii) 9.00 mm Rmt 28174.00
iii) 10.00 mm Rmt 31319.00
iv) 12.00 mm Rmt 37618.00
v) 16.00 mm Rmt 50253.00
an) Dia. of pipe 2150.00 mm (I. D.)
Thickness of pipe :
i) 8.00 mm Rmt 25625.00
Section-I-(XV)-M.S.PIPES 174
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
ii) 9.00 mm Rmt 28842.00
iii) 10.00 mm Rmt 32061.00
iv) 12.00 mm Rmt 38509.00
v) 16.00 mm Rmt 51440.00
ao) Dia. of pipe 2200.00 mm (I. D.)
Thickness of pipe :
i) 8.00 mm Rmt 26219.00
ii) 9.00 mm Rmt 29509.00
iii) 10.00 mm Rmt 32804.00
iv) 12.00 mm Rmt 39399.00
v) 16.00 mm Rmt 52627.00
ap) Dia. of pipe 2250.00 mm (I. D.)
Thickness of pipe :
i) 8.00 mm Rmt 26813.00
ii) 9.00 mm Rmt 30177.00
iii) 10.00 mm Rmt 33545.00
iv) 12.00 mm Rmt 40290.00
v) 16.00 mm Rmt 53815.00
aq) Dia. of pipe 2300.00 mm (I. D.)
Thickness of pipe :
i) 8.00 mm Rmt 27407.00
ii) 9.00 mm Rmt 30846.00
iii) 10.00 mm Rmt 34288.00
iv) 12.00 mm Rmt 41180.00
v) 16.00 mm Rmt 55002.00
ar) Dia. of pipe 2350.00 mm (I. D.)
Thickness of pipe :
i) 8.00 mm Rmt 28001.00
ii) 9.00 mm Rmt 31514.00
iii) 10.00 mm Rmt 35029.00
iv) 12.00 mm Rmt 42072.00
v) 16.00 mm Rmt 56190.00
Section-I-(XV)-M.S.PIPES 175
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
as) Dia. of pipe 2400.00 mm (I. D.)
Thickness of pipe :
i) 8.00 mm Rmt 28594.00
ii) 9.00 mm Rmt 32182.00
iii) 10.00 mm Rmt 35772.00
iv) 12.00 mm Rmt 42962.00
v) 16.00 mm Rmt 57379.00
at) Dia. of pipe 2450.00 mm (I. D.)
Thickness of pipe :
i) 8.00 mm Rmt 29188.00
ii) 9.00 mm Rmt 32849.00
iii) 10.00 mm Rmt 36514.00
iv) 12.00 mm Rmt 43853.00
v) 16.00 mm Rmt 58566.00
au) Dia. of pipe 2500.00 mm (I. D.)
Thickness of pipe :
i) 8.00 mm Rmt 29782.00
ii) 9.00 mm Rmt 33517.00
iii) 10.00 mm Rmt 37257.00
iv) 12.00 mm Rmt 44743.00
v) 16.00 mm Rmt 59753.00
Section-I-(XV)-M.S.PIPES 176
Sr No Item Description Unit
Major Works
1 Fabricating pipes from steel plates
supplied free of cost and stacking
the same in the fabricator’s yard.
The rate to include cutting the
plate, rolling, tack welding,
assembling in suitable lengths to
form pipes, welding on automatic
welding machines and forming ‘V’
edge for both ends of pipe.
Without
E.D.
5 to 8 mm MT 9005.00
8 to 12 mm MT 7062.00
12 to 16 mm MT 5297.00
16 to 20 mm MT 4767.00
20 to 25 mm MT 4590.00
2 Fabricating one piece cants, short
pipes (shorter than one strake
length) from the steel plates
supplied free of cost and stacking
the same in fabricator’s yard. The
rate to include cutting the plates,
rolling, tack welding either on
automatic welding machine or
manually and forming ‘V’ edge to
both ends of pipes :
5 to 8 mm MT 12359.00
8 to 12 mm MT 8121.00
12 to 25 mm MT 5827.00
3 Fabricating composite bends from
steel plates supplied free of cost
and stacking the same in the
fabricator’s yard. The rate to
include cutting the plates, rolling,
tacking drums, assembling the
same form bend of suitable length,
welding either on automatic
welding machine or manually and
Section - I- (XVI) - FABRICATION OF M.S.PIPES & SPECIALS
Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
Section-I-(XVI)-FABRICATION OF M.S.PIPES AND SPECIALS 177
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
forming ‘V’ edge to both ends of
bend but the rate excluding the
circumferential butt welding
required for assembling cants to
form necessary composite bend.
Circumferential butt welding will
be paid seperately under section
XVI of Item No. 7-A. However, the
rate under this item will include
the cost of longitudinal butt
welding of pipes strakes.
5 to 8 mm MT 14830.00
8 to 12 mm MT 9887.00
12 to 16mm MT 7768.00
16 to 25 mm MT 7239.00
4 Fabricating tapers from the steel
plates, supplied free of cost and
stacking the same in the
fabricator’s yard. The rate to
include cutting the plates, rolling,
tack welding, welding either on
automatic welding machine or
manually and forming ‘V’ edge to
both ends of tapers but the rate
excludes circumferential butt
welding required for assembling
drums to form necessary tapers.
Circumferential butt welding will
be paid for under section XVI of
Item No. 7-A. Howerver, the rate
under this includes the
longitudinal butt welding to form
drums The rate shall also include
the cost of fabrication of stifferner
rings and gussets and mounting
the same on tapers, tack and
chain welding, etc. as directed by
Engineer-in-charge.
MT 11476.00
Section-I-(XVI)-FABRICATION OF M.S.PIPES AND SPECIALS 178
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
5 Fabricating specials and fixtures
from steel materials supplied free
of cost (welding will be paid
separately except for category vi (a)
and (b) below. The weight for
payment under this item shall be
calculated on the basis of finished
material neglecting the bolt holes
wherever provided.)
i) Saddle pieces, loose stiffener rings,
pressure type blank flanges,
ladders, platforms, and any other
minor fixtures. The rate to include
cutting, bending, tack welding, etc.
complete
MT 4590.00
ii) ‘Y’ branches, ‘T’ branches. The rate
to include cutting, bending, tack
welding etc. complete.
MT 9711.00
iii) Dished closures such as domes.
The rate to include cutting, cold
pressing and tack welding etc.
complete
MT 15007.00
iv) Dished closures such as manhole
cover. The rate to include cutting
cold pressing and tack welding
only. The rate also to include
drilling holes including grinding
wherever nesessary, with supply of
bolts, nuts, washers, etc. complete
as per drawing
MT 16067.00
v) Flat manhole covers. The rate to
include cutting, tack welding. The
rate also to include drilling holes
including grinding
Section-I-(XVI)-FABRICATION OF M.S.PIPES AND SPECIALS 179
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
wherever necessary with supply of
bolts, nuts, washers, etc.complete
as per drawing.
MT 10417.00
vi) a) Flange rings below 40 mm. thick.
The rate to include gas cutting,
tack welding to form ring, drilling
holes including grinding wherever
necessary etc. complete.
MT 16949.00
b) Flange rings 40 mm and above
thick. The rate to in clude gas
cutting, tack welding to form ring,
drilling holes including grinding
wherever necessary etc. complete.
MT 22069.00
vii) a) Machining of flange ring for cut
upto 2 mm.including handling,
assembling, alignment the ring on
machine, etc. complete as directed
by Engineer-in-charge
i) for thickness of flange ring below
40 mm.
sqm 971.00
ii) for thickness of flange ring 40 mm.
and above.
sqm 1483.00
b) Machining offlange ringe for
cutupto 2 mm. : Extraover and
above (vii)(a) for machining beyond
2 mm. forevery additional cutof 2
mm. or partthereof.
sqm 741.00
i) Machining offlange ringe for
cutupto 2 mm. : Extraover and
above (vii)(a) for machining
sqm 3531.00
Section-I-(XVI)-FABRICATION OF M.S.PIPES AND SPECIALS 180
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
ii) Machining offlange ringe for
cutupto 2 mm. : Extraover and
above (vii)(a) for machining
Each 67.00
6 Providing, fabricating and fixing
expansion joints for pipelines as
per the drawing. The rate to
include machining the strakes and
steel ring as shown in the drawing
and welding on either automatic
welding machine or manually, Rate
includes plates and flats required
for expansion joint and all other
materials such as synthetic
rubber, rubber ring, etc. complete.
including packing as per
specifications, grease, bolts and
nuts, etc. including local handling,
all types of taxes and duties etc.
complete.
Expansion joints suitable for pipe
diameters.
i) 300mm. dia. each 21887.00
ii) 400 mm. dia. each 31585.00
iii) 450 mm. dia. each 41085.00
iv) 500 mm. Dia each 55084.00
v) 600 mm. dia. each 64711.00
vi) 700 mm. dia. each 80556.00
vii) 750 mm. dia. each 88773.00
viii) 800 mm. dia. each 103312.00
ix) 900 mm. dia. each 119952.00
x) 1000 mm. dia. each 143629.00
xi) 1200mm. dia. each 190757.00
7 Fabricating ring girder as per
drawing and specifications from
M.S. channels, flats, plates, etc.
supplied free of cost and
assembling the same on the ring
girder strake and tack
Section-I-(XVI)-FABRICATION OF M.S.PIPES AND SPECIALS 181
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
welding as per directions.
MT 5827.00
8 Fabricating ring girder supports
(stools) as per drawing and
specifications complete with top
plates, base plates, side flats for
fixing rollers wherever nescessary,
grease box covers, rag bolts, grid
road etc. from steel material
supplied free of cost and stacking
the same in fabricators yard.
MT 7945.00
9 Fabricating and assembling M.S.
roller as per drawing. The rate to
include machining, assembling
and fixing the same to the side
flats provided below the top plates
of R.C. supports (stools) greasing
including providing anti-theft
measures M.S. rounds will be
supplied free of cost. All other
materials such as bright stainless
steel pins etc. shall be supplied by
the fabricator at his cost.
MT 17293.00
10 Blast cleaning the surface of the
old or new pipeline internally to
remove all rust etc. complete,
including providing sand,
machinery, labour, cutting of pipes
at required places and rewelding
the same etc, complete as directed
by Engineer-in-charge. (Pipes
pieces if required for rewelding of
old pipeline shall be paid
separately.)
sqm 77.00
Section-I-(XVI)-FABRICATION OF M.S.PIPES AND SPECIALS 182
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
11 Blast Cleaning of old or new
pipeline surface internally with
mechanical cleaning machine
having steel scraper blades with
required passes including
removing all rust, scaling etc.
including cutting of pipes at
required places, rewelding the
same incuding cost of all materials
and labour, etc, complete (Pipes
pieces if required for rewelding of
old pipeline shall be paid
separately.)
MT 77.00
12 Blast Cleaning of old pipeline
surface internally by using
swabbing method by passing
polyurethane foam “Pig” with
required hydraulic pressure,
cutting of pipes at required places,
rewelding the same including cost
of all materials and labour, etc.
complete. (Pipe pieces if required
for rewelding of old pipeline shall
be paid separately.)
Note:- Water for this purpose shall
be supplied by the department free
of cost at fixed point within 5 km
lead and all arrangements for
filling section and creating
hydraulic pressure on polyrethene
pig shall be done by contractor at
his own cost.
Sqm 91.00
13 Blast cleaning the surface of the
old or new pipeline externally to
remove all rust including providing
sand machinery. etc. complete as
directed by Engineer-in-charge.
Sqm 91.00
Section-I-(XVI)-FABRICATION OF M.S.PIPES AND SPECIALS 183
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
14 Providing and applying primer and
one coat of red oxide of iron paint,
internally, to blast cleaned surface
of the pipes.
Sqm 25.00
15 Providing and applying primer and
one coat of red oxide of iron paint,
internally, including cleaning the
surface of the pipes with steel
scrappers, wire brushes, and metal
cleaning solution, etc.
Sqm 43.00
16 Fabricating and fixing insulated
flange rings assembly as per
drawing from steel material,
supplied free of cost. The rate to
include fabrication of tail pipe
(about 0.6 M long) fabrications of
flange rings, machining, drilling
holes, including grinding wherever
necessary and welding, The rate
above to include nuts, bolts,
washers, etc. but shall not include
supply and fixing of backbite/PVC
rings, cylinders and rubber
packing.
i) From 300mm.Upto 450mm. dia. Each 2138.00
ii) Above 450 mm.Upto 750 mm. dia. Each 4155.00
iii) Above 750 mm.Upto 1000 mm.
dia.
Each 6184.00
iv) Above 1000 mm.Upto 1250 mm.
dia.
Each 10817.00
v) Above 1250 mm.Upto 1500 mm.
dia.
Each 14722.00
vi) Above 1750 mm.Upto 2000 mm.
dia.
Each 17999.00
Section-I-(XVI)-FABRICATION OF M.S.PIPES AND SPECIALS 184
Sr No Item Description UnitRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
17 Providing and applying primer and
one coat of red oxide of iron paint,
externally, to blast cleaned surface
of the pipes.
Sqm 27.50
18 Providing and applying primer and
one coat of red oxide of iron paint,
externally, including cleaning the
surface of the pipes with steel
scrappers, wire brushes, and metal
cleaning solution, etc.
Sqm 60.00
19 Providing and applying covering
coat of grey graphite of approved
quality including dusting the
surface etc. complete.
Sqm 31.00
20 Providing and applying one coat of
zinc rich epoxy primer to the
internal surface of pipe line at site.
Sqm 66.00
21 Providing and applying primer first
coat of intertol 49 W emaline
05/58 pipe coat or any other
equivalent approved paint to the
internal surface of pipe line at site.
Sqm 50.00
b) Second coat Sqm 41.00
c)Third coat Sqm 40.00
Section-I-(XVI)-FABRICATION OF M.S.PIPES AND SPECIALS 185
Sr No Item Description Unit
1 Lowering laying in position to
correct line and level including M.
S. pipes with / without any
outcoating on pedestals or chairs
upon prepared formation. The rate
to include loading, unloading
hoisting, marginal cutting
wherever required, assembling and
tack welding, and transporatation
upto 500 M. etc. completed as
specified.
5 mm to 8 mmthick.
i) Upto 250 mm. dia. Rmt 282.00
ii) Above 250 mm.Upto 500 mm. dia. Rmt 332.00
iii) Above 500 mm.Upto 750 mm. dia. Rmt 381.00
iv) Above 750 mm.Upto 1000 mm. dia Rmt 431.00
v) Above 1000 mm.Upto 1250 mm.
dia.
Rmt 482.00
8 mm to 12 mm thick.
i) From 750 mm. Upto1000 mm. dia. Rmt 574.00
ii) Above 1000 mm.Upto l250 mm.
dia
Rmt 640.00
iii) Above 1250 mm.Upto 1500 mm.
Dia
Rmt 706.00
iv) Above 1500 mmUpto 1750 mm.
dia
Rmt 774.00
v) Above 1750 mm.Upto 2000 mm
dia
Rmt 840.00
vi) Above 2000 mm.upto 2250 mm dia Rmt 906.00
vii) Above 2250 mm.upto 2500 mm dia Rmt 974.00
12 mm to 16 mm thick.
i) From 2000 mm Upto2250 mm dia Rmt 864.00
Section - I- (XVII) - M.S.PIPES LAYINGRate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
Section-I-(XVII)-M.S.PIPES LAYING 186
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
ii) Above 2250 rnm.Uplo 2500 mm
dia.
Rmt 932.00
iii) Above 2500 mmUpto 2750 mm dia Rmt 996.00
iv) Above 2750 mm.Upto 3000 mm.
dia.
Rmt 1060.00
v) Above 3000 mm.upto 3250 mm
dia.
Rmt 1124.00
vi) Above 3250 mm.Upto 3500 mm
dia
Rmt 1189.00
16 mm to 20 mm thick.
i) From 2500 mm Upto 2750 mm dia Rmt 1306.00
ii) Above 2750 mmUpto 3000 mm dia Rmt 1378.00
iii) Above 3000 mmupto 3250 mm dia Rmt 1450.00
iv) Above 3250 mmUpto 3500 mm did Rmt 1522.00
v) Above 3500 mmUpto 3750 mm dia Rmt 1595.00
vi) Above 3750 mmupto 4000 mm dia Rmt 1668.00
20 mm to 25 mm thick.
i) Above 3500 mmUpto 3750 mm dia Rmt 1778.00
ii) Above 3750 mmupto 4000 mm dia Rmt 1880.00
2 Lowering laying in position to
correct line and level including M.
S. specials with / without any
outcoating such as distance pieces,
straps, bends, tapers, etc. on
pedestals or chairs upon
formation. The rate to include
loading, unloading hoisting,
marginal cutting wherever
required, assembling and tack
welding, and transportation upto
500M etc. complete.
Section-I-(XVII)-M.S.PIPES LAYING 187
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
a) 5 mm to 8 mm thick.
i) Upto 250 mm. dia. Rmt 394.00
ii) Above 250 mm.Upto 500 mm. dia. Rmt 462.00
iii) Above 500 mm.Upto 750 mm. dia. Rmt 534.00
iv) Above 750 mm.Upto 1000 mm.
dia.
Rmt 603.00
v) Above 1000 mm.Upto 1250 mm.
dia.
Rmt 673.00
8 mm to 12 mm thick.
i) From 750 mm.Upto1000 mm. dia. Rmt 804.00
ii) Above 1000 mm.Upto 1250 mm.
dia.
Rmt 897.00
iii) Above 1250 mm.Upto 1500 mm.
dia.
Rmt 989.00
iv) Above 1500 mm.Upto 1750 mm.
dia.
Rmt 1082.00
v) Above 1750 mm.Upto 2000 mm.
dia.
Rmt 1177.00
vi) Above 2000 mm.Upto 2250 mm.
dia.
Rmt 1269.00
vii) Above 2250 mm.Upto 2500 mm.
dia.
