APRESENTATION
ONSUMMER TRAINING
ATJAYPEE CEMENT
Presented by:
Shashank
7th SEM (ME)
![Page 2: ma seminar on jaypee cement](https://reader034.fdocuments.us/reader034/viewer/2022052504/55268128550346d36e8b4dd8/html5/thumbnails/2.jpg)
JAYPEE REWA PLANT
![Page 3: ma seminar on jaypee cement](https://reader034.fdocuments.us/reader034/viewer/2022052504/55268128550346d36e8b4dd8/html5/thumbnails/3.jpg)
Topics For Discussion
• Introduction of company.
• Manufacturing process of cement.
![Page 4: ma seminar on jaypee cement](https://reader034.fdocuments.us/reader034/viewer/2022052504/55268128550346d36e8b4dd8/html5/thumbnails/4.jpg)
JAYPEE CEMENTS Jaypee cement is a sub division of jaiprakash associates Ltd.
Mr. Jaiprakask Gaur is the Founding father of Jaiprakash
Associates Ltd.
Mr. Manoj Gaur is the Executive chairman of this company.
First plant is Set up in 1986 in REWA District.
3rd largest cement production company in INDIA.
Total cement capacity 21.30 MnTPA.
Capacity of Jaypee Rewa cement plant is 3.50 MnTPA.
![Page 5: ma seminar on jaypee cement](https://reader034.fdocuments.us/reader034/viewer/2022052504/55268128550346d36e8b4dd8/html5/thumbnails/5.jpg)
Use of cement
Production of mortar.
Production concrete.
Construction works
![Page 6: ma seminar on jaypee cement](https://reader034.fdocuments.us/reader034/viewer/2022052504/55268128550346d36e8b4dd8/html5/thumbnails/6.jpg)
CEMENT
Made by heating limestone with small
quantities of other material(such as laterite)
to 1450 degC in a kiln.
Resulting hard substance , called ‘clinker’ .
Clinker grounded with small amount of
gypsum to make ’Ordinary Portland Cement’.
![Page 7: ma seminar on jaypee cement](https://reader034.fdocuments.us/reader034/viewer/2022052504/55268128550346d36e8b4dd8/html5/thumbnails/7.jpg)
RAW MATERIALS
Calcium oxide(CaO)
Silica or (SiO2)
silicon dioxide.
Alumina(Al2O3)
Gypsum(CaSO4.2H20)
![Page 8: ma seminar on jaypee cement](https://reader034.fdocuments.us/reader034/viewer/2022052504/55268128550346d36e8b4dd8/html5/thumbnails/8.jpg)
Mining of Limestone
Crushing of Limestone
Mixing of Raw materials
Grinding of raw material
Clinkerisation
Grinding of clinker
Packing
Transport
![Page 9: ma seminar on jaypee cement](https://reader034.fdocuments.us/reader034/viewer/2022052504/55268128550346d36e8b4dd8/html5/thumbnails/9.jpg)
STEPSIN MANUFACTURING
OFCEMENT
![Page 10: ma seminar on jaypee cement](https://reader034.fdocuments.us/reader034/viewer/2022052504/55268128550346d36e8b4dd8/html5/thumbnails/10.jpg)
Mixing of raw materials
After crushing , the raw materials are mixed .
Depending upon what minerals are in the raw
mixture, there is further addition of desired
minerals such as silica and iron.
![Page 11: ma seminar on jaypee cement](https://reader034.fdocuments.us/reader034/viewer/2022052504/55268128550346d36e8b4dd8/html5/thumbnails/11.jpg)
Certain types of cement also require alumina
oxide.
The mixture is prepared in terms of fixed ratio.
![Page 12: ma seminar on jaypee cement](https://reader034.fdocuments.us/reader034/viewer/2022052504/55268128550346d36e8b4dd8/html5/thumbnails/12.jpg)
RAW MILL This section is
working with the fine grinding of raw material .
