Suresh BV Iyer D O B: 12 7 1964 QUALIFICATION: B ARCH., M C ENGG HASSAN 1984 – 89 COA/2011/52779;IIA Bangalore [email protected] [email protected] Mo 8904722864 IYER’S SPECIFIC SKILL SETS MICRO DOCUMENT SITE ANALYSIS: 1 | Page

Transcript of MACROSKILLS_12062015

Page 1: MACROSKILLS_12062015

Suresh BV IyerD O B: 12 7 1964 QUALIFICATION: B ARCH., M C ENGG HASSAN 1984 – 89COA/2011/52779;IIA [email protected]@gmail.com

Mo 8904722864

IYER’S SPECIFIC SKILL SETSMICRO DOCUMENT

SITE ANALYSIS:

Contour Dwg analysis, socio/economic survey of project location site analysis as per existing topography hardscape, existing greenery, water bodies, Kharab A and

1 | P a g e

Page 2: MACROSKILLS_12062015

Kharab B Identification, existing Raja Caluveys ,making location map as per CDP 2012 determine land as A.B or C category find out roadwidth and arrive at possible permissible FAR, evaluate property in terms of cost based on proximity to key facilities like Educational Institutions, commercial facilities, Markets, Transportation hubs Accessibility to other major towns, Environmental factors and existing land value based on latestGovt reserve price on the said area, Recognizing land use patterns at the location, climatologically studies and put forth recommendations to the Land Acquisition team on above report based on above criteria as well as govt approved latest Guidance value for the area concerned not forgetting return on investment.

P R O J E C T P L A N N I N G

Conceptual planning as per current Architectural vocabulary and contemporary trends(Examples available in Iyer’s archives) with local sensibilities to provide a clean and appealing façade for the target group of consumer group in the selected range while keeping the feasibility of the project’s viability in terms of maintainability and ease of execution to facilitate speed and economy in construction with simple but novel ideas drawn from the Architect’s massive experience and talent, obtain management’s final approval and proceeding to the next stage.

2 | P a g e

Page 3: MACROSKILLS_12062015

S T A T U T O R Y Dwgs

Adhering to their latest prescribed bye laws and NBC Codes and Architectural Data, CDP and Time savers standard as required for statutory authorities and detailing (Iyer is a COA licensee and is a approved signatory for statutory Dwgs nationally)

W O R K I N G Dwgs

Developing GFC’s (Examples available in Iyer’s archives) for execution in consultation with consultants of various services like Electrical, Sanitary & plumbing, Structural,HVAC, MEP, AAI, MOEF, KSPCB, BSNL, TRAI, Landscaping Consultants, Preparing detailed Estimates using Govt SR (Schedule of Rates, Blr Circle),Specifying methods and materials and finishes and textures, colours and techniques along with vendor specifications and details in consultation with other consultants and team, coordinating with contracts dept for finalization of invitation of bids by execution agencies, short listing, comparative analysis of bid offers evaluation of spread sheets and cost comparisons, price negotiation, and award of contract as per Time, Quality and Cost in that order.

L I A S O N I N G

Co coordinating with local bodies like BBMP, KEB, BWSSB (Examples available in Iyer’s archives) to obtain timely NOC and approval of the proposed Electrical, Sanitary &

3 | P a g e

Page 4: MACROSKILLS_12062015

plumbing, Structural, Dwgs,consult and produce Dwgs dealing with HVAC, MEP, AAI, MOEF, KSPCB, BSNL,to obtain NOC (Iyer is a COA licensee and is a approved signatory for statutory Dwgs nationally)

P R E S E N T A T I O N

Presentation of the completed project in coordination with Ad agency making Hard models using Mount Board, (Examples available in Iyer’s archives) Soft models using Auto Cadd 2012, 3Ds,sketch up, Max, Revit, PhotoShop, Maya, Elevations, extracting realistic 3d Views, Extracting Plans for brochures, (Examples available in Iyer’s archives) Legal Documentation, PPt, Marketing Dept Publicity Et cetera. Desigining web site along with consultant.

D O C U M E N T A T I O N

Production of detailed good for construction Dwgs using Auto cadd, Bently Architecture systems, Revit for project Mgmt, and scheduling, Photo shop for brochures, and web material, List of (List of Dwgs available in Iyer’s archives) Incorporation of revisions, updating and coordinating with team. Coordinating in the production of

4 | P a g e

Page 5: MACROSKILLS_12062015

GFCs/Strl dwgs for pile fdn in sandy or water logged sites (Examples available in Iyer’s archives) Coordinating with Mi Van agencies and consultants for their inputs and interpretation to other consultants on special or specific nuances, preparation of periodic reports on site situation photo documentation Et cetera.

