LVT Key reference plant/kilns upgrade jobs

Client Project Name Country Detail

CMS Plant upgrading to 2800

TPD Malaysia

Turnkey Contract for plant upgrading from 2100 TPD to 2800 TPD (Actual achieve is 2880 TPD)

NSCI Plant upgrading to 4000

TPD, Bahau Plant Malaysia

EP Contract for kiln upgrading from 3600 TPD to 4000 TPD (Actual achieve is 4300 TPD)

NSCI Kiln upgrading to 2750

TPD, Perlis Plant Malaysia

EP Contract for kiln upgrading from 1900 TPD to 2750 TPD (Actual achieve is 2850 TPD)

Power Cement

(Al Abbas Cement)

2 Plants upgrading to 1000 TPD and 1800 TPD

Pakistan EP Contract for plant upgrading from 500 TPD to 1000 TPD and 1000 to 1800 TPD

Cemex 2 Kilns upgrading to

1000TPD Thailand

EP Contract for plant upgrading to 1000 TPD

Hanil Kiln upgrading to 4800

TPD Korea Engineering supply for kiln upgrading 4800 TPD

Apiai Kiln upgrading to 2850

TPD Brazil EP Contract for plant upgrading from 2200 TPD to 2850 TPD

Bodoquena Kiln upgrading to 1900

TPD Brazil EP Contract for plant upgrading to 1900 TPD

Hoang Mai Kiln upgrading to 4500

TPD Vietnam EP Contract for kiln upgrading to 4500 TPD

Chinfon 2 Plants upgrading to

4800 TPD and 5000 TPD Vietnam

Engineering supply for kiln upgrading to 4500 TPD and 5000 TPD

Client Project Name Country Detail

APODI Nozzle ring upgrading

Brazil Engineering supply for Nozzle ring upgrading for Raw Vertical Mill from 290 tph to 320 tph

Holcim Nozzle ring upgrading

(Vietnam Plant) Vietnam

Engineering supply for Nozzle ring upgrading for Raw Vertical Mill from 347 tph to 375 tph

Viacha Nozzle ring upgrading

Bolivia Engineering supply for Nozzle ring upgrading for Raw Vertical Mill from 155 tph to 180 tph

Holcim Nozzle ring upgrading

(Lugait Plant) Philippines

Engineering supply for Nozzle ring upgrading for Raw Vertical Mill from 305 tph to 320 tph

LVT Key reference Nozzle ring upgrade jobs

Client Project Name Country Detail

TPIPL LV Classifier for semi-

finish grinding upgradation

Thailand EP Contract for cement mill upgrading from 220 tph to 257 tph

LVT Key reference LV Classifier for Semi Finish Grinding System

LVT Key reference

plant/kilns upgrade jobs

Client Name: Cahya Mata Sarawak, Malaysia

LVT Role: Turnkey EPC Contract for plant upgrading from 2,100 TPD to 2,800 TPD (Actual achieve is 2,880 TPD)

Project period: 2011 - 2013

Job carried out : Plant Modification to achieve guarantee capacity 2,800 TPD with New vertical raw mill and new vertical coal mill

1) Raw Mill

New raw mill grinding circuit of brand new vertical mill LVT/C-Hope (VRMR36.4) with LVT Classifier by normally VRMR36.4 can achieve 200 TPH but when operate with LVT Classifier the mill can achieve up to 230 TPH.

New hot gas handling system for new raw mill department

New Feeding system

New bucket elevator for silo feeding.

CMS, Malaysia

Plant upgrading to 2800 TPD

2) Pre heater: Top stage 4 cyclones replaced with 2 new

LVT spiral roof cyclones to reduce

the pressure drop and improve

the collection efficiency.

2nd and 3rd stage cyclones increased

height of cyclone roof to reduce pressure

drop in the preheater by increasing of

cyclone inlet area

5th stage modified inlet cyclone.

