M Street SE-SW Meeting 01-12-2012
-
Upload
anacostiawaterfront -
Category
Documents
-
view
290 -
download
3
Transcript of M Street SE-SW Meeting 01-12-2012
January 12, 2012
SafewayArena Stage
Fish Market
The WharfM Street / South Capitol Intersection
USDOT Navy YardEntrance
The YardsNationals Ball Park
To consider current transportation conditions, review the planned future land uses and to determine solutions for potential impacts within the study area. Improve safety, mobility and the quality of local connections to the regional transportation infrastructure.
Solicit input from the expertsWork with community in advance of developmentGather dataTransit considerationsVehicular considerationsPedestrian considerationsBicycle considerations
PN Hoffman development: The Wharf560 new residential units600 hotel rooms800,000 sf Office400,000 sf Retail and other2500 parking spacesEliminate Water St.
Arena StageStation Place
2.3 Million sf mix of residential, office, retail4th St. reopened
Ft. McNair new gateBuzzard Pt
Akridge development/ 100 V St, SW 2.7 Million sf developmentMarina Place 100 residential units + retailDouglas Development at 1900 Half St. SW 500,000 sf development (currently in use by FBI)Coast Guard moving to St. Elizabeths in 2013, leaves 600,000 sf office space
Tour bus parkingTransit routesMovement of goods
Focus on daily trafficOpening of 11th St. bridge Opening of Eye St. east of New Jersey Ave The Yards : 4 million sf of mixed use developmentAccess to freewaysPedestrian traffic
Connection between Ballpark and Barracks RowConnection between Ballpark and SW Waterfront once developed
Circulator routeAccess to the Capitol Complex
35 Million SF of new developmentPedestrian trafficNew traffic patterns developing with opening of 11th St. BridgeParking Green line study by BID11th St. south of Penn Ave Access to Barracks RowMovement of goodsTransit routes
Final ReportFindings and recommendations
Concept DevelopmentTraffic circulation plans Parking plan Bicycle/Pedestrian plans
Transportation Analysis and EvaluationMultimodal Performance
Modeling Traffic/Transit Simulation Parking Analysis
Street Functional Classification
Multimodal Demand EstimateExisting Conditions 2018 and 2035 Baseline 2035 demand for proposed
alternatives
Data CollectionReview of existing data from
previous studies Develop DCP Collect data
Sub Task Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12
Review Previous StudiesDevelop DCPCollect Data
Existing conditions2018 baseline demand2035 baseline demand2035 forecast for proposed concepts
Existing Conditions MMLOS2018 and 2035 MMLOS2035 hot-spot traffic simulationExisting and future parking conditionsExisting and Future transit conditions2035 roadway functional classification
Technical WorkshopsDevelop draft traffic circulation plansEvaluation of proposed alternativesDevelop draft parking plansDevelop draft ped/bike plansGenerate final concepts
Develop draft reportDDOT ReviewProduce final report
Final Report
Concept Development
Transportation Analysis and Evaluation
Multimodal Demand Estimate
Data Collection
Travel Demand Forecast•MWCOG Models•Future Land Use•Regional Trip Patterns•2011, 2018, and 2035 auto
and transit demand•Sub-area analysis
Post-Processing
•Demand Smoothing and Balancing•Quality Review•AM and PM Peak Turning
Movements
Planning Model VISUM•OD Estimation•Traffic Assignment (based
on link volumes and turning movements)• Transit Planning•Scenario Testing
Detailed Modeling• Intersection analysis•Corridor Evaluation•Spot Location Evaluation•Proposed Alternatives•Transit Modeling•Ped/Bike Modeling•3D Visualizations•Multi Modal Level of
Service Analysis
• Multimodal Level of Service (MMLOS) Analysis for Urban Streets
• Each urban street right-of-way is shared by 4 major types of users:• Automobile Drivers
• Transit Passengers
• Bicyclists
• Pedestrians
•
10’ 12’5’ 5’8’5’ 5’8’
70 ft ROW
12’
Identify traffic impactsMitigation strategies
Parking strategiesBike/ped facility plansTransitTravel Demand ManagementSignal prioritization optionsLane channelizations
Localized physical improvements
Southwest Waterfront Stage 1 PUD Traffic Impact Study (2010)M Street SE CSO Project Traffic Impact Study (2011)Virginia Avenue Road Closure Draft Traffic Analysis Report (2009)11th Street Bridge TMP Tasks (13th St On-Ramp Closure Analysis) (2011)St. Elizabeths Campus Traffic Study (Frederick Douglas & 11th St Bridges data) (2009-2010)South Capitol Street Corridor EIS (2007-2008)I-395/I-695 Interchange Justification Report (2010)Washington Nationals Ballpark Traffic Operations and Parking Plan (2007)14th Street Bridge Corridor EIS – Existing Traffic Conditions Report (2007)11th St Bridges –Final Environmental Impact Statement (Jun 2007)Anacostia Waterfront – Transportation Master Plan - 2008 UpdateAnacostia Waterfront – Frederick Douglass Memorial Bridge, Alignment Study Report (Mar 2007)Anacostia Gateway Transportation Study - Final Report (Sept 2004)
The AWI Framework Plan (Nov 2003)Plans of Proposed DC Streetcar System Anacostia – Operations and Maintenance Facility (Apr 2008)Anacostia Waterfront – Transportation Architecture GuidelinesAWI South Capitol St – Streetscape CoordinationAnacostia Light Rail: Preliminary Architectural Concepts (Apr 2004)Anacostia Waterfront – Middle Anacostia River Crossings Transportation Study (Jun 2005)Middle Anacostia River Crossings Transportation Study – Long-term Improvements – Draft (Nov 2004)Middle Anacostia River Crossings Transportation Study – Near-term & Mid-term Improvements – Draft (Nov 2004)Transportation Impact Study Addendum – Anacostia Gateway Government Center (2005)Traffic Impact Study – Marina View, Washington DC, (Dec 2006)Center City Action Agenda (2008)