M-000 · 2020. 1. 9. · pressure reducing valve circuit setter or balancing valve globe valve...

41
T UP TYPE LENGTH F 1 F M1 (1L) A PS FS DN (1L) EJ (E) A (X) CFM DEGREE FAHRENHEIT ENTERING PRESSURE TS T AIR DEVICE CALL OUT. TYP. OF (X) DEVICES. FLEXIBLE DUCT CONNECTION CEILING ACCESS PANEL DETAIL DESIGNATION EQUIPMENT DESIGNATION POINT OF CONN. (CONN. NEW TO EXISTING) POINT OF DISCONNECTION ARROW INDICATES DIRECTION OF FLOW RISE IN DIRECTION OF AIRFLOW DROP IN DIRECTION OF AIRFLOW CONSTANT AIR VOLUME GALLONS PER MINUTE INCH WATER COLUMN MOTOR CONTROL CENTER MINIMUM CIRCUIT AMP BRITISH THERMAL UNIT PER HOUR BRAKE HORSE POWER DIRECT DIGITAL CONTROL ENERGY EFFICIENT RATIO FEET WATER COLUMN PRESSURE DROP/ DIFFERENTIAL POUNDS PER SQUARE INCH GAUGE UNLESS OTHERWISE NOTED VENT THROUGH ROOF MAX. OVER CURRENT PROTECTION VARIABLE FREQUENCY DRIVE REVOLUTION PER MINUTE RETURN DUCT UP SUPPLY DUCT UP EXHAUST DUCT UP SUPPLY DUCT DOWN RETURN DUCT DOWN EXHAUST DUCT DOWN ROUND DUCT DOWN ROUND DUCT UP TRANSITION-RECT. TO RECT. OR ROUND TO ROUND TRANSITION-RECT. TO ROUND CAPPED DUCTWORK DUCT W/ INTERNAL LINING 1L= 1" THICK 2L= 2" THICK MOTORIZED DAMPER BACKDRAFT DAMPER CONICAL SPIN-IN FITTING W/ MANUAL VOLUME DAMPER SYMBOL DESCRIPTION ABBR RETURN/ EXHAUST AIR FLOW SYMBOL SUPPLY AIR FLOW SYMBOL RETURN AIR GRILLE LOW PRESSURE FLEXIBLE DUCT SUPPLY SLOT DIFFUSER SUPPLY DIFFUSER- 4-WAY THROW SUPPLY DIFFUSER- 3-WAY THROW SUPPLY DIFFUSER- 2-WAY THROW SUPPLY DIFFUSER- 1-WAY THROW CUBIC FEET PER HOUR CUBIC FEET PER MINUTE EXTERNAL STATIC PRESSURE STANDARD AIR CUBIC FEET PER MINUTE TOTAL STATIC PRESSURE HEATING WATER SUPPLY HEATING WATER RETURN BRINE WATER SUPPLY BRINE WATER RETURN CONDENSER WATER SUPPLY CONDENSER WATER RETURN SPACE TEMPERATURE SENSOR PRESSURE SWITCH CONTROL AIR (PNEUMATIC) BALL VALVE W/ HOSE CONNECTION STRAINER W/ BLOW-OFF & CAPPED HOSE- END CONNECTION TEMPERATURE/ PRESSURE RELIEF VALVE PIPE CAP OR PLUG PRESSURE GAUGE W/GAUGE COCK FLEXIBLE PIPE CONNECTOR THERMOMETER W/THERMOWELL EXPANSION JOINT ECCENTRIC REDUCER CONCENTRIC REDUCER PRESSURE/ TEMPERATURE PORT TAPS FOR MECHANICAL AND PLUMBING EQUIPMENT AS INDICATED ON THE DIVISION 21, 22, AND 23 DRAWINGS, THE DIVISION 21, 22 AND 23 CONTRACTORS SHALL COORDINATE WITH DIVISION 26 CONTRACTOR TO CONNECT ALL MECHANICAL AND PLUMBING EQUIPMENT INDICATED ON THE MECHANICAL AND PLUMBING DRAWINGS. COORDINATE FOR COMPLETE WIRING, STARTERS, AND DISCONNECTING MEANS FOR ALL MECHANICAL AND PLUMBING EQUIPMENT. CR/RG 2"HWS PIPE SIZE/ PIPE TYPE DESCRIPTION ABBR SYMBOL DESCRIPTION ABBR SYMBOL DESCRIPTION ABBR SYMBOL DESCRIPTION ABBR SYMBOL DESCRIPTION ABBR SYMBOL DESCRIPTION ABBR SYMBOL DESCRIPTION ABBR SYMBOL DESCRIPTION SYMBOL SINGLE DOUBLE DESCRIPTION ABBR SYMBOL SINGLE DOUBLE F M SECTION VIEW SHEET NO. SECTION NO. POC POD SHEET KEY NOTES (R) (E) REMOVE EXISTING DN AFF NTS AMB AFG TOP BTUH CFH DB DDC CV DEFL DIA ENT °F DWG EER FPI FPM GPH GPM FT WC GAL IN WC LBS MBH MIN LVG MAX DOWN ABOVE FINISHED FLOOR ABOVE FINISHED GRADE TOP OF PIPE (AFF) NOT TO SCALE AMBIENT CONSTANT VOLUME DECIBEL DRY-BULB DEFLECTION DIAMETER DRAWING FINS PER INCH FEET PER MINUTE GALLON GALLONS PER HOUR NC PRESS PSIG O.C. P.D. PWL QTY RH SS TYP SPECS SQ UON VEL. VTR WB W/ W/O POUNDS LEAVING MAXIMUM THOUSAND BTUH MINIMUM NOISE CRITERIA ON CENTER QUANTITY SOUND POWER LEVEL RELATIVE HUMIDITY SPECIFICATIONS SQUARE STAINLESS STEEL TYPICAL VELOCITY WET-BULB WITH WITHOUT F-1 BHP FLA HP HZ KW MCA MCC MOCP RLA RPM FULL LOAD AMP HORSEPOWER HERTZ KILOWATTS RUNNING LOAD AMP AFTER FILTER AF AH B BB CAV CC CH EF FC FF FT FS HC HU MUA PF P RF SF ST VAV VFD WF AIR HANDLING UNIT BOILER BASEBOARD COOLING COIL CHILLER EXHAUST FAN FAN COIL UNIT FINAL FILTER FLASH TANK FLOOR SINK HEATING COIL HUMIDIFIER SECTION MAKE-UP AIR UNIT PRE-FILTER PUMP RETURN FAN SUPPLY FAN SOUND TRAP VARIABLE AIR VOLUME WATER FILTRATION AL ALUMINUM COEFFICIENT OF PERFORMANCE EFFICIENCY ISOLATOR METAL OPENING REFERENCE SHEET COP EFF ISOL. MTL OPNG REF SHT DUCT DROP VANED ELBOW CONICAL TAP FD FIRE DAMPER FIRE SMOKE DAMPER. CONTROLLED BY DUCT SMOKE DETECTOR MANUAL VOLUME DAMPER W/ LOCKING QUADRANT FSD MD VD BD CD CD CD CD LD AP BOTTOM OF DUCT (AFF) BOD TOP OF DUCT (AFF) TOD CFM DP EA ESP MA OA DISCHARGE PLENUM EXHAUST AIR MAKE-UP AIR OUTSIDE AIR RA SA SCFM S.P. TG TSP RETURN AIR SUPPLY AIR STATIC PRESSURE TRANSFER GRILLE A FLOW SWITCH FS PS (E) T EXISTING THERMOSTAT NEW THERMOSTAT T HWS HWR BWS BWR CWS CWR DR V EQUIPMENT DRAIN VENT PLUG VALVE PV P&T CR ER EJ U UNION AIR VENT AV FC PG ELBOW UP ELBOW DOWN TEE UP TEE DOWN TPR STR STEAM TRAP POUNDS PER HOUR LOW PRESSURE STEAM SUPPLY LOW PRESSURE STEAM CONDENSATE RETURN PUMPED CONDENSATE RETURN PRESSURE REDUCING VALVE CONDENSATE RETURN UNIT DESCRIPTION ABBR SYMBOL LPS LPR PR PRV CRU LBS/HR DRAIN VALVE W/ HOSE END CONN. CHECK VALVE W/ INDICATION OF FLOW DIRECTION PRESSURE REDUCING VALVE CIRCUIT SETTER OR BALANCING VALVE GLOBE VALVE (STRAIGHT PATTERN) GLOBE VALVE (ANGLE PATTERN) BUTTERFLY VALVE AUTOMATIC TEMP. CONTROL VALVE, 2-WAY STRAINER W/ BLOW-OFF & CAPPED HOSE-END CONNECTION OUTSIDE STEM AND YOKE DESCRIPTION ABBR SYMBOL DV CV PRV SV SOLENOID VALVE CS,BV GLV BFV BV TCV GLV BALL VALVE STR GATE VALVE GV OS&Y SD SMOKE DAMPER S DUCT MOUNTED SMOKE DETECTOR LENGTH EXISTING PIPING TO BE REMOVED (DASHED LINE) EXISTING PIPING (LIGHT SOLID LINE) EXISTING DUCTWORK NO CHANGE (LIGHT SOLID LINE) EXISTING DUCTWORK TO BE REMOVED (DASHED LINE) CFM OR DEVICES. AIR DEVICE CALL OUT. TYP. OF (X) A CFM SIZE (X) A (X) MFS MAXIMUM FUSE SIZE DIESEL OIL GAUGE DIESEL OIL PUMP DOG FOG DOP FOP (E) (R) WIRE MESH SCREEN WMS SQ.FT SQUARE FEET GENERAL: 1. UNLESS OTHERWISE NOTED, THE WORK DESCRIBED ON THE PLANS AND SPECIFICATIONS SHALL INCLUDE THE FURNISHING AND INSTALLATION OF ALL LABOR AND MATERIALS NECESSARY FOR COMPLETE AND OPERATIONAL HVAC, FIRE PROTECTION AND PLUMBING SYSTEMS. CONTRACTOR SHALL FURNISH THESE EVEN IF ITEMS REQUIRED TO ACHIEVE THIS (I.E. OFFSETS, ISOLATION AND BALANCING DEVICES, MAINTENANCE CLEARANCES, ETC.) ARE NOT SPECIFICALLY SHOWN. 2. DATA GIVEN ON THE DRAWINGS IS AS EXACT AS COULD BE SECURED. ABSOLUTE ACCURACY IS NOT GUARANTEED AND THE CONTRACTOR SHALL OBTAIN AND VERIFY EXACT LOCATIONS, MEASUREMENTS, LEVELS, SPACE REQUIREMENTS, POTENTIAL CONFLICTS WITH OTHER TRADES, ETC. AT THE SITE AND SHALL SATISFACTORILY ADAPT HIS WORK TO THE ACTUAL CONDITIONS OF THE JOB. 3. THE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND SHALL NOT BE SCALED. THEY SHOW CERTAIN PHYSICAL RELATIONSHIPS WHICH MUST BE ESTABLISHED WITHIN THE DIVISION 23 WORK AND ITS INTERFACE WITH OTHER WORK. ESTABLISHING THIS RELATIONSHIP IN THE FIELD IS THE EXCLUSIVE RESPONSIBILITY OF THE CONTRACTOR. THIS DIVISION SHALL COORDINATE ITS WORK WITH ALL DIVISIONS OF THE WORK AND ADJUST ITS WORK AS REQUIRED BY THE ACTUAL CONDITIONS OF THE PROJECT. A. THE CONTRACTOR SHALL VISIT THE SITE BEFORE SUBMITTING A BID TO BECOME THOROUGHLY FAMILIAR WITH THE ACTUAL CONDITIONS OF THE PROJECT. NO EXTRAS WILL BE ALLOWED DUE TO LACK OF KNOWLEDGE OF EXISTING CONDITIONS. B. CERTAIN SYSTEMS REQUIRE ENGINEERING OF INSTALLATION DETAILS BY CONTRACTOR. UNLESS FULLY DETAILED IN THE CONTRACT DOCUMENTS, SUCH ENGINEERING IS THE EXCLUSIVE RESPONSIBILITY OF THE CONTRACTOR. C. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE WHERE CLEARANCES ARE LIMITED, AND WHERE INSTALLATION DRAWINGS OR SCHEMATICS, "CONSTRUCTION DRAWINGS", OR COORDINATION DRAWINGS MAY BE REQUIRED IN ACCORDANCE WITH, OR IN EXCESS OF, THOSE REQUIRED BY THE SPECIFICATIONS. THE CONTRACTOR SHALL PREPARE ALL SUCH COORDINATION DRAWINGS AS PART OF THE BASE CONTRACT. 4. THESE NOTES ONLY SUPPLEMENT, AND DO NOT REPLACE, THE SPECIFICATIONS. 5. DEFINITIONS AND TERMINOLOGY A. THE DEFINITIONS OF DIVISION 1 AND THE GENERAL CONDITIONS OF THIS SPECIFICATION ALSO APPLY TO THE DIVISION 23 CONTRACT DOCUMENTS. B. "CONTRACT DOCUMENTS" CONSTITUTE THE DRAWINGS, SPECIFICATIONS, GENERAL CONDITIONS, PROJECT MANUALS, ETC., PREPARED BY ENGINEER (OR OTHER DESIGN PROFESSIONAL IN ASSOCIATION WITH ENGINEER) FOR CONTRACTOR'S BID OR CONTRACTOR'S NEGOTIATIONS WITH THE OWNER. THE DIVISION 23 DRAWINGS AND SPECIFICATIONS PREPARED BY THE ENGINEER ARE NOT CONSTRUCTION DOCUMENTS. C. "CONSTRUCTION DOCUMENTS", "CONSTRUCTION DRAWINGS", AND SIMILAR TERMS FOR DIVISION 23 WORK REFER TO INSTALLATION DIAGRAMS, SHOP DRAWINGS AND COORDINATION DRAWINGS PREPARED BY THE CONTRACTOR USING THE DESIGN INTENT INDICATED ON THE ENGINEER'S CONTRACT DOCUMENTS. THESE SPECIFICATIONS DETAIL THE CONTRACTOR'S RESPONSIBILITY FOR "ENGINEERING BY CONTRACTOR" AND FOR PREPARATION OF CONSTRUCTION DOCUMENTS. D. "FURNISH" MEANS TO "SUPPLY" AND USUALLY REFERS TO AN ITEM OF EQUIPMENT. E. "INSTALL" MEANS TO "SET IN PLACE, CONNECT AND PLACE IN FULL OPERATIONAL ORDER". F. "PROVIDE" MEANS TO "FURNISH AND INSTALL". G. "EQUIVALENT" MEANS "MEETS THE SPECIFICATIONS OF THE REFERENCE PRODUCT OR ITEM IN ALL SIGNIFICANT ASPECTS." SIGNIFICANT ASPECTS SHALL BE AS DETERMINED BY THE ARCHITECT/ENGINEER. H. "WORK BY OTHER(S) DIVISIONS"; "RE: XX DIVISION", AND SIMILAR EXPRESSIONS MEANS WORK TO BE PERFORMED UNDER THE CONTRACT DOCUMENTS, BUT NOT NECESSARILY UNDER THE DIVISION OR SECTION OF THE WORK ON WHICH THE NOTE APPEARS. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO COORDINATE THE WORK OF THE CONTRACT BETWEEN HIS/HER SUPPLIERS, SUBCONTRACTORS AND EMPLOYEES. IF CLARIFICATION IS REQUIRED, CONSULT ARCHITECT/ENGINEER BEFORE SUBMITTING BID. I. BY INFERENCE, ANY REFERENCE TO A "CONTRACTOR" OR "SUB-CONTRACTOR" MEANS THE ENTITY WHICH HAS CONTRACTED WITH THE OWNER FOR THE WORK OF THE CONTRACT DOCUMENTS. J. "ENGINEER" MEANS THE DESIGN PROFESSIONAL FIRM WHICH HAS PREPARED THESE CONTRACT DOCUMENTS. ALL QUESTIONS, SUBMITTALS, ETC. OF THIS DIVISION SHALL BE ROUTED THROUGH THE ARCHITECT TO THE ENGINEER (THROUGH PROPER CONTRACTUAL CHANNELS). EXISTING BUILDING: 1. THE CONTRACTOR'S ATTENTION IS CALLED TO THE FACT THAT THE EXISTING BUILDING WILL BE OCCUPIED BY THE OWNER DURING CONSTRUCTION. CONTINUED OPERATION OF THE FACILITY SHALL NOT BE HINDERED BY THIS WORK. THE CONTRACTOR SHALL ACCOUNT FOR ALL ADDITIONAL COSTS WHICH MAY BE INCURRED BY HIM DUE TO THE DIFFICULTY OF WORKING OVER AND AROUND EMPLOYEES, SPORTING EVENTS AND CONCERTS, EQUIPMENT, ETC.; AND DUE TO THE HOURS OF THE DAY IN WHICH AN AREA MAY BE AVAILABLE WHEN SUBMITTING HIS BID. 2. MAINTAIN A MARK-UP SET OF DRAWINGS WHICH INDICATE VARIATIONS IN THE ACTUAL INSTALLATION FROM THE ORIGINAL DESIGN. SURRENDER DRAWINGS TO OWNER UPON COMPLETION. INCORPORATE THESE NOTES INTO THE AS-BUILDING DRAWINGS. 3. COORDINATE ALL PENETRATIONS OF THE FLOOR SLAB PRIOR TO COMMENCING WORK. UTILIZE X-RAY AND VISUAL INVESTIGATION OF EXISTING CONDITIONS AS REQUIRED PRIOR TO DRILLING OR CUTTING. COORDINATE ALL NEW PENETRATIONS WITH OTHER DIVISIONS OF THE WORK. ALL CONTRACTORS ARE INDIVIDUALLY RESPONSIBLE FOR ALL PENETRATIONS REQUIRED BY THEIR DIVISIONS. ELECTRICAL COORDINATION: 1. VERIFY THE ELECTRICAL SERVICE PROVIDED BY THE ELECTRICAL CONTRACTOR BEFORE ORDERING ANY MECHANICAL EQUIPMENT REQUIRING ELECTRICAL CONNECTIONS. 2. PROVIDE PREMIUM EFFICIENCY MOTORS (NEMA STANDARD MG1-2003, TABLES 12-12 AND 12-13) WITH 1.15 SERVICE FACTOR ON ALL EQUIPMENT, MOTORS SHALL BE CAPABLE OF OPERATING CONTINUOUSLY AT 105°F UNDER JOBSITE CONDITIONS AND ALTITUDE. 3. UNLESS NOTED OTHERWISE, ALL MECHANICAL EQUIPMENT SHALL BE PROVIDED WITH HOA SWITCH AND STARTER COMPATIBLE WITH EQUIPMENT AND BMS SYSTEM. STARTERS SHALL BE PROVIDED BY DIVISION 23 UNLESS IN A MOTOR CONTROL CENTER. ALL DISCONNECTS SHALL BE FURNISHED BY DIVISION 26. 4. THE ELECTRICAL POWER FOR CERTAIN EQUIPMENT PROVIDED UNDER DIVISION 23 HAS NOT BEEN SPECIFICALLY INDICATED ON THE ELECTRICAL DRAWINGS AND MUST BE PROVIDED BY AND FIELD COORDINATED BY THE DIVISION 23 TRADE REQUIRING SUCH POWER. 5. SUFFICIENT POWER FOR THIS PURPOSE SHALL BE FURNISHED AS "SPARE", DEDICATED CIRCUIT CAPACITY IN DIVISION 26'S PANELBOARDS. ALL WIRING, CONDUIT AND ELECTRICAL DEVICES DOWNSTREAM OF THE PANELBOARDS IS THE RESPONSIBILITY OF THE DIVISION 23 TRADE REQUIRING THE POWER UNLESS OTHERWISE SHOWN ON THE ELECTRICAL DRAWINGS. SUCH EQUIPMENT IS HEREBY DEFINED AS: A. ELECTRICAL HEAT TRACE. REQUIRED HEAT TRACE LOCATIONS, CAPACITIES AND SPECIFICATION ARE SHOWN OR INDICATED ON THE DRAWINGS. PROVIDE ELECTRICAL HEAT TRACING ON ALL PIPES THAT ARE SUBJECT TO FREEZING, THIS INCLUDES AREAS LIKE LOADING DOCK, INTAKE/RELIEF/EXHAUST SHAFTS, ETC. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION. B. TEMPERATURE CONTROL PANELS AND LINE VOLTAGE POWER FOR 24V CONTROL TRANSFORMERS. REQUIRED CONNECTION ARE INCLUDED IN DIVISION 23 09 00 AND WILL BE SHOWN BY THAT CONTRACTOR'S CONTROL SUBMITTAL DRAWINGS. INSTALLATION: 1. SUSPEND EACH TRADE'S WORK SEPARATELY FROM THE STRUCTURE. DUCTWORK SHALL BE HELD TIGHT TO STRUCTURE EXCEPT WHERE OTHERWISE SHOWN. 2. INSTALL ALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS UNLESS SPECIFICALLY INDICATED OTHERWISE OR WHERE LOCAL CODES OR REGULATIONS TAKE PRECEDENCE. 3. PROVIDE MANUFACTURER'S RECOMMENDED SERVICE CLEARANCE AROUND ALL EQUIPMENT REQUIRING SAME. 4. PROVIDE FOR SAFE CONDUCT OF THE WORK, CAREFUL REMOVAL AND DISPOSITION OF MATERIALS AND PROTECTION OF PROPERTY WHICH IS TO REMAIN UNDISTURBED. 6. ISOLATE ALL PRESSURIZED PIPE (CHILLED WATER, STEAM, ETC.) EACH RISER, BRANCH, PIECE OF EQUIPMENT, AND AREA SERVED. 7. NO CHILLED WATER OR CONDENSER WATER LINES SHALL BE LOCATED EXPOSED IN FINISHED SPACES OR BELOW THE BUILDING SLAB UNLESS SHOWN OTHERWISE ON THE DRAWINGS. 8. ALL CURBS, ROOF JACKS, ROOF THIMBLES, ROOF DRAINS, ETC. SHALL BE COMPATIBLE WITH ROOFING SYSTEM TO BE PROVIDED. REFERENCE ARCHITECTURAL DIVISION FOR REQUIRED FLASHING DETAILS. 9. MECHANICAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL CONCRETE EQUIPMENT PAD DIMENSIONS, BASED ON THE FINAL EQUIPMENT SELECTION, TO THE STRUCTURAL AND GENERAL CONTRACTOR FOR INCLUSION IN THOSE CONTRACTOR'S WORK AS DESCRIBED BY THE GENERAL CONTRACTOR. 10. UNDER THE BASE CONTRACT, THE CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIALS NECESSARY TO SPLIT EQUIPMENT INTO MULTIPLE PIECES TO FACILITATE RIGGING TO FINAL INSTALLED LOCATION. CONTRACTOR SHALL REASSEMBLE THE EQUIPMENT AND TEST TO CONFIRM PROPER OPERATION AND MAINTAIN ALL THE MANUFACTURERS WARRANTEES. 11. WARRANTY: AT A MINIMUM, THE ENTIRE MECHANICAL SYSTEM SHALL BE WARRANTED AGAINST DEFECTS IN MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE (1) YEAR AFTER ACCEPTANCE OF THE SYSTEM BY THE OWNER. REFER TO INDIVIDUAL SPECIFICATION SECTIONS FOR SPECIFIC WARRANTY REQUIREMENTS. DUCTWORK INSTALLATION: 1. SEAL ALL SEAMS (LONGITUDINAL AND TRANSVERSE) AIR TIGHT WITH SEALANT PER SPECIFICATIONS. 2. DUCT DIMENSIONS ARE INSIDE CLEAR. 3. DIFFUSER NECK SIZE IS SAME AS FLEXIBLE DUCT SIZE. 4. UNLESS OTHERWISE NOTED, ALL CHANGES IN DIRECTION SHALL BE MADE WITH RADIUS ELBOWS WITH RADIUS TO CENTERLINE EQUAL TO 1.5 DUCT WIDTH. 5. WHERE REQUIRED FOR SPACE CONSTRAINTS, PROVIDE MITERED ELBOWS WITH TURNING VANES AS FOLLOWS: A. FOR DUCT WIDTHS OF 36" OR LESS, PROVIDE MANUFACTURED SINGLE WIDTH TURNING VANES, WITH NO TRAILING EDGES AND SPACING IN ACCORDANCE WITH SMACNA DUCT CONSTRUCTION STANDARDS FOR "STANDARD SPACING". B. USE DOUBLE THICKNESS (AIRFOIL) BLADES WITHOUT TRAILING EDGES FOR DUCT WIDTHS GREATER THAN 36". 6. BRANCH LINES: A. MAKE ALL TAPS TO ROUND DUCTWORK WITH CONICAL TEES. B. MAKE ALL TAPS TO RECTANGLE DUCTWORK WITH 45° ENTRY OR CONICAL SPIN IN TO ROUND. C. INCLUDE DAMPERS AT ALL BRANCH LINES. 7. DUCT SIZES NOT CALLED OUT SHALL BE DETERMINED BASED ON 0.08" S.P. LOSS OR LESS PER 100 FT. OF LENGTH. 8. INCLUDE DAMPERS AT ALL BRANCH LINES, WHERE SHOWN ON THE DRAWINGS, AND WHERE OTHERWISE REQUIRED FOR BALANCING. DAMPERS SHALL BE INSTALLED A MINIMUM OF 3'-0" FROM ANY REGISTER. PIPE INSTALLATION: 1. ALL PIPING SHALL BE ADEQUATELY SUPPORTED FROM THE BUILDING STRUCTURE TO PREVENT SAGGING, POCKETING, SWAYING OR DISPLACEMENT BY MEANS OF HANGERS AND SUPPORTS. PIPING IS NOT TO BE SUPPORTED BY EQUIPMENT. 2. PROVIDE DIELECTRIC UNIONS BETWEEN DISSIMILAR MATERIALS. 3. PROVIDE MANUAL AIR VENTS AND CAPPED HOSE-END DRAINS WITH ISOLATION VALVES AT PIPING HIGH AND LOW POINTS. 4. WELD PIPE IN ACCORDANCE WITH APPLICABLE CODES AND STANDARDS. WELDERS SHALL BE CERTIFIED FOR TYPE OF WORK BEING PERFORMED. 5. FLUSH OUT PIPING AND REMOVE CONTROL DEVICES BEFORE PERFORMING PRESSURE TEST. DO NOT USE PIPING SYSTEM VALVES TO ISOLATE SECTIONS WHERE TEST PRESSURE EXCEEDS VALVE PRESSURE RATING. PRESSURIZE PIPING AT AS SPECIFIED IN THE SPECIFICATION OR TO 100 PSIG MINIMUM. IF LEAKAGE IS OBSERVED OR IF TEMPERATURE COMPENSATED PRESSURE DROP EXCEEDS 1% OF TEST PRESSURE, REPAIR LEAKS AND RETEST. DO NOT USE AIR PRESSURE TO TEST PLASTIC PIPE. 6. PROVIDE SUPPORT UNDER ELBOWS ON PUMP SUCTION AND DISCHARGE LINES. 7. ALL STRAINERS SHALL BE FURNISHED WITH A "ROUGHING" SCREEN AND TWO (2) SCREENS FOR NORMAL OPERATION. INSTALL STRAINER WITH ROUGHING SCREEN AND OPERATE SYSTEM FOR 24 HOURS MINIMUM (RUN DOMESTIC WATER SYSTEMS AT MAX FLOW FOR A MINIMUM OF ONE HALF (1/2) HOUR. REMOVE ROUGHING SCREEN AND INSTALL NORMAL SCREEN, AFTER TWO WEEKS OF NORMAL OPERATION INSTALL NEW NORMAL SCREEN. 8. PIPING SIZES SHALL BE BASED ON 2' OR LESS HEAD LOSS PER 100 FEET OF LENGTH. VELOCITIES SHALL NOT EXCEED 10 FEET PER SECOND. 9. INSTALL ALL PIPING TO ALLOW FOR EXPANSION AND CONTRACTION WITHIN THE PIPING SYSTEM. ENSURE ALL REQUIRED PIPE EXPANSION WILL OCCUR IN THE PROPER DIRECTION AND SEGMENT OF PIPE. PROPERLY ANCHOR (RE: SPECIFICATIONS) ALL PIPING REQUIRING EXPANSION/CONTRACTION ISOLATION. COORDINATE PIPE EXPANSION/CONTRACTION TO PREVENT DAMAGE TO ANY AND ALL BUILDING COMPONENTS. 10. PROVIDE ISOLATION VALVES AT EVERY HYDRONIC BRANCH LINE WHERE INDICATED OR NOT. CONDENSATE DRAINAGE: 1. PROVIDE CONDENSATE DRAINAGE FOR ALL COOLING COILS AND OVERFLOW PANS. 2. ROUTE CONDENSATE PIPING, FULL SIZE OF DRIP PAN CONNECTION, TO NEAREST CODE APPROVED RECEPTACLE. CUTTING, PATCHING AND DEMOLITION: 1. KEEP DEMOLITION & CUTTING TO MINIMUM REQUIRED FOR PROPER EXECUTION OF WORK. 2. BE RESPONSIBLE FOR ALL CUTTING AND PATCHING NECESSARY FOR THE COMPLETION OF THE WORK. 3. NO CUTTING (NOT SHOWN ON THE CONTRACT DOCUMENTS) SHALL BE DONE WITHOUT THE APPROVAL OF THE ARCHITECT AS TO LOCATIONS, METHOD AND EXTENT OF THE CUTTING. 4. REPAIR ALL ACCIDENTAL OR INTENTIONAL DAMAGE TO MATCH EXISTING CONSTRUCTION WITH NO NOTICEABLE DIFFERENCE IN CONTINUITY, APPEARANCE OR FUNCTION. 5. DEMOLISH AND CAP ALL INDICATED PIPING BACK AT NEAREST MAIN. STRUCTURE: 1. DO NOT PENETRATE STRUCTURAL MEMBERS. ALL EQUIPMENT SUPPORTS SHALL BE ATTACHED TO THE LOAD BEARING MEMBERS OF STRUCTURAL ELEMENTS. DO NOT OVER-STRESS ANY STRUCTURAL MEMBERS. CONTACT STRUCTURAL ENGINEER FOR ALLOWABLE LOADS FOR SPECIFIC MEMBERS. 2. DO NOT UTILIZE POWDER DRIVEN ANCHORS FOR ANY LOCATIONS WHICH REQUIRE THE LOAD TO BE HELD IN TENSION. SEE STRUCTURAL DIVISION FOR ADDITIONAL RESTRICTIONS. 3. SEE ALSO STRUCTURAL DIVISION FOR ACCEPTABLE ANCHORING AND SUPPORT MEANS, METHODS, AND LOCATIONS. 4. PROVIDE FLEXIBLE CONNECTORS, EXPANSION LOOPS, EXPANSION JOINTS, ADDITIONAL FITTINGS OR EQUIVALENT TO ACCOMMODATE THE THERMAL EXPANSION OF THE BUILDING THROUGH STRUCTURAL EXPANSION JOINTS. PROVIDE SUCH FITTING AT EVERY PIPE, DUCT, CONDUIT, ETC. CROSSING OF A STRUCTURAL EXPANSION JOINT. FIRE STOPPING: 1. FIRE STOPPING REQUIREMENT: PENETRATIONS THROUGH RATED WALLS AND FLOORS SHALL BE SEALED WITH A MATERIAL CAPABLE OF PREVENTING THE PASSAGE OF FLAMES AND HOT GASSES WHEN SUBJECTED TO THE REQUIREMENTS OF THE TEST STANDARD SPECIFIC FOR FIRE STOPS ASTM-E-814. ACCEPTANCE MATERIALS INCLUDE: DOW CORNING RTV FIRE STOP FOAM FOR BARE PIPE, METAL CONDUIT, AND ELECTRICAL CABLE; 3M FIRE DAM 150 CAULK FOR BARE PIPE, METAL CONDUIT, AND BUILDING CONSTRUCTION; GAPS 3M FS-195 INTUMESCENT STRIPS FOR INSULATED PIPES, PLASTIC PIPE OR CONDUIT, AND ELECTRICAL CABLE. SCOPE CLARIFICATION NOTES: 1. THESE DOCUMENTS SERVE TO DEFINE THE NATURE OF THE SYSTEMS, LEVEL OF CONTROL AND FINISH, RELATIONSHIPS WITH OTHER BUILDING SYSTEMS, AND GENERAL DESIGN INTENT OF THIS DIVISION'S WORK. THE CONTRACTOR SHALL EXAMINE THE DOCUMENTS OF ALL TRADES TO COMPLETELY FAMILIARIZE HIM/HERSELF WITH THE VARIOUS CONCEPTS PRESENTED BY OTHER TRADES AND ADAPT THIS WORK AND ANY ASSOCIATED PRICING ACCORDING. WHERE CONFLICTS EXIST BETWEEN THESE DOCUMENTS AND THOSE OF OTHER DIVISIONS, THE MORE STRINGENT (AS DETERMINED BY THE ENGINEER) SHALL TAKE PRECEDENCE. IN PARTICULAR, WHERE ARCHITECTURAL BACKGROUNDS INDICATE PROGRAMMATIC DIFFERENCES IN ROOM LOCATIONS, ROOM FUNCTIONS, PLUMBING FIXTURE COUNTS, CEILING TYPES, RATED CONSTRUCTION, CLEARANCES, OR ROOM RELATIONSHIPS, THE ARCHITECTURAL DRAWINGS SHALL TAKE PRECEDENCE AND THIS CONTRACTOR SHALL ADAPT HIS/HER WORK ACCORDINGLY WHILE MAINTAINING THE DESIGN INTENT REPRESENTED BY THE DOCUMENTS OF THIS DIVISION. 2. PROVIDE FIRE STOPPING ON ALL PIPES, DUCTS, DEVICES, ETC. PENETRATING ALL FIRE RATED CONSTRUCTION ASSEMBLIES. 3. EQUIPMENT SHOWN IS NOT NECESSARILY TO SCALE. 4. THE DRAWINGS ARE DIAGRAMMATIC IN NATURE. THE CONTRACTOR IS RESPONSIBLE FOR ALL OFFSETS, TRANSITIONS, ELBOWS, ETC. AS REQUIRED IN DUCTWORK, PIPING, SUPPORTS, ETC. TO COMPLETE HIS/HER WORK IN A CLEAN, FUNCTIONAL INSTALLATION. 5. THIS CONTRACTOR IS RESPONSIBLE FOR ALL SLEEVES FOR PENETRATIONS THROUGH SLABS AND BEAMS REQUIRED BY THE INTENT OF THE SCOPE OF WORK INDICATED ON THE DRAWINGS. COORDINATION OF QUANTITY AND LOCATIONS OF ALL PENETRATIONS SHALL BE DONE BY THIS CONTRACTOR DURING THE SHOP DRAWINGS PROCESS FOR REVIEW BY THE STRUCTURAL ENGINEER. 6. ALL COMBINATION FIRE/SMOKE DAMPERS SHALL HAVE END SWITCH PACKAGE FOR REMOTE STATUS MONITORING, REMOTE OVERRIDE CAPABILITY AND HIGH LIMIT TEMPERATURE SENSOR PREVENTING DAMPER REOPENING WHEN DUCT TEMPERATURE IS ABOVE DAMPER'S UL555S LISTING. RATED ASSEMBLY DUCT PENETRATIONS: 1. PROVIDE COMBINATION FIRE/SMOKE DAMPERS IN ALL SUPPLY, RETURN AND EXHAUST DUCTS PENETRATING SHAFT ENCLOSURES, FLOOR PENETRATIONS, 1-HR AND 2-HR FIRE BARRIERS, AND SMOKE BARRIERS. REFER TO ARCHITECTURAL PLANS, A-200 SERIES SHEETS, FOR RATED ASSEMBLY TYPES AND LOCATIONS. MECHANICAL SHEET LIST TABLE Sheet Number Sheet Title M-000.00 MECHANICAL LEGEND AND NOTES M-010.00 MECHANICAL SCHEDULES M-011.00 MECHANICAL SCHEDULES M-101.00 MECHANICAL DEMO PLAN - N.W. QUADRANT EL.48 M-102.00 MECHANICAL DEMO PLAN - N.E. QUADRANT EL.48 M-201.00 MECHANICAL PLAN - N.W. QUADRANT EL.48 M-500.00 MECHANICAL ENLARGED DEMO PLAN - FUTURE CHILLER PLANT M-501.00 MECHANICAL ENLARGED PLAN - CHILLER PLANT M-502.00 MECHANICAL ENLARGED PLANS - CENTRAL MER M-503.00 MECHANICAL PLAN - STAIRS M-600.00 MECHANICAL RISER DIAGRAM M-700.00 MECHANICAL DETAILS I M-701.00 MECHANICAL DETAILS II M-702.00 MECHANICAL DETAILS III M-703.00 MECHANICAL DETAILS IV M-704.00 MECHANICAL DETAILS V M-705.00 MECHANICAL CONTROLS I M-706.00 MECHANICAL CONTROLS II M-707.00 MECHANICAL CONTROLS III PROJ. NO. DWG. No. SCALE DWG. TITLE DATE PLOTTED CHECKED DRAWN REVISIONS/ISSUES DO NOT SCALE THE DRAWINGS DESCRIPTION DATE 1605.05-3 CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AND REPORT ANY OMISSIONS OR DISCREPANCIES TO THE ARCHITECT BEFORE PROCEEDING WITH THE WORK. SEAL G:\xl center ice chiller - dv18025.01\CAD\Mech\M-000.00_DV18025.01.dwg 09 Jan '20 - 11:37am FILENAME: PLOTDATE: XREFS: 9 JAN 2020 XL CENTER Tel (416) 591 8999 Fax(416) 591 9087 14 Duncan Street 4th Floor Toronto, Ontario, CA M5H 3G8 Tel (212) 986 3700 Fax (212) 687 6467 CO N S U L T I N G E N G I N E E R S P. C. CONSULTING ENGINEERS Tel (310) 842 8700 Fax (310) 842 7700 Severud Associates engineers 1 CIVIC CENTER PLAZA HARTFORD, CT CHILLER PLANT RELOCATION ISSUED FOR BID 2020-01-09 1 AS NOTED ME ME M-000.00 MECHANICAL LEGEND AND NOTES

