8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 1 of 35
MAHARASHTRA POLLUTION CONTROL BOARD
Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018 at 3.00 p.m. at MHADA Office, Grihanirman Bhavan,
Kalanagar, Bandra (East), Mumbai, Maharashtra 400051.
……….
The Consent Appraisal Committee meeting of the Board was held on 09.02.2018. Following members of the Consent Appraisal Committee were
present:
1. Shri Milind Mhaiskar, Chairman
Vice President & CEO, MHADA and
Chairperson, MPCB, Mumbai.
2. Shri. P. Anbalagan Member
Member Secretary, MPC Board, Mumbai
3. Shri. Padmakar Nandusekar Member
Technical Advisor (Environment), MIDC, Mumbai
4. Shri. P. K. Mirashe Member Conveyor
Assistant Secretary (Technical), MPC Board, Mumbai
Additional Chief Secretary, Home (Transport) Dept., Mumbai could not attend the meeting. Leave of absence was granted to them.
Following Officer of MPCB were present for the meeting:
1. Shri. V. M. Motghare, JD(APC), MPCB, Special Invitee
2. Shri. Y. B. Sontakke, JD(WPC), MPCB, Special Invitee
3. Shri A. R. Supate, PSO, Mumbai, Special Invitee
4. Shri. N. N. Gurav, Regional Officer (HQ), Mumbai, Special Invitee
The meeting thereafter deliberated on the fresh agenda items of renewal of consent [Book-let no 15] is placed before the committee and following
decisions were taken.
8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 2 of 35
Sr.
No.
Application
unique
number
Name of Industry Decision on grant
of consent
Consent
granted up
to
Remarks/Discussion (1)
Book-let No. 15
Renewal Cases
1 MPCB-
CONSENT-
0000009069
Viraj Profiles Limited,
Unit-II, Plot No. G-2,
1/2, 1/3 MIDC Tarapur
Palghar
APPROVED
for 1st consent to
operate for
expansion and
Renewal of consent
to operate with
increase in CI and
their amalgamation
31.07.2021 Committee noted the SCN issued for 1st consent to
operate for expansion and Renewal of consent to operate
with increase in CI and their amalgamation due to
various non-compliances of consent conditions.
Committee also noted that industry vide letter dated
03.10.2017 submitted their reply towards SCN issued by
the Board and personal hearing extended before Member
Secretary on 20.01.2018. Also noted the information
submitted by the PP as decided in the personal hearing
viz. production data for the year 2016-17, energy meter
reading of ETP, action plan for installation of
CAAQMS, Secondary fume extraction system, Online
monitoring system at ETP, installation of slag crushing
and etc.
Considering the action plan submitted by the industry
during personal hearing, it was decided to grant 1st
consent to operate for expansion and Renewal of consent
to operate with increase in CI and their amalgamation by
imposing following conditions;
1. Industry shall install secondary fume extraction
system by April 2018.
2. Industry shall install CAAQMS by March 2018.
3. Industry shall submit Board resolution within one
month for increasing C.I. by 115 Cr without
obtaining consent to establish from the Board and
submit Bank Guarantee of Rs. 2 lakh towards
compliance of same.
4. Industry shall install new system for slag crushing at
slag yard by June 2018 and also dispose the slag in
scientific manner.
8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 3 of 35
Sr.
No.
Application
unique
number
Name of Industry Decision on grant
of consent
Consent
granted up
to
Remarks/Discussion (1)
5. Industry shall comply with the conditions prescribed
in EC granted on 25.01.2016.
6. Industry shall submit the BG of Rs. 10 lakh towards
not to violate consent conditions in future.
It was also decided to forfeit the BG of Rs. 5 lakh each
obtained towards installation of CAAQMS and
installation of secondary fume extraction system
followed by Bag house at melting furnace as industry
failed to install the same within stipulated time and
obtain top-up BG of Rs. 10 lakh each towards
compliance of the same.
Consent shall be issued after submission of additional
requisite consent fee.
2 MPCB-
CONSENT-
0000013883
Grant Medical
Foundation, Ruby Hall
Clinic, 40 40, Sassoon
Road, Dist. Pune
APPROVED
Renewal of
combined consent &
BMW Authorization
31.10.2021 Committee noted the provision of ETP of capacity 20
CMD and STP of capacity 40 CMD which is inadequate
and commitment of PP towards its up-gradation. The
capital investment was increased due to up gradation &
renovation of patient care area. Up-graded medical
equipment’s & invested in latest technology.
In view of above, it was decided to grant renewal of
combined consent & BMW Authorization by imposing
HCE BG regime and imposing following conditions;
Forfeited the BG of Rs. 2 Lakhs obtained towards up-
gradation of STP as PP failed to up-grade the same
within stipulated time and obtain top up BG of Rs. 4
lakh towards up-gradation of existing STP within three
months period.
Consent shall be issued after submission of additional
requisite consent fee.
8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 4 of 35
Sr.
No.
Application
unique
number
Name of Industry Decision on grant
of consent
Consent
granted up
to
Remarks/Discussion (1)
3 MPCB-
CONSENT-
0000015323
The Automotive
Research Association
of India (ARAI)
Survey No. 102 Vetal
Hill, Off Paud Road,
Kothrud, Pune
APPROVED
Renewal of consent
with increase in CI
31.12.2020 Committee noted that Board has issued SCN for Refusal
of consent to the industry due to increase in C.I. by Rs.
132.09 Crrs without prior permission from the Board.
Also noted the clarification submitted by the industry
vide letters dated 12.06.2017 & 15.06.2017 about
increase in Capital Investment due to sanction of funds
and not towards any modifications, changes in the
existing set up/ infrastructure.
Considering the reply of the industry, it was decided to
grant renewal of consent to operate with increase in CI
for Research and Development Activity (for Automobile
Section) by imposing following conditions;
1. Industry shall extend the existing BG of Rs. 5 lakh
submitted towards O&M of pollution control
system.
Consent shall be issued after submission of additional
requisite consent fee, if any.
4 MPCB-
CONSENT-
0000018446
Gondegaon Extension
Opencast Coal Mine
Plot No 622
Gondegaon, Parseoni,
Dist. Nagpur
APPROVED
Renewal of consent
with increase in CI
31.12.2020 Committee noted that earlier consent to operate was
refused by the board due to various non-compliances.
Industry has made the appeal before Appellate authority.
Appellate Authority has issued the order dated
30.07.2015 with the instruction to consider the case as
per the merit of the case.
Accordingly, industry has again applied for renewal of
consent for Coal Mine - 2.5 Million Ton/Annum of
capacity.
Considering the compliance made by the industry, it was
decided to grant Renewal of Consent with increase in CI
for Coal Mining activity – 2.5 MTPA by imposing Coal
mine BG regime and by imposing standard conditions.
It was also decided to forfeit the BG of Rs. 10 lakh as
8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 5 of 35
Sr.
No.
Application
unique
number
Name of Industry Decision on grant
of consent
Consent
granted up
to
Remarks/Discussion (1)
JVS results are exceeding the consented standards and
obtain top-up BG of Rs. 20 lakh towards O&M of
pollution control system.
Consent shall be issued after submission of one term
consent fee against refusal of consent and additional
requisite consent fee.
5 MPCB-
CONSENT-
0000014804
Viraj Profiles Limited,
Plot No. G-75, 76, 77
MIDC Tarapur, Boisar
Palghar
APPROVED
Renewal of consent
with increase in CI
31.11.2021 Committee noted that the Board has issued stop work
order for expansion activity due to various non-
compliances and called the industry for personal hearing
to clarify about increase in CI from Rs. 24.96 Crs. to Rs
170.74 Crs on 20.01.2018.
As per minutes of personal hearing and commitment
made by the industry. It was decided to grant plain
renewal of consent to operate with increase in CI and
without increase in production quantity, water budget
and HW quantity and by imposing following conditions;
1. Industry shall submit Board resolution within one
month for increasing C.I. by 120.82 Cr without
obtaining consent to establish from the Board and
submit Bank Guarantee of Rs. 2 lakh towards
compliance of same.
2. Industry shall submit an undertaking within 15 days
stating that due to increase in CI by 120.82 Cr there
is no increase in production capacity and production
quantity more than consented limit.
3. Industry shall submit the BG of Rs. 10 lakh towards
not to violate consent conditions in future.