Extension of calciner to increases

the retention time and full combustion

Installation of dispersion box at all stages

of cyclones except cyclone no.5. This will

ensure the effective heat transfer between

hot gas and raw meal.

Kiln inlet seal replaced with pneumatic

type to arrest the false air leakage

3) Gas handling department: Existing ESP modified the electrical parts

for support extra flow and clinker dust from cooler after increase clinker production as well as

reduction of dust emission.

Installation of new mechanical parts for ESP system for support the new gas flow.

New kiln dust transportation transported to existing bucket elevator.

4) Kiln:

Increase kiln speed to 4.5 rpm for reduce volumetric loading

from higher kiln capacity to keep kiln filling percentage when

increase the production by changing gear box and new AC drive

motor.

Kiln main burner replaced with high momentum burner

After modification, kiln can achieve the capacity up to 2,850

TPD with free CaO of clinker less than 1%.

5) Cooler:

Added fixed inlet at the cooler starting portion with new cooler

air fans in order to get maximum heat recuperation.

Replace 1st grate of cooler by LV cooler with relocation of

cooling air fan

Clinker transportation machine was modified for

support the new upgrading capacity.

6) New Vertical Mill with LV Classifier for Coal grinding

New coal grinding circuit Installation of Beijing power

Vertical millfor fine coal preparation, Mill-ZGM80G with

LVT Classifier by when operate with LVT Classifier the mill

can achieve the capacity up to 20.6 TPH.

New hot gas handling for new coal mill department

New feeding system for raw coal

New coal feeder for calciner firing.

FINE

COARSE

Rotation

direction LV Pocket (Guide vane)

Rotor

Centrifugal force

Drag force

Gravity force

Vertical Mill with LV Classifier

Description Guarantee PGT

Kiln (TPD) 2800 2846

Raw Mill (TPH) 230 232

Coal Mill (TPH) 18.5 20.6

Guaranteed and PGT figure :

CMS, Malaysia

Plant upgrading to 2800 TPD

CMS, Malaysia

Plant upgrading to 2800 TPD

Client Name: Negeri Sembilan Cement Industries Sdn. Bhd., Malaysia

LVT Role: EP Contract for plant upgrading from 3600 TPD

to 4000 TPD (Actual achieve is 4300 TPD)

Project period: 2007 - 2008

Main objective : To increase the plant capacity from 3,600 to 4,000 TPD and reduce plant power consumption

NSCI, Bahau Plant

Plant upgrading to 4000 TPD

Job carried out : Modifications to achieve guarantee capacity 4,000 TPD

1) New LVT top cyclones

The LVT top cyclones will improve the efficiency and decrease the

pressure drop of the preheater.

2) Enlarge inlet area to 2nd stage cyclone

The inlet area to the 2nd stage is increased by lifting the roof in order

to decrease the inlet velocity and thereby the pressure loss.

NSCI, Bahau Plant

Plant upgrading to 4000 TPD

3) LVT design dispersion box for all stages

New effective dispersion boxes are required to disperse the material

properly when the velocity on cyclone riser pipes increases. This will

ensure the effective heat transfer between hot gas and raw meal.

4) Extension of calciner

To increase the retention time and better burning of fuel in the

calciner

5) New inlet and triangular cut in bottom stage cyclone

The inlet modified according to the calciner modification. The new

inlet will have a positive effect on the coating tendencies in this inlet.

A triangular cut is made to the bottom stage cyclone in order to

improve the cyclone efficiency and decrease the specific heat

consumption.

NSCI, Bahau Plant

Plant upgrading to 4000 TPD

6) Water spray in down comer

The water spray system is designed to reduce the temperature of the gases

leaving the preheater by 50C, which will increase the ID-fan capacity.

This water spray system will work as a secondary “cooling tower” as well.

7) New ID-fan and motor

It is necessary to install a new ID-fan with a higher flow and pressure

rating than the existing.