Transcript of M-000 · 2020. 1. 9. · pressure reducing valve circuit setter or balancing valve globe valve...

  • TUP

    TYPELENGTH

    F1

    FM1

    (1L)

    A

    PS

    FS

    DN

    (1L)

    EJ

    (E)

    A (X)CFM

    DEGREE FAHRENHEIT

    ENTERING

    PRESSURE

    TS

    T

    AIR DEVICE CALL OUT. TYP.OF (X) DEVICES.

    FLEXIBLE DUCT CONNECTION

    CEILING ACCESS PANEL

    DETAIL DESIGNATION

    EQUIPMENT DESIGNATION

    POINT OF CONN. (CONN. NEWTO EXISTING)

    POINT OF DISCONNECTION

    ARROW INDICATES DIRECTIONOF FLOW

    RISE IN DIRECTION OF AIRFLOW

    DROP IN DIRECTION OFAIRFLOW

    CONSTANT AIR VOLUME

    GALLONS PER MINUTE

    INCH WATER COLUMN

    MOTOR CONTROL CENTER

    MINIMUM CIRCUIT AMP

    BRITISH THERMAL UNIT PERHOUR

    BRAKE HORSE POWER

    DIRECT DIGITAL CONTROL

    ENERGY EFFICIENT RATIO

    FEET WATER COLUMN

    PRESSURE DROP/DIFFERENTIAL

    POUNDS PER SQUARE INCHGAUGE

    UNLESS OTHERWISE NOTED

    VENT THROUGH ROOF

    MAX. OVER CURRENTPROTECTION

    VARIABLE FREQUENCY DRIVE

    REVOLUTION PER MINUTE

    RETURN DUCT UP

    SUPPLY DUCT UP

    EXHAUST DUCT UP

    SUPPLY DUCT DOWN

    RETURN DUCT DOWN

    EXHAUST DUCT DOWN

    ROUND DUCT DOWN

    ROUND DUCT UP

    TRANSITION-RECT. TORECT. OR ROUND TOROUND

    TRANSITION-RECT. TOROUND

    CAPPED DUCTWORK

    DUCT W/ INTERNAL LINING1L= 1" THICK 2L= 2" THICK

    MOTORIZED DAMPER

    BACKDRAFT DAMPER

    CONICAL SPIN-IN FITTING W/MANUAL VOLUME DAMPER

    SYMBOL DESCRIPTIONABBR

    RETURN/ EXHAUST AIR FLOWSYMBOL

    SUPPLY AIR FLOW SYMBOL

    RETURN AIR GRILLE

    LOW PRESSURE FLEXIBLE DUCT

    SUPPLY SLOT DIFFUSER

    SUPPLY DIFFUSER-4-WAY THROW

    SUPPLY DIFFUSER-3-WAY THROW

    SUPPLY DIFFUSER-2-WAY THROW

    SUPPLY DIFFUSER-1-WAY THROW

    CUBIC FEET PER HOUR

    CUBIC FEET PER MINUTE

    EXTERNAL STATIC PRESSURE

    STANDARD AIR CUBIC FEET PERMINUTE

    TOTAL STATIC PRESSURE

    HEATING WATER SUPPLY

    HEATING WATER RETURN

    BRINE WATER SUPPLY

    BRINE WATER RETURN

    CONDENSER WATER SUPPLY

    CONDENSER WATER RETURN

    SPACE TEMPERATURE SENSOR

    PRESSURE SWITCH

    CONTROL AIR (PNEUMATIC)

    BALL VALVE W/ HOSECONNECTION

    STRAINER W/ BLOW-OFF &CAPPED HOSE- ENDCONNECTION

    TEMPERATURE/ PRESSURERELIEF VALVE

    PIPE CAP OR PLUG

    PRESSURE GAUGE W/GAUGECOCK

    FLEXIBLE PIPE CONNECTOR

    THERMOMETER W/THERMOWELL

    EXPANSION JOINT

    ECCENTRIC REDUCER

    CONCENTRIC REDUCER

    PRESSURE/ TEMPERATUREPORT TAPS

    FOR MECHANICAL AND PLUMBING EQUIPMENT ASINDICATED ON THE DIVISION 21, 22, AND 23 DRAWINGS,THE DIVISION 21, 22 AND 23 CONTRACTORS SHALLCOORDINATE WITH DIVISION 26 CONTRACTOR TOCONNECT ALL MECHANICAL AND PLUMBINGEQUIPMENT INDICATED ON THE MECHANICAL ANDPLUMBING DRAWINGS. COORDINATE FOR COMPLETEWIRING, STARTERS, AND DISCONNECTING MEANS FORALL MECHANICAL AND PLUMBING EQUIPMENT.

    CR/RG

    2"HWS PIPE SIZE/ PIPE TYPE

    DESCRIPTIONABBRSYMBOL

    DESCRIPTIONABBRSYMBOL

    DESCRIPTIONABBRSYMBOL

    DESCRIPTIONABBRSYMBOL

    DESCRIPTIONABBRSYMBOL

    DESCRIPTIONABBRSYMBOL

    DESCRIPTIONABBRSYMBOL

    DESCRIPTIONSYMBOLSINGLEDOUBLE

    DESCRIPTIONABBRSYMBOLSINGLEDOUBLE

    FM

    SECTION VIEW SHEET NO.

    SECTION NO.