4. Industry shall carryout performance audit of APC
equipment from renowned institute like IIT/NEERI
within 03 months and submit the BG of Rs. 2 lakh
towards compliance of the same.
5. Industry shall carry out water audit report within a
period of one month and submit the report to CAC
cell.
8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 6 of 35
Sr.
No.
Application
unique
number
Name of Industry Decision on grant
of consent
Consent
granted up
to
Remarks/Discussion (1)
6. Industry shall provide and operate online flow meter
at ETP Inlet, Outlet & recycle line with electronic
data logger.
7. Industry shall submit the online report to SRO office
monthly.
6 MPCB-
CONSENT-
0000021875
Ukni Opencast Mine
Western Coalfields
Limited, 669, Near
village Ukni, Tal.Wani,
Dist. Yavatmal
APPROVED
Renewal of consent
with increase in CI
31.03.2020 It was decided to grant renewal of consent to Operate
with increase in CI for Coal Mining activity- 2.2 MTPA
by imposing coal mine BG regime and imposing
following conditions;
1. Industry shall install CAAQMS before June 2018 as
per conditions imposed in consent to operate dated
18.03.2015
Consent shall be issued after submission of additional
requisite consent fee, if any.
7 MPCB-
CONSENT-
0000021968
Zoetis Pharmaceuticals
Private Limited, 16,
K.U. Bazar Post,
MIDC TTC Industrial
Area, Thane Belapur
Road, Turbhe, Navi
Mumbai
APPROVED
Renewal of consent
with increase in CI
30.01.2022 Committee noted that Board has issued SCN for refusal
of renewal of consent to operate with increase in CI due
to various non-compliances. Accordingly, industry has
submitted the reply and stated that
i. Industry has stopped using treated effluent for
internal gardening since June 2017 and shall
continue to discharge the treated effluent to CETP.
ii. The treated effluent is transferred to storage tank for
further discharge to CETP. The sludge is pumped to
Sludge tank and after passing through the Centrifuge
sent to CHWTSDF
iii. Industry has submitted the revised CA certificate
inclusive of the cost of the land.
In the view of above, considering the reply of the
industry, it was decided to grant renewal of consent with
increase in CI by imposing following conditions;
1. Industry shall extend the existing BGs
2. Industry shall submit and undertaking within 15
8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 7 of 35
Sr.
No.
Application
unique
number
Name of Industry Decision on grant
of consent
Consent
granted up
to
Remarks/Discussion (1)
days stating that in future they will not discharge the
treated trade effluent on land for gardening and
submit the BG of Rs. 5 lakh towards compliance of
the same.
3. Industry shall re-audit the hazardous waste quantity
with mass balance within a period of three months.
The increase in HW quantity to be amended after
submission of hazardous waste audit.
8 MPCB-
CONSENT-
0000021827
Hindustan Coca-Cola
Beverages Private
Limited, Gut No
1105/7/8/33 Pirangut
Pirangut, Mulshi, Dist.
Pune
APPROVED
Renewal of consent
with increase in CI
30.04.2022 It was decided to grant renewal of consent to operate
with increase in CI for production of Carbonated
Beverage and Carbonated Water-727 CMD & Package
Drinking Water- 50 CMD with reduction of trade &
domestic effluent quantity by imposing following
conditions;
1. Bank Guarantee of Rs. 2.5 lakh out of Rs. 5 lakh is
forfeited as JVS results of STP are exceeding the
consented standards and obtain top-up BG Rs. 5
lakh so as to make total Bank Guarantee of Rs. 7.5
lakh towards O & M of pollution control systems.
2. Industry shall extend the existing BG of Rs. 5 lakh
obtained towards performance of existing APC
system.
3. Industry shall obtain NOC from CGWB/Irrigation
department for consumption of ground
water/Surface water within 03 months.
9 MPCB-
CONSENT-
0000022365
Saint-Gobain India
Private Limited, 300/1,
2, 301, 2, 303/1, 304.5,
6, 7, 8, 9, 311/1, 348/2,
3, Village Nare &
Vadavali, Post Uchat,
Wada
APPROVED
Renewal of consent
with increased in
production quantity
of 02 products and
addition of one new
product with
decrease in CI
31.03.2022 Committee noted that Board has issued SCN for refusal
of renewal of consent with increase in production
quantity due to non compliances of restart direction.
Committee noted the reply submitted by the industry
dated 16.01.2018 that;
1. NEERI has completed the heath assessment study as
directed and submitted the report to the Board.
2. For treatment of RO reject, single evaporator cum
water recovery system is erected and under
8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 8 of 35
Sr.
No.
Application
unique
number
Name of Industry Decision on grant
of consent
Consent
granted up
to
Remarks/Discussion (1)
commissioning stage.
3. The qualitative assessment of open well and ground
water was conducted by IIT, Mumbai and report was
submitted to MPCB dated 20.11.2017.
4. Industry has not done any production of wet ready
mix. and applied for the consent to operate for ready
mix and waiting for approval.
5. Industry has proposed to increase the volume by
process optimization and for this they have asked for
increase in consented quantity from 1,04,500 T/A to
1,50,000 ton/A. This has planned over the next 5
years.
In view of above, considering the reply of the industry, it
was decided to grant renewal of consent to operate with
increased in production quantity of 02 Products and
addition of one new product with decrease in CI by
extending all the existing BG’s and by imposing
recommendations of NEERI.
10 MPCB-
CONSENT-
0000023494
Classic Citi
Investment Pvt.
Ltd36/3, Koregaon
Park, Haweli, Pune
APPROVED
Renewal of consent
with increase in CI
31.03.2022 It was decided to grant renewal of consent to operate
with increase in CI for Hotel activity including
Restaurant, Lodging, Swimming pool, Laundry &
Lounge, Banquet Hall, Bar, Club with 270 Rooms and
with total plot area of 14,528 sq. mtrs and total
construction BUA of 66,905 sq. Mtrs. by imposing
following conditions;
1. Project Proponent shall submit the BG of Rs. 10
lakhs towards O & M of pollution control system.
2. PP shall achieve the treated domestic effluent
standard for the parameter BOD- 10 mg/lit.
3. The treated effluent shall be 100% recycled for
secondary purposes such as toilet flushing, air
conditioning, cooling tower make up, firefighting
etc. same.
4. PP shall provide primary ETP for treatment of
laundry effluent within 3 months time and shall
8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 9 of 35
Sr.
No.
Application
unique
number
Name of Industry Decision on grant
of consent
Consent
granted up
to
Remarks/Discussion (1)
submit BG of Rs. 5 lakhs for the compliance of the
same.
5. PP shall install online monitoring system for
parameters BOD, TSS & flow at the outlet of STP
with a period of three months and submit BG of Rs
2 lakh towards the compliance of the same.
Consent shall be granted after obtaining:
i. Latest occupancy Certificate from PMC
ii. Submission of Certificate from Architect regarding
BUA completed for which they have applied for
renewal.
iii. Clarification for increase in CI, Submission of Water
budget and disposal details of the treated effluent.
iv. Additional fees if any.
11 MPCB-
CONSENT-
0000024111
Bhanegaon Open Cast
Coal Mine Project
(WCL), Khasrea No
12/1D & 12/2 Village
Bina Post
Khaperkheda,
Kamptee, Dist. Nagpur
APPROVED
Renewal of Consent
31.10.2020 It was decided to grant renewal of consent to operate
with increase in CI for Coal Mining activity-0.6 MTPA
by imposing Coal mine BG regime and imposing
standard conditions and following conditions;
1. Industry shall provide adequate capacity of STP
within six months and submit the BG of Rs. 5 lakh
towards compliance of the same.
Consent shall be issued after receipt of latest JVS and
AAQM results from SRO and if results are exceeding
the consented standards proportionate BG shall be
forfeited.
12 MPCB-
CONSENT-
0000024388
Makardhokda-1, Open
Cast Mine Project,
Western Coal Fields
Ltd. Post Shirpur, Tq.
Umred, Dist. Nagpur
APPROVED
1st consent to operate
for expansion and
renewal of existing
consent and their
amalgamation
31.03.2021 WCL mine is in the close vicinity of Karanda Wildlife
Century and decided to return the application and to
resubmit it along with NOC from Forest Department
Now industry has resubmitted application along with
NOC from Forest Department dated 03.04.2017.
Industry has provided STP of 0.3 MLD capacity using
Phytorid technology,
8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 10 of 35
Sr.
