MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … of 57th OCC… · Committee of MP held on...
Transcript of MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … of 57th OCC… · Committee of MP held on...
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected]
Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur,
Jabalpur 482008, CIN-U40109MP2001SGC01
vkbZ ,l vks : 9001-2008
ISO: 9001-2008
No.07-05/SG-9B-II/375 Jabalpur, dated: 28.04.2017
To
As per distribution list
Sub: Agenda of 57th
meeting of Operation and Coordination Committee of MP.
The Agenda of 57th
meeting of the Operation and Coordination Committee of MP
scheduled on 05th May 2017 at Conference Hall, SLDC, MPPTCL, Nayagaon Jabalpur has
been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded.
(R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur
Distribution List 1. The Chief Engineer (Works), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur, email-
2. The Chief Engineer (T&C), MP Power Transmission Co. Limited, Jabalpur. Fax No- 0761-2665593,
2702710 Email- [email protected]
3. The Chief Engineer (Transmission-East Zone), MP Power Transmission Co. Limited, Shakti Bhawan,
Jabalpur. Email- [email protected].
4. The Chief Engineer (Transmission-West Zone), MP Power Transmission Co. Limited, Indore.
5. The Chief Engineer (Transmission-Central Zone), MP Power Transmission Co. Limited, Bijlee Nagar,
Govindpura, Bhopal, email- [email protected]. 6. The Chief Engineer (Plg & Des), MP Power Transmission Co. Limited, Jabalpur, Fax No- 0761-2660908
Email- [email protected] 7. The Chief Engineer (Procurement.), MP Power Transmission Co. Limited, Jabalpur, .Fax No- 0761-
2660908 Email – [email protected] 8. The Executive Director (O & M:Gen), MP Power Generating Company Limited, Jabalpur. Fax No- 0761-
2664749, Email- [email protected], Email- [email protected]
9. The Chief Engineer (O&M:Hydel), MP Power Generating Co. Ltd, Jabalpur, Fax No-0761-2664749. 10. The General Manager(PM), MPPMCL, Jabalpur Email – [email protected]
[email protected] 11. The Superintending Engineer (GCC), MPPGCL, Jabalpur Email – [email protected]
12. The General Manger (DCC-EZ), DISCOM Control Centre, MP Poorva Kshetra Vidyut Vitaran Co.Limited, Jabalpur, Fax No- 0761-2668503, Email – [email protected].
13. The Dy. General Manager (DCC –CZ), DISCOM Control Centre, MP Madhya Kshetra Vidyut Vitaran Co. Limited, Bhopal, Fax No-0755-2580611,Email- [email protected].
14. The Executive Engineer (DCC-WZ), DISCOM Control Centre, MP Paschim Kshetra Vidyut Vitaran Co. Limited, Near Polo Ground, Jail Road, Indore, Fax No- 0731-2421554, Email- [email protected].
15. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Indore, Fax No- 0731-2874515, Email – [email protected].
16. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Bhopal, Fax No- 0755-2885220, Email – [email protected]
17. The General Manger(RO), MPPMCL, In front of Bhojpur Club, E-4, Arera Colony,Bhopal, Fax No-0755-
2423046, [email protected] 18. The Chief Engineer (PM&C), Narmada Hydroelectric Development Corpn. Ltd, NHDC Parisar, Shamla
Hills, Bhopal – 462013., Fax No- 0755-4030130,Email – [email protected] 19. The Chief Electrical Distribution Engineer, West Central Railway (WCR), General Manager’s Off ice,
Electrical Department, Jabalpur-482001 (MP), Fax: 0761-2627629, Email- [email protected],
[email protected], M-9752415312, Mr.Satyendra Kumar (Dy.CE), Mob.9752415301 (CEDE, WCR). 20. The General Manager, Indira Sagar Power Station, NHDC Office complex, PO : Narmada Nagar, Distt :
Khandwa (MP) – 450 119, Fax No- 07323-284080, Email – [email protected] 21. The General Manager, Omkareshwar Power Station, Prashsnik Bhawan, Urja Vihar, Sidhwarkut, Distt :
Khandwa (MP) – 450 554, FaxNo-07280-271703, Email- [email protected] 22. The Director (Projects), BLA Power Limited, At : Niwari, PO: Khorsipan, Tah : Gadarwara, Distt ;
Narsinghpur 487 551, Fax No. 07791-243667 / 243669, Email – [email protected] 23. The Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Agasod, Post
Office-Bina- 470113 Distt- Sagar, Fax No. 07580-277200, Email – [email protected]
24. The Chief Executive Officer, Kalpataru Satpura Transco Pvt. Ltd., Satpura Colony, Betul Road, Old Itarsi,
Distt. Hoshangabad, Email – [email protected]
25. M/s Ujaas Energy Ltd. 701, NRK Business park, Vijay Nagar Sqaure, Indore – 452010, Email id :-
[email protected] 26. M/s Suzlon Global Services Ltd., 1090, Scheme no. 114, Park-2, Ring Road, Universal Hospital Row,
Email- [email protected], Indore – 452010, [email protected]
ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 56th meeting of Operation & Coordination
Committee of MP held on 08TH
March 2017 at Hotel Kalchuri, Jabalpur were forwarded to the committee
members vide No. 07-05/SG-9B-II/110 dated 13.04.2017. [OCC may confirm the minutes]
ITEM NO. 2 : REVIEW OF SYSTEM OPERATION DURING THE MONTHS FEB 2017 TO MAR 2017.
2.1. Frequency Particulars: During February 2017 the system frequency was below 49.9 Hz for 5.30% of
time against 8.95% of time during March 2017. The system frequency was above 50.05 Hz for 20.71% of time
during February 2017 against 17.50% of time during March 2017. The system frequency was within the IEGC
range of 49.9-50.05 Hz for 73.99% of the time during February 2017 against 73.56% of time during March
2017. The average monthly frequency was 50.00 Hz during month of February 2017 and 49.99 Hz during
month of March 2017. The system frequency did not touch 49.20 Hz during the above period.
The detailed frequency particulars for the month of February 2017 and March 2017 are enclosed at
Annexure-2.1. The brief detail of frequency profile is given here under:
Month Average frequency
Minimum Integrated frequency over an hour
Maximum integrated frequency over an hour
Instantaneous Minimum Frequency
Instantaneous Maximum Frequency
Feb 2017 49.99 Hz 49.89 Hz 50.11 Hz 49.76 Hz 50.34 Hz
Mar 2017 49.99 Hz 49.86 Hz 50.14 Hz 49.66 Hz 50.34 Hz
[Committee may like to note]
2.2 Operational Matters
2.2.1 Operational Discipline : System operated in terms of frequency profile for the months Feb 2017 and
Mar 2017 is as given below for discussion by the committee :
Month
% of time Frequency Below 49.9 Hz
% of time Frequency above 50. 05 Hz
% of time frequency within the permissible range of 49.9-50.05 Hz.
Average monthly frequency
No. of times frequency dipped below 49.2 Hz
Feb 2017 5.30% 20.71% 73.99% 50.00 Hz 0
Mar 2017 8.95% 17.50% 73.56% 49.99 Hz 0
[Committee may like to note]
2.2.2 Voltage Profile: During the months Feb 2017 and Mar 2017 the maximum and minimum voltage as
recorded at following important 400 KV s/s in MP Grid:-
Feb 2016 Mar 2017
Max. Voltage Min. Voltage Max. Voltage Min. Voltage
Name of observed Observed observed Observed
Sr 400 KV Voltag
Volt
No Substation Voltage
ag
Voltage
Date e Date Date Date KV e KV
KV
KV
1 Indore 420 13.02.17 402 10.02.17 420 14.03.17 401 21.03.17
AGENDA FOR 57TH
MEETING OF OPERATION & COORDINATION COMMITTEE OF MP TO
BE HELD AT 11:00 AM AT CONFERENCE HALL, SLDC, MPPTCL, NAYAGAON, JABALPUR ON 05th MAY 2017.
Agenda of 57th OCCM of MP 1
2 Itarsi 420 13.02.17 394 10.02.17 418 09.03.17 395 23.03.17
3 Bina 416 13.02.17 397 10.02.17 417 15.03.17 397 06.03.17
4 Gwalior 421 10.02.17 388 23.02.17 420 07.03.17 389 06.03.17
5 Nagda 422 10.02.17 404 05.02.17 422 14.03.17 403 21.03.17
6 Satpura 426 13.02.17 408 10.02.17 423 11.03.17 409 21.03.17
7 Birsinghpur 424 12.02.17 408 10.02.17 422 14.03.17 406 17.03.17
8 ISP 424 05.02.17 409 19.02.17 420 14.03.17 401 21.03.17 [Committee may please note & discuss]
2.2.3 Status of Capacitor Banks in sub-transmission system: The updated information of the status of
capacitor banks in sub-transmission system as on 31st Mar 2017 as submitted by DISCOMs is detailed below:
[Action: DISCOMS]
2.2.4 Status of Shunt Capacitor Banks installed at various EHV Transmission Substation: The updated
information of the status of installed capacitor banks (in MVAR) in EHV transmission system as on 31.03.2017
as submitted by MPPTCL is given below:-
[Action: MPPTCL]
2.2.5 Status of completion of ongoing Transmission Schemes being executed by MPPTCL: The
various ongoing Transmission Schemes completed during the previous financial year 2016-2017 (up to March
2017) and plan for completion of various ongoing Transmission Schemes for the Year 2017-2018 is enclosed
as Annexure 2.2.5(i) and 2.2.5(ii) respectively.
[Action: Committee may like to note]
DIS
CO
M
Capacitor bank
installed in good
condition (No)
Capacitor
Banks healthy
but not in
service due to
control ckt
problem
Capacitor bank
installed but
defective & are
repairable (No)
Require
ment of
repair
against
each
unit (No)
Requiremen
t against
non-
repairable
capacitor
banks
Capacitor
banks already
covered under
ADB T-V
Balance
capacitor
banks to be
covered in
other
schemes
600
KVAR
1200
KVAR
1500
KVAR
600
KVA
R
1200
KVA
R
1500
KVA
R
600
KVA
R
1200
KVAR
1500
KVAR
No of 100
KVAR
Units
required
600
KVAR
1200
KVAR
600
KVAR
1200
KVAR
600
KVAR
1500
KVAR
EZ 404 145 32 27 10 0 18 09 0 29 - - - - - 77
CZ 5 687 686 0 0 0 0 0 0 0 0 0 0 588 0 0
WZ 631 542 564 17 17 05 15 20 77 181 2 10 - - - 37
Voltage
Class
Capacitor bank
installed as on
31.01.17(MVAR)
Capacity Added
after Last OCC
Meeting (MVAR)
Capacitor banks
already covered
under ADB T-V
TOTAL
CAPACITY AS
ON 31-03-17
Capacitor Bank
Installed but
defective & are not
repairable (No &
MVAR)
220 KV 100.00 0.00 - 100.00 All in Service
132 KV 1238.00 0.00 - 1238.00
33 KV 4480.50 120.00 - 4600.50
Total 5818.50 120.00 - 5938.50
Agenda of 57th OCCM of MP 2
2.2.6 U/F and df/dt Relay Operation
(i) U/F and df/dt Relay Operation: Frequency did not touch 49.20 Hz during Feb 2017 and Mar 2017. There was no df/dt operation during the same period.
[Action: MPPTCL]
(ii) Defective u/f, df/dt relays: MPPTCL has informed that all the df/dt relays are in good/healthy working
condition and where the U/F relays are not available, the numerical relays programmed for under
frequency operation.
[Committee may like to note]
2.3 Power Cuts / Load restrictions/Differential Load Shedding by DISCOMS & group allocation to 33
KV feeders : (i) Details of DISCOM wise Power supply given to various domestic categories during the period Feb
2017 and Mar 2017 is enclosed at Annexure 2.3(i).
[Committee may like to note]
(iii) Group Allocation to Newly Commissioned existing EHV substations:- The region wise list of 33
KV feeders emanating from various newly commissioned/existing EHV substations for which groups have not
been allocated is given in Annexure 2.3 (ii). The DISCOM wise details of pending group allocation to 33 KV
feeders is given below:-
SN DISCOM Region No of 33 KV feeders for which groups to
be allocated
01
EAST
Jabalpur 00
02 Sagar 00
03 Rewa 00
04 Total 00
05
WEST
Indore 14
06 Ujjain 03
07 Total 17
08
CENTRAL
Bhopal 06
09 Gwalior 07
10 Total 13
TOTAL Grand Total 30
Discoms are requested to furnish the details as per list enclosed at Annexure-2.3(ii) in the meeting.
[ACTION : DISCOMs]
ITEM NO. 3 : OPERATIONAL PLANNNING:
3.1 Generating Units under planned outage and proposed maintenance programme : The annual
maintenance /outages of thermal generating units of MPPGCL during May 2017 to June 17 is Nil as intimated
by ED(O&M:Gen.), MPPGCL, Jabalpur.
[Committee May like to note]
3.2 Proposed shutdown programme of Transmission lines / Transformers: The proposed shutdown of
transmission elements for the period 01.05.2017 to 30.06.2017 submitted by MPPTCL is enclosed as
Annexure-3.2.
[Committee May like to discuss]
3.3 Long Outages of transmission elements and protections: The status submitted by MPPGCL /MPPTCL
are given below:- Agenda of 57th OCCM of MP 3
S.No Line/Transformer/ etc
under long Outage
Outage date Reason Response from Utility
1. 315 MVA, 400/220 kV ICT-I
at 400 kV S/s Bina 15.10.15
Differential
Due to Buchholtz relay
alarm.
The transformer bank is out of circuit from 02.08.2015. 2 No. 105 MVA Units of these banks have failed. The complete bank has to The 315 MVA X’mer Sr. No. 6005210 is out of circuit from 15.10.2015. The Transformer was shifted from Bina to M/s BHEL works for repairs. .After repairs, transformer has been received back at 400 KV S/s Bina. MPPTCL is requested to submit the latest status about commissioning of the Transformer.
2. Main Breaker of 400 KV
Nagda-Rajgarh-II. 23.07.15
Y-phase CT burst/ BKR
Problem
400 KV Rajgarh II is charged from 400 KV Main Bus-I, for ensuring connectivity with Main Bus-II. The work is in progress with work of providing Reactor on ISP Bay 400 KV Rajgarh-I is shifted in diameter of 315 MVA ICT-IV, which has facility to connect on Main Bus-I and Main Bus-II. This will impact when outage of Bus-II occurs in outage of Nagda- Rajgarh–II circuit. MPPTCL is requested to submit the latest status.
3.
315 MVA, 400/220 KV X’mer II (TELK make) Main Breaker at 400 KV S/s Katni
03.11.2015
X’mer commissioned through bus coupler breaker since commissioning.
It has come to notice that the transformer-II has been connected through bus coupler breaker both side (400 KV & 220 KV) and there is no main breaker for this 315 MVA X’mer-II. In 54
th OCCM MPPTCL
informed the committee work of 220 KV Ckt breaker has been completed and 400 KV Ckt. Bkr. work is under progress. Latest status in the matter is requested from MPPTCL.
4.
12.5 MVA, 132/66/33 KV X’mer CGL make Sr. No. 23615 at 132 KV S/s Pichhore
19.05.2016 Transformer failed on
19.05.2016 as intimated by T&C, MPPTCL.
The load is manageable through (1x20 + 1x40) MVA X’mers in running condition at S/s Pichhore. Hence replacement of failed X’mer is not required as intimated by MPPTCL. In 52
nd 53
rd 54
th & 55
th
OCCM, Chairman OCC requested MPPTCL, P&D to submit the letter for removal of transformer from Asset. In 56
th OCC Chairman OCC
stated that T&C and P&D will perform load growth / load assessment study prior to decommissioning and intimate to SLDC. Latest status in the matter is requested from MPPTCL (T&C/P&D),
5. 12.5MVA, BBL Make (Sr. No.-1428/3) at 132 KV S/s Chapda.
Not intimated X’mer failed
The 12.5MVA BBL make Transformer Sl.No. 1428/3 failed and proposed to be withdrawn from system as intimated by MPPTCL. In 56th OCC representative from T&C informed the committee that correspondence is being done with P&D, MPPTCL for load growth study
Agenda of 57th OCCM of MP 4
and decommissioning of the transformer. Latest status may please be submitted by MPPTCL (T&C/P&D) in the meeting.
6. 160 MVA, 220/132 KV BHEL X’mer at 220 KV S/s Jabalpur
30.09.2016 Not intimated
Transformer dismantled and is being sent to M/s BHEL for inspection / repairs as intimated by MPPTCL. Latest status may please be submitted by MPPTCL in the meeting.
7. 20 MVA, 132/33 KV GEC X’mer at 132 KV S/s Waidhan
22.02.17 Kept out due to increased key gases.
Transformer under testing and oil filtration. MPPTCL is requested to submit the latest status.
8. 63MVAR 400KV Bus reactor-II at STPS, Sarni
06.09.2016
Not intimated
The Bus-reactor is ready. However its 400 KV SF6 gas Circuit Breaker has got irregularities in closing & tripping timings. Material received at site. MPPGCL is requested to submit the latest status in the meeting.
9. 63 MVA Auto X’mer at ATPS Chachai.
14:30 Hrs/ 16.03.2017
Generation of Acetylene Gas in the DGA result was found beyond dangerous limit.
MPPGCL informed that personnel from BHEL has carried out inspection at site and it is under checking and investigation. MPPGCL is requested to submit the latest status in the meeting.
10 132 KV R-Ph. CT of 132 KV Rajghat-Bina feeder at Rajghat.
22:24 Hrs/ 18.11.2016
Not intimated
132 KV R Ph. CT burst of 132 KV Bina feeder at Rajghat end on dated 18.11.2016. MPPGCL is requested to submit the latest status.
The utility may submit the latest status.
[Action:MPPGCL/MPPTCL]
ITEM NO. 4 : OPERATIONAL STATISTICS FOR THE MONTH OF FEB 2017 AND MAR 2017:
The details of actual generation, Schedule from Central Sector, demand etc. are given in the following
Annexures:
Annex. 4.1 Unit wise actual Generation of MPPGCL thermal Units and station wise Generation of
MPPGCL & NHDC Hydel Units.
Annex. 4.2 Power Supply Position. Annex. 4.3 Hourly Average of Availability and Demand. Annex. 4.4 Hourly average schedule Vs Drawal of DISCOMs.
[Committee may like to note]
ITEM NO. 5.0 : SYSTEM DISTURBANCE IN MP DURING FEB 2017 AND MAR 2017 : There was no major
grid disturbance in MP during Feb 2017 and Mar 2017. Moreover, the Grid Disturbances and Grid Incidents in
MP during these months are given in Annexure 5.0.
[Committee May like to discuss]
ITEM NO. 6.0 : IMPORTANT OPERATIONAL ISSUES:-
6.1 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS /
TRANSMISSION ELEMENTS:- It is brought to the notice of the Committee that 125 MVAR BHEL make Bus
Reactor commissioned on 29.04.2017 at 400 KV S/s, Katni. The present status regarding schedule and
commissioning of reactors / transmission elements is as below:- Agenda of 57th OCCM of MP 5
S.No. 400 KV S/s Size
MVAR
Implementing
Agency
Expected Date of Commissioning
as intimated in last OCC
1. Bus Reactor : ISP
125 MVAR NHDC
Representative from NHDC informed the committee that delivery of all equipment is expected by June 2017. Thereafter erection & commissioning work will be carried out. It is expected that the reactor will be in service by July 2017 as informed by NHDC. NHDC is requested to please submit the latest status in the meeting.
2.
Line Reactor on 400 kV Satpura–ISP line at STPS
50 MVAR MPPGCL
In 56th OCCM, MPPGCL informed the
committee that procurement of line reactor is under tendering stage and expected to be commissioned by Oct-2017. Latest status may please be submitted by MPPGCL in the meeting.
3. Bus Reactor at SSTPS
125 MVAR
MPPGCL
Work will be carried out under PSDF as intimated by MPPGCL. In 56
th OCCM
MPPGCL informed the committee that purchase tender will be opened on 31.03.2017 and the commissioning of reactor is expected by Oct-2017. Latest status may please be submitted by MPPGCL in the meeting.
The latest status may be submitted in the meeting.
[Action: MPPGCL/NHDC]
6.2 Provision of synchronization facility at EHV sub-stations of MPPTCL:- As per Grid Code, the
synchronization facility should be available at all the Power Stations, 400 KV Sub-stations and 220 KV Sub-
stations and 132 KV sub-stations in the path of black start. In last OCC meeting MPPTCL representative
informed the committee that order for 69 no. synchronization trolleys has been placed and 1 no.
synchronization trolley has been delivered for checking and testing purpose at 220KV S/S Barwaha.
As desired by MPPTCL, SLDC has already forwarded list of 27 Nos EHV substations on 04.01.2017
where synchronization trolleys are to be installed on priority. This list enclosed all the 400 KV substations and
220 KV /132 KV substations which fall on the routes of black start.
The status of installation and commissioning of synchronization trolleys at the 27 EHV substations has
not been intimated by the MPPTCL till date. MPPTCL is requested to submit latest status along with time line
in the meeting.
[Action: MPPTCL]
6.3 Ten Daily Reservoir operation table of MPPGCL HPS:- In the meeting held in Regional Office of
MPPMCL at Bhopal on 24.09.2016 to discuss availability from Sardar Sarovar Project, ISP & OPS and State
Hydel Plants for Rabi season, MPPGCL had agreed to obtain ten daily reservoir operation table from WRD
and NVDA for their operation of their hydro generators. In last 54th , 55
th & 56
th OCCM, request has been made
to MPPGCL for furnishing the same to SLDC within a week,
In last meeting MPPGCL has submitted the Ten Daily Reservoir Table of Bargi and Bansagar Hydel
Power Stations. It is requested that MPPGCL shall submit the Ten Daily Reservoir Table of remaining hydel
power stations in coordination with NVDA and WRD for optimum utilisation of available water in the reservoirs
during the summer season.
[Action: MPPGCL] Agenda of 57th OCCM of MP 6
6.4 : CONTROLLING HIGH VOLTAGE DURING OFF-PEAK HOURS :- Switchable Shunt Reactors are being
taken in service during high voltage conditions. However in view of inadequate shunt reactive compensation,
the generating units are advised to contribute in voltage regulation by operating their units in under-excited
mode (absorb Reactive Power) within the capability curve. The MW, MVAR and Voltage of generating units
was analyzed for the month of Feb 2017 with the help of SCADA data available at WRLDC.
In 494th OCC meeting of WRPC, WRLDC has drawn attention regarding MVAR generation at Satpura
Power Station when bus voltage was above nominal. The scatter plot of MW Vs MVAR of unit and Bus Voltage
Vs Reactive Power Injection by the unit has been plotted. It has been observed that generating unit at Satpura
Unit No. 10 & 11 was injecting reactive power into the grid even when the bus voltage was above nominal.
Such operation is not desirable and it is requested that AVR setting and the GT taps may be reviewed /
adjusted so as to enable the unit to contribute in voltage regulation within the capability curve. The directives in
this regard may please be adhered to control the high voltage during off peak hours.
[Action: MPPGCL/NHDC/IPPs]
6.5 : MONITORING OF SCHEMES FUNDED FROM PSDF :- it was decided in the 6th meeting of NPC held
on 19th December 2016 at Bengaluru, that all the RPCs in the monthly OCC meetings may follow up with the
utilities to expedite the completion of schemes by giving due priority. The implementation of most of the
schemes are based on the recommendation of the enquiry committee on grid disturbance of July 2012 headed
by Chairperson, CEA. Therefore timely implementation of these schemes would enhance the grid security and
reliability. Accordingly the details of grant sanctioned from PSDF for the schemes of MP is enclosed at
Annexure- 6.5A. The status of implementation of above schemes (physical as well as financial progress) may
please be reviewed and the entities are requested to expedite implementation of the schemes. The utilities
were advised to furnish the information in the format enclosed at Annexure – 6.5B by first week of every
month on regular basis to Member Convener, PSDF project monitoring group (AGM, NLDC, POSOCO) with a
copy to NPC, WRPC division and SLDC . The status of the same is being monitored by WRPC in OCC
meeting of WRPC every month.
The information from MPPTCL and MPPGCL is not being received regularly to SLDC i.e first week of
every month for submission the same in OCC meeting of WRPC.
[Action: MPPGCL/MPPTCL]
6.6 MAPPING OF FEEDERS WIRED UNDER AUFLS TO SLDC SCADA :- In the 4th, 5th & 6th NPC
meetings, mapping of the Feeders / Lines covered under AUFLS on SCADA systems of SLDC's/RLDC's was
discussed. NPC have desired that monitoring of the feeders / loads under the AUFLS shall be done at SLDC's
/ RLDC's, so as to ascertain that the desired results are ensured during the events, frequency falling below the
AUFLS frequency settings. In the 6th NPC meeting it was therefore desired that all the loads/feeders wired
under the AUFLS is monitored in Western Region also in OCC meeting and the progress be submitted to NPC.
MPPTCL is requested to initiate the process of mapping these feeders in the SCADA System so that same
shall be made available to WRLDC. MPPTCL is requested to update the list of feeders under AUFLS and
intimate the feeders which have already been mapped in their SCADA System and are monitored on line by
them. Also constraints, if any, faced in mapping AUFLS feeders in their SCADA System may be intimated. The
status of Mapping the AUFLS feeder with SCADA along with time line may please be submitted in the meeting.