    POC

    POD

    SHEET KEY NOTES

    (R)

    (E)

    REMOVE

    EXISTING

    DN

    AFF

    NTS

    AMB

    AFG

    TOP

    BTUH

    CFH

    DB

    DDC

    CV

    DEFL

    DIA

    ENT

    °F

    DWG

    EER

    FPI

    FPM

    GPH

    GPM

    FT WC

    GAL

    IN WC

    LBS

    MBH

    MIN

    LVG

    MAX

    DOWN

    ABOVE FINISHED FLOOR

    ABOVE FINISHED GRADE

    TOP OF PIPE (AFF)

    NOT TO SCALE

    AMBIENT

    CONSTANT VOLUME

    DECIBEL

    DRY-BULB

    DEFLECTION

    DIAMETER

    DRAWING

    FINS PER INCH

    FEET PER MINUTE

    GALLON

    GALLONS PER HOUR

    NC

    PRESS

    PSIG

    O.C.

    P.D.

    PWL

    QTY

    RH

    SS

    TYP

    SPECS

    SQ

    UON

    VEL.

    VTR

    WB

    W/

    W/O

    POUNDS

    LEAVING

    MAXIMUM

    THOUSAND BTUH

    MINIMUM

    NOISE CRITERIA

    ON CENTER

    QUANTITY

    SOUND POWER LEVEL

    RELATIVE HUMIDITY

    SPECIFICATIONS

    SQUARE

    STAINLESS STEEL

    TYPICAL

    VELOCITY

    WET-BULB

    WITH

    WITHOUT

    F-1

    BHP

    FLA

    HP

    HZ

    KW

    MCA

    MCC

    MOCP

    RLA

    RPM

    FULL LOAD AMP

    HORSEPOWER

    HERTZ

    KILOWATTS

    RUNNING LOAD AMP

    AFTER FILTERAF

    AH

    B

    BB

    CAV

    CC

    CH

    EF

    FC

    FF

    FT

    FS

    HC

    HU

    MUA

    PFP

    RF

    SF

    ST

    VAV

    VFD

    WF

    AIR HANDLING UNIT

    BOILER

    BASEBOARD

    COOLING COIL

    CHILLER

    EXHAUST FAN

    FAN COIL UNIT

    FINAL FILTER

    FLASH TANK

    FLOOR SINK

    HEATING COIL

    HUMIDIFIER SECTION

    MAKE-UP AIR UNIT

    PRE-FILTERPUMP

    RETURN FAN

    SUPPLY FAN

    SOUND TRAP

    VARIABLE AIR VOLUME

    WATER FILTRATION

    AL ALUMINUM

    COEFFICIENT OF PERFORMANCE

    EFFICIENCY

    ISOLATOR

    METAL

    OPENING

    REFERENCE

    SHEET

    COP

    EFF

    ISOL.

    MTL

    OPNG

    REF

    SHT

    DUCT DROP

    VANED ELBOW

    CONICAL TAP

    FD FIRE DAMPER

    FIRE SMOKE DAMPER.CONTROLLED BY DUCTSMOKE DETECTOR

    MANUAL VOLUMEDAMPER W/LOCKING QUADRANT

    FSD

    MD

    VD

    BD

    CD

    CD

    CD

    CD

    LD

    AP

    BOTTOM OF DUCT (AFF)BOD

    TOP OF DUCT (AFF)TOD

    CFM

    DP

    EA

    ESP

    MA

    OA

    DISCHARGE PLENUM

    EXHAUST AIR

    MAKE-UP AIR

    OUTSIDE AIR

    RA

    SA

    SCFM

    S.P.

    TG

    TSP

    RETURN AIR

    SUPPLY AIR

    STATIC PRESSURE

    TRANSFER GRILLE

    A

    FLOW SWITCHFS

    PS

    (E) T EXISTING THERMOSTAT

    NEW THERMOSTATT

    HWS

    HWR

    BWS

    BWR

    CWS

    CWR

    DR

    V

    EQUIPMENT DRAIN

    VENT

    PLUG VALVEPV

    P&T

    CR

    ER

    EJ

    U UNION

    AIR VENTAV

    FC

    PG

    ELBOW UP

    ELBOW DOWN

    TEE UP

    TEE DOWN

    TPR

    STR

    STEAM TRAP

    POUNDS PER HOUR

    LOW PRESSURE STEAM SUPPLY

    LOW PRESSURE STEAMCONDENSATE RETURN

    PUMPED CONDENSATE RETURN

    PRESSURE REDUCING VALVE

    CONDENSATE RETURN UNIT

    DESCRIPTIONABBRSYMBOL

    LPS

    LPR

    PR

    PRV

    CRU

    LBS/HR

    DRAIN VALVE W/ HOSE ENDCONN.

    CHECK VALVE W/ INDICATIONOF FLOW DIRECTION

    PRESSURE REDUCING VALVE

    CIRCUIT SETTER OR BALANCINGVALVE

    GLOBE VALVE (STRAIGHTPATTERN)

    GLOBE VALVE (ANGLEPATTERN)

    BUTTERFLY VALVE

    AUTOMATIC TEMP. CONTROLVALVE, 2-WAYSTRAINER W/ BLOW-OFF &CAPPED HOSE-ENDCONNECTION

    OUTSIDE STEM AND YOKE

    DESCRIPTIONABBRSYMBOL

    DV

    CV

    PRV

    SV SOLENOID VALVE

    CS,BV

    GLV

    BFV

    BV

    TCV

    GLV

    BALL VALVE

    STR

    GATE VALVEGV

    OS&Y

    SD SMOKE DAMPER

    S DUCT MOUNTED SMOKEDETECTOR

    LENGTH EXISTING PIPING TO BEREMOVED (DASHED LINE)

    EXISTING PIPING(LIGHT SOLID LINE)

    EXISTING DUCTWORKNO CHANGE(LIGHT SOLID LINE)

    EXISTING DUCTWORK TOBE REMOVED (DASHEDLINE)

    CFMOR

    DEVICES.

    AIR DEVICE CALLOUT. TYP. OF (X)

    A CFMSIZE (X)

    A (X)

    MFS MAXIMUM FUSE SIZE

    DIESEL OIL GAUGE

    DIESEL OIL PUMP

    DOGFOG

    DOPFOP

    (E)

    (R)

    WIRE MESH SCREENWMS

    SQ.FT SQUARE FEET

    GENERAL:1. UNLESS OTHERWISE NOTED, THE WORK DESCRIBED ON THE PLANS

    AND SPECIFICATIONS SHALL INCLUDE THE FURNISHING ANDINSTALLATION OF ALL LABOR AND MATERIALS NECESSARY FORCOMPLETE AND OPERATIONAL HVAC, FIRE PROTECTION ANDPLUMBING SYSTEMS. CONTRACTOR SHALL FURNISH THESE EVEN IFITEMS REQUIRED TO ACHIEVE THIS (I.E. OFFSETS, ISOLATION ANDBALANCING DEVICES, MAINTENANCE CLEARANCES, ETC.) ARE NOTSPECIFICALLY SHOWN.

    2. DATA GIVEN ON THE DRAWINGS IS AS EXACT AS COULD BE SECURED.ABSOLUTE ACCURACY IS NOT GUARANTEED AND THE CONTRACTORSHALL OBTAIN AND VERIFY EXACT LOCATIONS, MEASUREMENTS,LEVELS, SPACE REQUIREMENTS, POTENTIAL CONFLICTS WITH OTHERTRADES, ETC. AT THE SITE AND SHALL SATISFACTORILY ADAPT HISWORK TO THE ACTUAL CONDITIONS OF THE JOB.

    3. THE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND SHALL NOT BESCALED. THEY SHOW CERTAIN PHYSICAL RELATIONSHIPS WHICHMUST BE ESTABLISHED WITHIN THE DIVISION 23 WORK AND ITSINTERFACE WITH OTHER WORK. ESTABLISHING THIS RELATIONSHIPIN THE FIELD IS THE EXCLUSIVE RESPONSIBILITY OF THECONTRACTOR. THIS DIVISION SHALL COORDINATE ITS WORK WITHALL DIVISIONS OF THE WORK AND ADJUST ITS WORK AS REQUIREDBY THE ACTUAL CONDITIONS OF THE PROJECT.

    A. THE CONTRACTOR SHALL VISIT THE SITE BEFORE SUBMITTINGA BID TO BECOME THOROUGHLY FAMILIAR WITH THE ACTUALCONDITIONS OF THE PROJECT. NO EXTRAS WILL BE ALLOWEDDUE TO LACK OF KNOWLEDGE OF EXISTING CONDITIONS.

    B. CERTAIN SYSTEMS REQUIRE ENGINEERING OF INSTALLATIONDETAILS BY CONTRACTOR. UNLESS FULLY DETAILED IN THECONTRACT DOCUMENTS, SUCH ENGINEERING IS THEEXCLUSIVE RESPONSIBILITY OF THE CONTRACTOR.

    C. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINEWHERE CLEARANCES ARE LIMITED, AND WHERE INSTALLATIONDRAWINGS OR SCHEMATICS, "CONSTRUCTION DRAWINGS", ORCOORDINATION DRAWINGS MAY BE REQUIRED IN ACCORDANCEWITH, OR IN EXCESS OF, THOSE REQUIRED BY THESPECIFICATIONS. THE CONTRACTOR SHALL PREPARE ALLSUCH COORDINATION DRAWINGS AS PART OF THE BASECONTRACT.

    4. THESE NOTES ONLY SUPPLEMENT, AND DO NOT REPLACE, THESPECIFICATIONS.

    5. DEFINITIONS AND TERMINOLOGY

    A. THE DEFINITIONS OF DIVISION 1 AND THE GENERAL CONDITIONSOF THIS SPECIFICATION ALSO APPLY TO THE DIVISION 23CONTRACT DOCUMENTS.

    B. "CONTRACT DOCUMENTS" CONSTITUTE THE DRAWINGS,SPECIFICATIONS, GENERAL CONDITIONS, PROJECT MANUALS,ETC., PREPARED BY ENGINEER (OR OTHER DESIGNPROFESSIONAL IN ASSOCIATION WITH ENGINEER) FORCONTRACTOR'S BID OR CONTRACTOR'S NEGOTIATIONS WITHTHE OWNER. THE DIVISION 23 DRAWINGS AND SPECIFICATIONSPREPARED BY THE ENGINEER ARE NOT CONSTRUCTIONDOCUMENTS.

    C. "CONSTRUCTION DOCUMENTS", "CONSTRUCTION DRAWINGS",AND SIMILAR TERMS FOR DIVISION 23 WORK REFER TOINSTALLATION DIAGRAMS, SHOP DRAWINGS ANDCOORDINATION DRAWINGS PREPARED BY THE CONTRACTORUSING THE DESIGN INTENT INDICATED ON THE ENGINEER'SCONTRACT DOCUMENTS. THESE SPECIFICATIONS DETAIL THECONTRACTOR'S RESPONSIBILITY FOR "ENGINEERING BYCONTRACTOR" AND FOR PREPARATION OF CONSTRUCTIONDOCUMENTS.

    D. "FURNISH" MEANS TO "SUPPLY" AND USUALLY REFERS TO ANITEM OF EQUIPMENT.

    E. "INSTALL" MEANS TO "SET IN PLACE, CONNECT AND PLACE INFULL OPERATIONAL ORDER".

    F. "PROVIDE" MEANS TO "FURNISH AND INSTALL".

    G. "EQUIVALENT" MEANS "MEETS THE SPECIFICATIONS OF THEREFERENCE PRODUCT OR ITEM IN ALL SIGNIFICANT ASPECTS."SIGNIFICANT ASPECTS SHALL BE AS DETERMINED BY THEARCHITECT/ENGINEER.

    H. "WORK BY OTHER(S) DIVISIONS"; "RE: XX DIVISION", AND SIMILAREXPRESSIONS MEANS WORK TO BE PERFORMED UNDER THECONTRACT DOCUMENTS, BUT NOT NECESSARILY UNDER THEDIVISION OR SECTION OF THE WORK ON WHICH THE NOTEAPPEARS. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TOCOORDINATE THE WORK OF THE CONTRACT BETWEEN HIS/HERSUPPLIERS, SUBCONTRACTORS AND EMPLOYEES. IFCLARIFICATION IS REQUIRED, CONSULT ARCHITECT/ENGINEERBEFORE SUBMITTING BID.

    I. BY INFERENCE, ANY REFERENCE TO A "CONTRACTOR" OR"SUB-CONTRACTOR" MEANS THE ENTITY WHICH HASCONTRACTED WITH THE OWNER FOR THE WORK OF THECONTRACT DOCUMENTS.

    J. "ENGINEER" MEANS THE DESIGN PROFESSIONAL FIRM WHICHHAS PREPARED THESE CONTRACT DOCUMENTS. ALLQUESTIONS, SUBMITTALS, ETC. OF THIS DIVISION SHALL BEROUTED THROUGH THE ARCHITECT TO THE ENGINEER(THROUGH PROPER CONTRACTUAL CHANNELS).

    EXISTING BUILDING:1. THE CONTRACTOR'S ATTENTION IS CALLED TO THE FACT THAT THE

    EXISTING BUILDING WILL BE OCCUPIED BY THE OWNER DURINGCONSTRUCTION. CONTINUED OPERATION OF THE FACILITY SHALLNOT BE HINDERED BY THIS WORK. THE CONTRACTOR SHALLACCOUNT FOR ALL ADDITIONAL COSTS WHICH MAY BE INCURRED BYHIM DUE TO THE DIFFICULTY OF WORKING OVER AND AROUNDEMPLOYEES, SPORTING EVENTS AND CONCERTS, EQUIPMENT, ETC.;AND DUE TO THE HOURS OF THE DAY IN WHICH AN AREA MAY BEAVAILABLE WHEN SUBMITTING HIS BID.

    2. MAINTAIN A MARK-UP SET OF DRAWINGS WHICH INDICATEVARIATIONS IN THE ACTUAL INSTALLATION FROM THE ORIGINALDESIGN. SURRENDER DRAWINGS TO OWNER UPON COMPLETION.INCORPORATE THESE NOTES INTO THE AS-BUILDING DRAWINGS.

    3. COORDINATE ALL PENETRATIONS OF THE FLOOR SLAB PRIOR TOCOMMENCING WORK. UTILIZE X-RAY AND VISUAL INVESTIGATION OFEXISTING CONDITIONS AS REQUIRED PRIOR TO DRILLING ORCUTTING. COORDINATE ALL NEW PENETRATIONS WITH OTHERDIVISIONS OF THE WORK. ALL CONTRACTORS ARE INDIVIDUALLYRESPONSIBLE FOR ALL PENETRATIONS REQUIRED BY THEIRDIVISIONS.

    ELECTRICAL COORDINATION:1. VERIFY THE ELECTRICAL SERVICE PROVIDED BY THE ELECTRICAL

    CONTRACTOR BEFORE ORDERING ANY MECHANICAL EQUIPMENTREQUIRING ELECTRICAL CONNECTIONS.

    2. PROVIDE PREMIUM EFFICIENCY MOTORS (NEMA STANDARD MG1-2003,TABLES 12-12 AND 12-13) WITH 1.15 SERVICE FACTOR ON ALLEQUIPMENT, MOTORS SHALL BE CAPABLE OF OPERATINGCONTINUOUSLY AT 105°F UNDER JOBSITE CONDITIONS ANDALTITUDE.

    3. UNLESS NOTED OTHERWISE, ALL MECHANICAL EQUIPMENT SHALL BEPROVIDED WITH HOA SWITCH AND STARTER COMPATIBLE WITHEQUIPMENT AND BMS SYSTEM. STARTERS SHALL BE PROVIDED BYDIVISION 23 UNLESS IN A MOTOR CONTROL CENTER. ALLDISCONNECTS SHALL BE FURNISHED BY DIVISION 26.

    4. THE ELECTRICAL POWER FOR CERTAIN EQUIPMENT PROVIDEDUNDER DIVISION 23 HAS NOT BEEN SPECIFICALLY INDICATED ON THEELECTRICAL DRAWINGS AND MUST BE PROVIDED BY AND FIELDCOORDINATED BY THE DIVISION 23 TRADE REQUIRING SUCH POWER.

    5. SUFFICIENT POWER FOR THIS PURPOSE SHALL BE FURNISHED AS"SPARE", DEDICATED CIRCUIT CAPACITY IN DIVISION 26'SPANELBOARDS. ALL WIRING, CONDUIT AND ELECTRICAL DEVICESDOWNSTREAM OF THE PANELBOARDS IS THE RESPONSIBILITY OFTHE DIVISION 23 TRADE REQUIRING THE POWER UNLESS OTHERWISESHOWN ON THE ELECTRICAL DRAWINGS.

    SUCH EQUIPMENT IS HEREBY DEFINED AS:

    A. ELECTRICAL HEAT TRACE. REQUIRED HEAT TRACE LOCATIONS,CAPACITIES AND SPECIFICATION ARE SHOWN OR INDICATED ONTHE DRAWINGS. PROVIDE ELECTRICAL HEAT TRACING ON ALLPIPES THAT ARE SUBJECT TO FREEZING, THIS INCLUDES AREASLIKE LOADING DOCK, INTAKE/RELIEF/EXHAUST SHAFTS, ETC.REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

    B. TEMPERATURE CONTROL PANELS AND LINE VOLTAGE POWERFOR 24V CONTROL TRANSFORMERS. REQUIRED CONNECTIONARE INCLUDED IN DIVISION 23 09 00 AND WILL BE SHOWN BYTHAT CONTRACTOR'S CONTROL SUBMITTAL DRAWINGS.

    INSTALLATION:1. SUSPEND EACH TRADE'S WORK SEPARATELY FROM THE STRUCTURE.

    DUCTWORK SHALL BE HELD TIGHT TO STRUCTURE EXCEPT WHEREOTHERWISE SHOWN.

    2. INSTALL ALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITHMANUFACTURER'S RECOMMENDATIONS UNLESS SPECIFICALLYINDICATED OTHERWISE OR WHERE LOCAL CODES OR REGULATIONSTAKE PRECEDENCE.

    3. PROVIDE MANUFACTURER'S RECOMMENDED SERVICE CLEARANCEAROUND ALL EQUIPMENT REQUIRING SAME.

    4. PROVIDE FOR SAFE CONDUCT OF THE WORK, CAREFUL REMOVALAND DISPOSITION OF MATERIALS AND PROTECTION OF PROPERTYWHICH IS TO REMAIN UNDISTURBED.

    6. ISOLATE ALL PRESSURIZED PIPE (CHILLED WATER, STEAM, ETC.)EACH RISER, BRANCH, PIECE OF EQUIPMENT, AND AREA SERVED.

    7. NO CHILLED WATER OR CONDENSER WATER LINES SHALL BELOCATED EXPOSED IN FINISHED SPACES OR BELOW THE BUILDINGSLAB UNLESS SHOWN OTHERWISE ON THE DRAWINGS.

    8. ALL CURBS, ROOF JACKS, ROOF THIMBLES, ROOF DRAINS, ETC.SHALL BE COMPATIBLE WITH ROOFING SYSTEM TO BE PROVIDED.REFERENCE ARCHITECTURAL DIVISION FOR REQUIRED FLASHINGDETAILS.

    9. MECHANICAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALLCONCRETE EQUIPMENT PAD DIMENSIONS, BASED ON THE FINALEQUIPMENT SELECTION, TO THE STRUCTURAL AND GENERALCONTRACTOR FOR INCLUSION IN THOSE CONTRACTOR'S WORK ASDESCRIBED BY THE GENERAL CONTRACTOR.

    10. UNDER THE BASE CONTRACT, THE CONTRACTOR SHALL PROVIDE ALLLABOR AND MATERIALS NECESSARY TO SPLIT EQUIPMENT INTOMULTIPLE PIECES TO FACILITATE RIGGING TO FINAL INSTALLEDLOCATION. CONTRACTOR SHALL REASSEMBLE THE EQUIPMENT ANDTEST TO CONFIRM PROPER OPERATION AND MAINTAIN ALL THEMANUFACTURERS WARRANTEES.

    11. WARRANTY: AT A MINIMUM, THE ENTIRE MECHANICAL SYSTEM SHALLBE WARRANTED AGAINST DEFECTS IN MATERIALS ANDWORKMANSHIP FOR A PERIOD OF ONE (1) YEAR AFTER ACCEPTANCEOF THE SYSTEM BY THE OWNER. REFER TO INDIVIDUALSPECIFICATION SECTIONS FOR SPECIFIC WARRANTY REQUIREMENTS.

    DUCTWORK INSTALLATION:1. SEAL ALL SEAMS (LONGITUDINAL AND TRANSVERSE) AIR TIGHT WITH

    SEALANT PER SPECIFICATIONS.

    2. DUCT DIMENSIONS ARE INSIDE CLEAR.

    3. DIFFUSER NECK SIZE IS SAME AS FLEXIBLE DUCT SIZE.

    4. UNLESS OTHERWISE NOTED, ALL CHANGES IN DIRECTION SHALL BEMADE WITH RADIUS ELBOWS WITH RADIUS TO CENTERLINE EQUAL TO1.5 DUCT WIDTH.

    5. WHERE REQUIRED FOR SPACE CONSTRAINTS, PROVIDE MITEREDELBOWS WITH TURNING VANES AS FOLLOWS:

    A. FOR DUCT WIDTHS OF 36" OR LESS, PROVIDE MANUFACTUREDSINGLE WIDTH TURNING VANES, WITH NO TRAILING EDGES ANDSPACING IN ACCORDANCE WITH SMACNA DUCT CONSTRUCTIONSTANDARDS FOR "STANDARD SPACING".

    B. USE DOUBLE THICKNESS (AIRFOIL) BLADES WITHOUT TRAILINGEDGES FOR DUCT WIDTHS GREATER THAN 36".

    6. BRANCH LINES:

    A. MAKE ALL TAPS TO ROUND DUCTWORK WITH CONICAL TEES.B. MAKE ALL TAPS TO RECTANGLE DUCTWORK WITH 45° ENTRY OR

    CONICAL SPIN IN TO ROUND.C. INCLUDE DAMPERS AT ALL BRANCH LINES.