No.
Application
unique
number
Name of Industry Decision on grant
of consent
Consent
granted up
to
Remarks/Discussion (1)
provided Concrete Sedimentation tank, provided ETP
capacity 100 CMD for effluent generated from
workshop, mobile water sprinkler are provided for dust
suppression for haul road, Common CHP and Railway
siding of Umred area will be used where 26 Nos. of
fixed sprinklers are provided.
In view of above, It was decided to grant 1st consent to
operate for expansion and renewal of existing consent
and their amalgamation for Coal Mine activity- 2.0
MTPA (existing 1.08 MTPA+ Expansion 0.92 MTPA)
by imposing Coal mine BG regime.
Consent shall be issued after receipt of latest JVS and
AAQM results from SRO and if results are exceeding
the consented standards proportionate BG shall be
forfeited.
13 MPCB-
CONSENT-
0000021946
Eternis Fine Chemicals
Limited, D9/1, D9/2,
D9/3, D-15 Kurkumbh
MIDC, Tal. Daund,
Dist. Pune
APPROVED
1st consent to
operate and
Renewal of existing
consent to operate
and their
amalgamation with
increased CI
28.02.2022 Committee noted that the application was discussed in
CAC meeting held on 23.07.2017. The production
quantity mentioned in the EC and in renewal of consent
and consent to establish after amalgamation does not
match. Deviation is observed in the consent application
and amalgamated quantity of C to R and C to E for
water budget, hazardous waste quantity and boiler
details etc.
Accordingly, clarification was called from the industry.
Industry stated that they have clubbed all the quantities
of the products (combined quantity in MT/A). Also the
quantities of water consumption, effluent generation,
boiler details and hazardous waste generation are same
as previous consent.
In the view of above, it was decided to grant 1st consent
to operate and Renewal of existing consent to operate
and their amalgamation without clubbing the
products and their quantity and by imposing
8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 11 of 35
Sr.
No.
Application
unique
number
Name of Industry Decision on grant
of consent
Consent
granted up
to
Remarks/Discussion (1)
following conditions
1. Industry shall extend the existing BG of Rs. 5 lakh
obtained towards O&M of pollution control system.
2. Industry shall 100% reuse/recycle the treated trade
effluent so as to achieve the zero liquid discharge.
Decision regarding forfeiture/release of BG of Rs. 2 lakh
and Rs. 5 lakh obtained towards carryout performance
evaluation of ETP and provision of ESP/Bag filter to
briquette fired boiler will be taken after receipt of
verification report from SRO.
Consent shall be issued after submission of additional
requisite consent fee, if any.
14 MPCB-
CONSENT-
0000021400
The Manjri Stud Farm
Pvt. Ltd. 209 Next to
Satyapuram Society,
Pune-Saswad Road,
Phursungi, Haveli,
Dist. Pune
APPROVED
Renewal of Consent
31.01.2022 Committee noted that PP has obtained Environmental
Clearance vide letter dated 04.09.2014 for total plot area
319900 Sq. Mtrs and total BUA105565 Sq. Mtrs.
In view of above, it was decided to grant renewal of
Consent to Operate for IT and ITES project having plot
area 3,19,900 sq. mtrs. and total construction BUA of
86,131.29 sq.m. by imposing following conditions;
1. PP shall extend/ top up the BG to form total sum of
Rs. 25 lakh towards O&M of pollution control
system.
2. PP shall achieve the treated domestic effluent
standard for the parameter BOD- 10 mg/lit. within 6
months time period and shall submit BG of Rs. 10
lakhs for the same.
3. The treated domestic effluent shall be 60% recycled
for secondary purposes such as toilet flushing, air
conditioning, cooling tower make up, firefighting
etc. and remaining shall be utilized on land for
gardening and connected to the sewerage system
provided by local body.
8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 12 of 35
Sr.
No.
Application
unique
number
Name of Industry Decision on grant
of consent
Consent
granted up
to
Remarks/Discussion (1)
4. PP shall install online monitoring system for
parameters BOD, TSS flow at the outlet of STP with
a period of three months and submit BG of Rs 5 lakh
towards the compliance of the same.
5. PP shall provide Organic waste management system
(OWC / Bio-digestor etc.) within three months
period and submit BG of Rs 5 lakh towards the
compliance of the same.
15 MPCB-
CONSENT-
0000020295
Bhatadi Open Cast
Mine, Western
Coalfields Ltd, P.O.
Bhatadi, Dist.
Chandrapur
APPROVED
Renewal of Consent
The Committee noted that presently applied for the
enhancement of Coal production 0.975 MTPA.
Applications submitted vide UAN No. 0000001660 and
UAN No. 0000020295.
It was noted that PP has provided 02 nos of
sedimentation Tanks, STP recently provided, Air
Pollution Control arrangements provided.
It was decided to grant consent to operate for Opencast
Coal Mine activity – 0.975 Million Tons/Annum by
imposing standard conditions and by imposing following
condition:-
Consent shall be issued after:-
1. Receipt of latest visit report / compliance report, JVS
results and forfeiting proportionate bank Guarantee.
2. Receipt of requisite additional consent fees.
16 MPCB-
CONSENT-
0000020395
Padmapur Open Cast
Mine, Western Coal
Fields Limited, P.O. –
Padmapur, Dist.
Chandrapur
APPROVED
Renewal of Consent
31.03.2020 The Committee noted that presently applied for renewal
of Consent to operate of Coal production 2.5 MTPA.
Applications submitted vide UAN No. 0000020395.
It was noted that on the basis of non-compliances
observed during the visit of Board Official RO,
Chandrapur issued Show Cause notice on 10.08.2017.
Reply submitted by PP that they have taken measures
towards the non-compliances mentioned in SCN i.e.
provided 03 nos. of sedimentation Tank for treatment of
8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 13 of 35
Sr.
No.
Application
unique
number
Name of Industry Decision on grant
of consent
Consent
granted up
to
Remarks/Discussion (1)
mine water discharge, ETP provided for workshop
effluent including Air Pollution Control arrangements.
In view of above, it was decided to grant renewal of
consent to operate for Opencast Coal Mine activity –
2.50 Million Tons/Annum by imposing standard
conditions and by imposing following condition:-
1. To forfeit the Bank Guarantee Rs. 10 lakhs on the
basis of non-compliances mentioned in Show cause
Notice. Also, to top up with double amount of Bank
guarantee.
Consent shall be issued after: -
1. Receipt of requisite additional consent fees.
17 MPCB-
CONSENT-
0000024996
Viraj Profiles Ltd.
Survey No. 25 (1), 25
(2), 26 & 34 Village
Maan, Palghar
APPROVED
Renewal of consent
to operate with
increased CI and
without increase in
production quantity
& capacity, water
budget, HW catg.
30.06.2022 Committee noted that Board has issued SCN for refusal
of renewal of consent to operate with increase in CI due
to various non-compliances reported by SRO.
Industry vide letter dated 21.01.2018 submitted the reply
in respect of minutes published on website and reported
as below
1. Industry is constantly upgrading the manufacturing
facilities with improved machineries/accessories to
improve the quality and enhance the product range.
2. Industry has converted pre heating furnaces from FO
to CNG and had spent considerable amount.
3. Industry has pickling process which is the only
source of trade effluent. At present about 50-60
CMD is being treated and same is recycled in
Rolling Mill process along with direct Cooling
Water for the descaling of Hot Rolled Metal at the
time of Rolling. Industry has provided 3 MLD water
holding tank collected from ETP through closed
loop pipeline. Hence, industry achieved zero
discharge by reuse/recycle the complete treated
effluent into Mill process and requested to waive the
8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 14 of 35
Sr.
No.
Application
unique
number
Name of Industry Decision on grant
of consent
Consent
granted up
to
Remarks/Discussion (1)
condition of installation of MEE and BG of Rs. 50
lakh for the same.
4. Industry had requested to increase the water
consumption for domestic use from 25 CMD to 87
CMD, however, industry agree to continue with
existing water budget without increase in water
consumption.
5. The 03 Nos. of Thermic fluid heater and DG set are
the part of manufacturing plant from day one and
have missed out the same at the time of applying
first consent to operate. Industry has change the fuel
pattern from FO/LDO to CNG.
6. Industry has missed out the HW catg. 5.1 & 5.2
while applying for first CtoO and also mentioned
very low ETP sludge generation compared to
production quantity in first CtoO.
