Lynn Soporowski, PE Branch Manager, Division of Planning Kentucky Transportation Cabinet

25
Lynn Soporowski, PE Branch Manager, Division of Planning Kentucky Transportation Cabinet September 24, 2013 SCORT Kentucky Railroad Planning Experience

description

Lynn Soporowski, PE Branch Manager, Division of Planning Kentucky Transportation Cabinet September 24, 2013SCORT. Kentucky Railroad Planning Experience. Kentucky Railroad Planning Experience. Not a railroad operating/owning state Not a railroad power state Not a railroad funding state - PowerPoint PPT Presentation

Transcript of Lynn Soporowski, PE Branch Manager, Division of Planning Kentucky Transportation Cabinet

Page 1: Lynn Soporowski, PE Branch Manager, Division of Planning Kentucky Transportation Cabinet

Lynn Soporowski, PEBranch Manager, Division of PlanningKentucky Transportation CabinetSeptember 24, 2013 SCORT

Kentucky Railroad Planning Experience

Page 2: Lynn Soporowski, PE Branch Manager, Division of Planning Kentucky Transportation Cabinet

Kentucky Railroad Planning Experience

• Not a railroad operating/owning state• Not a railroad power state• Not a railroad funding state• Not an intracity or intercity passenger rail state

Page 3: Lynn Soporowski, PE Branch Manager, Division of Planning Kentucky Transportation Cabinet

Not a railroad operating/owning state

Page 4: Lynn Soporowski, PE Branch Manager, Division of Planning Kentucky Transportation Cabinet

• State rail with shortlines

Page 5: Lynn Soporowski, PE Branch Manager, Division of Planning Kentucky Transportation Cabinet
Page 6: Lynn Soporowski, PE Branch Manager, Division of Planning Kentucky Transportation Cabinet

Freight Network Rail Lines and Railyards

2,769 miles of mainline track99 Railyards

Page 7: Lynn Soporowski, PE Branch Manager, Division of Planning Kentucky Transportation Cabinet

Locate-Major (MFUI) : TerminologySiding• Spur• Yard

– Classification Yard– Distribution Yard– Intermodal (Container)

Page 8: Lynn Soporowski, PE Branch Manager, Division of Planning Kentucky Transportation Cabinet

Locate-Major (MFUI) : Terminology• Intermodal

Connectors Needs– Ramps– Turning

Radii– Sight

Distance

Page 9: Lynn Soporowski, PE Branch Manager, Division of Planning Kentucky Transportation Cabinet

Not a Power State

Page 10: Lynn Soporowski, PE Branch Manager, Division of Planning Kentucky Transportation Cabinet
Page 11: Lynn Soporowski, PE Branch Manager, Division of Planning Kentucky Transportation Cabinet

Tons (in millions) Dollars (in millions)

21%

8641%

7635%

2411% 27

12%

Truck Rail Water Other intermodal Pipeline & unknown

13,2077%

1,1711%

10,4175%

11,3836%

31,92316%

127,01865%

Truck RailWater Air, air & truckTruck and rail Other intermodalPipeline & unknown

Source: Freight Analysis Framework, FWHA

Total Freight Transportation into Kentucky by Mode-2008

Page 12: Lynn Soporowski, PE Branch Manager, Division of Planning Kentucky Transportation Cabinet

Tons (in millions) Dollars (in millions)

5921%

11340%

8129%

2710%

Truck RailTruck and rail Other intermodalPipeline & unknown

159,06772%

11,3705%

1,3591%

10,9065%

26,92412%

11,0915%

Truck RailWater Air, air & truckOther intermodal Pipeline & unknown

Source: Freight Analysis Framework, FWHA

Total Freight Transportation from Kentucky by Mode-2008

Page 13: Lynn Soporowski, PE Branch Manager, Division of Planning Kentucky Transportation Cabinet

Article : Business First—Louisville Edition, August 5, 2011

Page 14: Lynn Soporowski, PE Branch Manager, Division of Planning Kentucky Transportation Cabinet

Not a railroad funding state

Page 15: Lynn Soporowski, PE Branch Manager, Division of Planning Kentucky Transportation Cabinet

• TIGER I ARRA- RJ Corman Railroad Group$16,205,553 ($12,964,443 Federal)$200,000 State dollars

• TIGER III – Paducah and Louisville Railroad$14,447,775 ($11,558,220 Federal)$1,000,000 State dollars

Kentucky TIGER Grants

Page 16: Lynn Soporowski, PE Branch Manager, Division of Planning Kentucky Transportation Cabinet

• $2 million FY 2010-2011• $2 million FY 2011-2012• Minimum of 50/50 match. • Governor decided to award both Fiscal

Years funds from 12 submitted applications.

Kentucky Shortline Railroad Assistance Grants

Page 17: Lynn Soporowski, PE Branch Manager, Division of Planning Kentucky Transportation Cabinet

• $1.6 million FY 2012-2013• $1.6 million FY 2013-2014• Minimum of 50/50 match• 105 Applications Received

Kentucky Railroad Crossing Improvement Program

Page 18: Lynn Soporowski, PE Branch Manager, Division of Planning Kentucky Transportation Cabinet

RJ Corman Railroad Group

Page 19: Lynn Soporowski, PE Branch Manager, Division of Planning Kentucky Transportation Cabinet
Page 20: Lynn Soporowski, PE Branch Manager, Division of Planning Kentucky Transportation Cabinet

Muldraugh Bridge- Paducah and Louisville Railroad

Page 21: Lynn Soporowski, PE Branch Manager, Division of Planning Kentucky Transportation Cabinet

Not an intracity or intercity passenger rail state

Page 22: Lynn Soporowski, PE Branch Manager, Division of Planning Kentucky Transportation Cabinet
Page 23: Lynn Soporowski, PE Branch Manager, Division of Planning Kentucky Transportation Cabinet

• Despite the high population density in Cincinnati, Louisville, and Lexington, the ridership … only ..15 % operating costs

• Ops Only $245 fare one way• Cap and Ops $2,800 fares

Examination of I-75, I-64, and I-71 High Speed Rail Corridors -1999

Page 24: Lynn Soporowski, PE Branch Manager, Division of Planning Kentucky Transportation Cabinet

• Louisville Airport• Ohio River Bridge• Lexington Center

Page 25: Lynn Soporowski, PE Branch Manager, Division of Planning Kentucky Transportation Cabinet

Kentucky Railroad Planning Experience• Not a railroad operating/owning state

• Intermodal Connections• Not a railroad power state

• Investment IS being made• Not a railroad funding state

• Creative dollars are spent• Not an intracity or intercity passenger rail state

• Continue to participate and PLAN!!!