Rmt 1362.00
12 mm to 16 mm thick.
i) From 2000 mm.Upto 2250 mm.
dia.
Rmt 1252.00
ii) Above 2250 mm.Upto 2500 mm.
dia.
Rmt 1304.00
iii) Above 2500 mm.Upto 2750 mm.
dia.
Rmt 1394.00
iv) Above 2750 mm.Upto 3000 mm.
dia.
Rmt 1483.00
v) Above 3000 mm.Upto 3250 mm.
dia.
Rmt 1574.00
vi) Above 3250 mm.Upto 3500 mm.
dia.
Rmt 1664.00
Section-I-(XVII)-M.S.PIPES LAYING 188
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
16 mm to 20 mm thick.
i) From 2500 mm.Upto 2750 mm.
dia.
Rmt 1796.00
ii) Above 2750 mm.Upto 3000 mm.
dia.
Rmt 1877.00
iii) Above 3000 mm.Upto 3250 mm.
dia.
Rmt 2031.00
iv) Above 3250 mm.Upto 3500 mm.
dia.
Rmt 2132.00
v) Above 3500 mm.Upto 3750 mm.
dia.
Rmt 2232.00
vi) Above 3750 mm.Upto 4000 mm.
dia.
Rmt 2333.00
Above 20 mm to upto 25mm
thick.i) From 3500 mmUpto 3750 mm.
dia.
Rmt 2488.00
ii) Above 3750 mm.Upto 4000 mm.
dia.
Rmt 2631.00
3 Lowering laying in position to
correct line and level including M.
S. pipes with / without any
outcoating, on pedestals or chairs
upon piers, trestles etc. The rate to
include loading, unloading
hoisting, marginal cutting
wherever required, assembling and
tack welding, transportaion upto
500 m. etc. complete.
a) 5 mm to 8 mm thick.
i) Upto 250 mm. dia. Rmt 337.00
ii) Above 250 mm.Upto 500 mm. dia. Rmt 396.00
iii) Above 500 mm.Upto 750 mm. dia. Rmt 457.00
iv) Above 750 mm. Upto1000 mm.
dia.
Rmt 517.00
v) Above 1000 mm.Upto 1250 mm.
dia.
Rmt 578.00
Section-I-(XVII)-M.S.PIPES LAYING 189
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
b) 8 mm to 12 mm thick.
i) From 750 mm.Upto1 000 mm. dia. Rmt 689.00
ii) Above 1000 mm.Upto 1250 mm.
dia.
Rmt 768.00
iii) Above 1250 mm.Upto 1500 mm.
dia.
Rmt 848.00
iv) Above 1500 mm.Upto 1750 mm.
dia.
Rmt 928.00
v) Above 1750 mm.Upto 2000 mm.
dia.
Rmt 1009.00
vi) Above 2000 mm.Upto 2250 mm.
dia.
Rmt 1089.00
vii) Above 2250 mm.Upto 2500 mm.
dia.
Rmt 1167.00
c) 12 mm to 16 mm thick.
From 2000 mm.Upto 2250 mm.
dia.
Rmt 994.00
Above 2250 mm.Upto 2500 mm.
dia.
Rmt 1042.00
Above 2500 mm.Upto 2750 mm.
dia.
Rmt 1194.00
Above 2750 mm.Upto 3000 mm.
dia.
Rmt 1273.00
Above 3000 mm.Upto 3250 mm.
dia.
Rmt 1350.00
Above 3250 mm.Upto 3500 mm.
dia.
Rmt 1416.00
d) 16 mm to 20 mm thick.
Above 2500 mm.Upto 2750 mm.
dia.
Rmt 1566.00
Above 2750 mm.Upto 3000 mm.
dia.
Rmt 1653.00
Above 3000 mm.Upto 3250 mm.
dia.
Rmt 1740.00
Above 3250 mm.Upto 3500 mm.
dia.
Rmt 1826.00
Above 3500 mm.Upto 3750 mm.
dia.
Rmt 1913.00
Above 3750 mm.Upto 4000 mm.
dia.
Rmt 2001.00
Section-I-(XVII)-M.S.PIPES LAYING 190
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
e) 20 mm to 25 mm thick.
from 3500 mm. Upto3750 mm.
dia.
Rmt 2133.00
Above 3750 mm.Upto 4000 mm.
dia.
Rmt 2256.00
4 Lowering and laying in position to
correct line and level including M.
S. specials such as distance
pieces, straps,
bends, tapers, etc. on pedestals or
chairs upon piers or trestles. The
rate to include loading, unloading
hoisting, marginal cutting
wherever required, assembling and
tack welding, and including
transportation upto 500 m. etc.
complete as specified.
a) 5 mm to 8 mm thick.
Upto 250 mm. dia. Rmt 472.00
Above 250 mm.Upto 500 mm. dia. Rmt 556.00
Above 500 mm.Upto 750 mm. dia. Rmt 639.00
Above 750 mm.Upto 1000 mm.
dia.
Rmt 724.00
Above 1000 mm.Upto 1250 mm.
dia.
Rmt 807.00
b) 8 mm to 12 mm thick.
From 750 mm.Upto1000 mm. dia. Rmt 965.00
Above 1000 mm.Upto 1250 mm.
dia.
Rmt 1076.00
Above 1250 mm.Upto 1500 mm.
dia.
Rmt 1188.00
Above 1500 mm.Upto 1750 mm.
dia.
Rmt 1299.00
Above 1750 mm.Upto 2000 mm.
dia.
Rmt 1412.00
Above 2000 mm.Upto 2250 mm.
dia.
Rmt 1525.00
Section-I-(XVII)-M.S.PIPES LAYING 191
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
Above 2250 mm.Upto 2500 mm.
dia.
Rmt 1635.00
c) 12 mm to 16 mm thick.
From 2000 mm.Upto 2250 mm.
dia.
Rmt 1503.00
Above 2250 mm.Upto 2500 mm.
dia.
Rmt 1563.00
Above 2500 mm.Upto 2750 mm.
dia.
Rmt 1672.00
Above 2750 mm.Upto 3 000 mm.
dia.
Rmt 1781.00
Above 3000 mm.Upto 3250 mm.
dia.
Rmt 1889.00
Above 3250 mm.Upto 3500 mm.
dia.
Rmt 1998.00
d) 16 mm to 20 mm thick.
From 2500 mm.Upto 2750 mm.
dia.
Rmt 2195.00
Above 275Omm.Upto 3000 mm.
dia.
Rmt 2314.00
Above 3000 mm.Upto 3250 mm.
dia.
Rmt 2437.00
Above 3250 mm.Upto 3500 mm.
dia.
Rmt 2555.00
Above 3500 mm.Upto 3750 mm.
dia.
Rmt 2679.00
Above 3750 mm.Upto 4000 mm.
dia.
Rmt 2802.00
e) 20 mm to 25 mm thick.
From 3500 mm.Upto 3750 mm.
dia.
Rmt 2988.00
Above 3750 mm.Upto 4000 mm.
dia.
Rmt 3157.00
Section-I-(XVII)-M.S.PIPES LAYING 192
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
5 Transporting within 500
meters,laying in position to correct
line and level M. S. pipes with /
without any outcoating, on
prepared bedding in trenches
including marginal cutting
wherever required, assembling
tack welding the same. The rate to
include loading, unloading,
hoisting, etc. complete as specified.
a) 5 mm to 8 mm thick
Upto 250 mm. dia. Rmt 289.00
Above 250 mm.Upto 500 mm. dia. Rmt 340.00
Above 500 mm.Upto 750 mm. dia. Rmt 391.00
Above 750 mm.Upto 1000 mm.
dia.
Rmt 442.00
Above 1000 mm.Upto 1250 mm.
dia.
Rmt 493.00
b) 8 mm to 12 mm thick
From 750 mm.Upto1000 mm. dia. Rmt 589.00
Above 1000 mm.Upto 1250 mm.
dia.
Rmt 656.00
Above 1250 mm.Upto 1500 mm.
dia.
Rmt 724.00
Above 1500 mm.Upto 1750 mm.
dia.
Rmt 793.00
Above 1750 mm.Upto 2000 mm.
dia.
Rmt 860.00
Above 2000 mm.Upto 2250 mm.
dia.
Rmt 928.00
Above 2250 mm.Upto 2500 mm.
dia.
Rmt 996.00
c) 12 mm to 16 mm thick
From 2000 mm.Upto 2250 mm.
dia.
Rmt 915.00
Above 2250 mm.Upto 2500 mm.
dia.
Rmt 955.00
Section-I-(XVII)-M.S.PIPES LAYING 193
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
Above 2500 mm.Upto 2750 mm.
dia.
Rmt 1021.00
Above 2750 mm.Upto 3000 mm.
dia.
Rmt 1087.00
Above 3000 mm.Upto 3250 mm.
dia.
Rmt 1153.00
Above 3250 mm.Upto 3500 mm.
dia.
Rmt 1219.00
d) 16 mm to 20 mm thick
From 2500 mm.Upto 2750 mm.
dia.
Rmt 1334.00
Above 2750 mm.Upto 3000 mm.
dia.
Rmt 1408.00
Above 3000 mm.Upto 3250 mm.
dia.
Rmt 1483.00
Above 3250 mm.Upto 3500 mm.
dia.
Rmt 1558.00
Above 3500 mrn.Upto 3750 mm.
dia.
Rmt 1632.00
Above 3750 mm.Upto 4000 mm.
dia.
Rmt 1708.00
e) 20 mm to 25 mm thick
From 3500 mm.Upto 3750 mm.
dia.
Rmt 1817.00
Above 3750 mm.Upto 4000 mm.
dia.
Rmt 1922.00
6 Transporting within 500
meters,laying in position to correct
line and level M. S. specials pipes
with / without any outcoating,
such as distance pieces, straps,
bends, tapers, etc. on prepared
bedding in trenches including
marginal cutting wherever
required, assembling tack welding,
the same. The rate to including
loading, unloading, hoisting, etc.
complete as specified.
Section-I-(XVII)-M.S.PIPES LAYING 194
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
a) 5 mm to 8 mm thick
Upto 250 mm. dia. Rmt 406.00
Above 250 mm.Upto 500 mm.dia. Rmt 475.00
Above 500 mm.Upto 750 mm. dia. Rmt 548.00
Above 750 mm.Upto 1000 mm.
dia.
Rmt 618.00
Above 1000 mm.Upto 1250 mm.
dia.
Rmt 691.00
b) 8 mm to 12 mm thick
From 750 mm.Upto1000 mm. dia. Rmt 824.00
Above 1000 mm.Upto 1250 mm.
dia.
Rmt 919.00
Above 1250 mm.Upto 1500 mm.
dia.
Rmt 1013.00
Above 1500 mm.Upto 1750 mm.
dia.
Rmt 1109.00
Above 1750 mm.Upto 2000 mm.
dia.
Rmt 1288.00
Above 2000 mm.Upto 2250 mm.
dia.
Rmt 1345.00
Above 2250 mm.Upto 2500 mm.
dia.
Rmt 1394.00
c) 12 mm to 16 mm thick
From 2000 mm.Upto 2250 mm.
dia.
Rmt 1282.00
Above 2250 mm.Upto 2500 mm.
dia.
Rmt 1387.00
Above 2500 mm.Upto 2750 mm.
dia.
Rmt 1428.00
Above 2750 mm.Upto 3000 mm.
dia.
Rmt 1521.00
Above 3000 mm.Upto 3250 mm.
dia.
Rmt 1616.00
Above 3250 mm.Upto 3500 mm.
dia.
Rmt 1708.00
Section-I-(XVII)-M.S.PIPES LAYING 195
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
d) 16 mm to 20 mm thick
From 2500 mm.Upto 2750 mm.
dia.
Rmt 1855.00
Above 2750 mm.Upto 3000 mm.
dia.
Rmt 1972.00
Above 3000 mm.Upto 3250 mm.
dia.
Rmt 2078.00
Above 3250 mm.Upto 3500 mm.
dia.
Rmt 2181.00
Above 3500 mm.Upto 3750 mm.
dia.
Rmt 2286.00
Above 3750 mm.Upto 4000 mm.
dia.
Rmt 2391.00
e) 20 mm to 25 mm thick
From 3500 mm.Upto 3750 mm.
dia.
Rmt 2543.00
Above 3750 mm.Upto 4000 mm.
dia.
Rmt 2692.00
7 Welding in all positions with
required number of runs, for M. S.
pipes internally and / or externally
including gauging wherever
necessary, fixing appurtenances
and other accessories in
connection with pipe laying work
as per specification.
a) Butt Joints : Plat Thickness
4 mm. Rmt 131.00
5 mm. Rmt 198.00
6 mm. Rmt 465.00
7 mm. Rmt 519.00
8 mm. Rmt 651.00
10mm. Rmt 798.00
12mm. Rmt 854.00
14mm. Rmt 1018.00
16mm. Rmt 1232.00
18mm. Rmt 1334.00
20 mm. Rmt 1599.00
22 mm. Rmt 2008.00
25 mm. Rmt 2725.00
Section-I-(XVII)-M.S.PIPES LAYING 196
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
b) Lap joints with convex fillet welds Lag Lengths
Lengths:
5 mm. Rmt 183.00
6 mm. Rmt 234.00
8 mm. Rmt 310.00
10mm. Rmt 347.00
12mm. Rmt 519.00
14mm. Rmt 705.00
16mm. Rmt 776.00
18mm. Rmt 941.00
20 mm. Rmt 1062.00
22 mm. Rmt 1419.00
25 mm. Rmt 1723.00
8 Shifting and aligning ring girders
including removing tack welds
and re-tacking in the correct
position etc. complete as per
specification for the pipes of
following diameter.
From 1000 mm,Upto 1250 mm.
dia.
Rmt 355.00
Above 1250 mm.Upto 1500 mm.
dia.
Rmt 435.00
Above 1500 mm.Upto 1750 mm.
dia.
Rmt 513.00
Above 1750 mm.Upto 2200 mm.
dia.
Rmt 592.00
Above 2000 mm.Upto 2250 mm.
dia.
Rmt 670.00
Above 2250 mm.Upto 2500 mm.
dia.
Rmt 749.00
Above 2500 mm.Upto 2750 mm.
dia.
Rmt 827.00
Above 2750 mm.Upto 3000 mm.
dia.
Rmt 908.00
Above 3000 mm.Upto 3250 mm.
dia.
Rmt 987.00
Above 3250 mm.Upto 3500 mm.
dia.
Rmt 1065.00
Section-I-(XVII)-M.S.PIPES LAYING 197
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
Above 3500 mm.Upto 3750 mm.
dia.
Rmt 1144.00
Above 3750 mm.Upto 4000 mm.
dia.
Rmt 1229.00
9 Transporting within 500 meters
and fixing in position stools, base
plates, roller sets, grease box
covers, etc. including welding
wherever necessary. The rate also
to include fixing stools, base
plates, etc. in true line and level,
connecting the base plate to
anchor bolts by flush welding
including cutting the bolts, if
required, assembling and aligning
C. I. or M. S. roller sets of any size
including oiling, greasing, etc. The
rate also to include grouting
anchor bolts, welding of two halves
of grease box covers as directed by
Engineer-in-charge, for pipes of
following dia.
From 1000 mm,Upto 1250 mm.
dia.
each 1299.00
Above 1250 mm.Upto 1500 mm.
dia.
each 1405.00
Above 1500 mm.Upto 1750 mm.
dia.
each 1511.00
Above 1750 mm.Upto 2200 mm.
dia.
each 1617.00
Above 2000 mm.Upto 2250 mm.
dia.
each 1723.00
Above 2250 mm.Upto 2500 mm.
dia.
each 1829.00
Above 2500 mm.Upto 2750 mm.
dia.
each 1935.00
Above 2750 mm.Upto 3000 mm.
dia.
each 2041.00
Above 3000 mm.Upto 3250 mm.
dia.
each 2147.00
Section-I-(XVII)-M.S.PIPES LAYING 198
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
Above 3250 mm.Upto 3500 mm.
dia.
each 2253.00
Above 3500 mm.Upto 3750 mm.
dia.
each 2378.00
Above 3750 mm.Upto 4000 mm.
dia.
each 2463.00
10 Transporting within 500 meters
and aligning, fixing in position and
tack welding expansion joints
suitable for pipeline of diameters.
From 1000 mm,Upto 1250 mm.
dia.
each 4395.00
Above 1250 mm.Upto 1500 mm.
dia.
each 4558.00
Above 1500 mm.Upto 1750 mm.
dia.
each 4723.00
Above 1750 mm.Upto 2200 mm.
dia.
each 4887.00
Above 2000 mm.Upto 2250 mm.
dia.
each 9238.00
Above 2250 mm.Upto 2500 mm.
dia.
each 9445.00
Above 2500 mm.Upto 2750 mm.
dia.
each 9650.00
Above 2750 mm.Upto 3000 mm.
dia.
each 9793.00
Above 3000 mm.Upto 3250 mm.
dia.
each 10063.00
Above 3250 mm.Upto 3500 mm.
dia.
eacj 10270.00
Above 3500 mm.Upto 3750 mm.
dia.
each 10474.00
Above 3750 mm.Upto 4000 mm.
dia.
each 10682.00
11 Transporting within 500 meters
aligning and fixing in position and
tack welding only, including
marginal cutting, supplying and
providing rubber packing etc.
where necessary.
Section-I-(XVII)-M.S.PIPES LAYING 199
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
A) Minor fixtures such as manhole
cover, pressure and non-pressure
type blank
flanges, loose rings, small pipes to
form saddle bypass arrangement,
plug plates, ladders, platform,
stiffener rings, etc.
MT 7868.00
B) Minor fixtures such as tees,
domes, ‘Y’ branches, insulating
flange ring assembly, etc.
MT 3997.00
12 Gas cutting (either square cut or V
cut) pipes, plates, etc. of thickness.
