Staffing Telescope technical support –Sufficient staffing –Improved progress on long-term projects Observer support –Insufficient, even for experienced observers –Some observations lost due to slow communications Instrumentation support –Sufficient for routine work –Insufficient for new instrument commissioning

Transcript of Magellan SAC April 7-8, 2006 Pasadena, CA. Personnel New hires: –None Open positions:...

Page 1: Magellan SAC April 7-8, 2006 Pasadena, CA. Personnel New hires: –None Open positions: –Programmer –Scientists (two, through AAO) Changes –Pasadena EE.

Magellan SAC

April 7-8, 2006Pasadena, CA

Page 2: Magellan SAC April 7-8, 2006 Pasadena, CA. Personnel New hires: –None Open positions: –Programmer –Scientists (two, through AAO) Changes –Pasadena EE.

Personnel

• New hires:– None

• Open positions:– Programmer

– Scientists (two, through AAO)

• Changes– Pasadena EE to part-time

Page 3: Magellan SAC April 7-8, 2006 Pasadena, CA. Personnel New hires: –None Open positions: –Programmer –Scientists (two, through AAO) Changes –Pasadena EE.

Staffing

• Telescope technical support– Sufficient staffing

– Improved progress on long-term projects

• Observer support– Insufficient, even for experienced observers

– Some observations lost due to slow communications

• Instrumentation support– Sufficient for routine work

– Insufficient for new instrument commissioning

Page 4: Magellan SAC April 7-8, 2006 Pasadena, CA. Personnel New hires: –None Open positions: –Programmer –Scientists (two, through AAO) Changes –Pasadena EE.

Australia

• Sale of 30 nights over two years at $46K/night

• Cash ($690K) & personnel (two scientists)

• Personnel contribution:– Two AAO scientists (new hires)

– Two years at LCO (Magellan support & research)

– Third year in Australia (research)

• Hiring selection is AAO/Magellan collaboration

• Starts in 2007A

Page 5: Magellan SAC April 7-8, 2006 Pasadena, CA. Personnel New hires: –None Open positions: –Programmer –Scientists (two, through AAO) Changes –Pasadena EE.

TSIP proposals (selections ~May)

• MMT and Magellan Infrared Spectrograph (MMIRS) Brian McLeod & collaborators, SAO. $917K, 9 Magellan nights in 1 year (and 9 at MMT).

• A Second, Higher-red-sensitivity Mosaic CCD Camera for IMACS (Mosaic2) Alan Dressler & collaborators, Carnegie Observatories. $648K, 15 Magellan nights in one year (community-wide).

• Development of a Magellan Adaptive Secondary Laird Close & collaborators, University of Arizona. $1,356K, 31 Magellan nights over three years

Page 6: Magellan SAC April 7-8, 2006 Pasadena, CA. Personnel New hires: –None Open positions: –Programmer –Scientists (two, through AAO) Changes –Pasadena EE.

F/5 secondary news

• LBT secondary problems will delay Magellan F/5

• Magellan secondary now expected early 2007

• About 1 year to commission F/5 focal plane

• Ready in time for MMIRS arrival

Page 7: Magellan SAC April 7-8, 2006 Pasadena, CA. Personnel New hires: –None Open positions: –Programmer –Scientists (two, through AAO) Changes –Pasadena EE.

WFC fit-test

• SAO team fit-checked F/5 Wide Field Corrector

• First test of instrument lift and WFC carts

• Minor modifications being applied

• WFC cells now being fitted with lenses

Page 8: Magellan SAC April 7-8, 2006 Pasadena, CA. Personnel New hires: –None Open positions: –Programmer –Scientists (two, through AAO) Changes –Pasadena EE.

F/5 WFC fit-check

Page 9: Magellan SAC April 7-8, 2006 Pasadena, CA. Personnel New hires: –None Open positions: –Programmer –Scientists (two, through AAO) Changes –Pasadena EE.

F/5 WFC fit-check

Page 10: Magellan SAC April 7-8, 2006 Pasadena, CA. Personnel New hires: –None Open positions: –Programmer –Scientists (two, through AAO) Changes –Pasadena EE.

F/5 secondary cell

• Most parts are machined (cell body, supports)

• See it in the OCIW assembly area

Page 11: Magellan SAC April 7-8, 2006 Pasadena, CA. Personnel New hires: –None Open positions: –Programmer –Scientists (two, through AAO) Changes –Pasadena EE.

Instrument News

• IMACS dispersers tested– 150 l/mm grism (McCarthy, Dressler)

– LDP “Low Dispersion Prism” (Burles)

• MMTF Maryland-Magellan Tunable Filter– Passed Director’s pre-ship review

– Installation starts in a few months

• LDSS– New shutter controller installed

– VPH-ALL grism fabricated

Page 12: Magellan SAC April 7-8, 2006 Pasadena, CA. Personnel New hires: –None Open positions: –Programmer –Scientists (two, through AAO) Changes –Pasadena EE.