8) New filter fan and motor parallel to existing ESP Fan

A new parallel filter fan installed parallel to existing ESP fan. This will

facilitate to exhaust the additional kiln gases after the upgrading to 4000

tpd.

NSCI, Bahau Plant

Plant upgrading to 4000 TPD

9) GCT modification

The gas conditioning tower modified with new water spray system to achieve 160 Deg.C gas temperature as the outlet.

10) Clinker transport

Installed the new transportation for support material flow after kiln upgrade to 4,000 TPD.

NSCI, Bahau Plant

Plant upgrading to 4000 TPD

NSCI, Bahau Plant

Plant upgrading to 4000 TPD

NSCI, Bahau Plant

Plant upgrading to 4000 TPD

Client Name: Negeri Sembilan Cement Industries Sdn. Bhd., Malaysia

LVT Role: EP Contract for kiln upgrading from 1900 TPD to 2750 TPD (Actual achieve is 2850 TPD)

Project period: 2008 - 2009

Main objective : To increase the plant capacity from 1,900 to 2,750 TPD and reduce plant power consumption

NSCI, Perlis Plant

Kiln upgrading to 2750 TPD

Job carried out :

1) Pre-heater Cyclone modification

Installation of new top LVT cyclone.

To install new dispersion boxes for improve heat exchange

efficiency

Top part of downcomer duct modified.

Enlarge and extend calciner to increase retention time.

Modified tertiary air duct and connect to the calciner

Kiln hood modification for reducing of hot cooler dust injection issue which cause severely injured

New coal feeding system for calciner firing

NSCI, Perlis Plant

Kiln upgrading to 2750 TPD

2) Kiln gas dedusting

Installation of new main baghouse for

upgrade capacity (former is ESP)

3) New Kiln motor, VVVF and Gear box

Installed a new motor and gear box for

new kiln speed.

4) Clinker Cooler modification

New fixed inlet (7 rows 8 plate wide)

and 2 new fixed inlet cooler fan for

increase heat recuperation.

5) Cooler cooler ESP extenstion

Extend one more field for existing ESP

for additional amount of cooler waste gas

and reduce dust emission

6) Kiln feed system

New bucket elevator for kiln feed system

NSCI, Perlis Plant

Kiln upgrading to 2750 TPD

Client Name: Al Abbas Cement, Pakistan

LVT Role: EP Contract for plant upgrading from 500 TPD to 1000 TPD and 1000 to 1800 TPD (Actual achieve are 1,236 and 1,891 TPD)

Project period: 2005 - 2007

Main objective: To increase 2 plants capacity from 500 TPD to 1000 TPD and 1000 TPD to 1800 TPD

Job carried out :

1) Vertical Mill for raw material grinding

Installed new transportation equipment for support upgrading

capacity.

Power cement, Pakistan 2 Plants upgrading to 1000 TPD and 1800 TPD

1) Vertical Mill for raw material grinding (cont.)

Installed new raw vertical roller mill(LM32.4 with LVT Classifier,

normally this mill size can achieve the capacity below 200 TPH but

when operate with LVT Classifier can achieve the capacity up to

216 TPH)

2) New kiln feed system

Installed new kiln feed transportation machine for support

upgrading capacity.

Power cement, Pakistan 2 Kilns upgrading to 1000 TPD and 1800 TPD

3) Preheater system and clinker cooler modification

Installed the LVT top cyclones for improve the efficiency and

decrease the pressure drop of the preheater.

New kiln gear reducer for new kiln speed.

Tertiary Air Duct, clinker cooler, and fan system and dust collecting

system was modified.

4) Clinker storage and new cement grinding system

Installed the new clinker storage and transportation for increasing

the stock capacity.

Installed the new cement vertical mill system and modified the

existing cement ball mill by optimize ball charge and installed the

LVT Classifier system.

Power cement, Pakistan 2 Kilns upgrading to 1000 TPD and 1800 TPD

5) New cement packing system

Installed the new packing plant system for support new

upgrading capacity.