Upto 5 mm. Rmt 59.00
Above 5 mm. Upto10 mm. Rmt 84.00
Above 10 mm. Upto14 mm. Rmt 109.00
Above 14 mm. Upto18 mm. Rmt 124.00
Above 18 mm. Upto22 mm. Rmt 172.00
Above 22 mm. Rmt 230.00
13 Gas cutting holes upto50mm dia
(for plugs)
Thickness of shell :
5 mm. to 12 mm No 65.00
Above 12 mm No 90.00
14 Providing M.S. bar mesh prepared
out of 16 mm dia M.S. bar at 15
cm. c/c both ways, welded to
flanged ring including tack welding
of bars and fixing the same with
nuts and bolts on open faces of
outlet/inlet pipes in the sump or
reservoir, etc. complete as directed
by Engineer-in-charge.
Sq.m 1192.00
Section-I-(XVII)-M.S.PIPES LAYING 200
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
15 Providing permanent test points on
the pipe line as per drawing and as
directed by Engineer-in-charge
including providing and fixing
sluice
valves, road boxes for sluice valves
of size 80 mm to 250 mm in one
brick masonry chamber 300 mm x
300 mm clear C. M. 1:5 with 12
mm thick 1:3 cement plaster both
inside and outside on M-100 c.c.
150 mm thick etc. complete as
specified and directed.
No 2675.00
16 Supplying transporting, the S.P.
fire hydrants including duck foot
bend, S.V. and S.V. road box,
painting the hydrant,fixing the
saddle piece, supplying, and laying
required length of C.I. pipeline and
jointing the same spun yarn,
molten lead including caulking,
fixing the S.V. road box in one
brick masonry chamber in 1:5
C.M. with 12 mm thick 1:3 cement
plaster both inside and outside on
1:3:6: C.C.150 mm thick etc,
complete specified and directed.
[As per I.S.900/1965 Revised]
No 13090.00
17 Hydraulic testing of M.S. pipeline
to specified pressure including cost
of all materials and labour and
water for testing for the length
upto 1km., using reciprocating
type pumps which should be able
to provide specified test pressure
Section-I-(XVII)-M.S.PIPES LAYING 201
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
gauges and other necessary
equipments, labour, operation
charges, etc. required for testing.
The rate under this item shall also
include cost of retesting, if
necessary.
Upto 600mm. dia.(I.D.) km 37248.00
Above 600 mm.upto 750 mm.
dia.(l.D.)
km 37303.00
Above 750 mm.upto 900 mm.
dia.(l.D.)
km 37389.00
Above 900 mm.upto 1050 mm.
dia.(l.D.)
km 37518.00
Above 1050 mm.upto 1200 mm.
dia.(l.D.)
km 37646.00
Above 1200 mm.upto 1500 mm.
dia.(l.D.)
km 37899.00
Above 1500 mm.upto 1800 mm.
dia.(l.D.)
km 38272.00
Above 1800 mm.upto 2250 mm.
dia.(l.D.)
km 38898.00
Above 2250 mm.upto 2500 mm.
dia.(l.D.),
km 39354.00
Above 2500 mm.dia. (l.D.) km 39809.00
Extra over initial KM
Upto600mm. dia.(I.D.) km 189.00
Above 600 mm.upto 750 mm.
dia.(l.D.)
km 270.00
Above 750 mm.upto 900 mm.
dia.(l.D.)
km 402.00
Above 900 mm.upto 1050 mm.
dia.(l.D.)
km 531.00
Above 1050 mm.upto 1200 mm.
dia.(l.D.)
km 684.00
Above 1200 mm.upto 1500 mm.
dia.(l.D.)
km 1010.00
Above 1500 mm.upto 1800 mm.
dia.(l.D.)
km 1528.00
Above 1800 mm.upto 2250 mm.
dia.(l.D.)
km 2344.00
Above 2250 mm.upto 2500 mm.
dia.(l.D.),
km 2919.00
Section-I-(XVII)-M.S.PIPES LAYING 202
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
Above 2500 mm.dia.upto 2750 mm
dia
km 3530.00
Above 2750 mm dia (I.D) km 4167.00
18 Providing and applying with
mechanical arrangement 1:3
proportion cement sand gunite, 40
to 50 mm thick to M. S. pipe
surface under 2.1 kg. per sqcm. to
2.80 kg. per sqcm. pressure
including removing the loose
materials as directed by Engineer -
in- charge and including scrapping
the surface with wire brushes,
degreasing, cleaning by
compressed air and providing
fixing BRC fabric no.14 as
reinforcement, curing for 21 days,
disposing off the rebound
materials within a lead of 50 M,
etc. complete as directed by
Engineer-in-charge.
Sq.m 416.00
19 Providing and applying pipe
coating of fibres, coaltar and
solvent based rubber modified
bituminous primer of density 0.92
gms/cu cm and viscosity of 1000-
2000 cps @ 150 gms/sqm followed
by seven layers(4mm thick) of
polythene polymerised bitumen
and polyester of local 7 layers)
pipe coat 4 mm should conform to
requirement of IS-10221 and
AWWA C-203 for per-fabricated
tapes including covering cost on
pipe coating. Rates shall include
cost of material coating and
wrapping over the pipes, handling
charges, preparation of pipe
surface, all labour, material, etc.
complete.
Sq.m 448.00
Section-I-(XVII)-M.S.PIPES LAYING 203
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
Note : Pipe coating is to be done at laying work site only.
20 Providing and applying with
mechanical arrangement cement
sand gunite of 50 mm thickness to
floors, walls, floor slabs or any
other structure under 2.1 kg. per
sqcm. to 2.80 kg. per sqcm.
pressure including removing the
loose materials on surface,
cleaning with comperssed air,
degreasing, etc. including
scaffolding and curing for 21 days,
providing and fixing BRC fabric no.
14 but excluding cost of
reinforcement, if any and removing
rebound materials within a lead of
50 M, etc. complete as directed by
Engineer-in-charge (for GSRs and
buildings.)
Sq.m 363.00
21 Providing and applying with
mechanical arrangement cement
sand gunite of 50 mm thickness to
floors, walls, roof slabs or any
other structure under 2.1 kg. per
sqcm. to 2.80 kg. per sqcm.
pressure including removing the
loose materials on surface,
cleaning with compressed air,
degreasing, etc. including
scaffolding and curing for 21 days,
providing and fixing BRC fabric no.
14 but excluding cost of
reinforcement, if any and removing
rebound materials within a lead of
50 M, for staging and bottom of
bottom slab, etc. complete as
directed by Engineer-in-charge (for
RCC ESRs)
Sq.m 476.00
Section-I-(XVII)-M.S.PIPES LAYING 204
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
22 Providing and making inner
cement mortar lining to M.S. pipes
with mechanical devices in cement
mortar 1:1 proportion, including
cost of all materials, labour,
special sand required, machinery,
power generation, all equipments
and taking necessary access
openings and manholes, cuts at
suitable intervals as directed by
Engineer-in-charge and rewelding
the same after done with doubler
plates pipes including necessary
excavation, refilling concerte
breaking and remaking if any,
breaking guniting and remaking
the same, repainting whereven
required with epoxy paint in 3
coats, all dewatering including
emptying the pipeline and refilling
the same after done with (water to
be supplied by department free of
cost within 5 km. lead at fixed
point and all other arrangements
to be done by agency), including
carrying out “C” value performance
test of pipeline, complete job as per
the directions of the Engineer-in-
charge.I 9 mm thick for pipesupto 700 mm
dia.
(Increase 25% for alignment in
hilly area)
sq.m 326.00
ii 12 mm thick forpipes upto 700
mm dia.
sq.m 377.00
23 Providing and applying of
elastomeric (450% elongation),
thermoplastic, fire retardant,
coating skin tensile strength 18 to
21 kg/cm2, antifungal
antibacterial anticorrosive, graft co-
polymer Coating on smooth
plastered surface. 100 Micron
dyufilm thickness of self bonding
with plastered surface and 100
Micron of top cost. For sewage
treatment
Section-I-(XVII)-M.S.PIPES LAYING 205
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
plant (R. C. C. Tank inside coating)
and water treatment plant.
sq.m 1057.00
24 Providing and applying external
and internal coating for steel
structures in sewage treatement
plant/water treatement plant with
elastomeric (450% elongation),
thermoplastic, fire retardant,
coating skin tensile strength 18 to
21 kg/cm2, antifungal
antibacterial, anticorrosive, graft
co-polymer. 50 Micron DFT. of self
bonding with steel, 50 Micron DFT.
of inner coat and 50 Micron DFT of
top coat.
sq.m 618.00
25 Providing and applying of
elastomeric (450% elongation),
thermoplastic, fire retardant,
coating skin tencile strength 18 to
21 kg/cm2, antifungal,
antibacterial anticorrosive, graft co-
polymer coating on external pipe
lines in un laid/laid condition after
proper cleaning. 50 micron DFT of
self bonding grade with metal
surface, 50 Micron DFT of self
bonding grade with metal surface,
50 Micron DFT inner coat and 50
Micron DFT of top coat.
1) water and sewage pipelines
(external) in unlaid condition.
sq.m 647.00
2) water and sewage pipelines
(external) in laid condition.
sq.m 663.00
26 Providing and applying of
elastomeric (450% elongation),
thermoplastic, fire retardant,
coating skin tensile strength 18 to
Section-I-(XVII)-M.S.PIPES LAYING 206
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
21 Kg/cm2, antifungal,
antibacterial anticorrosive, graft co-
polymer coating on internal
surface of pipe lines. 100 Micron
DFT of site bonding grade with
steel surface and 100 Micron DFT
of top coat.
1) Pipe lines (external) in unlaid
condition.
sq.m 814.00
2) Pipe lines (external) in laid
condition.
sq.m 869.00
27 Providing and applying of
elastomeric (450% elongation),
thermoplastic, fire retardant,
coating skin tensile strength 18 to
21 kg/cm2, antifungal,
antibacterial anticorrosive, graft co-
polymer coating on cleaned steel
reinforcement bars. 80 to 100
micron DFT With self bonding
trade of bar coating.
1) 6mm dia M.T. 29598.00
2) 8mm dia M.T. 22648.00
3) 10mm dia M.T. 17947.00
4) 12mm dia M.T. 14933.00
5) 16mm dia M.T. 11182.00
6) 20mm dia M.T. 9100.00
7) 25mm dia M.T. 7187.00
8) 32mm dia M.T. 5759.00
9) 40mm dia M.T. 4373.00
28 Providing and applying of H D P E
coating for MS pipe internally as
well as externally including cost of
H D P E powder moulding pipe
grade, labour, scrapping the pipe
surface with wire brushes,
degreasing, cleaning by
Section-I-(XVII)-M.S.PIPES LAYING 207
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
compressed air and surface
grinding and finishing including
cost of loading , unloading and
handling of pipe at factory etc.
complete as directed by Engineer -
in -charge.
HDPE Coating
Thickness in micron
External Internal Total
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,coating ---
-------,,--------------------thick
Without
E.D.
1) 0 micron 2000 2000 sq.m 1508.00
2) 2000 micron 1000 3000 sq.m 1893.00
3) 3000 micron 1000 4000 sq.m 2176.00
4) 3000 micron 2000 5000 sq.m 2501.00
Section-I-(XVII)-M.S.PIPES LAYING 208
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
1 Designing (aesthetically), providing and
constructing high rate Unconventional Water
Treatment Plant i.e. Simplified Water Treatment
Plants consisting of Civil works including cost of
Providing and applying Epoxy paint to inside
surface of water retaining structures in contact
with chlorine and providing anti - termite treatment
to entire structure below Ground level, Mechanical
and Electrical components of variours sub-works as
given below : including necessary hydraulic testing,
structural testing and trial run for 3 months, etc.
complete as directed by Engineer-in-charge (turn-
key job) works.
1) Aeration Fountain
2) Inlet arrangements
3) Mixing channel with ventury flume and flow
measuing arrangement
4) Inlet channel
5) Flocculator -
Confirming to I.S. 7208-1974 (Type - C) with
detention period of 30 minutes
6) Tube Settlers -
“Designing, fabricate and construct Tube Settlers
with square or any other shaped tube like Circular,
Cheveron, Hexagonal etc. having proven
performance.”
7) Rapid sand gravity filters
8) Filter house
9) Chemical house
10) Alum tanks 2 Nos. with mixing carrying and
dosing arrangements with piping.
11) Gravity feed gas chlorinator with 100% standby.
12) TCL solution tank with mixing, carrying and
dosing arrangement with piping
13) Bye-pass arrangement
14) External and internal electrification
15) Laboratory equipments
Section - I- (XVIII) - TREATMENT PLANT (W.T.P. S.T.P.)
Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.) 209
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
16) Wash water tanks of capacity equal to 12 minutes
to wash specified number of filter beds at time at
600 lit/m2/m under head of 12 m at under drain
17) Wash water pumps with 100% standby
18) Air blowers capable of delivering 600 LPM per
square metre of free air of filter area at 0.4
Kg/sqcm at the under drains (100%standby)
19) Pure water sump capacity equal to 1 hour
pumping capacity
20) Pure water pump house over the sump / by the
side of sump
21) Drainage arrangements
22) Alum store
23) Sanitary block with necessary water supply and
drainage arrangement and internal WBM roads
24) These rates are applicable for seismic zones 2,3
and 4
25) Rates given below are inclusive of uplift pressure if
any and dewatering during the entire work
26) All RCC structures shall be constructed in M-250.
Structures in contact with water shall be in M-300.
27) Unconventoinal Treatment Plants less than 1 MLD
capacity shall not be constructed.
Note: Conditions from Sr. No. 1 to 27 shall form a part
and parcel of the tender and must be included in
draft tender papers for the work of unconventional
treatment plants.
UnconventionalWaterTreatmentPlant LABOUR
S.No. Capacity in Mld Unit Rate in
Lakhs
Rate in
Lakhs
1 Fixed cost for 1 MLD Job 53.00 21.40
2 Add for capacity above 1 MLD upto 2 MLD MLD 24.00 9.50
3 Cost of 2 MLD Treatment Plant Job 77.00 30.90
4 Add for capacity above 2 MLD upto 5 MLD MLD 18.00 7.10
5 Cost of 5 MLD Treatment Plant Job 131.00 52.30
6 Add for capacity above 5 MLD MLD 14.00 5.70
7 Cost of 10 MLD Treatment Plant Job 201.00 80.40
Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.) 210
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
2 Designing (aesthetically), providing and
constructing and commissioning Conventionl Water
Treatment Plant consisting of all Civil, works
including cost of Providing and applying Epoxy
paint to inside surface of water retaining structures
in contact with chlorine and providing anti -
termite treatment to entire structure below Ground
level, Mechanical and Electrical components of
variours sub-works as given below : including
necessary hydraculic testing, structural testing
equipment testing, trial run for a period of 3
months, etc. complete as directed by Engineer-in-
charge (turn-key job).
1) Aeration Fountain
Plan area not less than 0.625 square metre per
MLD
2) Ventury Flume
With necessary devices, consisting of simple
mechanical indicator. ( Pedestal type gauge)
3) Flash Mixer
Rapid mixing device, detention time 60 seconds to
give velocity gradient 300 to 400 sec-1 vane mixer
type confirming to I.S. 7090 of 1985.
4) Flocculator
Confirming to I.S. 7208 of 1974 (Type-C) with
detention period of 30 minutes.
5) Clarifier
Horizontal flow circular tank, detention period 2-5
hours, overflow rate 30 cubic metre per square
metre per day (to be specified), Weir loading not
more than 300 cubic metre per metre per day, with
mechanical sludge scraper conforming to I.S. No.
10313 -1982 with necessary inlet arrangements.
6) Rapid Sand Filters and Filter House
Filter designed for filteration rate of 5,000 liters per
square metre per hour, minimum 2 beds for plant
upto 10 MLD, for larger plants as specified, filters
Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.) 211
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
to be located in filter house with roof slab, pipe
gallery and platform minimum 5.5 metre in width
with constant rate filtration or declining rate
filtration.
a) Filter Sand
Effective size 0.45 to 0.70 mm, uniformity
coefficient not more than 1.7, nor less than 1.3,
depth of water over sand 0.75 M, free board 50 cm,
gravel 0.45 M in depth, sand and gravel confirming
to I.S. 849 (i)-77, back wash by air wash, standard
appurtenances
b)Wash Water Tank
Capacity to be specified and suitable to supply
water to wash specified number of filter beds at a
time 12 minutes @ 600 lit/sqm/min. under a head
of 12 m at under drain.
c)Wash Water Pumps
Capacity to fill water tank in 1 hour with 100 %
standby.
d)Air Blowers
Capable of delivering 600 LMP per square metre of
free air, of filter area at 0.4 kg/square cm at the
underdrains (100% stand by) for period of 5 min.
7) Chemical House in Two Storeys
a)Ground floor to accommodate 7 days alum
requirement and sundry storage (Minimum 4 m
height)
b)First floor to accommodate alum and lime tanks.
chain pulley block etc. (min. 5 m height)
c) Solution tanks
Minimum 3 tanks (one for preparation. second for
dosing and third as standby), each tank capable of
giving 8 hours maximum dose without interruption,
minimum free board 0.30 M, trays for dissolving,
level indicator, mechanical agitation devices,
solution feed and drain lines, solution feed device
(constant head device,strength of solution upto
10% only) conforming to I.S. 9222 part-I/1979.
Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.) 212
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
8) Pure Water Sump and Pump House
a) Capacity of sump
One hour of designed flow.
b) Pump House
Pump house of required size over the sump or by
the side.
9) Store House
Suitable for alum storage of three months and 7
days temporary storage, 7 days TCL requirement in
mansoon with 20 % extra capacity for other sundry
articles.
10) Vacuum feed type chlorinators - make to be
approved by MJP.
a) Confirming to I.S. 10533 - A Part-II 1983.
b) Rate of withdrawal.
