Transcript of m Usman Akram,Chp 1

  • 8/6/2019 m Usman Akram,Chp 1

    1/21

  • 8/6/2019 m Usman Akram,Chp 1

    2/21

    Change

    y Transformation

    y

    Enhancementy Improvement

    y Innovation

    y creativity

    y Planning

    y

    Staffingy Organizing

    y Leading

    y Controlling

    Management

  • 8/6/2019 m Usman Akram,Chp 1

    3/21

    yWhich ultimately result in increase of

    three things

    ProductivityEffectiveness

    Efficiency

  • 8/6/2019 m Usman Akram,Chp 1

    4/21

    To solve the problem.

    Or enhance the product image etc.

  • 8/6/2019 m Usman Akram,Chp 1

    5/21

    CHAPTER1

    ySCOPE OF MANAGING

    CHANGE

  • 8/6/2019 m Usman Akram,Chp 1

    6/21

    yThis chapter tells us about the how the

    change is processes through differentsteps . What ways are involve in change

    process to achieve victories.

  • 8/6/2019 m Usman Akram,Chp 1

    7/21

    Scopeofchange managementand specificchangemanagement system needs to bedefined

  • 8/6/2019 m Usman Akram,Chp 1

    8/21

    Sixprimaryissues

    Cycleofchange

    Process ofchange

    Levels ofchanges

    Sequenceofchanges

    Commitmentofemployees

    Quickwinprojects forresults

  • 8/6/2019 m Usman Akram,Chp 1

    9/21

    y Points ofview ofidentifyvarious stagesy Change agentfollow

    y Plan ,model , implementandinstitutionalizeorganizationalchanges

    y Institutionalize;y

    To makepartofa structureand usually wellestablish system

    y Accordingto Morgan;y As afirst step inthecycleofchange, itis imperative thatthose

    desirous ofchangingtheirorganizations continuously monitorand scantheexternalenvironment surroundingtheirorganizationsandthepressureitgenerates.

  • 8/6/2019 m Usman Akram,Chp 1

    10/21

    Continued

    For non profit organization

    A change in donors strategic intentetc. Revisitvision , mission

    For profit organizationSupplyanddemand

    Changein Govt. regulatoryFramework

    Poorfinancialperformance

    Changeinfinancial structure

  • 8/6/2019 m Usman Akram,Chp 1

    11/21

    y Current state and internal challenges

    y Internal challenges

    Individual behavior

    AttitudeKnowledge

    Competencies

    y Also related to internal process

  • 8/6/2019 m Usman Akram,Chp 1

    12/21

    y Change has to plan and model

    y Change program as well as implementation strategy

    y Conceptual framework A structure for supporting or enclosing something else, especially a

    skeletal support used as the basis for something being constructed.

    y Changes in existing system processes and policies.

  • 8/6/2019 m Usman Akram,Chp 1

    13/21

    Continued..

    In the end

    y For sustainability of organization some measures willrequired.

    y Which assure that changes implemented in organization

    are properly injected in firms culture.

    y For example South Asian context.

  • 8/6/2019 m Usman Akram,Chp 1

    14/21

    y Questions to ensure effectiveness of change outcomes.

    1. Whether the change program is top-down or bottom-

    up.

    2. Employees commitment to organizational change.

    3. How to deal with employees at different levels.

    4. Sequencing the change initiatives.

  • 8/6/2019 m Usman Akram,Chp 1

    15/21

    Continued

    TOP-DOWN VERSUS BOTTOM-UP

    Field experience

    Non-profit organization

    Delivery of services

    Improving internal operational efficiency Managing external threats.

    Profit organization

  • 8/6/2019 m Usman Akram,Chp 1

    16/21

    y Roles are crucial for ensuring the effective

    implementation for change.

    Change champion

    Change sponsors

    Change agents

    Change advocates

    Change targets

  • 8/6/2019 m Usman Akram,Chp 1

    17/21

    Four interconnected levels of change.

    First level relates to individuals employees. Attitude

    etc

    Second level is of work processes and to make themeffective and less cost.

    Third at the time functional unit in an organization

    can suffer from certain malfunctioning.

    Finally a major change initiatives attempt to

    turnaround an organization.

  • 8/6/2019 m Usman Akram,Chp 1

    18/21

    y Process of change related to sequencing various step

    in designing & implementing large scale change.

    Without Realizing the consequences of change.

    Restructuring of an organization without due

    regard

    Strategy-structure-people-culture.

  • 8/6/2019 m Usman Akram,Chp 1

    19/21

    yNo large scale change is possible

    y Buy-in occurs in various ways

    Formal communication

    WorkshopsSenior managers talk to their teams

    y Universally accepted/golden principle

    Communicate, communicate and

    COMMUNICATE

  • 8/6/2019 m Usman Akram,Chp 1

    20/21

    y Quick-win projects:-

    Break up the project in small

    achievable targets.

    y Short term victories:-

    Celebrate short term victories for

    employees motivation.

  • 8/6/2019 m Usman Akram,Chp 1

    21/21