6) Coal grinding system modification

Installed the new coal vertical roller mill system (Raymond Mill)

with LV Classifier for support new upgrading kiln system.

Power cement, Pakistan 2 Kilns upgrading to 1000 TPD and 1800 TPD

Client Name: CEMEX Thailand

LVT Role: EP Contract for kiln upgrading from 900 TPD and 1200 TPD

Project period: 2003 - 2004

Main objective: To increase the plant capacity from 900 to 1,200 TPD

Cemex, Thailand

2 Kilns upgrading to 1200 TPD

Cemex, Thailand

2 Kilns upgrading to 1200 TPD

Job carried out :

New top stage cyclones

Top cyclones preheater will be replaced to the new LVT cyclones

(without refractory) for improving the efficiency. It can be

improved by installing a cylindrical part at the body of the

cyclone.

LVT suggest modifying the complete inlet duct section to the top

stage cyclones to LVT new design, to avoid the present ducting

“pinch point” at the cyclone inlets, where caking on tendency on

the roof has been observed. This will also reduce the pressure

drop over the top cyclone stage. The new cylindrical cyclone part

will also call for installation of an extra downcomer part.

Cemex, Thailand

2 Kilns upgrading to 1200 TPD

Modification of the 4 stage cyclone

Expand the riser duct after Pre-calciner and Enlarge the riser part of

the Pre-calciner

A small but not unimportant improvement can be done in the riser

part of the calciner. The expansion of the riser part was done on

the front side (towards the kiln) and on the right side (seen from the

kiln). The start of the riser expansion to the sides has been done

nearly horizontal, which has created “shelves” and areas for possible

turbulence resulting in downwards flow and undesired material

dropping directly to the kiln (along the walls).

New preheater ID Fan & Motor

New top stage

cyclones without

refractory

Modification of

the 4th stage

cyclone

Expand the riser duct

after Pre-calciner

Enlarge the riser part

of the Pre-calciner

New preheater ID Fan

& Motor

Cemex, Thailand

2 Kilns upgrading to 1200 TPD

*Final Acceptance Certification

Cemex, Thailand

2 Kilns upgrading to 1200 TPD

Guaranteed figure :

Description Present Pass Guaranteed

(FAC*)

Production (TPD) 900 1200

Hanil Cement (Danyang plant ), Korea

Kiln No.5upgrading to 4800 TPD

Client Name: Hanil Cement (Danyang plant), Korea

LVT Role: Engineering Service for kiln upgrading

Project period: November 2008 – April 2009

Main objective: To increase the kiln capacity from 4,320 to 4,800 TPD and increasing the waste firing upto 20%

In year 2008, Hanil cement at Danyang plant would like to upgrade plant capacity and they consult with LVT. After LVT team investigation, the LVT suggest that the Danyang plant can be upgraded to 4800 tpd from 4320 TPD as per the measured during pretest.

The operation by following the existing main equipment

In-Line Calciner (ILC) 5-stage preheater with swirl chamber

Kiln 4.57 x 67 m , slope 4 %

Kiln drive motor 522 kW

Fuller grate cooler (CIS-CFG-RFT)

Pillard kiln main burner

Hanil Cement (Danyang plant ), Korea

Kiln No.5upgrading to 4800 TPD

Job carried out :

1) Cyclone Preheater

The 4 existing top cyclones will be replaced by completely new LV Cyclones to reduce the pressure loss and to improve the top cyclone efficiency. This will lead to a bit higher pressure drop over the new LVT top stage cyclones. The cyclones are foreseen installed with 114 mm castable

Hanil Cement (Danyang plant ), Korea

Kiln No.5upgrading to 4800 TPD

2) Extension of the ILC calciner with New TAD inlet and new LVT mixing chamber

Hanil is firing approx. 20 % of waste fuel to the calciner. This leads to operational problems and CO formation in the calciner. Hanil possesses at the same time a strong desire to increase the waste firing to 30 %.