In view of above, considering the reply of the industry, it
was decided to grant renewal of consent to operate with
increase in CI but without change in water budget and
production quantity and capacity by imposing following
conditions;
1. Industry shall submit Board resolution within one
month in Board’s prescribed format for increase in
C.I. by 296.22 Cr for up-gradation of plant and
machinery, infrastructure development, up-gradation
of pollution control system etc. without obtaining
consent to establish from the Board and submit Bank
Guarantee of Rs. 2 lakh towards compliance of
same.
2. Industry shall submit an undertaking within 15 days
stating that due to increase in CI by 296.22 Cr there
is no increase in production capacity and production
quantity more than consented limit.
3. Industry shall submit the BG of Rs. 25 lakh towards
not to violate consent conditions in future.
4. Industry shall carry out water audit with techno
8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 15 of 35
Sr.
No.
Application
unique
number
Name of Industry Decision on grant
of consent
Consent
granted up
to
Remarks/Discussion (1)
feasibility of recycle/reuse the treated trade effluent
in Rolling Mill process along with direct Cooling
Water for the descaling of Hot Rolled Metal at the
time of Rolling so as to achieve the zero liquid
discharge from renowned institute like NEERI/IIT
within a period of three months and submit the
report to CAC cell.
5. Industry shall install and operate online flow meter
at ETP Inlet, Outlet & recycle line with electronic
data logger.
6. Industry shall submit the online report to SRO office
on monthly basis.
18 MPCB-
CONSENT-
0000025881
Pride Purple
Properties- Park
Street210,211,214,215,
217,218,219,220,221,2
22,224,225 Wakad,
Dist. Pune
APPROVED
Renewal of Consent
to operate (Part)
30.04.2022 Committee noted that Board has issued SCN for refusal
of renewal of consent (part) due to non-operation of
OWC and STP reported by SRO.
PP submitted the reply and reported that they have put
all the pollution control system in operation.
Committee noted the reply submitted by PP and
considering the reply of PP, it was decided to grant
renewal of existing consent (part) by imposing following
conditions.
1. BG of Rs. 10 lakh to be forfeited as O&M of
pollution control system i.e. OWC & STP is very
poor and obtain top-up BG of Rs. 20 lakh towards
compliance of the same.
Consent shall be issued after submission of additional
requisite consent fee, if any
19 MPCB-
CONSENT-
0000025443
Clover Forging &
Machining Private
Limited (Formerly
known as M/s. Exon
Machines Private
NOT APPROVED
Renewal of consent
with increase in CI
and name change
--- The information regarding increased CI by 91.66 Cr,
change in manufacturing process, HW and furnace
details was called from the PP vide letter dated
15.01.2018, however, PP has failed to submit the same
till date.
8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 16 of 35
Sr.
No.
Application
unique
number
Name of Industry Decision on grant
of consent
Consent
granted up
to
Remarks/Discussion (1)
Limited) B-21 Shendra
B-21, Dist.
Aurangabad
There is no clarity about emission sources and their
pollution control system, increase in CI by Rs. 91.66 Cr
without obtaining consent from the Board, and changed
the manufacturing process without Board permission.
In view of above, due to above non-compliance, it was
decided to issue SCN for refusal of Renewal of consent
with increase in CI and name change.
20 MPCB-
CONSENT-
0000024187
Hindusthan Lalpeth
Open Cast Project
Lalpeth,
Dist.Chandrapur
APPROVED
Renewal of Consent
to operate
31.03.2020 The Committee noted that presently applied for renewal
of Consent to operate of Coal production 1.00 MTPA.
Applications submitted vide UAN No. 0000003947 and
UAN No. 0000024187.
It was noted as per reply of PP that PP has provided
sedimentation Tank for treatment of mine water
discharge, ETP provided for workshop effluent, Air
Pollution Control arrangements provided. JVS results
are within Consented limit.
In view of above, it was decided to grant renewal of
consent to operate for Opencast Coal Mine activity –
1.00 Million Tons/Annum by imposing standard
conditions and by imposing following condition:-
1. To forfeit the Bank Guarantee Rs. 10 lakhs on the
basis of non-compliances reported by Board Official.
Consent shall be issued after: -
1. Receipt of latest compliance report, JVS results and
forfeiture proportionate bank Guarantee.
2. Receipt of requisite additional consent fees.
21 MPCB-
CONSENT-
0000026208
Rajuri Steel and Alloys
Pvt. Ltd. Plot No. B-6,
7 & 8, MIDC Mul, Tal.
Mul, Dist. Chandrapur
APPROVED
Renewal of consent
30.06.2020 Committee noted that the existing consent is valid up to
30.06.2015 and industry is not in operation since from
last three year and there is no clarity about decrease in
CI from 189.97 Cr to 33.57 Cr. Board has issued SCN
for refusal of renewal of consent.
8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 17 of 35
Sr.
No.
Application
unique
number
Name of Industry Decision on grant
of consent
Consent
granted up
to
Remarks/Discussion (1)
Industry has submitted the reply and reported that
Consent to establish was taken for 180 TPD Sponge Iron
Plant, Steel Plant, Rolling Mill and Power plant having
total CI of Rs. 157.75 Cr. But as of now, the current and
actual investment of the unit is of Rs. 32.22 Cr for 100
TPD Sponge Iron Plant and for which consent to operate
is obtained which was valid upto 30.06.2015 and there
has been no further capacity enhancement and no further
capex.
In view of above, it was decided to grant renewal of
consent to operate with increase in CI to manufacture
Sponge Iron- 100 TPD for the period upto 30.06.2020
by imposing Sponge Iron BG regime and following
conditions.
1. BG of Rs. 5 lakh obtained towards O&M of
pollution control system is forfeited and obtain top
up BG of Rs. 10 lakh towards compliance of the
same.
2. Interlinking of ESP operation with production
processes and provision of separate energy meter for
pollution control system including connectivity to
the Board server within 3 months.
3. Industry shall repair/install Metal Sheet covering
provided to most of the conveyor belts carrying raw
material which were found damaged/misplaced to
control dust emission within 01 month.
4. Industry shall provide adequate pollution control
system to magnetic separator and transfer points
within 02 months so as to control the fugitive
emission.
5. Industry shall tarred/concreted the internal road
within 03 months so as to avoid air pollution due to
vehicular movements.
6. Industry shall install Continuous online stack and
ambient quality monitoring system within 03
months.
8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 18 of 35
Sr.
No.
Application
unique
number
Name of Industry Decision on grant
of consent
Consent
granted up
to
Remarks/Discussion (1)
7. Industry shall submit the irrevocable BG of Rs. 10
lakh towards compliance of above point no 2 to 6.
8. Industry shall obtain specific permission from
Regional Officer Chandrapur to restart the
manufacturing activity.
22 MPCB-
CONSENT-
0000027431
Chandrapur Super
Thermal Power
Station, Unit 3 to 716
Urja Nagar,
Chandrapur
Chandrapur
APPROVED
Renewal of Consent
31.08.2020 It was decided to grant renewal of consent of Unit No. 3
to 7 for electricity generation- 1920 MW by imposing
following conditions
1. Scientific arrangement for storage of furnace oil.
2. Industry shall improve Operation and Maintenance of
Pollution Control arrangement so as to achieve
consented standards.
3. In no case industry shall use coal having ash content
more than 34%.
4. To provide scientific arrangement for Coal Handling
plant & Coal Crusher for controlling dust emission.
5. To install Automatic real time online monitoring
system.
It was also decided to forfeit the proportionate amount
of BG towards use of coal having ash content more than
34%, exceeding JVS results, fly ash utilization non-
compliances, non-provision of Automatic real-time
online monitoring system, and obtain top-up BG towards
compliance of the same.
23 MPCB-
CONSENT-
0000020267
Dicitex Home
Furnishing Pvt. Ltd
Plot No. G-7/2/1
Boisar – Tarapur,
MIDC Palghar.
NOT APPROVED
Renewal of consent
to operate with
increased C.I. and
reduced water
consumption and
effluent quantity and
increased HW
--- Committee noted that Board has issued SCN for refusal
of renewal of consent to operate due to non-compliances
of consent conditions dated 07.10.2017. Accordingly,
industry has submitted the reply which not satisfactory.