Temperature Kg.of Chlorine discharge per day
Degree “C”
45 67 Tonners
10 6.35 9.50 110
15 10.75 16.10 130
20 14.50 21.24 254
27 & above 18.70 28.12 315
c) Chlorinator equipment and container room: to
confirm to I.S. 10553 Part - I 1983.
d) 100% Standbye shall be provided
11) By pass arrangements - C.I. pipes.
i) By passing all units of T.P.
ii) By passing flash mixer, clariflocculator.
iii) By passing flash mixer, clariflocculator & filter
units
12) Disposal of waste from WTP : Safe disposal
arrangement to nearby nalla including cost of pipe
13) For WTP of capacity 30 mld and more additional
arrangement for backwash water recycle shall be
provided, including sump, pumping machinary,
rising main etc. complete.
Cylinders
Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.) 213
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
14) Drainage arrangements To decant all units of WTP
with CI pipes upto boundary of each unit and
further extension with RCC pipes to nearby nalla.
15) Electrical installation.
Both internal and external including entire plant
area.
16) Laboratory equipment.
As per requirement (to be specified during
tendering.)
17) Sanitary blocks.
Carpet area-15 square metre minimum upto 25 Mld
and 25 square metre above 25 Mld.
18) Administrative block and internal road.
To accommodate office room. chlorine room,
laboratory room, panel board room, blower room
etc. and WBM road to connect all units from main
gate of plot.
19) Rates given below are inclusive of uplift pressure
if any and dewatering during entire work.
20) Disposal of waste from WTP: Safe disposal
arrangement to nearby nalla including cost of
pipes.
21) For WTP of capacity 30 mld and more additional
arrangement for backwash water recycle shall be
provided, including sump, pumping machinary,
rising main etc. complete.
22) All pipes conduits channel with 20% overloading.
23) These rates are applicable for seismic zones-2,3
and 4.
24) All RCC structures shall be constructed in M-300.
25) All pipes and conduits channel with 20%
overloading capacity.
Note: Conditions from Sr. No. 1 to 19 shall form a part
and parcel of the tender and must be incorporated
in draft tender papers of conventional treatment
plants.
Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.) 214
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
Rates for Conventional Treatment Plants (proposed) LABOUR
S.No. Capacity in Mld Unit Rate in
Lakhs
Rate in
Lakhs
1 Upto 5 MLD MLD 33.00 13.3
2 Cost of 5 MLD Treatment Plant Job 166.00 66.5
3 Add for capacity above 5 MLD upto 10 MLD MLD 24.00 9.5
4 Cost of 10 MLD Treatment Plant Job 285.00 114.0
5 Add for capacity above 10 MLD upto 20 MLD MLD 15.00 6.2
6 Cost of 20 MLD Treatment Plant Job 440.00 175.8
7 Add for capacity above 20 MLD upto 50 MLD MLD 14.00 5.7
8 Cost of 50 MLD Treatment Plant Job 867.00 346.8
9 Add for capacity above 50 MLD upto 100 MLD MLD 12.00 4.8
10 Cost of 100 MLD Treatment Plant Job 1461.00 584.4
11 Add for capacity above 100 MLD MLD 9.50 3.8
3 Designing (aesthetically), providing, fabricating,
Package Water Treatment Plant. At the shop,
transporting to site, installing, testing and
commissioning at the site, giving necessary one
month’s free test and trial run with guarantee for
one year, etc. complete.
Prefabricated Package Water Treatment Plant
comprising following
1 Rapid mixing channel in M.S. sheets and M. S.
baffle.
2 Flocculator not less than 10 minutes detention, in
M.S. prefabricated box, flocculation being achived
either by glass pebbles of graded size or PVC
tetrapod or equivalent arrangement to ensure good
flocformation.
Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.) 215
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
3 Plate or tube settlers of not less than 30 minutes
detention, in M.S. prefabricated box, plates / tubes
mounted in the settler basin with inclination of not
less than 60 degree to horizontal.
4 Rapid sand gravity filter in M. S. prefabricated
box with filter sand not less than 500 mm thick,
supported on false floor below with polypropylene
nozzles spaced at not more than 500 mm centres
in either direction
5 Backwashing, inlet facilities only shall be
provided. Department shall provide either ESR
giving 8 to 10 M head at filter nozzles or backwash
pump, having flow rate of 0.6 Cum per minute per
square metre of filter bed. (Limit upto 5.0 M. from
W.T.P. face)
6 All civil works for foundation, consisting of raised
RCC platform above G.L. or walls in B.B. masonry
or UCR masonry shall be provided as per needs at
site.
7 Bypass in the form of pipes or M.S. channels
included in the design, effecting bypass of such
new tank and filter individually or both. (Limit upto
5.0 M. from W.T.P. face)
8 The entire M.S. fabricated tank provided with FRP
lining (5 mm thick) to inside face in contact with
water epoxy painting- two coats with one coat of
primer on outside. The thickness of plates
employed shall not be less than 6 mm
9 Alum dosing and mixing arrangements to be
provided in twin tanks, each of 8 hours capacity,
capable of importing does of 20 ppm with 5%
solution. The alum tanks provided with a dose in
steps of 5 ppm and entire unit mounted on the top
of flocculator / settler box, in the form of
prefabricated structure, with access platform and
ladder. Alum boxes with FRP lining (5 mm thick)
inside and epoxy paint two coats with one coat of
primer on outside.
Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.) 216
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
10 Both flocculator and settling basins provided
with hopper bottom with slope not less than 45
degrees to the horizontal drain pipes and valves
provided to both flocculator and settling basin.
11 Flow ratings to conform following parameters :
a) Velocities in channels not to exceed 0.6 M./Second.
b) Velocities in filter outlet pipes and valves not to
exceed 1 M./Second.
c) Velocities in interconnecting pipe and controls not
to exceed 1M./Second.
d) Backwash with air : Not required.
e) Backwash with water : Not less than 0.6 M./ Sqm.
of filter bed area in filter box.
12 Free board for all units not less than 300 mm
13 Rates as above include all taxes, octroi and duties
which would be specific to the site locations.
Rates for Package Water Treatment Plant LABOUR
S.No. Capacity in Mld Unit Rate in
Lakhs
Rate in
Lakhs
1 21 Cum / Hr. (0.50 MLD) Each 27.40 11.10
2 34 Cum / Hr. (0.80 MLD) Each 33.70 13.50
3 42 Cum / Hr. (1.00 MLD) Each 37.80 15.10
4 63 Cum / Hr. (1.50 MLD) Each 47.40 19.00
5 83 Cum / Hr. (2.00 MLD) Each 56.20 22.50
6 125 Cum / Hr. (3.00 MLD) Each 72.40 28.90
Note : Depending upon the capacity required for the scheme,one of the above capacity
should be choiced.
Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.) 217
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
SEWAGE TREATMENT PLANT (STP )
A) Designing (aesthetically), providing, and
constructing and giving satisfactory trials of
modernised Sewage Treatment Plant consisting of
receiving chamber, screen chamber, grit chamber,
measuring flume, distribution chamber with
primary and secondary treatment, etc. as detailed
below, administration block of suitable size
including allied units for waste disposal with all
civil and mechanical works involved, etc. complete
(Turn key job).
A) Primary and Secondary Treatment (Extended
Aeration Process)
LABOUR
S.No. Capacity of Plant Unit Rate in
Lakhs
Rate in
Lakhs
1) 1. Upto 10 MLD MLD 48.00 19.00
2) 2. Cost of 10 MLD Plant Job 475.00 190.10
3) 3. Add for capacity above 10 MLD upto 20 MLD MLD 42.00 16.60
4) 4. Cost of 20 MLD Plant Job 891.00 356.40
5) 5. Add for capacity above 20 MLD MLD 36.00 14.30
6) 6. Cost of 50 MLD Plant Job 1960.00 784.10
7) 7. Add for capacity above 50 MLD MLD 30.00 11.90
8) 8. Cost of 100 MLD Plant Job 3445.00 1378.10
B) Designing (Aesthetically) Providing and
constructing, hydraulic testing commissioning and
giving satisfactory trials of modernised sewage
treatment plant consisting of inlet chamber,
screen chamber, Detritus tanks, Parshall flume,
primary settling tanks, Aeration tanks, Secondary
settling tanks, Sludge Sump and Pump House
,Sludge Thickner, Primary digester , Secondary
digester, SST Sump and Pump house, Chlorine
contact tank, Chlorinators, Chlorinator room, sump
cum blending tank, PST sludge sump cum blending
tank,Pump house, Sludge Centrifuge, gas holder,
necessary piping work with required valves, gates,
drains, pathways, Administrative Building cum
Laboratory, Laboratory equipments, tools and
plants, Spare parts etc. complete as turnkey job
with all involved civil electrical and
Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.) 218
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
mechanical works inclusive of following items,
units as per detailed specification for civil,
Electrical and Mechanical Components with all
duties and taxes etc.complete.
1 Inlet Chamber:
Designing, providing and constructing R.C.C.
(M:250) Inlet chamber designed for the peak flow 2
DWF including necessary excavation in all types of
strata including walkway around the periphery.
Each compartment will have phosper bronze, steel
gate with extension rod, head stock, opreating
wheel, G.I. Pipe railing etc. The work includes
providing and making necessary arrangements to
connect the flow to screen chamber by approach
channel as directed and as per specifications.
2 Screen Chambers:
Designing, providing and constructing and testing
commissioning screen chamber, designed for
average 1DWF & maximum 2 DWF in RCC (M-250),
including inlet pipe/Channel from inlet chamber
outlet, pipe/channel to detritus tank, free board of
0.50 m minimum, RCC walkway 1.2M wide with
G.I. Pipe railing. RCC stair case of 1.2 m width
from G.L. to screen chamber.
3 Detritus Tank :
Designing, providing and constructing continuously
grit removal type of Detritus Tank, mechanically
operated in RCC (M-250) capable of removing 100%
0.20mm size particle and above, having specific
gravity 2.30, designed for one peak 2 DWF with
suitable arrangement of separation of grit from
putrescible solids including providing and making
necessary arrangement of JB-1. inlet and outlet
channels of required sizes as may be required to
connect the flow to parshall flume etc. complete
including hydraulic testing for water tightness of
the structure having minimum free board of 0.30
m, washout arrangement to grit chamber and
platform 1.20m wide RCC walkway with G.I. pipe
hand railing shall be provided. A pit for collecting
grit conveyed by conveyor shall be provided It
should be suitable to handle the grit for carting. All
arrangments shall be as per detailed spaecifications
and as directed.
Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.) 219
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
4 Parshall Flume:
Designing, Providing and constructing Parshall
Flume Channel in RCC(M:250) for
5 measuring quantity of sewage received at the
treatment works, max flow of 2 DWF and minimum
flow of 1/2 DWF including providing and making
necessary arrangment of approch channel as may
be required to connect the flow having minimum
velocity of 0.3m per second to Distribution Box (DB-
1) The unit shall be provided with walkway & RCC
staircase having width of 1.20 m each etc.
complete, including hydraulic testing for water
tightness of the civil structure having free board of
0.6 m including electrically operated, flow
indicating and flow integrating devices having a
standby of float operated ROF meter. All
arrangments as per specifications.
Primary Settling Tanks With Equipments :
Designing, providing, constructing and hydraulic
testing in RCC (M-250) water tight Primary Settling
Tanks of 1 DWF capaicty with feed chamber sludge
and effluent chamber, base adequately supported
providing 1.20m wide clear peripherial and
appraoch walkway interconnecting C.I. double
flanged pipes from feed chamber of the clarifier
distribution well grouting wherever necessary,
including foundation etc. as per speicifications
water depth at outer side shall be minimum 3.0
meters, weir loading shall not be greater than 125
cum DMF for average flow Bottom slope shall be
1:12
The floor of clarifier shall have 40 mm thick (min.)
screed course of cement grout of mix in C.M. 1:2
Detention period shall be 2.25 hrs. dispersion box
and stiffened weir plate made of mild steel plate not
less than 8 mm thick, aniticorrosive epoxy paint on
both faces shall be provided Minimum free board of
0.50 m. be provided it includes inlet pipe from
distribution chamber, central shaft inlet baffle
outlet chamber, Scum remover, skimming device,
scum chamber, connecting channel from PST outlet
chamber to DB-2 as per detailed specifications.
Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.) 220
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
6 Aeration Tank (AT) :
Designing, providing and constructing in RCC mix
(M-250) Aeration Tank in compartments to handle
combined flow of 1 DWF, incoming flow and
recirculation flow including construction of inlet,
outlet and distrbution chamber DB-3 and providing
1.20m wide clear peripherial and approach walk
ways, expansion joints wherever necessary,
including foundation etc. as per specifications.
Peak factor shall be 2, F/M ratio shall be 0.40, low
speed aerator speed between 20 to 100 RPM
recirculation flow @ 50% and free board 0.60 m
Depth, (SWD) 3.50 m minimum D.O. level at A.T. 2
Mg/Lit, MLVSS concentration shall be 2500 Mg/Lit
and MLVSS concentration shall be 2000 Mg/Lit,
HRT shall be 4 to 6 hours and STR 6-8 days. It
should have compartents for washing, oxygen
transfer capacity of mechanical aerator shall not be
less than 1.5 Kg/KWH, BOD of effluent 20 mg/lit
with input to aerator 0.15 to 0.30 Kwh/1000 Cum
of Aeratoin tank. All related works shall be as per
detailed specifications.
7 Secondary Settling Tanks with equipments :
Designing, providing & constructing in RCC
(M:250) water tight secondary settling tank having
detention period 2 hours and SWD shall be 4.20
meter. The effluent BOD & SS from the secondary
clarrifier shall not be more then 20 Mg/lit and 30
mg/lit respectively. It should be hydraulically
tested, bottom floor slope of 1:12 and free board of
0.60 m minimum Dispersion box shall be made of
Mild Steel plate not less then 8 mm thick with
anticorrosive epoxy paint from both faces and well
stiffened The sewage admitted at the centre flowing
upward and outwards towards periphery be slowly
and continuously collected towards a convenient
discharge point near centre by a rotating wheel
arm. The Clarifier will be completed with end drive
half rotating bridge, structural steel rake, over flow
weir, walkway diffuser, over load alarms, having
push bottons, starters for the clarifier, walkway
and the suitable sludge withdrawing arrangement
with flush valve capable of withdrawing moisture
content not more then 97% to 98%, slote.oil and
Grease < 10 ppm recyclable qaulity of water for
industrial / agricultural
Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.) 221
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
rotating sludge scrapper mechanism fitted with
squeezes including providing and making necessary
arrangement to connect the flow to outlet chamber
(DB-4) then the gravity mains for final diaposal and
as per detailed specifications and obligatory
provision. All other arrangements shall be as per
detailed specifications.
8 Sludge Thickner with equipments:
Designing providing and constructing water tight of
Sludge Thickner (Gravity type) including foundation
in RCC (M-250) with inlet and outlet chamber
influent well, inlet and outlet pipes, with sludge pit
and sludge removal arrangment, grouting wherever
necessary with walkway all around of 1.20 m width
G.I. pipe railing interconnecting CI pipes all
complete as per specifications Detention time 24
hours. SWD shall be 4.25 metre with necessary
fixed bridge scraper arrangment as per detailed
speicifications and necessary inlet and outlet
arrangement. All other arrangement as per detailed
specifications.
9 Primary Digester with mixer equipment (Fixed
Cover)
Designing, providing and constructing unit of water
tight and gas tight Primary Digester suitable for 1
DWF plant and complete with pipe gallery,
building, staircase for access from dome of digester
into inside staircase, walkways at springing levels
etc. walls and base slab being in RCC M:250,
domes in stucutural concrete including providing
burners and civil works for gas collection, grouting
wherever necessary etc. complete as per
specifications. It should be designed for min 90 C
and max. 450C. and minimum detention time of 30
days, water depth shall not be more then 8.5m free
board shall be 0.6m with inlet and outlet
arrangement of C.I. flanged pipes including giving
hydraulic testing and air tightness testing. The item
includes providing works for collecting Gas and Gas
burner as per specification.
10 Secondary Digester with equipment (Fixed cover)
Designing, providing and constructing including
foudation unit of watertight and gastight Secondary
Digester to deal with 1 DWF complete
Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.) 222
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
with pipe gallery, building, staircase for access from
dome of digester into inside, staircase to walkways
at springing levels etc., Walls and base slab and
domes being in RCC M:250, providing arrangement
for digested sludge from digesters to centrifuge,
providing burners and civil works for gas collection
grouting wherever necessary etc. complete. as per
specifications and obligatory provision All other
arrangements as per detailed specifications.
11 S.S.T. Sump & Pump House with recirculation
Pumps and Sludge Pumps to Digester:
Designing, providing & constructing Sump & Pump
house of requisite capacity with ceiling height not
less then 6.M., Sludge stream for recirculation to
aeration tank & excess sludge to SCBT, including
C.I. Piping to carry this flow to sump as per
detailed specification & as directed by Engineer-in-
charge.
12 Chlorine Contact Tank :
Designing, providing and constructing Chlorine
Contact chamber of adequate capacity to deal with
1 DWF. Average flow. The chlorine contact tank
should be of 30 minutes capacity during average
flow to achieve 99.99% coliform reduction. Chlorine
dose shall be maintained as per standard
provisions including provisions including designing,
providing and constructing water supply
arrangment for chlorination, including providing
dewatering and by-pass arrangements jointing to
final effluent main and outlet weir etc complete.
The effluent quality should match with the
standards laid down by Maharashtra Water
pollution Control Board and as per the obligatary
provision and detailed specifications and as
directed by Engineer-in- charge.
13 Chlorinator and chlorinator Room/Tonner
Room.
Designing, providing and constructing chlorinators
vaccum type 2 Nos each having capacity of 10
Kg/Hr as per obligatory provisions and detailed
sprcifications with necessary provision of
chlorinator room having floor area not less then 30
Sqmt including automatic residual chiorine
Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.) 223
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
controller with actuator and residual chlorine
analyser including cost of chlorine cylinder, piping,
valves, measuring and controlling equipments,
safty devices, lifting equipments, etc. complete as
per I.S - 10553 (Part-II) 1982.The tonner room
should have 3 MT capacity crane for loading and
unloading facility. Tonner storage should distincitly
isolated and should be for minumum 10 Tonners
space and arrangements as per gas laws 1981 and
factory act shall be provided. and all other
matching amenities be provided, 5 MT gantry shall
be provded for full length of Tonner room at 6 m
height from floor level, with /outlet chember and
treated effluet outlet channel etc. complete as per
detailed specicifications.