Hanil Cement (Danyang plant ), Korea

Kiln No.5upgrading to 4800 TPD

Extension of the ILC calciner

LVT therefore suggests extending the

existing calciner with a new square duct.

The result in the largest possible

extension of the calciner gas retention

time, which is crucial for the satisfying

completion of the combustion of the

waste fuel fired in the calciner.

The calciner a gas retention time of

approx. 4.6 seconds is achieved (at 4800

TPD)

Hanil Cement (Danyang plant ), Korea

Kiln No.5upgrading to 4800 TPD

New TAD inlet and

new mixing chamber

Installing a new LVT mixing

chamber and a modified TAD inlet to the

new mixing chamber. The reason is that

the existing swirl chamber is much too large (low gas velocity) and do not

facilitate a proper mixing of the calciner fuel (waste) and the combustion

air. The result is the observed CO problems out of the calciner.

With the new LVT mixing chamber we improve the start conditions for

the combustion of the calciner fuel (waste), and we are convinced that it

shall be possible to increase the %-waste fired from the existing 20 % –

even at the increased clinker production level to 4800 TPD.

Hanil Cement (Danyang plant ), Korea

Kiln No.5upgrading to 4800 TPD

3) New LVT material flap gates

Installation of new LVT material flap gates to minimize the amount of heat transfer bypass gas flows in the preheater.

Any amount of hot gas bypassing the heat transfer process stages leads to an increase in the kiln system heat consumption and to increased temperature profile and hereby to increased pressure drop and increased fan power consumptions

4) Modified inlets to the two bottom stage (C5) cyclones

Modification of the inlets to the two cyclone stage number 5 cyclones to minimize dust settlement and build up in these areas.

Hanil Cement (Danyang plant ), Korea

Kiln No.5upgrading to 4800 TPD

5) Material spreader boxes (distribution boxes)

The existing spreader boxes (distribution boxes) in the preheater are suggested replaced by new and more efficient spreader boxes of LVT design

Hanil Cement (Danyang plant ), Korea

Kiln No.5upgrading to 4800 TPD

Hanil Cement (Danyang plant ), Korea

Kiln No.5upgrading to 4800 TPD Over all for modification

*Final Acceptance Certification

**The heat consumption figure does not include (not constant)

the combustibles added in the raw mix.

Hanil Cement (Danyang plant ), Korea

Kiln No.5upgrading to 4800 TPD

Guaranteed figure :

Description Present

(Sep.07)

Present

(Sep.08)

Pass

Guaranteed

(FAC*)

Production (TPD) 4,461 4,320 (+) 4,800 (#)

Heat cons. (kcal/kg) 657** 710 (+) 657**

Specify power consumption

(kWh/t), kiln drive 1.75 2.08 (+) 1.75

Waste firing in calciner (%) Approx.20** Approx.13 (+) 20 at 4,800 TPD

Hanil Cement (Danyang plant ), Korea

Kiln No.5upgrading to 4800 TPD

Client Name : APIAI Brazil (Intercement group)

LVT Role: EP Contract for plant upgrading from 2200 TPD to 2850 TPD

Project period: 2009 - 2011

Main objective : To increase the plant capacity from 2200 to 2850 TPD

Job carried out

1) Kiln-Preheater section modification

The homogenizing silo replaced aeration system.

The kiln feeding added by new rotary feeder and belt weigh feeder

together with a new FULLER pump and blowers.

APIAI, Brazil Kiln upgrading from 2200 TPD to 2850 TPD

1) Kiln-Preheater section modification (cont.)

The kiln equipped with new four cyclones at top stage and 2nd stage

pre heater. The installation of LVT cyclone improved the efficiency of

the collection efficiency, decrease the pressure drop of the preheater

Modified inlet and new outlet of six cyclones at 3rd, 4th and 5th stage to

decrease the inlet velocity and thereby the pressure loss. This will

ensure the effective heat transfer between hot gas and raw meal.