The size limit is 80-90 microne.
Grinding of raw material is required for proper burning &calcination .
![Page 13: ma seminar on jaypee cement](https://reader034.fdocuments.us/reader034/viewer/2022052504/55268128550346d36e8b4dd8/html5/thumbnails/13.jpg)
PRE HEATERRaw meal (powder) then goes to pre heater for removal of CO2Preheater temp 850 decg celcius.There are six stage present in preheating tower of first unit at JRP.
![Page 14: ma seminar on jaypee cement](https://reader034.fdocuments.us/reader034/viewer/2022052504/55268128550346d36e8b4dd8/html5/thumbnails/14.jpg)
ROTARY KILNFrom preheater the powder goes to rotary kiln.The kiln is adjusted at an angle so that the powder moves slowly from top to bottom.The temp of the kiln reaches to about 1600 to 1700 degree celcius.
![Page 15: ma seminar on jaypee cement](https://reader034.fdocuments.us/reader034/viewer/2022052504/55268128550346d36e8b4dd8/html5/thumbnails/15.jpg)
COAL MILLLarge size of coal is ground to the size of 90 micron.Coal from coal mill is used to feed kiln and calciner.Outlet tem of coal is different in different seasons.
![Page 16: ma seminar on jaypee cement](https://reader034.fdocuments.us/reader034/viewer/2022052504/55268128550346d36e8b4dd8/html5/thumbnails/16.jpg)
CLINKER
Clinker is the solid material produced by the cement kiln Typically of diameter 3-25 mm It is cooled down to about 60 to 80 deg celcius to obtain quality cement. The clinker goes to the storage area called as clinker silo.
![Page 17: ma seminar on jaypee cement](https://reader034.fdocuments.us/reader034/viewer/2022052504/55268128550346d36e8b4dd8/html5/thumbnails/17.jpg)
CEMENT MILL
The last stage of cement making is final grinding of clinker.
The grinding is done by two types of mill Ball mill. Vertical roller mill.
![Page 18: ma seminar on jaypee cement](https://reader034.fdocuments.us/reader034/viewer/2022052504/55268128550346d36e8b4dd8/html5/thumbnails/18.jpg)
BALL MILL Mixture of clinker and gypsum is transferred to a hopper Then is fed to the mill from the hopper. The mixed material then passes to Pre-crushed chamber.Then the material passes to fine grinding chamber.
![Page 19: ma seminar on jaypee cement](https://reader034.fdocuments.us/reader034/viewer/2022052504/55268128550346d36e8b4dd8/html5/thumbnails/19.jpg)
CEMENT SILOSThere are six cement silos in ‘JAYPEE REWA CEMENT PLANT’capacity of each cement silo is 3000 tons.The cement from silo feed to the bucket elevator.
![Page 20: ma seminar on jaypee cement](https://reader034.fdocuments.us/reader034/viewer/2022052504/55268128550346d36e8b4dd8/html5/thumbnails/20.jpg)
PACKING PLANT
In this section the cement is extracted from several cement silos and fed to the rotary packer for packing in to the bags. The weight of each bag is 50kg.
There are 4 packers used in old packing plant with the capacity of 80-90 TPH each.
And 3 packers are used in new packing plant with the capacity of 100-120 TPH each.
![Page 21: ma seminar on jaypee cement](https://reader034.fdocuments.us/reader034/viewer/2022052504/55268128550346d36e8b4dd8/html5/thumbnails/21.jpg)
TRANSPORT
TRANSPORT
![Page 22: ma seminar on jaypee cement](https://reader034.fdocuments.us/reader034/viewer/2022052504/55268128550346d36e8b4dd8/html5/thumbnails/22.jpg)
THANK YOUFOR YOUR
ATTENTION!!
![Page 23: ma seminar on jaypee cement](https://reader034.fdocuments.us/reader034/viewer/2022052504/55268128550346d36e8b4dd8/html5/thumbnails/23.jpg)