[Action: MPPTCL]
Agenda of 57th OCCM of MP 7
6.7 REPORTING OF FLASH REPORT, DR and EL FOR 400KV, Interstate Transmission Elements &
Detailed Tripping Report:- As per the provisions of Regulation 5.2 (r) of CERC (Indian Electricity Grid Code)
Regulations 2010 and Regulation of 5(9) of CERC (Indian Electricity Grid Code) (First Amendment)
Regulations, 2012 all the Regional Entities of the Region shall furnish the tripping details including DR & SEL
output to RLDC with in 24 hrs of the event for analysis and identify the real time measures required in future to
ensure secured grid operation. The flash report is also required to be furnished to SLDC within an hour of
tripping. It is observed that FLASH REPORT, DR & EL of station is not made available after tripping of
transmission grid element by the State Grid Entities and the flash report is also not being sent after repeated
pursuation.
All intra-state entities are requested to submit the FIR, DR & EL of station during tripping of
transmission grid elements.
[Action: MPPTCL/MPPGCL/IPPs/NHDC/ISP/OSP]
6.8 NON-SUBMISSION OF TRIPPING DETAILS OF INTER-STATE & INTER-REGIONAL
LINES/ELEMENTS BY MPPTCL:- It has been intimated by WRLDC wide letter no.- WRLDC/SO-II/1737/936-
954 dated-20.04.2017 that in case of tripping of Inter State & inter Regional lines of voltage class 220 KV &
above level, a tripping report along with the DR/EL files shall be submitted to WRLDC. In the matter it is to
mention that the detailed report along with DR/EL shall be submitted to WRLDC/WRPC within 24Hrs. Non-
submission of details within stipulated time is violation of CEA Grid standard 2010-3.e, 15.3, CEA
Transmission Planning Criteria, IEGC, CEA Technical Standard for Construction of electric plants and electric
lines clause- 43(4)©, 43.4.A, etc. Several incidences / trippings which occurred during the month of March-
2017 for which the details has not been submitted are as below:-
S.no
.
Element Date of
tripping
Time of
tripping
Remark
1. 220 KV Badod -
Sakatpur
04.03.2017 03:44 MPPTCL is requested to submit the detailed
report along with DR/EL files, A/R details, etc.
in the meeting.
2. 220 KV Badod
Sakatpur
22.03.2017 12:52 MPPTCL is requested to submit the detailed
report along with DR/EL files, A/R details, etc.
in the meeting.
3. 220 KV Badod
Sakatpur
26.03.2017 03:11 MPPTCL is requested to submit the detailed
report along with DR/EL files, A/R details, etc.
in the meeting.
4. 220 KV
Bhanpura –
Modak
27.03.2017 12:53 MPPTCL is requested to submit the detailed
report along with DR/EL files, A/R details, etc.
in the meeting.
In view of the above MPPTCL is requested to kindly take up the matter with the field offices and submit
the detailed tripping report to SLDC at the earliest for onward submission to WRLDC/WRPC.
[Action:MPPTCL]
6.9 MAJOR GRID DISTURBANCE AT 220 KV S/S JABALPUR ON 07.04.2017:- at around 22:21:06 Hrs.,
220/132 KV, 120 MVA Mistubishi X’mer – II tripped from 220 KV Side on Over Current indication at 220 KV S/s
Jabalpur resulting in overloading and tripping of 220/132 KV, 120 MVA BHEL X’mer – I & 220/132 KV, 160
MVA GEC X’mer – III at 220 KV S/s Jabalpur and 220/132 KV, 160 MVA X’mer at 220 KV S/s Panagar, 132
KV Katni Interconnector – I & II, 132 KV Shrinagar – Narsinghpur Ckt and 132 KV Jabalpur – Tejgarh tap
Patan Ckt also tripped due to over loading. Consequently interruption occurred at 11 no. S/s i.e., 220 KV S/s Agenda of 57th OCCM of MP 8
Jabalpur, 220 KV S/s Panagar, 132 KV S/s Katni, 132 KV S/s Madhotal, 132 KV S/s Mansakra, 132 KV S/s
VFJ, 132 KV S/s Vinobhave, 132 KV S/s Katangi, 132 KV S/s Shahpura, 132 KV S/s Shrinagar, 132 KV S/s
Tejgarh, 132 KV S/s Patan and 132 KV S/s Maneri. There was load loss of about 279 MW, 139.5MWH.
In view of the above tripping it is to mention that the incomplete detailed tripping has been submitted to SLDC
which is violation of following grid standards:-
Issues - Agency
DR/EL not provided within 24
Hours.
IEGC-5.2(r )
CEA Grid Standard 15.3
MPPTCL
Non-submission of details for the
tripping which is required for
appropriate analysis for GD/GI.
IEGC-5.2(r ), 5.9.6.c.(vi)
CEA Grid Standard 15.3
CEA (Technical standards for connectivity ti the
Grid) Regulation, 2007-6.4.d.
MPPTCL
MPPTCL is requested to submit the report including the following details:-
The actual cause of tripping of 220/132 KV, 120 MVA Mistubishi X’mer – II at 220 KV at 220 KV S/s
Jabalpur shall be submitted by MPPTCL. Due to tripping of X’mer – II its complete load shifted of
X’mer – I & III at 220 KV S/s Jabalpur and on 220/132 KV, 160 MVA X’mer at 220 KV S/s Panagar.
Consequently 220/132 KV X’mer – I & III at 220 KV S/s Jabalpur & 220/132 KV X’mer at 220 KV S/s
Panagar tripped due overloading along with 132 KV lines (source) feeding to Jabalpur and Panagar
area.
The details of tripping at 220 KV S/s Panagra and connected 132 KV S/s has not been submitted by
MPPTCL so far. It is requested that the detailed tripping report may kindly be submitted to this office at
the earliest.
Only 1-no.DR/EL file has been submitted without specifying its details(element name, type, etc.) where
as 3 No. X’mer at 220 KV S/s Jabalpur and 1 no. X’mer at 220 KV S/s Panagar tripped, without which
actual cause of tripping could not be analyzed. MPPTCL is requested to kindly submit the DR of all the
elements tripped to SLDC at the earliest.
Reason for hand tripping the source feeder i.e., 132 KV Jabalpur – Bargi Ckt – I & II may please be
provided by MPPTCL.
Delay in resuming 33 KV supply at 220 KV S/s Panagar.
[Action:MPPTCL]
6.10 Bus Bar & LBB Protection taken out of service without obtaining code from SLDC:- The Assistant
Engineer 400 KV S/s Chhegaon has intimated vide e-mail dtd-14.04.2017 that at 17:00 Hrs. on 14.04.2017
Bus Bar Protection and LBB protection are taken out of service due to faulty module of C-Phase Bus Bar
Relay at 400 KV S/s Chhegaon. In the above context it is to convey that such operation should have been
done before taking real time grid code and prior intimation /permission of SLDC.
Such unilaterally switching operation of transmission elements without obtaining code from SLDC is
not desirable for safe, secure and smooth operation of integrated grid and also violation of IEGC Section 5.2
and 5.6.2. It is, therefore, requested to ensure, not to repeat such occurrences in future.
[Action: MPPTCL]
6.11 Extension of RGMO/FGMO signal to SLDC/WRLDC:- As per IEGC 5.2(f), RGMO/FGMO is mandatory
for all thermal units above 200 MW and hydro units above 10 MW. Further considering the high penetration of
renewable to grid and also the Government target to achieve 175 GW, it is essential to monitor operation of
RGMO/FGMO at SLDC/RLDC for ensuring grid security and compliance of regulation. Subsequently SLDC Agenda of 57th OCCM of MP 9
vide letter no. 07-05/RPC-27/3739 dated 18-01-2017 and letter No. SE/LD:E&T/693 dated 23-01-2017
requested MPPGCL/NHDC for integration of telemetry of RGMO/FGMO in RTU installed at power station and
forward the object address configured in RTU so that same may also be configured in SLDC SCADA and
RGMO/FGMO status may be displayed in SCADA system
In last meeting NHDC has informed that wiring work SCADA to RTU panel has been completed,
mapping is required before got connected. In this regard service engineer of OEM has been called and shall
expected to be complete by end of April 17. Regarding OSP, NHDC intimated that presently machines of OSP
are operating at 191 meter below MDDL i.e 193.54. After achieving the level of MDDL the same may be
provided. JP Bina representative has informed that signal has been extended up to the switch yard, quotation
from GE T&D India Ltd has been received for configuration in SCADA and it is under Process. MPPGCL has
not submitted any status in this regard.
It is requested that NHDC and JP Bina may submit the updated status in the meeting. MPPGCL is
requested to submit the plan to extend the RGMO signal to SCADA in the meeting.
[Action: MPPGCL/IPPs/NHDC/ISP/OSP]
6.12 Availing of outage of Interstate and 400 KV transmission elements: The standard procedure for
availing outages on interstate and 400 KV transmission elements has been devised by WRPC and WRLDC in
line with guidelines of CEA and NLDC. This process is approved in OCC meeting of WRPC. This procedure
has already been communicated by SLDC to state grid entities for strict compliance. Matter was discussed in
various meetings of MP also. A detailed procedure for approval of transmission lines /elements outage
planning procedure in Western Region is attached at Annexure 6.12.
The Gist of the procedure is given below:-
For WRPC, OCCM Approval :
A. Shut Down Proposed for OCCM approval- The WRPC OCC meeting held in the every month and outage planning of transmission elements
for next month shall be finalized during the meeting. The procedure for submission of proposal for approval of transmission elements in OCC meeting is as under: 1. MPPTCL,MPPGCL,JP Bina, BLA, NHDC (ISP &OSP) & M/s Kalpataru should submit their outage
proposal of transmission elements for next month by 1st of every month to SLDC for onward
transmission to WRPC for OCCM approval..
2. As finalized in MP OCCM, the office of T&C, MPPTCL shall submit the consolidated proposal of EHT & T&C division to SLDC. The proposed by other section of MPPTCL shall not be considered.
3. After 2nd
day of month no outage shall be considered for proposal to be submitted to WRPC for OCCM approval.
4. After approval from WRPC, the approved shut down of MP shall be sent by SLDC to each concerned entities.
5. The WR, OCCM approved outage shall also be available for current month and next month in the website of SLDC. The url of website is sldcmpindia.comWRPC OCC approved S/D. Each entities are requested to confirm their approved shut down as available in website of SLDC.
B. Procedure for Availing OCCM approved Shut Down 1. The entity / concerned authority shall give their readiness to avail the approve shut down on D-3
basis, i.e i.e., three days prior to approved date of shut down MPPTCL to SLDC for onward transmission to WRPC/WRLDC.
2. If the consent of the entity is not received on D-3 basis, the shut down shall be treated as deemed cancel. Agenda of 57th OCCM of MP 10
3. If due to any reason the entity is not in a position to avail the shut down on approved
date and desired to avail the shut down on next date(s), the same may be rescheduled on D-3 basis and intimated to SLDC. The format for rescheduling of OCC approved shut down is enclosed herewith as Annexure – 6.12(B).
4. The entities shall also submit the reason for non-availing the OCC, WR approved
shut down to SLDC For WRPC, Non- OCCM Approval:-
Post-OCC meeting, fresh proposals for transmission outage should be discouraged. Only under exceptional cases, the request for transmission outage after issue of OCC minutes shall be submitted to SLDC on D-3 basis. The procedure for proposal of shut down of non-occm shut down is as under :
1. The entity shall submit the proposal of outage of transmission elements along
with readiness to avail the shut-down to SLDC on D-3 basis by 14.00 hrs as per format enclosed as Annexure-6.12(C).
2. The shut-down proposed during real time (after d-3 basis) shall not be forwarded to WRLDC by SLDC except of emergency type.
3. If the shut-down is not availed by the entity after approval of WRPC/WRLDC,
the reason should be submitted to SLDC.
For Emergency Shut Down for WRLDC Approval :
For emergency outages, the outage indenting agency would directly approach
SLDC control room for outage code as being the practice in vogue. The outage proposal shall clearly indicate the name of the indenting agency, element details (such as element name, substation, voltage level, bay number etc.), element owner, outage time & duration, reason for seeking the outage, schematic/Single Line diagram (SCADA SLD from respective substation to be submitted for transmission elements at substation) as per format enclosed as Annexure-6.12(D).
It is requested that the standard procedure finalized in OCC meetings of MP and WRPC must be
followed strictly for availing outages on interstate and 400 KV transmission elements in future and SLDC shall
not forward any outage message to WRLDC during the real time of operation except of emergency nature.
[Action- MPPTCL, MPPGCL, IPPs, NHDC}
{Committee may like to Discuss]
6.13 COMPLIANCE TO LOW VOLTAGE RIDE THROUGH (LVRT) BY WIND GENERATORS:- As per CEA
regulations(Technical Standards for Connectivity)- Regulations-2013 (Part-II) provides that all Wind Electric
Generating stations commissioned on or before 15.04.2016 and connected at a voltage level of 66 Kv and
above shall remain connected to the grid when voltage at the interconnection point on any phases dips upto
0.15 pu. This CEA standard is applicable to the wind generating stations &n generating stations using
invertors.
CERC on its order dtd. 05.01.2016 in petition no. 420/MP/2014 directed that LVRT should be
implemented for all wind turbines commissioned before 15.04.2014 and connected to voltage level of 66 KV
and above and having a Installed capacity equal to or more than 500 KW. Further CERC direct that the solar
Agenda of 57th OCCM of MP 11
generators whose bidding process has not yet commenced i.e NIT has not been issued on the date of the
order shall take necessary steps to implement LVRT in their generating Stations.;
In 494th OCC meeting of WRPC, Member Secretary WRPC, requested all states to indicate the
present methodology of checking LVRT compliance in vogue for giving clearance for integration and update
the status of LVRT compliance. The details may be compiled in the format given below and submit the same
to WRPC and WRLDC
Location Pooling
Station
Deverloper Turbine
make
Turbine
type
Turbine
Capacity
If turbine
commissioned
before
15.04.2014
Expected date
of completion
of retrofitting
If turbine
commissioned
after
15.04.2014
whether
compliant to
LVRT
(Yes/No)
In view of the above it is requested that all wind and solar generators should comply the directives of
CERC and submit the information to SLDC for onward transmission to WRPC and WRLDC. In future the
injection permission of wind and solar generators shall be issued by SLDC after compliance of LVRT. MPPTCL
is also requested to include the same its connectivity agreement/permission while issuing to RE generators.
[ACTION : Wind generators/Solar Generators/MPPTCL]
6.14 Permission for injection of RE Power by SLDC:- C.E(T&C) vide letter no-04-04/K-SLDC/213 dated-
19.04.2017 intimated to SLDC that 1 MW solar power plants of M/s Arihant Sunsen India connected through
33 KV Banco-II feeder at 132 KV S/s Delchi(Makdone), is injecting power in MP grid due to which one no.
132/33 KV, 40 MVA X’mer is being overloaded causing frequent power regulation and requested SLDC to
issue injection code after commissioning of proposed additional transformer at 132 KV S/s Makdone.
it is to intimate all the injection permission issued by SLDC to RE generators/developer after
compliance of regulatory requirements such as connectivity permission from MPPTCL/Discom, copy of
PPA/LTA, etc. SLDC issues the injection permission to RE generators with advising that the injection code
shall be obtained from SLDC through respective MPPTCL sub-station in which the RE generator is connected.
The copy is also endorsed to concerned EE(O&M) / EE(T).
It is therefore requested that the suitable instruction may be issued to concerned T&C field/Discom
officials to request for the injection code from SLDC only after ascertaining availability of adequate network
capacity at sub-station.
[ACTION : MPPTCL, DISCOMs]
6.15 Integration of Load Drop Scheme at 220 KV S/s Satna with the 400/220 KV ICT’s at Satna (PGCIL):-
The existing Load drop scheme installed at 220 KV S/s Satna is as below:-
1. On 220 KV Satna – Satna(PGCIL) Ckt – I & II to avoid over loading of 220 KV Satna – Satna (PGCIL)
Ckt – I & II and to avoid over loading of 400/220, 315 MVA ICT – I & II at 400 KV S/s Satna (PGCIL) by
providing approximately 100 MW relief by tripping of 132 KV Panna, Pawai, & Nagod Ckt.
Condition:- Current on either line of 220 KV Satna (PG) – Satna(MP) > 800 Amp with 4sec delay.
Agenda of 57th OCCM of MP 12
2. On 220/132 KV, 160 MVA X’mer – I & II at 220 KV S/s Satna (M.P) to avoid its over loading by
providing approximately 100 MW relief by tripping of 132 KV Panna, Pawai, & Nagod Ckt.
Condition:- Current on either ICT > 110% with 1sec delay.
Seeing to the increasing load profile of Satna region and to avoid over loading of existing 400/220 KV
315 MVA ICT – I & II, as an interim arrangement addition 1 no. 400/220 KV, 315 MVA ICT – III is being
installed at Satna(PGCIL) in conjunction with 400/220 KV, ICT – II (i.e., both ICT’s will be using the same Bay).
In turn an addition 220 KV Satna – Satna(PGCIL) Ckt – III has been added/constructed for evacuation of
power from ICT’s and avoid over loading of 220 KV Satna – Satna(PGCIL) Ckt – I & II.
In view of the above it has been gathered that 220 KV Satna – Satna(PGCIL) Ckt – III has not been
integrated/included in the Load Drop Scheme. Further after the installation of 400/220 KV, 315 MVA ICT – 3 at
440 KV S/s Satna (PGCIL) the existing load drop scheme at 220 KV S/s Satna(M.P) shall be revised and it
was proposed that the revised Load Drop scheme shall be integrated with 400/220 KV, 315 MVA ICT – I, II &
III at 400 KV S/s Satna (PGCIL) providing a load relief of about 200 MW in N-1 condition of ICT’s.
In view of the above it is requested to MPPTCL to take up the matter with PGCIL Satna for integration
of Load Drop scheme (SPS) to provide appropriate load relief in N-1 condition for safe and secure grid
operation. The same has been intimated to T&C through SLDC letter No-07-05/RPC-42/222 dated-21.04.2017.
[ACTION : MPPTCL]
6.16 Charging of 132 KV Chhegaon – Pandhana – Nepanagar Ckt without line protection at 132 KV S/s
Pandhana:- It has been gathered that LILO of 132 KV Chhegaon – Nepanagar Ckt – II tap Pandhana was
completed on 25.04.2017. The new arrangement i.e., 132 KV Chhegaon – Pandhana Ckt and 132 KV
Pandhana – Nepanagar Ckt was charged by closing the isolators and breaker at 132 KV S/s Pandhana without
any line protection due to non-availability of control/relay panel at 132 KV S/s Pandhana. At present line
protection of 132 KV S/s Chhegaon – Pandhana & 132 KV Pandhana – Nepanagar Ckt is available at 132 KV
S/s Chhegaon & 132 KV S/s Nepanagar, considering the line as 132 KV S/s Chhegaon – Pandhana –
Nepanagar Ckt as one complete line tapped at Pandhana.
For keeping the line charged, the required protections are mandatory at all the ends of the line as per
IEGC, CERC & MPEGC for safe grid operation. Therefore it is requested that the 3 no. control panel for 132
KV S/s Chhegaon – Pandhana, 132 KV Pandhana – Nepanagar Ckt and 132 KV Bus Coupler shall be
provided at 132 KV S/s Pandhana so that the line protection can be taken in service. MPPTCL is requested to
provide time line and present status for providing control panel at 132 KV S/s Pandhana in the meeting.
[ACTION : MPPTCL]
ITEM NO. 7: BLACK-START MOCK DRILL OF HYDEL POWER STATIONS :
Black Start mock drill of Hydel stations of MPPGCL:- During 2016-17 the black start mock drill
successfully carried out at ISP, OSP, Pench, Tons, Gandhisagar, Bargi and Birsingpur Hydel power station. As
per IEGC Black Start Mock Drill shall be conducted in every 6 months duration.
The black start mock drill exercise of above power stations shall be planned in the month of May 17
and June 2017. It is to inform that SLDC representative shall not be available at respective power stations and
all the exercises shall be done by the concerned officials of respective power stations as per SLDC instructions
from SLDC control room.
Agenda of 57th OCCM of MP 13
MPPGCL and NHDC are requested to submit the plan for carrying out black start mock drill of
Gandhisagar Bargi, Pench, Indira Sagar Power Station (ISP), Omkareshwar Power Station (OSP), Tons HPS
Birsinghpur HPS, Rajghat and Madikheda HPS for the year 2017-18. MPPGCL may also intimate the
preparedness and suitable dates for carrying out the black start mock drill of Rajghat and Madikheda.
[Action : MPPGCL/NHDC]
ITEM NO. 8: AVAILABILITY BASED TARIFF (ABT) RELATED ISSUES: 8.1 Status of AMR system installed at SLDC:
In the month of Mar 2017, the complete data of 546 meters was received through AMR system and data of 83 Nos meters (Monthly-76 & Partial – 07) was not received through AMR system. The incomplete data is received due to site related issues such as network problem, modem switched off, meter defective or replaced, misalignment of optical cable, time drift, panel shifting or due to some other problems. The status of data received through AMR system is invariably sent to all concerned offices including SE(T&C) offices through email for furnishing the missing data alongwith monthly JMR data latest by 4th of every month. The Committee may like to discuss the following as an action plan for receiving the complete data through AMR system in in a time bound manner.
1. CE(T&C) office may take up the matter with M/s Secure Meters Ltd for resolving the site
related issues such as time drift in meters, meter defective, network problem and SIM defective. Details are shown in enclosed Annexure-8.1.i.
2. Integration of ABT meters installed at the interface points of newly commissioned substation / Xmers / HT consumers / OACs – 49 Nos as Annexure-8.1.ii. SLDC vide email dated 25.04.2017 has forwarded the list of interface points to CE(T&C) office for furnishing the details of meters, modem and SIMs for integrating the ABT meters with AMR system of SLDC. (T&C) office is requested to furnish the same on priority basis.
3. M/s Secure Meters Ltd is not attending the AMR related problems of the ABT meters installed at newly commissioned substation / Xmers / HT consumers those are not covered in AMC of AMR system. CE(T&C) office is requested to issue instructions to M/s Secure for attending the same.
4. CE(T&C) office is requested to issue instructions to field offices that they should ensure that modems are not switched off and optical cable is properly connected & aligned. This will improve the readability of meters installed at the interface points.
[Action : CE(T&C) MPPTCL]
8.2 AMR facility for the ABT meters installed at MPPGCL : In compliance to state commission directives for computation of weekly transmission losses and
Deviation charges, SLDC has requested the MPPGCL for providing the AMR facility on the meters installed at the interface points for data downloading through AMR System installed at SLDC. Accordingly MPPGCL has provided AMR facility on 107 Nos ABT meters installed at the interface points as intimated by CE(Thermal), O/o ED(O&M:Gen), MPPGCL vide letter No. 426 dated 01.03.2016. The status of first fortnight of April 2017 of ABT meter data (52Nos) not received through AMR system of SLDC has been emailed to GCC, MPPGCL on 25th April 2017. MPPGCL is requested to take up the matter with M/s Secure Meters Ltd. to resolve the problems related with non readability of meters integrated successfully. MPPGCL is also requested to instruct the Gandhi Sagar HPS officials for furnishing JMR data of the ABT meters integrated with AMR system.
Further, MPPGCL is also requested to intimate the plan for integrating the ABT meters installed
at SSTPS. [Action : MPPGCL ]
Agenda of 57th OCCM of MP 14
ITEM NO 9: SCADA/EMS RELATED ISSUES:
9.1 ARRANGENEMENT OF TELEMETRY OF IMPORTANT 220KV SUB STATIONS & 132KV S/S HAVING INJECTION FROM RENEWABLES/CAPTIVE POWER PLANTS OR HAVING INTERDISCOM FEEDERS & HAVING TRACTION FEEDERS- The telemetry of new 220KV S/s, important 132KV S/s having injection from renewable generating Stations, and Captive Power Plant, is to be provided through Dongfeng RTUS installed and commissioned under MPPTCL SCADA project. Total 50 Nos. Sub Stations has already been identified and forwarded to MPPTCL for arranging integration of telemetry. The integration of around TEN RTUs (132KV Biora,132KV Arniakala,132KV Kannod, 132KV Poliakala, 132KV Jeerapur ,132KV S/s Tarana, 132 KV Bankhedi S/s, 132 KV Khapaswami S/s, 132 KV Umreth S/s, 132 KV Chanera S/s is also required to be integrated with SLDC SCADA system. In addition to the above, telemetry of Six number of RTUs (132KV Banmore S/s, 132KV Morena S/s, 132KV Datia, 132KV Mungaoli S/s, 132KV Shujalpur S/s, 132KV Meghnagar S/s) is also pending to be commissioned for monitoring of railway drawal. The telemetry of two more RTU’s at 132 KV Semri Harchan S/s & 132 KV Amla S/s is also required to be integrated with SLDC SCADA system for monitoring of railway drawal. Further, most of the RTUs commissioned recently is not working properly and functioning intermittently. The telemetry of 132KV Khilchipur, 132KV Mandideep ,132 kV Dewas BNP,132 KV Shankargrah, 132 KV Kukshi is commissioned but functioning intermittently. The telemetry of 220KV Morena, 220KV Gwalior-2 is not available simultaneously.