From the reply submitted by the industry it is noted that
industry has not installed MEE and APC to boiler,
therefore, SCN for stop the manufacturing activity with
forfeiture of BG of Rs. 5 lakh obtained towards
installation of MEE was issued to the industry vide letter
8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 19 of 35
Sr.
No.
Application
unique
number
Name of Industry Decision on grant
of consent
Consent
granted up
to
Remarks/Discussion (1)
dated 18.11.2017.
Further, as industry failed to install the MEE and also
JVS results are exceeding the consented standards.
Closure direction was issued to the industry.
It was decided to extend personal hearing to the PP and
put the case before ensuing CAC along with time bound
program for provision of MEE and recycling of treated
effluent.
24 MPCB-
CONSENT-
0000027013
Mula Sahkari Sakhar
Karkhana Ltd. 852,
864 Sonai, Newasa,
Ahmednagar
APPROVED
Renewal of consent
31.07.2019 It was decided to grant renewal of consent for Sugar unit
of capacity- 5500 TCD & 30 MW co-generation plant,
by imposing following conditions;
1. Industry shall submit Bank Guarantee of Rs. 5 lakh
towards O & M of pollution control systems.
Consent shall be issued after submission of requisite
consent fee.
25 MPCB-
CONSENT-
0000026055
Hotel Conrad Palm
Grove Beach Hotels
Pvt. Ltd. S. N0. 468,
C.T.S. No. 2F S. No.
468, C.T.S. NO.2F,
Mangaldas Road, Pune.
APPROVED
Renewal of Consent
30.04.2022 Committee noted that PP has submitted the copy of EC
vide letter dated 09.10.2009 and amended EC dated
10.11.2014 along with requisite information.
In view of above, it is decided to grant Renewal of
Consent to Operate for Hotel activity (with restaurant,
lodging, swimming pool and laundry activity, club
house) for 310 rooms on total plot area of 11,568 sq.
mtr. & total BUA 59,968 sq. mtr. by imposing following
conditions;
1. PP shall extend/ top up the BG to form total sum of
Rs. 25 lakh towards O & M of pollution control
system.
2. PP shall achieve the treated domestic effluent standard
for the parameter BOD- 10 mg/lit within 6 months’
time period and shall submit BG of Rs. 10 lakhs for
the same.
8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 20 of 35
Sr.
No.
Application
unique
number
Name of Industry Decision on grant
of consent
Consent
granted up
to
Remarks/Discussion (1)
3. The treated domestic effluent shall be 60% recycled
for secondary purposes such as toilet flushing, air
conditioning, cooling tower make up, firefighting etc.
and remaining shall be utilized on land for gardening
and connected to the sewerage system provided by
local body.
4. PP shall install online monitoring system for
parameters BOD, TSS & flow at the outlet of STP
with a period of three months and submit BG of Rs 5
lakhs towards the compliance of the same.
5. PP shall submit the affidavit within 15 days in the
prescribed format regarding built up area/building for
which application submitted is unchanged i.e. area as
per 1st Consent to Operate.
Consent shall be issue after obtaining –
i. Latest results (JVS) from SRO and forfeiture of
proportionate BG in case of exceed JVS results.
ii. Submission of additional consent fee of
Rs.2,99,985/-.
26 MPCB-
CONSENT-
0000027782
Balaji Infra Projects
Limited (M/s Dighi
Port Limited-Dighi
Terminal), Dighi
Shrivardhan, Ratnagiri
NOT APPROVED
Renewal of consent
--- Committee has noted that PP has obtained EC dated
30.09.2005, consent to establish dated 07.12.2011 and
part consent to operate dated 08.04.2013. Also noted
that PP has constructed 02 nos. of Jetties/Berths of
dimensions 325 x 34 meter at south side, however,
Board has granted consent to establish for Jetties/Berths
of dimensions 300 x 20 meter at south side and also EC
state that all the Berth will be of 300 x 20 meter
dimensions.
It was decided to keep the case in abeyance and revert
back to next CAC along with clarification from PP and
verification report from Regional Officer.
27 MPCB-
CONSENT-
0000028056
Godavari Biorefineries
Limited, 180, 187 A/p-
Sakarwadi Kopargaon,
APPROVED
Renewal of consent
31.08.2019 It was decided to grant plain renewal of consent to
operate including permission for the storage of 85000
m3 rainwater/freshwater for recharge of ground water by
8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 21 of 35
Sr.
No.
Application
unique
number
Name of Industry Decision on grant
of consent
Consent
granted up
to
Remarks/Discussion (1)
Dist. Ahmendnagar imposing following conditions;
1. Industry shall not operate the distillery until CPCB
issue Restart Directions.
2. This Consent is issued without prejudice to the order
passed or being passed by the Hon’ble NGT Pune in
the application bearing No. 68/2014 filed by Mr.
Ashok Kajale.
Consent shall be issued after submission of requisite
consent fee.
28 MPCB-
CONSENT-
0000028233
Gangamai Industries
and Constructions Ltd,
222, 223, 224, Najik
Babhulgaon,
Shevgaon,
Ahmednagar
APPROVED
Renewal of consent
31.08.2019 Committee noted that the industry has 30 KLPD
molasses based unit and 120 KLPD Ethanol based unit
are in same premises. It is also noted that the unit is
complied with the consent conditions.
In view of above, it was decided to grant renewal of
consent for 30 KLPD molasses based unit with
amalgamation with 120 KLPD ethanol unit, by imposing
following conditions;
1. Industry shall submit Bank Guarantee of Rs. 5 lakh
towards O & M of pollution control systems.
2. The industry shall obtain NOC from CGWB/Irrigation
department for consumption of ground water/Surface
water within 03 months.
Consent shall be issued after submission of additional
consent fee.
29 MPCB-
CONSENT-
0000028707
Chalet Hotels Pvt. Ltd.,
Plot no. 1483, 1491,
1495, 1496A, 1496B,
1503/4 & 1500D, (New
CTS no. 1483/A(pt),
1483/C & 1483/D)
Village Marol Mumbai
Suburban.
APPROVED
Consent to operate
(Part-II) and
amalgamation with
existing consent
(part-I)
31.05.2021 Committee noted that PP has obtained EC vide letter
dated 11.12.2014 for total plot area 58,094.50 Sq. mtrs
and total BUA-1,46,696 sq. mts.
PP has also obtained part consent to operate (part-I) vide
letter dated 28.05.2016 for total plot area 29,047 Sq.
mtrs and total BUA-1,20,532 sq. mts. which is valid
upto 31.05.2021.
8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 22 of 35
Sr.
No.
Application
unique
number
Name of Industry Decision on grant
of consent
Consent
granted up
to
Remarks/Discussion (1)
In view of above, it was decided to grant Consent to
Operate (part-II) for total plot area 58,094.50 sq. mtrs
and total BUA- 26,164 sq. mtrs. And amalgamation with
existing consent (part-I) which is valid utpo 31.05.2021
by imposing standard conditions and BG as per BG
regime.
1. Industry shall install online monitoring system for
the parameter flow, BOD, SS within 03 months.
Consent shall be issued after
i. Industry shall submit the OC of completed project.
ii. Receipt of C to E re validated copy.
iii. Additional consent fees and Bank Guarantee as per
BG regime.
30 MPCB-
CONSENT-
0000027759
Sharda Shree Ispat
Limited, E-12 MIDC
Butibori, Nagpur
NOT APPROVED
Renewal of consent
with increase in CI
and production
quantity
--- Committee noted that the PP has applied for renewal of
consent with increase in CI and production quantity.
Also noted that the appeal is pending with Hon’ble
Additional Chief Secretary, Environment against refusal
of 1st consent to operate for expansion and renewal of
existing consent and their amalgamation. However,
Appellate Authority has not issued any order
till date.
Since, the appeal is pending, it is decided to keep the
case in abeyance and communicate the PP that their
application will be considered only after receipt of order
from Appellate authority.
31 MPCB-
CONSENT-
0000029345
The Ashok Sahakari
Sakhar Karkhana
Limited,Ashoknagar
(Distillery)
162,172,157 P
Ashoknagar
Shrirampur
NOT APPROVED
Renewal of consent
--- It was decided to issue SCN for refusal of consent as
industry has not scraped old kaccha lagoons/Evaporation
ponds & not installed online monitoring system to sugar
unit.
8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 23 of 35
Sr.
No.
