LVT Key reference projects for Plant Upgradationlv-technology.com/upload/brochure_pdf/090916.pdf ·...
Transcript of LVT Key reference projects for Plant Upgradationlv-technology.com/upload/brochure_pdf/090916.pdf ·...
LVT Key reference plant/kilns upgrade jobs
Client Project Name Country Detail
CMS Plant upgrading to 2800
TPD Malaysia
Turnkey Contract for plant upgrading from 2100 TPD to 2800 TPD (Actual achieve is 2880 TPD)
NSCI Plant upgrading to 4000
TPD, Bahau Plant Malaysia
EP Contract for kiln upgrading from 3600 TPD to 4000 TPD (Actual achieve is 4300 TPD)
NSCI Kiln upgrading to 2750
TPD, Perlis Plant Malaysia
EP Contract for kiln upgrading from 1900 TPD to 2750 TPD (Actual achieve is 2850 TPD)
Power Cement
(Al Abbas Cement)
2 Plants upgrading to 1000 TPD and 1800 TPD
Pakistan EP Contract for plant upgrading from 500 TPD to 1000 TPD and 1000 to 1800 TPD
Cemex 2 Kilns upgrading to
1000TPD Thailand
EP Contract for plant upgrading to 1000 TPD
Hanil Kiln upgrading to 4800
TPD Korea Engineering supply for kiln upgrading 4800 TPD
Apiai Kiln upgrading to 2850
TPD Brazil EP Contract for plant upgrading from 2200 TPD to 2850 TPD
Bodoquena Kiln upgrading to 1900
TPD Brazil EP Contract for plant upgrading to 1900 TPD
Hoang Mai Kiln upgrading to 4500
TPD Vietnam EP Contract for kiln upgrading to 4500 TPD
Chinfon 2 Plants upgrading to
4800 TPD and 5000 TPD Vietnam
Engineering supply for kiln upgrading to 4500 TPD and 5000 TPD
Client Project Name Country Detail
APODI Nozzle ring upgrading
Brazil Engineering supply for Nozzle ring upgrading for Raw Vertical Mill from 290 tph to 320 tph
Holcim Nozzle ring upgrading
(Vietnam Plant) Vietnam
Engineering supply for Nozzle ring upgrading for Raw Vertical Mill from 347 tph to 375 tph
Viacha Nozzle ring upgrading
Bolivia Engineering supply for Nozzle ring upgrading for Raw Vertical Mill from 155 tph to 180 tph
Holcim Nozzle ring upgrading
(Lugait Plant) Philippines
Engineering supply for Nozzle ring upgrading for Raw Vertical Mill from 305 tph to 320 tph
LVT Key reference Nozzle ring upgrade jobs
Client Project Name Country Detail
TPIPL LV Classifier for semi-
finish grinding upgradation
Thailand EP Contract for cement mill upgrading from 220 tph to 257 tph
LVT Key reference LV Classifier for Semi Finish Grinding System
Client Name: Cahya Mata Sarawak, Malaysia
LVT Role: Turnkey EPC Contract for plant upgrading from 2,100 TPD to 2,800 TPD (Actual achieve is 2,880 TPD)
Project period: 2011 - 2013
Job carried out : Plant Modification to achieve guarantee capacity 2,800 TPD with New vertical raw mill and new vertical coal mill
1) Raw Mill
New raw mill grinding circuit of brand new vertical mill LVT/C-Hope (VRMR36.4) with LVT Classifier by normally VRMR36.4 can achieve 200 TPH but when operate with LVT Classifier the mill can achieve up to 230 TPH.
New hot gas handling system for new raw mill department
New Feeding system
New bucket elevator for silo feeding.
CMS, Malaysia
Plant upgrading to 2800 TPD
2) Pre heater: Top stage 4 cyclones replaced with 2 new
LVT spiral roof cyclones to reduce
the pressure drop and improve
the collection efficiency.
2nd and 3rd stage cyclones increased
height of cyclone roof to reduce pressure
drop in the preheater by increasing of
cyclone inlet area
5th stage modified inlet cyclone.
Extension of calciner to increases
the retention time and full combustion
Installation of dispersion box at all stages
of cyclones except cyclone no.5. This will
ensure the effective heat transfer between
hot gas and raw meal.
Kiln inlet seal replaced with pneumatic
type to arrest the false air leakage
3) Gas handling department: Existing ESP modified the electrical parts
for support extra flow and clinker dust from cooler after increase clinker production as well as
reduction of dust emission.
Installation of new mechanical parts for ESP system for support the new gas flow.
New kiln dust transportation transported to existing bucket elevator.
4) Kiln:
Increase kiln speed to 4.5 rpm for reduce volumetric loading
from higher kiln capacity to keep kiln filling percentage when
increase the production by changing gear box and new AC drive
motor.