The telemetry of these identified Sub Stations is urgently required for monitoring of grid. Hence the progress in the matter as well as further schedule of commissioning, including data channel, plan for arrangement of modems, and rectification of SOE issue may please be provided by T&C.
[Action: - CE (T&C)/CE (T&P), MPPTCL]
9.2 UPGRADATION OF EXISTING RTUS & DISCREPANCY IN TELEMETRERED VALUES RECEIVED FROM DIFFERENT EHV S/S & POWER STATIONS & The present status of telemetry discrepancy including upgradation requirement is enclosed herewith as annexure-9.2. The list of important locations where RTU upgradation is required to accommodate renewable feeders/other feeders/transformers is detailed is also given hereunder:-
Sl No.
Name of Substation whose RTU is required to be
upgraded
Name of feeders/transformers required to be included in telemetry
01 400KV S/s Bina
The telemetered values of following feeders are wrong:- 1. 400 KV Bina-Bina(PG) ckt 1,2,3,4 2. 400 KV Bina-Bhopal ckt 1,2 3. 220 KV Bina-Gwalior 4. 220 KV Bina-Datia 5. 220 KV Bina-Guna 6. 220 KV Bina-Ashoknagar The above wrong values affecting MP/DISCOM drawal.
Immediate action is required
02 220KV Birsingpur S/s
The telemetry of 220KV IC-1 & 4 feeder is not available since last six month
03
132 KV Jaora S/s
33 KV Chowksi wind 1,2 is not available
04
220 KV Badnagar S/s
132 KV Kshema Power is not available
05 220KV Anuppur S/s 132KV Shahdol,132KV Kotma 2, 132KV TRF 2 telemetry not available.
06 132KV Kotma S/s 132KV Anuppur feeder telemetry not available
Agenda of 57th OCCM of MP 15
07 220KV Shivpuri S/s 220/132KV Transformer telemetry is not available
08 220KV Pandurna S/s 220KV Pandurna-Sarni telemetry is not available
09 220 KV Satna S/s Satna 220KV-Satna PG Interconnector 3 telemetry is not available
10 220 KV Jabalpur S/s The telemetered value of 220/132 KV 120 MVA Mitsubishi transformer is not correct.
11 220KV Ratlam Telemetry of 132/33KV 40 MVA trf-3 telemetry not available
12
220Kv Indore SZ
Telemetry of 132 KV CAT II feeder is not available.
13
220 KV Sirmour
Telemetry of 220 KV Tons feeder is not available.
14
220 KV Tons
Telemetered values of following feeders is wrong:- 1. 220 KV Tons-Sirmour 2. 220 KV Tons-Rewa 3. 220 KV Tons-Satna 4. 220 KV Tons-Kotar
15 220KV Julwaniya 132KV Nimrani-1 & 2, 132KV Interconnector 1 & 2 132KV Anjad and 132KV Sendhwa digital telemetry is
not available.
The commissioning of new SCADA/EMS system at SLDC is completed and for successful
functioning of EMS system the availability of complete telemetry including CB status is a prerequisite. Hence the work regarding telemetry discrepancy mentioned in enclosed annexure is to be taken up on highest priority. MPPGCL and MPPTCL may please provide completion schedule regarding rectification of telemetry discrepancy and upgradation of RTU’s.
[ACTION: T&C, MPPTCL & O&M: GEN, MPPGCL]
9.3 PRESENT STATUS OF PROCUREMENT OF RTUs BY MPPGCL:- The matter of procurement of RTU for Rajghat HPS and Bansgar III HPS was discussed in detail in last sixteen OCCM meetings as well as on two number special telemetry meetings, without any conclusive result. The Telemetry of Rajghat HPS is out since LAST THREE YEARS . In the last OCC meeting it was informed by MPPGCL that the order has already been placed & factory inspection is expected by end of March 2017 & RTU is expected to be delivered in next three months. The latest status in the matter along with commissioning schedule may please be provided by MPPGCL.
[Action: - ED (O&M: GEN: MMPPGCL] 9.4 Extension of RGMO/FGMO signal to SLDC/WRLDC :- As per IEGC 5.2(f), RGMO/FGMO is
mandatory for all thermal units above 200 MW and hydro units above 10 MW. Further considering the high penetration of renewable to grid and also the Government target to achieve 175 GW, it is essential to monitor operation of RGMO/FGMO at SLDC/RLDC for ensuring grid security and compliance of regulation. Subsequently SLDC vide letter no. 07-05/RPC-27/3739 dated 18-01-2017, letter No. SE/LD:E&T/693 dated 23-01-2017 & letter No. SE/LD:E&T/34 dated 13-04-2017 requested MPPGCL/NHDC for integration of telemetry of RGMO/FGMO in RTU installed at power station and forward the object address configured in RTU so that same may also be configured in SLDC SCADA and RGMO/FGMO status may be displayed in SCADA system. However, no feedback in the matter is received, so far. The present status of the same may please be provided as the same is required to be forwarded to WRLDC.
S.No. Name of Generating Station ACTION
1 Satpura TPS MPPGCL 2 SGTPS
3 ATPS Agenda of 57th OCCM of MP 16
4 SSTPS
5 JP BINA TPS JP BINA
6 ISP NHDC
7 TONS HPS MPPGCL 8 BARGI HPS
9 PENCH HPS
[Action: - ED (O&M: GEN: MPPGCL), GM (ISP:NHDC), GM(OSP:NHDC)] 9.5 COMMISSIONING OF COMMUNICATION CHANNELS FOR DUAL REPORTING OF RTUS AS PER BACKUP SLDC REQUIREMENT:-
The commissioning of SCADA/EMS system at SLDC Jabalpur and backup SLDC Bhopal is already completed however the additional communication channel required for dual control centre reporting as per backup SLDC requirement is yet to be commissioned by MPPTCL & MPPGCL .The RTU wise progress may please be provided by MPPTCL & MPPGCL.
The Strengthening of existing wideband communication node is also required to be arranged so as to ensure reliable backbone communication network. The immediate requirement in the matter has already been submitted by SLDC to MPPTCL and MPPGCL. The present status of the same may please be provided.
The wideband equipment installed and commissioned at SGTPS however, remains unutilized. The RTU data need to be transferred using wideband link. The scheme for the same is already prepared and forwarded to SGTPS around four months back. The present status may be intimated by MPPGCL.
9.6 Arrangement of Air Conditioners for wideband locations :-
Frequent tripping of wideband equipment at 220KV Katni S/s is observed on high temperature due to non availability of air conditioners. Further, during the recent visit of EE (Sub-LDC) Indore to 400KV Nagda Sub Station, it is found that because of non availability of air conditioners, door of the equipments panels was kept opened which resulted in heavy dust in the equipment panel. In this reference, SLDC is constantly perusing the matter regarding arrangement of air conditioner at wideband locations since 2012, the air conditioners is not provided at wideband locations namely 220KV Jabalpur, 400KV Bina, 220Kv Satna, 220Kv Itarsi and 220KV Damoh, 400KV Nagda so far. SLDC vide letter dated 10-02-2016 has already informed that equipment failure due to improper or no air conditioning environment has not been covered under maintenance contract/guarantee period and failure of equipments at these locations, due to environmental conditions is required to be attended at the cost of company. Hence Air conditioner are required to be arranged on top most priority. The schedule of arranging air conditioner at these locations may please be intimated by MPPTCL. Further wideband node equipments at 220Kv Chindwara, 220KV Seoni, 220KV Ratlam,220KV Shivpuri, 220KV Indore SZ, 220KV Shujalpur, 220KV Neemuch,132KV Waidhan, 220KV Rajgarh, 220KV Maalnpur,400KV Pithampur, 220KV Pithampur, 132KV Indore Chambal, Pench & Gandhisagar HPS are delivered at respective locations and are expected to be commissioned within next two months. The necessary provision of space, DCPS, Air conditions is required to be ensured by MPPTCL & MPPGCL.
[Action: - CE (T&C)/CE (T&P), MPPTCL, ED (O&M: GEN: MPPGCL)] 9.7 MAINTENANCE OF OPGW
The 8 No. fibers had been installed on EHV line section between 220 KV Jabalpur to 220 KV Katni S/s under ULDC project in 2003. Presently three number fibres out of eight number of fibers is not serviceable/ ready to use due to problem in joint box placed at 20 KM distance from 220 KV S/s Jabalpur towards Katni. The SLDC vide letter No.SE/LD:E&T/707/826 dt. 06/03/2017 already requested, SE (EHT:Maint), Jabalpur to arrange for replacement of the Joint box and ensure that all 8 fibers between 220 KV Jabalpur S/s to 220 KV Katni S/s being healthy and ready to use. However, replacement of joint box is still pending.
In addition to above, EHT (Cons), Jabalpur started the work of tower shifting work on 220 KV Damoh S/s to Damoh(PGCIL) line section without any prior information and its comes to notice when the 220 KV S/s Damoh telemetry routed through 220 KV S/s Damoh wideband node. EHT (Const), Jabalpur requested to
Agenda of 57th OCCM of MP 17
arrange the relaying of OPGW between 220 KV Damoh S/s to Damoh(PGCIL), so that Damoh 220 wideband node could be utilized and 220 KV Damoh substation telemetry and voice communication could be restore at the earliest.
[Action: - CE (EHT :Maint))/CE (EHT :Cons), MPPTCL]
9.8 LONG OUTAGE OF RTUS, PROBLEM IN DATA AND VOICE CHANNELS The long outage of telemetry of following S/s is discussed in detail:-
Sl No. Name of Sub Station Out from /Remark
01 Rajghat HPS Out from last three years
02
132KV Morwa S/s
More then one and half Year
03 132KV Waidhan S/s Out from eight months. Channel problem between Anuppur to Jabalpur
04 132KV Beohari S/s Out from more than eight months
05 132 KV Deolond S/s Out due to PLCC channel
06 220 KV Gwalior-II S/s Out since one month ( it is gathered that telemetry of either of the two sub stations i.e. Morena 220 or Gwl-2 220 is functioning)
MPPTCL, MPPGCL requested to sort out rectification of above RTU/data channel on top most priority.
9.9 TELEMETRY OF RAILWAY TSS SUB STATIONS:-
The telemetry of 36 Nos railway Traction Sub Stations is required to be provided by railway for monitoring of drawal by each TSS and also monitoring of demand of railway in MP. In last OCC, the railway representative informed that the tender for the telemetry arrangement is yet to be floated by railway and railway is planning to float tender for providing telemetry of 20 Railway TSS and not for all 38 existing TSS. Further, MPPTCL representative informed that in addition to existing 38 Nos Railway TSS in MP, planning for establishment of around 25 new TSS is also under progress. Accordingly, Railway is requested to plan for arranging telemetry of all 38 existing TSS as well as for 25 upcoming TSS and expedite the matter. Further Railway officials are requested to provide current progress in the matter along with the timeline.
ITEM No 10 : DATE AND VENUE OF NEXT OCC MEETING :
It is proposed to hold 58th
Operation and Coordination Committee meeting of MP on 28.06.2017. The
host and venue of the same shall be decided in the meeting.
***********
Agenda of 57th OCCM of MP 18
Annexure-2.1
S. No. Particulars
1
1.1 Maximum Frequency 50.11 HzBetween 23.00 hrs & 24.00 Hrs on 12.02.17
50.14 HzBetween 13.00 hrs & 14.00 Hrs on 12.03.17
1.2 Minimum Frequency 49.89 HzBetween 15.00 hrs & 16.00 Hrs on 23.02.17
49.86 HzBetween 18.00 hrs & 19.00 Hrs on 27.03.17
1.3 Average Frequency 50 Hz 49.99 Hz
2
2.1 Maximum Frequency 50.34 HzAT 18.02.02 HRS ON 17.02.17
50.34 Hz AT 18.03 HRS ON 05.03.17
2.2 Minimum Frequency 49.76 Hz AT 07.11 HRS ON 01.02.17 49.66 Hz AT 18.58. HRS ON
27.03.173 Percentage of time when frequency was :-
%age of time when frequency was Feb-17 Mar-17
3.1 Below 48.5 Hz 0.00 0
3.2 Between 48.50 Hz and 48.8 Hz 0.00 0
3.3 Between 48.80 Hz and 49.2 Hz 0.00 0
3.4 Between 49.20 Hz and 49.5 Hz 0.00 0
3.5 Between 49.50 Hz and 49.7 Hz 0.00 0
3.6 Between 49.70 Hz and 49.9 Hz 5.30 8.95
3.7 Between 49.9 Hz and 50.05 Hz 73.99 73.56
3.8 Between 50.05 Hz AND 51.5 Hz 20.71 17.5
3.9 Above 51.5 Hz 0.00 0.00
4 No. of times frquency touched 48.80 Hz 0 0
4.1 No. of times frquency touched 48.60 Hz 0 0
4.2 No. of times frquency touched 51.0 Hz 0 0
FREQUENCY PARTICULARS
INTEGRATED OVER AN-HOUR
INSTANTANEOUS FREQUENCY
Feb-17 Mar-17
Agenda of 57th OCCM of MP 19
I
S.
No. NAME OF THE TRANSMISSION LINE / (FINANCED
BY)
TYPE OF
CIR CUITS
ROUTE
LENGT
H
CIRCUIT
KMS.
DATE OF
COMPL-
ETION
DATE OF
COMMI-
SSIONING
A. 400 KV TRANSMISSION LINES
NIL 0 0
B. 220 KV TRANSMISSION LINES
1LILO of 220 KV Katni - Satna line at PGCIL,
SatnaDCDS 0.7 1.40 April'16 09.04.2016
2
LILO of one Ckt of 220kv DCDS Bhopal - Ashta
line at 220kv S/S Mugaliya chhap. (DCDS)
(2x26.459) (JICA)
DCDS 26.46 52.92 June'16 18.06.2016
3
LILO of 220KV line Indore 400 -Pithampur
at Pithampur-II 220Kv S/s in Indore (2x6.898)
(PFCIIi)
DCDS 6.90 13.80 June'16 10.06.2016
4
220Kv DCDS line from 400Kv S/s Bina to plant
of M/s Bharat Oman Refinaries Ltd. Agasod,
Bina (2x18.197) (Contr.Works)
DCDS 18.197 36.394 Aug'16 01.08.2016
5220Kv DCDS line from Gwalior(Malanpur)-
Morena (2X29.765) (PFC_II)DCDS 29.765 59.530 Feb'17
charged on
16.02.2017
6(Part-b) LILO of one Ckt of 220kv Indore-II
(Jaitpura) - Indore(400KV) line at 220kv S/S
Indore(N/Z) (2x10.163) PFC
DCDS 10.16 20 Mar'17 31.03.2017
C. 132 KV TRANSMISSION LINES
12nd Circuit of 132 Kv Gudgaon - Kukru Wind
Power Ltd. Betul (Contributory work)2nd ckt 22.5 22.50 Aprilo'16 07.04.2016
2LILO of one circuit of Mandideep -
Hoshangabad for 132 KV Sub-Station
Tamot(2x1.686) (REC-I)
DCDS 1.686 3.37 Aprilo'16 30.04.2016
32nd Ckt. Of 132 Kv DCSS Gairatganj- Vidisha
line (48.30) ADB-III2nd ckt 48.27 48.27 May'16 10.05.2016
4132Kv 2phase 2wire S/c line from 132Kv s/s
Amla to GSS Bordehi of RVNL(1x23.5) DCSS 23.29 23.29 May'16 06.05.2016
5
132Kv DCSS line from 132Kv S/s Madhotal to
11.5 MW Processing Plant of M/s Essel
Jabalpur MSW Pvt.Ltd. at Kathonda Dist-
Jabalpur Contrib.
DCSS 2.52 2.515 May'16 02.05.2016
6
2nd Ckt.of 132 KV Rewa - Mangawan line
(Dist. Rewa) (JICA) approch section of
mangawan end (4x2.079+1x6.75) (JICA)
(Balance work)
2nd Ckt 8.829 15.066 June'16 27.06.2016
7132 kv DCSS Datiya- Bhander line
(1x34.038)ADB-IIIDCSS 34.04 34.04 June'16 27.06.2016
8132 kv DCSS Ashoknagar - Kothiya line
(1x27.5+4x2.5) ADB-IIIDCSS 37.50 37.50 June'16 09.06.2016
9132 kv DCSS line from 132Kv S/s Lahar -
132Kv S/s Seondha (1x15.5) PFC-IIIDCSS 16.70 16.70 June'16 24.06.2016
102nd ckt of Betul - Gudgaon line (1X57) ADB-
III2nd ckt 57.00 57.00 June'16 24.06.2016
11132kV DCDS line Panagar- Katangi (2x29.471)
PFC-IIDCDS 29.47 58.94 JULY'16 04.07.2016
12132 kv DCSS line from 132Kv S/s Porsa -
132Kv S/s Ambah (1x22.524) PFC-IIIDCDS 22.52 22.52 Aug'16 11.08.2016
13
2nd Ckt.of 132Kv DCSS Katangi tap line
tapped to one ckt. Of 132Kv Balaghat-Seoni
line (1x0.5+35.67) ADB-III
DCDS 35.67 35.67 Aug'16 29.08.2016
14132 kv DCSS line Mehgaon - Pratappura
(1x29.74) ADB-IIIDCDS 29.74 29.74 Aug'16 31.08.2016
ANNEXURE - 2.2.5.i
M.P POWER TRANSMISSION COMPANY LIMITED
TRANSMISSION WORKS COMPLETED DURING 2016-17 (UP TO 31.03.2017)
EHV TRANSMISSION LINES
Agenda of 57th OCCM of MP 20
15132kv Jeerapur -Susner DCSS line (1x30.236)
(JICA)DCSS 30.24 30.236 Sept'16 21.09.2016
162nd ckt of 132kv Bairagarh - Shyampur line
(1x0.5+4x1.9+19) (ADB-III)2nd ckt 19.04 19.04 Sept'16 28.09.2016
17
132 kv Ashoknagar - Eshagarh DCSS line
(1x37) (Transco)
(Est.Sanc.-0281dtd. 17.03.2015 for
Rs.1895.67)
DCSS 38.50 38.50 Sept'16 30.09.2016
18
132KV DCDS line from 132KV S/s Pithampur
(to be upgrated) for Pithampur SEZ Phase-II
of AKVN(2x0.54) (contr. work)
DCDS 0.54 1.08 Sept'16 10.09.2016
19132 kv DCSS line Datiya - Dabra (1x23.091)
PFC-IIIDCSS 23.09 23.09 Oct'16
comm. On
10.10.2016
202nd ckt of 132kv RTS Mangliyagaon line
(Contr. Work)2nd ckt. 8.82 8.82 Oct'16
comm. On
19.10.2016
212nd ckt of 132Kv Chhatarpur- Khajuraho line
(1x0.5+33.2) ADB-III2nd ckt. 32.00 32 Oct'16
comm on
19.10.2016
222nd ckt of 132kv Kukshi - Alirajpur line
(1x1+35.82) ADB-III2nd ckt. 35.82 35.82 Oct'16
comm. On
22.10.2016
232nd Ckt. Of 132 Kv DCSS Tikamgarh- Budhera
line (32.138) ADB-III2nd ckt. 32.14 32.14 Oct'16
comm. On
26.10.2016
24LILO of 132 kv Manawar - Kukshi Line at
132Kv S/s Singhana(2x3.1) ADB-IIIDCDS 3.10 6.2 Oct'16
comm on
27.10.2016
25132Kv DCDS line for LILO of both circuit of 132Kv
Banmore -Morena/Hetampur DCDS line for 220Kv
S/s Morena(2x0.781+4x2.974) (PFC-III)
DCDS 3.755 13.46 Nov'16comm. On
06.11.2016
26LILO of 132 kv Chhegaon - Nepanagar Line at
132Kv S/s Pandhana(2x1.895) ADB-IIIDCDS 1.895 3.79 Nov'16
comm. On
04.11.2016
27LILO of Khargone - Julwaniya DP line(132Kv) at
Talakpura (2x1.1+1x0.8) ADB-IIIDCDS 1.900 3.80 Nov'16
comm. On
20.11.2016
28132kv DCSS Shujalpur( 220kv) - Pachhore DCSS
line (1x31.782) JICADCSS 31.782 31.782 Dec'16
Comm. On
30.12.2016
29132 kv DCSS Line from 220Kv S/s Barwaha - 132Kv
S/s Kishangarh (1x57.197) (GoMP)DCSS 57.197 57.197 Dec'16
comm. On
29.12.2016
30Diversion of 132kV Anuppur HJI line from Ash
Dam of Chachai Power House (1x0.654) (MPPTCL)DCSS 0.654 0.654 Feb'17
comm. On
11.02.2017
31132Kv DCSS line from 220Kv S/s Badod - 132kV
Rajkot 43 MVA Solar Power line ( Contrib. work)
(1x3.942)
DCSS 3.942 3.942 Feb'17comm. On
23.02.2017
32 (Part-a) Upgradation of 132KV D/C Indore-II
(Jaitpura) - Indore(N/Z) line on composite multi
circuit monopole (2x10.045) (PFC-II)
DCDS 10.045 20.090 Feb'17
22.02.2017
(ckt-I on
Zebra)&
23.02.2017
(ckt-II on
Zebra)
33132Kv line from 220KV S/s Dhar to plant of M/s
Vacmet (1x11.367) (Contr. Work)DCSS 11.37 11.367 Mar'17
comm.on
22.03.2017
34132Kv 2 phase 2wire line from 132Kv s/s Semri-
Harchan for PS to RTS Bagra Tawa(1x4.3) (Contr.
Work)
DCSS 4.30 4.300 Mar'17comm.on
18.03.2017
35 132kv Ichhawar -Sehore DCSS line (1x36.524) JICA DCSS 36.52 36.524 Mar'17comm.on
31.03.2017
Agenda of 57th OCCM of MP 21
II.
S.
No.
NAME OF SUBSTATION / (DISTRICT) /
(FINANCED BY)
VOLTAGE
RATIO
(KV)
No.OF
X-mer
& Cap.
(MVA)
EFFECT
IVE
CAPACI
TY
MVA
DATE OF
COMPL-
ETION
DATE OF
COMMI-
SSIONING
A. 400 KV SUBSTATIONS
11x125 MVAR 400 Kv Bus Reactor at existing
400Kv S/s Nagda ADB-III400Kv Aug'16 09.08.2016
Nil 0.00
B. 220 KV SUBSTATIONS
a. 220 KV NEW SUBSTATIONS
1220kv switching S/s at Nagra Dist- Ratlam
Contrib.
220/132
KV0.00 0 May'16 30.05.2016
2Mugaliachhap(Bhopal) 220kv (New
S/s)(1x160+40) (JICA)
220/132
KV1x160 160 June'16 20.06.2016
3
Morena 220/132kv S/s 1x160 +1x63 MVA
+2No.220Kv FB +4No.132Kv FB+6No.33Kv
FB+BC +Capacitor Bank (PFC-III)
220/132K
V1x160 160 Dec'16
comm. On
31.12.2016
(from 132Kv
side) &
18.03.2017
(220kV side)
C. 132 KV SUBSTATIONS
a. 132KV NEW SUBSTATIONS
1Pratappura 132 KV New S/s (1x40) ADB-III
(Dist- Bhind)132/33KV 1x40 40 April'16
12.04.2016
(33KV side)
&
31.08.2016
(132KV side)
2Tamot 132kv s/s (Distt. Raisen ) 1x50MVA
(REC-I)132/33KV 1x40 40 May'16 05.05.2016
3Bhander 132kv s/s (Distt. Datia) 1x63
(ADB-II)132/33KV 1x63 63 June'16 28.06.2016
4Kothiya 132kv s/s (Distt. Guna ) 1x40 MVA
(ADB-III)132/33KV 1x40 40 June'16 09.06.2016
5Katangi 132kv s/s with 1 no. 132 kv feeder
bay & 1x40 MVA (Distt. - Jabalpur) (PFC-III)132/33KV 1x40 40 June'16
28.06.2016
from 33kV
&
05.07.2016
from 132Kv
6Pithampur SEZ- II 132kv s/s 1x63 MVA
(Distt.Dhar) (contr.work)132/33KV 1x63 63 Sept'16 19.09.2016
7Singhana 132kv s/s (Distt. Dhar) 1x40 MVA
(ADB-III)132/33KV 1x40 40 Oct'16
comm on
27.10.2016
8Pandhana 132kv s/s (Distt. Khandwa) 1x63
MVA (ADB-III)132/33KV 1x63 63 Nov'16
comm. On
04.11.2016
9Talakpura 132kv s/s (Distt. Barwani) 1x40
MVA (ADB-III)132/33KV 1x40 40 Nov'16
comm. On
23.11.2016
10
Kishangarh 132kv s/s with 1 no. 132 kv
feeder bay & 1x40 MVA (Distt. Dewash)
(GoMP)
132/33KV 1x40 40 Dec'16comm. On
29.12.2016
11 Rahatgarh132kv s/s (Distt.Sagar) (JICA) 132/33KV 1x40 40 Jan'17
28.01.2017
(from 33KV
side)
12 Bairad 132kv s/s (Dist.-Shivpuri ) PFC-II 40 1x40 40 Mar'17
comm.on
25.03.2017
(33kV side)
13 Indergarh 132kv s/s (Distt. Datia) PFC-II 40 1x40 40 Mar'17
comm.on
27.03.2017
(33kV side)
14Chinaur 132kv s/s1x40 MVA (Dist. Datia)
ADB-III40 1x40 40 Mar'17
comm.on
27.03.2017
(33kV side)
EHV SUB - STATIONS
Agenda of 57th OCCM of MP 22
S.