Application
unique
number
Name of Industry Decision on grant
of consent
Consent
granted up
to
Remarks/Discussion (1)
32 MPCB-
CONSENT-
0000027850
GMR Warora Energy
Limited Plot No B1 B1
Plot, MIDC Industrial
Growth Centre, Warora
Dist. Chandrapur, (
Mah) -440927 Warora
APPROVED
Renewal of consent
to Operate
31.08.2022 Committee noted that the industry has provided ETP,
STP, Air Pollution Control arrangement as Electrostatic
Precipitators, Provided continuous on line monitoring
system at ETP outlet & for both units No. 1 & 2, stacks
and 3 Nos. of CAAQMS within premises as per the
MPCB directions. All the continuous monitoring
stations are connected to CPCB & MPCB servers also
results are within the limit most of the times.
In view of above, it was decided to grant renewal of
consent to operate by imposing thermal power BG
regime and standard conditions.
Consent shall be issued after submission of additional
requisite consent fee.
33 MPCB-
CONSENT-
0000028486
Tilaknagar Industries
Ltd.(Molasses Based
Distillery Unit ) 45 P O
Tilaknagar Shrirampur
APPROVED
Renewal of consnet
31.08.2020 It was decided to grant renewal of consent for 100
KLPD molasses based distillery, by imposing following
conditions;
1. Industry shall extend existing Bank Guarantee of
Rs. 5 lakh towards O & M of pollution control
systems.
2. The industry shall obtain NOC from
CGWB/Irrigation department for consumption of
ground water/Surface water within 03 months.
Consent shall be issued after submission of additional
requisite consent fee.
34 MPCB-
CONSENT-
0000029518
Mula sahakari sakhar
karkhana ltd
sonai(Distillery Unit)
Gut No 852,853,859
Sonai Newasa,
Ahmednagar
APPROVED
Renewal of consent
31.08.2019 It was decided to grant renewal of consent for 30 KLPD
molasses based distillery, by imposing following
conditions:
1. Industry shall submit Bank Guarantee of Rs. 5 lakh
towards O & M of pollution control systems.
2. The industry shall obtain NOC from
CGWB/Irrigation department for consumption of
8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 24 of 35
Sr.
No.
Application
unique
number
Name of Industry Decision on grant
of consent
Consent
granted up
to
Remarks/Discussion (1)
ground water/Surface water
Consent shall be issued after submission of additional
requisite consent fee.
35 MPCB-
CONSENT-
0000029612
Gokul Sugar Industries
Ltd. 165/2 Datta
Nagar, Dhotri South-
Solapur
APPROVED
1st consent to operate
31.07.2019 Committee noted that Board has issued SCN for refusal
for 1st operate for the 3500 TCD cane crushing capacity
& 14.5 MW Co-gen Capacity and stop work due to
various non-compliances.
Industry submitted reply on 04.02.2017. Considering the
reply submitted by the industry, it was decided to grant
consent to 1st operate for the 3500 TCD cane crushing
capacity & 14.5 MW Co-gen Capacity, by imposing
following conditions:
1. Bank Guarantee of Rs. 10 lakh is forfeited due to
violation of consent conditions and obtain top-up
with Rs. 20 lakh towards O & M of pollution
control systems and compliance of consent
conditions.
2. Industry shall submit Board Resolution from
company Board towards not to violate in future
and submit Bank Guarantee of Rs. 2 lakh towards
compliance of same.
Consent shall be issued after obtaining requisite consent
fee and NOC from CGWB/Irrigation department for
consumption of ground water/Surface water
36 MPCB-
CONSENT-
0000030632
Reliable Sugar &
Distillery Power Ltd.
(Formerly Known As
Mahadik Sugar & Agro
Products Ltd) 29 A/p
Panori, Vill. Farale,
Tal. Radhanagari, Dist.
Kolhapur
APPROVED
Renewal of consent
31.07.2019 It was decided to grant renewal of consent for 1250 TCD
sugar unit & 8.5 MW Co-generation with change of
name, by imposing following conditions:
1. Industry shall submit Bank Guarantee of Rs. 5 lakh
towards O & M of pollution control systems.
2. Industry shall install online monitoring system
within 3 months and submit Bank Guarantee of Rs.
5 lakh towards compliance of same.
8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 25 of 35
Sr.
No.
Application
unique
number
Name of Industry Decision on grant
of consent
Consent
granted up
to
Remarks/Discussion (1)
Consent shall be issued after obtaining requisite consent
fee
37 MPCB-
CONSENT-
0000030803
Cosmo Films Limited
Plot No. AL-24/1
Shendra Aurangabad
APPROVED
Renewal of consent
with increase in CI
30.09.2022 It was decided to grant renewal of consent to operate by
extending the BG of Rs 5 lakh towards O & M of
Pollution Control System.
Consent shall be granted after the receipt of additional
fees.
38 MPCB-
CONSENT-
0000018341
Steel Authority of
India Limited,
Chandrapur Ferro
Alloy Plant 498/2, 499,
500,503/2 Mul Road,
Chandrapur
NOT APPROVED
Renewal of consent
to operate with
increase in CI
--- Committee noted that Board has granted consent to
operate to M/s. Steel Authority India Ltd., Chandrapur,
Ferro Alloy Plant, Mul Road, Chandrapur which is valid
upto 28.02.2017.
Board has also issued conditional direction dated
10.11.2016 to allow to restart 1 MVA electric Arc
Furnace (EAF) for one month subject to compliance of
following conditions
1. Industry shall complete installation of Fume
extraction System to the 1 MVA Electric Arc
furnace before January 2017.
2. Industry is allowed to operate 1 MVA electric Arc
furnace for one month with existing APC system.
During operational period SRO shall monitor the
emission level of this furnace on weekly basis and
report to CAC.
3. Further permission to operate the plant will consider
on the basis of emission report submitted by SRO.
Committee also noted that action proposal submitted by
the Regional officer, it is noted that industry has not
complied the above conditional direction issued by the
Board.
In view of above, it was decided to issue SCN and to
call the industry for personal hearing before CAC due to
8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 26 of 35
Sr.
No.
Application
unique
number
Name of Industry Decision on grant
of consent
Consent
granted up
to
Remarks/Discussion (1)
above non-compliance of conditional direction and
action proposal submitted by the RO, Chandrapur.
39 MPCB-
CONSENT-
0000028648
Chandrapur Super
Thermal Power Station
Chandrapur -Unit No.
8 & 91 to 16
Urjanagar, Chandrapur
APPROVED
Renewal of Consent
31.08.2020 It was decided to grant renewal of consent to operate for
Electricity generation- 1000 MW of Unit No. 8 and 9 by
imposing following conditions;
1. Industry shall install Continuous on line monitoring
system at ETP outlet.
2. Industry shall provide scientific arrangement for
storage of furnace oil.
3. Industry shall improve Operation and Maintenance
of Pollution Control arrangement so as to achieve
consented standards.
4. Industry shall comply the points mentioned in
Warning Notice and Show Cause Notice issued by
Board office.
5. Industry shall provide measures to control % ash
content in coal as per Boards guideline.
6. Industry shall provide scientific arrangement for
Coal Handling plant & Coal Crusher.
7. Industry shall install Automatic real-time online
monitoring system for coal analysis.
It was also decided that proportionate BG shall be
forfeited towards use of coal having ash content more
than 34%, exceeding JVS results, fly ash utilization
non-compliances, non-provision of Automatic real-time
online monitoring system, O & M of pollution control
system and obtain top up with the double amount of BG
Consent shall be granted after the receipt of additional
fees.
40 MPCB-
CONSENT-
0000032595
Greta Energy Ltd Plot
No. A-28 MIDC Mul
Mul, Chandrapur
NOT APPROVED
Renewal of consent
with increase in CI
--- Committee noted that Board had issued Show Cause
Notice dated 22.06.2017 and proposal for initiation of
action dtd. 20.11.2017 submitted due to following non-
compliances
8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 27 of 35
Sr.
No.
Application
unique
number
Name of Industry Decision on grant
of consent
Consent
granted up
to
Remarks/Discussion (1)
1. Fly ash generated found stored near ESP / Boiler area
without providing any dust suppression system
resulting heavy fugitive emission.
2. 22 Nos. of water sprinklers provided on road but
during visit sprinklers were not found in operation.
3. Huge quantity of rice husk found stored
unscientifically outside the shed. Also, GI sheet
enclosure of common dust collector found inadequate.
