The Synchrotron (DESY- II) John Maidment MDE MAC Review Meeting May 2008 DESY

description

MAC Review Meeting May 2008 DESY. Decouple Desy3 Vacuum System New Beamline Vacuum Chambers Replace Kicker Pulsers, Relocate Controls Connect New Cooling Water Facility Install/Test New Power Supplies and Regulation. Shutdown Activities. Tunnel overview. Desy 2. Desy 3. - PowerPoint PPT Presentation

Transcript of MAC Review Meeting May 2008 DESY

Page 1: MAC Review Meeting May 2008 DESY

The Synchrotron (DESY-II)John Maidment MDE

MAC Review Meeting

May 2008

DESY

Page 2: MAC Review Meeting May 2008 DESY

• Decouple Desy3 Vacuum System

• New Beamline Vacuum Chambers

• Replace Kicker Pulsers, Relocate Controls

• Connect New Cooling Water Facility

• Install/Test New Power Supplies and Regulation

Shutdown Activities

Page 3: MAC Review Meeting May 2008 DESY

Tunnel overview

Desy 2

Desy 3

Page 4: MAC Review Meeting May 2008 DESY

In and Ejection

To Petra

FromPia

Page 5: MAC Review Meeting May 2008 DESY

Test beam region

Photons FromInternal Target

Converters

Spectrometer

Page 6: MAC Review Meeting May 2008 DESY

In and Ejection May 08

To Petra(E-Weg)

Page 7: MAC Review Meeting May 2008 DESY

BPM in ejection line

Page 8: MAC Review Meeting May 2008 DESY

Test beam region May 08

Page 9: MAC Review Meeting May 2008 DESY

Test beam outlet to Hall 2 May 08

ShutterCollimator

Page 10: MAC Review Meeting May 2008 DESY

• Replace Kicker Pulsers, Relocate Controls

• Connect New Cooling Water Facility

• Install/Test New Power Supplies and Regulation

Shutdown Activities

Page 11: MAC Review Meeting May 2008 DESY

Kicker Locations

Nebenbunch-kicker

Ki 20

R1

R2

R3

R4

R5

R6

R7

R8

SER

Injektionskicker

Ki 2+ Ki 2-

Dumpkicker

Ki 16

Vertikaler Anregungs-kicker

Ki 12V

Ejektionskicker DORIS

Ki 24R

Horizontaler Anregungs-kicker

Ki 36H

Ejektionskicker PETRA

Ki 40E

e+

e-

e- / e+PIA / Linac II

PETRA III

DORIS

G1 G2 G

3 G4 G

5 G6 G

7 G8

G9

Injektionsspetum

SEPT +/-

Ejektionsseptum PETRA

Sept 42E

Ejektionssepta DORIS

Sept 26AR Sept 26BR

VBB 46 E/R

VBB 44

E/R

HBB R

HBB R HBB R

HBB R

HBB E

HBB E

HB

B E

Page 12: MAC Review Meeting May 2008 DESY

Typical pulser unit May 08

Page 13: MAC Review Meeting May 2008 DESY

• Six units (for the 5 circuits) have been ordered plus 2 general purpose spares

• Dipole retains white circuit• New chokes for quad resonance circuits have been ordered

• Manufacturing schedule has slipped, so:• One unit (sextupole) is here and has been connected• Tunnel has been closed to allow technical tests (albeit at low load

current)

• Three regulation loops, current, voltage, field• Biased cosine set point tables for both I and V• How will the DSP management perform, questions of synchronous

data acquisition etc

New Power Supplies

Page 14: MAC Review Meeting May 2008 DESY

• Desy-II is just a work horse, can accelerate a single bunch with up to 1.3*1010 particles

• Programmable hardware exists ( “Zyklusgenerator”, LTG) • Top-up to Petra has been demonstrated• Injection to Doris using a 6GeV magnet cycle has been

demonstrated

• The existing linac gun allowed positron accumulation of 50 mA in 48 Petra-II bunches in < 3 minutes at 3 Hz

• Doris was refilled using 3*109 positrons per bunch at 6 Hz in under 1 minute

Future Operation in “Top-up” Mode