No.NAME OF THE TRANSMISSION LINE
CKT.
KMS.
PROGRESS
IN %A. 400 KV TRANSMISSION LINES
1 NIL 0 0%
B. 220 KV TRANSMISSION LINES
1 2nd Ckt of 220kv Satna - Chhatarpur line (152) 160 8%
2LILO of 2nd circuit of Damoh (MPPTCL) - Sagar 220KV line at Damoh
(PGCIL) 400 kV Sub-station Damoh (4x0.592)2.368 20%
3LILO of one circuit of Satna (MPPTCL) - Chhatarpur 220KV line at Satna
(PGCIL) 400 kV Sub-station (2x1.726)3.452 30%
4LILO of one Ckt of 220kv DCDS Ashta - Dewas line at 220kv S/S Chapda
(DCDS) (2x32.782)66 3%
5 220Kv DCDS line from Pithampur-Depalpur line (2X31) 62 37%
6220Kv FCFS line for LILO of both Ckt. Of Badnagar -Ratlam D/C line at
400Kv S/s Badnawar (2x1+4x8)34 4%
7 220Kv DCDS Julwaniya- Kukshi (2X58) 116 16%
8 220Kv DCSS Shujalpur- Narsinghgarh line (1X43.6) 44 15%
9220Kv DCDS line for inter-connection of 400Kv S/s Betul with 220Kv
S/s Betul (2x1.88)3.76 31%
10 LILO of 220kV Sarni - Pandhurna at 220kV S/s Betul (2x38.864) 77.728 1%
11
220Kv DCDS Morena(400KV S/s CWRTL Adani Group) - Sabalgarh DCDS
line & lilo of Morena 400KV S/s (Adani) to Sabalgarh at Morena 220Kv
s/s (2X92 + 2x0.5)
185 18%
12LILO of 2nd ckt. Of Birsinghpur - Amarkantak 220kV line at Shahdol
220 KV S/s. (2X5.6)11.2 2%
13LILO of one circuit of Malanpur - Mehgaon at 400Kv S/s CWRTL (Adani)
(2x8)16 0%
14LILO of 2nd ckt. Of Bansagar - Satna 220Kv line at Kotar 220 KV S/s.
(2X5.693)11.386 40%
C. 132 KV TRANSMISSION LINES
1 132 kv DCDS Ujjain(220 kv) -Chandrawatiganj line (2x35.42) 70.84 88%
2 132 kv DCSS Dewas-Barotha line (1x23) 23 60%
3 132 kv DCSS Ghatabillod-Betama line (1x18) 18 29%
4 132kv DCSS Gautampur -Depalpur line (1x19) 19 20%
5 132kv Nagda(220kv)- Kachrod-Jaora DCSS line (1x64) 64 18%
6 132kv Mugaliya Chaap - Sehore DCSS line (1x24) 24 30%
7132 kv DCSS line between 132Kv S/s Nasrullaganj & 220KV Itarsi
s/s(1x53.209)53.209 42%
8LILO of S/C ckt of 132 KV Seoni-Lakhnadon line at 220kv S/S Seoni
(2x20)40 48%
9 132 kv DCSS Guna-Eshagarh line (1x72) 72 32%
10LILO of one circuit of 132 kv Neemuch220 - Ratangarh DCDS line at 132
KV S/s Morwan (2x1)2 4%
11 132 kv DCSS Line from 220Kv S/s Shivpuri-132Kv Bairad (1x32.859) 32.859 35%
12 132 kv DCSS from 220Kv S/s Datiya-132kv S/s Indergarh (1x27.1) 27.1 49%
13 132 kv DCSS line from 132Kv S/s Kymore-132Kv S/s Barhi (1x35) 35 48%
14 132 kv Sirmour - Katra DCDS line (2x37.67) 75.34 18%
15 132 kv DCSS line from220Kv S/s Chichli - 132Kv Karapgaon (1x31.059) 31.059 45%
16 132 kv Sagar-Rahatgarh DCSS line (1x55) 55 57%
17LILO of Both circuit of 132 kv DCDS Gwalior(Mahalgaon) -
Dabra/Karera line at 220 KV S/s Gwalior II) (2x2x7.87)55.09 36%
18 132Kv DCSS line from 220Kv S/s Rajgarh to 132Kv S/s Jhabua (1x50) 50 43%
19132Kv DCDS line for extension of 132Kv line from Manliya(132) -
Mangliya (220) (2x1)2 8%
20 132 kv DCSS Dewas-Agrod line (1x20.76) 20.76 28%
21 132 kv DCSS Khurai- Khimlasa line (1x20.937) 20.937 20%
ANNEXURE - 2.2.5.ii
EHV TRANSMISSION WORKS UNDER PROGRESS AS ON 31.03.2017
Page 1 of 4
Agenda of 57th OCCM of MP 23
22
LILO of 132Kv Mungaoli Traction feeder at 132Kv S/s Mungaoli
(4x7.8+2x0.7) Note: (4x7.8ckt.km line charged on 30.12.2015 by
tapping )
32.6 96%
23 LILO of 132Kv Vidisha- Bairasiya line at salamatpurr (2x0.162) 0.324 46%
24 132 kv DCDS Line Chichli - Udaypura (2x47) (On 220Kv Tower) 94 45%
25 132 kv DCSS Panagar - Patan line (1x22.749) 22.749 7%
26 132 kv DCSS Badnagar - Chhayan Line (1x31) 31 36%
27 132 kv DCSS Dhar - Teesgaon line (1x15.35) 15.35 16%
28 LILO of 132 kv Ratlam - Meghnagar line at 132Kv S/s Petlawad (2x7.4) 14.8 5%
29 132 kv DCDS Beragarh - Intkhedi (2x8.7+4x1.5) 23.4 55%
30 132 kv DCSS Udaipura - Silvani line (1x25.8) 25.8 38%
31 132 kv DCSS Narsinghpur - Devnagar (1x23) 23 18%
32 132 kv DCSS Karakbel - Belkheda (1x24.445) 24.445 13%
33 132 kv DCDS Narsinghpur - Karakbel line (2x23) 46 15%
34
LILO of 132KV Gwalior- Dabra/Karera line at Chinour (132KV DCSS
Dabra- Chinour line) (2X13.68) & LILO of 2ND CIRCUIT OF 132KV
Gwalior- pIChore at 132Kv S/s Dabra (2X0.108)
27.36 13%
35 132KV DCSS Sabalgarh - Kelaras line (1x25) 25 37%
36 132kv DCSS Chhegaon -Singot line (1x58) 58 3%
37 132kv DCSS Chhanera -Khirkiya line (1x30.42) 30.42 22%
38 LILO of 132kv Nagda - Ratadiya line Unhel 132KV Sub-station (2x2) 4 20%
39 132kv DCSS Mugaliyachhap - Bilkishganj line (1x17.274) 17.274 2%
40 132kv DCSS line from Kolaras - Mada line (1x18.366) 18.366 29%
41 132kv DCSS line Chhindwara-Saori line (1x31.60) 31.6 4%
42132kv Birsinghpur -Shahdol DCSS line (1x45) (Revised Estt.
Sanc.no.0187dtd.05.09.2016)45 12%
43 132 KV DCSS Kukshi - Jobat line (1x33.74) 33.74 27%
44 132kV MACT (Bhopal) - Mugaliachhap line (2x30.368) 60.736 5%
45132Kv DCSS line from GWSTPP to upcoming Make up Water Pump
House river Narmada (Line-I)(1x24.192)24.192 34%
46132Kv DCSS line from GWSTPP to upcoming Make up Water Pump
House river Narmada (Line-II)(1x24.152)24.152 17%
47132Kv Chichli - Gadarwara Super Thermal Power Plant for startup
power(1x5.79)5.79 100%
48132Kv DCSS 2 phase 2wire line from 132Kv s/s Majhgawan for PS to
TSS Majhgawan(1x0.19)0.19 89%
49132Kv DCSS 2 phase 2wire line from 132Kv s/s Rewa for PS to TSS
Rewa(1x0.4)0.4 74%
50132Kv DCSS line from proposed 132Kv s/s Tamot to Sagar Yarn plant
of M/s Sagar Manufacturer (P) Ltd.(1x3.1)3.1 30%
51132Kv DCSS line from 220kV s/s Pithampur for supply of 5MVA to M/s
SRF Ltd.(1x2.423)2.423 32%
52132Kv DCSS 2 phase 2wire line from 220Kv s/s KOtar for PS to RTS
kaima1x26.938)26.938 24%
53132Kv DCSS 2 phase 2wire line from 220Kv s/s Maihar for PS to TSS
Bhadanpur(1x13.1)13.1 23%
54132Kv DCSS 2 phase 2wire line from 132Kv s/s Bankhedi for PS to RTS
Bankhedi (1x7.9)7.9 28%
55132Kv DCDS 2 phase 4wire line from 220Kv s/s Ashoknagar for PS to
132kV RTS Ashoknagar (2x4.474)8.948 25%
56132Kv DCSS 2 phase 2wire line from 132Kv s/s Umreth to RTS
Parasiya (1x13.623)13.623 27%
57132Kv DCDS line from 132Kv s/s Morwa for Power supply of 21.6MVA
in pfase manner on 132kV for RTS Singroli (1x1.809)1.809 37%
582nd circuit of 132KV 2 Phase 2 wire line from 220KV Guna to RTS
Guna RVNL (1x8)8 90%
Page 2 of 4
Agenda of 57th OCCM of MP 24
S.
No.NAME OF THE SUBSTATION
EFFECTIVE
CAPACITY
MVA
PROGRESS
IN %
A. 400 KV SUBSTATIONS
1400 KV sub-station Balaghat/Kirnapur with 2x100MVA 400/220
kv x-MER+ 1X40 MVA X-mer (Distt.Balaghat)200 13%
2400 KV sub-station Badnawar with 2x315MVA 400/220 KV X-mer
(Distt. )630 23%
3Bhopal (Sukhi Sewaniya) 400/220 kv s/s Addl. 315 MVA X-mer
(Distt.Bhopal)315 30%
4 Chhegaon 400/220 kv s/s Addl. 315 MVA X-mer (Distt.Khandwa) 315 67%B. a 220 KV SUBSTATIONS
1Upgradation of Chapda 132Kv S/s to 220kv with 1x160MVA
(Distt. )160 2%
2Upgradation of Depalpur 132Kv S/s to 220kv with
1x160MVA(Distt. )160 9%
3 Adampur 220/33kv S/s 2x50MVA 100 8%
4Upgradation of Kukshi 132Kv S/s to 220kv with 1x160MVA
(Distt. )160 11%
5
Upgradation of Chhanera 132Kv S/s to 220kv with 2x160MVA
+1x50MVA 132KV X-mer
(Distt. )
320 12%
6 220/132kV S/s Suwasara (2x160MVA + 1x50)
(Distt. )320 6%
7 Upgradation of Shahdol 132Kv S/s to 220kv with 1x160MVA
(Distt. )160 12%
8220/132 KV S/s Mangliya with 1x160MVA+ 63MVA 132/33KV X-
mer 160 19%
9 220/33Kv Pooling Sub-station at Barsitadesh 3x100MVA 300 9%
10 220/33Kv Pooling Sub-station at Suwasara (Gujarkhedi) 3x100 300 23%
C. 132 KV SUBSTATIONS(a) NEW SUBSTATIONS1 Barahi 132kv s/s (Distt. Katni) 40 11%2 Karapgaon 132kv s/s (Distt- Narsinghpur) 40 14%3 Biston 132kv s/s1x40 MVA (Distt. ) 40 45%4 Agrod 132kv s/s 1x40 MVA (Distt. ) 40 59%5 Chhayan 132kv s/s1x40 MVA (Distt. ) 40 78%6 Teesgaon 132kv s/s 1x40MVA (Distt. ) 40 26%7 Waraseoni 132kv s/s1x40 MVA (Dist- Balaghat) 40 3%8 Devnagar 132kv s/s 1x40 MVA (Dist- Narsighpur) 40 35%9 Belkheda 132kv s/s 1x40 MVA (Dist- Jabalpur) 40 4%
10 Khimlasa 132kv s/s 1x40 MVA (Dist. ) 40 3%11 Karakbel 132kv s/s1x40 MVA (Dist. Narsinghpur) 40 17%
12 Kelaras 132kv s/s with 1x63 MVA (Dist. ) 63 73%
Page 3 of 4
Agenda of 57th OCCM of MP 25
13 Narsinghgarh 132kv s/s with 1x40 MVA (Dist. ) 40 7%14 Salamatpur 132kv s/s with 1x40 MVA (Dist. ) 40 51%15 Intkhedi 132kv s/s 1x63 MVA (Dist. ) 63 71%16 Silvani 132kv s/s with 1x40 MVA (Dist. ) 40 12%17 Udaipura 132kv s/s with 1x40 MVA (Dist. ) 40 20%18 Singot 132kv s/s with 1x50 MVA (Dist. ) 50 4%19 Unhel 132kv s/s with 1x50 MVA (Dist. ) 50 16%20 Bilkishganj 132kv s/s with 1x50 MVA (Dist. ) 50 16%21 Khajner/Sindaota 132kv s/s with 1x50 MVA (Dist. ) 50 8%22 Bisnoor/Masod 132kv s/s with 1x50 MVA (Dist. ) 50 4%23 Kapasi/Paranth 132kv s/s with 1x50 MVA (Dist. ) 50 2%24 Mada 132kv s/s with 1x50 MVA (Dist. ) 50 10%25 Jobat 132kv s/s with 1x40 MVA (Dist. ) 40 -
Page 4 of 4
Agenda of 57th OCCM of MP 26
Annexure-2.3.(i)
Feb-17 Mar-17 Feb-17 Mar-17
Commissinary HQ 23:56 23:55 23:39 23:40
District HQ 23:54 23:54 23:47 23:51
Tehsil HQ 23:48 23:48 23:39 23:39
Rural -Mixed 23:34 23:28 22:56 22:41
Rural -DLF 23:34 23:28 23:17 23:08
Rural -Irrigation 9:57 9:58 9:42 9:35
Feb-17 Mar-17 Feb-17 Mar-17
Commissinary HQ 23:55 23:54 23:49 23:49
District HQ 23:55 23:56 23:52 23:54
Tehsil HQ 23:50 23:52 23:46 23:46
Rural -3Phase 22:55 23:32 23:15 23:07
Rural -1Phase 23:44 23:44 23:31 23:26
Total Rural 9:53 9:52 9:51 9:48
Discoms wise Average Supply Hours
PARTICULARS
PARTICULARS
West Zone MP
East Zone Central Zone
Agenda of 57th OCCM of MP 27
Name of EHV Substation Name of 33KV feederDate of commission-ing of
feeder bay
Date of commission-ing of
feeder
Name of EHV Substation Name of 33KV feederDate of commission-ing of
feeder bay
Date of commission-ing of
feeder
Name of EHV Substation Name of 33KV feederDate of commission-ing of
feeder bay
Date of commission-ing of
feeder
33KV Discom Bay 29.11.2014 25.09.2015
33KV Khamni 29.11.2014 25.09.2015
132KV Khandwa 33KV Amalpura 30.01.2011 19.08.2016
132KV Moondi 33KV Chandel 31.01.2013 27.10.2016
33KV Khandwa Oil --- 18.11.2016
33KV Chamati 04.11.2016 20.11.2016
33KV Borgaon 26.11.2016 26.11.2016
33KV Dhulkot 03.12.2016 03.12.2016
33KV Ashok Spoon 07.11.2016 07.11.2016
33KV Kathora 15.11.2016 15.11.2016
33KV Multhan 03.09.2016 03.09.2016
33KV Dewla 27.10.2016 27.10.2016
33KV Ahirkheda 02.11.2016 02.11.2016
132KV Anjad 33KV Shivai 29.12.2016 29.12.2016
132KV
220KV
NIL
NIL
NIL
REWA REGION
Annexure-2.3.(ii)
220KV
132KV
LIST OF 33KV FEEDERS UNDER MPPKVVCL, JABALPUR (For which group to be allocated)
220KV
JABALPUR REGION
INDORE REGION
NIL
NIL
132KV
132KV Badgaon
132KV Kasrawad
132KV Andhad
132KV Chhegaon- Makhan
132KV Pandhana
Agenda of 57th OCCM of MP 28
Annexure-2.3.(ii)
Name of EHV Substation Name of 33KV feederDate of commission-ing of
feeder bay
Date of commission-ing of
feeder
220KV Daloda 33kV Nimbod 25.06.2016 29.06.2016
33kV NVR Solar-I 15.09.2016 22.09.2016
33kV NVR Solar-II 15.09.2016 22.09.2016
Name of EHV Substation Name of 33KV feederDate of commission-ing of
feeder bay
Date of commission-ing of
feeder
33 KV AKVN Kanjna
Pathar20.10.2016 --
33 KV Simcon Solar
Power18.11.2016 --
132 KV Bareli 33 KV Boras 19.02.2014 --
132 KV Gopalpur 33 KV AE, PHE 27.02.2015 --
132 KV Amrawad-Khurd 33 KV Katara Hills-II 01.06.2016 --
Name of EHV Substation Name of 33KV feederDate of commission-ing of
feeder bay
Date of commission-ing of
feeder
220 KV Sagalgarh 33 KV Mangrol 30.05.2014 --
LIST OF 33KV FEEDERS UNDER MPPKVVCL,BHOPAL
132KV
UJJAIN REGION
220KV
220 KV
33 KV Nagar Palika 09.03.2014 --
132KV A lot
220 KV Ganjbasoda
132 KV Biora
(For which group to be allocated)
BHOPAL REGION
GWALIOR REGION
132 KV
220 KV
132 KV
Agenda of 57th OCCM of MP 29
Annexure-3.2
FROM TO
A
1 Nagda 400 400KV 50MVAR Bus Reactor - 09/May/17 08:00 17:00 9:00 For pre monsoon maintenance work
2 Nagda 400 400KV 125MVAR Bus Reactor - 11/May/17 08:00 17:00 9:00 For pre monsoon maintenance work
3 Nagda 400 315MVA ICT-II - 18/May/17 08:00 -
4 Nagda 400 315MVA ICT-II - 20/May/17 - 17:00
5 Nagda 400 315MVA ICT-III III 24/May/17 08:00 -
6 Nagda 400 315MVA ICT-III III 26/May/17 - 17:00
7 Indore 400 01/May/17 10:00 -
8 Indore 400 02/May/17 - 17:00
9 Indore 400 03/May/17 10:00 -
10 Indore 400 06/May/17 - 17:00
11 Indore 400 11/May/17 10:00 -
12 Indore 400 12/May/17 - 17:00
13 Bina 400 50MVAR Bhopal Line Reactor-I I 08/May/17 09:00 17:00 8:00 For pre monsoon maintenance work
14 Bina 400 50MVAR Bhopal Line Reactor-II II 15/May/17 09:00 17:00 8:00 For pre monsoon maintenance work
15 Bina 400 315MVA X-MER -III 18/May/17 09:00 17:00 8:00 For pre monsoon maintenance work
16 Bina 400 315MVA X-MER-II 22/May/17 09:00 17:00 8:00 For pre monsoon maintenance work
17 Bina 400 50MVAR BUS REACTOR 23/May/17 09:00 17:00 8:00 For pre monsoon maintenance work
18 Julwaniya 400 315MVA ICT-I (CGL) 08/May/17 09:00 17:00 8:00 For pre monsoon maintenance work
19 Julwaniya 400 315MVA ICT-I (CGL) 09/May/17 09:00 17:00 8:00 For pre monsoon maintenance work
20 Julwaniya 400 315MVA ICT-II (EMCO) 11/May/17 09:00 17:00 8:00 For pre monsoon maintenance work
21 Julwaniya 400 315MVA ICT-II (EMCO) 12/May/17 09:00 17:00 8:00 For pre monsoon maintenance work
22 Julwaniya 400 50MVAR Bus Reactor 17/May/17 09:00 17:00 8:00 For pre monsoon maintenance work
23 Bhopal 400 315MVA XMER NO I BHEL 02/May/17 09:00 17:00 8:00
24 Bhopal 400 315MVA XMER NO I BHEL 03/May/17 09:00 17:00 8:00
25 Bhopal 400 315MVA XMER NO III BHEL 05/May/17 09:00 -
26 Bhopal 400 315MVA XMER NO III BHEL 11/May/17 - 17:00
B
1 Nagda 400 400KV Main Bus-II II 15/May/17 08:00 -
2 Nagda 400 400KV Main Bus-II II 17/May/17 - 17:00
3 Nagda 400 400KV Main Bus-I I 22/May/17 08:00 -
4 Nagda 400 400KV Main Bus-I I 23/May/17 - 17:00
5 Indore 400 08/May/17 10:00 -
6 Indore 400 09/May/17 - 17:00
7 Indore 400 15/May/17 10:00 -
8 Indore 400 17/May/17 - 17:00
9 Indore 400 22/May/17 10:00 17:00 7:00 For pre monsoon maintenance work
10 Indore 400 23/May/17 10:00 17:00 7:00 For pre monsoon maintenance work
11 Indore 400 24/May/17 10:00 17:00 7:00 For pre monsoon maintenance work
12 Indore 400 25/May/17 10:00 17:00 7:00 For pre monsoon maintenance work
13 Bina 400 400KV Bhopal-I I 04/May/17 09:00 17:00 8:00 For pre monsoon maintenance work
14 Bina 400 400KV Bhopal-II II 06/May/17 09:00 17:00 8:00 For pre monsoon maintenance work
15 Bina 400 400KV BPSCL 09/May/17 09:00 17:00 8:00 For pre monsoon maintenance work
315 MVA 400/220 KV Xmer-I 55:00 For NIFPS commissioning work
PROPOSED SHUT DOWN PROGRAMME OF TANSMISSION ELEMENTS OF 400 KV EQUIPMENTS/FEEDER FOR THE DURATION
01-03-2017 TO 30-04-2017
S-NO-NAME OF 400KV
SUB-STATION
NAME OF 400KV
EQUIPMENT/FEEDER/LINE
CIRCUIT
NO.DATE
PERIOD OF DURATION
IN HRS-MAINTENANCE WORK PROPOSED
400KV Transformers / Reactors
57:00For replacment of Isolators and complete
Painting of ICT and its accessories
57:00For replacment of Main Bus Jumper and
complete Painting of ICT and its accessories
315 MVA 400/220 KV Xmer-IV 55:00 For NIFPS commissioning work
3x105 MVA 400/220 KV Xmer-II 55:00 For Replacement of 400KV CT
For pre monsoon maintenance work
152:00For pre monsoon maintenance work , Attending
oil leakge and transformer painting work
400KV Feeders / Bays
57:00For replacment of Pentagraph Iaoltors and
complete maintenance of BUS and Bus CVT
57:00For replacment of Line Isolators and complete
Painting of ICT and its accessories
400KV Indore-ISP II II 55:00 For replacement of 400KV CT
400KV Indore-ISP I I 55:00 For replacement of Penal
400KV Main Bus-I I
400KV Main Bus-II II
Agenda of 57th OCCM of MP 30
FROM TOS-NO-
NAME OF 400KV
SUB-STATION
NAME OF 400KV
EQUIPMENT/FEEDER/LINE
CIRCUIT
NO.DATE
PERIOD OF DURATION
IN HRS-MAINTENANCE WORK PROPOSED
16 Chhegaon 400 400KV Malwa 05/May/17 09:00 18:00 9:00 For pre monsoon maintenance work
17 Chhegaon 400 400KV Malwa 06/May/17 09:00 18:00 9:00 For pre monsoon maintenance work
18 Julwaniya 400 400kV SSTPH 03/May/17 09:00 17:00 8:00 For pre monsoon maintenance work
19 Julwaniya 400 400kV Chhegaon 05/May/17 09:00 17:00 8:00 For pre monsoon maintenance work
20 Julwaniya 400 400kV TBC 15/May/17 09:00 17:00 8:00 For pre monsoon maintenance work
21 Julwaniya 400 400kV Bus Tie 16/May/17 09:00 17:00 8:00 For pre monsoon maintenance work
C
1 15/May/17 09:00 17:00 8:00 For Bay Maintenance Work.
2 16/May/17 09:00 17:00 8:00 For Bay Maintenance Work.
3 17/May/17 09:00 17:00 8:00 For Bay Maintenance Work.
4 18/May/17 09:00 17:00 8:00 For Bay Maintenance Work.
