M4 Smart Motorway Project Update July 2019 The NSW Government is building the M4 Smart Motorway project. The first of its kind in NSW, the project will introduce intelligent technology to the M4 Motorway between Mulgoa Road, Penrith and Pitt Street, Mays Hill, to: provide safer, smoother, faster journeys use real time information to monitor and manage traffic flow and incidents use digital signs to update motorists of conditions ahead. M4 Motorway looking east M4 Smart Motorway – what we’re delivering Roper Road to Wallgrove Road widened to 4 lanes 40 emergency breakdown bays 16 new noise walls 41 overhead gantries Pitt Street to The Northern Road

Transcript of M4 Smart Motorway – what we’re delivering · 2020-03-06 · M4 Smart Motorway Project Update...

Page 1: M4 Smart Motorway – what we’re delivering · 2020-03-06 · M4 Smart Motorway Project Update July 2019 The NSW Government is building the M4 Smart Motorway project. The first

M4 Smart MotorwayProject UpdateJuly 2019

The NSW Government is building the M4 Smart Motorway project. The first of its kind in NSW, the project will introduce intelligent technology to the M4 Motorway between Mulgoa Road, Penrith and Pitt Street, Mays Hill, to:

• provide safer, smoother, faster journeys

• use real time information to monitor and manage traffic flow and incidents

• use digital signs to update motorists of conditions ahead.

M4 Motorway looking east

M4 Smart Motorway – what we’re delivering

Roper Road to Wallgrove Road

widened to 4 lanes40 emergency breakdown bays

16 new noise walls

41 overhead gantries Pitt Street to The Northern Road

Page 2: M4 Smart Motorway – what we’re delivering · 2020-03-06 · M4 Smart Motorway Project Update July 2019 The NSW Government is building the M4 Smart Motorway project. The first

M4 Smart Motorway What makes it ‘smart’?• Traffic sensors every 500 metres along the

motorway and at entry ramps and exit ramps will detect changes in traffic flow and speed on the motorway.

• 100+ additional CCTV cameras on poles and bridges will help with both monitoring traffic and responding quickly to traffic conditions and incidents.

• Ramp meters at each entry ramp will control traffic entering the M4 with quick change traffic lights to improve traffic flow. The combined intelligent traffic technologies will help deliver faster, easier and safer journeys.

When the M4 Smart Motorway is up and running in 2020, its ramp meters, CCTV, traffic sensors and digital signs, will work together to transform the journey for motorists on the M4. The next step in this process is the installation of 29 overhead gantries along the M4.

New overhead gantriesWe will install 41 overhead steel gantries along the M4 Motorway between Pitt Street, Mays Hill and The Northern Road.

The gantries will hold Integrated Speed and Lane Use Signs, with one above each lane. These signs will display the current speed limit and can be changed to indicate alternate speed limits or if a lane is closed. The signs will also improve incident response time and management.

Gantry installations will require sections of the M4 Motorway to be closed in both eastbound and westbound directions. To minimise impact on traffic we will install the gantries using weekday night shifts. The M4 Motorway will be closed between 11pm and 4am in the area we are installing the gantries.

Gantry installations began in late June 2019.

Register for updatesRegister for SMS and email updates for M4 Motorway and M4 ramp closures at www.rms.work/m4closures

For more information about the M4 Smart Motorway project or gantry installations, contact our project team on 1800 989 929 or visit the project website at rms.nsw.gov.au/m4smartmotorway

Artist’ impression of the gantries

Roads and Maritime Services | M4 Smart Motorway 2020

Page 3: M4 Smart Motorway – what we’re delivering · 2020-03-06 · M4 Smart Motorway Project Update July 2019 The NSW Government is building the M4 Smart Motorway project. The first

M4 MOTORWAY

MA

MRE

RO

AD

M4 MOTORWAY

M4 MOTORWAY

M4 Smart Motorway - Mamre Road to Reservoir due for completion July 2019.

100km/h speed limit - east of Mamre Road to west of Reservoir Road(80km/h near M7 to M4 on ramps)