14 Sump cum Blending Tank (SCBT)
Designing providing and constructing sump cum
blending tank of appropiate size and detention time
with free board of 0.60 m. The slope of floor 1:4
with suction pit at the centre as per detailed
specicfications and obligatory requirements.
15 P.S.T. Sump Cum Blending Tank, Pump House
with recirculation pumps:
Designing providing and constructing pump house
of appropriate size with pumps, ceiling height
minimum 6m over the circular sump for
discharging the sludge to thickner and recycling of
flow for blending with C.I. piping etc. complete as
per detailed specifications.
16 Sludge Centrifuge Room with Centrifuges.:
Designing, providing constructing and installing
including foundation etc. Sludge Centrifuge to
handle the sludge flow of one day in one hour per
unit with sludge dewatering unit drain etc.
Complete as per specifications. sludge centrifuge
with all necessary arrangements as per detailed
specifications mentioned in Volume -II and Volume -
III of tender and obligatory provisions, be provided
with satisfactory functioning.
17 Gas Holder:
Designing, providing and constructing gas holder
having gas collection system, gas flow meter and
gas burner with floating dome arrangement and
Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.) 224
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
storage time 6 hrs. to be constructed in M-250
having appropriate diameter as per detailed
specifications and obligatory provisions. The
floating dome shall be of 8mm thick M.S. Plate
minimum and shall be provided with two coats of
anticorrosive epoxy coating from both faces.
18 Outfall Sewer :
Designing providing and constructing appropriate
Outfall Sewer of R.C.C. NP-2 pipe, to discharge
treated effluent, untreated effluent form outlet
chamber (after secondery clarifier) to the local
nallah at a point shown on the drawing including
necessary chambers for inspection / cleaning
including necessary excavation dewatering,
refilling, concrete encasing/bedding concrete steps
to reach the nallah bed level. pitching and energy
dissipation chamber in the nallah portion etc.
complete.
19 Piping work in C.I.-LA Class including Sluice
Valve, Reflux Valve, M. S. Gate.
Providing laying and jointing pipes other than those
already included in the above items for
interconnection by-pass drains etc. of all units
including adequate numbers of manhole chambers.
The item includes excavations, refilling and
hydraullic testing of pipes,valves , gates
,accessiories and cost of jointing materials The item
includes required channels with gates for
interconnection of units by pass drains etc. for all
units and as directed etc. complete as per detailed
specifications.
20 Administrative Building Cum Laboratory (G+1)
Designing providing and constructing
Adminisrative Building, Office Cum Laboratory
including stores. This shall be a building having
appropriate Carpet area at ground floor and at first
floor complete as per specifications including
necessary excavation, foundation in RCC M-200
framed structure B. B. masonry (II-Class in C. M.
1:6) 20 mm cement plaster in C. M. 1:3 inside and
outside painting. Alluminum door and window with
glass pannels, mosaic tile flooring and
Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.) 225
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
skirting and all other allied items, fixtures fastening
electrification arrangement water supply
arrangment etc. complete. The building will have
laboratory on upper floor of administrative building
and should be so centralised that it should not be
attached with any unit but should have complete
control of every unit as per Laboratory Equipment,
beautification, telephone and intercom
arrangement and Wireless system etc. complete
21 Primary and secondary treatment-with
digesters, sludge drying beds etc. complete.LABOUR
S.No. Capacity of Plant Unit Rate in
Lakhs
Rate in
Lakhs
1 Upto 10 MLD MLD 57 22.80
2 Cost of 10 MLD Plant Job 570 228.10
3 Add for capacity above 10 MLD upto 20 MLD MLD 50 20.00
4 Cost of 20 MLD Plant Job 1069 427.70
5 Add for capacity above 20 MLD MLD 43 17.10
6 Cost of 50 MLD Plant Job 2352 940.90
7 Add for capacity above 50 MLD MLD 36 14.30
8 Cost of 100 MLD Plant Job 4134 1653.70
5 Moving Media Bio Reactor (MMBR) / FAB
(Fluidised Aerated Bed) Process
Designing, providing, construction, hydraulic
testing, commissioning and giving satisfactorily
trials of STP consisting of Inlet Chamber, screen
chamber, Grit Separator, MMBR / FAB (Based on
technologies providing attached growth on plastic
meddi kept suspended in the waste water due to
low density of plastic & provided with compressed
air for aeration with very high MLSS of greater than
15,000 mg/lit.) tank, Secondary Clari settler,
Sludge sump, Sludge Thickener, Chlorine Contact
Tank, Chlorinator room/Shed, sludge Centrifuge,
associated piping work with required valves,
gates, drains, pathways, Administration Block
cum Laboratory, Laboratory Equipments, spares
parts for 2 years of operation, etc. complete as
turnkey job with all involved civil, electrical
Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.) 226
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
and mechanical works inclusive of following items,
units as per detailed specifications for civil,
electrical and mechanical components with all
duties and taxes etc. complete to acheive BOD < 10
ppm, COD < 50 ppm, TSS < 10 ppm Ph between 7
to 8.5, oil and Grease < 10 ppm recyclable qaulity
of water for industrial / agricultural purpose
FOLLOWING UNITS ARE INCLUDED
1. Inlet Chamber
Designing, providing and constructing RCC (M:25)
inlet chamber designed for the peak flow including
necessary excavation in all types of strata including
walkway all around the periphery. Each
compartment will have CI gates with extension rod.
Head stock, operating wheels, GI pipe railing etc.
The work includes providing and making necessary
arrangements to connect the flow to screen
chamber by approach channel as directed and as
per specifications.
2. Screen Chamber
Designing, providing, constructing, testing and
commissioning of screen chamber, designed for
peak flow in RCC (M-25), including walkway 1.2 m
wide with GI pipe.
3. Grit Separator
Designing, providing & constructing detritor type
grit removal mechanism in RCC (M-25) capable of
removing 100% 0.2 mm size particle & above
having specific gravity 2.30 designed for peak flow
with suitable arrangement of separation of grit from
putrescible solids including providing & making
necessary arrangements of Jb-1. Inlet & outlet
channels of required sizes as make be required to
connect the flow to connecting unit etc. complete
including hydraulic testing for water tightness of
structure having minimum FB of 0.3 m, wash out
arrangement to grit chamber & platform 1.2 m wide
RCC walkway with GI pipe handling shall be
provided. A pit for collecting grit conveyed by
conveyor shall be provided.
Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.) 227
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
It should be suitable to handle the grit for carting.
All arrangements shall be as detailed specifications
and as directed.
4. MMBR / FAB Tank
Designing, providing & constructing in RCC (M-25)
biological reactor tank for removal of BOD along
with nutrient removal to handle the average flow &
having hydraulics suitable to handle peak flow
conditions with suitable 1.2 m wide walk way,
expansion joints as required, including foundation
etc as per specifications. The tank shall be
equipped with inlet & outlet arrangement, air
blowers for supply of air, coarse bubble diffusers &
aeration grid in SS 304, PP carrier bio media etc.
FB of 0.5 m & SWD as required should be complete
as per detailed specifications.
5. Secondary Clarisettler
Designing, providing & constructing in RCC (M-25)
water tight secondary clarisettler having SWD of
3.75 m + 0.5 m FB & has tube media in the
clarification zone to provide additional surface area
for settling. The settler shall be provided with a
scraper mechanism in MS with epoxy painting for
collecting the settled solids at the bottom (bottom
slope 1:12). The central feed well shall be made of
MS with epoxy painting from both faces & well
stiffened. The sewage will be admitted in the feed
well & then will move outwards towards periphery
slowly & continuously over a weir & will be
collected in a launder.
6. Chlorine Contact Tank
Designing, providing & constructing chlorine
contact tank of adequate capacity to deal with
average flow. The contact time provided is 30 mm
to achieve 99.99 % reduction in coliform during
average flow condition. Chlorine dosage will be as
per standard provisions including designing,
providing & constructing water supply provisi9n for
chlorination, including providing dewatering &
Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.) 228
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
by pass arrangement for joining to final effluent
mains & outlet weir etc complete. The effluent
quality should match with the standards laid down
by Maharashtra Pollution Control Boars & as per
obligatory provision & as detailed specification & as
directed by engineer in charge.
7. Chlorinator & Chlorinator Room / Tonner
Room
Designing, providing & constructing vacuum type
chlorinators having adequate capacity for dosage of
adequate chlorine to ensure 99.99% coliform
reduction as per obligatory provisions detailed
specifications with necessary provision of having
chlorinator room of adequate size. The chlorinator
equipment shall include chlorine cylinders I
tonners, piping, valves, measuring controlling
equipments, safety devises, lifting equipment etc.
complete as per IS 10553 (Part II) 1982. The tonner
room should have mm 3 MT capacity crane for
loading & unloading facility. Tonner storage should
be distinctly isolated and should have min. storage
space as per the detailed specifications & as per gas
law 1981 & factory act shall be provided. All other
matching amenities shall be provided, 5 MT gantry
rail shall be provided for full length of tonner room
a 6 m Ht from level of tonner room with outlet.
8. Sludge Sump
Designing, providing & constructing of sludge sump
and pump for discharging sludge to sludge
thickener using MS pipe complete as per detailed
specification.
9. SIudge Thickener
Designing, providing & constructing water tight of
sludge thickener - gravity type in RCC (M-25) with
inlet & outlet pipes, central feed well, sludge it &
sludge removal arrangement, grouting wherever
necessary with walkway all around of 1.20 m with
GI pipe railing interconnecting CI pipes all complete
as per specifications, having bottom slope 1:8 & 3
m SWD with necessary fixed bridge scraper
Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.) 229
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
arrangement as per detailed specifications &
necessary inlet & outlet arrangement. All other
arrangement as per detailed specifications.
10. Sludge Centrifuge Platform with Centrifuge
Designing, providing, constructing & installing
including foundation etc. Sludge centrifuge to
handle the sludge flow of 1 day in 18 hrs per unit
with sludge dewatering unit drain etc complete is
per specification. Sludge centrifuge with necessary
arrangements as per detailed specification
mentioned in tender and obligatory provisions to be
provided with satisfactory functioning.
11. Outfall sewer
Designing, providing, constructing appropriate
outfall sewer of RCC NP2 pipe to discharge treated
effluent, untreated effluent from outlet chamber
(after basin / chlorination tank) to the local Nallah
at the point shown on the drawing including
necessary chambers for inspection & cleaning
including excavation, dewatering, refilling, concrete
encasing I bedding concrete.
12. Pining work in CI- LA class including sluice
valves, reflux valves, MS Gates
Providing, laying & jointing pipes other than hose
already included in the above items for
interconnection by pass drains etc. of all units
including adequate numbers of manhole chambers.
The item includes excavations, refilling & hydraulic
testing of pipes, valves, gates, accessories & cost of
jointing materials. The item includes required
channels with gates or interconnection of units, by
pass drains etc. for ill units as directed etc
complete as per detailed specifications.
13. Administrative Building cum Laboratory
(G+1)
Designing, providing & constructing administrative
building, office cum laboratory including stores.
This shall be building having appropriate carpet
Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.) 230
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
area & ground floor & at first floor complete as per
specifications including necessary excavation,
foundation in RCC M 20 framed structure, BB
masonry (II class in CM 1:6) 20 mm cement plaster
in CM 1:3 inside & outside painting, aluminum
door & window with glass panels, mosaic tile
flooring & skirting & all other allied items, fixtures,
fastening, electrification arrangement, water supply
arrangement etc complete. The building will have
laboratory on upper floor of administrative building
& should have complete control of every unit as per
laboratory equipment, beautification, telephone &
intercom arrangement & wireless system etc.
complete.
Capacity of Plant Area Required Rate in lakh
01 0450 MLD 130.84
03 0650 MLD 77.04
05 1000 MLD 66.41
08 1500 MLD 60.31
10 1800 MLD 58.97
13 2300 MLD 53.36
15 2650 MLD 48.53
18 3250 MLD 47.89
20 3500 MLD 46.24
25 4350 MLD 44.47
NOTES
1 Screen chamber & grit separator up to 5 MLD
Capacity are manual type.
2 Up to 5 MLD Capacity STP chlorination is done
by using sodium hypochlorite solution. Above 5
MLD capacity gas chlorinator is provided.
3 Sludge thickener is not provided up to 3 MLD
capacity STP. Sludge will be collected into sludge
sump & pumped directly to sludge dewatering
system
4 For all STP sludge dewatering is using solid bowl
centrifuge.
Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.) 231
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
5 Chlorinator room not provided for STP up to 3
MLD. For STP up to 3 MLD laboratory I
administration building is not provided. Only a
room for operator is provided.
6 Boundary wall, fencing, gate, storm water drains,
site clearance is not considered in scope.
7 All water retaining structures are in M 25 grade
of concrete.
8 Water table is considered 5 m below GL for
design.
9 Soil bearing capacity is considered as 20 TIm2 at
1.5 m below GL.
10 Lead for excavation is considered as 0.5 km.
11 Grade of cement used is OPC 43 grade.
12 Grade of steel used is Fe 415.
13 Peak factor considered for design for plants up
to 3 MLD is 3, 4 to 15 MLD is 2.5,16 to 20 MLD is
2.0.
14 Chemicals required during trial run &
commissioning is not considered.
15 Water & power during construction, trial run &
commissioning shall be provided by client.
16 Power available at STP location is assumed as
LT power supply.
IV MAKES OF EQUIPMENT
S.No. Description Make
1 Centrifugal Pumps Kirloskar /
Jhonson /Kishor
/ Eqv.
2 Screw Pumps Roto/Tushaco/Eqv.
3 Air Blower Usha/Swam/Kay/
Kulkarni / Eqv.
4 Dosing Pumps Milton Roy/VK
Pumps/Positive/
Minimax / Eqv.
5 Agitators/ Pavan/Fibre&Fibre
Flocculators / Ceecons
6 Clarifier/Thickener Mechanism To be
Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.) 232
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
fabricated as per
MJP approved
design / make
7 Screens To be fabricated as
per MJP approved
design / make
8 Grit Separator To be fabricated as
per MJP approved
design / make
9 Chlorinator Toshcon Jesco /
Banaco/Perfect
Chloro/Chlorocon-
trol/Metito/Eqv.
10 Chlorine Tonner Meenakshi / Eqv.
11 Solid Bowl Cent- Alfa Laval/Humbolt
rifuge /Wedag/Hiller/Eqv.
12 Motors Crompton/Siemens
/Lakshmi
13 Cables Finolex/ Polycab
14 MS pipes Mahalakshmi
Seamless/ Mahara-
shtra Seamless/
Suryaroshni/Jindal
/Eqv.
15 CI Pipes Truform/Electrosteel
/Kejriwal/Eqv.
16 Valves Intervalve/BDK/
Procon/Tyco/AV
valves/Eqv.
17 Clarisettler Media Cooldeck/
Munters
18 Bio Reactor As per MJP approved
Carrier Media design /make
Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.) 233
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
6 CYCLIC ACTIVATED SLUDGE PROCESS
Designing , providing, constructing, hydraulic
testing, commissioning and giving satisfactory
trials of Syaclic Activeted Flushe Procesess Based
on SBR Technology STP consisting of Inlet
Chamber, Screen Chamber, Detritus Tanks,
Distribution Chamber and Biological CASP Basins,
Sludge Sump, Chlorine Contact Tank, Chlorinator
Room/Shed, Sludge Centrifuge necessary piping
work with required valves, gates, drains, pathways
administration Block cum Laboratory, Laboratory
Equipments, Tools and Plants, Spare Parts, etc.
complete as turnkey job with all involved civil,
electrical and mechanical works inclusive of
following items, units as per detailed specification
for civil, electrical and mechanical components with
all duties and taxes etc. complete to achieve BOD <
5 ppm, COD < 100 ppm, TSS < 10 ppm, to get
recyclable quality of water for industrial /
agricultural purposes. (In Case Cyclic activated
sludge plant is designed for N, P outlet parameters
shall also include TN < 10 ppm, Nh3N < 2 ppm and
TP < 1 ppm)
UNITS INCLUDED
1. Inlet Chamber
Designing, providing, and constructing RCC
(M:250) inlet chamber for the peak low of 2 DWF
including necessary excavation in all types of strata
including walkway all around the periphery. Each
compartment will have phosphor bronze steel gates
with extension rod, head stock, operating wheels.
GI pipe railing etc. The work includes providing and
making necessary arrangements to connect the
flow to screen chamber by approach channel as
directed and as per specifications.
Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.) 234
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
2. Screen Chamber
Designing, providing, constructing, testing and
commissioning of screen chamber, designed for
average 1 DWF and maximum peak flow of 2 DWF
in RCC (M -250), including inlet pipe / channel
from inlet chamber, outlet pipe channel to detritus
tank, free board of 0.5 m minimum, RCC walkway
1.2 m wide with GI pipe railing, RCC stair case of
1.2 m width from GL to screen chamber.
3. Detritus Tank
Designing, providing and constructing continuous
grit removal type of Detritus Tank, mechanically
operated in RCC (M 250) capable of removing
100% of 0.2 mm size particle and above, having
specific gravity 2.30 designed for one peak 2 DWF
with suitable arrangement of separation of grit from
putrescible solids. Inlet and outlet channels of
required sizes as may be required to connect the
flow to connecting unit etc. Complete including
hydraulic testing for water tightness of structure
having minimum FB of 0.3 m, wash out
arrangement to Grit chamber and platform 1.2 m
wide RCC walkway with GI pipe handling shall be
provided. A pit for collecting grit conveyed by
conveyor shall be provided. It should be suitable to
handle the grit for carting. All arrangements shall
be as detailed specifications and as directed.