5 Indore 400 220KV Main Bus-I 18/May/17 10:00 17:00 7:00 For pre monsoon maintenance work
6 Indore 400 220KV Main Bus-II 19/May/17 10:00 17:00 7:00 For pre monsoon maintenance work
7 Bina 400 220KV Gwalior 01/May/17 09:00 17:00 8:00 For pre monsoon maintenance work
8 Bina 400 220KV Datiya 02/May/17 09:00 17:00 8:00 For pre monsoon maintenance work
9 Bina 400 220KV Guna 03/May/17 09:00 17:00 8:00 For pre monsoon maintenance work
10 Bina 400 220KV Ashoknagar 05/May/17 09:00 17:00 8:00 For pre monsoon maintenance work
11 Bina 400 220KV Sagar-II II 16/May/17 09:00 17:00 8:00 For pre monsoon maintenance work
12 Bina 400 220KV Sagar-I I 19/May/17 09:00 17:00 8:00 For pre monsoon maintenance work
13 Bina 400 220KV Bina-1 I 24/May/17 09:00 17:00 8:00 For pre monsoon maintenance work
14 Bina 400 220KV Bina-2 II 26/May/17 09:00 17:00 8:00 For pre monsoon maintenance work
15 Bina 400 220KV Shivpuri 29/May/17 09:00 17:00 8:00 For pre monsoon maintenance work
16 Bina 400 220KV PGCIL 30/May/17 09:00 17:00 8:00 For pre monsoon maintenance work
17 Malanpur 220 220KV PGCIL-I I 04/May/17 09:00 17:00 08:00 For pre monsoon maintenance work
18 Malanpur 220 220KV PGCIL-II II 05/May/17 09:00 17:00 08:00 For pre monsoon maintenance work
19 Malanpur 220 160MVA X-mer-I I 08/May/17 09:00 17:00 08:00 For pre monsoon maintenance work
20 Malanpur 220 160MVA X-mer-II II 09/May/17 10:00 17:00 08:00 For pre monsoon maintenance work
21 Malanpur 220 220KV Auraiya 10/May/17 11:00 17:00 08:00 For pre monsoon maintenance work
22 Malanpur 220 220KV Mehgaon 11/May/17 12:00 17:00 08:00 For pre monsoon maintenance work
23 Mehgaon 220 220KV Auraiya 15/May/17 13:00 17:00 08:00 For pre monsoon maintenance work
24 Mehgaon 220 160MVA X-mer-I I 16/May/17 14:00 17:00 08:00 For pre monsoon maintenance work
25 Mehgaon 220 160MVA X-mer-II II 17/May/17 15:00 17:00 08:00 For pre monsoon maintenance work
26 Datia 220 220KV Bina 22/May/17 16:00 17:00 08:00 For pre monsoon maintenance work
27 Datia 220 220KV Gwalior 23/May/17 17:00 17:00 08:00 For pre monsoon maintenance work
Sukha 220 220KV ICT - II 2
220KV Feeders / Bays
Sukha 220 220KV ICT - I 1
Agenda of 57th OCCM of MP 31
Annexure-4.1
A. ThermalStn. Name UNIT No.
Capacity
MWFeb-17 Mar-17
3 120 0.00 0.00
4 120 0.00 0.00
PH II 240 0.00 0.00
5 210 137.19 148.13
PH III 210 137.19 148.13
TOT 210 137.19 148.13
6 200 80.73 0.00
7 210 29.18 37.15
PH II 410 109.91 37.15
8 210 0.00 0.00
9 210 0.00 0.00
PH III 420 0.00 0.00
10 250 86.87 163.25
11 250 142.10 162.81
PH IV 500 228.97 326.06
TOT 1330 338.87 363.21
1 210 94.82 45.14
2 210 105.61 107.70
PH I 420 200.43 152.84
3 210 97.11 86.92
4 210 100.28 118.57
PH II 420 197.39 205.49
5 500 263.93 333.06
PH III 500 263.93 333.06
TOT 1340 661.74 691.40
1 600 0.00 25.14
2 600 232.11 74.01
PH1 1200 232.11 99.15
4080 1369.91 1301.88
B. HydelCapacity
MW Feb-17 Mar-17
115.0 60.76 59.74
172.0 63.66 44.32
99.0 41.25 28.95
386.0 165.66 133.01
193.0 82.83 66.51
160.0 22.70 11.95
107.0 15.13 7.97
90.0 25.31 24.22
315.0 99.74 100.39
20.0 0.03 0.0060.0 0.00 4.3530.0 10.49 10.45
45.0 6.61 0.00
22.5 3.31 0.0020.0 12.99 12.5260.0 8.87 6.42
1186.0 352.41 303.31915.0 247.50 230.04917.5 258.70 232.83
Capacity
MWFeb-17 Mar-17
Indira Sagar Hydel Project 1000 214.615 262.805
Omkareshwar Hydel Project 520 87.730 109.346
Note : 1. Amarkantak Thermal Power Station-II Unit # 4 De-commissioned wef 01-May-2014.
2. Amarkantak Thermal Power Station-II Unit # 3 De-commissioned wef 13-Jan-2015.
TOTAL HYDEL
MPPGCL Hydel
MPSEB HYDEL Share
M.P.CHAMBAL
PENCH
M.P.PENCH
BARGI
C. NHDC (Ex-Bus)Station Name
B.SGR(DEOLONDH)
B.SGR(SILPARA)
RAJGHAT
M.P.RAJGHAT
B.SGR(JINHA)
MADIKHEDA
TONS
BIRSINGHPUR
Station Name
GANDHISAGAR
R.P.SAGAR
J.SAGAR
CHAMBAL
Unitwise / Stationwise Genration in MU
Ann 4.1
AM
AR
KA
NT
AK
SA
TP
UR
AS
AN
JA
Y G
AN
DH
I
MPPGCL THERMAL
SS
TP
S
Agenda of 57th OCCM of MP 32
S No. Source Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Total30 31 30 31 31 30 31 30 31 31 28 31 365
A.
1 Thermal 1534.26 1058.71 641.73 332.22 352.62 928.27 1206.18 1404.48 1778.77 1519.50 1244.53 1191.46 13192.72
2 Hydel 71.27 73.63 49.50 146.54 372.19 392.84 393.36 315.61 317.57 312.04 254.54 230.87 2929.98
3 Total 1605.53 1132.35 691.22 478.76 724.82 1321.11 1599.54 1720.09 2096.34 1831.55 1499.07 1422.33 16122.70
B.
1 Indira Sagar 120.81 146.45 52.97 496.81 731.60 304.97 330.31 229.04 209.31 258.23 215.79 157.03 3253.33
2 Omkareshwar 65.89 75.81 31.09 215.83 290.23 131.97 143.58 95.50 87.73 109.35 93.51 76.12 1416.60
3 MPPMCL Schedule from Central Sector of WR 1753.12 1394.10 1634.96 1127.74 933.38 1494.56 1394.87 1744.29 1828.76 1702.15 1594.51 1968.51 18570.95
4 MPPMCL Schedule from Central Sector ER 47.17 31.17 15.19 4.98 11.58 14.23 14.21 12.01 29.69 20.23 19.47 17.65 237.59
5 Total MPPMCL Schedule from Central Sector (WR+ER) 1800.29 1425.27 1650.15 1132.72 944.96 1508.79 1409.08 1756.30 1858.45 1722.38 1613.97 1986.17 18808.54
6 Deviation Energy of (WR+ER) -47.47 -70.17 -59.80 -88.60 -92.98 -83.76 -97.98 -84.65 -71.95 -49.26 -36.18 -48.49 -831.29
7 Schedule From DVC ER 232.92 202.40 229.04 111.04 8.12 57.86 134.56 201.32 226.28 191.79 148.15 192.29 1935.78
8 Schedule From Sugen 0.00 0.00 0.00 4.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.12 4.92
9 LANCO Amk 195.30 186.44 187.18 144.74 54.50 140.13 149.39 148.45 178.19 148.02 168.99 202.57 1903.88
10 SASAN 988.04 886.52 921.35 834.99 589.41 616.28 784.87 988.66 934.90 1011.15 932.39 910.76 10399.32
11 ESSAR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12 J P Nigri 278.92 323.20 295.64 250.95 308.17 318.10 326.63 309.14 180.43 277.32 254.84 178.71 3302.06
13 MB Power 63.53 131.56 84.34 18.07 14.29 43.26 51.57 139.47 87.64 81.91 69.77 76.91 862.33
14 JHABUA Power 0.00 20.41 3.30 0.00 0.00 0.00 0.00 0.21 3.22 0.00 0.00 0.10 27.24
15 STOA Schedule other than MPPMCL 8.69 63.07 64.44 75.76 80.19 19.73 49.39 -82.36 -96.21 1.02 -30.22 -89.90 63.59
16 Himachal Pradesh HYDAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
17 BARH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18 Schedule from Sardar Sarovar 8.89 19.97 78.71 257.09 527.28 268.86 313.48 77.27 55.04 50.71 79.82 48.36 1785.48
19 SCH to Railway from RGPPL_ebid 144.00 148.02 143.44 158.36 161.40 161.67 155.33 146.77 153.65 157.12 143.27 154.64 1827.67
20 Schedule from SEZ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
21 Schedule from Rihand+Matatila 2.37 3.07 3.26 5.02 11.49 19.42 19.06 11.87 13.52 12.55 8.82 6.88 117.32
22Medium Term Power Purchase from CSPDCL through PTC agaisnt PPA
CSPDCCL dtd. 18.09.20120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
23Medium Term Power Purchase from Balco through PTC agaisnt PPA Balco dtd.
18.09.2012 Including Short term purchase against MTOA0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
24 Additional Power Purchase 6.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.93 0.59 0.00 0.00 12.05
25 Energy Exchange 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
26 Banking of Energy -145.84 -11.74 -77.54 -210.04 -297.14 -149.27 -1.48 527.43 459.10 321.09 11.92 0.00 426.49
27 Sale of Power -321.72 -171.39 -105.78 -155.59 -512.51 -399.33 -472.36 -97.70 -42.75 -77.47 -34.77 -321.56 -2712.93
28 Total MP Schedule (Including Railway) 3261.91 3226.81 3477.52 2627.92 1890.17 2605.51 2919.52 4126.83 4016.40 3898.19 3366.94 3346.03 38763.75
29 Total MP Drawal (Including Railway) 3214.44 3156.63 3417.72 2539.32 1797.19 2521.75 2821.54 4042.19 3944.45 3848.93 3330.75 3297.55 37932.47
30 Wheeled Energy of Tawa HEG 0.00 0.00 0.00 6.87 11.38 8.33 5.95 10.89 9.84 7.68 3.96 0.33 65.22
31 Wheeled Energy of Wind Farm 18.13 9.25 25.91 19.94 12.96 6.17 6.30 2.33 2.53 4.01 4.64 4.97 117.15
32 Wheeled Energy of Solar Plant 16.07 15.81 13.19 8.67 8.05 12.82 14.09 14.40 12.71 13.72 18.78 22.97 171.30
33 Wheeled Energy of Ascent Hydro 1.39 1.16 0.67 0.05 0.13 0.98 0.62 0.54 1.11 1.11 1.12 1.19 10.08
34 POWER PURCHASE by MPPMCL from BLA Power + JP BINA (Intra State STOA) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
35 Deviation Energy of MPPGCL Thermal 11.36 0.36 -7.88 -10.24 -10.91 2.46 9.39 0.31 9.84 5.74 7.91 -6.57 11.76
36 Energy Purchased by MP from Wind Farm 227.92 447.95 437.76 435.03 496.33 279.71 158.80 75.47 109.87 196.95 247.09 291.21 3404.10
37 Energy Purchased by MP from Solar Plant 87.17 87.65 75.92 76.23 48.36 77.74 85.50 86.28 89.97 85.33 88.47 103.56 992.19
38Firm / Infirm Energy of HEG Mandideep+Hindalco+HEG Tawa +Trimula Ind.
purchase by MP +Wheeled enrgy of CPP / IPP20.37 8.23 8.07 21.17 23.00 50.10 27.77 153.03 187.42 59.39 87.22 121.80 767.55
39
Purchased from ASN Biomass Katni + RDM Care Ind. Biogas Pariyat +
Pragya Energy Pvt. Ltd. Biogas Richhai+ Arya Energy Kotma + Orient Green
Power Limited, Gadarawara Bio-Mass+Shaliwahna (CHH+Umariya) + JBP
MSW
10.35 8.46 9.39 6.14 8.23 8.82 7.29 11.11 14.80 9.14 3.62 5.71 103.07
40 Deviation Energy of ISP 1.99 2.22 2.15 6.76 9.00 5.66 4.88 4.34 5.30 4.57 4.67 6.03 57.57
41 Schedule Energy of BLA Power against LTOA 7.85 1.92 2.76 1.09 0.16 1.69 0.00 0.00 0.00 0.21 0.00 0.03 15.70
42 Schedule Energy of JP BINA Power against LTOA 0.00 3.86 0.00 0.00 0.00 17.27 6.51 25.86 29.62 8.16 51.23 19.80 162.33
43 Import from bargi Left Bank Canal Power House + ISP NVDA 0.01 0.01 0.01 0.01 0.01 0.55 0.93 2.01 2.03 1.99 1.79 1.68 11.03
44 Chambal Complex Excess / less Overshare by MP -3.19 3.46 6.91 -6.51 -41.40 -14.62 -35.68 -59.26 -41.47 -30.00 -27.43 -8.85 -258.03
45 Rajghat Hydel Power Station Excess / Less Overshare by MP -0.03 0.01 -0.02 3.50 2.62 -0.02 -0.03 2.47 2.41 2.71 1.53 -0.04 15.11
46 State Supply (Ex-Power st. Bus) 5406.06 5101.59 4767.84 4299.45 4111.75 4737.46 5187.28 6416.59 6773.82 6418.79 5633.72 5516.85 64371.21
47 AVERAGE DAILY (Ex-Bus) 180.20 164.57 158.93 138.69 132.64 157.92 167.33 213.89 218.51 207.06 201.20 177.96 176.36
48 MINIMUM DAILY (MP Periphery) 167.37 137.08 134.68 107.18 92.82 135.71 143.39 189.11 205.79 167.22 173.64 150.51 92.82
49 MAXIMUM DAILY (MP Periphery) 177.75 174.97 166.73 144.25 142.69 177.30 194.93 214.77 219.26 212.20 201.65 195.29 219.26
50 State Supply (Ex-Power st. Bus):- YEAR : 2015-16 4367.73 4896.38 4154.87 4286.84 4466.27 5138.62 6383.83 6369.03 6761.28 6232.92 5759.47 5331.43 64148.66
51 Year ((16-17)-(15-16))*100/Year (15-16) 23.77 4.19 14.75 0.29 -7.94 -7.81 -18.74 0.75 0.19 2.98 -2.18 3.48 0.35
52 Unshedule L/S : Year-2016-17 0.00 5.37 0.00 0.27 0.00 0.00 0.00 0.00 0.00 0.60 0.00 0.02 6.27
53 Frequency Correction 3.92 1.95 2.34 1.38 1.52 1.86 1.89 3.34 4.28 2.32 1.58 2.81 29.20
54 Restricted Requirement : Year-2016-17 5409.99 5108.91 4770.18 4301.10 4113.27 4739.32 5189.17 6419.93 6778.10 6421.71 5635.30 5519.69 64406.67
55 Shedule L/S : Year-2016-17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
56 Un-Restricted Requirement : Year-2016-17 5409.99 5108.91 4770.18 4301.10 4113.27 4739.32 5189.17 6419.93 6778.10 6421.71 5635.30 5519.69 64406.67
ENERGY BALANCE SHEETYear : 2016 - 17
All figures in Million Unit
M.P. Availability
Exchange with other States / Systems
29Agenda of 57th OCCM of MP 33
S.NO. Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Yr 16-17
C.
1 DEMAND MET 7984 7347 7019 6147 6146 7909 8790 10816 11421 11198 10881 9841 11421
2 LOAD RELIEF 0 0 0 0 0 0 0 0 0 0 0 0 0
3 LOAD SHEDDING 0 0 0 0 0 0 0 0 0 0 0 0 0
D.
1 DEMAND MET 8011 7902 7501 6903 6964 7963 8656 9487 9693 9589 8465 8453 9693
2 LOAD RELIEF 0 0 0 0 0 0 0 0 0 0 0 0 0
3 LOAD SHEDDING 0 0 0 0 0 0 0 0 0 0 0 0 0
F. REGISTERED MAXIMUM 8119 8045 7501 6903 6964 7963 8790 10816 11421 11198 10881 9841 11421
G. COMPUTED MAXIMUM DEMAND 8153 8050 7517 6913 6964 7978 8790 10839 11431 11201 10891 9856 11431
H. UNRESTRICTED MAXIMUM DEMAND 8153 8050 7517 6913 6964 7978 8790 10839 11431 11201 10891 9856 11431
I.
1. Div. Head Quarters 23:47 23:37 23:42 23:42 23:45 23:47 23:47 23:49 23:49 23:47 23:49 0:00 21:44
2. District Head Quarters 23:52 23:44 23:45 23:48 23:49 23:50 23:50 23:52 23:53 23:52 23:52 0:00 21:48
3. Tahsil Head Quarters 23:44 23:31 23:34 23:36 23:40 23:38 23:42 23:45 23:44 23:44 23:46 0:00 21:40
4. Rural -Mixed 23:25 22:52 22:54 22:56 23:05 23:10 23:14 23:17 23:13 23:13 23:15 0:00 21:11
5. Rural -DLF 23:32 23:09 23:06 23:12 23:18 23:17 23:23 23:29 23:24 23:27 23:31 0:00 21:22
6. Rural -Irrigation 9:51 9:37 9:37 9:39 9:42 9:43 9:45 9:50 9:50 9:49 9:51 0:00 8:55
J LOAD FACTOR % 92.48 85.23 88.28 83.71 79.36 82.63 79.32 82.40 79.72 77.04 77.05 75.35 81.88
S.N PARTICULARS Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Yr 16-17
A. INTGRATED FREQUENCY
1 MAXIMUM 50.11 50.20 50.11 50.16 50.14 50.09 50.11 50.09 50.11 50.21 50.11 50.14 50.21
2 MINIMUM 49.80 49.78 49.82 49.82 49.67 49.85 49.89 49.78 49.82 49.88 49.89 49.86 49.67
B. INSTANTANEOUS FREQUENCY
1 MAXIMUM 50.32 50.44 50.37 50.35 50.35 50.24 50.25 50.27 50.31 50.33 50.34 50.34 50.44
2 MINIMUM 49.64 49.56 49.65 49.69 49.65 49.67 49.74 49.54 49.67 49.71 49.76 49.66 49.54
C. AVG FREQUENCY 49.98 50.00 50.00 50.01 50.00 50.00 50.00 49.99 49.99 50.00 50.00 49.99 50.00
D. % TIME WHEN FREQUENCY WAS
1 ABOVE 51.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 50.05 TO 51.5 Hz 16.98 23.12 18.28 23.65 20.32 19.00 19.80 19.04 19.38 23.35 20.71 17.50 20.11
3 49.9 TO 50.05 Hz 69.94 69.78 74.09 72.35 73.73 75.15 74.78 71.94 69.58 70.46 73.99 73.55 72.43
4 49.7 TO 49.9 Hz 12.92 6.96 7.50 3.90 5.83 5.75 5.42 9.02 11.04 6.19 5.30 8.95 7.40
5 49.5 TO 49.7 Hz 0.16 0.14 0.13 0.10 0.12 0.10 0.00 0.00 0.00 0.00 0.00 0.00 0.06
6 49.2 TO 49.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7 48.8 TO 49.2 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8 48.5 TO 48.8 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9 BELOW 48.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ENERGY BALANCE SHEET : Demand & Sypply Hours
Year : 2016 - 17
MORNING PEAK (MAX)
EVENING PEAK (MAX)
Average Power Supply per day to
FREQUENCY ANALYSIS YEAR 2016-17
29Agenda of 57th OCCM of MP 34
THER.
Incl
Aux
THER.
Excl
Aux
HYD. ISP OSP
Total
IPPs
Injecti
on
Total
CPPs
Injecti
on
Total CSSDVC
ERSugen Lanco Sasan Essar
JP
Nigri
MB
Power
Jhabu
a
Power
SSP
SCH
to
Railw
ay
SEZ Banking Sale Pur
Total
MTO
A
at MP
STO
A
Riha
nd+
Mata
tila-
Rajg
hat
Total SCHUN
SCHTOTAL
1:00 49.99 1855 1688 261 102 54 193 514 2813 2058 74 0 213 1329 0 352 14 0 57 213 0 0 -4 0 0 -123 10 4193 7006 4085 -108 0 6897 0 0 0 6900 6900
2:00 50.01 1856 1689 256 85 46 193 504 2772 1964 59 0 206 1346 0 352 7 0 57 215 0 0 -4 0 0 -122 10 4090 6862 4024 -66 0 6796 0 0 0 6797 6797
3:00 50.01 1850 1683 246 84 41 194 490 2739 1935 51 0 202 1364 0 353 1 0 57 220 0 0 -4 0 0 -118 10 4072 6810 4075 4 0 6814 0 0 0 6814 6814
4:00 50.01 1852 1686 249 164 72 193 477 2841 1910 51 0 202 1347 0 358 9 0 57 217 0 0 -4 0 0 -118 10 4041 6883 4017 -24 0 6858 0 0 0 6859 6859
5:00 50.02 1850 1684 235 304 128 194 462 3006 1916 51 0 209 1287 0 358 19 0 70 217 0 0 -4 0 0 -125 10 4009 7015 3931 -79 0 6936 0 0 0 6937 6937
6:00 50.02 1896 1726 290 375 162 199 463 3214 2096 87 0 221 1313 0 357 31 0 114 221 0 0 -4 0 0 -119 10 4328 7542 4211 -117 -1 7425 0 0 0 7426 7426
7:00 49.98 2085 1897 443 501 217 204 454 3717 2393 299 0 262 1341 0 363 106 0 147 219 0 0 -30 0 0 -49 10 5062 8778 5094 32 -1 8810 0 0 0 8816 8816
8:00 50.00 2298 2091 510 623 278 221 561 4283 2615 374 0 262 1341 0 367 163 0 160 223 0 87 -48 0 0 20 10 5574 9857 5435 -139 -1 9717 0 0 0 9720 9720
9:00 50.00 2340 2129 537 692 290 228 639 4514 2647 377 0 262 1341 0 368 168 0 190 220 0 67 -40 0 0 21 10 5632 10146 5666 34 -1 10179 0 0 0 10183 10183
10:00 50.03 2315 2107 518 695 287 220 651 4478 2632 374 0 262 1341 0 369 168 0 156 219 0 60 -16 0 0 -2 10 5573 10050 5479 -94 -1 9956 0 0 0 9957 9957
11:00 50.04 2270 2066 400 504 227 220 727 4144 2581 363 0 262 1338 0 370 168 0 156 217 0 45 -30 0 0 -19 10 5462 9606 5318 -144 -1 9461 0 0 0 9462 9462
12:00 50.01 2200 2002 355 315 149 221 758 3801 2547 338 0 262 1330 0 372 163 0 149 210 0 27 -67 0 0 -32 10 5308 9109 5070 -238 -1 8871 0 0 0 8872 8872
13:00 50.02 2138 1945 346 307 137 217 759 3712 2518 328 0 262 1329 0 372 157 0 93 202 0 22 -46 0 0 -46 10 5200 8912 5305 105 -1 9017 0 0 0 9018 9018
14:00 50.02 2097 1908 322 297 136 217 722 3602 2515 314 0 262 1329 0 372 148 0 109 203 0 22 -8 0 0 -40 10 5234 8836 5134 -100 0 8736 0 0 0 8737 8737
15:00 49.98 2088 1900 310 268 123 215 648 3464 2466 311 0 258 1329 0 371 145 0 94 206 0 22 -25 0 0 -36 10 5151 8615 5091 -60 -1 8554 0 0 0 8560 8560
16:00 49.97 2069 1883 343 303 127 215 523 3394 2436 287 0 258 1330 0 372 145 0 116 212 0 22 -83 0 0 -20 10 5084 8478 5126 42 -1 8519 0 0 0 8526 8526
17:00 49.98 2082 1895 380 352 146 215 327 3316 2432 276 0 258 1330 0 371 139 0 121 217 0 22 -31 0 0 9 10 5153 8468 4968 -185 -1 8283 0 0 0 8290 8290
18:00 50.04 2065 1879 395 356 166 204 181 3182 2438 261 0 254 1328 0 373 137 0 179 220 0 0 -30 0 0 -117 10 5053 8235 4750 -303 -1 7931 0 0 0 7931 7931
19:00 49.97 2068 1882 473 371 177 206 253 3363 2406 272 0 254 1328 0 371 144 0 173 211 0 7 -234 0 0 -113 10 4829 8192 4847 18 -1 8209 0 0 0 8217 8217
20:00 50.03 2007 1826 459 333 162 206 337 3323 2346 202 0 250 1329 0 372 129 0 162 207 0 7 -229 0 0 -113 10 4673 7996 4620 -53 -1 7942 0 0 0 7942 7942
21:00 50.02 1919 1746 376 248 127 205 420 3122 2269 141 0 250 1336 0 374 99 0 128 211 0 0 -167 0 0 -110 10 4540 7662 4421 -118 -1 7542 0 0 0 7544 7544
22:00 50.05 1879 1710 299 155 84 203 486 2937 2160 99 0 224 1338 0 374 61 0 77 209 0 0 -58 0 0 -102 10 4392 7329 4212 -181 -1 7148 0 0 0 7148 7148
23:00 50.02 1880 1711 326 217 103 203 530 3089 2188 125 0 224 1338 0 366 42 0 73 207 0 0 0 0 0 -140 10 4434 7523 4440 6 -1 7528 0 0 0 7529 7529
24:00 50.03 1873 1704 314 212 95 199 518 3042 2082 102 0 217 1337 0 372 28 0 66 202 0 0 0 0 0 -138 10 4278 7320 4164 -114 -1 7206 0 0 0 7207 7207
Avg. 50.01 2035 1852 360 328 147 208 517 3411 2315 217 0 241 1333 0 367 100 0 115 213 0 17 -48 0 0 -73 10 4807 8218 4728 -78 -1 8139 0 0 0 8141 8141
00 TO 06
HRS.50.01 1860 1693 256 186 84 194 485 2898 1980 62 0 209 1331 0 355 14 0 69 217 0 0 -4 0 0 -121 10 4122 7020 4057 -65 0 6954 0 0 0 6956 6956
06 TO 12
HRS.50.01 2251 2049 460 555 241 219 632 4156 2569 354 0 262 1339 0 368 156 0 160 218 0 48 -39 0 0 -10 10 5435 9591 5344 -92 -1 9499 0 0 0 9502 9502
12 TO 18
HRS.50.00 2090 1902 349 314 139 214 527 3445 2467 296 0 259 1329 0 372 145 0 118 210 0 18 -37 0 0 -42 10 5146 8591 5063 -83 -1 8507 0 0 0 8510 8510
06TO 18
HRS.50.01 2171 1975 405 435 190 216 579 3801 2518 325 0 260 1334 0 370 150 0 139 214 0 33 -38 0 0 -26 10 5291 9091 5203 -87 -1 9003 0 0 0 9006 9006
18 TO 24
HRS.50.02 1938 1763 374 256 125 204 424 3146 2242 157 0 237 1334 0 371 84 0 113 208 0 2 -115 0 0 -119 10 4524 7670 4451 -74 -1 7596 0 0 0 7598 7598
REST.