    7. DUCT SIZES NOT CALLED OUT SHALL BE DETERMINED BASED ON 0.08"S.P. LOSS OR LESS PER 100 FT. OF LENGTH.

    8. INCLUDE DAMPERS AT ALL BRANCH LINES, WHERE SHOWN ON THEDRAWINGS, AND WHERE OTHERWISE REQUIRED FOR BALANCING.DAMPERS SHALL BE INSTALLED A MINIMUM OF 3'-0" FROM ANYREGISTER.

    PIPE INSTALLATION:1. ALL PIPING SHALL BE ADEQUATELY SUPPORTED FROM THE BUILDING

    STRUCTURE TO PREVENT SAGGING, POCKETING, SWAYING ORDISPLACEMENT BY MEANS OF HANGERS AND SUPPORTS. PIPING ISNOT TO BE SUPPORTED BY EQUIPMENT.

    2. PROVIDE DIELECTRIC UNIONS BETWEEN DISSIMILAR MATERIALS.

    3. PROVIDE MANUAL AIR VENTS AND CAPPED HOSE-END DRAINS WITHISOLATION VALVES AT PIPING HIGH AND LOW POINTS.

    4. WELD PIPE IN ACCORDANCE WITH APPLICABLE CODES ANDSTANDARDS. WELDERS SHALL BE CERTIFIED FOR TYPE OF WORKBEING PERFORMED.

    5. FLUSH OUT PIPING AND REMOVE CONTROL DEVICES BEFOREPERFORMING PRESSURE TEST. DO NOT USE PIPING SYSTEM VALVESTO ISOLATE SECTIONS WHERE TEST PRESSURE EXCEEDS VALVEPRESSURE RATING. PRESSURIZE PIPING AT AS SPECIFIED IN THESPECIFICATION OR TO 100 PSIG MINIMUM. IF LEAKAGE IS OBSERVEDOR IF TEMPERATURE COMPENSATED PRESSURE DROP EXCEEDS 1%OF TEST PRESSURE, REPAIR LEAKS AND RETEST. DO NOT USE AIRPRESSURE TO TEST PLASTIC PIPE.

    6. PROVIDE SUPPORT UNDER ELBOWS ON PUMP SUCTION ANDDISCHARGE LINES.

    7. ALL STRAINERS SHALL BE FURNISHED WITH A "ROUGHING" SCREENAND TWO (2) SCREENS FOR NORMAL OPERATION. INSTALL STRAINERWITH ROUGHING SCREEN AND OPERATE SYSTEM FOR 24 HOURSMINIMUM (RUN DOMESTIC WATER SYSTEMS AT MAX FLOW FOR AMINIMUM OF ONE HALF (1/2) HOUR. REMOVE ROUGHING SCREEN ANDINSTALL NORMAL SCREEN, AFTER TWO WEEKS OF NORMALOPERATION INSTALL NEW NORMAL SCREEN.

    8. PIPING SIZES SHALL BE BASED ON 2' OR LESS HEAD LOSS PER 100FEET OF LENGTH. VELOCITIES SHALL NOT EXCEED 10 FEET PERSECOND.

    9. INSTALL ALL PIPING TO ALLOW FOR EXPANSION AND CONTRACTIONWITHIN THE PIPING SYSTEM. ENSURE ALL REQUIRED PIPE EXPANSIONWILL OCCUR IN THE PROPER DIRECTION AND SEGMENT OF PIPE.PROPERLY ANCHOR (RE: SPECIFICATIONS) ALL PIPING REQUIRINGEXPANSION/CONTRACTION ISOLATION. COORDINATE PIPEEXPANSION/CONTRACTION TO PREVENT DAMAGE TO ANY AND ALLBUILDING COMPONENTS.

    10. PROVIDE ISOLATION VALVES AT EVERY HYDRONIC BRANCH LINEWHERE INDICATED OR NOT.

    CONDENSATE DRAINAGE:1. PROVIDE CONDENSATE DRAINAGE FOR ALL COOLING COILS AND

    OVERFLOW PANS.

    2. ROUTE CONDENSATE PIPING, FULL SIZE OF DRIP PAN CONNECTION,TO NEAREST CODE APPROVED RECEPTACLE.

    CUTTING, PATCHING AND DEMOLITION:1. KEEP DEMOLITION & CUTTING TO MINIMUM REQUIRED FOR PROPER

    EXECUTION OF WORK.

    2. BE RESPONSIBLE FOR ALL CUTTING AND PATCHING NECESSARY FORTHE COMPLETION OF THE WORK.

    3. NO CUTTING (NOT SHOWN ON THE CONTRACT DOCUMENTS) SHALLBE DONE WITHOUT THE APPROVAL OF THE ARCHITECT AS TOLOCATIONS, METHOD AND EXTENT OF THE CUTTING.

    4. REPAIR ALL ACCIDENTAL OR INTENTIONAL DAMAGE TO MATCHEXISTING CONSTRUCTION WITH NO NOTICEABLE DIFFERENCE INCONTINUITY, APPEARANCE OR FUNCTION.

    5. DEMOLISH AND CAP ALL INDICATED PIPING BACK AT NEAREST MAIN.

    STRUCTURE:1. DO NOT PENETRATE STRUCTURAL MEMBERS. ALL EQUIPMENT

    SUPPORTS SHALL BE ATTACHED TO THE LOAD BEARING MEMBERS OFSTRUCTURAL ELEMENTS. DO NOT OVER-STRESS ANY STRUCTURALMEMBERS. CONTACT STRUCTURAL ENGINEER FOR ALLOWABLELOADS FOR SPECIFIC MEMBERS.

    2. DO NOT UTILIZE POWDER DRIVEN ANCHORS FOR ANY LOCATIONSWHICH REQUIRE THE LOAD TO BE HELD IN TENSION. SEESTRUCTURAL DIVISION FOR ADDITIONAL RESTRICTIONS.

    3. SEE ALSO STRUCTURAL DIVISION FOR ACCEPTABLE ANCHORING ANDSUPPORT MEANS, METHODS, AND LOCATIONS.

    4. PROVIDE FLEXIBLE CONNECTORS, EXPANSION LOOPS, EXPANSIONJOINTS, ADDITIONAL FITTINGS OR EQUIVALENT TO ACCOMMODATETHE THERMAL EXPANSION OF THE BUILDING THROUGH STRUCTURALEXPANSION JOINTS. PROVIDE SUCH FITTING AT EVERY PIPE, DUCT,CONDUIT, ETC. CROSSING OF A STRUCTURAL EXPANSION JOINT.

    FIRE STOPPING:1. FIRE STOPPING REQUIREMENT: PENETRATIONS THROUGH RATED

    WALLS AND FLOORS SHALL BE SEALED WITH A MATERIAL CAPABLEOF PREVENTING THE PASSAGE OF FLAMES AND HOT GASSES WHENSUBJECTED TO THE REQUIREMENTS OF THE TEST STANDARDSPECIFIC FOR FIRE STOPS ASTM-E-814. ACCEPTANCE MATERIALSINCLUDE: DOW CORNING RTV FIRE STOP FOAM FOR BARE PIPE,METAL CONDUIT, AND ELECTRICAL CABLE; 3M FIRE DAM 150 CAULKFOR BARE PIPE, METAL CONDUIT, AND BUILDING CONSTRUCTION;GAPS 3M FS-195 INTUMESCENT STRIPS FOR INSULATED PIPES,PLASTIC PIPE OR CONDUIT, AND ELECTRICAL CABLE.

    SCOPE CLARIFICATION NOTES:1. THESE DOCUMENTS SERVE TO DEFINE THE NATURE OF THE

    SYSTEMS, LEVEL OF CONTROL AND FINISH, RELATIONSHIPS WITHOTHER BUILDING SYSTEMS, AND GENERAL DESIGN INTENT OF THISDIVISION'S WORK. THE CONTRACTOR SHALL EXAMINE THEDOCUMENTS OF ALL TRADES TO COMPLETELY FAMILIARIZEHIM/HERSELF WITH THE VARIOUS CONCEPTS PRESENTED BY OTHERTRADES AND ADAPT THIS WORK AND ANY ASSOCIATED PRICINGACCORDING. WHERE CONFLICTS EXIST BETWEEN THESEDOCUMENTS AND THOSE OF OTHER DIVISIONS, THE MORESTRINGENT (AS DETERMINED BY THE ENGINEER) SHALL TAKEPRECEDENCE. IN PARTICULAR, WHERE ARCHITECTURALBACKGROUNDS INDICATE PROGRAMMATIC DIFFERENCES IN ROOMLOCATIONS, ROOM FUNCTIONS, PLUMBING FIXTURE COUNTS, CEILINGTYPES, RATED CONSTRUCTION, CLEARANCES, OR ROOMRELATIONSHIPS, THE ARCHITECTURAL DRAWINGS SHALL TAKEPRECEDENCE AND THIS CONTRACTOR SHALL ADAPT HIS/HER WORKACCORDINGLY WHILE MAINTAINING THE DESIGN INTENTREPRESENTED BY THE DOCUMENTS OF THIS DIVISION.

    2. PROVIDE FIRE STOPPING ON ALL PIPES, DUCTS, DEVICES, ETC.PENETRATING ALL FIRE RATED CONSTRUCTION ASSEMBLIES.

    3. EQUIPMENT SHOWN IS NOT NECESSARILY TO SCALE.

    4. THE DRAWINGS ARE DIAGRAMMATIC IN NATURE. THE CONTRACTOR ISRESPONSIBLE FOR ALL OFFSETS, TRANSITIONS, ELBOWS, ETC. ASREQUIRED IN DUCTWORK, PIPING, SUPPORTS, ETC. TO COMPLETEHIS/HER WORK IN A CLEAN, FUNCTIONAL INSTALLATION.

    5. THIS CONTRACTOR IS RESPONSIBLE FOR ALL SLEEVES FORPENETRATIONS THROUGH SLABS AND BEAMS REQUIRED BY THEINTENT OF THE SCOPE OF WORK INDICATED ON THE DRAWINGS.COORDINATION OF QUANTITY AND LOCATIONS OF ALL PENETRATIONSSHALL BE DONE BY THIS CONTRACTOR DURING THE SHOP DRAWINGSPROCESS FOR REVIEW BY THE STRUCTURAL ENGINEER.

    6. ALL COMBINATION FIRE/SMOKE DAMPERS SHALL HAVE END SWITCHPACKAGE FOR REMOTE STATUS MONITORING, REMOTE OVERRIDECAPABILITY AND HIGH LIMIT TEMPERATURE SENSOR PREVENTINGDAMPER REOPENING WHEN DUCT TEMPERATURE IS ABOVEDAMPER'S UL555S LISTING.

    RATED ASSEMBLY DUCT PENETRATIONS:

    1. PROVIDE COMBINATION FIRE/SMOKE DAMPERS IN ALL SUPPLY,RETURN AND EXHAUST DUCTS PENETRATING SHAFT ENCLOSURES,FLOOR PENETRATIONS, 1-HR AND 2-HR FIRE BARRIERS, AND SMOKEBARRIERS. REFER TO ARCHITECTURAL PLANS, A-200 SERIES SHEETS,FOR RATED ASSEMBLY TYPES AND LOCATIONS.

    MECHANICAL SHEET LIST TABLESheet Number Sheet Title

    M-000.00 MECHANICAL LEGEND AND NOTESM-010.00 MECHANICAL SCHEDULESM-011.00 MECHANICAL SCHEDULESM-101.00 MECHANICAL DEMO PLAN - N.W. QUADRANT EL.48M-102.00 MECHANICAL DEMO PLAN - N.E. QUADRANT EL.48M-201.00 MECHANICAL PLAN - N.W. QUADRANT EL.48M-500.00 MECHANICAL ENLARGED DEMO PLAN - FUTURE

    CHILLER PLANTM-501.00 MECHANICAL ENLARGED PLAN - CHILLER PLANTM-502.00 MECHANICAL ENLARGED PLANS - CENTRAL MERM-503.00 MECHANICAL PLAN - STAIRSM-600.00 MECHANICAL RISER DIAGRAMM-700.00 MECHANICAL DETAILS IM-701.00 MECHANICAL DETAILS IIM-702.00 MECHANICAL DETAILS IIIM-703.00 MECHANICAL DETAILS IVM-704.00 MECHANICAL DETAILS VM-705.00 MECHANICAL CONTROLS IM-706.00 MECHANICAL CONTROLS IIM-707.00 MECHANICAL CONTROLS III

    PROJ. NO.

    DWG. No.SCALE

    DWG. TITLE

    DATE PLOTTED

    CHECKED

    DRAWN

    REVISIONS/ISSUES

    DO NOT SCALE THE DRAWINGS

    DESCRIPTION DATE

    1605.05-3

    CONTRACTOR SHALL CHECK AND VERIFY ALLDIMENSIONS AND REPORT ANY OMISSIONS ORDISCREPANCIES TO THE ARCHITECT BEFOREPROCEEDING WITH THE WORK.

    SEAL

    G:\x

    l cen

    ter i

    ce c

    hille

    r - d

    v180

    25.0

    1\C

    AD

    \Mec

    h\M

    -000

    .00_

    DV

    1802

    5.01

    .dw

    g 0

    9 Ja

    n '2

    0 - 1

    1:37

    amFI

    LENA

    ME:

    PLOT

    DATE

    :

    XREF

    S:

    9 JAN 2020

    XL CENTER

    Tel (416) 591 8999 Fax(416) 591 9087

    14 Duncan Street 4th FloorToronto, Ontario, CA M5H 3G8

    Tel (212) 986 3700 Fax (212) 687 6467

    CO N S U L T I N G E N G I N E E R S P. C.

    CONSULTING ENGINEERSTel (310) 842 8700 Fax (310) 842 7700

    Severud Associates

    engineers

    1 CIVIC CENTER PLAZAHARTFORD, CT

    CHILLER PLANTRELOCATION

    ISSUED FOR BID 2020-01-091

    AS NOTED

    ME

    ME

    M-000.00

    MECHANICAL LEGENDAND NOTES

  • CHILLER SCHEDULE (WATER COOLED)

    CODE(CH)

    CH-1GENERAL NOTES1.BRINE WATER CONTAINS 40% ETHYLENE GLYCOL.2. PROVIDE VFD ON COMPRESSORS.3. REFRIGERANT: R-717 (AMMONIA)4. CHILLER SHALL BE CAPABLE OF PROVIDING THE SCHEDULED CAPACITY WITH THE CHILLED (BRINE) WATER CHEMISTRY.5. FOULING FACTORS: EVAPORATOR - 0.0005 CONDENSER - 0.00056. CONNECTIONS (IN/OUT): EVAPORATOR: 10"/10" CONDENSER: 8"/8"7. CHILLER CONTROL PANEL/MCC SHALL BE SUPPLIED WITH TWO INDEPENANT POWER CONNECTIONS. CHILLER CONTROL PANEL SHALL INCLUDE ALL DISCONNECTS, COMPRESSOR VFDS, BRINE PUMP VFDS, CONDENSER PUMP STARTERS, AND CONTROLS. POWER CONNECTION #1 SHALL INCLUDE: (1) 200 HP COMPRESSOR, (1) 40 HP BRINE PUMP, & (1) 15 HP CONDENSER WATER PUMP. POWER CONNECTION #2 SHALL INCLUDE: (1) 200 HP COMPRESSOR, (1) 40 HP BRINE PUMP, (1) 15 HP CONDENSER WATER PUMP, & CONTROL SYSTEM POWER.

    MANUFACTURER/MODEL NO.

    ICE BUILDERS INC. / WCC-CFZWM-D0400S

    OPERATINGWEIGHT

    (LBS)

    10,500

    NOMINALTONS

    210

    NO.OF

    COMPRESSORS

    2

    CHILLED (BRINE) WATER DATAEWT(F)

    17

    LWT(F)

    14

    GPM

    1,200

    WPD(FT)

    27

    FOULINGFACTOR

    0.0005

    CONNECTIONIN/OUT

    10"/10"

    CONDENSER WATER DATAEWT(F)

    85

    LWT(F)

    95

    NO. OFCONDENSERS

    1

    EA.GPM

    576

    WPD(FT)

    10.4

    FOULINGFACTOR

    0.0005

    CONNECTIONIN/OUT

    8"/8"

    ELECTRICALPOWER

    CONNECTION12

    VOLTS460460

    HZ6060

    PH33

    MCA(AMPS)

    381383

    DESIGN(AMPS)

    278280

    MFS(AMPS)

    400400

    DIMENSIONS (IN)LENGTH

    252

    WIDTH

    72

    HEIGHT

    107

    KW/TON

    1.26

    REMARKS

    EXPANSION TANK SCHEDULE

    CODE(ET)

    ET-ICE

    GENERAL NOTES1. TYPE: B=FULL BLADDER2. PROVIDE 4" HOUSEKEEPING PAD BELOW UNIT.3. FLUID CONTAINS 40% ETHYLENE GLYCOL. EXPANSION TANK COMPONENTS IN CONTACT WITH THE FLUID SHALL BE COMPATIBLE WITH GLYCOL.

    REMARKS

    MANUFACTURER/MODEL NO.

    AMTROL / 3000-LSERVICE

    BRINELOCATIONICE PLANT

    OPERATINGWEIGHT

    LBS.9,200

    DESIGN PARAMETERSSYSTEMVOLUME

    (GAL)10,000

    MIN. TEMP (F)

    10

    MAXTEMP (F)

    150

    OPERATING PARAMETERSRELIEF VALVE

    SETTING(PSIG)

    60

    CW MUPRV REQ'T

    (PSIG)-

    TANKCONFIG

    VERTICAL

    TYPE

    B

    TANKVOLUME

    (GAL)792

    MAXWORKING

    PRESSURE(PSI)150

    PHYSICALSIZE

    DIA. X LEN48" X 118"

    REMARKS

    CHILLER PUMP SKID SCHEDULE (PP-ICE)GENERAL

    CODEBWP-1BWP-2

    CWP-1CWP-2

    GENERAL NOTES1. PROVIDE A COMPLETE PUMP PACKAGE. PUMP PACKAGE INCLUDES PUMPS, MOUNTING RAILS, VIBRATION ISOLATION, INTERIAL BASES, AND ALL PIPING TRIM FOUND ON THE DETAIL DRAWINGS. PROVIDE HEADERS ON THE SUCTION AND DISCHARGE SIDE OF EACH PUMPS WITH ALL REQUIRED ISOLATION VALVES. SKID SHALL INCLUDE ADDITIONAL SPACE TO ACCOMMODATE A 3 BRINE AND CONDENSER WATER PUMP WITH CONNECTION FLANGE WITH ISOLATION VALVE. 2. PROVIDE MAGNETIC STARTER WITH AUXILIARY CONTACTS AND HOA SWITCH ON ALL THREE PHASE MOTORS WHERE VARIABLE FREQUENCY DRIVES ARE NOT SPECIFIED.3. PROVIDE PREMIUM EFFICIENCY MOTORS FOR MOTORS 1 HP AND OVER PER NEMA STANDARD MG1-2003, TABLES 12-12 AND 12-13. 4. FOR PARALLEL PUMP APPLICATIONS MANUFACTURER SHALL REVIEW SINGLE PUMP OPERATON SUCH THAT PUMP CAN OPERATE AND NOT EXCEED THE END OPERATION POINT ON THE PUMP CURVE AND MOTOR HP IS PROPERLY SELECTED TO PREVENT OVERLOADING.5. NPSHR AT SCHEDULED OPERATING POINT SHALL NOT EXCEED 0.8*NPSHA.6. REFER TO DRAWINGS TO DETERMINE REQUIRED PUMP ROTATION. COORDINATE WITH MECHANICAL CONTRACTOR PRIOR TO ORDERING.7. PUMP HOUSING SHALL BE COMPLETELY INSULATED.8. PROVIDE A SEAL FLUSH AT EACH PUMP.

    REMARK NOTESA. PARALLEL PUMP APPLICATION WITH ONE PUMP STANDBY. B. FLUID CONTAINS 40% ETHYLENE GLYCOL. ALL PUMP COMPONENTS IN CONTACT WITH THE FLUID SHALL BE COMPATIBLE WITH GLYCOL. ADJUST STANDARD CATALOG PERFORMANCE TO ACCOUNT FOR USE OF GLYCOL.

    CONTROL NOTESI. MAINTAIN PRESSURE MEASURED ACROSS THE CHILLER EVAPORARTOR SHELL.II. MAINTAIN PRESSURE MEASURED ACROSS THE CHILLER CONDENSER SHELL.

    MANUFACTURER/MODEL NO.

    BELL & GOSSETT / E-1510 5EBBELL & GOSSETT / E-1510 5EB

    BELL & GOSSETT / E-1510 4BDBELL & GOSSETT / E-1510 4BD

    SERVICEBRINE PUMPBRINE PUMP

    CONDENSER WATERCONDENSER WATER

    LOCATIONICE PLANTICE PLANT

    ICE PLANTICE PLANT

    PUMP DATA

    PUMPTYPE

    END SUCTIONEND SUCTION

    END SUCTIONEND SUCTION

    GPM1,2001,200

    576576

    DRIVE

    VFDVFD

    CVCV

    RPM1,8001,800

    1,8001,800

    HEAD(FT)9090

    7070

    FLUID TEMP.RANGE (F)

    10-12010-120

    55-10055-100

    NPSHR(FT)14.814.8

    7.67.6

    IMPELLERSIZE (IN.)

