Magellan SAC
April 7-8, 2006Pasadena, CA
Personnel
• New hires:– None
• Open positions:– Programmer
– Scientists (two, through AAO)
• Changes– Pasadena EE to part-time
Staffing
• Telescope technical support– Sufficient staffing
– Improved progress on long-term projects
• Observer support– Insufficient, even for experienced observers
– Some observations lost due to slow communications
• Instrumentation support– Sufficient for routine work
– Insufficient for new instrument commissioning
Australia
• Sale of 30 nights over two years at $46K/night
• Cash ($690K) & personnel (two scientists)
• Personnel contribution:– Two AAO scientists (new hires)
– Two years at LCO (Magellan support & research)
– Third year in Australia (research)
• Hiring selection is AAO/Magellan collaboration
• Starts in 2007A
TSIP proposals (selections ~May)
• MMT and Magellan Infrared Spectrograph (MMIRS) Brian McLeod & collaborators, SAO. $917K, 9 Magellan nights in 1 year (and 9 at MMT).
• A Second, Higher-red-sensitivity Mosaic CCD Camera for IMACS (Mosaic2) Alan Dressler & collaborators, Carnegie Observatories. $648K, 15 Magellan nights in one year (community-wide).
• Development of a Magellan Adaptive Secondary Laird Close & collaborators, University of Arizona. $1,356K, 31 Magellan nights over three years
F/5 secondary news
• LBT secondary problems will delay Magellan F/5
• Magellan secondary now expected early 2007
• About 1 year to commission F/5 focal plane
• Ready in time for MMIRS arrival
WFC fit-test
• SAO team fit-checked F/5 Wide Field Corrector
• First test of instrument lift and WFC carts
• Minor modifications being applied
• WFC cells now being fitted with lenses
F/5 WFC fit-check
F/5 WFC fit-check
F/5 secondary cell
• Most parts are machined (cell body, supports)
• See it in the OCIW assembly area
Instrument News
• IMACS dispersers tested– 150 l/mm grism (McCarthy, Dressler)
– LDP “Low Dispersion Prism” (Burles)
• MMTF Maryland-Magellan Tunable Filter– Passed Director’s pre-ship review
– Installation starts in a few months
• LDSS– New shutter controller installed
– VPH-ALL grism fabricated
Computing and networking
• CTIO CISS now provides systems administration
• Major network upgrade– Firewall to the world
– Managed routers added
– New mail server to be installed
• CTIO network connection– 45 Mbit/sec to Internet2 from El Pino
– 4 Mbit/sec to El Pino from LCO
Cleanroom
• MMIRS and FourStar are large vacuum systems
• Both have expensive detectors
• Large clean work area needed for:– Particle and volatile contaminant control
– ESD control
• Alternatives:– Ship back to US (risky and lengthy)
– Work in dirty environments (risky, difficult)
Cleanroom concept
V3
V3
V3
20
D
1918
B
A
COMPRESOR
V4V4
MACHINE SHOP
V5
-0.35
V5
P2
MU
RET
E D
E P
IEDR
A
1615
9
13 14
10
DARK ROOM
P8
STORAGE
P8
P8
P4
-0.175
P3
-0.35
INSTRUMENT LAB.
V2 V1
VEREDA
STORAGE
P8P8
P6
TOILET
P8
P8 P8
-+0.00
ELECTRONIC LAB.
V1
DOWN FLOOR ACCESS
P1
-0.175
STORAGE
17
7
RADIER ARMADO NIVEL SUPERIOR
I
P5
I
F
E
-0.175
98 7
2
6 54
3
P8
P8
18
12
11
14
13
15
16
17
MECHANICAL TECH.
STORAGE
10
ELECTRONIC TECH.
V3
TEL. OPS
V3
V3
C
A12
V3
STORAGE
C.CIVILC.CIVIL
98-02A6
MANUEL RENCORET R. JUAN LUIS FLORES S.
ARQUITECTOS
DIBUJANTE TECNICO - UNIVERSIDAD DE CHILE PATRICIA VILLAGRAN B. ( CAD 14)
PLANO N°
ESC: 1:50
PROPIETARIO
CONTENIDO
UBICACION
PROYECTO
PROPIETARIO
PLANTA DE AMPLIACION PRIMER NIVEL
THE CARNEGIE INSTITUTION OF WASHINGTON
ASTRONOMERS SUPP. BUILDING
CERRO LAS CAMPANAS
PATIO ESTACIONAMIENTO
-0.35
VEREDONMURETE DE PIEDRA
ESCALA 1:50
PLANTA NIVEL INFERIORASTRONOMERS SUPP. BUILDING
21
23
21
22
23
D'
C'
B'
A'
CLEAN ROOM
GOWNING AREA
PUMP ALLEY
CLEAN PREP
AREA
DIRTY PREP
AREA
FECHA: Marzo 2006
rev-1: 28 Marzo 2006
A'CASETA
A'
Cleanroom location
Cleanroom view
VIEW FROM LODGEASTRONOMERS SUPP. BUILDINGESCALA 1:100
CERRO LAS CAMPANAS
ASTRONOMERS SUPP. BUILDING
THE CARNEGIE INSTITUTION OF WASHINGTON
FACHADAS
PROPIETARIO
PROPIETARIO
PROYECTO
UBICACION
CONTENIDO
MANUEL RENCORET R. JUAN LUIS FLORES S.
ARQUITECTOSC.CIVIL
ESC: 1:50
PLANO N°
98-03A6DIBUJANTE TECNICO - UNIVERSIDAD DE CHILE PATRICIA VILLAGRAN B. ( CAD 14)
C.CIVIL
rev-1: 28 Marzo 2006
FECHA: Marzo 2006
SECCION A'-A'ASTRONOMERS SUPP. BUILDING
SECCION B'-B'ASTRONOMERS SUPP. BUILDING
Clean Prep AreaDirty Prep Area
Cleanroom
• Approximate cost:– $200K for building
– $50K for cleanroom equipment
• Resolution from SAC requested