DEMAN
D
UNRES
T.
DEMA
ND
Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand
Month :- February 2017
FIGURES IN MW
Hrs. FREQ.
Own Generation Schedule from
Tot
Avl.
Act.
DrlDeviation
Intra
State
STO
A
DEMAN
D MET
Load Shedding
Agenda of 57th OCCM of MP 35
THER.
Incl
Aux
THER.
Excl
Aux
HYD. ISP OSP
Total
IPPs
Injecti
on
Total
CPPs
Injecti
on
Total CSSDVC
ERSugen Lanco Sasan Essar
JP
Nigri
MB
Power
Jhabu
a
Power
SSP
SCH
to
Railw
ay
SEZ Banking Sale Pur
Total
MTO
A
at MP
STO
A
Riha
nd+
Mata
tila-
Rajg
hat
Total SCHUN
SCHTOTAL
1:00 49.99 1654 1505 222 88 54 184 560 2613 2420 174 0 259 1199 0 230 58 0 53 207 0 0 -226 0 0 -144 9 4238 6851 4187 -51 -2 6798 0 0 0 6801 6801
2:00 50.00 1645 1497 224 67 49 185 527 2548 2406 147 0 262 1181 0 222 52 0 53 215 0 0 -214 0 0 -144 9 4190 6738 4102 -87 -2 6648 0 0 0 6650 6650
3:00 50.01 1632 1485 220 43 30 184 496 2458 2403 135 0 262 1193 0 222 49 0 53 208 0 0 -200 0 0 -144 9 4190 6648 4157 -33 -2 6612 0 0 0 6614 6614
4:00 50.01 1643 1496 215 47 30 189 464 2441 2421 140 0 259 1185 0 222 54 0 60 208 0 0 -239 0 0 -144 9 4175 6616 4166 -9 -2 6604 0 0 0 6605 6605
5:00 50.00 1666 1516 247 146 65 189 449 2613 2419 170 0 259 1147 0 222 62 0 60 211 0 0 -329 0 0 -144 9 4087 6700 4056 -31 -2 6666 0 0 0 6669 6669
6:00 49.99 1704 1551 306 265 105 185 446 2857 2512 191 0 262 1168 0 222 75 0 67 211 0 0 -274 0 0 -143 9 4299 7155 4275 -23 -3 7129 0 0 0 7135 7135
7:00 50.02 1832 1667 446 389 166 185 437 3290 2733 350 0 262 1187 0 222 115 0 63 218 0 0 -186 0 0 -120 9 4854 8144 4837 -17 -3 8124 0 0 0 8125 8125
8:00 50.00 1912 1740 444 421 191 189 532 3517 2790 415 0 262 1183 0 224 156 0 65 220 0 0 -178 0 0 -82 9 5063 8580 4967 -96 -3 8481 0 0 0 8484 8484
9:00 49.98 1926 1752 465 443 201 195 544 3600 2792 410 0 262 1181 0 226 155 0 71 219 0 0 -271 0 0 -78 9 4975 8575 4938 -37 -3 8535 0 0 0 8542 8542
10:00 50.02 1910 1738 399 363 177 195 651 3523 2777 400 0 262 1177 0 227 146 3 67 214 0 0 -326 0 0 -101 9 4855 8378 4671 -184 -3 8190 0 0 0 8192 8192
11:00 50.01 1900 1729 320 257 155 190 733 3385 2723 357 2 262 1178 0 226 146 0 68 212 0 0 -477 0 0 -183 9 4524 7908 4350 -173 -3 7732 0 0 0 7735 7735
12:00 50.00 1846 1680 284 223 131 192 764 3273 2622 307 0 262 1180 0 227 134 0 64 204 0 0 -527 0 0 -226 9 4255 7528 3938 -317 -3 7208 0 0 0 7212 7212
13:00 50.00 1798 1636 243 171 97 193 791 3131 2615 243 0 262 1172 0 228 112 0 65 202 0 0 -730 0 0 -248 9 3932 7063 3940 9 -3 7068 0 0 0 7070 7070
14:00 50.00 1695 1543 225 147 75 194 794 2977 2559 225 0 262 1167 0 232 77 0 64 200 0 0 -632 0 0 -239 9 3924 6902 3847 -78 -3 6821 0 0 0 6824 6824
15:00 49.97 1690 1538 216 148 80 194 733 2908 2540 212 0 262 1168 0 227 68 0 55 209 0 0 -671 0 0 -227 9 3851 6759 3820 -31 -3 6725 0 0 0 6733 6733
16:00 49.97 1695 1542 236 194 86 191 609 2858 2561 247 0 262 1167 0 232 74 0 64 210 0 0 -794 0 0 -205 9 3827 6685 3888 61 -3 6743 0 0 0 6750 6750
17:00 49.99 1700 1547 267 249 107 193 444 2807 2555 225 0 262 1163 0 234 78 0 66 212 0 0 -619 0 0 -174 9 4012 6818 3863 -149 -3 6667 0 0 0 6672 6672
18:00 50.00 1697 1545 277 234 109 193 272 2630 2532 211 0 262 1183 0 244 84 0 78 216 0 0 -627 0 0 -146 9 4046 6675 4028 -18 -4 6654 0 0 0 6657 6657
19:00 49.93 1789 1628 461 388 159 197 286 3118 2635 341 0 262 1177 0 246 118 0 78 214 0 -5 -700 0 0 -103 9 4274 7392 4382 108 -3 7497 0 0 0 7512 7512
20:00 50.01 1789 1628 446 381 175 198 405 3234 2632 316 2 262 1178 0 246 142 0 76 202 0 -10 -507 0 0 -104 9 4445 7679 4333 -112 -3 7564 0 0 0 7567 7567
21:00 49.99 1749 1591 379 235 118 193 503 3019 2578 284 0 262 1180 0 247 135 0 61 208 0 -10 -516 0 0 -112 9 4326 7345 4202 -123 -3 7218 0 0 0 7222 7222
22:00 50.04 1706 1553 302 118 82 193 583 2832 2527 203 0 255 1180 0 251 123 0 61 196 0 -5 -400 0 0 -144 9 4257 7090 4120 -138 -3 6949 0 0 0 6949 6949
23:00 50.00 1695 1542 290 146 80 193 614 2866 2541 206 0 262 1174 0 248 99 0 59 190 0 -5 -181 0 0 -149 9 4452 7319 4405 -47 -3 7269 0 0 0 7271 7271
24:00 50.02 1658 1509 257 102 73 192 622 2756 2506 181 0 262 1188 0 251 71 0 58 199 0 -5 -198 0 0 -149 9 4374 7130 4275 -98 -3 7029 0 0 0 7030 7030
Avg. 50.00 1747 1590 308 219 108 191 552 2969 2575 254 0 261 1177 0 232 99 0 64 209 0 -2 -418 0 0 -152 9 4309 7278 4240 -70 -3 7205 0 0 0 7209 7209
00 TO 06
HRS.50.00 1657 1508 239 109 56 186 490 2588 2430 160 0 260 1179 0 223 58 0 58 210 0 0 -247 0 0 -144 9 4196 6785 4157 -39 -2 6743 0 0 0 6746 6746
06 TO 12
HRS.50.00 1888 1718 393 349 170 191 610 3431 2739 373 0 262 1181 0 225 142 1 66 215 0 0 -327 0 0 -132 9 4754 8185 4617 -137 -3 8045 0 0 0 8048 8048
12 TO 18
HRS.49.99 1713 1558 244 190 92 193 607 2885 2560 227 0 262 1170 0 233 82 0 65 208 0 0 -679 0 0 -206 9 3932 6817 3898 -34 -3 6779 0 0 0 6784 6784
06TO 18
HRS.50.00 1800 1638 319 270 131 192 608 3158 2650 300 0 262 1175 0 229 112 0 66 211 0 0 -503 0 0 -169 9 4343 7501 4257 -86 -3 7412 0 0 0 7416 7416
18 TO 24
HRS.50.00 1731 1575 356 228 115 195 502 2971 2570 255 0 261 1180 0 248 115 0 65 201 0 -7 -417 0 0 -127 9 4355 7326 4286 -68 -3 7254 0 0 0 7259 7259
REST.
DEMAN
D
UNRES
T.
DEMA
ND
Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand
Month :- March 2017
FIGURES IN MW
Hrs. FREQ.
Own Generation Schedule from
Tot
Avl.
Act.
DrlDeviation
Intra
State
STO
A
DEMAN
D MET
Load Shedding
Agenda of 57th OCCM of MP 36
SCHDemand
Met
O/U
DRL
SCH
LS
Unsch
LS
Restricte
d
Demand
Unrestrict
ed
Demand
SCHDemand
Met
O/U
DRL
SCH
LS
Unsch
LS
Restricte
d
Demand
Unrestrict
ed
Demand
SCHDemand
Met
O/U
DRL
SCH
LS
Unsch
LS
Restricte
d
Demand
Unrestrict
ed
Demand
Total SchTotal
Drawal
1:00 49.99 2233 2287 54 0 0 2288 2288 2292 2330 39 0 0 2331 2331 2244 2067 -177 0 0 2068 2068 210 213
2:00 50.01 2148 2170 22 0 0 2171 2171 2202 2216 14 0 0 2217 2217 2314 2192 -121 0 0 2193 2193 210 217
3:00 50.01 2075 2120 45 0 0 2120 2120 2092 2142 51 0 0 2142 2142 2395 2329 -66 0 0 2329 2329 210 222
4:00 50.01 2047 2105 58 0 0 2106 2106 2094 2139 44 0 0 2139 2139 2444 2396 -48 0 0 2396 2396 210 218
5:00 50.02 2083 2132 49 0 0 2132 2132 2121 2153 33 0 0 2154 2154 2510 2431 -79 0 0 2432 2432 210 220
6:00 50.02 2182 2210 28 0 0 2210 2210 2231 2272 40 0 0 2272 2272 2757 2720 -37 0 0 2720 2720 210 223
7:00 49.98 2457 2541 84 0 0 2543 2543 2498 2702 204 0 0 2704 2704 3359 3345 -14 0 0 3347 3347 210 222
8:00 50.00 2701 2662 -39 0 0 2663 2663 2928 2979 51 0 0 2980 2980 3878 3849 -29 0 0 3850 3850 210 228
9:00 50.00 2703 2674 -28 0 0 2675 2675 3145 3221 76 0 0 3222 3222 4067 4063 -5 0 0 4064 4064 210 221
10:00 50.03 2713 2642 -71 0 0 2642 2642 3175 3188 13 0 0 3188 3188 3960 3907 -53 0 0 3908 3908 210 219
11:00 50.04 2738 2649 -89 0 0 2649 2649 3105 3068 -37 0 0 3068 3068 3635 3527 -108 0 0 3527 3527 210 217
12:00 50.01 2647 2522 -125 0 0 2522 2522 2897 2777 -120 0 0 2778 2778 3445 3363 -82 0 0 3364 3364 210 208
13:00 50.02 2536 2538 2 0 0 2538 2538 2699 2803 104 0 0 2803 2803 3434 3476 41 0 0 3476 3476 210 200
14:00 50.02 2473 2366 -106 0 0 2366 2366 2718 2693 -24 0 0 2693 2693 3480 3475 -5 0 0 3475 3475 210 202
15:00 49.98 2371 2296 -74 0 0 2298 2298 2624 2612 -11 0 0 2614 2614 3430 3439 9 0 0 3441 3441 210 207
16:00 49.97 2344 2303 -41 0 0 2305 2305 2573 2583 10 0 0 2585 2585 3379 3419 40 0 0 3422 3422 210 214
17:00 49.98 2366 2276 -90 0 0 2278 2278 2606 2566 -40 0 0 2568 2568 3309 3222 -87 0 0 3225 3225 210 218
18:00 50.04 2417 2311 -106 0 0 2311 2311 2640 2509 -131 0 0 2509 2509 3022 2889 -133 0 0 2889 2889 210 222
19:00 49.97 2618 2677 59 0 0 2680 2680 2514 2579 65 0 0 2581 2581 2832 2741 -91 0 0 2743 2743 208 212
20:00 50.03 2638 2668 30 0 0 2668 2668 2576 2596 20 0 0 2596 2596 2601 2473 -128 0 0 2473 2473 208 206
21:00 50.02 2564 2571 7 0 0 2571 2571 2475 2469 -6 0 0 2469 2469 2451 2292 -158 0 0 2293 2293 208 210
22:00 50.05 2445 2426 -19 0 0 2426 2426 2343 2330 -14 0 0 2330 2330 2385 2184 -201 0 0 2184 2184 208 209
23:00 50.02 2438 2506 68 0 0 2506 2506 2425 2577 153 0 0 2578 2578 2420 2240 -181 0 0 2240 2240 210 205
24:00 50.03 2362 2396 34 0 0 2397 2397 2406 2441 35 0 0 2441 2441 2409 2168 -241 0 0 2168 2168 210 201
Avg. 50.01 2429 2419 -10 0 0 2419 2419 2557 2581 24 0 0 2582 2582 3007 2925 -81 0 0 2926 2926 210 214
00 TO 06
HRS.50.01 2128 2171 43 0 0 2171 2171 2172 2209 37 0 0 2209 2209 2444 2356 -88 0 0 2356 2356 210 219
06 TO 12
HRS.50.01 2660 2615 -45 0 0 2616 2616 2958 2989 31 0 0 2990 2990 3724 3676 -48 0 0 3677 3677 210 219
12 TO 18
HRS.50.00 2418 2349 -69 0 0 2349 2349 2643 2628 -15 0 0 2629 2629 3342 3320 -22 0 0 3321 3321 210 211
06TO 18
HRS.50.01 2539 2482 -57 0 0 2483 2483 2801 2809 8 0 0 2810 2810 3533 3498 -35 0 0 3499 3499 210 215
18 TO 24
HRS.50.02 2511 2541 30 0 0 2541 2541 2456 2499 42 0 0 2499 2499 2516 2350 -167 0 0 2350 2350 209 207
Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) Drawal
Month :- February 2017
FIGURES IN MW
Hrs. FREQ.
EZONE CZONE WZONE Railway
Agenda of 57th OCCM of MP 37
SCHDemand
Met
O/U
DRL
SCH
LS
Unsch
LS
Restricte
d
Demand
Unrestrict
ed
Demand
SCHDemand
Met
O/U
DRL
SCH
LS
Unsch
LS
Restricte
d
Demand
Unrestrict
ed
Demand
SCHDemand
Met
O/U
DRL
SCH
LS
Unsch
LS
Restricte
d
Demand
Unrestrict
ed
Demand
Total SchTotal
Drawal
1:00 49.99 2284 2327 42 0 0 2328 2328 2251 2285 34 0 0 2286 2286 2154 1979 -175 0 0 1980 1980 211 207
2:00 50.00 2189 2204 15 0 0 2205 2205 2163 2193 30 0 0 2194 2194 2188 2035 -153 0 0 2036 2036 211 216
3:00 50.01 2107 2153 45 0 0 2153 2153 2057 2107 50 0 0 2108 2108 2208 2144 -64 0 0 2145 2145 211 208
4:00 50.01 2066 2128 62 0 0 2128 2128 2043 2089 46 0 0 2089 2089 2217 2180 -36 0 0 2181 2181 211 207
5:00 50.00 2073 2144 71 0 0 2145 2145 2045 2092 47 0 0 2092 2092 2258 2220 -37 0 0 2221 2221 211 210
6:00 49.99 2159 2195 36 0 0 2196 2196 2143 2213 70 0 0 2215 2215 2537 2511 -26 0 0 2513 2513 211 211
7:00 50.02 2378 2402 23 0 0 2402 2402 2374 2483 108 0 0 2483 2483 3057 3023 -34 0 0 3023 3023 211 217
8:00 50.00 2446 2406 -40 0 0 2407 2407 2586 2604 17 0 0 2604 2604 3321 3250 -71 0 0 3251 3251 211 221
9:00 49.98 2411 2382 -29 0 0 2384 2384 2596 2622 27 0 0 2624 2624 3335 3312 -23 0 0 3315 3315 211 218
10:00 50.02 2420 2356 -64 0 0 2357 2357 2563 2517 -46 0 0 2518 2518 3205 3101 -104 0 0 3101 3101 211 216
11:00 50.01 2383 2336 -46 0 0 2337 2337 2440 2395 -45 0 0 2396 2396 2911 2788 -123 0 0 2789 2789 211 212
12:00 50.00 2288 2185 -103 0 0 2186 2186 2255 2165 -90 0 0 2166 2166 2819 2655 -163 0 0 2657 2657 211 203
13:00 50.00 2117 2110 -7 0 0 2110 2110 2017 2043 26 0 0 2044 2044 2743 2713 -30 0 0 2714 2714 211 202
14:00 50.00 2035 1987 -48 0 0 1988 1988 2007 1981 -26 0 0 1982 1982 2739 2653 -87 0 0 2654 2654 211 199
15:00 49.97 1948 1930 -18 0 0 1932 1932 1947 1916 -31 0 0 1918 1918 2732 2670 -62 0 0 2673 2673 211 209
16:00 49.97 1909 1951 42 0 0 1953 1953 1897 1922 26 0 0 1924 1924 2665 2659 -5 0 0 2662 2662 211 210
17:00 49.99 1979 1963 -16 0 0 1965 1965 1980 1945 -36 0 0 1946 1946 2664 2548 -116 0 0 2550 2550 211 211
18:00 50.00 1996 2010 13 0 0 2010 2010 2003 2012 9 0 0 2012 2012 2470 2418 -52 0 0 2420 2420 211 214
19:00 49.93 2322 2427 104 0 0 2432 2432 2143 2280 136 0 0 2284 2284 2612 2577 -36 0 0 2582 2582 208 214
20:00 50.01 2523 2536 13 0 0 2537 2537 2433 2456 23 0 0 2457 2457 2545 2371 -173 0 0 2372 2372 208 201
21:00 49.99 2444 2473 29 0 0 2474 2474 2347 2371 24 0 0 2372 2372 2348 2170 -178 0 0 2171 2171 208 205
22:00 50.04 2363 2359 -4 0 0 2359 2359 2267 2275 7 0 0 2275 2275 2292 2120 -173 0 0 2120 2120 208 196
23:00 50.00 2461 2480 19 0 0 2481 2481 2386 2440 54 0 0 2441 2441 2345 2162 -183 0 0 2163 2163 211 186
24:00 50.02 2366 2405 39 0 0 2405 2405 2351 2364 13 0 0 2364 2364 2253 2062 -191 0 0 2063 2063 211 199
Avg. 50.00 2236 2244 7 0 0 2245 2245 2221 2240 20 0 0 2242 2242 2609 2513 -96 0 0 2515 2515 210 208
00 TO 06
HRS.50.00 2146 2192 45 0 0 2192 2192 2117 2163 46 0 0 2164 2164 2260 2178 -82 0 0 2179 2179 211 210
06 TO 12
HRS.50.00 2388 2345 -43 0 0 2345 2345 2469 2464 -5 0 0 2465 2465 3108 3022 -86 0 0 3023 3023 211 215
12 TO 18
HRS.49.99 1998 1992 -6 0 0 1993 1993 1975 1970 -5 0 0 1971 1971 2669 2610 -59 0 0 2612 2612 211 208
06TO 18
HRS.50.00 2193 2168 -24 0 0 2169 2169 2222 2217 -5 0 0 2218 2218 2888 2816 -73 0 0 2817 2817 211 211
18 TO 24
HRS.50.00 2413 2446 33 0 0 2448 2448 2321 2364 43 0 0 2365 2365 2399 2244 -156 0 0 2245 2245 209 200
Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) Drawal
Month :- March 2017
FIGURES IN MW
Hrs. FREQ.
EZONE CZONE WZONE Railway
Agenda of 57th OCCM of MP 38
Annexure-5
System Disturbance / System Incidence
1. System Disturbance on 20.02.2017 at ISP: On dated 20.02.2017.2017 at around 11:15
Hrs. M.P system was normal and frequency of National Grid was 49.89 Hz. Prior to fault ISP
HPS Unit No # 3 & 7 were On Bar. On 20.02.2017 at around At around 11:18 Hrs. during
stopping of ISP Unit # 7, its Generator Circuit Breaker R-Phase failed to open due to
breakage of operating rod, resulting in operation of LBB protection, which further initialed the
operation of Bus Bar Protection of 400 KV Main Bus – II at ISP. Consequently feeders,
transformers & Units connected to 400 KV Main Bus – II at ISP tripped as follows:-
400 KV ISP – Indore Ckt – II.
400 KV ISP – STPS Ckt.
ISP Unit # 7
Due to the above tripping there was no interruption in any area and hence there was no load
loss. There was no generation loss and System was normalized in due course of time.
2. System Disturbance on 21.02.2017 at 400 KV Indore: On dated 21.02.2017 at around
15:25 Hrs. M.P system was normal and frequency of National Grid was 50.02 Hz. On
21.02.2017 at around 15:30 Hrs., LBB Protection of 220 KV Indore – South Zone Ckt – I, mal-
operated, resulting in operation of 220 KV Main Bus – II Bus Bar Protection at 440 KV S/s Indore.
Consequently all feeders and transformers connected to 220 KV Main Bus – II at 400 KV S/s Indore
tripped as follows:-
220 KV Indore – South Zone Ckt – I.
220 KV Indore – Barwaha Ckt – I.
220 KV Indore – Badnagar Ckt.
220 KV Indore – Indore East Ckt.
220 KV Indore – Jetpura Ckt – II.
220 KV Indore – South Zone Ckt – II.
400/220 KV, 315 MVA ICT – I.
400/220 KV, 315 MVA ICT – IV.
220 KV Bus Coupler
Due to the above tripping there was no interruption in any area and hence there was no load
loss. There was no generation loss and System was normalized in due course of time.
3. System Disturbance on 02.03.2017 at 220 KV S/s Itarsi: On dated 02.03.2017 at around
06:59 Hrs. M.P system was normal and frequency of National Grid was 49.96 Hz. At around
06:59 Hrs., 220 KV, ‘B’-Phase bus PT failed at 220 KV S/s Itarsi resulting multiple
transmission elements tripped due to bus fault at 220 KV S/s Itarsi (bus no I). Resulting ,220
KV bays connected to Main Bus 1 got tripped from Itarsi End as follows:-
220 KV Itarsi – Hoshangabad.
220 KV Itarsi - Pipariya Ckt – II.
220 KV Transfer Bus Coupler(220KV Piariya 1st Load ).
220 KV Itarsi - Handiya Ckt – I.
220 KV Itarsi – Barwaha Ckt.
220 KV Itasi - Sarni Ckt – IV.
Agenda of 57th OCCM of MP 39
220 KV Itasi – Itarsi(PGCIL) Ckt.
220 KV Bus Tie.
Due to the above tripping there was no interruption in any area and hence there was no load
loss. There was no generation loss and System was normalized in due course of time.
4. System Disturbance on 02.03.2017 at 400 KV S/s Sukha: On dated 02.03.2017 at around
21:16 Hrs. M.P system was normal and frequency of National Grid was 49.90 Hz. At 21:16
Hrs., 220 KV Y-ph CT of 400/220 KV, 315 MVA ICT - II burst at 400 KV S/S Sakha,
resulting in bus fault on 220 KV Main Bus – II and operation of Bus Bar Protection of 220 KV
Main Bus – II. Consequently following feeders and transformers tripped as follows:-
400/220 KV, 315 MVA ICT – I.
400/220 KV, 315 MVA ICT – II.
