Magnetically Sensitive Components Luke Fry 17/12/20121 Luke Fry - Magnetic Sensitivity Database...
-
Upload
cynthia-price -
Category
Documents
-
view
213 -
download
1
Transcript of Magnetically Sensitive Components Luke Fry 17/12/20121 Luke Fry - Magnetic Sensitivity Database...
Luke Fry - Magnetic Sensitivity Database CM34
1
Magnetically Sensitive Components
Luke Fry
17/12/2012
Luke Fry - Magnetic Sensitivity Database CM34
2
Goals
• Comprehensive Inventory of Components• Gather Information • Categorise & Locate Components• Identify Components/Systems at Risk• Prioritise Actions to be Taken
17/12/2012
Luke Fry - Magnetic Sensitivity Database CM34
3
Database
17/12/2012
Item No. Object Location System System Owner
Sensitive Components (Max in Air [Gauss])
Magnetic Mass Risk Level Notes Installed
S4 Switch Board D1 West Wall General Power Ian Mullacrane None Should be OK in this location Yes
S11D16 Circuit Breakers X4 North Wall General Power Ian Mullacrane None Should be OK in this location Yes
S18D4 PSU Distribution Box North Wall General Power Ian Mullacrane None Should be OK in this location Yes
S21 MCB's North Wall General Power Ian Mullacrane At Risk
All that will be affected will be replaced by Redspot fuses were possible Yes
S26Power Isolation Box North Wall Mezz General Power Ian Mullacrane Remove Obsolete Yes
S27
Emergency Lighting Contactor North Wall Mezz General Power Ian Mullacrane Remove Obsolete Yes
S32
North Mezz Extension Distribution Board North Wall Mezz General Power Ian Mullacrane At Risk Change for Redspot Yes
S33Distribution Board South Wall Mezz General Power Ian Mullacrane At Risk Change for Redspot Yes
S50 DSA MCB D11South East Corner General Power Ian Mullacrane None Should be OK in this location Yes
S55D5 Distribution Board
South East Corner General Power Ian Mullacrane None Should be OK in this location Yes
S75KLIXON Junction Box 1 & 2 Trench General Power Ian Mullacrane Not sure Not my kit Yes
S87D10 Board and Isolator Trench General Power Ian Mullacrane At Risk Is the trench area a problem?? Yes
L1 Sub Station 25 North Wall General Power Ian Mullacrane At Risk Extra Sheilding YesL13 HV Rack South Wall General Power Ian Mullacrane At Risk Relocate Yes
Luke Fry - Magnetic Sensitivity Database CM34
4
3D Modelling
17/12/2012
Added small components into model
Overlay with field plots to identify components at risk
Luke Fry - Magnetic Sensitivity Database CM34
5
So Far?
• Highlighted some key issues to be addressed– PPS– Fire Safety– Large ferrous masses unaccounted for in model– MCB’s– Small electronic components
17/12/2012
Luke Fry - Magnetic Sensitivity Database CM34
6
Next Steps
• Complete the Database• System Owners to Research the Sensitivity of
their Components• More comprehensive breakdown of systems
EMR, KL, cKOV, RFCC, TOF’s, SS
17/12/2012
Luke Fry - Magnetic Sensitivity Database CM34
7
Adding Information• http://micewww.pp.rl.ac.uk/projects/magnetic-shielding/documents
• http://micewww.pp.rl.ac.uk/documents/47 • 1m x 500mm Helmholtz Coils at KIT (up to 200G) – Vishal Francis• AFC in R9
• Add directly to the Database and upload to micemine with updated front sheet and issue number
• Email information to [email protected]
17/12/2012