Installed the new calciner placed inline on top of the kiln. The

retention time in the calciner will be about 2.5 s. The installation of the

calciner made the retention time and better burning of fuel in the

calciner.

APIAI, Brazil Kiln upgrading from 2200 TPD to 2850 TPD

1) Kiln-Preheater section modification (cont.)

The kiln shortened corresponding to the new lay out of the pre heater,

and a new kiln inlet seal was installed

A new ID fan with 15% reserve on the flow and 30% reserve on the

pressure was installed.

The gas conditioning tower was installed. Hot gases from the ID fan

was cooled in a conditioning tower to app. 200 dg. C, and at the

location of the existing ESP a new bag filter was installed. The existing

housing of the ESP can be re-used. For the de-dusting a new fan has

been included.

To make the cooler more efficient a new fixed inlet was installed with

a surface area of approximately 6 sqm. together with a new cooling fan

and the renovation of Grate 1.

APIAI, Brazil Kiln upgrading from 2200 TPD to 2850 TPD

2) New vertical mill for petcoke grinding

To install vertical mill (Ube mill) with LV classifier with gas handling

system for petcoke grinding

To install new feeding system to vertical mill

To install fine petcoke feeding to kiln system

3) Cement mill classifier

To install LV Classifier for existing cement mill system

APIAI, Brazil Kiln upgrading from 2200 TPD to 2850 TPD

APIAI, Brazil

Kiln upgrading from 2200 TPD to 2850 TPD

APIAI, Brazil Kiln upgrading from 2200 TPD to 2850 TPD

Bodoquena, Brazil

Kiln upgrading to 1,900 TPD

Client Name: Bodoquena, Brazil (Intercement Group)

LVT Role: EP contract for Plant upgrading to 1,900 TPD

Project period: 2009 - 2010

Main objective : To increase the kiln capacity from 1,500 to 1,900 TPD

Job carried out :

1) Kiln-Preheater section modification

Change new ID fan to higher efficiency and bigger capacity

Fixed inlet of the cooler and modification of first grate

Extension of calciner to increase retention time, modification of triangular cut of 3nd and 4th cyclones, increase roof height of bottom cyclone and dividing gate

Addition BF for additional preheater waste gas to handle additional preheater waste gas

Bodoquena, Brazil

Kiln upgrading to 1,900 TPD

2) Coal mill modification to LV-MODE

Modification of the Classifier to an LV-type and an adjustment of the velocity profile in the mill so that the materials are accelerated to the classifier avoiding static classification in the mill body

With concept to control the entire flow of both material and air in the mill to be able to reduce the internal circulation of material in the mill

By modifying vertical mill to LV-MODE an increase in production of 18%, with a consequent power saving is possible

3) Cement mill modification

The gases from separator outlet shall go to LV cyclone to reduce dust load before bag filter inlet

Bodoquena, Brazil

Kiln-Preheater section modification

Bodoquena, Brazil

Kiln-Preheater section modification

Bodoquena, Brazil

Kiln-Preheater section modification

Bodoquena, Brazil

Kiln-Preheater section modification

Guaranteed and expected figure :

Description Guaranteed Obtained (*PAC)

Clinker production

(TPD) 1,900 2,032.4

Bodoquena, Brazil

Cement Mill Modification with LV-cyclone

Bodoquena, Brazil

Mill modification with LV-cyclone

Bodoquena, Brazil

Mill modification with LV Cyclone

Guaranteed and expected figure :

Description Present Obtained (*PAC)

Cement production (TPH)

@Blaine 3065 cm2/g 107.57 123.3

Bodoquena, Brazil

Coal mill modification to LV-MODE

Bodoquena, Brazil

Coal mill modification to LV-MODE

Guaranteed and expected figure :