    1111

    9.1259.125

    MIN.EFF. %

    8282

    8484

    ELECTRICAL

    BHP35.635.6

    12.712.7

    HP4040

    1515

    VOLT460460

    460460

    PH33

    33

    HZ6060

    6060

    FLA45.745.7

    18.518.5

    CONTROLSII

    IIII

    WEIGHT(LBS.)1,8901,890

    460460

    REMARKSA,BA,B

    AA

    FAN SCHEDULE

    CODEGX-1GX-2

    GENERAL NOTES1. DRIVE TYPE: D=DIRECT-PROVIDE RHEOSTAT SPEED CONTROLLER IN FAN HOUSING UNLESS OTHERWISE NOTED. B=BELT-PROVIDE ADJUSTABLE SHEAVE UNLESS OTHERWISE NOTED. VFD=VARIABLE FREQUENCY DRIVE.2. PROVIDE MAGNETIC STARTER WITH AUXILARY CONTACTS AND HOA SWITCH ON ALL THREE PHASE UNITS.3. PROVIDE PREMIUM EFFICIENCY MOTORS. PER NEMA STANDARD MG1-2003, TABLED 12-12, AND 12-13.4. PROVIDE FLEXIBLE CONNECTIONS AT DUCT INLET AND OUTLET.5. FAN SHALL MEET THE REQUIREMENT OF THE AMCA TYPE B SPARK RESISTANCE.

    MOUNTING (MTG)1. INSTALL FAN WITH HANGING VIBRATION ISOLATORS.

    CONTROL (CTRL)I. INTERLOCK WITH REFRIGERATION MONITORING SYSTEM. INTERLOCK FAN WITH ISOLATION DAMPERII. INTERLOCAK WITH CHILLER PLANT AIR HANDING UNIT (AC-ICE) AND ISOLATION DAMPERS.

    REMARK NOTES

    MANUFACTURER/MODEL NO.

    GREENHECK / TCB-2-16-50GREENHECK / TCB-1-09-3

    SERVICEICE PLANTICE PLANT

    LOCATIONMECH MEZZANINEMECH MEZZANINE

    WEIGHTLBS327165

    CFM5,000600

    DRIVEBB

    MOTORTYPE

    CVCV

    FANRPM2,2641,866

    ESP("WC)

    1.51

    ELECTRICAL DATA

    HP5

    1/3

    BHP4.280.24

    VOLT460115

    PH31

    HZ6060

    FLA7.67.2

    MTG11

    CONTROLIII

    REMARKS

    PUMP SCHEDULEGENERAL

    CODECWP-AC1CWP-AC2

    GENERAL NOTES1. PROVIDE MAGNETIC STARTER WITH AUXILIARY CONTACTS AND HOA SWITCH ON ALL THREE PHASE MOTORS WHERE VARIABLE FREQUENCY DRIVES ARE NOT SPECIFIED.2. PROVIDE PREMIUM EFFICIENCY MOTORS FOR MOTORS 1 HP AND OVER PER NEMA STANDARD MG1-2003, TABLES 12-12 AND 12-13. 3. FOR PARALLEL PUMP APPLICATIONS MANUFACTURER SHALL REVIEW SINGLE PUMP OPERATON SUCH THAT PUMP CAN OPERATE AND NOT EXCEED THE END OPERATION POINT ON THE PUMP CURVE AND MOTOR HP IS PROPERLY SELECTED TO PREVENT OVERLOADING.4. NPSHR AT SCHEDULED OPERATING POINT SHALL NOT EXCEED 0.8*NPSHA.5. REFER TO DRAWINGS TO DETERMINE REQUIRED PUMP ROTATION. COORDINATE WITH MECHANICAL CONTRACTOR PRIOR TO ORDERING.6. MOUNT PUMP ON 6" HOUSEKEEPING PAD.

    CONTROL NOTESI. INTERLOCK PUMP WITH WATER COOLED PACKAGE UNIT (AC-ICE)

    MANUFACTURER/MODEL NO.

    BELL & GOSSETT / E-90 1AABBELL & GOSSETT / E-90 1AAB

    SERVICEAC-ICEAC-ICE

    LOCATIONICE PLANTICE PLANT

    PUMP DATA

    PUMPTYPE

    IN-LINEIN-LINE

    GPM3838

    DRIVE

    CVCV

    RPM3,6003,600

    HEAD(FT)7070

    FLUID TEMP.RANGE (F)

    55-10055-100

    NPSHR(FT)14.814.8

    IMPELLERSIZE (IN.)

    4.754.75

    MIN.EFF. %

    57.257.2

    ELECTRICAL

    BHP1.581.58

    HP22

    VOLT460460

    PH33

    HZ6060

    FLA3.43.4

    CONTROLSII

    WEIGHT(LBS.)

    6565

    REMARKSAA

    PROJ. NO.

    DWG. No.SCALE

    DWG. TITLE

    DATE PLOTTED

    CHECKED

    DRAWN

    REVISIONS/ISSUES

    DO NOT SCALE THE DRAWINGS

    DESCRIPTION DATE

    1605.05-3

    CONTRACTOR SHALL CHECK AND VERIFY ALLDIMENSIONS AND REPORT ANY OMISSIONS ORDISCREPANCIES TO THE ARCHITECT BEFOREPROCEEDING WITH THE WORK.

    SEAL

    G:\x

    l cen

    ter i

    ce c

    hille

    r - d

    v180

    25.0

    1\C

    AD

    \Mec

    h\M

    -010

    .00_

    DV

    1802

    5.01

    .dw

    g 0

    9 Ja

    n '2

    0 - 1

    1:37

    amFI

    LENA

    ME:

    PLOT

    DATE

    :

    XREF

    S:

    9 JAN 2020

    XL CENTER

    Tel (416) 591 8999 Fax(416) 591 9087

    14 Duncan Street 4th FloorToronto, Ontario, CA M5H 3G8

    Tel (212) 986 3700 Fax (212) 687 6467

    CO N S U L T I N G E N G I N E E R S P. C.

    CONSULTING ENGINEERSTel (310) 842 8700 Fax (310) 842 7700

    Severud Associates

    engineers

    1 CIVIC CENTER PLAZAHARTFORD, CT

    CHILLER PLANTRELOCATION

    ISSUED FOR BID 2020-01-091

    AS NOTED

    ME

    ME

    M-010.00

    MECHANICALSCHEDULES

  • COOLING TOWER SCHEDULE

    CODE(CT)

    CT-1&2

    GENERAL NOTES1. PROVIDE PREMIUM EFFICIENCY MOTORS (FOR MOTORS 1HP AND OVER PER NEMA STANDARD MG-1 2003: TABLES 12-12, 12-13).2. PROVIDE MAGNETIC STARTERS WITH AUXILIARY CONTACTS AND HOA SWITCH ON ALL THREE PHASE MOTORS.3. SEE SPECIFICATIONS FOR VIBRATION ISOLATION REQUIREMENTS.4. TOWER TO BE CTI RATED.5. PROVIDE A VFD ON EACH FAN MOTOR. PROVIDE DIGITAL OUT, DIGITAL IN, ANALOG OUT, AND ANALOG IN COMMUNICATION WITH BMS.6. PROVIDE TYPE 304 STAINLESS STEEL CONSTRUCTION FOR BASIN, PANELS, STRUCTURAL MEMBERS, FASTENERS, AND ALL OTHER COMPONENTS.7. PROVIDE A VIBRATION CUTOUT SWITCH.8. BASIN HEATERS SHALL BE PROVIDED WITH CONTROLS TO MAITIAIN 40F WATER TEMPERATURE AT -20F AMBIENT9. PROVIDE A TOTALLY ENCLOSED FAN COOLED MOTOR.10. PROVIDE ELECTRIC LIQUID LEVEL CONTROL INTERFACE, INCLUDING OPERATING LIQUID LEVEL, DRY CONTACT SENSOR AND DRY CONTACTS FOR HIGH AND LOW LEVEL ALARM INDICATION FOR CONNECTION TO BUILDING AUTOMATION SYSTEM AT EACH TOWER.11. VFD SHALL COME FACTORY MOUNTED IN A NEMA 3R ENCLOSURE. PROVIDE HEATER AND FAN WITHIN VFD ENCLOSURE.12. PROVIDE EXTERNAL LADDERS, RAILINGS, AND INTERNAL WALKING PLATFORM.13. SEE SPECIFICATION FOR SOUND DATA REQUIREMENTS.

    REMARK NOTES

    MANUFACTURER/MODEL NO.

    BAC / XES15E-1285-06FNTYPE

    INDUCED DRAFTSERVICE

    ICE CHILLERLOCATION

    ROOF

    NUMBEROF

    CELLS2

    TOTALOPERATING

    WEIGHT (LBS)19,275

    TOTALFLOWGPM630

    EWT(°F)95

    LWT(°F)85

    DESIGNWBT(°F)76.6

    MAX. TOWERPUMPING

    HEAD (FT W)10

    ELECTRICALFAN (EACH CELL)

    HP2

    VOLT460

    PH3

    HZ60

    FLA3.4

    BASIN HEATER (EACH CELL)kW12

    VOLT460

    PH3

    HZ60

    FLA15.2

    OVERALLDIMENSIONS

    LENGTH17'-2"

    WIDTH11'-10"

    HEIGHT10'-0"

    REMARKS

    STEAM SHELL AND TUBE HEAT EXCHANGER SCHEDULE

    CODE(HX)

    HX-ICE

    GENERAL NOTES1. BRINE: 40% ETHYLENE GLYCOL.2. REFER TO DETAILS AND SPECIFICATIONS FOR PIPING ARRANGEMENT AND ACCESSORIES.3. HEAT EXCHANGER AND TANK TO BE ASSEMBLED AT THE FACTORY AND SHIPPED FULLY ASSEMBLED.4. DELTA T = 6 DEGREES FOR HEAT EXCHANGER. OPERATING TEMPERATURE, 5 TO 150F5. HEAT EXCHANGER SHALL BE COMPATABLE WITH THE BRINE SOLUTION AND OPERATING TEMPERATURES.

    REMARK NOTESA.

    MANUFACTURER/

    MODEL NO.BELL & GOSSETT / SU-203-2

    SERVICEICE OUT

    LOCATIONMECHANICAL MEZZINE

    OPERATINGWEIGHT (LBS)

    1,444MBH3,500

    TUBE SIDE

    FLUIDBRINE

    GPM1,200

    DELTAT (F)6.5

    WPD(FT)15

    NO. OFPASSES

    2

    RATEDPRES. (PSI)

    150

    SURFACE AREA(SQFT)212.5

    SHELL SIDEPRESSURE

    (PSIG)5

    LBS/HR3,620

    RATEDPRES. (PSI)

    150REMARKS

    WATER COOLED PACKAGE UNIT SCHEDULE

    CODE(WSHP)AC-ICE

    GENERAL NOTES:1. UNIT SHALL PROVIDE COOLING ONLY.2. INSTALL UNITS WITH ADEQUATE CLEARANCE FOR COIL PULL, FILTER REPLACEMENT, COMPRESSOR REPAIR, AND TO FULLY OPEN ALL ACCESS DOORS. PROVIDE A MINIMUM OF 3 FEET IN FRONT OF ALL DISCONNECTS, VFD'S, AND CONTROL PANELS. COMPLY FULLY WITH NEC. 3. PROVIDE FACTORY INSTALLED P-TRAP FOR CONDENSATE LINE. PIPE CONDENSATE PIPING TO NEAREST FLOOR DRAIN LOCATED WITHIN THE ICE PLANT.4. PROVIDE A 5 YEAR WARRANTY ON THE COMPRESSOR.5. REFIGERANT: R-410A.6. PROVIDE FACTORY INSTALLED DISCONNECT SWITCH.7. PROVIDE 2" MERV 8 FILTER.8. ALL PIPING AND ELECTRICAL CONNECTIONS SHALL BE MADE WITH FLEXIBLE CONNECTIONS. 9. PROVIDE DUCT SMOKE DETECTORS PER CODE IN THE SUPPLY AND RETURN AIR OF ALL UNITS 2000 CFM OR GREATER. RE: SPECIFICATIONS. INITIALIZATION OF A DUCT SMOKE DETECTOR SHALL STOP RESPECTIVE FANS AND CLOSE OUTSIDE AIR DAMPERS. 10. ALL FANS TO BE DELIVERED IN SECTIONS. ANY FURTHER REQUIRED FIELD DISASSEMBLY AND UNIT REASSEMBLY SHALL BE DONE BY THE CONTRACTOR UNDER THE SUPERVISION OF THE MANUFACTURER. 11. MOUNT UNIT ON A 4" HOUSEKEEPING PAD.12. PROVIDE HAYES MEASUREFLOW PRESSURE INDEPENDENT BALANCING VALVE AND 2-WAY CONTROL VALVE FOR EACH UNIT.13. PROVIDE FACTORY INSTALLED ECM MOTORS14. PROVIDE 2-STAGE COMPRESSORS.

    REMARK NOTES:

    MANUFACTURER/MODEL

    CLIMATEMASTER / TC-160

    AREASERVED

    ICE PLANTLOCATION

    FLOOR

    WEIGHT(LBS)1,069

    CFM4,900

    ESP(IN.)0.5

    COOLING CAPACITYTOTALMBH140.8

    SENSMBH114.6

    EWT(F)85

    LWT(F)95

    GPM38

    WPD(FT)11.3

    EAT (F)D.B.77

    W.B.62

    LAT (F)D.B.55

    W.B.55

    EER12.3

    ELECTRICAL DATA

    KW13.3

    VOLT460

    PH3

    HZ60

    FLA26.5

    MCA29.3

    MFS40

    DIMENSIONS (IN)WIDTH

    82DEPTH

    29HEIGHT

    70REMARKS

    GRILLE REGISTER DIFFUSER SCHEDULE

    CODE

    A

    B

    C

    GENERAL NOTES1. SEE PLANS FOR CFM AND NECK SIZES.2. MAXIMUM NOISE CRITERIA (NC) SHALL BE 30 UNLESS OTHERWISE NOTED.3. COLOR TO BE COORDINATED WITH ARCHITECT PRIOR TO ORDERING.4. MATERIAL IS STEEL UNLESS OTHERWISE NOTED.5. PROVIDE BALANCING DEVICE FOR ALL GRILLES, REGISTERS, AND DIFFUSERS UNLESS OTHERWISE NOTED. BALANCING DEVICES SHALL BE LOCATED AS FAR FROM THE GRILLES AS POSSIBLE.

    REMARKS

    MANUFACTURER/MODEL NO.

    TITUS / 350 RL

    TITUS / 300

    TITUS / OMNI

    SERVICE

    RETURN/EXHAUST

    AIR

    SUPPLY AIR

    SUPPLY AIR

    TYPE

    GRILLE

    GRILLE

    SQUARE

    ACCESSORIES

    PROVIDE OPPOSEDBLADE DAMPERWHERE NOTED

    PROVIDE OPPOSEDBLADE DAMPERWHERE NOTED

    NONE

    FACE SIZE

    SEE DRAWINGS

    SEE DRAWINGS

    24X24

    NECK SIZE

    SEE DRAWING

    SEE DRAWING

    SEE DRAWINGS

    FINISH

    TBD BYARCHITECT

    TBD BYARCHITECT

    TBD BYARCHITECT

    REMARKS

    HEATING AND VENTILATING AIR HANDLING UNIT SCHEDULECODE(AHU)

    HV-ICE

    GENERAL NOTES1. PROVIDE PREMIUM EFFICIENCY MOTORS FOR MOTORS 1 HP AND OVER PER NEMA STANDARD MG1-2003, TABLES 12-12 AND 12-13. 2. PROVIDE FACTORY MOUNTED VFD AND DISCONNECT3. INSTALL UNITS WITH ADEQUATE CLEARANCE FOR COIL PULL , FILTER REPLACEMENT AND TO FULLY OPEN ACCESS DOORS. PROVIDE A MINIMUM OF 3 FEET CLEARANCE IN FRONT OF DISCONNECTS SWITCHES AND CONTROL PANELS. COMPLY FULLY WITH NEC.4. UNIT TOTAL STATIC PRESSURE SHALL INCLUDE SCHEDULED EXTERNAL STATIC PRESSURE PLUS ALL SCHEDULED INTERNAL PRESSURE DROPS. INCLUDE VALUES FOR DIRTY FILTERS.5. PROVIDE DUCT SMOKE DETECTORS IN THE SUPPLY AND RETURN AIR OF ALL UNITS 2000 CFM OR GREATER. RE: SPECIFICATIONS. INITIALIZATION OF A DUCT SMOKE DETECTOR SHALL STOP RESPECTIVE FANS.6. ALL UNITS TO BE DELIVERED IN SECTIONS. ANY FURTHER REQUIRED FIELD DISASSEMBLY AND UNIT REASSEMBLY SHALL BE DONE BY THE CONTRACTOR UNDER THE SUPERVISION OF THE MANUFACTURER.7. CEILING HUNG UNIT, PROVIDE VIBRATION ISOLATION AS REQUIRED.8. PROVIDE SINGLE POINT ELECTRICAL CONNECTION.9. PROVIDE ACCESS DOORS ON BOTH SIDES OF UNIT.10. PROVIDE MAGNETIC FILTER GAUGES.11. PROVIDE FREEZE STAT PER CODE DOWNSTREAM OF HEATING COIL.

    MANUFACTURER/MODEL NO.

    CARRIER / 39L10

    AREASERVED

    ICE PLANTLOCATION

    MECH MEZZANINE

    WEIGHTLBS664

    SUPPLY FAN

    CFM4,800

    TYPELG

    TSP(IN)1.73

    ESP(IN.)

    1HP5

    MAXBHP

    3

    FANRPM958

    MIN. OSA(CFM)4800

    HEATING CAPACITY (STEAM)

    EAT (°F)0

    LAT (°F)64

    APD("W.C.)

    0.15

    TOTALMBH339

    STEAMLB/HR

    354PSI5

    COILROWS

    1

    FINSPER IN

    9

    PRE-FILTER

    TYPEMERV 8

    APD ("WC)INITIAL

    0.16FINAL

    0.5

    ELECTRICAL

    VOLT460

    PH3

    FLA6.5

    MOCP10

    DIMENSIONS (IN)WIDTH

    57DEPTH

    58HEIGHT

    32REMARKS

    CABINET HEATER SCHEDULE (HYDRONIC)

    CODECH-1

    GENERAL NOTES1. HEATING WATER: EWT:180 F, LWT=160F2. UNIT SHALL BE SHIPPED WITH 2" PLEATED FILTERS.3. PROVIDE CONTROLS TRANSFORMER. COORDINATE LOCATION WITH CONTROLS CONTRACTOR.4. NO BMS CONNECTION OR MONITORING. PROVIDE LOCAL CONTROLS ONLY.5. ENCLOSURE COLOR SELECTED BY ARCHITECT.6. UNIT CONTROLLED BY WALL MOUNTED TEMPERATURE SENSOR/CONTROLLER PROVIDED BY CONTROL CONTRACTOR7. BOTTOM INLET, TOP BAR GRILLE OUTLET

    REMARK NOTES:

    MANUFACTURER/MODEL NO.

    STERLING / F04AREA SERVED

    STAIR

    FAN

    CFM375

    ESP(IN.)

    0

    HEATING COILEAT(F)40

    LAT(F)114

    MBH30

    GPM3

    ROW1

    WPD(FT)0.27

    ELECTRICAL

    VOLT115

    PH1

    DIMENSIONS(INCHES)

    W47

    H25

    D9.5

    WEIGHT(LBS)122

    REMARKS

    PROJ. NO.

    DWG. No.SCALE

    DWG. TITLE

    DATE PLOTTED

    CHECKED

    DRAWN

    REVISIONS/ISSUES

    DO NOT SCALE THE DRAWINGS

    DESCRIPTION DATE

    1605.05-3

    CONTRACTOR SHALL CHECK AND VERIFY ALLDIMENSIONS AND REPORT ANY OMISSIONS ORDISCREPANCIES TO THE ARCHITECT BEFOREPROCEEDING WITH THE WORK.

    SEAL

    G:\x

    l cen

    ter i

    ce c

    hille

    r - d

    v180

    25.0

    1\C

    AD

    \Mec

    h\M

    -010

    .00_

    DV

    1802

    5.01

    .dw

    g 0

    9 Ja

    n '2

    0 - 1

    1:37

    amFI

    LENA

    ME:

    PLOT

    DATE

    :

    XREF

    S:

    9 JAN 2020

    XL CENTER

    Tel (416) 591 8999 Fax(416) 591 9087

    14 Duncan Street 4th FloorToronto, Ontario, CA M5H 3G8

    Tel (212) 986 3700 Fax (212) 687 6467

    CO N S U L T I N G E N G I N E E R S P. C.

    CONSULTING ENGINEERSTel (310) 842 8700 Fax (310) 842 7700

    Severud Associates

    engineers

    1 CIVIC CENTER PLAZAHARTFORD, CT

    CHILLER PLANTRELOCATION

    ISSUED FOR BID 2020-01-091

    AS NOTED

    ME

    ME

    M-011.00

    MECHANICALSCHEDULES

  • GENERAL NOTES KEYNOTES11. EXISTING SYSTEMS INFORMATION IS SHOWN FOR REFERENCE

    ONLY TO CLARIFY SCOPE. CONTRACTOR SHALL FIELD VERIFYTHESE EXISTING CONDITION TO CONFIRM THE PRECISE TIE-INLOCATION FOR NEW WORK.

    2. INTERIM RELOCATIONS OF EXISTING SYSTEMS MAY BE REQUIREDTO ACCOMPLISH THE FINAL INDICATED SCOPE IN A STAGEDMANNER. CONTRACTOR'S SCOPE SHALL INCLUDE A PHASEDAPPROACH AND ALL COSTS ASSOCIATED WITH THIS MAKE-READYWORK. REFER TO ARCHITECTURAL PHASING PLANS.

    3. DEMOLITION TO OCCUR ONLY WHEN SPACES ARE NOT OCCUPIED.

    4. CUT ALL SUPPLY, RETURN, AND EXHAUST DUCTWORK ANDASSOCIATED AT EACH POINT OF DISCONNECTION INDICATED ONDEMOLITION PLANS.