220 KV Sukha - Narsingpur Ckt – II.
220 KV Sukha - Panagar Ckt – II.
220 KV Sukha - Jabalpur Ckt – II.
220 KV Sukha - Jabalpur Ckt – I.
Due to the above tripping there was no interruption in any area and hence there was no load
loss. There was no generation loss and System was normalized in due course of time.
Agenda of 57th OCCM of MP 40
Annexure-6.5A
Schemes of Western Region funded under PSDF
State I UT Sr. No.
Details of the Scheme Nos. of Schemes
Grant Sanctioned (in Rs Crores)
Date of Sanction
Funds released (in Rs Crores) as on 30.11.2016
%age of fund Disbursed against Grant sanctioned
Madhya Pradesh
1. Implementation of Integrated system for availability based tariff.
2 3.6 17/03/2016 0 0%
2. Renovation and Upgradation of protection system of substations of MPPTCL
92.7 17/03/2016 0 0%
Madhya Pradesh
3. Renovation and Upgradation of protection system of substations MPPGCL
2 47.11 5/9/2016 0 0%
4. Installation of 125MVARBus Reactor at SSTPP Khandwaand 50MVARLine Reactor at SGSTPS Birsinghpur substation of MPPGCL.
5.59 0 0%
Chhattisgarh 5. Renovation and Upgradation of protection system of substations
1 61.67 5/9/2016 0 0%
Gujarat 6. Automatic Demand Management Scheme
3 1.50 11105/2015 17/03/2015
1.35 89.82%
7. Load Forecasting Scheme
3.70 04/08/2015 0 0%
8. Wind generation forecasting project for State of Gujarat.
1.62 17/03/2015 0 0%
TOTAL 8 217.49
Agenda of 57th OCCM of MP 41
Annexure-6.8B
1. Name of the Scheme
1.1 Name of the substation and its Location
1.2 Executing Agency
1.3 State/Region
2. Date of Sanction Order
2.1 Date of Agreement of Entity with State Govt. / NLDC
2.2 Total Approved Cost of Scheme
2.3 Approved Grant by Monitoring Committee (Rs. In Lakhs)
2.4 Date of Requisition by the Entity
2.4 a) Date and Reference of LOA
2.4 b) Amount of LOA
2.5 Date of Disbursement and amount
2.5.1 Ist Installment
2.5.2 IInd Installment
2.5.3 IIIrd Installment
2.6 Date of Scheduled completion of work
2.7 Date of Handling over of Site to entity ( In case of Turn key project)
Sch. Act.1 Item Details (As per Annexure-II)
1.1
1.2
Erection Discriptionworks as per
LOAProgress During Month
Balance
2 Work Details
2.1
2.2
3 Others
Signature With Seal of The Nodal Officer
CUMMULATIVE PROGRESS till date
RemarkBalance
Quantity Received during
MonthQty. AS PER
LOASupply DiscriptionNo.
Report for the Month of JANUARY 2017
CUMMULATIVE PROGRESS till date
Reporting Format to the PSDF Project Monitoring Group
Agenda of 57th OCCM of MP 42
Baart sarkarGovernment of India
kond`Iya ivaVut p`aiQakrNa
Central Electricity Authority
piScama xao~Iya ivaVut saimaitWESTERN REGIONAL POWER COMMITTEE
TRANSMISSION LINES/ELEMENTS OUTAGE
PLANING PROCEDURE
IN
WESTERN REGION
mauMba[-MUMBAI
Agenda of 57th OCCM of MP 43
TRANSMISSION LINES/ELEMENTS OUTAGE PLANING PROCEDURE
IN
WESTERN REGION
The transmission elements outages planning procedures being followed in the WR OCC
are as follows:
The annual transmission elements outages planning shall be done in annual LGBR.
And shall be reviewed in OCC meeting on monthly basis .
I. The OCC held in the current month (M) shall discuss the line outages for the
period in the next calendar month(M+1).
II. The line /element outages are of the following types: Routine Maintenance,
Constructional and Inter-Regional.
III. As per the control areas, IEGC roles and existing practices WR, OCC discusses
all 400 kV and 765 kV lines outages, irrespective of ownership, all inter-regional/
inter-state lines, all 220 kV lines from ISGS stations. Where outage of a line not
covered under the above and wholly under a state, for example a 220 kV line in
Gujarat, the agency seeking the outage shall have to approach Gujarat STU
/SLDC authorities. If there are any problems, WR OCC may be informed for any
assistance required.
IV. The data for the above line outages shall be positively sent by 4th working day of
current month for outages of next month.
V. The compiled data is e-mailed to SLDCs /utilities for any comments by 5th
working day of current month.
VI. Since line outages are becoming complex, they are discussed in a pre-OCC
meeting with WRLDC/utilities if needed.
VII. WR OCC typically meets during second or third week of every month.
VIII. Inter-regional outages shall be preferably planned in the last week. Hence the
outage for Inter-Regional can get about 36 days time (15 in current month and
Agenda of 57th OCCM of MP 44
three weeks of following month) time for co-ordination by NLDC/WRLDC. NLDC
shall co-ordinate inter-regional outages under intimation to the concerned
RPC/RLDC. WRLDC coordinates in real-time and also along with line outages
already agreed in OCC.
IX. For construction related outages the dates cannot be exactly planned in advance
though the tentative month/ dates may be decided and based on real time
conditions the outages can be permitted by WRLDC/SLDC for constructional
related category.
X. Only those elements planned for maintenance shall be taken for outage
subjected to real time condition permitting.
XI. For Non OCC transmission elements outages following points shall be
taken care:
I. Non-OCC outages should be discouraged.
II. Only under exceptional cases, the request for transmission outage
after issue of OCC minutes must be posted through email for
concurrence of the WRPC members (OCC group Email) at least
three days in advance (D-3).
III. WRPC members may respond back in email within three hours.
IV. After three hours the proposal shall deemed to have been
concurred by WRPC for further processing by WRLDC.
V. WRLDC coordinates in real-time and also along with line outages
already agreed in OCC.
VI. For emergency outages, the outages availing agency should
directly approach WRLDC for outage code as being the practice in
vogue.
XII. The status of lines planned vs. lines availed and any deviation from planning or
emergency outages for the concerned month shall be submitted by WRLDC for
discussion in respective OCC.
XIII. Code Giving Procedure: Since short term market clearance depends on
available transmission capacity & is cleared on day ahead basis, there was a
Agenda of 57th OCCM of MP 45
need for better planning. In this regard he informed that that following was
decided in the previous OCC meeting and shall be implemented:
I. All utilities shall confirmed on D-3 about readiness to avail outages(where
D is date of outage).
II. WRLDC shall issue code in real time within reasonable time with best
effort either the code to avail or cancel depending on real time conditions.
III. All utilities that do not confirm by D-3, those outages shall be deemed
cancelled.
XIV. Clearing of Rescheduled line outages:
A. Utilities were requested to adhere to the plan as far as possible.
B. In spite of planning in the OCC, at times a few outages are required to be
shifted in real time.
C. Under such conditions WRLDC is insisting on WRPC to give clearance
for shift of plan. WRLDC/ SLDC can mutually decide and shift from the
plan if grid conditions permit. Only the number of such cases to the
possible extent, shall be minimize.
D. Rescheduling of outage shall be treated as Non-OCC planned & all the
procedure for Non –OCC plan will be applicable for the same.
XV. Time limits for changes in Outage plan:
A. If any outages plan approved in OCC for the month could not be availed in
the respective month due to any reasonable cause, the same can be
cleared in real time condition by WRLDC, after consent of WRPC.
B. All outages shall adhere to the Code Giving procedure.
C. Considering difficulties in giving line outages, all utilities may plan the
outage with adequate manpower and avoid repeating outages again and
again.
This procedure will be implemented w.e.f. 01st March, 2017 after discussion/approval in
492nd OCC meeting.
***********************
Agenda of 57th OCCM of MP 46
Annexure-6.12.B
(FORMAT FOR RESCHEDULING OF OCC APPROVED SHUTDOWN)
(To be submitted in D-3 basis)
Subject: Rescheduling of ____(OCCM No)___OCCM approved shut down of___(Element
Name)____________ proposed for _____(date)_____ .
To,
The Shift Incharge, SLDC, Jabalpur.
Dear Sir/Ma’am,
Due to ______ (Reason for deferment) _____ we are unable to avail below mentioned outage from
_____(from-to date )__________.kindly same may be rescheduled as detailed below-
S.NO. ELEMENT DATE FROM TO REASON/REMARK
The revised plan for above shut down is updated in the google sheet. It is requested to kindly
reschedule the above shut down.
Regards,
Shutdown availing authority
Mobile no.-
Agenda of 57th OCCM of MP 47
Annexure-6.12.C
(FORMAT FOR RESCHEDULING OF NON-OCC D-3 SHUTDOWN PROPOSED)
Subject: Request for Approval of Post OCCM Outage of____ (Element Name) ______for
____(Date)______
To,
The Shift Incharge, SLDC, Jabalpur.
Dear Sir/Ma’am,
The following subjected element shut down was not planned for OCCM approval due to ___(reason
for non-planning in OCCM)_______. Hence it is requested to accord approval for Post-OCCM shut
down as proposed below:-
S.NO. ELEMENT DATE FROM TO REASON/REMARK
The above shut down is also updated in WRLDC Outage Google Sheet. Load shall be manageable by
SLDC Jabalpur during Shutdown.
Regards,
Shutdown availing authority
Designation
Mobile no.-
Agenda of 57th OCCM of MP 48
Annexure-6.12.D
(FORMAT FOR AVAILING EMERGENCY, NON-OCCM SDHUTDOWN)
Subject: Emergency shut down on___(Element Name)____________ proposed for
_____(date)_____ .
To,
The Shift Incharge, SLDC, Jabalpur.
All WRPC OCCM Member
Dear Sir/Ma’am,
Due to ______ (Reason for availing S/D) _____ an emergency S/d is required is required on
(Element) as detailed below:-
S.NO. ELEMENT DATE FROM TO REASON/REMARK
It is requested to accord approval for above mentioned emergency shut down. Load shall be
managed by SLDC Jabalpur during Shutdown.
Regards,
Shutdown availing authority
Mobile no.-
Agenda of 57th OCCM of MP 49
Annexure-8.1.i
SNO Meter No Location Circle Name Feeder Name Data Not Available Dates Problem at Site1 MPE51969 132KV S/S GANJBASODA BHOPAL 40MVA MAKE BBL SN 4732-1 01/03/2017 to 31/03/2017 METER DEFECTIVE
2 MPP28719 132KV S/S SHEOPUR GWALIOR 50MVA BBL SN 5406/03 01/03/2017 to 31/03/2017 METER DEFECTIVE
3 MPE51923 132KV S/S SHIVPURI GWALIOR 40MVA, BHEL 01/03/2017 to 31/03/2017 METER DEFECTIVE
4 MPE51930 132KV S/S SHIVPURI GWALIOR 40MVA,BBL 01/03/2017 to 31/03/2017 METER DEFECTIVE
5 MPP28722 220KV S/S SHIVPURI GWALIOR 40MVA,ABB 01/03/2017 to 31/03/2017 METER DEFECTIVE
6 MPE51906 132KV S/S SANWER INDORE 16 MVA EMCO 1045/10878 01/03/2017 to 31/03/2017 METER DEFECTIVE
7 MPE51806 132KV S/S CHHOTI-KRGN. INDORE 40 MVA BBL SN 3072/5 01/03/2017 to 31/03/2017 METER DEFECTIVE
8 MPE51859 132KV S/S CHHOTI-KRGN. INDORE 30 MVA,Mareli SN 36668 01/03/2017 to 31/03/2017 METER DEFECTIVE
9 MPE51943 220KV S/S MAHALGAON GWALIOR 63 MVA MAKE GEC SN 27060-B 01/03/2017 to 31/03/2017 METER DEFECTIVE
10 MPP28402 132KV S/S WAIDHAN SATNA 40 MVA X-mer (BBL) 01/03/2017 to 31/03/2017 MODEM DEFECTIVE
11 MPP28720 132KV S/S KANNOD UJJAIN 16MVA MAKE BBL SN 1992/5 01/03/2017 to 31/03/2017 Modem Removed
12 MPE53442 132KV S/S DHAR INDORE 20 MVA BHEL SN 6004544 01/03/2017 to 31/03/2017 Modem Removed
13 XB577398 132KV S/S SEHORE BHOPAL 40MVA MAKE ANDREW YULE SN 12472 01/03/2017 to 31/03/2017 NETWORK PROBLEM
14 MSP44327 132KV S/S GOPALPUR BHOPAL 40MVA TRANSFORMER PC0100096 T&R 01/03/2017 to 31/03/2017 NETWORK PROBLEM
15 MPP28502 132KV S/S MANAWAR INDORE 40MVA 132/33KV XMER EMCO S.NO. 1661/12505 01/03/2017 to 31/03/2017 PENAL SHIFTED (Modem not connected)
16 MPE51975 132KV S/S BIORA BHOPAL 40MVA MAKE BBL SN 3072/7 01/03/2017 to 31/03/2017 PENAL SHIFTED (Modem not connected)
17 MPE51720 132KV S/S BIJAWAR SAGAR 12.5 MVA MAKE HEL SN 6002785 01/03/2017 to 31/03/2017 PENAL SHIFTED (Modem not connected)
18 MPP28447 132KV S/S BNP DEWAS UJJAIN 40MVA MAKE CGL SN 47292 01/03/2017 to 31/03/2017 PENAL SHIFTED (Modem not connected)
19 MPE51830 132KV S/S SHAJAPUR UJJAIN 40MVA MAKE ECE SN S-86020 01/03/2017 to 31/03/2017 PENAL SHIFTED (Modem not connected)
20 MPP28615 132KV S/S ARNIAKALA UJJAIN 40MVA MAKE ABB SN 12020-018 01/03/2017 to 31/03/2017 PENAL SHIFTED (Modem not connected)
21 MPC58859 132KV S/S JAORA UJJAIN 63MVA MAKE BBL SN 4909/2 01/03/2017 to 31/03/2017 PENAL SHIFTED (Modem not connected)
22 MPE51826 132KV S/S SHUJALPUR UJJAIN 40MVA MAKE BHEL SN -6004698 01/03/2017 to 31/03/2017 PENAL SHIFTED (Modem not connected)
23 GEC08911 132KV S/S GHATA BILLOD INDORE 40MVA 132/33KV XMER NGEF S.NO. 2500051108 01/03/2017 to 31/03/2017 SIM DEFECTIVE
24 MPE51741 132KV S/S NARSINGPUR JABALPUR 40MVA TELK XMER 01/03/2017 to 31/03/2017 SIM DEFECTIVE
25 MPE53482 132KV S/S ARON 400KV BINA 40MVA,EMCO 01/03/2017 to 31/03/2017 TIME DRIFT
26 MPP28488 132KV S/S CHAMBAL BHOPAL BHOPAL 63MVA MAKE ABB SN 12018-004 01/03/2017 to 31/03/2017 TIME DRIFT
27 MPE53480 132KV S/S MORAR GWALIOR 63 MVA MAKE BBL SN 4909/5 04/03/2017 to 31/03/2017 TIME DRIFT
28 MPE51937 132KV S/S SEONDHA GWALIOR 40MVA MAKE BHEL SN 2037068 01/03/2017 to 31/03/2017 TIME DRIFT
29 MPP28363 132KV S/S CHHINDWARA JABALPUR 40MVA MAKE CGL 01/03/2017 to 31/03/2017 TIME DRIFT
30 MPP28364 132KV S/S CHHINDWARA JABALPUR 40MVA ECE MAKE 01/03/2017 to 31/03/2017 TIME DRIFT
31 MPP28365 132KV S/S CHHINDWARA JABALPUR 40MVA BBL XMER 01/03/2017 to 31/03/2017 TIME DRIFT
32 MPP28424 220KV S/S CHHINDWARA JABALPUR 40MVA XMER SN 5076/04 01/03/2017 to 31/03/2017 TIME DRIFT
Agenda of 57th OCCM of MP 50
Sr. No Make SIM No.SIM Data
No.IMSI No.
Service
Activated
GPRS/ GSM
1 MPC57149 132KV S/S ANJAD 40MVA XMER BHEL S.NO. 2037088400KV Indore Testing Division - II Indore
2 MPC57145 132KV S/S DHAR 40MVA BHEL 400KV Indore Testing Division - II Indore
3 GEC88970 220KV S/S HOSANGABAD SPM M/S SPM BHOPAL Testing Division HOSHANGABAD
4 XB577467 132KV S/S BANKHEDI 40MVA MAKE IMP BHOPAL Testing Division HOSHANGABAD
5 XB577430 132KV S/S SEMRI HARCHAND 40 MVA IMP PT6722 BHOPAL Testing Division HOSHANGABAD
6 XB577404 220KV S/S PIPARIA 12.5MVA BHEL MAKE 6001776 BHOPAL Testing Division - Itarsi
7 MPP28775 132KV S/S BETUL Tr.132KV RLY. TR. BETUL-I BHOPAL Testing Division Itarsi
8 XB577730 220KV S/S DATIA 40MVA GWALIOR Testing Division -II Gwalior
9 XB583274 132KV GAHOD 63 MVA MAKE IMP SN PT7479 GWALIOR Testing Division -II Gwalior
10 MPC59861 132KV S/S ALIRAJPUR 20MVA BBL 1991/3 INDORE Testing Division - Rajgarh
11 MPC57146 132KV S/S ANJOD CH GANJ 40 MAVA BHEL INDORE Testing Division - I Indore
12 MPC58410 132KV S/S BICHHUA 40MVA BHEL XMER JABALPUR Testing Division -II Chindwara
13 MP925055 220KV S/S PANAGAR 220KV PANAGAR JABALPUR Testing Division - JABALPUR
14 MPP28518 220KV S/S CHHINDWARA 50MVA XMER JABALPUR Testing Division -II Chindwara
15 5246422 132KV S/S JEERAPUR 20MVA NGEF RAJGARH Testing Division -I Bhopal-S/s DN Beora
16 XB549199 132KV S/S DONGARITAL 20 MVA EMCO SN 1058 B/10930 REWA Testing Division - Rewa
17 XB552535 132KV S/S SIRMOUR 40MVA IMP REWA Testing Division - Rewa
18 GEC88948 132KV S/S MAIHAR 132 KV RELIANCE FEEDER SATNA Testing Division - Satna
19 KA907077 220KV S/S ANUPUR 132KV MOSERBEAR SATNA Testing Division - Satna- S/S DN Shahdol
T & C Circle
Annexure-8.1.ii
T & C Division
List of newly commissioned substations / recently connected HT Consumers which are not integrated with AMR system of SLDC.