Description Present Guaranteed

Fine coal production (TPH) 11 13

%Residue @90µm 2.5 2.5

HGI (Min.) Pet coke 35 35

HGI (Min.) Coal 55 55

Hoang Mai, Vietnam

Kiln upgrading to 4500 TPD

Client Name: Hong Mai, Vietnam

LVT Role: EP contract for Kiln upgrading to 4500 TPD

Project period: 2005-2007

Main objective : To increase the kiln capacity from 4,100 to 4,500 TPD

Job Carried out :

1) Kiln-Preheater section modification

New LVT top cyclones to improve the efficiency and decrease the pressure drop of the preheater

A triangular cut at the inlet to bottom stage cyclones to improve the collecting efficiency of the bottom stage cyclones by leading the gas and material away from the immersion tube

Extension of calciner to increase retention time

Addition filter fan (parallel existing fan) to handle the additional smoke gases

Hoang Mai, Vietnam

Kiln upgrading to 4500 TPD

2) Raw mill MPS5000B modification with LV Classifier

The modification of the Classifier to an LV-type and an adjustment of the velocity profile in the mill so that the materials are accelerated to the classifier avoiding static classification in the mill body

With concept to control the velocity of the air any point in the mill body from above the rollers. This system effectively separates the transport of the material rejected by the classifier from the air transport of material to the classifier

By increasing the efficiency of the entire classification process in the mill it is possible to reduce the specific power consumption of mill and fan

Hoang Mai, Vietnam

Kiln-Preheater section modification

Hoang Mai, Vietnam

Kiln-Preheater section modification

Hoang Mai, Vietnam

Kiln-Preheater section modification

Guaranteed and expected figure :

Description Present Guaranteed Achieved

Clinker production

(TPD) 4,150-4,200 4,500 4,580

Heat consumption

(kcal/kg) 800 N/A 775

∆P preheater

(mbar) 73 N/A 75

Hoang Mai, Vietnam

Raw mill modification with LV Classifier

Hoang Mai, Vietnam

Raw mill modification with LV Classifier

Guaranteed and expected figure :

Description Present Expected

Raw meal production (TPH) 320-325 360

%Residue @90µm 12 <12

Mill Specific power

consumption (kWh/t) 8.6 8.5

Mill fan Specific power

consumption (kWh/t) 6.6 5.0

Total Specific power

consumption (kWh/t) 15.2 14

∆P fan (mmwg) 900 850

Fan flow (m3/h) 630,000 590,000

Chinfon, Vietnam

Kiln No.1 upgrading to 4,800 TPD

Client Name: Chinfon, Vietnam

LVT Role: Engineering supply for Kiln No.1 upgrading to 4,800 TPD

Project period: 2003-2005

Job Carried out :

1) Kiln upgrade to 4,800 TPH

Modification top cyclone to be LV cyclones to improve the efficiency and decrease the pressure drop of the preheater

Addition EP fan

2) Coal mill modification with LV Classifier

Chinfon, Vietnam

Kiln No.2 upgrading to 5,000 TPD

Client Name: Chinfon, Vietnam

LVT Role: Engineering supply for Kiln No.2 upgrading to 5,000 TPD

Project period: July, 2009-2010

Job Carried out :

1) Kiln No.2 upgrade to 5,000 TPH

Modification top cyclone to be LV cyclones to improve the efficiency and decrease the pressure drop of the preheater

Addition EP fan (parallel existing fan)

Modification kiln feed bucket elevators by increasing speed

Installation new burner

2) Modification of LV Classifier by install LV-Pocket

Modification of LV Classifier for Raw mill No.2 (UM40.4)

Modification of LV Classifier for Coal mill (UM26.3)

Modification of LV Classifier for Cement mill (UM46.2+2)

Chinfon, Vietnam

Kiln No.2 upgrading to 5,000 TPD

Guaranteed and expected figure :

*With Modification of LV Classifier for Raw mill No.2 and Coal mill

*Power consumption covering mill, classifier and fan(s)

Description Present Guaranteed

Clinker production (TPD) 4,300 > 5,000

Description Raw mill No.2 Coal mill

(HGI 37) Cement mill

Production (TPH) ≥ Raw mill No.1 15% more than

UBE Guarantee

170

(@3600 cm2/g)