    5. WHERE DISCONNECTING DUCTWORK, CONTRACTOR SHALLPROVIDE AN AIRTIGHT CAP AND SEAL EXISTING TO REMAINDUCTWORK AIRTIGHT.

    6. COORDINATION DRAWINGS SHALL BE PREPARED TO ENSUREROUTING AVOIDS CONFLICTS WITH NEW AND EXISTING WORK.CONTRACTOR SHALL COORDINATE WITH ALL OTHER TRADES.

    7. 7. ALL WORK AFFECTING BUILDING SYSTEM OPERATION SHALLBE COORDINATED WITH BUILDING ENGINEERING.

    XX

    A A.5 A.7 B

    (E)10"LPSDN

    (E)10"LPS (E)12"LPS

    (R)6"CWS/RDN

    (E)6"LPS

    (E)6"LPSUP

    (E)6"LPS

    (E)6"LPSUP

    (E)8"LPS

    EXISTING EXHAUST AIR PLENUM

    ..

    (R)6"CWS/RDN (R) (2)112" REFRIGERANT

    RELIEF PIPING DN

    DEMOLISH (2)112" REFRIGERANTRELIEF PIPING BACK TODISCHARGE LOCATION.

    (R)62X40 (R)62X40 TAP AND PATCHEXHAUST AIR PLENUM

    (R)62X40 TAP AND PATCHEXHAUST AIR PLENUM

    (R)62X40

    (R)40X62

    (E)6

    0X18

    (R)54X100

    (R)54X100

    (R)8

    6X60

    EXISTING INTAKE AIR PLENUM

    (R)56X48

    (R)56X48

    (R)6"CWS/RDN

    (R)56X48 TAP AND PATCHOUTSIDE AIR PLENUM

    EXISTING INTAKE AIR PLENUM

    (R)40X62

    DEMOLISH (2) INDOOR COOLING TOWERS

    (E)14"STORMM

    (E)6"LPSUP

    (E)60

    X68

    (E)6"LPS

    (E)8

    "LP

    S

    (E)5"LPR

    (E)4"LPR

    (E)5"LPRDN TOPUMP

    (E)V1

    (E)66X60

    PROJ. NO.

    DWG. No.SCALE

    DWG. TITLE

    DATE PLOTTED

    CHECKED

    DRAWN

    REVISIONS/ISSUES

    DO NOT SCALE THE DRAWINGS

    DESCRIPTION DATE

    1605.05-3

    CONTRACTOR SHALL CHECK AND VERIFY ALLDIMENSIONS AND REPORT ANY OMISSIONS ORDISCREPANCIES TO THE ARCHITECT BEFOREPROCEEDING WITH THE WORK.

    SEAL

    G:\x

    l cen

    ter i

    ce c

    hille

    r - d

    v180

    25.0

    1\C

    AD

    \Mec

    h\M

    -102

    .00_

    DV

    1802

    5.01

    .dw

    g 0

    9 Ja

    n '2

    0 - 1

    1:37

    amFI

    LENA

    ME:

    PLOT

    DATE

    :

    XREF

    S:

    9 JAN 2020

    XL CENTER

    Tel (416) 591 8999 Fax(416) 591 9087

    14 Duncan Street 4th FloorToronto, Ontario, CA M5H 3G8

    Tel (212) 986 3700 Fax (212) 687 6467

    CO N S U L T I N G E N G I N E E R S P. C.

    CONSULTING ENGINEERSTel (310) 842 8700 Fax (310) 842 7700

    Severud Associates

    engineers

    1 CIVIC CENTER PLAZAHARTFORD, CT

    CHILLER PLANTRELOCATION

    ISSUED FOR BID 2020-01-091

    AS NOTED

    ME

    ME

    M-101.00

    MECHANICAL DEMOPLAN - N.W. QUADRANTEL.48

    MECHANICAL DEMO PLAN - N.W. QUADRANT EL.481 1/8" = 1'-0"

  • GENERAL NOTES KEYNOTES11. EXISTING SYSTEMS INFORMATION IS SHOWN FOR REFERENCE

    ONLY TO CLARIFY SCOPE. CONTRACTOR SHALL FIELD VERIFYTHESE EXISTING CONDITION TO CONFIRM THE PRECISE TIE-INLOCATION FOR NEW WORK.

    2. INTERIM RELOCATIONS OF EXISTING SYSTEMS MAY BE REQUIREDTO ACCOMPLISH THE FINAL INDICATED SCOPE IN A STAGEDMANNER. CONTRACTOR'S SCOPE SHALL INCLUDE A PHASEDAPPROACH AND ALL COSTS ASSOCIATED WITH THIS MAKE-READYWORK. REFER TO ARCHITECTURAL PHASING PLANS.

    3. DEMOLITION TO OCCUR ONLY WHEN SPACES ARE NOT OCCUPIED.

    4. CUT ALL SUPPLY, RETURN, AND EXHAUST DUCTWORK ANDASSOCIATED AT EACH POINT OF DISCONNECTION INDICATED ONDEMOLITION PLANS.

    5. WHERE DISCONNECTING DUCTWORK, CONTRACTOR SHALLPROVIDE AN AIRTIGHT CAP AND SEAL EXISTING TO REMAINDUCTWORK AIRTIGHT.

    6. COORDINATION DRAWINGS SHALL BE PREPARED TO ENSUREROUTING AVOIDS CONFLICTS WITH NEW AND EXISTING WORK.CONTRACTOR SHALL COORDINATE WITH ALL OTHER TRADES.

    7. 7. ALL WORK AFFECTING BUILDING SYSTEM OPERATION SHALLBE COORDINATED WITH BUILDING ENGINEERING.

    XX

    (E)10"LPSDN

    (E)6"LPSUP

    (E)14"LPS

    (E)14"LPS

    (E)6"LPSUP

    (E)1

    2"LP

    S

    (E)12"LPS

    (E)6"CWS

    (E)6"CWR

    (E)6"CWS(E)6"CWR

    (R)6"CWS/RDN

    EXISTING EXHAUST AIR PLENUM

    ..

    (R)6"CWS/RDN (R) (2)112" REFRIGERANT

    RELIEF PIPING DN

    DEMOLISH (2)112" REFRIGERANTRELIEF PIPING BACK TODISCHARGE LOCATION.

    (R)62X40 (R)62X40 TAP AND PATCHEXHAUST AIR PLENUM

    (R)62X40 TAP AND PATCHEXHAUST AIR PLENUM

    (R)62X40

    (R)40X62

    (E)6

    0X18

    DEMOLISH (2) INDOOR COOLING TOWERS

    PROJ. NO.

    DWG. No.SCALE

    DWG. TITLE

    DATE PLOTTED

    CHECKED

    DRAWN

    REVISIONS/ISSUES

    DO NOT SCALE THE DRAWINGS

    DESCRIPTION DATE

    1605.05-3

    CONTRACTOR SHALL CHECK AND VERIFY ALLDIMENSIONS AND REPORT ANY OMISSIONS ORDISCREPANCIES TO THE ARCHITECT BEFOREPROCEEDING WITH THE WORK.

    SEAL

    G:\x

    l cen

    ter i

    ce c

    hille

    r - d

    v180

    25.0

    1\C

    AD

    \Mec

    h\M

    -102

    .00_

    DV

    1802

    5.01

    .dw

    g 0

    9 Ja

    n '2

    0 - 1

    1:37

    amFI

    LENA

    ME:

    PLOT

    DATE

    :

    XREF

    S:

    9 JAN 2020

    XL CENTER

    Tel (416) 591 8999 Fax(416) 591 9087

    14 Duncan Street 4th FloorToronto, Ontario, CA M5H 3G8

    Tel (212) 986 3700 Fax (212) 687 6467

    CO N S U L T I N G E N G I N E E R S P. C.

    CONSULTING ENGINEERSTel (310) 842 8700 Fax (310) 842 7700

    Severud Associates

    engineers

    1 CIVIC CENTER PLAZAHARTFORD, CT

    CHILLER PLANTRELOCATION

    ISSUED FOR BID 2020-01-091

    AS NOTED

    ME

    ME

    M-102.00

    MECHANICAL DEMOPLAN - N.E. QUADRANTEL.48

    MECHANICAL DEMO PLAN - N.E. QUADRANT EL.481 1/8" = 1'-0"

  • GENERAL NOTES KEYNOTES11. EXISTING SYSTEMS INFORMATION IS SHOWN FOR REFERENCE

    ONLY TO CLARIFY SCOPE. CONTRACTOR SHALL FIELD VERIFYTHESE EXISTING CONDITION TO CONFIRM THE PRECISE TIE-INLOCATION FOR NEW WORK. REFER TO DEMOLITION PLANS FORADDITIONAL INFORMATION REGARDING EXISTING SYSTEMS.EXISTING SYSTEMS NOTES ARE NOT SHOWN ON CONSTRUCTIONPLANS FOR CLARITY OF THE DRAWINGS.

    2. CONTRACTOR SHALL PROVIDE CORE DRILLING AS REQUIRED FORNEW PIPE PENETRATIONS.

    3. COORDINATION DRAWINGS SHALL BE PREPARED TO ENSUREROUTING AVOIDS CONFLICTS WITH NEW AND EXISTING WORK.CONTRACTOR SHALL COORDINATE WITH ALL OTHER TRADES.

    4. ALL WORK AFFECTING BUILDING SYSTEM OPERATION SHALL BE

    COORDINATED WITH BUILDING ENGINEERING.

    5. PIPING SHALL BE ROUTED TO AVOID IMPACTING ALL EXISTINGCEILING HEIGHTS. PROVIDE RISE AND FALLS AS NECESSARY TOAVOID OBSTRUCTIONS, SUCH AS STRUCTURAL ELEMENTS ANDEXISTING TO REMAIN PIPING.

    6. INTERIM RELOCATIONS OF EXISTING SYSTEMS MAY BE REQUIREDTO ACCOMPLISH THE FINAL INDICATED SCOPE IN A STAGEDMANNER. CONTRACTOR'S SCOPE SHALL INCLUDE A PHASEDAPPROACH AND ALL COSTS ASSOCIATED WITH THIS MAKE-READYWORK.

    7. PROVIDE FIRE/SMOKE DAMPERS AT ALL SHAFT PENETRATIONS,MECHANICAL ROOM WALL PENETRATIONS AND RATED ASSEMBLYPENETRATIONS. REFER TO ARCH. FOR RATED ASSEMBLY TYPES

    AND LOCATIONS.

    8. PROVIDE 1/2"X1/2" WIRE MESH SCREEN ON ALL OPEN DUCTSTAPPED TO SHAFT PLENUM.

    9. CONTRACTOR IS RESPONSIBLE FOR ALL CEILING REMOVALS ANDREINSTALLATIONS REQUIRED TO COMPLETE WORK. PROVIDECEILING TILES AS REQUIRED. CEILING TILES SHALL MATCHEXISTING.

    ADD/DEDUCT ALTERNATE: PROVIDE A PRICING ALTERNATE FORROUTING THE BRINE PIPING WITHIN THE PROPOSED TRENCH.

    A A.5 A.7 B

    10

    9.5

    9.3

    9

    8.5

    AA

    (E)10"LPSDN

    (E)10"LPS

    (E)6"LPS

    (E)6"LPSUP

    (E)6"LPS

    (E)6"LPSUP

    (E)8"LPS

    EXISTING EXHAUST AIR PLENUM

    (E)6

    0X18

    EXISTING INTAKE AIR PLENUM EXISTING INTAKE AIR PLENUM

    (E)14"STORMM

    (E)6"LPSUP

    (E)60

    X68

    (E)6"LPS

    (E)8

    "LP

    S

    (E)5"LPR

    (E)4"LPR

    (E)5"LPRDN TOPUMP

    (E)V1

    (E)66X60

    10"BRINE SUPPLY& RETURN DN

    10"BWS/R DN

    10"BWR10"BWS

    8"CWS/R DN

    8"CWS/RUP

    24X24 EA DN

    8"BWRDN

    6"LPS

    4"LPRDN

    HXICE

    112"MAKEUP WATERSLOW CLOSINGSOLENOID VALVE

    SEE PLUMBING DWGFOR CONTINUATION.

    30X18

    18X3

    0

    24X24

    30X20 EA UP

    24X2

    4

    8"CWR8"CWSHV

    ICE 212"

    LPS

    2"LPR

    30X

    18

    112"MAKUP CWDN

    6"REFRIGERATIONRELIEF UP

    18X30SA UP

    12X10OA DN

    12X12

    GX1

    GX2

    24X

    24

    12X

    10

    12X10

    M

    112"WATER METERWITH 112" BYPASS

    10"BWR10"BWS

    1

    APPROXIMATELOCATION OFPROPOSEDTRENCH ONFLOOR BELOW.

    6"REFRIGERATIONRELIEF DN

    LOW LEAK MOTORIZEDDAMPERS

    LOW LEAKMOTORIZED

    DAMPERS

    LOW LEAKMOTORIZED

    DAMPERS

    S

    PROJ. NO.

    DWG. No.SCALE

    DWG. TITLE

    DATE PLOTTED

    CHECKED

    DRAWN

    REVISIONS/ISSUES

    DO NOT SCALE THE DRAWINGS

    DESCRIPTION DATE

    1605.05-3

    CONTRACTOR SHALL CHECK AND VERIFY ALLDIMENSIONS AND REPORT ANY OMISSIONS ORDISCREPANCIES TO THE ARCHITECT BEFOREPROCEEDING WITH THE WORK.

    SEAL

    G:\x

    l cen

    ter i

    ce c

    hille

    r - d

    v180

    25.0

    1\C

    AD

    \Mec

    h\M

    -202

    .00_

    DV

    1802

    5.01

    .dw

    g 0

    9 Ja

    n '2

    0 - 1

    1:37

    amFI

    LENA

    ME:

    PLOT

    DATE

    :

    XREF

    S:

    9 JAN 2020

    XL CENTER

    Tel (416) 591 8999 Fax(416) 591 9087

    14 Duncan Street 4th FloorToronto, Ontario, CA M5H 3G8

    Tel (212) 986 3700 Fax (212) 687 6467

    CO N S U L T I N G E N G I N E E R S P. C.

    CONSULTING ENGINEERSTel (310) 842 8700 Fax (310) 842 7700

    Severud Associates

    engineers

    1 CIVIC CENTER PLAZAHARTFORD, CT

    CHILLER PLANTRELOCATION

    ISSUED FOR BID 2020-01-091

    AS NOTED

    ME

    ME

    M-201.00

    MECHANICAL PLAN -N.W. QUADRANT EL.48

    MECHANICAL PLAN - N.W. QUADRANT EL.481 1/8" = 1'-0"

  • (E)5"LPR UP

    (E)212"PDUP

    (R)30x6RA

    (R)18x10EAD

    (R)12x8EAD

    (R)?x8EA

    (E)16x16

    (E)20x10TRANSFERDUCT

    (E)22x14SAD

    (E)20x12SAD(E)BH-16

    (E)2

    0x12

    SA

    D(R

    )16x

    8SA

    D

    (E)112"BHF UP

    (E)112"BHR UP

    (E)1

    6x10

    SA

    D

    (R)12x8SAD

    (R)16x8SAD

    (R)1

    6x8S

    AD

    (E)112"BHF UP(E)112"BHR UP

    (E)10x8

    (E)10x6TF UP

    (E)BH-17

    (R)10x8SADT(R)14x8SAD

    (E)28x

    14EAD

    (E)18x10EAD

    (E)STEAMCONDENSATEPUMP

    DEMOLISH EXISTING TOILETEXHAUST BACK TO MAIN

    GENERAL NOTES

    KEYNOTES1

    1. EXISTING SYSTEMS INFORMATION ISSHOWN FOR REFERENCE ONLY TOCLARIFY SCOPE. CONTRACTOR SHALLFIELD VERIFY THESE EXISTING CONDITIONTO CONFIRM THE PRECISE TIE-INLOCATION FOR NEW WORK. REFER TODEMOLITION PLANS FOR ADDITIONALINFORMATION REGARDING EXISTINGSYSTEMS. EXISTING SYSTEMS NOTES ARENOT SHOWN ON CONSTRUCTION PLANSFOR CLARITY OF THE DRAWINGS.

    2. CONTRACTOR SHALL PROVIDE COREDRILLING AS REQUIRED FOR NEW PIPEPENETRATIONS.

    3. COORDINATION DRAWINGS SHALL BEPREPARED TO ENSURE ROUTING AVOIDSCONFLICTS WITH NEW AND EXISTINGWORK. CONTRACTOR SHALL COORDINATEWITH ALL OTHER TRADES.

    4. ALL WORK AFFECTING BUILDING SYSTEMOPERATION SHALL BE COORDINATED WITHBUILDING ENGINEERING.

    5. PIPING SHALL BE ROUTED TO AVOIDIMPACTING ALL EXISTING CEILINGHEIGHTS. PROVIDE RISE AND FALLS ASNECESSARY TO AVOID OBSTRUCTIONS,SUCH AS STRUCTURAL ELEMENTS ANDEXISTING TO REMAIN PIPING.

    6. INTERIM RELOCATIONS OF EXISTINGSYSTEMS MAY BE REQUIRED TOACCOMPLISH THE FINAL INDICATED SCOPEIN A STAGED MANNER. CONTRACTOR'SSCOPE SHALL INCLUDE A PHASEDAPPROACH AND ALL COSTS ASSOCIATEDWITH THIS MAKE-READY WORK.

    7. PROVIDE FIRE/SMOKE DAMPERS AT ALLSHAFT PENETRATIONS, MECHANICALROOM WALL PENETRATIONS AND RATEDASSEMBLY PENETRATIONS. REFER TOARCH. FOR RATED ASSEMBLY TYPES ANDLOCATIONS.

    8. PROVIDE 1/2"X1/2" WIRE MESH SCREEN ONALL OPEN DUCTS TAPPED TO SHAFTPLENUM.

    9. CONTRACTOR IS RESPONSIBLE FOR ALLCEILING REMOVALS ANDREINSTALLATIONS REQUIRED TOCOMPLETE WORK. PROVIDE CEILINGTILES AS REQUIRED. CEILING TILES SHALLMATCH EXISTING.

    10. PROVIDE CHILLER BREAK GLASS STATIONWITH HORN/STOBE IN ACCORDANCE WITHCODE. AT A MINIMUM, PROVIDE A BREAKGLASS STATION AND HORN STROP WITHINTHE CHILLER PLANT AND JUST OUTSIDETHE ROOM AT EACH DOOR TO THECHILLER PLANT.

    24X14 SA OPENING, EXTEND DUCTWORKDOWN TO 12" ABOVE THE FINISHED FLOORAND PROVIDE WMS. 2,450 CFM

    PROVIDE FLANGED CONNECTION TOALLOW PIPE TO BE REMOVED IN THEFUTURE TO ALLOW FOR A FUTURE CHILLERTO BE RIGGED.

    PROVIDE FLANGED CONNECTION ABOVETHE BOTH THE EVAPORATOR ANDCONDENSER BUNDLES TO ALLOW PIPE TOREMOVED FOR CLEANING OF THE SHELL.

    78X12 RA DUCT, EXTEND DUCTWORK UP TO24" FROM THE UNDERSIDE OF SLAB. ANDPROVIDE WMS. PROVIDE VOLUME DAMPERON RETURN AND VENTILATION AIR IN THEVERTICAL. BALANCE VENTILATION AIRDAMPER TO 500 CFM AND THE RETURN AIRTO 4,400 CFM.

    ALL BRINE AND CONDENSER WATER PIPINGSHALL BE RACKED AT AN ELEVATION THATMAINTAINS ACCESS FOR A SECONDCHILLER BEING INSTALLED AS INDICATED.ASSUME SECOND CHILLER WILL BE THESAME SIZE AND THE PROPOSED.

    ADD ALTERNATE: PROVIDE A PRICINGALTERNATE FOR ROUTING THE BRINEPIPING WITHIN THE PROPOSED TRENCH.TEMPORARILY SUPPORT ALL EXISTING TOREMAIN MECHANICAL, PLUMBING, ANDELECTRICAL EQUIPMENT TOACCOMMODATE TRENCH.

    2

    3

    4

    5

    6

    PROJ. NO.

    DWG. No.SCALE

    DWG. TITLE

    DATE PLOTTED

    CHECKED

    DRAWN

    REVISIONS/ISSUES

    DO NOT SCALE THE DRAWINGS

    DESCRIPTION DATE

    1605.05-3

    CONTRACTOR SHALL CHECK AND VERIFY ALLDIMENSIONS AND REPORT ANY OMISSIONS ORDISCREPANCIES TO THE ARCHITECT BEFOREPROCEEDING WITH THE WORK.

    SEAL

    G:\x

    l cen

    ter i

    ce c

    hille

    r - d

    v180

    25.0

    1\C

    AD

    \Mec

    h\M

    -500

    .00_

    DV

    1802

    5.01

    .dw

    g 0

    9 Ja

    n '2

    0 - 1

    1:37

    amFI

    LENA

    ME:

    PLOT

    DATE

    :

    XREF

    S:

    9 JAN 2020

    XL CENTER

    Tel (416) 591 8999 Fax(416) 591 9087

    14 Duncan Street 4th FloorToronto, Ontario, CA M5H 3G8

    Tel (212) 986 3700 Fax (212) 687 6467

    CO N S U L T I N G E N G I N E E R S P. C.