4. CASP Basins
Designing, providing and constructing in RCC
(M:250), CASP basins for biological removal of BOD
along with nitrification, denitrification, Bio-P
removal in compartments to handle combine flow of
1 DWF incoming flow and recirculation flow
including construction of selector compartments
and providing 1.2 m wide clear approach walkways,
expansion joints wherever necessary, including
foundations etc as per specifications. Peak factor
shall be 2, F/M ration shall be 0.15,
Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.) 235
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
complete with air blowers, fine diffused aeration
grid / equipment and FB 0.5 m and SWD as
required. DO level in basin to be minimum 2 mg/l
complete with “Oxygen Uptake Rate” control system
and all related instruments. Stainless steel
decanters and automation works. MLSS
concentrations shall be 2000-5500 mg/l or more,
MLVSS to MLSS ratio to be 0.8. HRT shall be
between 12 to 13 hrs and SRT suitable for fully
disgested sludge. It should have all other related
works as per detailed specification. In Case CASP is
designed to achieve N, P removal HRT
5. Chlorine Contact Tank
Designing providing and constructing chlorine
contact chamber of adequate capacity to deal with
1 DWF average flow. The chlorine contact tank
should be 30 min capacity, during average flow to
achieve 99.99% coliform reduction. Chlorine dose
shall be maintained as per standard provisions,
including designing, providing and constructing
water supply provision for chlorination including
providing dewatering and by pass arrangement
jointing to final effluent mains and outlet weir, etc
complete. The effluent quality should match with
the standards laid down by Maharashtra water
pollution control board and as per obligatory
provision and as detailed specification and as
directed by Engineer-in-charge.
6. Chlorinator and Chlorinator Room / Tonner
Room
Designing, providing and constructing chlorinators
vacuum type 2 Nos. with auto switchover facility
and having capacity for dosage of adequate chlorine
to ensure 99.99% coliform reduction as
Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.) 236
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
per obligatory provisions and detailed specifications
with necessary provision of having chlorinator room
of adequate size. The chlorinator equipment shall
include cost of chlorine cylinders / tonner piping,
valves, measuring and controlling equipments,
safety devices, lifting euipments, etc. complete as
per IS-10553 (part II) 1982. The tonner room
should have minimum 3 MTcapacity Hoist for
loading and unloading facility. Tonner storage
should be distinctly isolated and should be for
minimum storage space as directed in the design
specification and as per gas laws 1981 and factory
act shall be provided. All other matching amenities
shall be provided, 5 MT gantry rail shall be
provided for full length of tonner room at 6 m
height from level of tonner room, with outlet
chamber and treated effluent outlet channel etc.
complete.
7. Sludge Sump
Designing, providing and constructing of sludge
sump and pump house of appropriate size with
pumps, ceiling height minimum 6 m over sump for
discharging sludge to centrifuge using CI pipe
complete as per detailed specification.
8. Sludge Centrifuge Platform with Centrifuges
Designing, providing, constructing and installing
including foundation etc., sludge centrifuge to
handle the sludge flow of 1 day in 20 hours per
unit with sludge dewatering unit drain etc complete
as per specification. Sludge centrifuges with the
necessary arrangement, as per detailed
specification mentioned in tender and obligatory
provisions to be provided with satisfactory
functioning.
9. OutfaIl Sewer
Designing, providing and constructing appropriate
outfall sewer of RCC NP2 pipe, to discharge treated
effluent from outlet chamber after chlorination
Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.) 237
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
tank to the local Nallah at the point shown on the
drawing including necessary chamber for
inspection and cleaning including necessary
excavation, dewatering, refilling concrete encasing
/ bedding concrete steps to reach the nallah bed
level, pitching and energy dissipation chamber in
nallah portion etc. complete upto 50 m length RCC
NP2 pipe line and including all above items.
10. Piping work in CI-LA Class including Sluice
valves, Reflux Valves, MS gates
Providing laying and jointing pipes other than those
already included in the above items for
interconnection by - pass drains etc. of all units
including adequate numbers of manhole chambers.
The item includes excavations, refilling and
hydraulic testing of pipes, valves, gates, accessories
and cost of jointing materials. The items includes
required channels with gates for interconnection of
units by pass drains etc for all units as directed etc
complete as per detailed specifications.
11. Administrative Building cum Laboratory
(G+1)
Designing, providing and constructing
administrative building, office cum laboratory
including stores. This shall be a building having
appropriate carpet area and ground floor and at
first floor complete as per specifications including
necessary excavation, foundation in RCC M 200
framed structure B. B masonry (11- class in C.M.
1:6) 20 mm cement plaster in CM 1:3 inside and
outside painting. Aluminium door and window with
glass panels, mosaic tile flooring and skirting and
all other allied items, fixtures fastening
electrification arrangement water supply
arrangement etc complete. The building will have
laboratory on upper floor of administrative building
and should be so centralized that it should not be
attached with any unit but should have complete
control of every unit
Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.) 238
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
as per laboratory euipment, beautification,
telephone and intercom arrangement and wireless
system.
Capacity of Area required No. of Rate in
the Plant in in Ha Basins Lakh
MLD
1 0.5 2 MLD 299.67
2 0.6 2 MLD 200.37
5 0.65 2 MLD 125.89
10 0.70 2 MLD 102.85
15 0.75 2 MLD 92.09
20 0.80 4 MLD 87.16
25 1.00 4 MLD 83.87
30 1.20 4 MLD 78.94
40 1.60 4 MLD 74.00
50 1.75 4 MLD 72.36
60 1.90 4 MLD 70.71
75 2.25 4 MLD 69.07
100 2.40 6 MLD 65.78
125 3.00 6 MLD 62.49
150 3.50 6 MLD 60.85
NOTES
a. These Rates are for Civil Works, in M25 grade RCC.
b. Water Table is considered at 5 m below ground level.
c. Soil bearing capacity considered as 20 T/m² at
1.5 m below ground level.
d. OPC has been considered for costing purposes.
e. All civil items, electrical, piping, valves, pumps,
motors, blowers, etc. are considered as per MJP
Schedule of Rates.
f. I. No.1,2 includes sludge drying beds instead of
sludge centrifuge and DWPE dosing system.g I. No.1,2,3 includes NaOCI Dosing System
instead of Gas Chlorination.
h. I. No.1,2,3 do not includes Lab and Lab Equipments.
i. O&M shall be added extra
j. No piling, dewatering, soil improvent, desilting
considered in the cost.
k. Site is cleared flat and levelled. No site
development works filling dewatering considered.
Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.) 239
Sr No Item Description Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
l. Peak factor considered as 2.0 times average flow.
For every 25% increase in peak factor, 10% extra
cost shall be added over the above rates.
m. OPC TOR steel considered.
n. Treated water disposal upto 50 m considered.
o. N&P reduction not considered.
p. HT electrical works shall be added as per case
specific conditions.
q. Raw sewage pumping shall be added as per case
specific conditions.
r. In case TN<10 & TP<1 quality is required, above
rates shall be increased by 10%
s. Cost of I.No. 1 to 5 do not include HT station,
Lab and Mechanical dewatering of sludge.
Section-I-(XVIII)-TREATMENT PLANT (W.T.P. S.T.P.) 240
Sr No Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
Note :
1 The designing shall be in accordance with
various rel evant I.S. specification (I.S.
456/2000, I.S. 875 - 1987, I.S.3370-1965
or revised.)
2 Only M.S. bars grade I confirming to I.S.
432 part-I or high yield strength deformed
bars confirming to I.S. 1786 or I.S.1139
shall be used grade II M.S. bars shall not
be used.
3 Entire structure shall be in M - 300 only.
4 The scope of pipe assembly work shall be
upto 5 metre beyond outside face of the
wall, cost of pipes valves and specials is
not included in the rate but labour cost for
laying and jointing is included.
5 The G.S.R. / Sump above 15 lakh litres
capacity shall
Section - I- (XIX) - R.C.C. G.S.Rs AND SUMPS
Designing (aesthetically), and constructing RCC
ground service reservoirs / RCC sumps in M-300
mix. of required capacity including excavation in
all types of strata, foundation concrete, container
walls, bottom slab top RCC roof slab / or dome, 20
mm thick cement plaster with water proofing
compound in CM 1:3 proportion. to inside face of
the container,including epoxy paint from inside
including refilling and disposing of surplus stuff
within lead of 50 M, all labour and material
charges, for laying and jointing of pipe assembly
for inlet, outlet washout, over flow and bye-pass
arrangement consisting of C.I./ M.S. D/F. pipes,
specials and valves of given diameters, providing
and fixing accessories such as M.S. ladder inside
and outside, C.I. Manhole frame and cover, water
top slab, B.B. masonry chamber for all valves,
ventilating shafts, including giving satisfactory
hydraulic test and water tightness test as per IS
code and providing three coat of cement paints to
all expose surface of structure including roof
surface etc. complete as per design data, criteria,
obligatory requirements and detailed
specifications.Anti terminite treatment shall be
given for under ground portion of the structure.
Item Description
Section-I-(XIX)-R.C.C. G.S.Rs AND SUMPS 241
Sr No Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
Item Description
be in two compartment
6 The job includes designing the structure
for uplift pressure and dewatering if
required using entire execution and
disposal of surplus excavated stuff with in
lead of 50 metres as directed by Engineer-
in-charge. If up lifts considered in design
then these rate shall be increased by 7.5%.
7 G.S.R. outlets shall be with bell mouth of
approved partern in bottom slab and cost
of designing bell mouth is included in the
rate. Sump well includes cost of suction pit
required at bottom.
8 For pipe diameters upto 300 mm only CI
pipes and CI specials shall be used. For
pipe diameters above 300mm, M.S. pipes
and specials minimum 10 mm thick shall
be used with proper anticorrosive epoxy
treatment from in side and outside.
9 Cost of pump house is not included in
these rates.
10 Above rates are applicable for seismic
zones-2,3 and 4
11 75% part rate shall be payable for
reinforcement,concrete and plastering
items of all types of G.S.R.s. and sumps
till satisfactory hydraulic testing for water
tightness test is given and till that work
shall be treated as incomplete
12 10% shall be added for sump if overhead
pump house is proposed
Note: Condition from Sr. No. 1 to 11 shall
form a part and parcel of tender and
must be included in the Draft tender
papers for work of R.C.C. GSRs and
sump. Rates for R.C.C.G.S.Rs or Sumps
Section-I-(XIX)-R.C.C. G.S.Rs AND SUMPS 242
Sr No Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
Item Description
Rates for R.C.C. G.S.Rs and Sumps
S.No. Capacity in Litres Unit Rate is Rs. Rates in Rs.
1 Upto 250000 lit 12.36 4.90
2 Cost of 25000 lit capacity 308880.00 123552.00
3 Add for capacity above 25000 to 50000 lit 7.30 2.90
Cost of 50000 lit capacity 491380.00 196552.00
4 Add for capacity above 50000 to 75000 lit 6.00 2.40
5 Cost of 75000 lit capacity 641380.00 256552.00
Add for capacity above 75000 to 100000 lit 5.35 2.40
6 Cost of 100000 lit capacity 775130.00 310052.00
7 Add for capacity above 100000 to 150000
lit
5.05 2.00
Cost of 150000 lit capacity 1027630.00 411052.00
8 Add for capacity above 150000 to 200000
lit
4.32 1.70
9 Cost of 200000 lit capacity 1243630.00 497452.00
Add for capacity above 200000 to 300000
lit
4.16 1.70
10 Cost of 300000 lit capacity 1659630.00 663852.00
11 Add for capacity above 300000 to 500000
lit
3.24 1.30
12 Cost of 500000 lit capacity 2307630.00 923052.00
13 Add for capacity above 500000 to 1000000
lit
2.97 1.20
Cost of 1000000 lit capacity 3792630.00 1517052.00
14 Add for capacity above 1000000 to
1500000 lit
2.38 1.00
15 Cost of 1500000 lit capacity 4982630.00 1993052.00
Add for capacity above 1500000 1.78 0.70
Section-I-(XIX)-R.C.C. G.S.Rs AND SUMPS 243
Sr No Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
1 The design of the structure be in
accordance with relevent (I.S.3370 - 2009
or revised)
2 The design shall satisfy the stipulation as
per IS 1893-1984 and I.S. 13920/1993 for
seismic focrce and I.S.- 11682/1985 for
R.C.C. staging of overhead tanks.
Section - I- (XX) - R.C.C. E.S.RsItem Description
Designing (aesthetically), and constructing RCC
elevated service reservoirs of following capacity
with RCC staging consisting of columns, internal
and external bracings spaced vertically not more
than 4.5 meters centre to centre for ESR having
Capacity upto 500 Cum. and not more than 6 m
c/c for ESRs having capacity above 500 cum
including excavation in all types of strata,
foundation concrete, cement plaster with water
proofing compound to the inside face of the
container including refilling disposing of the
surplus stuff within a lead of 50 meters, all labour
and material charges including lowering, laying,
erecting, hoisting and jointing of pipe assembly of
inlet, outlet, washout, overflow and bypass
arrangements as per departmental design,
providing and fixing accessories such as M.S.
ladder, C. I. manhole frame and covers water level
indicatiors, lightening conductor, G. I. pipe railing
around walk way and top slab, providing spiral
staire case from ground level to roof level,M.S.grill
gate of 2 mtr.height with locking arrangement of
approved design. B.B. masonry chambers for all
valves, ventilating shafts, providing and applying
three coats of cement paint to the structure
including roof slab epoxy painting to internal
surface & anti termite treatment for underground
parts of the structure. and giving satisfactory
water tightness test as per I.S. code, The job to
include painting the name of the scheme and other
details on the reservoir as per the directions of
Engineer-in-charge.
Section-I-(XX)-R.C.C. E.S.Rs 244
Sr No Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
Item Description
3 For design having more than 6 columns,
Providing of internal bracing is obligatory,.
External bracking is also obligatory.
4 The entire structure shall be in M/250 mix
only. However concrete in contact with
water such as container, base slab, wall,
roof slab & footing in water borne area
shall be in M-300
5 Plain round mild steel bars grade - I
confirming to I.S:432 Part-I or high yield
strengh deformed bars confirming to I.S.
1786 or I.S. 1139 shall be used, grade-II
mild steel bars will not be allowed.
6 Irrespective of the type of foundation
proposed in the design, one set of bracing
be provided at the gound level.
7 These rates include providing, M.S. ladder
for E.S.R's upto 2 lakhs liters capacity and
providing sprial staircase for E.S.R. above
2 lakhs liters capacity.
8 Stagging shall have to be designed with
stresses of M-200 for ESR. However all
RCC construction should be done in M-250
except concrete in contact with water shall
be designed & constructed in M-300
9 These rates are including the cost of uplift
pressure if any and entire dewatering
during execution. In case of water logging
area where water is struck at shallow
depth extra provision of dewatering shall
be made as per site condition.
10 All condition given in the Member
Secretary"s Circular No.MJP/TS-
I/350/1668 dt. 2.8.97 and MJP/S-
I/350/2127 dt. 13.7.99 shall be strictly
followed and additional cost, if any due to
these conditions is included in the rates
Section-I-(XX)-R.C.C. E.S.Rs 245
Sr No Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
Item Description
mentioned below.
11 75% part rate shall be payable for
reinforced cocnrete and plastering items of
containers of E.S.R. till satisfactory
hydraulic testing for water tightness is
given ; and till that work shall be treated
as incomplete.
12 The rates indicated in the table are
excluding the cost of pipes, specials and
valves required for inlet, outlet washout
overflow and by-pass arrangement. The
scope of work, however inclueds cost of
erecting, laying and jointing of pipes and
valvews including cost of jointing materials
upto 5M beyond outer face of outermost
column.
13 For ESR upto 500cum capacity C.I.D.
double flanged pipes upto 300mm dia shall
be provided and C.I.Specials shall be
used.For ESR above 500 cum capacity
C.I./M.S. pipes assembly with minimum
8mm thick ness up to 500mm dia. And
minimum 10mm thickness above 500mm
dia can be used with proper anti-corrosive
epoxy teratment from inside and outside.
14 Below mentioned rates are for foundation,
with individuals footing with bearing
capacity of 30 tonnes per square metre.
For raft foundations, these rates shall be
increased by 7.5% wheresafebearing
capacity ( SBC) is 5 M.T. per Sq.m and by
5% where SBC is more than 5 MT/Sqm.
and upto 10MT/Sq.m. This percentage of
5% or 7,5% is applicable for estimation of
amount of L.S. items ESR for Extra item
due to change from individual footing
foundation to raft actual increase in
concrete and steel quantities be paid as per
relevent DSR Item.
Section-I-(XX)-R.C.C. E.S.Rs 246
Sr No Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
Item Description
15 The rates shall be increase by 30% for
brearing piles upto depth of 10m and for
further increased in depth by 5M each it
shall be increased by another 10% These
rates are applicable where raft is not
reasible for pile foundation sulfate
resistant cement shall only be used. Single
pile for the column is not permitted Group
of piles shall be designed with pile cap for
each column of ESR.
16 These rates are applicable for staging
height of 12 M These rates shall be
increased or decreased for per metre
variation in the staging height as below
12 to 16 M staging 2% per metre
16 to 20m staging 3% per meter
20 M and abovd 4% per metre
i.e. for 17m stagging height
percentage calculation will be like below
12 to16m = 4 x 2 = 8%
16 to 17 m x 1 x 3 = 3%
Total = 11 %
For 21 m stagging height
Percentage calculation will be like below
12 to 16m = 4 x 2 = 8%
16 to 20m = 4 x 3 = 12%
20 to 21m = 1 x 4 = 4%
Total = 24%
17 Following rates are for seismic zone-III for
Zone-IV these rates shall be increased by
5% and for Zone-II, these rates shall be
decreased by 5% concerned Executive
Engineer shall confirm the seismic zone for
the scheme from seismic zones plan before
estimation and adopt appropriate rates as
per actual seismic zones( Seismic maps
attached in this C.S.R.)