Computing and networking

• CTIO CISS now provides systems administration

• Major network upgrade– Firewall to the world

– Managed routers added

– New mail server to be installed

• CTIO network connection– 45 Mbit/sec to Internet2 from El Pino

– 4 Mbit/sec to El Pino from LCO

Page 13: Magellan SAC April 7-8, 2006 Pasadena, CA. Personnel New hires: –None Open positions: –Programmer –Scientists (two, through AAO) Changes –Pasadena EE.

Cleanroom

• MMIRS and FourStar are large vacuum systems

• Both have expensive detectors

• Large clean work area needed for:– Particle and volatile contaminant control

– ESD control

• Alternatives:– Ship back to US (risky and lengthy)

– Work in dirty environments (risky, difficult)

Page 14: Magellan SAC April 7-8, 2006 Pasadena, CA. Personnel New hires: –None Open positions: –Programmer –Scientists (two, through AAO) Changes –Pasadena EE.

Cleanroom concept

V3

V3

V3

20

D

1918

B

A

COMPRESOR

V4V4

MACHINE SHOP

V5

-0.35

V5

P2

MU

RET

E D

E P

IEDR

A

1615

9

13 14

10

DARK ROOM

P8

STORAGE

P8

P8

P4

-0.175

P3

-0.35

INSTRUMENT LAB.

V2 V1

VEREDA

STORAGE

P8P8

P6

TOILET

P8

P8 P8

-+0.00

ELECTRONIC LAB.

V1

DOWN FLOOR ACCESS

P1

-0.175

STORAGE

17

7

RADIER ARMADO NIVEL SUPERIOR

I

P5

I

F

E

-0.175

98 7

2

6 54

3

P8

P8

18

12

11

14

13

15

16

17

MECHANICAL TECH.

STORAGE

10

ELECTRONIC TECH.

V3

TEL. OPS

V3

V3

C

A12

V3

STORAGE

C.CIVILC.CIVIL

98-02A6

MANUEL RENCORET R. JUAN LUIS FLORES S.

ARQUITECTOS

DIBUJANTE TECNICO - UNIVERSIDAD DE CHILE PATRICIA VILLAGRAN B. ( CAD 14)

PLANO N°

ESC: 1:50

PROPIETARIO

CONTENIDO

UBICACION

PROYECTO

PROPIETARIO

PLANTA DE AMPLIACION PRIMER NIVEL

THE CARNEGIE INSTITUTION OF WASHINGTON

ASTRONOMERS SUPP. BUILDING

CERRO LAS CAMPANAS

PATIO ESTACIONAMIENTO

-0.35

VEREDONMURETE DE PIEDRA

ESCALA 1:50

PLANTA NIVEL INFERIORASTRONOMERS SUPP. BUILDING

21

23

21

22

23

D'

C'

B'

A'

CLEAN ROOM

GOWNING AREA

PUMP ALLEY

CLEAN PREP

AREA

DIRTY PREP

AREA

FECHA: Marzo 2006

rev-1: 28 Marzo 2006

A'CASETA

A'

Page 15: Magellan SAC April 7-8, 2006 Pasadena, CA. Personnel New hires: –None Open positions: –Programmer –Scientists (two, through AAO) Changes –Pasadena EE.

Cleanroom location

Page 16: Magellan SAC April 7-8, 2006 Pasadena, CA. Personnel New hires: –None Open positions: –Programmer –Scientists (two, through AAO) Changes –Pasadena EE.

Cleanroom view

VIEW FROM LODGEASTRONOMERS SUPP. BUILDINGESCALA 1:100

CERRO LAS CAMPANAS

ASTRONOMERS SUPP. BUILDING

THE CARNEGIE INSTITUTION OF WASHINGTON

FACHADAS

PROPIETARIO

PROPIETARIO

PROYECTO

UBICACION

CONTENIDO

MANUEL RENCORET R. JUAN LUIS FLORES S.

ARQUITECTOSC.CIVIL

ESC: 1:50

PLANO N°

98-03A6DIBUJANTE TECNICO - UNIVERSIDAD DE CHILE PATRICIA VILLAGRAN B. ( CAD 14)

C.CIVIL

rev-1: 28 Marzo 2006

FECHA: Marzo 2006

SECCION A'-A'ASTRONOMERS SUPP. BUILDING

SECCION B'-B'ASTRONOMERS SUPP. BUILDING

Clean Prep AreaDirty Prep Area

Page 17: Magellan SAC April 7-8, 2006 Pasadena, CA. Personnel New hires: –None Open positions: –Programmer –Scientists (two, through AAO) Changes –Pasadena EE.

Cleanroom

• Approximate cost:– $200K for building

– $50K for cleanroom equipment

• Resolution from SAC requested