Roper Road eastbound on ramp widened and realigned

Four lanes in both directions between Wallgrove Road and Roper Road

Wallgrove Road east and west on ramps extended, widened and realigned

Reservoir Road on ramps upgraded and off ramp traffic lights installed

M4 Smart MotorwayM4 Smart Motorway

Reconciliatio nRo

ad

Reservo

ir Ro

ad

Briens R

oad

Easte

rn

Road

Pro

spect H

ighw

ay

Fe

rrersR

o

ad

Do

ons

ide

Ro

ad

Woodstock Avenue

Hor

sley

Roa

d

Old

W

allgrove Road

The HorsleyDrive

Ersk

ine

Park

Roa

d

Mam

re Ro

ad

Car

lisle

Ave

nue

Gre

ysta

nes

Ro

ad

Ro

oty

Hill

Ro

adNorth

The N

orthern R

oad

Dunheved Road

Caddens Road

Werringto

nR

oad

Great Western Highway

Fo

rres

ter

Ro

ad

Roper Road

The

No

rthe

rn R

oad

Park

er

Stre

et

Mul

goa

Road

Castlereag

h Ro

ad

Cum

ber

land

Highway

Cum

berla

nd Highw

ay

Wal

lgro

veR

oad

Great Western Highway

Wa llg

roveR

oad

ROOTYHILL

MT DRUITT

MINCHINBURY

ERSKINE PARK

OXLEY PARK

STMARYS

WERRINGTONCOUNTY

KINGSWOOD

ORCHARDHILLS

Werrington Arterial Interchange

PENRITH

GLENMOREPARK

COLYTON

ST CLAIR

HORSLEYPARK

EASTERNCREEK

FAIRFIELD

SMITHFIELDWETHERILLPARK

GREYSTANESGUILD-FORD

WESTMEAD

PROSPECT GIRRAWEEN

Installing maintenance bays, vehicle detection loops and emergency phones. Upgrading power and Intelligent Transport System (ITS) infrastructure.

Stage 2

Realigning, extending and widening ramps at Burnett Street, Coleman Street and Cumberland Highway. Installing ramp meters and ramp meter signals.

Stage 2

Realigning, extending and widening ramps at Mamre Road interchange.

Stage 3

Installing maintenance bays, vehicle detection loops and emergency phones. Upgrading power and Intelligent Transport System (ITS) infrastructure.

Stage 3

Installing maintenance bays, vehicle detection loops and emergency phones. Upgrading power and Intelligent Transport System (ITS) infrastructure.

Stage 1

Realigning, extending and widening ramps at Reservoir Road, Wallgrove Road and Roper Road. Installing ramp meters and ramp meter signals.

Widening the M4 Motorway to four lanes in both directions from Roper Road to the M7 Interchange.

Stage 1

Installing ramp meters and ramp meter signals at The Northern Road and Mamre Road.

Stage 3

Stage 1

Light HorseInterchange

Wallgrove RoadInterchange

Burnett StreetInterchange

Coleman Street

Interchange

Reservoir RoadInterchange

Prospect Highway

InterchangeCumberland

HighwayInterchange

WesternSydney

Parklands

Prospect Reservoir

Ropes Creek

WesternSydney

Regional Park

M4

SouthC

reek

M7

Mulgoa RoadInterchange

The Northern Road Interchange

Mamre Road Interchange

Roper Road InterchangeM4

Completion July 2019 Completion 2020Completion 2020

Reduce fatalitiesand serious injury

Better and more

reliable tripsfor people, business and freight

Catering for Western Sydney’s growth

Easingcongestion

Improveroad alignment

Improvetravel speeds

Delivering improvements to

air qualityImprovingsafety

Improvingtraffic flow

Increaseroad capacity

Reduce fatalitiesand serious injury

Increaseroad capacity

Better and more

reliable tripsfor people, business and freight

Improveroad alignment

Delivering improvements to

air quality

Improving

safety

Improvingtraffic flow

Easingcongestion

Catering forSydney’s growth

Improvetravel speeds

Roper Road eastbound on ramp with two lanes and quick change traffic lights

Roads and Maritime Services | M4 Smart Motorway 2020 Roads and Maritime Services | M4 Smart Motorway 2020 Roads and Maritime Services | M4 Smart Motorway 2020

Page 4: M4 Smart Motorway – what we’re delivering · 2020-03-06 · M4 Smart Motorway Project Update July 2019 The NSW Government is building the M4 Smart Motorway project. The first

Speed limits on M4 MotorwayWe have recently changed the speed limit for the ten kilometre section of the M4 Motorway between Reservoir Road and Mamre Road to 100km/h. There are still sections of the M4 where reduced speed limits are in place while construction continues.

There is construction happening all along the project length, even though some of our work is not always visible from the road. Speed limits and safety barriers along the M4 keep the road safe for both motorists and workers.

When the project is finished, customers will experience reduced travel times on the M4 Smart Motorway. In the meantime, we appreciate your patience while we ensure the safety of our workers and motorists.

Thank you for your patience!

July 2019 RMS 19.1299

Privacy Roads and Maritime Services (“RMS”) is subject to the Privacy and Personal Information Protection Act 1998(“PPIP Act”) which requires that we comply with the Information Privacy Principles set out in the PPIP Act. All information in correspondence is collected for the sole purpose of assisting in the delivery this project. The information received, including names and addresses of respondents, may be published in subsequent documents unless a clear indication is given in the correspondence that all or part of that information is not to be published. Otherwise RMS will only disclose your personal information, without your consent, if authorised by the law. Your personal information will be held by RMS at 27 Argyle Street, Parramatta. You have the right to access and correct the information if you believe that it is incorrect.