Section-I-(XX)-R.C.C. E.S.Rs 247
Sr No Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
Item Description
Note:
1) Conditin from Sr.No.1 to 11 shall form a
part and parcel of the tender papers and
shall be included in the DTP for works of
R.C.C.E.S.R.
2) Condition from Sr.No.12 to 17 are for
estimation purpose only and shall not be
S.No. Unit for Seismic
Zone-III Rate
in Lakh Rs.
LABOUR
Rate in Lakh
Rs.
1 Litre 26.14 7.20
2 Job 653500.00 180000.00
3 Litre 13.06 3.60
4 Job 980000.00 270000.00
5 Litre 9.50 2.60
6 Job 1217500.00 335000.00
7 Litre 8.30 2.50
8 Job 1425000.00 570000.00
9 Litre 7.14 2.90
10 Job 1782000.00 712800.00
11 Litre 5.94 2.40
12 Job 2079000.00 831600.00
13 Litre 5.65 2.30
14 Job 2361500.00 944600.00
15 Litre 5.34 2.10
16 Job 2628500.00 1051400.00
Cost of 200000 lit capacity
Add for capacity above 200000 to 250000 lit
Cost of 250000 lit capacity
Add for capacity above 250000 to 300000 lit
Cost of 300000 lit capacity
Cost of 75000 lit capacity
Add for capacity above 75000 to 100000 lit
Cost of 100000 lit capacity
Add for capacity above 100000 to 150000 lit
Cost of 150000 lit capacity
Add for capacity above 150000 to 200000 lit
Capacity in Litres
Upto 250000 lit
Cost of 25000 lit capacity
Add for capacity above 25000 to 50000 lit
Cost of 50000 lit capacity
Add for capacity above 50000 to 75000 lit
Section-I-(XX)-R.C.C. E.S.Rs 248
Sr No Unit Rate (in Rs.)
2012-2013
Rate in Rs.
2013-2014
Item Description
S.No. Unit for Seismic
Zone-III Rate
in Lakh Rs.
LABOUR
Rate in Lakh
Rs.
17 Litre 5.05 2.00
18 Job 3133500.00 1253400.00
19 Litre 4.75 1.90
20 Job 3608500.00 1443400.00
21 Litre 4.45 1.80
22 Job 4721000.00 1888400.00
23 Litre 4.16 1.70
24 Job 5761000.00 2304400.00
25 Litre 3.86 1.50
26 Job 7691000.00 3076400.00
27 Litre 3.57 1.40
28 Job 9476000.00 3790400.00
Cost of 1500000 lit capacity
Cost of 400000 lit capacity
Add for capacity above 400000 to 500000 lit
Capacity in Litres
Add for capacity above 1500000 to 2000000 lit
Cost of 2000000 lit capacity
Add for capacity above 500000 to 750000 lit
Cost of 750000 lit capacity
Add for capacity above 750000 to 1000000 lit
Cost of 1000000 lit capacity
Add for capacity above 1000000 to 1500000 lit
Add for capacity above 300000 to 400000 lit
Cost of 500000 lit capacity
Section-I-(XX)-R.C.C. E.S.Rs 249
Sr No Item Description Unit Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
1 Providing and constructing B.B. masonry valve
chamber with 15 cm thick 1:3:6 proportion PCC
bedding, excluding excavation, B.B. masonry in
C.M. 1:5 Proportion precast RCC frame and cover,
etc. complete as directed by Engineer-in-charge.
Note:
Wall thickness : 0.23 M for depth of 1.2 M and
0.35 M for balance depth exceeding 1.2 M)
A. As above of 60 x 45 cm internal size and depth
upto 0.9M .
No 4621.00 1161.00
a). Add for every increase of depth of 30cm or part
thereof.
30cm
depth
1005.00 276.10
B. As above of 95 x 45 cm internal size and depth
upto 1.2M .
No 6839.00 1745.30
a). Add for every increase of depth of 30cm or part
thereof.
30cm
depth
1202.00 331.40
C. As above of 90 x 60 cm internal size and depth
upto 1.2M .
No 7435.00 1908.30
a). Add for every increase of depth of 30cm or part
thereof.
30cm
depth
1300.00 361.10
D. As above of 90 x 90 cm internal size and depth
upto 1.2M .
No 8898.00 2288.00
a). Add for every increase of depth of 30cm or part
thereof.
30cm
depth
1500.00 422.80
E. As above of 1.2 x 1.2 M internal size and depth
upto 1.2M .
No 6735.30 1751.00
a). Add for every increase of depth of 30cm or part
thereof.
30cm
depth
1168.00 329.80
F. As above of 1.5 x 1.5M internal size and depth
upto 1.5M .
No 11926.00 3069.00
a). Add for every increase of depth of 30cm or part
thereof.
30cm
depth
1905.00 547.90
G. As above of 90 cm internal dia size and depth upto
1.2 M .
No 17449.00 4596.30
Section -I (XXI)- CHAMBERS, MANHOLES and DRAINAGE DROPS
Section-I-(XXI)CHAMBERS, MANHOLES and DRAINAGE DROPS 250
Sr No Item Description Unit Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
a). Add for every increase of depth of 30cm or part
thereof.
30cm
depth
2345.00 684.50
2 Providing and constructing B.B. masonry valve
chamber with 15 cm thick 1:3:6 proportion PCC
bedding, excluding excavation, B.B. masonry in
C.M. 1:5 proportion 12 mm thick cement plaster in
cm 1:4 proportion on both sides with providing
and fixing C.I. manhole frame and cover in RCC
1:2:4 coping or RCC 1:2:4 proportion 15 cm thick
slab, etc.complete as directed by Engineer-in-
charge.
Note:
Wall thickness : 0.23 M for depth of 1.2 M and
0.35 M for balance depth exceeding 1.2 M
Valve Chamber with Cast iron frame & covers.
A. As above of 60x45 cm internal size and depth upto
0.9 M with 60 x 45 cm size CI manhole frame and
cover of 40 kg
No 7211.00 1094.00
a). Add for every increase in depth of 30cm or part
thereof
30cm
depth
1005.00 275.10
B. As above of 90x45 cm internal size and depth upto
1.2 M with 90 x 45 cm size CI manhole frame and
cover of 40 kg
No 9388.00 1646.90
a). Add for every increase in depth of 30cm or part
thereof
30cm
depth
1148.00 315.70
C. As above of 90x60 cm internal size and depth upto
1.2 M with 90 x 60 cm size CI manhole frame and
cover of 50 kg
No 10709.00 1806.00
a). Add for every increase in depth of 30cm or part
thereof
30cm
depth
1244.00 344.70
D. As above of 90x90 cm internal size and depth upto
1.2 M with 53 cm dia CI manhole frame and cover
of 90 kg fixed in R.C.C. Slab
No 14830.00 2140.90
a). Add for every increase in depth of 30cm or part
thereof
30cm
depth
1500.00 420.80
E. As above of 1.2 x 1.2M internal size and depth
upto 1.2 M with 53 cm dia CI manhole frame and
cover of 90 kg fixed in R.C.C. Slab
No 17368.00 2818.00
Section-I-(XXI)CHAMBERS, MANHOLES and DRAINAGE DROPS 251
Sr No Item Description Unit Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
a). Add for every increase in depth of 30cm or part
thereof
30cm
depth
1904.00 545.90
F. As above of 1.5 x 1.5 M internal size and depth
upto 1.5 M with 53 cm dia CI manhole frame and
cover of 90 kg fixed in R.C.C. Slab
No 22412.00 4238.80
a). Add for every increase in depth of 30cm or part
thereof
30cm
depth
2303.00 670.20
3 Providing and constructing B.B. masonry valve
chamber with 15 cm thick 1:3:6 proportion PCC
bedding, excluding excavation, B.B. masonry in
C.M. 1:5 Proportion precast S. F. R. C.frame and
cover,etc.complete as directed by Engineer-in-
charge.
Note:
Wall thickness : 0.23 M for depth of 1.2 M and
0.35 M for balance depth exceeding 1.2 M
Valve Chamber with Precast steel fibre
reinforced concrete ( S.F.R.C.) frame & covers.
A. As above of 60x45 cm internal size and depth upto
0.9 M . No
6708.00 1240.90
a). Add for every increase in depth of 30cm or part
thereof
30cm
depth
1005 185.90
B. As above of 90x45 cm internal size and depth upto
1.2 M .
No 9663 1787.60
a). Add for every increase in depth of 30cm or part
thereof
30cm
depth
1148 212.40
C. As above of 90x60 cm internal size and depth upto
1.2 M .
No 10636 1967.70
a). Add for every increase in depth of 30cm or part
thereof
30cm
depth
1244.00 230.20
D. As above of 90x90 cm internal size and depth upto
1.2 M . No12515.00 2315.30
a). Add for every increase in depth of 30cm or part
thereof
30cm
depth
1436.00 265.70
E. As above of 1.2 x 1.2M internal size and depth
upto 1.2 M with S.F.R.C. frame and cover of size
540 mm dia fixed in R.C.C. Slab No
15525.00 2872.20
Section-I-(XXI)CHAMBERS, MANHOLES and DRAINAGE DROPS 252
Sr No Item Description Unit Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
a). Add for every increase in depth of 30cm or part
thereof
30cm
depth
1904.00 352.20
F. As above of 1.5 x 1.5 M internal size and depth
upto 1.2 M with S.F.R.C. frame and cover of size
540 mm dia fixed in R.C.C. Slab
No 20812.00 3850.20
a). Add for every increase in depth of 30cm or part
thereof
30cm
depth
2301.00 425.80
4 Providing and fixing in position M.S. Air valve
boxes fabricated with 2 mm thick M.S. plate, 30 x
30 x3 mm size M.S. angle frame, concre- ting in M-
150 for fixing the box in position,applying two
coats of oil paint, painting chainage, locking
arrangement, etc. complete as directed by Engineer-
in-charge.
a) For single ball air valve No 2121.00 81.10
b) For Double ball air valve No 2933.00 208.40
5 Providing and fixing C.I. road box including
loading, unloading and carting to site of work
including all necessary excavation in all types of
strata and fixing in murum packing, etc. complete.
a) 100 mm x 225 mm (20 kg) No 1449.00 268.10
b) 225 mm x 300 mm (40 kg) No 2898.00 536.13
6 Providing and constructing on sewer, B.B.
masonry circular manhole concentric cone 1.2 M
dia. at bottom and 0.5 M dia. at top and upto a
depth of 2.00 M with 23 cm brick work in CM 1:4
proportion excluding excavation including
foundation concrete 250 mm thick and haunches
and channels in c.c.1:2:4 proportion, finishing
channels in smooth rendering, providing C.I.
dapuri type steps each weighing 5.5 kg., 1:2:4
coping and providing and fixing approved make
and quality S.F.R.C. frame and cover of 56 cm.dia.
etc. complete as directed by Engineer-in-charge.No 18156.00 3106.00
a) Rebate for every decrease in depth of 50 cm or
part thereof
50cm
depth
2415.00 1159.00
Section-I-(XXI)CHAMBERS, MANHOLES and DRAINAGE DROPS 253
Sr No Item Description Unit Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
7 Providing and constructing on sewer, B.B.
masonry circular manhole concentric cone 1.5 M
dia. at bottom and 0.5 M dia. at top and upto a
depth of 5.00 M with 23 cm brick work up to depth
of 2 M from top and 35 cm thick brick work for
balance depth in CM 1:4 proportion with 20 mm
thick smooth plaster on both side in cm 1:2
proportion excluding excavation including
foundation concrete 250 mm thick and haunches
and channels in c.c.1:2:4 proportion, finishing
channels in smooth rendering, providing C.I.
dapuri type steps each weighting 5.5 kg., 1:2:4
coping and providing and fixing approved make
and quality S.F.R.C. frame and cover of 56 cm.dia.
etc. complete as directed by Engineer-in-charge.
No 49685.00 3106.00
a) Rebate for every decrease in depth of 50 cm
or part thereof
50cm
depth
4822.00 3224.00
8 Providing and constructing on sewer, B.B.
masonry circular manhole with concentric cone
1.5 M dia. at bottom and 0.5 M dia. at top and
upto a depth of 9.00 M with 23 cm brick work,
upto depth of 2 M from top and 35 cm thick brick
work for depth of 2 M and 45 cm thick brick work
for remaining depth upto 9 M in CM 1:4
proporpion with 20 mm thick smooth plaster on
both sides in CM 1:2 proportion excluding
excavation, including foundation concrete 250 mm
thick and haunches and channels in c.c.1:2:4
proportion, finishing channels in smooth
rendering, providing C.I. dapuri type steps each
weighing 5.5 kg., 1:2:4 coping and providing and
fixing approved make and quality S.F.R.C. frame
and cover of 56 cm.dia. etc. complete as directed
by Engineer-in-charge.
No 104073.00 3090.30
a) Rebate for every decrease in depth of 50 cm
or part thereof
50cm
depth
5989.00 4307.70
9 Providing and constructing B.B. masonry circular
manhole without conical shape excluding
Section-I-(XXI)CHAMBERS, MANHOLES and DRAINAGE DROPS 254
Sr No Item Description Unit Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
excavation, RCC 1:2:4 proportion, 20 cm bedding
brick masonry in CM 1:4 proportion,23 cm thick
for 2 M depth from top35 cm thick for 2 M below it
and 45 cm thick for balance depth, RCC slab at
top and at 2 M depth from top for supporting brick
masonry above it, plastering with smooth finish in
CM 1:2 proportion C.C.1:2:4 finishing channels in
smooth rendering, providing C.I. dapuri type steps
each weighing 5.5 kg., providing and fixing
S.F.R.C. frame and cover of 56 cm.dia. at top
including cost of all materials and labour,
etc.complete.
A. 1.00 M dia x 2 M Depth No 16632.00 2808.90
a). Rebate for every decrease in depth of 50 cm or
part thereof
50cm
depth
2438.00 571.50
B. 1.00 M dia x 3 M Depth No 23907.00 4478.90
a). Rebate for every decrease in depth of 50 cm or
part thereof
50cm
depth
3407.00 754.30
C. 1.00 M dia x 4.5 M Depth No 36242.00 7335.20
a). Rebate for every decrease in depth of 50 cm or
part thereof
50cm
depth
4216.00 937.10
D. 1.50 M dia x 2 M Depth No 24814.00 4347.50
a). Rebate for every decrease in depth of 50 cm or
part thereof
50cm
depth
2922.00 747.90
E. 1.50 M dia x 3 M Depth No 31730.00 6374.30
a). Rebate for every decrease in depth of 50 cm or
part thereof
50cm
depth
4372.00 1038.70
F. 1.50 M dia x 4.5 M Depth No 47432.00 10217.90
a). Rebate for every decrease in depth of 50 cm or
part thereof
50cm
depth
5404.00 1272.10
Drainage Drops
10 Providing 150 mm dia S.W. or R.C.C.pipes in
vertical drop arrangement including providing 150
mm dia S.W.and R.C.C. pipe fixed in B.B. masonry
of manhole at the required level including
providing 150 mm dia double tee, 150 mm dia
right angled bend, encasing in B.B. masonry 1:4
proportion all around the pipe,double tee, bend
Section-I-(XXI)CHAMBERS, MANHOLES and DRAINAGE DROPS 255
Sr No Item Description Unit Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
upto the foundation of manhole, jointing, cutting,
filleting including neat cement rendering, plugging
the opening with jungle wood knob complete as
directed by Engineer-in-charge (0.60M depth)
excluding cost of chamber.
No 1824.00 341.40
a). Extra for every 0.5 M depth beyond initial depth
of o.60 M
50cm
depth
660.00 90.00
11 As above but for 200 mm dia. Pipes & depth 0.60
M
No 2478.00 451.30
a). Extra for every 0.5 M depth beyond initial depth
of o.60 M
50cm
depth
788.00 109.50
12 As above but for 250 mm dia. Pipes & depth 0.60
M
No 2930.00 546.30
a). Extra for every 0.5 M depth beyond initial depth
of o.60 M
50cm
depth
981.00 139.20
13 As above but for 300 mm dia. Pipes & depth 0.60
M
No 3580.00 649.80
a). Extra for every 0.5 M depth beyond initial depth
of o.60 M
50cm
depth
1068.00 136.90
14 As above but for 400 mm dia. Pipes & depth 0.60
M
No 5017.00 869.10
a). Extra for every 0.5 M depth beyond initial depth
of o.60 M
50cm
depth
1585.00 170.60
15 As above but for 500 mm dia. Pipes & depth 0.60
M
No 6765.00 1152.30
a). Extra for every 0.5 M depth beyond initial depth
of o.60 M
50cm
depth
1928.00 187.90
16 As above but for 600 mm dia. Pipes & depth 0.60
M
No 8831.00 1514.10
a). Extra for every 0.5 M depth beyond initial depth
of o.60 M
50cm
depth
2124.00 201.00
17 Providing and fixing in position steel fibre
reinforced concrete (S.F.R.C.) frame and covers of
approved make including loading, unloading,
transportation, all taxes, etc. complete as directed
by Engineer-in-charge (20 tonnes capacity)
a) 540 mm dia No 2633.00 487.10
Section-I-(XXI)CHAMBERS, MANHOLES and DRAINAGE DROPS 256
Sr No Item Description Unit Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
b) 560 mm dia No 3754.00 694.50
c) 90 x 45 cm size No 2633.00 487.11
d) 90 x 60 cm size No 2853.00 527.87
e) 60 x 60 cm size No 2606.00 482.12
f) 60 x 45 cm size No 2258.00 417.78
18 Providing and fixing intercepting sewer trap
including concrete bedding, etc. complete.
a) 150 x 100 mm No 431.00 43.50
b) 100 x 100 mm No 312.00 28.80
19 Providing and fixing in position S.W. bends of
various size,etc. complete.
a) 100 mm No 138.00 11.60
b) 150 mm No 164.00 13.90
20 Providing and fixing ‘Y’ junction and labour, etc.
complete.
a) Saddle junction 100 x 100 mm No 152.00 12.50
b) "Y" junction 150 x 150 x 100 mm No 183.00 16.20
c) "Y" junction 300 x 300 x 300 mm No 216.00 19.20
d) "Y" junction 300 x 300 x 100 mm No 183.00 16.20
21 Providing and fixing in position A.C. soil ventilators
/ slotted as necessary and as directed by Engimeer-
in-charge etc. complete.
a) 80 mm No 152.00 12.18
b) 100 mm No 183.00 14.60
c) 150 mm No 260.00 20.82
22 Providing and fixing A.C. soil pipe or downtake
pipe with all required fittings, taking hole, etc.
complete (as per manufacturer’s code of practice).
a) 80 mm No 261.00 20.91
b) 100 mm No 316.00 25.32
c) 150 mm No 475.00 38.02
23 Providing and fixing Cast Iron soil pipe of 1.8 M
length including taking out holes and all required
fittings, etc. complete.
