A Texas born company located in Houston, the MadMackenzie team is a small and

effective group of experienced oil and gas professionals. Our team is comprised of

backgrounds in the fields of reservoir engineering, geoscience engineering,

project management and business management.

We believe when good people come together to provide a good solution, great

things happen! We treat our clients like they were

neighbors and we follow through with what we say we can do.

~ Performance as Prescribed

Page 3: MadMackenzie GreenZyme Prez_Rev 9.7.16

Company Timeline

Q1 2016

Q2 2016Historical research dating back to 1990

confirms proven success of the GreenZyme EOR process. With an

extensive track record, business model development and team organizational

meetings begin to take place.

Early business start-up discussions among potential team members begin. Initial research of a proven GreenZyme EOR solution kicks off.

Page 4: MadMackenzie GreenZyme Prez_Rev 9.7.16

WE WILL CONTINUE

Q3 2016

Q4 2016MadMackenzie Team is solidified and company is

officially open for business.

MadMackenzie Solutions, LLC is formed. The company’s sole purpose is to provide EOR services utilizing the GreenZyme solution.

Page 5: MadMackenzie GreenZyme Prez_Rev 9.7.16

Why EOR services?

Depressed Oil Market

Time Value of Money

Opportunistic Time for Service

Contracts

Our Team’s Experience

Product History & Success of GreenZyme®

Page 6: MadMackenzie GreenZyme Prez_Rev 9.7.16

What’s our Business Model? Our Service Offering

We Offer EOR Investment Opportunities

Reoccurring Services

We are a licensed supplier of the GreenZyme product. We also provide well analysis and analytical engineering services to provide clients the intel needed to correctly choose the best candidates for EOR. We offer EOR project management services with associated 3rd party operations services.

We have confidence in the GreenZyme EOR solution and in the experience of our well analysis team. For selective wells, at our discretion, MadMackenzie offers financial sponsorship for up to 100% of our entire EOR project cost.

Well monitoring and analysis. After successful EOR campaign wells will typically be ready for a follow up project 2-3 years later where we hope to support our clients again.

Page 7: MadMackenzie GreenZyme Prez_Rev 9.7.16

Our Service Stages

Stage II: EOR Program DevelopmentInjection packages are developed for selected EOR candidates and include well-specific injection plans. Injection program costs are reviewed and a service package is selected.

Stage IV: Well MonitoringWell performance is monitored regularly after project execution.

Stage III: Project Execution

EOR injection package is planned and executed. No special tooling

is required, however standard shut-in time is required to allow EOR solution to properly dilute

within the formation.

Stage I: Well AnalysisEvery project starts with a

detailed review of each well’s data. Our experienced team will

carefully review a prospective client’s well data to determine if

a particular well is a strong candidate for EOR.

Page 8: MadMackenzie GreenZyme Prez_Rev 9.7.16

Let’s talk about GreenZyme®

Success Rate

Product Simplicity

Environmentally Friendly

Product Applications

Proven product for over 25 years and has been injected in over 1,000 wells worldwide.

GreenZyme’s high rate of success per project is why we are able to financially sponsor EOR projects.

No special equip needed operationally; product is injected directly through the well’s casing-tubing.

GreenZyme solution is a non-pathogenic, nontoxic, and 100% biodegradable.

GreenZyme can accommodate a wide array of well formations and life cycle’s, with many strong advantages over other EOR methods.

Product History & Experience

Page 9: MadMackenzie GreenZyme Prez_Rev 9.7.16

• Mature wells with continuous decline

• New wells with rapid decline• Mobilize oils of various

viscosities• Improve start-up well

performance • Wells with clogging problems• Waterflooding systems• Single huff-and-puff wells• Steam Injection wells• Chemical Fracturing wells

Applications:

Page 10: MadMackenzie GreenZyme Prez_Rev 9.7.16

• Temperature• pH• Salinity• Radioactive Isotopes• NORM• Sulfur• Hydrogen Sulfide content• Parrafins• Asphaltenes (up to 50%)

Unaffected by adverse well conditions such as:

Page 11: MadMackenzie GreenZyme Prez_Rev 9.7.16

• Semi-clear yellow fluid• Environmentally friendly• 100% biodegradable• Non-toxic and non-

pathogenic• Level pH: 5 to 7• Stable up to 270℃• Soluble in water / insoluble

in oil

Technical Data:

Page 12: MadMackenzie GreenZyme Prez_Rev 9.7.16

How does GreenZyme® work?

GreenZyme-wetted surfaces

Release of oil from solid surfaces

Increase formation permeability

Oil-wetted and water-wetted surfaces are turned into GreenZyme-wetted surfaces, enhancing the formation’s ability to flow.

GreenZyme releases oil from sandy surfaces catalytically as an enzyme protein which acts as a catalyst.

GreenZyme also works as a catalyst to unclog formation blockages. This increases permeability and naturally restores formation pressure due to blockages.

