Madrid, April 1st 2008
5th SG Meeting South Gas Regional Initiative
Working Group 4B : Open Seasons
2
Open Seasons: Why ?
• Open Seasons: assessment and contracting of market needs, leading to investment decisions
• Developments based on binding requests by market participants
• Process allowing:• Capacity development at existing entry/exit points
(Larrau/Biriatou)
• Creation of new entry / exit point (Midcat)
3
Spain <> France interconnections
• Open Season:
• required in France for decision
• not required in Spain for decision, but jointly conducted by Enagas for coordination
• Framework for open season proposed by French TSOs (current presentation)
• This framework is a basis for a trilateral discussion (Enagas, TIGF, GRTgaz)
4
Western and Eastern corridors
CentreFrance
Rhône
MidCat
North
SouthGuyenne
Larrau
Biriatou
5
Toolbox of an Open Season
• Information Memorandum• Definition of Capacity Products (from / to which market zones)• Pricing Information• Planning of the Open Season
• Allocation Rules• Capacity matching• Priority ranking• Allocation process
• Contractual Rules• « TSO builds, shipper books »• Delays, Financial Guarantees…
• Inter-Operator Agreement• Physical interface (Pressure, Location…)• Coordination of Works
6
Draft action Plan
Coordinated Open Seasons > WG launched Western corridor (2012) Eastern corridor (2014)
Monitoring of the WG: South GRI IG
Estimated Timetable (Western corridor) Preparation of Info Memo: S1 2008 Publication of Info Memo: Q4 2008 Signature of Interface Agreements between TSOs: Q4 2008 Publication of allocation and contractual rules: Q4 2008 Binding requests: Q1 2009 Capacity allocations: Q1 2009 Decisions to build: 2009
7
WESTERN CORRIDOR
MIDCAT
EASTERN CORRIDOR
INTERCONNECTION CAPACITYLINK between ZONES - year 2015
Considering every infraestructure decided and under study in operation
TOTAL CAPACITY
LARRAUIRÚN
BIRIATOU430 400
490
55
35
16
5
26
0
16
5
37
5
18
0
23
0
23
0
23
0
23
0
23
0
22
0
20
02
60
37
5
18
0
23
0
555
TIGF
SPAIN
GRTgazNORTH
GRTgaz SOUTH
SPAI N
GWh/d
(*)
(*)(*)
(*) Existing, expansion not defined
Thank you for your attention