4. HCL acid was found stored in the shed with
inadequate acid proof arrangement resulting
contamination of soil.
5. It was found that huge quantity of ash found stored on
another plot within MIDC premises near the lake
without providing any dust suppression system and
not stabilized resulting air pollution in the area. Also,
fly ash is dumped at a distance of 4 Km. i.e. vill.
Maregaon, Tal. Mul, Dist. Chandrapur without
providing any dust suppression system and without
obtaining NOC from the Board.
6. JVS results of Ambient Air Quality are exceeding the
standards.
In view of above, considering non-compliances
communicated by Regional Officer, Chandrapur it is
was decided to issue proposed direction to the industry
due to above non-compliances including forfeiture of
existing bank guarantee of Rs. 5 lakhs obtained towards
O&M of pollution control system.
41 MPCB-
CONSENT-
0000032651
Pioneer Gas Power
Limited D-119 MIDC,
Vile Bhagad Mangaon,
Ratnagiri
APPROVED
Renewal of consent
with increase in CI
31.08.2022 Committee noted that industry has obtained
environmental clearance vide letter dated 19.04.2011.
Committee also noted that industry has installed 60 mtrs
stack height to HRSG (128MW) and 35.0 Meter stack
height to GT (260MW) fuel used for the same is Natural
gas which is supplied by Gail through pipe line. Gas
Turbine generator have built in dry low Nox burner to
8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 28 of 35
Sr.
No.
Application
unique
number
Name of Industry Decision on grant
of consent
Consent
granted up
to
Remarks/Discussion (1)
lean premix combustion technology. Ladder and
platform arrangement is provided to HRSG and GT
stack.
Industry has also installed continuous monitoring
equipment for stack emission analysis. Industry has
installed one continuous automatic ambient air and
micro-meteorological monitoring station at prominent
downwind direction. (Near main Gate) For treatment of
trade effluent industry has installed Primary, Secondary
and tertiary treatment followed by Reverse osmosis. The
R.O permeate will be used as makeup water for IDCT
and HUAC system. Industry has not started commercial
operation.
In view of above, it was decided to grant renewal of
consent to generate Electricity Power (gas based)- 388
MW by imposing BG regime and standard conditions.
42 MPCB-
CONSENT-
0000032669
Bebitz Flanges Works
Pvt. Ltd. Survey no.
140 Village Saravali,
Boisar Palghar
APPROVED
Renewal of consent
with increase in CI
31.10.2017 Committee note that the PP has applied for renewal of
consent with increase in CI under ORANGE category.
After due deliberation, It was decided to grant renewal
of consent to operate with increase in CI under RED
category by imposing following conditions
1. Industry shall extend the existing BG of Rs. 5 lakh
obtained towards O&M of pollution control system.
It was also decided to return the BG of Rs. 5 lakh
obtained towards installation of STP as industry has
installed the same.
43 MPCB-
CONSENT-
0000029857
Kalisma Steel Pvt. Ltd.
45/2, 45/3 & 47
Village Gorhe, Wada,
Dist. Palghar
APPROVED
Renewal of consent
30.04.2022 Committee noted that industry has provided RO & MEE
so as to achieve zero liquid discharge and also provided
pollution control system.
In view of above, it was decided to grant renewal of
consent to operate by imposing following conditions;
8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 29 of 35
Sr.
No.
Application
unique
number
Name of Industry Decision on grant
of consent
Consent
granted up
to
Remarks/Discussion (1)
1. Industry shall extend the existing BG of Rs. 5 lakh
obtained towards O&M of pollution control system.
Consent shall be issued after submission of latest CA
certificate and compliance report of interim direction
issued by the Board vide letter dated 31.07.2015
accordingly decision regarding release/forfeiture of BG
of Rs. 50 lakh shall be taken.
44 MPCB-
CONSENT-
0000031137
Sant Muktai Sugar &
Energy Ltd. Gat no.-
340/345 to 350
Ghodasgaon
Muktainagar, Dist.
Jalgoan
APPROVED
Renewal of consent
with increase in CI
31.07.2019 It was decided to grant renewal of consent for 2500 TCD
Sugar unit & 12 MW Co-generation unit by imposing
following conditions;
1. Industry shall submit Bank Guarantee of Rs. 5 lakh
towards O & M of pollution control systems.
2. The industry shall obtain NOC from
CGWB/Irrigation department for consumption of
ground water/Surface water within 03 months.
Consent shall be issued after submission of clarification
regarding increase in C.I. and additional requisite
consent fee.
45 MPCB-
CONSENT-
0000031718
Topworth Pipes and
Tubes Pvt. Ltd., Gut
No. 148, 150, 153
Village Hedacali,
Khopoli-Pali Road,
Tal. Sudhagad, Dist.
Raigad
NOT APPROVED
Renewal of consent
to operate with
downsizing of one
product
--- It was decided to issue SCN for refusal of renewal of
consent due to following non-compliances;
1. ETP was not in operation and ETP plant machinery
are found corroded.
2. Industry has provided STP for domestic effluent and
same was not in operation.
3. Industry uses water from bore wells (2 Nos.) and not
obtained permission from ground water authority.
4. Industry has newly added 04 Nos. of HW categories
compared to previous consent
5. Industry has newly added 04 Nos. of non HW
categories compared to previous consent
6. Industry has increased 06 Nos. of stacks compared
to previous consent
8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 30 of 35
Sr.
No.
Application
unique
number
Name of Industry Decision on grant
of consent
Consent
granted up
to
Remarks/Discussion (1)
7. Industry has started shot blasting activity without
obtaining consent from the Board.
8. Industry is not in operation since Nov-2015 till date.
46 MPCB-
CONSENT-
0000033030
Foundation Brakes
Manufacturing Private
Limited ( Formerly
Known Foundation
Brakes Manufacturing
Li303, 304, 306, 307,
308, 309, 310, 316, 317
,320 Off: NH 6 , A/p-
Bambhori Dharangaon
APPROVED
Renewal of consent
with increase in CI
with name change
30.09.2022 It was decided to grant renewal of consent to operate
with increase in CI and name change from M/s.
Foundation Brakes Manufacturing Limited to M/s.
Foundation Brakes Manufacturing Private Limited to
manufacture Automotive Brakes Systems and their
Aggregates- 2.6 Lack sets/Month by imposing following
conditions.
1. Industry shall extend the existing BG of Rs. 5 lakh
submitted towards O&M of pollution control
system.
2. Industry shall segregate and treat metal bearing
effluent generated from phosphating and anodizing
process separately and 100% reuse/recycle in the
process only. The non-metal bearing effluent shall
be used on land for gardening.
3. Industry shall submit the Board resolution within
one month in Boards prescribed format stating that
they have violated the environmental laws by
carrying out modernization by increase in CI by 56
Cr without obtaining C to E from the Board and they
will not do such violation in future and submit the
BG of Rs. 2 lakh towards compliance of the same.
4. Industry shall submit an undertaking on Rs. 100
stamp paper stating that industry has not increased
the production capacity and production more than
consented quantity due to increase in investment of
Rs. 56 Cr.
Consent shall be issued after submission of additional
consent fee.
47 MPCB-
CONSENT-
0000033847
Mumbai Port
Trust1873- Units
Includes Alexandra
NOT APPROVED
Renewal of two
--- Committee noted that PP has applied for renewal of two
consents and their amalgamation.
Committee also noted that PP has not submitted the
8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 31 of 35
Sr.
No.
Application
unique
number
Name of Industry Decision on grant
of consent
Consent
granted up
to
Remarks/Discussion (1)
(Indira Dock) (21
berths) -1914,PirPau
berth -1922, Revenue
Survey Number for
Indira Dock and
Ballard Pier-CS 1187
part of Fort Divisio In
Sea of Mumbai Port
Limit
Consent to Operate
and their
amalgamation
details of EC, CRZ clearance including revalidation
copy, clarification regarding increase in CI, by 435.39
Cr, details of BG’s and details of sewage treatment
system.
In view of above, it was decided to keep the case in
abeyance and revert back to next CAC along with above
details from PP.
48 MPCB-
CONSENT-
0000020614
Durgapur Open Cast
Mine, Western
Coalfields Limited,
document uploade P.O.