    CONSULTING ENGINEERSTel (310) 842 8700 Fax (310) 842 7700

    Severud Associates

    engineers

    1 CIVIC CENTER PLAZAHARTFORD, CT

    CHILLER PLANTRELOCATION

    ISSUED FOR BID 2020-01-091

    AS NOTED

    ME

    ME

    M-500.00

    MECHANICAL ENLARGEDDEMO PLAN - FUTURECHILLER PLANT

    MECHANICAL ENLARGED DEMO PLAN - FUTURE CHILLER PLANT1/4" = 1' - 0"1

  • (E)5"LPR UP

    (E)212"PDUP

    4"LPR UP

    (E)16x16

    (E)20x10TRANSFERDUCT

    (E)22x14SAD

    (E)20x12SAD(E)BH-16

    (E)2

    0x12

    SA

    D

    (E)112"BHF UP

    (E)112"BHR UP

    (E)1

    6x10

    SA

    D

    (E)112"BHF UP(E)112"BHR UP

    (E)10x8

    (E)10x6TF UP

    (E)BH-17

    (E)28x

    14EAD

    (E)18x10EAD

    ACICE

    CWP1

    CWP2

    BWP1

    BWP2

    24X24 EA UP

    18X30 SA UPFSD

    10"BWS/R UP

    8"CWS/R UP

    ETICE

    8"BWR UP

    6"REFRIGERATIONRELIEF UP

    10"BWS

    10"BWR

    8"CWS/R

    10"BWS/R & 8"CWS/RTO CHILLER

    18X

    20

    1

    1

    24X

    14

    8"B

    WR

    3

    2

    2

    CO

    NTR

    OL P

    AN

    EL

    FUTURE CHILLER

    44X14WMS

    EMERGENCYSHOWER/EYEWASH STATION

    1" TO EXPANSIONTANK

    CO

    NTR

    OL

    PA

    NE

    L

    CH1

    4

    12X10 OA UPFSD

    (E)STEAMCONDENSATEPUMP

    5

    212"CWS

    212"CWR

    CWPAC1

    CWPAC2

    PPICE

    8x10 SAD

    A 8Ø150A 6Ø50

    T

    (2)

    16x1

    0 S

    AD

    750 CFM

    8x6 SAD

    B 26X8750

    16x1

    0 S

    AD

    B 8X675B8X675

    WMS

    T

    GLYCOLMIXINGSTATION

    FSD

    FSD

    FSD

    CH1

    1"HWS/R

    S

    S

    S

    1,500 GALLON AMMONIADIFFUSION TANK

    6"REFRIGERATIONRELIEF

    M

    CONDENSER WATERLINKED BUTTERFLYCONTROL VALVES

    BMS CONTROLPANEL

    REFRIGERANTMONITOR

    PANEL

    112"CONDENSER WATER BLOWDOWN VALVE. PIPE DRAINDISCHARGE TO EXISTING DRAIN.REMOVE GRATE TO FACILITATEDIRECT DISCHARGE.

    CONDENSER WATERWATER TREATMENT

    TS

    TO BMS

    GENERAL NOTES

    KEYNOTES1

    1. EXISTING SYSTEMS INFORMATION ISSHOWN FOR REFERENCE ONLY TOCLARIFY SCOPE. CONTRACTOR SHALLFIELD VERIFY THESE EXISTING CONDITIONTO CONFIRM THE PRECISE TIE-INLOCATION FOR NEW WORK. REFER TODEMOLITION PLANS FOR ADDITIONALINFORMATION REGARDING EXISTINGSYSTEMS. EXISTING SYSTEMS NOTES ARENOT SHOWN ON CONSTRUCTION PLANSFOR CLARITY OF THE DRAWINGS.

    2. CONTRACTOR SHALL PROVIDE COREDRILLING AS REQUIRED FOR NEW PIPEPENETRATIONS.

    3. COORDINATION DRAWINGS SHALL BEPREPARED TO ENSURE ROUTING AVOIDSCONFLICTS WITH NEW AND EXISTINGWORK. CONTRACTOR SHALL COORDINATEWITH ALL OTHER TRADES.

    4. ALL WORK AFFECTING BUILDING SYSTEMOPERATION SHALL BE COORDINATED WITHBUILDING ENGINEERING.

    5. PIPING SHALL BE ROUTED TO AVOIDIMPACTING ALL EXISTING CEILINGHEIGHTS. PROVIDE RISE AND FALLS ASNECESSARY TO AVOID OBSTRUCTIONS,SUCH AS STRUCTURAL ELEMENTS ANDEXISTING TO REMAIN PIPING.

    6. INTERIM RELOCATIONS OF EXISTINGSYSTEMS MAY BE REQUIRED TOACCOMPLISH THE FINAL INDICATED SCOPEIN A STAGED MANNER. CONTRACTOR'SSCOPE SHALL INCLUDE A PHASEDAPPROACH AND ALL COSTS ASSOCIATEDWITH THIS MAKE-READY WORK.

    7. PROVIDE FIRE/SMOKE DAMPERS AT ALLSHAFT PENETRATIONS, MECHANICALROOM WALL PENETRATIONS AND RATEDASSEMBLY PENETRATIONS. REFER TOARCH. FOR RATED ASSEMBLY TYPES ANDLOCATIONS.

    8. PROVIDE 1/2"X1/2" WIRE MESH SCREEN ONALL OPEN DUCTS TAPPED TO SHAFTPLENUM.

    9. CONTRACTOR IS RESPONSIBLE FOR ALLCEILING REMOVALS ANDREINSTALLATIONS REQUIRED TOCOMPLETE WORK. PROVIDE CEILINGTILES AS REQUIRED. CEILING TILES SHALLMATCH EXISTING.

    10. PROVIDE CHILLER BREAK GLASS STATIONWITH HORN/STOBE IN ACCORDANCE WITHCODE. AT A MINIMUM, PROVIDE A BREAKGLASS STATION AND HORN STROP WITHINTHE CHILLER PLANT AND JUST OUTSIDETHE ROOM AT EACH DOOR TO THECHILLER PLANT.

    24X14 SA OPENING, EXTEND DUCTWORKDOWN TO 12" ABOVE THE FINISHED FLOORAND PROVIDE WMS. 2,450 CFM

    PROVIDE FLANGED CONNECTION TOALLOW PIPE TO BE REMOVED IN THEFUTURE TO ALLOW FOR A FUTURE CHILLERTO BE RIGGED.

    PROVIDE FLANGED CONNECTION ABOVETHE BOTH THE EVAPORATOR ANDCONDENSER BUNDLES TO ALLOW PIPE TOREMOVED FOR CLEANING OF THE SHELL.

    78X12 RA DUCT, EXTEND DUCTWORK UP TO24" FROM THE UNDERSIDE OF SLAB. ANDPROVIDE WMS. PROVIDE VOLUME DAMPERON RETURN AND VENTILATION AIR IN THEVERTICAL. BALANCE VENTILATION AIRDAMPER TO 500 CFM AND THE RETURN AIRTO 4,400 CFM.

    ALL BRINE AND CONDENSER WATER PIPINGSHALL BE RACKED AT AN ELEVATION THATMAINTAINS ACCESS FOR A SECONDCHILLER BEING INSTALLED AS INDICATED.ASSUME SECOND CHILLER WILL BE THESAME SIZE AND THE PROPOSED.

    ADD ALTERNATE: PROVIDE A PRICINGALTERNATE FOR ROUTING THE BRINEPIPING WITHIN THE PROPOSED TRENCH.TEMPORARILY SUPPORT ALL EXISTING TOREMAIN MECHANICAL, PLUMBING, ANDELECTRICAL EQUIPMENT TOACCOMMODATE TRENCH.

    2

    3

    4

    5

    6

    PROJ. NO.

    DWG. No.SCALE

    DWG. TITLE

    DATE PLOTTED

    CHECKED

    DRAWN

    REVISIONS/ISSUES

    DO NOT SCALE THE DRAWINGS

    DESCRIPTION DATE

    1605.05-3

    CONTRACTOR SHALL CHECK AND VERIFY ALLDIMENSIONS AND REPORT ANY OMISSIONS ORDISCREPANCIES TO THE ARCHITECT BEFOREPROCEEDING WITH THE WORK.

    SEAL

    G:\x

    l cen

    ter i

    ce c

    hille

    r - d

    v180

    25.0

    1\C

    AD

    \Mec

    h\M

    -500

    .00_

    DV

    1802

    5.01

    .dw

    g 0

    9 Ja

    n '2

    0 - 1

    1:37

    amFI

    LENA

    ME:

    PLOT

    DATE

    :

    XREF

    S:

    9 JAN 2020

    XL CENTER

    Tel (416) 591 8999 Fax(416) 591 9087

    14 Duncan Street 4th FloorToronto, Ontario, CA M5H 3G8

    Tel (212) 986 3700 Fax (212) 687 6467

    CO N S U L T I N G E N G I N E E R S P. C.

    CONSULTING ENGINEERSTel (310) 842 8700 Fax (310) 842 7700

    Severud Associates

    engineers

    1 CIVIC CENTER PLAZAHARTFORD, CT

    CHILLER PLANTRELOCATION

    ISSUED FOR BID 2020-01-091

    AS NOTED

    ME

    ME

    M-501.00

    MECHANICAL ENLARGEDPLAN - CHILLER PLANT

    MECHANICAL ENLARGED PLAN - CHILLER PLANT1/4" = 1' - 0"1

  • (E)42X18

    (E)42X18

    (E)ICE MELTINGPUMP

    (E)8"

    (E)96x18 GR5660 CFM

    (R)ETHYLENEGLYCOL DRUM

    (E)5" (E)3"LPS

    (E)10"LPS(E)212"CPD

    (E)60X18

    (E)5"

    (E)114"

    (E)212"CPD

    (E)6"

    (E)6"

    (E)DOMESTICWATER HEATER

    (E)42X18

    (E)212"

    (E)5"

    (E)4"

    (E)2"

    (E)4"

    (E)96x18 GR5660 CFM

    (E)SUMPPUMPS

    (R)ETHYLENEGLYCOL

    TRANSFER PUMP

    ALL EQUIPMENTAND TANKS ARE

    LOCATED ONMECHANICAL

    MEZZANINE INTHIS LOCATION.

    (E)6

    "(E

    )6"L

    PR

    (E)6

    "

    (E)2"

    (E)114"(R)1

    1 2"

    TO EXISTINGDOMESTIC

    COLD WATER

    (R)BRINEMIX PUMP

    (R)BRINEMIX TANK

    (R)BRINEEXPANSION

    TANK

    (R)10"BRINE(R)10"BRINE

    (R)10"BRINE(R)10"BRINE(R)10"BRINE

    (R)6"CWS/RTO COOLING

    TOWER

    (R)6"CWS/RTO METER

    ROOM

    (R)4"CW (R)4"CW

    (R)6"CW (R)6"CW(R)6"CW(R)4"CW

    (E)10"LPS

    (R)BRINECHILLER #1

    (R)BRINECHILLER #2

    (R)CONDENSERWATER PUMP #1

    (R)CONDENSERWATER PUMP #2

    (R)BRINEPUMP #2

    (R)BRINEPUMP #1

    (R)ICEOUT HX

    (E)ICE MELT HX

    (E)SUMPPUMPS

    (E)EXHAUSTFAN (E-3)

    (E)60X18

    (E)60X18

    (E)24X12

    (R)24X16

    (E)AHU(V-3)

    (E)AHU(S-3)

    (E)SA DUCTSERVEROOM

    (R) TWO112"REFRIGERANTRELIEF PIPES

    (E)MANHOLECOVERS

    (E)42X18

    (E)42X18

    (E)ICE MELTINGPUMP

    (E)8"

    (E)96x18 GR5660 CFM

    (E)5" (E)3"LPS

    (E)10"LPS(E)212"CPD

    (E)60X18

    (E)5"

    (E)114"

    (E)212"CPD

    (E)6"

    (E)6"

    (E)DOMESTICWATER HEATER

    (E)42X18

    (E)212"

    (E)5"

    (E)4"

    (E)2"

    (E)4"

    (E)96x18 GR5660 CFM

    (E)SUMPPUMPS

    10"B

    RIN

    E

    10"B

    RIN

    E

    10"BRINE SUPPLY& RETURN UP

    -

    ALL EQUIPMENTAND TANKS ARE

    LOCATED ONMECHANICAL

    MEZZANINE INTHIS LOCATION.

    (E)6

    "(E

    )6"L

    PR

    (E)6

    "

    (E)2"

    (E)114"(R)1

    1 2"

    TO EXISTINGDOMESTIC

    COLD WATER

    (E)10"LPS

    (E)ICE MELT HX

    (E)SUMPPUMPS

    (E)EXHAUSTFAN (E-3)

    (E)60X18

    (E)60X18

    (E)24X12

    (E)AHU(V-3)

    (E)AHU(S-3)

    (E)SA DUCTSERVEROOM

    (E)MANHOLECOVERS

    10"B

    RIN

    E

    10"B

    RIN

    E

    6

    GENERAL NOTES

    KEYNOTES1

    1. EXISTING SYSTEMS INFORMATION ISSHOWN FOR REFERENCE ONLY TOCLARIFY SCOPE. CONTRACTOR SHALLFIELD VERIFY THESE EXISTING CONDITIONTO CONFIRM THE PRECISE TIE-INLOCATION FOR NEW WORK. REFER TODEMOLITION PLANS FOR ADDITIONALINFORMATION REGARDING EXISTINGSYSTEMS. EXISTING SYSTEMS NOTES ARENOT SHOWN ON CONSTRUCTION PLANSFOR CLARITY OF THE DRAWINGS.

    2. CONTRACTOR SHALL PROVIDE COREDRILLING AS REQUIRED FOR NEW PIPEPENETRATIONS.

    3. COORDINATION DRAWINGS SHALL BEPREPARED TO ENSURE ROUTING AVOIDSCONFLICTS WITH NEW AND EXISTINGWORK. CONTRACTOR SHALL COORDINATEWITH ALL OTHER TRADES.

    4. ALL WORK AFFECTING BUILDING SYSTEMOPERATION SHALL BE COORDINATED WITHBUILDING ENGINEERING.

    5. PIPING SHALL BE ROUTED TO AVOIDIMPACTING ALL EXISTING CEILINGHEIGHTS. PROVIDE RISE AND FALLS ASNECESSARY TO AVOID OBSTRUCTIONS,SUCH AS STRUCTURAL ELEMENTS ANDEXISTING TO REMAIN PIPING.

    6. INTERIM RELOCATIONS OF EXISTINGSYSTEMS MAY BE REQUIRED TOACCOMPLISH THE FINAL INDICATED SCOPEIN A STAGED MANNER. CONTRACTOR'SSCOPE SHALL INCLUDE A PHASEDAPPROACH AND ALL COSTS ASSOCIATEDWITH THIS MAKE-READY WORK.

    7. PROVIDE FIRE/SMOKE DAMPERS AT ALLSHAFT PENETRATIONS, MECHANICALROOM WALL PENETRATIONS AND RATEDASSEMBLY PENETRATIONS. REFER TOARCH. FOR RATED ASSEMBLY TYPES ANDLOCATIONS.

    8. PROVIDE 1/2"X1/2" WIRE MESH SCREEN ONALL OPEN DUCTS TAPPED TO SHAFTPLENUM.

    9. CONTRACTOR IS RESPONSIBLE FOR ALLCEILING REMOVALS ANDREINSTALLATIONS REQUIRED TOCOMPLETE WORK. PROVIDE CEILINGTILES AS REQUIRED. CEILING TILES SHALLMATCH EXISTING.

    10. PROVIDE CHILLER BREAK GLASS STATIONWITH HORN/STOBE IN ACCORDANCE WITHCODE. AT A MINIMUM, PROVIDE A BREAKGLASS STATION AND HORN STROP WITHINTHE CHILLER PLANT AND JUST OUTSIDETHE ROOM AT EACH DOOR TO THECHILLER PLANT.

    24X14 SA OPENING, EXTEND DUCTWORKDOWN TO 12" ABOVE THE FINISHED FLOORAND PROVIDE WMS. 2,450 CFM

    PROVIDE FLANGED CONNECTION TOALLOW PIPE TO BE REMOVED IN THEFUTURE TO ALLOW FOR A FUTURE CHILLERTO BE RIGGED.

    PROVIDE FLANGED CONNECTION ABOVETHE BOTH THE EVAPORATOR ANDCONDENSER BUNDLES TO ALLOW PIPE TOREMOVED FOR CLEANING OF THE SHELL.

    78X12 RA DUCT, EXTEND DUCTWORK UP TO24" FROM THE UNDERSIDE OF SLAB. ANDPROVIDE WMS. PROVIDE VOLUME DAMPERON RETURN AND VENTILATION AIR IN THEVERTICAL. BALANCE VENTILATION AIRDAMPER TO 500 CFM AND THE RETURN AIRTO 4,400 CFM.

    ALL BRINE AND CONDENSER WATER PIPINGSHALL BE RACKED AT AN ELEVATION THATMAINTAINS ACCESS FOR A SECONDCHILLER BEING INSTALLED AS INDICATED.ASSUME SECOND CHILLER WILL BE THESAME SIZE AND THE PROPOSED.

    ADD ALTERNATE: PROVIDE A PRICINGALTERNATE FOR ROUTING THE BRINEPIPING WITHIN THE PROPOSED TRENCH.TEMPORARILY SUPPORT ALL EXISTING TOREMAIN MECHANICAL, PLUMBING, ANDELECTRICAL EQUIPMENT TOACCOMMODATE TRENCH.

    2

    3

    4

    5

    6

    PROJ. NO.

    DWG. No.SCALE

    DWG. TITLE

    DATE PLOTTED

    CHECKED

    DRAWN

    REVISIONS/ISSUES

    DO NOT SCALE THE DRAWINGS

    DESCRIPTION DATE

    1605.05-3

    CONTRACTOR SHALL CHECK AND VERIFY ALLDIMENSIONS AND REPORT ANY OMISSIONS ORDISCREPANCIES TO THE ARCHITECT BEFOREPROCEEDING WITH THE WORK.

    SEAL

    G:\x

    l cen

    ter i

    ce c

    hille

    r - d

    v180

    25.0

    1\C

    AD

    \Mec

    h\M

    -500

    .00_

    DV

    1802

    5.01

    .dw

    g 0

    9 Ja

    n '2

    0 - 1

    1:37

    amFI

    LENA

    ME:

    PLOT

    DATE

    :

    XREF

    S:

    9 JAN 2020

    XL CENTER

    Tel (416) 591 8999 Fax(416) 591 9087

    14 Duncan Street 4th FloorToronto, Ontario, CA M5H 3G8

    Tel (212) 986 3700 Fax (212) 687 6467

    CO N S U L T I N G E N G I N E E R S P. C.

    CONSULTING ENGINEERSTel (310) 842 8700 Fax (310) 842 7700

    Severud Associates

    engineers

    1 CIVIC CENTER PLAZAHARTFORD, CT

    CHILLER PLANTRELOCATION

    ISSUED FOR BID 2020-01-091

    AS NOTED

    ME

    ME

    M-502.00

    MECHANICAL ENLARGEDPLANS - CENTRAL MER

    MECHANICAL ENLARGED PLAN - CHILLER PLANT1/4" = 1' - 0"1

    MECHANICAL DEMO ENLARGED PLAN - CHILLER PLANT1/4" = 1' - 0"1

  • GENERAL NOTES

    KEYNOTES1

    1. EXISTING SYSTEMS INFORMATION ISSHOWN FOR REFERENCE ONLY TOCLARIFY SCOPE. CONTRACTOR SHALLFIELD VERIFY THESE EXISTING CONDITIONTO CONFIRM THE PRECISE TIE-INLOCATION FOR NEW WORK. REFER TODEMOLITION PLANS FOR ADDITIONALINFORMATION REGARDING EXISTINGSYSTEMS. EXISTING SYSTEMS NOTES ARENOT SHOWN ON CONSTRUCTION PLANSFOR CLARITY OF THE DRAWINGS.

    2. CONTRACTOR SHALL PROVIDE COREDRILLING AS REQUIRED FOR NEW PIPEPENETRATIONS.

    3. COORDINATION DRAWINGS SHALL BEPREPARED TO ENSURE ROUTING AVOIDSCONFLICTS WITH NEW AND EXISTINGWORK. CONTRACTOR SHALL COORDINATEWITH ALL OTHER TRADES.

    4. ALL WORK AFFECTING BUILDING SYSTEMOPERATION SHALL BE COORDINATED WITHBUILDING ENGINEERING.

    5. PIPING SHALL BE ROUTED TO AVOIDIMPACTING ALL EXISTING CEILINGHEIGHTS. PROVIDE RISE AND FALLS ASNECESSARY TO AVOID OBSTRUCTIONS,SUCH AS STRUCTURAL ELEMENTS ANDEXISTING TO REMAIN PIPING.

    6. INTERIM RELOCATIONS OF EXISTINGSYSTEMS MAY BE REQUIRED TOACCOMPLISH THE FINAL INDICATED SCOPEIN A STAGED MANNER. CONTRACTOR'SSCOPE SHALL INCLUDE A PHASEDAPPROACH AND ALL COSTS ASSOCIATEDWITH THIS MAKE-READY WORK.

    7. PROVIDE FIRE/SMOKE DAMPERS AT ALLSHAFT PENETRATIONS, MECHANICALROOM WALL PENETRATIONS AND RATEDASSEMBLY PENETRATIONS. REFER TOARCH. FOR RATED ASSEMBLY TYPES ANDLOCATIONS.

    8. PROVIDE 1/2"X1/2" WIRE MESH SCREEN ONALL OPEN DUCTS TAPPED TO SHAFTPLENUM.

    9. CONTRACTOR IS RESPONSIBLE FOR ALLCEILING REMOVALS ANDREINSTALLATIONS REQUIRED TOCOMPLETE WORK. PROVIDE CEILINGTILES AS REQUIRED. CEILING TILES SHALLMATCH EXISTING.

    DISCHARGE EMERGENCY MACHINERYROOM EXHAUST VERTICALLY UPWARDS ATA MINIMUM OF 2,500 FPM. ADJUST DUCTDISCHARGE DIMENSIONS AS REQUIRED TOACHIEVE VELOCITY. PROVIDE A DRAINWITH A TRAP AT THE BASE OF THEDUCTWORK TO DRAIN ANY WATER THATCOLLECTS. DUCTWORK ELBOW SHALL BEAT LEAST 6' ABOVE ROOF DECK.