Modem SIM
Modem & SIM Details
SNO Meter No Location Feeder Name
Page 1Agenda of 57th OCCM of MP 51
20 KA904800 220KV S/S ANUPUR 132KV OPM SATNA Testing Division - Satna- S/S DN Shahdol
21 XB577419 132KV S/S UMARIYA 20 MVA NGEF SATNA Testing Division - Rewa
22 BENEGAON_NEW 132KV BENEGAON 12.5MVA JABALPUR Testing Division -II Chindwara
23 TAMOT_NEW 132KV TAMOT 40MVA MAKE CGL SN 24788 BPL Testing Division -II Bhopal
24 XB577473 132KV S/S MAKSUDANGARH 63MVA MAKE BBL SN 5442/07 GWL Testing Division Guna
25 XB577425 132KV S/S SLEEMANABAD 12.5MVA NGEF SN2800022226 JBP Testing Division -Katni
26 XC530817 132KV S/S LALBARRA 40MVA IMP JBP Testing Division -II Chindwara
27 XC548595 132KV S/S UMRETH 40MVA BBL XMER JBP Testing Division -II Chindwara
28 MPP28606 132KV S/S RATLAM 50MVA X-mer BBL SN 5406/10 UJJ Testing Division - Ratlam
29 XB577474 132KV AMARWARA 50MVA BHEL JABALPUR Testing Division -Chhindwara
30 MPC58407 220KV S/S JULWANIYA 40MVA BHEL SN 2037620 INDORE Testing Division - II Barwaha
31 XB560307 220KV S/S MUNGALIYA CHHAP 40MVA BHEL SN 2037622 BHOPAL Testing Division - I Bhopal
32 XB577435 132KV S/S KATNI 50MVA MAKE BHEL JABALPUR Testing Division - Katni
33 XB577453 220KV S/S SEONI 50MVA BHEL JABALPUR Testing Division - Seoni
34 ANDHAD_NEW 132 KV ANDHAD 40MVA INDORE Testing Division - II Indore
35 ESAGARH_NEW 132KV S/S ESAGARH_NEW 40MVA GWALIOR Testing Division Guna
36 XB583342 132KV S/S KOTHIYA 20MVA GWALIOR Testing Division Guna
37 TAL_NEW 132KV S/S TAL 40MVA MAKE IMP UJJAIN Testing Division - Ratlam
38 JHABUA_NEW 132KV JHABUA 40 MVA MAKE NGEF INDORE Testing Division - II Indore
39 GUDGAON_NEW 132KV S/S GUDGAON 50MVA BHEL SN 2042484 BHOPAL Testing Division Itarsi
40 BOREGAON_NEW 132KV S/S BOREGAON 50MVA BHEL SN.2042482 JBP Testing Division -II Chindwara
41 MPC73878 132KV PANDHANA 63MVA IMP INDORE Testing Division KHANDWA
42 XB569347 220KV S/S ANUPUR 50MVA BHEL SATNA Testing Division - Satna- S/S DN Shahdol
Page 2Agenda of 57th OCCM of MP 52
43 TALAKPURA_NEW 132KV S/S TALAKPURA 40 MVA INDORE Testing Division - Barwaha
44 NEEMUCH_NEW 220KV S/S NEEMUCH 50MVA BHEL UJJAIN Testing Division - Neemuch
45 NARSINGPUR_NEW 132KV S/S NARSINGPUR 50MVA BHEL SN2042481 JABALPUR Testing Division -II Jabalpur
46 KISHANGARH_NEW 132KV S/S Kishangarh 40 MVA IMP INDORE Testing Division - Dewas
47 XC559777 220KV MORENA 63MVA GWALIOR Testing Division Morena
48 XB583344 132KV BHANDER 63MVA GWALIOR Testing Division DATIA
49 XB577532 132KV BEOHARI 50MVA BHEL SATNA Testing Division - Satna- S/S DN Shahdol
Page 3Agenda of 57th OCCM of MP 53
Name at SLDC end at site end
1 GEN 6 GT MW/MVAR 0 155 /102 GEN 7 GT MW/MVAR 0 160/103 GEN 6 GT CB FAULTY OPEN4 GEN 7 GT CB FAULTY OPEN5 220 KV TRB CB FAULTY CLOSE
1 STATION XMER 5A & 5B CB N/A2 132/33 AUTO XMER CB N/A
1 400/220 KV TR 1 & 2 (315MVA ) OLTC N/C
1 400/220 KV ICT CB FAULTY CLOSE2 400 KV BUS TIE CB NA CLOSE
3 400 KV STN TRANSFORMER A & B CB NA CLOSE5 STN TR 1 ,2 (220 KV ) CB NA CLOSE6 220 KV BUS TIE CB NA CLOSE7 220 /33 KV TR CB/MW/MVAR NA8 400 KV BUS 1 FREQ 49.79 49.98
9 220 KV BUS 2 VOLTAGE 197 230
1 220 KV SIRMORE MVAR 494 52 220 KV SIRMORE MVAR 685 53 220 KV SATNA MW 23 274 220 KV KOTAR MW 49 54
DEOLOAN H P S Telemetry N/C RAJGHAT H P S RTU OUT
TONS H P S
SATPURA T P S
SINGHA JI S T P S
S G T P S
AMARKANTAK TPS
Agenda of 57th OCCM of MP 54
TELEMETRY DISCRIPIENCY
Sr.no. DESCRIPTION Status telemetry value at SLDC actual value at site
1 GEN 7 MVAR 100 102 GEN 3 MVAR 80 8
3 400 KV ISP -INDORE 1 MVAR 16 8
4 400 KV ISP- INDORE 2 MVAR 206 10
I SP H P S
Agenda of 57th OCCM of MP 55
SR.NO. NAME AT SLDC AT SITE
1 GENERATOR 2 MW N/A 1582 GENERATOR 2 MVAR N/A 25
JP bina TPS T/M 2nd channel GPRS not working
jp bina TPS
Agenda of 57th OCCM of MP 56
DATA OUT FROM LONG TIME1 WAIDHAN 132KV S/S2 MORWA 132 KV S/S3 BEOHARI 132 KV S/S
LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER
1 220 KV PGCIL SATNA CB FAULTY OPEN2 132/33 KV XMER 1 MW /MVAR 10/4 20/83 132/33 KV XMER 2 MW /MVAR 5/2 10/4
1 220 KV KOTOR CB FAULTY CLOSE2 220 KV SATNA PG 3 CB /MW/MVAR N/A PROCESSES CONNECTION REQUIRED3 220 KV BUS VOLTAGE /FREQUENCY 0 220/50
1 ALL T.M. DATA CB ,MW,MVAR N/A2 132/33 KV(50MVA) XMER CB ,MW,MVAR N/A PROCESSES CONNECTION REQUIRED
1 132 KV MANGAWAN 2 CB /MW/MVAR N/A PROCESSES CONNECTION REQUIRED2 132 KV REWA 2(INTERCONNECTOR) CB /MW/MVAR N/A PROCESSES CONNECTION REQUIRED3 220/132 XMER 2 SEC CB FAULTY CLOSE
1 220 KV INTERCONNECTOR 1 & 4 MW/MVAR N/C 115/15
1 132 KV KOTMA CB N/A2 220/132 KV TR 2 (160 MVA) PRI & SEC CB N/A CLOSE3 220 KV BUS VOLTAGE & FREQUENCY N/A3 132 KV SHAHDOL CB ,MW,MVAR N/A4 132 KV KOTMA 2 CB ,MW,MVAR N/A5 132 /33 KV TR 2 CB ,MW,MVAR N/A
1 132 KV ANUPPUR 2 CB /MW/MVAR FAULTY PROCESSES CONNECTION REQUIREDKOTMA 132 KV S/S
SATNA220 KV S/S
BEOHARI 132KV S/S
REWA 220 KV S/S
SATNA CIRCLE
MAIHAR 220 KV S/S
BIRSINGHPUR 220 KV S/S
ANUPPUR 220 KV S/S
PROCESSES CONNECTION REQUIRED
Agenda of 57th OCCM of MP 57
LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER
Sr.no. DESCRIPTION Status telemetry value at SLDC actual value at site
1 220 KV BUS 2 VOLTAGE 0 222 KV2 220 /132 KV XMER 2 (120MVA) MW/MVAR 0 58/103 220 /132 KV XMER 2 (120MVA) SEC CB FAULTY CLOSE4 132/33 KV XMER 3 (63MVA) CB ,MW,MVAR N/A PROCESSES CONNECTION REQUIRED
1 132/33 KV XMER 2 CB ,MW,MVAR N/A PROCESSES CONNECTION REQUIRED
1 220 KV SARNI CB /MW/MVAR N/C PROCESSES CONNECTION REQUIRED2 220/132 KV XMER CB FAULTY CLOSE
1 132 KV BUS COUPLER CB FAULTY OPEN
1 132KV B/C CB FAULTY OPEN
1 132 KV BUS VOLTAGE /FREQUENCY N/A 132/50
JABALPUR CIRCLE
JABALPUR 220 KV S/S
SEONI 220 KV S/S
PANDURNA 220 KV S/S
KYMORE 132 KV S/S
BHANEGAON 132 KV S/S
CHINDWARA 132 KV S/S
Agenda of 57th OCCM of MP 58
1 132 KV B/C CB FAULTY CLOSE2 132 KV BUDHERA MW/MVAR N/C 15 /05
SAGAR CIRCLE
TIKAMGRAH 220 KV S/S
Agenda of 57th OCCM of MP 59
1 400/200/33 KV TERTIARY REACTOR 1 & 2 MVAR N/A2 BINA-BINA PG CKTS 1 MW 74 823 BINA-BINA PG CKTS 2 MW 82 914 BINA-BINA PG CKTS 3 MW 220 2025 400 KV JP BINA CKT MW 171 1636 400 KV BHOPAL I & II MW 155 1657 220 kv BORL 2 MW 3 08 220 kv BORL 2 CB FAULTY OPEN9 220 KV SAGAR-2 CB N/A CLOSE
10 220 KV DATIA CB CLOSE OPEN11 220 kv GWALIOR MW 3 012 220 KV BUS VOLTAGE 191 225
1 132 KV ASHOK NAGAR MW/MVAR N/C PROCESSES CONNECTION REQUIRED2 220 KV & 132 KV B/C CB FAULTY3 132/33 KV XMER-4 CB CB FAULTY
1 220 KV BUS COUPLER CB FAULTY CLOSE2 132/33 KV TR 40 -1 CB FAULTY CLOSE3 220/132 KV 160 MVA-2(LV) CB NON CURRENT4 132 KVBUSCOUPLER CB FAULTY OPEN
1 132KV KOTHIYA PROCESSES CONNECTION REQUIRED2 132KV ESAGARH PROCESSES CONNECTION REQUIRED
GUNA 220 KV S/S
ASOKNAGAR 220 KV S/S
BINA CIRCLE
BINA 400 KV S/S
BINA 220 KV S/S
Agenda of 57th OCCM of MP 60
LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER
1 220/132 KV TR 2 (160 MVA-2) MVAR NON CURRENT2 220/132 KV TR 2 (160 MVA-2) MW WRONG VALUES3 220/132 KV TR 2 (160 MVA-2)LV CB FAULTY4 132/33 KV TR (63 MVA)-2 CB FAULTY
1 220 KV MORENA-1 MW/MVAR NON CURRENT
1 132 KV CHANDERI CB OPEN CLOSE2 132 KV DATIA CB FAULTY CLOSE3 132 Kv KARERA CB OPEN CLOSE4 132 KV RAJGHAT CB FAULTY OPEN5 132 KV SHIVPURI CB OPEN CLOSE6 132/33 KV TR 40 MVA CB FAULTY CLOSE7 132/33 KV 40 MVA MW/MVAR NON CURRENT
1 220/132 KV TR 2(160MVA-2) MW/MVAR/CB N/A PROCESSES CONNECTION REQUIRED2 220 KV BUS COUPLER CB FAULTY3 132 KV KOLARAS MW/MVAR NON CURRENT4 132 KV MOHNA MW/MVAR NON CURRENT5 132/33 KV TR -1 MW/MVAR NON CURRENT6 132/33 KV TR -2 MW/MVAR NON CURRENT7 220/132 KV TR (160 MVA)LV CB FAULTY CLOSE8 132 KV BUS VOLTAGE NON CURRENT
1 132 KV BUS COUPLER CB FAULTY OPEN2 132 KV SEONDHA CB FAULTY CLOSE
1 132 KV SABALGARH-2+KANDHAR MW/MVAR NON CURRENT2 132 KV BUS FREQENCY NON CURRENT3 132 KV BUS VOLTAGE NON CURRENT 4 132/33 KV 63 MVA TR MW/MVAR NON CURRENT5 132/33 KV 63 MVA TR CB FAULTY CLOSE6 132/33 KV 40 MVA TR CB FAULTY CLOSE7 132KV BARODA PROCESSES CONNECTION REQUIRED8 132/33KV 50 MVA MW/MVAR NON CURRENT
SOE DATA NOT RECEIVED
1 132/33 KV 40 MVA TR CB NON CURRENT 1 132/33 KV 40 MVA TR CB NON CURRENT
SHEOPURKALA 132 KV S/S
DATIA 220 KV S/S
VIJAYPUR 132 KV S/S
15-04-2017GWALIOR 220 KV S/S
MALANPUR 220 KV S/S
PICHORE 132 KV S/S
SHIVPURI 220 KV S/S
MEHGAON 220 KV S/S
Agenda of 57th OCCM of MP 61
LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER
1 400 KV ITARSI-2 MVAR WRONG VALUES2 400 KV DAMOH-1&2 (LINE REACTOR) MVAR WRONG VALUES3 400 KV BDTCL-2 MW/MVAR WRONG VALUES
1 220KV BUS COUPLER MW/MVAR NON CURRENT2 220KV BHOPAL CB OPEN CLOSE3 132 KV R.TRACT.-2 MW/MVAR NON CURRENT4 132KV BUS COUPLER MW/MVAR NON CURRENT
1 220KV BUS VOLTAGE WRONG VALUES2 220KV BUS COUPLER MW/MVAR PROCESSES CONNECTION REQUIRED3 132 KV SANCHI R.-TRACT.-1 CB NON CURRENT4 132KV BUS COUPLER MW/MVAR PROCESSES CONNECTION REQUIRED5 220/132 KV 160 MVA XMER-2(LV) CB FAULTY CLOSE
1 132KV BUS COUPLER CB FAULTY OPEN
1 220 KB BUS COUPLER CB FAULTY CLOSE2 220 KV TRANSFER BREAKER CB FAULTY OPEN3 220/132 KV 160 MVA XMR-2 CB FAULTY CLOSE
MANDIDEEP 220 KV S/S
BERASIA 132 KV S/S
15-04-2017BHOPAL 400 KV S/S
GANJBASODA 220 KV S/S
VIDISHA 220 KV S/S
MANDIDEEP 132 KV S/SALL CB STATUS ARE NON CURRENT
Agenda of 57th OCCM of MP 62
LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER
1 220/132 KV 160 MVA XMER CB FAULTY CLOSE
1 132 KV KHIRKIYA PROCESSES CONNECTION REQUIRED2 132 KV KHIRKIYA TRACTION-2 MW SIGN REVERSAL
1 220 KV BUS-2 VOLTAGE WRONG VALUES2 220 KV PIPARIYA-2 MW/MVAR WRONG VALUES3 132KV HOSHANGABAD-2 MW/MVAR/CB PROCESSES CONNECTION REQUIRED4 132/33 TR 20MVA CB FAULTY CLOSE
1 132 KV GUDGAON-1 MW /MVAR /CB PROCESSES CONNECTION REQUIRED
1 132 KV BUS COUPLER MW/MVAR NON CURRENT2 132 KV BUS COUPLER CB FAULTY OPEN
1 132 KV ASTHA-2 MW/MVAR WRONG VALUES2 132 KV ASHTA-2 CB FAULTY CLOSE3 132 KV ASTHA-1 MW/MVAR WRONG VALUES4 132/33 KV 40 MVA CB OPEN CLOSE5 132 KV BUS FREQUENCY NON CURRENT
1 132 KV RAGHOGARH MW/MVAR NON CURRENT2 132/33 KV 20 MVA MW/MVAR NON CURRENT3 220/132 KV 160 MVA- XMER (LV SIDE) CB OPEN CLOSE
1 400 KV & 220 KV BUS FREQUENCY WRONG VALUES2 400 KV BUS COUPLER CB FAULTY3 220 KV BUS COUPLER CB FAULTY
1 220 KV BHOPAL-1 CB OPEN CLOSE2 132/33 KV 50MVA TR CB OPEN CLOSE3 132 KV SHYAMPUR-2 CB NON CURRENT
1 132 KV HARDA-1 CB OPEN CLOSE
1 132/33 KV 40MVA BBL MW/MVAR WRONG VALUES2 132/33 KV 20MVA TR MVAR NON CURRENT3 132 KV BUS VOLTAGE NON CURRENT
1 132 KV SEHORE CB FAULTY2 132/33KV 20 MVA XMER CB PROCESSES CONNECTION REQUIRED
1 132/33 KV 20 MVA XMER CB NA CLOSE
1 132 KV SHUJALPUR-2 CB NON CURRENT
1 SOE DATA PROCESSES CONNECTION REQUIRED
1 132 KV BAIRAGARH CB OPEN CLOSE
ASHTA 132 KV S/S
ASHTA 400 KV S/S
RAJGARH 220 KV S/S
15-04-2017
ITARSI 220 KV S/S
BETUL 220 KV S/S
SARNI 220 KV S/S
HARDA 132 KV S/S
GUDGAON 132 KV S/S
PACHORE 132 KV S/S
SOE DATA NOT RECEIVED
SARANGPUR 132 KV S/S
SEHORE 132 KV S/S
SOE DATA NOT RECEIVED
BAIRAGRAH 220 KV S/S
HANDIA 220 KV S/S
HOSHANGABAD 220 KV S/S
ICHAWAR 132 KV S/S
KHILCHIPUR 132 KV S/S
Agenda of 57th OCCM of MP 63
1 132 KV JULWANIA-NIMRANI CKT I CB/SOE N/C2 132 KV JULWANIA-NIMRANI CKT II CB/SOE N/C3 132 KV JULWANIA-ANJAD CKT CB/SOE N/C4 132 KV JULWANIA- I/C I CB/SOE N/C5 132 KV JULWANIA- I/C II CB/SOE N/C6 132 KV SENDHWA CB/SOE FAULTY7 400KV BUS 2 KV N/C8 400KV BUS 2 HZ N/C9 220KV BUS 2 KV N/C
10 220KV BUS 2 HZ N/C11 132/33 KV 40 MVA TR CB FAULTY12 400/220KV TRF-1(Sec side) CB FAULTY CLOSE12 400/220KV TRF-2 CB OPEN CLOSE
1 220/132 KV TR OLTC N/A2 132/33 KV TR I CB/OLTC FAULTY3 132/33 KV TR II OLTC N/A4 132 KV NIMRANI I CB FAULTY CLOSE5 132/33 KV 20 MVA TR CB FAULTY OPEN
1 220/132 TR2 160MVA OLTC N/A2 220/132 TR 1 4*40 MVA OLTC N/A3 132 KV CHOTI KHARGONE MVAR N/A4 220KV BUS 2 KV 223 181.3(SCADA VALUE)
1 220 KV BUS COUPLER CB FAULTY CLOSE2 220/132 KV TR 160 MVA (PRIMARY) CB FAULTY CLOSE3 220/132 KV TR 2 160 MVA (SEC) CB OPEN CLOSE
1 132 KV CHAPDA 1 CB FAULTY CLOSE2 132 KV CHAPDA 2 CB FAULTY CLOSE3 132 KV SHANKARGARH 2 CB/MW/MVAR N/A PROCESSES CONNECTION REQUIRED3 220/132 KV 160MVA TR3 CB FAULTY CLOSE4 132 KV GAMESHA FATANPUR 2 CB FAULTY CLOSE5 33KV CAP BANK CB FAULTY CLOSE6 33KV JOHNDEER 2 CB FAULTY CLOSE7 33KV TONK KALAN CB FAULTY CLOSE8 33KV DEWAS PRADHIKARAN CB FAULTY CLOSE9 33KV NEW BAY CB FAULTY CLOSE
10 33KVGAMESHA JAMBODARANI-1 CB FAULTY CLOSE11 33KVGAMESHA JAMBODARANI-2 CB FAULTY CLOSE
1 220 KV BUS TIE CB FAULTY CLOSE2 400 KV BUS TIE CB FAULTY CLOSE3 400 KV BUS COUPLER CB FAULTY CLOSE4 400 KV ISP-1 CB FAULTY CLOSE
1 400 KV REACTOR CB FAULTY2 400 KV BUS COUPLER CB FAULTY OPEN3 220 kV BUS I & II FREQ NOT SHOWING IN DECIMAL POINT
3 220KV BUS COUPLER CB FAULTY CLOSE4 220KV BUS VOLTAGE & FREQUENCY N/C 5 132KV BUS VOLTAGE & FREQUENCY N/C 6 33KV BUS VOLTAGE & FREQUENCY N/C 7 132KV BUS COUPLER CB FAULTY CLOSE8 220/132 TR-2 CB OPEN CLOSE9 132 KV CAP BANK-1 CB FAULTY OPEN
10 33KV DHNERAKALAN CB FAULTY CLOSE11 33KV NAYAGAON CB OPEN CLOSE
1 220/132 KV TR (160 MVA) 2 SECONDARY CB FAULTY CLOSE2 132 KV BUS COUPLER CB FAULTY CLOSE
JULWANIA 400 KV S/S
JULWANIA 220 KV S/S
PROCESSES CONNECTION REQUIRED
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDINDORE 400 KV S/S
CHEGAON 400 KV S/S
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED
BARWAHA 220 KV S/S
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDNEPANAGAR 220 KV S/S
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDDEWAS 220 KV S/S
NEEMUCH 220 KV S/S
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDBADOD 220 KV S/S
Agenda of 57th OCCM of MP 64
3 33kV BAPCHA CB FAULTY CLOSE4 132KV RAJKOT Solar MVAR N/C5 33kV SUZLON-2 CB FAULTY CLOSE5 33kV SUZLON-2 MW,MVAR N/C6 33KV TODAY ENERGY-1 CB FAULTY CLOSE7 33kV BUS CP CB FAULTY CLOSE5 33kV SUZLON-2 MW,MVAR N/C
1 132 KV BUS COUPLER CB FAULTY CLOSE2 33KV CAP BANK CB FAULTY CLOSE3 33KV BUS COUPLER CB FAULTY CLOSE4 33KV BUS TIE CB FAULTY CLOSE
1 400KV 50MVAR BUS REACTOR CB FAULTY CLOSE2 400KV 125MVAR BUS REACTOR CB FAULTY CLOSE3 400KV 125MVAR BUS REACTOR MVAR N/A4 400 KV ISP LINE REACTOR MVAR FUTURE FUTURE5 400 KV SHUJALPUR I MVAR N/A6 220 KV BUS II KV/FREQ N/A
1 132 KV SIDTUBE CB /MW/MVAR N/A8
1 220 KV BUSCOUPLER CB FAULTY CLOSE2 220 KV INDORE CB FAULTY CLOSE
2 220/132 TR 1 & 2 OLTC N/A3 132/33 TR-2 CB/OLTC N/A
1 220 KV BUS -1 KV,HZ N/A2 132/33 KV TR 2 SEC CB FAULTY CLOSE4 33KV CAP BANK CB FAULTY CLOSE
1 220 KV MAHESHWAR 2 CB FAULTY OPEN2 220/132 TR3 MW,MVAR, OLTC N/C3 132/33 TR3 OLTC N/C
1 220/132kV 160MVA TRF-1(SEC SIDE) CB FAULTY CLOSE
1 220 KV NAGDA I CB OPEN CLOSE2 220/132 TR1 OLTC N/C3 220/132 TR2 OLTC N/C4 220/132 TR3 OLTC N/C5 132 KV TARANA I CB OPEN CLOSE6 132 KV CDWT-1&2 MW,MVAR,CB N/C7 132/33 TR3 OLTC N/C
1 220/132 TR1 & TR2 OLTC N/C2 220/132 TR4(SECONDARY SIDE) CB FAULTY3 132KV BUS COUPLER CB FAULTY CLOSE4 220 KV MAIN BUS HZ NOT COMING
1 132KV BUS COUPLER CB FAULTY CLOSE2 132KV GAUTAM CB FAULTY CLOSE2 132KV GAUTAM MW,MVAR NOT COMING3 33KV CAP BANK CB FAULTY CLOSE
INDORE EAST 220 KV S/S
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED
PITAMPUR 220 KV S/S-II
NAGDA 400 KV S/S
PITAMPUR 220 KV S/S
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDNAGDA 220 KV S/S
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED
SHAJAPUR 220 KV S/S
NIMRANI 220 KV S/S
ALL BREAKERS OF 132 SIDE ARE FAULTY EXCEPT 220/132 KV X-MAR II (HV DIDE)SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED
UJJAIN 220 KV S/S
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDINDORE NZ (JETPURA) 220KV S/S
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDINDORE SZ 220KV S/S
RAJGRAH (DHAR) 220 KV S/S
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED
DEPALPUR 132 KV S/S
SANWER 132KV S/SSOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED
Agenda of 57th OCCM of MP 65
4 33/11 KV TR1 CB FAULTY CLOSE5 33/11 KV TR2 CB FAULTY CLOSE6 33KV BUS COUPLER CB FAULTY CLOSE
1 33KV IND NO-4 CB FAULTY CLOSE2 33KV DRP CB FAULTY CLOSE3 33KV DEWAS BNP-2 CB FAULTY CLOSE4 33KV SIYA CB FAULTY CLOSE
1 CAP BANK MVAR N/C 10.662 132KV UJJAIN CB FAULTY OPEN3 132KV BUS COUPLER CB FAULTY CLOSE
1 132KV BUS COUPLER CB FAULTY CLOSE2 33KV BUS COUPLER CB FAULTY CLOSE3 33 KV CAP BANK CB FAULTY CLOSE4 33KV DISCOM CB FAULTY CLOSE5 33KV MADKOTA CB FAULTY CLOSE
1 132/33 KV XMER-1 P MW NOT COMING2 132/33 KV XMER-1 P MVAR NOT COMING3 132/33 KV XMER-1 S MW NOT COMING4 132/33 KV XMER-1 S MVAR NOT COMING5 33KV NARBHERAM MW,MVAR,CB,SOE6 33KV A LOT CB OPEN CLOSE7 33KV PATAN CB OPEN CLOSE8 132/33 KV XMER-3 P MW NOT COMING9 132/33 KV XMER-3 P MVAR NOT COMING
10 132/33 KV XMER-3 S MW NOT COMING11 132/33 KV XMER-3 S MVAR NOT COMING12 33KV TAL CB OPEN CLOSE
3 132/33 XMER CB FAULTY CLOSE4 132KV SARJAN CB FAULTY CLOSE
5 132KV UPPALURU MW,MVAR,CB,SOE6 132KV KSHEMA POWER MW,MVAR,CB,SOE
1 132KV RAILWAY TRAC 1 MW NOT COMING2 132KV RAILWAY TRAC 1 MVAR NOT COMING3 132KV RAILWAY TRAC 1 CB FAULTY CLOSE4 33/11 KV TRF 1 & 2 MW,MVAR,CB,SOE NOT COMING
1 132/33 KV 12.5MVA TR CB,MW,MVAR N/C2 132/33 KV 20MVA TR CB,MW,MVAR N/C3 33KV DEVGARH CB FAULTY CLOSE2 132/33 KV 20MVA TR-4 CB FAULTY CLOSE
1 132KV BHIKANGAON CB FAULTY CLOSE2 132/33 TRF 2 SEC MW,MVAR NOT COMING3 132/33 TRF 2 SEC CB FAULTY CLOSE4 33/11 KV TRF 1 & 2 MW,MVAR,CB,SOE NOT COMING5 33KV MALWA 1&2 MW,MVAR,CB,SOE NOT COMING6 33/11 KV TRF 1 & 2 MW,MVAR,CB,SOE NOT COMING
1 220KV SOUMIL POWER MW,MVAR,CB,SOE NOT COMING2 220KV BUS FREQ3 132 KV BUS FREQ
220 KV S/S DEWASBNP
Telemetry not coming
1 132KV BUS KV NOT COMING CLOSE2 132KV BUS HZ3 132KV BUS COUPLER CB FAULTY CLOSE4 132/33 TRF-1 CB FAULTY CLOSE
132 KV S/S A LOT
Process connection need to be done
220 KV S/S BADNAGAR
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED132 KV S/S AGAR
DEWAS BNP 132 KV S/S
GHOSLA 132 KV S/S
NOT COMINGNOT COMING
132 KV S/S CHAPDA
132 KV S/S CHHEGAON
220 KV S/S DALODA
CONSTANT 50.00
132 KV S/S BAHADURPUR
CONSTANT 50.00
220 KV S/S DHAR
NOT COMING
Agenda of 57th OCCM of MP 66
1 33KV BUS KV NOT COMING CLOSE2 33KV BUS HZ
1 220KV INDORE CB FAULTY CLOSE2 220KV BUS COUPLER CB FAULTY CLOSE
1 132KV DALODA CB FAULTY CLOSE2 132/33KV TRF1 MW,MVAR NOT COMING3 132/33 TRF2(sec side) CB OPEN CLOSE4 33KV CHOUKSEY ENERGY 1 CB,MW,MVAR NOT COMING5 33KV CHOUKSEY ENERGY 2 CB,MW,MVAR2 33/11KV TRF1 MW,MVAR,CB,SOE NOT COMING2 33/11KV TRF2 CB FAULTY
1 132KV RATLAM MW,MVAR NOT COMING2 132KV JICA 1 MW,MVAR NOT COMING3 132KV JICA 2 MW,MVAR NOT COMING4 132KV NAGDA CB OPEN CLOSE5 132/33 KV TRF 2 PRI CB OPEN CLOSE5 132/33 KV TRF 2 SEC CB FAULTY CLOSE
5 33 KV GRASIM CB FAULTY CLOSE
1 132KV ALIRAJPUR CB FAULTY CLOSE2 132KV BUS COUPLER CB FAULTY CLOSE3 33KV CAP BANK MW,MVAR NOT COMING
1 33LKV GATA CB FAULTY CLOSE2 33KV CAP BANK MW,MVAR NOT COMING
1 220/132KV TRF1 CB FAULTY CLOSE2 132KV INTCC-1 CB OPEN CLOSE3 33KV SHIVPUR CB OPEN CLOSE4 132/33 TRF-3 CB FAULTY CLOSE
1 33KV CAP BANK CB FAULTY CLOSE2 33KV DELIGENTIA-1 CB FAULTY CLOSE3 132KV BUS COUPLER CB OPEN CLOSE
1 132KV BUS COUPLER CB FAULTY CLOSE2 33KV SUZLON 2 CB FAULTY CLOSE3 33KV SUZLON 4 CB OPEN CLOSE4 33KV SUZLON 5 CB OPEN CLOSE
NOT COMING220 KV S/S INDORE EAST
132 KV S/S JAORA
NOT COMING
132 KV S/S SAILANA
132 KV S/S KACHROD
132 KV S/S KUKSHI
132 KV S/S MAKDONE
220 KV S/S RATLAM
132 KV S/S RATANGARH
Agenda of 57th OCCM of MP 67
132 KV S/S SHANKARGARH
Telemetry not coming PLCC issue
1 132KV FOCAL ENERGY CB FAULTY CLOSE2 132/33KV TRF CB OPEN CLOSE
1 132KV TRACTION 1 CB FAULTY OPEN2 132/33KV TRF 3& 4 MW,MVAR NOT COMING3 33KV CAP BANK CB FAULTY CLOSE4 132/33KV TRF1 CB OPEN CLOSE5 33KV RAWTI CB FAULTY CLOSE
132 KV S/S SITAMAU
132 KV S/SUWASRA
Agenda of 57th OCCM of MP 68