Durgapur Chandrapur
APPROVED
Renewal of Consent
Committee noted that Show Cause Notice was issued by
Regional Officer, Chandrapur on the basis of news
published and on the basis of observations of Board
Official during visit. Also, noted that the reply submitted
by Project Proponent. Also, noted that at present PP don
not have valid Bank guarantee due to forfeiture of earlier
Bank Guarantee of Rs 37 Lakhs.
In view of above, it was decided for grant of renewal of
consent by forfeiting propionate BG and top up with
double the amount based on the compliance report
submission from RO/SRO.
49 MPCB-
CONSENT-
0000035084
JSW Steel Limited
(Blast Furnace Plant)
94,95 DOLVI Village
Geetapuram, Dolvi,
Dist. Raigad
APPROVED
Renewal of consent
to operate with
decrease in CI and
removal of
electricity power
unit of DG set
(11.81 MW)
31.12.2022 It was decided to grant renewal of consent to operate
with decrease in CI and removal of electricity power
from DG set (11.81 MW) for Blast Furnace including
Pig casting -3.5 MTPA by imposing following
conditions;
1. Industry shall extend the existing BG of Rs. 10 lakh
obtained towards O&M of pollution control system
2. This consent is issued without prejudiced to order
passed / being passed by Hon’ble NGT Pune &
Hon’ble High Court, Mumbai.
3. The specific condition no. VI of EC shall be strictly
comply. Town Planning authority shall monitor the
compliance of the said condition as directed by
MCZMA.
4. Industry shall comply with the CRZ Notification
2011.
8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 32 of 35
Sr.
No.
Application
unique
number
Name of Industry Decision on grant
of consent
Consent
granted up
to
Remarks/Discussion (1)
5. Industry shall comply the conditions prescribed in
EC granted by MoEF&CC vide letter no. EC No.
EC No. J-11011/76/2013-IA-I I (I) dated
25.08.2015.
It was also decided to return the BG of Rs. 10 lakh
obtained toward compliance of consent to establish
conditions as Board has already granted 1st consent to
operate to the industry.
Decision regarding forfeiture/release of BG of Rs. 2 lakh
each obtained toward Submission of design details of
APC and to carryout overall unit-wise performance of
existing STP will be taken after receipt of verification
report from SRO
Consent will be issued after submission of additional
requisite consent fee.
50 MPCB-
CONSENT-
0000034884
JSW Steel Limited
(Sponge Iron Plant)
Geetapuram, Dolvi,
Dist. Raigad
APPROVED
Renewal of consent
to operate with
change in name and
increase in CI
31.12.2022 It was decided to grant renewal of consent to operate
with increase in CI to manufacture Direct Reduced Iron
(Gas Based Mega Module)- 2 MTPA and change in
name from M/s. JSW ISPAT Steel Ltd to M/s. JSW
Steel ltd. by imposing standards condition and following
conditions.
1. Industry shall extend the existing BG of Rs. 10
lakh submitted towards O&M of pollution control
system.
2. This consent is issued without prejudiced to order
passed / being passed by Hon’ble NGT Pune &
Hon’ble High Court, Mumbai.
3. The specific condition no. VI of EC shall be
strictly comply. Town Planning authority shall
monitor the compliance of the said condition as
directed by MCZMA.
4. Industry shall comply with the CRZ Notification
8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 33 of 35
Sr.
No.
Application
unique
number
Name of Industry Decision on grant
of consent
Consent
granted up
to
Remarks/Discussion (1)
2011.
5. Industry shall comply the conditions prescribed in
EC granted by MoEF&CC vide letter no. EC No.
EC No. J-11011/76/2013-IA-I I (I) dated
25.08.2015.
6. Industry shall amend the EC or obtain NOC from
MoEF&CC within 03 months as EC is granted on
the name of M/s. JSW Steel Limited.
Consent will be issued after submission of additional
requisite consent fee, details of HW catg. & quantity
and documentary proof regarding change in name from
M/s. JSW ISPAT Steel Ltd., to M/s. JSW Steel Ltd.
51 MPCB-
CONSENT-
0000032661
Indreshwar Sugar Mills
Ltd, 310, 311
Bhagwantnagar Uplai
Barshi, Dist. Solapur
APPROVED
Renewal of consent
31.08.2019 It was decided to grant renewal of consent to operate for
45 KLPD distillery unit, by imposing following
conditions;
1. Industry shall submit Bank Guarantee of Rs. 5 lakh
towards O & M of pollution control systems.
2. Industry shall obtain NOC from CGWA within 3
months.
52 MPCB-
CONSENT-
0000035654
MJ BIOTECH Private
Limited, Plot No.18
International Biotech
Park, Phase -II,
Hinjawadi, Mulshi,
Dist. Pune
APPROVED
Amendment for
change in name in
existing consent to
operate
30.04.2020 It was decided to grant amendment in change in name
from M/s. Scigen Biopharma to M/s. MJ BIOTECH
PRIVATE LIMITED.
53 MPCB-
CONSENT-
0000034586
Century Textiles &
Industries Ltd. 794, of
lower parel div, G/S
Ward, P.B. Marg,Worli
Lower Parel G.S.
Ward, Pandurang
Budhkar Marg, Worli
Mumbai Mumbai
APPROVED
Renewal of Consent
(Part)
31.10.2021 It was decided to grant renewal of consent to operate
(part) for total plot area 61,184.93 sq. mtrs. and
58,326.06 sq. mtrs out of total construction built up area-
2,69,918.62 sq. mtrs by imposing following conditions;
1. PP shall extend/ top up the BG to form total sum of
Rs. 25 lakh towards O&M of pollution control
system.
8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 34 of 35
Sr.
No.
Application
unique
number
Name of Industry Decision on grant
of consent
Consent
granted up
to
Remarks/Discussion (1)
2. PP shall achieve the treated domestic effluent standard
for the parameter BOD- 10 mg/lit. within 6 month
time period and shall submit BG of Rs. 10 lakhs for
the same.
3. The treated domestic effluent shall be 60% recycled
for secondary purposes such as toilet, flushing, air
conditioning, cooling tower make up, firefighting etc.
and remaining shall be utilized on land for gardening
and connected to the sewerage system provided by
local body.
4. PP shall install online monitoring system within 3
months period for the parameters BOD, SS and flow
at the outlet of STP and submit BG of Rs 5 lakh for
the compliance of the same
Consent shall be issued after obtaining additional
consent fee.
54 MPCB-
CONSENT-
0000036756
Panchshil Realty &
Developers Pvt. Ltd.
(Project EON
Waterfront - Phase I)
S.No 70/3A/1, 70/2,
70/3A/2, 70/3A/3,
70/3A/4, 70/3B, 70/4
Kharadi Haveli, Dist.
Pune
APPROVED
Renewal of Consent
(part)
30.01.2023 It is decided for Renewal of Consent to Operate
(part)for total plot area of 51,259.02 sq.m. and
construction BUA area of 19,955.79 sq.m. (out of
Total construction BUA of 68,813.69 Sq.Mtrs) by
imposing following conditions:-
1. PP shall extend/ top up the BG to form total sum of
Rs. 25 lakh towards O& M of pollution control
system.
2. PP shall achieve the treated domestic effluent
standard for the parameter BOD- 10 mg/lit. within
6 months time period and shall submit BG of Rs.
10 lakhs for the same.
3. The treated domestic effluent shall be 60%
recycled for secondary purposes such as toilet
flushing, air conditioning, cooling tower make up,
firefighting etc. and remaining shall be utilized on
land for gardening and connected to the sewerage
system provided by local body.
8th CAC meeting of 2017-2018 (Book-let no 15 of Renewal of Consent) dated 09.02.2018 Page 35 of 35
Sr.
No.
Application
unique
number
Name of Industry Decision on grant
of consent
Consent
granted up
to
Remarks/Discussion (1)
55 MPCB-
CONSENT-
0000036889
Golden Fibers LLP,
Plot No. T-8, Textile
Park, Nandgoan Peth,
Dist. Amravati
APPROVED
Renewal of consent
31.01.2023 It was decided to grant renewal of consent to operate by
imposing following conditions;
1. Industry shall extend existing Bank Guarantee of Rs.
5 lakh obtained towards O & m of pollution control
system.
2. All the effluent generated from the process shall be
treated at RO & MEE (Combine treatment facility
provided at CETP) to achieve ZLD till Board allows
part of effluent on the SSHEHS as per EC and
extend existing Bank Guarantee of Rs. 5 lakh
towards compliance of same.