ISO D O C U M E N T A T I O N

Draw up ISO documentation and file the same in coordination with internal auditors and maintain periodic up dates and scrutinize and up date and prepare as and when external ISO auditors make annual reviews. fix responsibility for actions and make weekly follow ups and assess evaluate individual performance and make recommendations regarding non performance or dereliction and failure to produce results and take suitable action to avoid conflict and execution delays and find remedies, evaluate consultants response and track results and take corrective steps to maintain best performance at all times.

G R E E N B U I L D I N G CODES

Explore green building adoption feasibility in proposals cost implications as against popularity quotient to management. using green building products viz a viz terracotta roofing and terracotta wall blocks composite

5 | P a g e

Page 6: MACROSKILLS_12062015

masonry to maintain thermal and structural sustenance and efficiency and plan as per ratings.

I N T E R I O R D E S I G N

Coordinate and conceptualize with client regarding special customization for handicap accessibility and other specific requests, wrt colour, finishes, textures, partitioning, vertical integration of super imposed flats or adjacent flats for special needs of elderly, children with special needs, interior decoration selection of lifestyle consumables, deco elements, LED lighting fixtures, fittings and finishes, POP false ceiling, glass, wooden, and SS finishes, solid wooden wall and floor finishes, to enhance quality of spaces by using innovative materials, colours, textures, fabrics and other finishes as per client budget, in bath and kitchen areas, dining and living areas, strategic lighting air conditioning, realigning, of doors and windows for enhanced light and ventilllation, individualize interiors as per client request to their satisfaction including drawing cost estimates procuring and executing the same with in stipulated time frames.

S I T E S K I L L SPre Acquisition:

6 | P a g e

Page 7: MACROSKILLS_12062015

Coordinating with Govt survey agencies and Consultants in locating site features, soil conservation environmental factor comment o and report on site condition evaluation based on site resources, future prospect, proximity to facilities accessibility utility climatological analysis putting forth recommendations to Mgmt as regards development feasibility with local Socio Economic background, analysis based on SBC, landscape feasibility Et cetera.

Post Acquisition:Marking up building foot print Basement, determine and fix formation levels, trenches ETP area, ramps, lift wells, stair case central core, shear walls, crane location, project start and direction stock yards control offices location offices Mock up apt location site office and other temp infra. Marking up of the plans with mark up agencies using Total Station, marking levels and locations as per GFC’s, briefing consultants, making progress charts and periodic up dateTaking relevant insitu decisions, daily reports MOM’s IOM’s, project status, quantities executed, labor coordination weekly payments,Material inventory, coordinating with clerk of works Weekly progress of work and reporting back to the Management, Issuing circulars, project tracking wrt Time, Quality and Cost in that order,Incorporating better methods Coordinating Mi Van technologies using their Dwgs and skill imparting to special Mi Van (Examples available in Iyer’s archives) teams as per manufacturer Guide lines.

7 | P a g e

Page 8: MACROSKILLS_12062015

O F F I C E S K I L L S

Basic office skills like Microsoft office suit, MS word, MS Excel, Giving power point presentations, writing articles (Examples available in Iyer’s archives) on request by periodicals/papers/blurbs etc, for publicity, Photographing projects in situ and mock up interiors for ad agency, presentation for Mgmt and other agencies ,client meeting, clarification of their doubts coordinating with sales and marketing teams during project launch, ad agencies with providing them with appropriate views and write up, and persuading prospective clients to make an investment, clarify and clear client queries regarding spaces, FAR, CDP, SBUA, Carpet area, zoning and various other FAQs ,monitoring and mentoring and motivating team members through innovative performance based incentives, organizing tours and trivia, get togethers, short excursions so as to keep production of dwgs flawless and timely and avoid costly mistakes and wastage of time, weekly project meetings producing and tracking MOM’s, IOM’s, and appraising Mgmt on project progress and give early warning on delays or various other eventualities, adding to lessons learnt files.

PS:Skills listed above are a part of the candidate’s vast Experience in various areas of construction and forms part of a detailed resume and can be understood only by an equally competent skilled and through professional, most of the skills are hands on and based on team effort and diligence, this document is only for understanding

8 | P a g e

Page 9: MACROSKILLS_12062015

the candidate’s appeal to the recruiter and does not purport to be a offer document in the event of appointment by the recruiter.