    DISCHARGE EMERGENCY REFRIGERANTEXHAUST PIPE AS HIGH ON THE WALL ASPOSSIBLE, A MINIMUM OF 10'-0" ABOVEROOF. PROVIDE 45 DEGREE MITERED ENDWITH BUG SCREEN AT DISCHARGE. PIPINGSHALL BE PAINTED TO MATCHSURROUNDINGS.

    PIPE SHALL BE HEAT TRACED.COORDINATE POWER CONNECTION ANDSENSOR LOCATION WITH ELECTRICALCONTRACTOR.

    CONNECT 4"DRAIN TO COOLING TOWERDRAIN AND OVERFLOW DRAIN IN THIS CELL.

    2

    3

    4

    EXISTINGSHAFT

    30X20 EA DN/UP

    8"CWS/RDN/UP

    6"REFRIGERATIONRELIEF DN/UP

    HEAT TRACECONTROL PANEL

    8"CWS/RDN

    8"CWS/RDN/UP

    (E)R6

    30X20 EA UP

    6"REFRIGERATIONRELIEF DN

    6"REFRIGERATIONRELIEF UP

    EXISTINGRETURN DUCT

    30X20 EA DN

    30X20 EA UP

    20X30

    8"CWS/RDN/UP

    6"REFRIGERATIONRELIEF DN/UP

    4"DR

    CT2

    CT1

    4"HUBDN

    4"DR

    30X20 EA DN

    8"CWS/RDN

    1

    4"HUBDRAIN

    6"REFRIGERATIONRELIEF DN

    2

    3

    3

    3

    3 6"CWR36"CWR

    6" EQUALIZERLINE

    4

    4

    PROJ. NO.

    DWG. No.SCALE

    DWG. TITLE

    DATE PLOTTED

    CHECKED

    DRAWN

    REVISIONS/ISSUES

    DO NOT SCALE THE DRAWINGS

    DESCRIPTION DATE

    1605.05-3

    CONTRACTOR SHALL CHECK AND VERIFY ALLDIMENSIONS AND REPORT ANY OMISSIONS ORDISCREPANCIES TO THE ARCHITECT BEFOREPROCEEDING WITH THE WORK.

    SEAL

    G:\x

    l cen

    ter i

    ce c

    hille

    r - d

    v180

    25.0

    1\C

    AD

    \Mec

    h\M

    -502

    .00_

    DV

    1802

    5.01

    .dw

    g 0

    9 Ja

    n '2

    0 - 1

    1:37

    amFI

    LENA

    ME:

    PLOT

    DATE

    :

    XREF

    S:

    9 JAN 2020

    XL CENTER

    Tel (416) 591 8999 Fax(416) 591 9087

    14 Duncan Street 4th FloorToronto, Ontario, CA M5H 3G8

    Tel (212) 986 3700 Fax (212) 687 6467

    CO N S U L T I N G E N G I N E E R S P. C.

    CONSULTING ENGINEERSTel (310) 842 8700 Fax (310) 842 7700

    Severud Associates

    engineers

    1 CIVIC CENTER PLAZAHARTFORD, CT

    CHILLER PLANTRELOCATION

    ISSUED FOR BID 2020-01-091

    AS NOTED

    ME

    ME

    M-503.00

    MECHANICAL PLAN -STAIRS

    MECHANICAL PLAN - STAIRS - CONCOURSE LEVEL (LEVEL 61)1 1/8" = 1'-0"

    MECHANICAL PLAN - STAIRS - INTERMEDIATE (LEVEL 76 THRU 95)2 1/8" = 1'-0"

    MECHANICAL PLAN - STAIRS - CLUB LEVEL (LEVEL 107)3 1/8" = 1'-0"

    MECHANICAL PLAN - STAIRS - COOLING TOWER LEVEL (LEVEL 121)4 1/8" = 1'-0"

  • BWP2 CH

    1

    10"B

    WR

    10"B

    WR

    10"BWR

    10"BWR

    10"BWS

    LEVEL 31

    LEVEL 48

    BWP1

    10"B

    WR

    10"B

    WR

    10"BWR

    CHILLED WATERDIFFERENTIALBYPASS

    ICE PLANT & PUMP ROOM

    LEVEL 61

    (E) ICE FLOOR

    (E)10"BWS(E)10"BWR

    10"BWR10"BWS

    BRINE WATER ONE LINENOT TO SCALE

    CONDENSER WATER ONE LINENOT TO SCALE

    CWP1

    CWP2

    8"C

    WR

    8"C

    WR

    8" CWR

    LEVEL 31

    LEVEL 48

    ICE PLANT & PUMP ROOM

    CH1

    8"C

    WR

    8"C

    WR

    CONDENSER WATERLINKED BUTTERFLY

    CONTROL VALVES

    M

    M

    2"METER WITHBYPASS

    2"RPZ PIPEDTO DRAIN

    2"MAKEUP WATER SLOWCLOSING SOLENOID VALVE

    (E)4"DCW2"DCW

    LEVEL 61

    LEVEL76

    LEVEL 95

    LEVEL 107

    LEVEL 121(ROOF)

    8"C

    WR

    8"C

    WS

    CT1

    CT2

    6"CWS

    8"CWS

    M

    6"CWR6"CWR

    M

    8"CWR

    4"DR

    2"DRAIN3"OVERFLOW DRAIN

    6"CWS

    2"DRAIN3"OVERFLOW DRAIN

    6" EQUALIZERLINE

    PROVIDE ELECTRIC HEAT CABLE, INSULATIONAND METAL PROTECTIVE COVER FOR ALL

    PIPING ABOVE THE ROOF EXCEPT FOR THEOVERFLOW AND DRAIN PIPES DOWN STREAM

    OF THE DRAIN VALVE.

    4"HUB DRAIN, SEE PLUMBINGDRAWINGS FOR CONTINUATION

    8"CWR

    HXICE

    M

    MECHANICAL MEZZANINEMECHANICAL MEZZANINE

    8"B

    WR

    8"BWS

    M

    ETICE

    PART OF THE CHILLER PUMP SKIDPACKAGE

    PPICE PART OF THE CHILLER PUMP SKIDPACKAGE

    PPICE

    PROJ. NO.

    DWG. No.SCALE

    DWG. TITLE

    DATE PLOTTED

    CHECKED

    DRAWN

    REVISIONS/ISSUES

    DO NOT SCALE THE DRAWINGS

    DESCRIPTION DATE

    1605.05-3

    CONTRACTOR SHALL CHECK AND VERIFY ALLDIMENSIONS AND REPORT ANY OMISSIONS ORDISCREPANCIES TO THE ARCHITECT BEFOREPROCEEDING WITH THE WORK.

    SEAL

    G:\x

    l cen

    ter i

    ce c

    hille

    r - d

    v180

    25.0

    1\C

    AD

    \Mec

    h\M

    -600

    .00_

    DV

    1802

    5.01

    .dw

    g 0

    9 Ja

    n '2

    0 - 1

    1:37

    amFI

    LENA

    ME:

    PLOT

    DATE

    :

    XREF

    S:

    9 JAN 2020

    XL CENTER

    Tel (416) 591 8999 Fax(416) 591 9087

    14 Duncan Street 4th FloorToronto, Ontario, CA M5H 3G8

    Tel (212) 986 3700 Fax (212) 687 6467

    CO N S U L T I N G E N G I N E E R S P. C.

    CONSULTING ENGINEERSTel (310) 842 8700 Fax (310) 842 7700

    Severud Associates

    engineers

    1 CIVIC CENTER PLAZAHARTFORD, CT

    CHILLER PLANTRELOCATION

    ISSUED FOR BID 2020-01-091

    AS NOTED

    ME

    ME

    M-600.00

    MECHANICAL RISERDIAGRAM

  • PROVIDE TRANSITION WHERE REQUIREDTYPICAL OF INLET AND OUTLETPROVIDE 30 DEGREE MAXIMUM DUCTANGLE AT TRANSITION

    INLET

    OUTLET

    THREADED ROD TOSTRUCTURE ABOVE

    BELT DRIVE MOTOR COVER

    SPRING VIBRATIONISOLATORS

    (TYPICAL)

    MOTORIZEDBACKDRAFT

    DAMPER(LOCATION

    PER PLANS)

    FLEXIBLECONNECTION(TYPICAL)

    INLINE FAN WITH ACOUSTICALLYLINED HOUSING

    PROVIDE ADEQUATE CLEARANCETO ALLOW FULL OPENING OF ACCESSDOOR

    DUCTWORK SIZESINDICATED ONDRAWINGS

    NOTE:INSTALL FAN WITH PROPER SERVICE CLEARANCE TO MOTOR AND DRIVE AND ALL PARTS FORPROPER AIR MOVEMENT AS RECOMMENDED BY THE MANUFACTURER.

    A INLINE FAN DETAILNO SCALE

    1'-0"

    DR

    CWS

    CWR

    S

    S

    NOTES:1. CONTROL/WATER REGULATING VALVES SHALL BE ON-OFF FOR FLOWS LESS THAN 6 GPM. FOR FLOWS GREATER THEN 6 GPM, THE SUPPLY SIDE

    VALVE SHALL BE ON-OFF AND THE RETURN SIDE SHALL MODULATE BASED ON CONDENSER PRESSURE TO OPERATE AS A WATER REGULATINGVALVE. VALVE SHALL BE SET TO MAINTAIN MINIMUM REQUIRED FLOW AT ALL TIMES.

    2. LIQUID DETECTOR SHALL SHUT DOWN UNIT AND CLOSE AUTOMATIC SUPPLY & RETURN VALVES UPON SENSING LIQUID.3. PROVIDE STAINLESS STEEL DRIP PAN AND LIQUID DETECTORS BENEATH ALL HYDRONIC EQUIPMENT AND PIPING.4. PROVIDE CONDENSATE PUMP FOR EACH UNIT HUNG ABOVE CEILING AND PIPE TO JANITOR CLOSET OR APPROVED LOCATION ON THIS FLOOR.

    VERIFY LOCATION WITH BUILDING. CONDENSATE PUMPS SHALL BE 120V, 1PH, 60 HZ, 93W. 25 GPH @ 15' HEAD, 20' SHUTOFF HEAD, LOCATED:A. IN EXPOSED CEILINGS: LITTLE GIANT VCMA-20ULS. 12 GAL TANK CAPACITY, RECEPTACLE PLUG.B. CONCEALED ABOVE FINISHED CEILINGS: LITTLE GIANT VCC-20-P. 1.2 QT TANK CAPACITY, HARD WIRED.

    5. ALL PIPE CONNECTIONS, INCLUDING CONDENSATE, SHALL BE MADE WITH FLEXIBLE, STAINLESS STEEL BRAIDED HOSE OF THE SAME SIZE AS THEPIPE.

    6. PROVIDE A DUCT SMOKE DETECTOR IN THE SUPPLY AND RETURN IN ALL UNITS 2000 CFM OR GREATER.7. PROVIDE SEISMIC BRACING FOR ALL CEILING HUNG UNITS. PROVIDE SEISMIC ANCHORS FOR ALL FLOOR MOUNTED UNITS.8. PROVIDE 2-WAY VALVE FOR SYSTEMS WITH VFD PUMPING OR PRESSURE DEPENDENT BYPASS. PROVIDE 3-WAY VALVES WITH BYPASS AND

    BALANCING VALVE FOR SYSTEMS WITHOUT EITHER.

    PACKAGED WATERA/C OR HEAT PUMP

    SPRING ISOLATOR

    2" DEEP SECONDARY DRAIN PANSMOKE DETECTOR

    SUPPLY AIR DUCT SEE PLANFOR SIZE AND CONT.

    WATER SENSOR WIRE TO UNIT TO SHUT DOWNOPERATION UPON SENSING OF WATER IN PAN

    4" DEEP COPPER P-TRAP IF UNIT IS NOT SELF TRAPPED

    FLEXIBLE PIPE CONNECTORS (TYP.). HIGH PRESSURESTAINLESS STEEL BRAIDED HOSE.

    UNION (TYP.)

    THERMOMETER (TYP.)CIRCUITSETTER

    CHECK VALVEBALL VALVE (TYP.)

    STRAINER

    MOTORIZED WATERVALVE

    PRESSURE GAUGE (TYP.)CONTROL/WATER REGULATING VALVE

    O.A. DUCT

    MVD

    SMOKE DETECTORR.A. BOOT

    FILTER

    AIR VENT

    G WATER SOURCE HEAT PUMP DETAILNO SCALE

    H TYPICAL STEAM CONVERTOR (SHELL & TUBE HEAT EXHANGGER)NO SCALE

    PITCH

    3/4" SWING CHECK VALVE(VACUUM BREAKER)

    NOTE1. MAX. AUTOMATIC CONTROL VALVE SIZE 2-1/2 INCHES. FOR STEAM FLOW RATE GREATER THAN 2-1/2 INCHES VALVECAPACITY, FURNISH TWO CONTROL VALVES IN PARALLEL AS INDICATED.2. BY-PASS PIPING AROUND CONTROL VALVES TO BE ONE LINE SIZE SMALLER THAN MAIN STEAM SUPPLY LINEUPSTREAM OF CONTROL VALVES.3. PROVIDE PIPE UNIONS, FLANGES & ARRANGE WATER PIPING TO FACILITATE TUBE BUNDLE REMOVAL WITH MINIMUMDISTURBANCE TO PIPING.4. PRESSURE RELIEF VALVE SET AT 20% OVER WORKING PRESSURE.

    B END SUCTION WATER PUMP DETAILNO SCALE

    TRIPLE DUTY VALVECHECK, BALANCING, ANDSHUTOFF

    FLEX CONNECTION (TYP.)

    PRESSURE GAUGEWITH ISOLATION

    COUPLING GUARDEND SUCTIONPUMP

    INERTIA BASESPRING VIBRATION ISOLATORS

    PUMP SUCTION

    THERMOMETER(TYP)

    BUTTERFLY VALVE (TYP)

    PRESSURE GAUGE(TYP)

    GAUGE ISOLATIONVALVE (TYP)

    PROVIDE REDUCERS AS REQUIRED

    FULL SIZE SUCTION DIFFUSERWITH STRAINER

    4" CONCRETEHOUSEKEEPING PAD

    INCREASER AS REQUIRED

    NOTES:1. CONCRETE PAD AND INERTIA BASES TO BE PROVIDED UNDER GENERAL CONSTRUCTION DIVISION OF SPECIFICATIONS.

    INERTIA BASE HEIGHTS SHALL BE AS FOLLOWS UP TO 15HP=6": 15-50HP=8": 60-100HP=10": OVER 100HP=12"2. PROVIDE SUCTION DIFFUSER WITH BASKET STRAINER IN LIEU OF INLINE Y-STRAINER

    PROVIDE PRESSURE DIFFERENTIAL BYPASS VALVELOCATE ACROSS SUPPLY AND RETURN MAINS WHERE

    MULTIPLE PUMPS ARE PROVIDED

    PUMP DISCHARGE

    SPRING TYPE VIBRATION ISOLATOR (TYP)

    BASE TO BE SHIMMEDLEVELED, BOLTED ANDGROUTED TO INERTIA BASE

    COMBINE CASING, SEAL LEAK-OFF & BEDPLATEDRAINS & EXTEND TO FLOOR DRAIN

    SUPPORT PIPE WELD TO ELBOWHEEL AND BASE PLATE

    VENT VALVE

    FLUSHING WATER TOPUMP MECHANICAL SEALS

    PRESSURE GAUGE WITHSTOP COCK (TYP)

    CONICALSEDIMENT

    SEPARATOR

    FROM DISCHARGESIDE OF PUMP

    BLOW OFFVALVE

    TO SUCTION SIDE OF PUMP

    D PIPING ASSEMBLY FOR EXTERNALLY FLUSHED MECHANICAL SEALS PUMPSNO SCALE

    DUCT LINER

    METAL FASTENERS12" O.C. MAX. (TYP.)

    NOT MORE THAN 2" FROM EDGE OF LINER

    GALVANIZED SHEETMETAL DUCT

    ALL ENDS OF LINER TO BE COATEDWITH ADHESIVE. ENDS OF LINER SHALLBE BUTTED FIRMLY TOGETHER ANDTAPED OVER.

    GALVANIZED SHEETMETAL DUCT

    TOP AND BOTTOM SECTIONOF LINER SHALL OVERLAPTHE SIDES

    DUCT LINER

    LINER TO BE ADHERED TODUCT WITH 100% ADHESIVE

    F DUCT LINER DETAILNO SCALE

    E CHILLER CONNECTIONS DETAILNO SCALE

    1" DRAIN VALVE AND CAP

    CHILLERAIR VENT(TYP.)

    P&T TAP (TYP.)

    BALANCING VALVE (TYP.)

    PRESSURE GAUGE (TYP.)

    CWR(OUT)

    STRAINER WITH BLOW OFFVALVE AND 1"Ø HOSE

    ADAPTER

    BUTTERFLY VALVE (TYP.)

    THERMOMETER (TYP.) CWS(IN)

    BWR(IN)

    BWS(OUT)

    AUTOMATIC MODULATINGISOLATION VALVE (TYP).PROVIDE BMS CONTROLCONNECTION & POWER ASREQUIRED

    T P

    T P

    BMS CONNECTED FLOWMEASURING STATION

    T PP T

    BMS CONNECTEDPRESSURE AND

    TEMPERATURE SENSOR(TYP.)

    CHILLER BASE RAIL SYSTEMEND SUCTION PUMPS

    I HEATING AND VENTILATING UNIT DETAILNO SCALE

    ~

    ~

    ~

    ~

    S

    S

    NOTES:1. LIQUID DETECTOR SHALL BE WIRED TO SHUT DOWN UNIT AND CLOSE AUTOMATIC SUPPLY & RETURN VALVES UPON SENSING LIQUID.2. PROVIDE STAINLESS STEEL DRIP PAN AND LIQUID DETECTORS BENEATH ALL HYDRONIC EQUIPMENT AND PIPING.3. ALL PIPE CONNECTIONS SHALL BE MADE WITH FLEXIBLE, METAL BREADED HOSE OF THE SAME SIZE AS THE PIPE.4. PROVIDE A DUCT SMOKE DETECTOR IN THE SUPPLY AND RETURN IN ALL UNITS 2000 CFM OR GREATER.5. WHERE UNITS UTILIZE A PLENUM RETURN, PROVIDE EACH TERMINAL UNIT WITH A FIRE ALARM RELAY FOR FAN SHUTDOWN.

    FLEX CONNECTION IF DUCTED RETURN HANGER RODS WITH SPRINGISOLATORS. TYPICAL.SUPPORT UNIT INACCORDANCE W/ MFG.RECOMMENDATIONS. (TYP.)

    FANCOIL

    FLEXIBLE CONNECTION

    30 DEGREE MAXIMUM.

    SUPPLY DUCTWITH 1" LINER

    SECONDARY DRAIN PAN

    LIQUIDS DETECTOR

    REFER TO COIL PIPINGDETAIL (TYP)

    SMOKE DETECTORSEE NOTE BELOW

    (TYP.)

    RETURNAIR WITH1" LINER

    CONTROLCABINET

    NOTE:1. PROVIDE ANGLE IRON OR UNISTRUT SUPPORTS FROM FLOOR FOR ALL INLINE PUMPS 712 HP & LARGER. SMALLER PUMPS MAY BE

    SUPPORTED FROM STRUCTURE ABOVE. PUMPS MUST BE SUPPORTED WITH VIBRATION ISOLATORS. PROVIDE LAYOUT ANDSUPPORT DETAILS FOR APPROVAL.

    2. VALVES SHALL BE THE SAME SIZE AS PIPE, REDUCE AS REQUIRED TO PUMP CONNECTIONS.3. FOR PUMPS OVER 1 HP: PUMP & PIPE WITHIN 20' SHALL BE SUPPORTED FROM SPRING ISOLATORS.4. SUBSTITUTE BALL VALVES FOR BUTTERFLY VALVES FOR ALL PIPING 2" AND SMALLER.

    LIFTING EYES

    BUTTERFLY VALVE (3" AND LARGER) BALLVALVE (212" AND SMALLER W/LEVER

    HANDLE. (VALVE NOT NEEDED IFBALANCING VALVE IS RATED FOR

    BUBBLE SHUT OFF)

    INLINE PUMP

    STRAINER HOSEEND DRAIN VALVE

    PRESSURE GAUGE(TYP)

    TEMP GAUGE (TYP)

    PROVIDE TRIPLE DUTY VALVE ORBALANCING VALVE W/ MEMORYSTOP AND CHECK VALVE

    FLEXCONNECTION

    (TYP)

    C IN-LINE PUMP DETAILNO SCALE

    PROJ. NO.

    DWG. No.SCALE

    DWG. TITLE

    DATE PLOTTED

    CHECKED

    DRAWN

    REVISIONS/ISSUES

    DO NOT SCALE THE DRAWINGS

    DESCRIPTION DATE

    1605.05-3

    CONTRACTOR SHALL CHECK AND VERIFY ALLDIMENSIONS AND REPORT ANY OMISSIONS ORDISCREPANCIES TO THE ARCHITECT BEFOREPROCEEDING WITH THE WORK.

    SEAL

    G:\x

    l cen

    ter i

    ce c

    hille

    r - d

    v180

    25.0

    1\C

    AD

    \Mec

    h\M

    -700

    .00_

    DV

    1802

    5.01

    .dw

    g 0

    9 Ja

    n '2

    0 - 1

    1:37

    amFI

    LENA

    ME:

    PLOT

    DATE

    :

    XREF

    S:

    9 JAN 2020

    XL CENTER

    Tel (416) 591 8999 Fax(416) 591 9087

    14 Duncan Street 4th FloorToronto, Ontario, CA M5H 3G8

    Tel (212) 986 3700 Fax (212) 687 6467

    CO N S U L T I N G E N G I N E E R S P. C.

    CONSULTING ENG