Page 13: MadMackenzie GreenZyme Prez_Rev 9.7.16

Is your well a strong candidate for

GreenZyme® EOR?

• Oil service pumping truck capable of up to 5000 psig

• High pressure piston, plunger or triplex pump

• Onsite mixing tanks

• Initial start-up daily production average of >100 bopd

• Current oil production of >20 bopd

• Water cut < 80%• Porosity > 15%

• Vertical wells require 4-12 drums

• Horizontal wells require 8-12 drums

• 3 days with well porosity >20%, with little wax.

• 4-5 days if higher oil density

• 6-8 days if reduced porosity and increased wax.

Shut-in TimeHow much GreenZyme?

Good Candidate

Required Equipment

Page 14: MadMackenzie GreenZyme Prez_Rev 9.7.16

1985 1995 2005 2015 20200

50

100

150

200

250

Typical oil well life expectancy

Baseline Performance Under Performing Over Performing Poor Performance

Years of Expected Service

BOPD

Page 15: MadMackenzie GreenZyme Prez_Rev 9.7.16

1985 1995 2005 2015 20200

50

100

150

200

250

Typical oil well life expectancy

~~~~~ Daily Production ~~~ ~~~~

Initial highest daily pro-duction

80% drop from initial production rate

Typical Production

GreenZyme Injection #1 GreenZyme

Injection #2

Page 16: MadMackenzie GreenZyme Prez_Rev 9.7.16

GreenZyme® Competitive Advantages

Product ExperienceInjected into over

1,000 wells worldwide over the past 25 years

of service.

Eco FriendlyGreenZyme is made

biologically and is 100% biodegradable. It is not toxic

to the formation, well equipment, or the

environment.

Simple & SuccessfulOutstanding project success rate with no special equipment needed for project execution.

Product ApplicationsGreenZyme is a preferred EOR solution for a variety of well applications and varying formation characteristics.

Page 17: MadMackenzie GreenZyme Prez_Rev 9.7.16

MADMACKENZIE SOLUTIONS Summary of Services

Well AnalysisOur team will review well

data to determine if a well is a candidate for GreenZyme

EOR.

EOR Program Development

Well analysis results will provide our team the

information needed to produce a well-specific

program to meet your EOR needs.

EOR SponsorshipWe are confident in our EOR solution! For selective candidates we will sponsor the cost of our EOR services.Reoccurring ServicesRegular well monitoring and analysis post EOR injection is critical to understanding the success of the program.

Page 18: MadMackenzie GreenZyme Prez_Rev 9.7.16

Publication references about GreenZyme®New Frontiers in EOR Methodologies by Application of Enzymes

SPE 154690: Tarang Jain and Akash Sharma

“The enzyme function of the product is due to the fact that the enzymes seek and release oil, but is not consumed in the releasing mechanism. After the release of hydrocarbons the enzymes will be attached to the solid surfaces and… are available to interact with new hydrocarbons and cause the release of oil.”

EOR Pilot Tests with Modified Enzyme [GreenZyme] – Dangang Field, ChinaAuthors: Qing-xian Feng, Xian-ping Ma, Li-hong Zhou, Ding-bo Shao, Xiao-lin Wang and Bao-yan Qin of PetroChina Oilfield Co.

“… [GreenZyme] was applied to the Shengli field in China and increased production was sustained for 180 days producing an additional 10,961 bbl. …With continued development over the next two years, more than 100 wells saw enzyme applications with a success ratio of greater than 88%.”

“GreenZyme® is the EOR of the future: cleaner, safer, and smarter. It is a biodegradable, biological enzyme derivative.  It  digests nothing, dissolves nothing, and causes nothing to grow. GreenZyme performs its biological function in every reservoir.”

~ Olivia Carey, Asset Manager, Operator

EEOR Success in Mann Field, MyanmarSPE 144231: William K. Ott, Thu Nyo, Win Nyunt Aung, and Aung Thet Khaing

“The environment-friendly enzyme, a biological catalyst, can significantly accelerate (several million reactions per second) release of oil from grain surfaces in an oil reservoir. In addition, it can change rock wettability from oil-wet to water-wet, thus reducing interfacial tension of solids and oil-flow resistance through formation pore spaces. The enzyme works biologically, theoretically never being consumed, reapplied until diluted by produced water.”

Page 19: MadMackenzie GreenZyme Prez_Rev 9.7.16

Customer Satisfaction is our Priority

At MadMackenzie, we pride ourselves on delivering service that exceeds your expectations. Let us earn your trust and your business one project at a time. ~

Performance as PrescribedHow can we be of service?

Page 20: MadMackenzie GreenZyme Prez_Rev 9.7.16

MadMackenzie Solutions, LLC is an authorized Agent of GreenZyme®, an Apollo Separation Technologies

product.

Thank you for your time.

[email protected] 9119 Hwy 6 Suite 230Office: 281-778-8128 Missouri City, TX 77459