S / S
a) 80 mm No 895.00 71.63
b) 100 mm No 1026.00 82.08
D / S
a) 80 mm No 973.00 77.85
b) 100 mm No 1123.00 89.86
Section-I-(XXI)CHAMBERS, MANHOLES and DRAINAGE DROPS 257
Sr No Item Description Unit Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
1 Providing, constructing coffer dam in river basin /
dam storages as per type design including
excavation, filling, the middle portion with B. C.
soil (in gunny bags if requried). Providing
impervious / semipervious materials on both side
of B.C. soil (in gunny bags if required) including
ramming, compacting to the satisfaction of
Engineer-in-charge, till the complection of work
including dismantling coffer dam after completion
of works and disposing off the material as directed
by the Engineer-in-charge.
Cum 535.00 15.10
Note : Pay line maximum- Top width payable shall
be 2 mtr. And maximum payable side slopes shall
be 1.5 Horizontal to 1 vertical, if the constructed
top width of the side slopes are less, then the
measurements at actual are payable. Extra top
width or flatter slopes are not payabale Contractor
is free to use ballies, plastic sheets, piles, pipes,
CGI sheets for supporting hearting materials
instead of impervious/semipervious hearting
materials for which no extra payments shall be
payable. 30% payment shall be withheld for
dismantling of coffer dam. This foot note shall
appear in tender condition. (type section is shown
on last page of type design section of CSR)
2 Providing and fabricating at work shop, carting to
site of work, including transport, loading,
unloading, hoisting, lowering and setting out at
actual site of well, sinking M.S. plate cutting edge.
for R.C.C. well curb consisting of 350 mm M.S.
plate, 10 mm thick, champhering at bottom.
Cutting edge should be provided in pieces not less
than 2 M in length. Each joint should be plain
from outside and jointed by gusset plate 400 x 200
x 12 mm thick M. S. plate with 12 nos. of 20 mm
dia. crurshank headed bolts (gusset plates from
inside) with unequal angle of 90 x 60 x 10 mm
should be welded from top of chamfered portion at
Section -J - WELL SINKING AND RIVER INFILTRATION WORKS
Section-J-WELL SINKING RIVER INFILTRATION WORKS 258
Sr No Item Description Unit Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
14mm from bottom so that 15mm side should be
in contact with cutting edge with overlap of 300
mm joints. 16 mm dia bar should be welded to
M.S. plate 200 mm below the top surface and
length should be 1.8 M above plate with a bend
300 mm from plate surface including 3 coats of
anticorrosive paint as directed by Engineer-in-
chage.
Kg 81.00 12.20
3 Providing and filling puddle (selected good
impervious clay) in Kolhapur type weirs in proper
layers of 15 cm including watering, ramming and
compaction, etc. complete with all leads and lifts.
Cum 221.00 95.60
4 Providing and filling around the well boulders
filling of selected variety and size of boulders
including cost of all materials, labour,
transportation, etc. complete with all leads and
lifts. Cum 808.00 178.90
5 Providing, and fixing 80 mm dia A.C./P.V.C. pipe
weep holes at 1.5 M c/c staggered including cost of
all materials and labour involved with all leads and
lifts.etc. complete with all leads and lifts.
Rmt 168.00 32.70
6 Providing and fixing M.S. chaquerred plate flooring
of following thickness supported on M.S.angles (25
x 25 x 5 mm size) including welding, cutting and
fabricating the plate to the required square or
rounding shape, making holes in the plate,
including providing and applying 3 coats of
anticorrosive paint, etc. complete as directed by
Engineer-in-charge.
a) 6 mm thick Sqm 3623.00 329.90
b) 8 mm thick Sqm 4633.00 330.60
7 Providing at site of works ISI standard RCC slotted
pipes of NP-3 class including cost of all central and
local taxes, octroi, inspection, transportation, etc.
complete including cost of RCC collar, etc.
complete.
450 mm dia RMT 3623.00
600 mm dia RMT 5619.00
Section-J-WELL SINKING RIVER INFILTRATION WORKS 259
Sr No Item Description Unit Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
8 Lowering, laying and jointing RCC slotted pipes of
following diameters including all leads and lifts,
cost of jointing material, labour, etc. complete as
directed by Engineer-in-charge.
450 mm dia RMT 178.00 116.90
600 mm dia RMT 238.00 151.20
9 Lowering, laying and jointing CI ‘B’ class
connecting mains with rubber gaskets including
transportation of pipes from stores to site of works,
cost of jointing materials, cost of rubber gasket
with all leads and lifts, etc. complete.
300 mm dia RMT 222.00 244.90
350 mm dia RMT 269.00 299.20
400 mm dia RMT 333.00 362.50
450 mm dia RMT 336.00 354.60
500 mm dia RMT 398.00 408.70
600 mm dia RMT 561.00 570.60
700 mm dia RMT 748.00 708.90
750 mm dia RMT 847.00 819.60
10 Providing, lowering, laying and placing in position,
shrouding material for porous pipe gallery / slotted
pipe gallery/ trench gallery with all leads and lifts
involved including transportation of materials to
site of works, screening and washing of materials
and placing in position with given section, etc.
complete as directed by Engineer-in-charge.
40 mm pebbles Cu.m 1129.00 173.30
12 mm to 20 mm pebbles Cu.m 1366.00 196.70
6 mm to 12 mm pebbles Cu.m 1557.00 224.20
Coarse Sand (from river sand at site) Cu.m 772.00 111.20
Fine sand (from river sand at site) Cu.m
11 Providing and fixing in position C.I. Type dapuri
steps of 22 mm dia. M.S. bar step with proper
anchorage, etc. and providing and applying 3 coats
of ant-corrosive paint, etc complete as directed by
Engineer-in-charge.
No 356.00 48.60
Section-J-WELL SINKING RIVER INFILTRATION WORKS 260
Sr No Item Description Unit Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
12 Providing and fixing M.S. sluice gates in position
as per detailed drawing and specification including
cost of all materials, labour, operating pedestal,
connecting rod, painting with three coats of anti-
corrosive paint, etc. complete as directed by
Engineer-in-charge.
Kg 88.00 33.50
13 Providing and fixing in position C.I. /M.S. rose
pieces in intake wells including cost of all
materials and labour, painting with three coats of
anti-corrosive oil paint, etc.complete as directed by
Engineer-in-charge.
Kg 87.00 12.80
14 Providing and spreading around the well 1 mm
thick polyethylene sheet complete as directed by
Engineer-in-charge.
Sq.m 22.60 2.92
15 Dewatering charges for estimation purpose for
head works in river basin or dam
Approach channel RMT 5203.00 676.10
Intake well of 3 M dia No 69391.00 9011.90
Inspection well of 2 M dia No 44681.00 6784.30
Connecting main RMT 4170.00 648.20
Jack well of 6 M dia No 208161.00 20968.90
Approach Bridge RMT 701.00 127.90
Notes
1) The Contractor at his request may be allowed to
start construction of masonry steining so as not to
allow silting of well inoncoming monsoon and while
paying masonry, 25% amount shall be
withheld and released only when excavation to the
full depth is completed.
2) Dewatering: Total dewatering charges are to be
proposed in the tender as lumpsum amount and
75% is payable for excavation and 25% is payable
for construction of well / gallery. Out of 75%
excavation, break-up shall be as under:
25% for last 1 M depth.
20%for2Mdepthwhichjustabovelast1M depth.
15%for2Mdepthwhichjustabovelast3M depth.
15%fortherestofdepthfromwatertablelevel.
Section-J-WELL SINKING RIVER INFILTRATION WORKS 261
Sr No Item Description Unit Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
3) The provisions made for dewatering in the tender
being on lumpsum basis, the same shall have to be
reduced / increased proportionately as the length
of approach channel, connecting main or approach
bridge reduces / increases during actual
execution.
Condition No. 1 and 2 shall appear in Tender
condition
16 Carrying out recuparation / Yield test for
ascertaining the discharge of constructed well /
excavated profile as directed by Engineer - In -
Charge. The test carried out by drawing down
water from the well / profile below normal /
subsoil water level upto full depth rise is recorded.
The normal water level / subsoil water level /
subsoil water level in the well / profile as well as
strainer / suction level at pump as per design of
W.S. Scheme shall be recorded prior to the test
including cost of all materials, overload, labours
etc. complete as directed.
The test shall be carried out as per technical
circular No. 2597 dt. 20.11.1997 and shall be
carried out for 7 days.
a) Lps more than 25000 Day 3231.00 2034.70
b) Lps less than 25000 Day 3214.00 2126.30
Section-J-WELL SINKING RIVER INFILTRATION WORKS 262
Sr No Item Description Unit Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
1 Providing and fixing in position copper lightening
conductor including copper rod of 20 mm dia as
per upper terminal 1.5 M long with a knob at end
and with conical spike at top, copper tape
conductor 20 x 3 mm size, copper earth plate of 3
mm thick and 0.81 sqm. in area, clamps at 1 M
centre to centre including, necessary excavation,
laying and fixing the conductor, providing and
fixing 40 mm G.I pipe upto 3 M height from ground
and 0.5 M below ground including making all
connections, filling the earthing pit with charcoal,
salt, etc. and refilling and watering, etc. complete
as per specifications laid down in relevent I.S.
codes.
i) For Tape of 10M length No 10227.00 909.00
ii) Rebate / Extra rate per metre length or part
thereof over and above initial length of 10M
Mtr 267.00 10.00
2 Providing and fixing in position copper lightening
conductor including copper rod of 20 mm dia as
per upper terminal 1.5M long with a knob at end
and with conical spike at top, aluminium tape
conductor 20 x 3 mm size copper earth plate of 3
mm thick and 0.81 sqm. in area, clamps at 1 M
centre to centre including, necessary excavation,
laying and fixing the conductor, providing & fixing
40 mm G.I pipe upto 3 M height from ground and
0.5 M below ground including making all
connections, filling the earthing pit with charcoal,
salt, etc. and refilling and watering, etc. complete
as per specifications laid down in relevent I.S.
codes.
i) For Tape of 10M length No 9328.00 912.00
ii) Rebate / Extra rate per metre length or part
thereof over and above initial length of 10M Mtr 117.00 4.70
3 Providing, hoisting and fixing in position inverted
‘J’ type 100 mm dia. C.I. cowl type ventilators with
mosquitoproof aluminium mesh at top including No 1722.00 827.00
applying 2 coats of anti-corrosive paint, etc.
complete as directed by Engineer-in-charge,
weighing not less than 35 kg.
Section -K - ANCILLARY ITEMS FOR RESERVOIRS
Section-K-ANCILLARY ITEMS FOR RESERVOIRS 263
Sr No Item Description Unit Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
4 Providing, hoisting and fixing in position C.I.
manhole, frame and cover of best quality and of
required size and shape with locking arrangements
including applying 2 coats of anti-corrosive paint,
etc. complete
i) 90 x 60 cm size and weight 35 kg No 2658.00 200.10
ii) Rate on weight basis for any size and type of frame
and cover
Kg 76.00 6.00
5 Providing and fixing in position M.S. ladder 0.50 M
wide consisting of 75 x 10 mm M.S. flats as
stringers and 16 mm dia M.S. bars in double rows
as steps placed at 25 cm c/c including cost of
material and labour involved, welding, anchoring
and applying 3 coat of anti-corrosive paint, etc.
complete as directed by Engineer-in-charge.
RMT 1400.00 200.90
6 Providing and applying epoxy paint of approved
make (Shalimar, Ciba or Mahindra & Mahindra) to
concrete surface of RCC ESR or GSR or any other
structure including cleaning the surface by
scrapping and air blowers to the satisfaction of
Engineer-in-charge, necessary scaffolding, etc
complete with all leads and lifts and giving
satisfactory hydraulic test for water tightness as
per I.S. codes
a) For new surfaces - Two coats. Sq.m 571.00 299.60
b) For old surfaces - Two coats. Sq.m 642.00 360.60
7 Providing and constructing RCC spiral staircase in
M-150 mix concrete at site of work and consisting
of central vertical column of 400 mm dia and steps
in RCC M-150, tie members at each brace level,
RCC parapet wall 80 cm high including cost of all
labour and material involved, cost of scaffolding,
centering, shuttering, curing, finishing in CM 1:3
proportion including RCC M-150 footing
foundation, its excavation, refilling and cleaning
the site, etc. complete as per type design, with 3
coats of cement paint.
RMT 6415.00 434.30
Section-K-ANCILLARY ITEMS FOR RESERVOIRS 264
Sr No Item Description Unit Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
8 Providing and constructing RCC ventilating shaft
of diameters and height mentioned below with
required number of RCC 15 x 15 cm size columns
and RCC circular slab or dome over the pillars in
M-150 including cost of all material and labour,
providing and fixing steel or wooden frame &
providing & fixing G.I. flyproof mesh of 26 gauge
and providing and applying in 3 coats of oil paint
to wooden or steel frame and cement paint to
concrete structure. etc. complete as directed by
Engineer-in-charge.
i) 0.9 M dia x 1.35 M height No 6882.00 782.30
ii) 1.2 M dia x 1.80 M height No 8748.00 1000.00
iii) 1.5 M dia x 2.25 M height No 13997.00 1623.00
9 Providing and installing mercury water level
indicator for RCC ESR and wash water tank site as
per instructions of Engneer-in-charge at ground
level of the tank or nearing pump house or room
for RCC ESR having 15 mtrs. staging height and 5
mtrs. water storage height with indication of water
height in storage tank in metre and 1/10th of
meter including providing and installing 15 mm
dia class ‘B’ G.I. piping with necessary accessories
from bottom of the tank upto the instrument as
per instructions of Engineer-in-charge.
No 17496.00 2920.20
For Extra stage height over 15M or part thereof
and water depth over 5 M or part thereof
Mtr 933.00 155.70
10 Providing and Erecting, installing and
commissioning Barometric Leg Chlorination
system for water treatment plant upto 5 MLD.
capacity as per manufacturers specifications with
all required materials viz. 15 Kg. pressure yellow
PVC pipe, specially prepared chamber, mixing
chamber, scrubber unit, gas pressure flexible pipe,
brass nozzle nipple, electronic alarm unit, PPM
dose, indicator of 25 mm dia. 4mm thick glass
tube (Borosil), gas ubit opening spanner 3 hole
type, instruction board, aluminium pipe upto
sump ( Maximum length 15 Mtr.) etc. including
civil works wherever required for above material
Section-K-ANCILLARY ITEMS FOR RESERVOIRS 265
Sr No Item Description Unit Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
fittings, including satisfactory test and trial at
work site etc. complete. ( Item do not include
construction of chlorine Gas Room of 3.0 x 3.0
Mtr. or adequate size).
For 5 MLD Capacity 1No. per
unit
116640.00 11243.70
Add/Deduct per MLD or part of per MLD capacity. per
MLD
4082.00 400.80
11 Providing and fixing water level indicator upto 5 M
height including M.S. enamelled gauge plate 300
mm wide 3 mm thick, P.V.C. float, providing and
fixing required accessories such as pointer,
pulleys, nylon thread including cost of all material,
labour, etc. complete.
No 8686.00 1549.00
12 Providing and fixing water level indicator upto 5 M
height including M.S. enamelled gauge plate 150
mm wide 3 mm thick, P.V.C.float, providing and
fixing required accessories such as pointer,
pulleys, nylon thread including cost of all material,
labour, etc. complete.
No 5249.00 1547.80
Section-K-ANCILLARY ITEMS FOR RESERVOIRS 266
Sr No Item Description Unit Rate
(in Rs.)
2012-2013
LABOUR
INVOLVED
1 Commisioning running and maintaining the
scheme to quantites, rated capacity, including
manning necessary personnel such as operator,
valveman, etc. as per requirements of the scheme
and who should also administer chemical dose for
a period of 1 month for individual scheme and 3
months for regional scheme, together with training
of personnel spared by MJP/ Local Body and
handing over the scheme to Local Body after
completion of the above period as directed by
Engineer-in-charge.
Note:
Required chemicals to be supplied by Department
free of cost and electricity bill will also be paid by
the Depertment.
a) For single village ( 3 months) Job 48572.00 33489.40
b) For regional scheme upto 3 villages with raw
water pumping, one treatment plant with pumps,
raw water pumping main, leading main, ESR, BPT
and distribution system etc. (
6 months) Job 201115.00 166988.40
c) For regional scheme upto 3 villages with
pumping, pumping main, leading main, ESR, BPT
and distribution system etc. ( 6 months) (Without
WTP). Job 130081.00 108007.10
d) For regional schemes upto 3 villages, trial
period shall be one year with raw water pumping
, one treatment plant with pumps,raw water
pumping main, leading main,ESR, BPT and
distribution system etc. ( for One year)
Job 407997.00 338764.80
e) For regional schemes upto 3 villages, trial
period shall be one year with raw water pumping
, pumps , raw water pumping main, leading
main,ESR, BPT and distribution system etc. (
Without WTP) ( for One year )
Job 264105.00 219289.90
f) Add for every additional village Month 5996.00 4428.00
g) Add for every pumping station. Month 9867.00 9192.40
Section -L - TRIAL RUN
Section-L-TRIAL RUN 267