%Residue @90µm Same as Raw mill

No.1 Same as present N/A

Specific power

consumption (kWh/t)

0.5 kWh/t less than

Raw mill No.1 N/A

0.5 kWh/t less

than present

LVT Key reference Nozzle ring upgrade jobs

For Vertical Mills

Nozzle Ring Upgrading

Drawing section of mill

Before After

Nozzle Ring Upgrading

Existing LV modification

Nozzle Ring Upgrading

Nozzle Ring Upgrading

Nozzle ring modification

Client Name: APODI, Brazil

LVT Role: Engineering supply and supervision for Nozzle ring modification of Raw vertical mill

Project period: 2015

Main objective: Nozzle Ring Modification for upgrading vertical mill

Nozzle ring Before After

Capacity (tph) 290 320

Reject (tph) ~ 100 <20

Mill pressure diff. (mbar) - ↓12

Power saving (Kwh/t) - 0.5

Apodi, Brazil

Raw mill UBE38.4

Apodi, Brazil

Raw mill UBE38.4

Client Name: Holcim, Vietnam

LVT Role: Engineering supply and supervision for Nozzle ring modification of Raw vertical mill

Project period: 2015

Main objective: Nozzle Ring Modification for upgrading vertical mill

Nozzle ring Before After

Capacity (tph) 347 375

Reject (tph) ~ 100 <40

Mill pressure diff. (mbar) - ↓12

Power saving (Kwh/t) - -

Holcim, Vietnam

Raw mill LM46.4

Holcim, Vietnam

Raw mill LM46.4

Client Name: Viacha Cement Plant, Bolivia

LVT Role: Engineering supply and supervision for Nozzle ring modification of Raw vertical mill

Project period: 2016

Main objective: Nozzle Ring Modification for upgrading vertical mill , Additional Chute, Lowering the Dam Ring

Nozzle ring Before After

Capacity (tph) 155 180

Reject (tph) - -

Mill pressure diff. (mbar) - -

Power saving (kwh/t) - -

Viacha, Bolivia

Raw mill ATOX32.5

Viacha, Bolivia

Raw mill ATOX32.5

Client Name: Holcim Lugait Plant, Philippines

LVT Role: Engineering supply and supervision for Nozzle ring modification of Raw vertical mill

Project period: 2016

Main objective: Nozzle Ring Modification for upgrading vertical mill , Lowering the Dam Ring

Nozzle ring Before After

Capacity (tph) 305 320

Reject (tph) >100 <40

Mill pressure diff. (mbar) - ↓2

Power saving (Kwh/t) - -

Holcim, Philippines

Raw mill LM48.4

Holcim, Philippines

Raw mill LM48.4

LVT Key reference

LV Classifier for semi-finish grinding upgradation

Client Name: TPI Polene PCL, Thailand

LVT Role: Engineering, supply of equipment and erection for cement ball mill no.1 upgradation

Project period: 2015-2016

Main objective: To improve the capacity of semi-finish grinding system by LV Classifier system

TPIPL, Thailand

Upgradation of Semi-Finish Grinding

Existing system consisting of roller press with 2x825kW (Polycom) and ball mill 4.8x14.5 m, 5400 kW.

Job carried out :

Installation of LV classifier for material outlet from roller press

Installation of LV cyclone

Installation of gas handling system of classifier circuit

Nozzle ring Before After

Capacity (TPH) 220 257.4

Blaine (cm2/g) 3785 3776

Sieve on 45 micron (%) 9.16 4.8

TPIPL, Thailand

Upgradation of Semi-Finish Grinding

TPIPL, Thailand

Upgradation of Semi-Finish Grinding

Fluidizing bed system

Guide plate

Inlet chute

TPIPL, Thailand

Upgradation of Semi-Finish Grinding

L/O/G/O

THANK YOU LV Technology Public Company Limited