Kiln main burner replaced with high momentum burner
After modification, kiln can achieve the capacity up to 2,850
TPD with free CaO of clinker less than 1%.
5) Cooler:
Added fixed inlet at the cooler starting portion with new cooler
air fans in order to get maximum heat recuperation.
Replace 1st grate of cooler by LV cooler with relocation of
cooling air fan
Clinker transportation machine was modified for
support the new upgrading capacity.
6) New Vertical Mill with LV Classifier for Coal grinding
New coal grinding circuit Installation of Beijing power
Vertical millfor fine coal preparation, Mill-ZGM80G with
LVT Classifier by when operate with LVT Classifier the mill
can achieve the capacity up to 20.6 TPH.
New hot gas handling for new coal mill department
New feeding system for raw coal
New coal feeder for calciner firing.
FINE
COARSE
Rotation
direction LV Pocket (Guide vane)
Rotor
Centrifugal force
Drag force
Gravity force
Vertical Mill with LV Classifier
Description Guarantee PGT
Kiln (TPD) 2800 2846
Raw Mill (TPH) 230 232
Coal Mill (TPH) 18.5 20.6
Guaranteed and PGT figure :
CMS, Malaysia
Plant upgrading to 2800 TPD
Client Name: Negeri Sembilan Cement Industries Sdn. Bhd., Malaysia
LVT Role: EP Contract for plant upgrading from 3600 TPD
to 4000 TPD (Actual achieve is 4300 TPD)
Project period: 2007 - 2008
Main objective : To increase the plant capacity from 3,600 to 4,000 TPD and reduce plant power consumption
NSCI, Bahau Plant
Plant upgrading to 4000 TPD
Job carried out : Modifications to achieve guarantee capacity 4,000 TPD
1) New LVT top cyclones
The LVT top cyclones will improve the efficiency and decrease the
pressure drop of the preheater.
2) Enlarge inlet area to 2nd stage cyclone
The inlet area to the 2nd stage is increased by lifting the roof in order
to decrease the inlet velocity and thereby the pressure loss.
NSCI, Bahau Plant
Plant upgrading to 4000 TPD
3) LVT design dispersion box for all stages
New effective dispersion boxes are required to disperse the material
properly when the velocity on cyclone riser pipes increases. This will
ensure the effective heat transfer between hot gas and raw meal.
4) Extension of calciner
To increase the retention time and better burning of fuel in the
calciner
5) New inlet and triangular cut in bottom stage cyclone
The inlet modified according to the calciner modification. The new
inlet will have a positive effect on the coating tendencies in this inlet.
A triangular cut is made to the bottom stage cyclone in order to
improve the cyclone efficiency and decrease the specific heat
consumption.
NSCI, Bahau Plant
Plant upgrading to 4000 TPD
6) Water spray in down comer
The water spray system is designed to reduce the temperature of the gases
leaving the preheater by 50C, which will increase the ID-fan capacity.
This water spray system will work as a secondary “cooling tower” as well.
7) New ID-fan and motor
It is necessary to install a new ID-fan with a higher flow and pressure
rating than the existing.
8) New filter fan and motor parallel to existing ESP Fan
A new parallel filter fan installed parallel to existing ESP fan. This will
facilitate to exhaust the additional kiln gases after the upgrading to 4000
tpd.
NSCI, Bahau Plant
Plant upgrading to 4000 TPD
9) GCT modification
The gas conditioning tower modified with new water spray system to achieve 160 Deg.C gas temperature as the outlet.
10) Clinker transport
Installed the new transportation for support material flow after kiln upgrade to 4,000 TPD.
NSCI, Bahau Plant
Plant upgrading to 4000 TPD
Client Name: Negeri Sembilan Cement Industries Sdn. Bhd., Malaysia
LVT Role: EP Contract for kiln upgrading from 1900 TPD to 2750 TPD (Actual achieve is 2850 TPD)
Project period: 2008 - 2009
Main objective : To increase the plant capacity from 1,900 to 2,750 TPD and reduce plant power consumption
NSCI, Perlis Plant
Kiln upgrading to 2750 TPD
Job carried out :
1) Pre-heater Cyclone modification
Installation of new top LVT cyclone.
To install new dispersion boxes for improve heat exchange
efficiency
Top part of downcomer duct modified.
Enlarge and extend calciner to increase retention time.
Modified tertiary air duct and connect to the calciner
Kiln hood modification for reducing of hot cooler dust injection issue which cause severely injured
New coal feeding system for calciner firing
NSCI, Perlis Plant
Kiln upgrading to 2750 TPD
2) Kiln gas dedusting
Installation of new main baghouse for
upgrade capacity (former is ESP)
3) New Kiln motor, VVVF and Gear box
Installed a new motor and gear box for
new kiln speed.
4) Clinker Cooler modification
New fixed inlet (7 rows 8 plate wide)
and 2 new fixed inlet cooler fan for
increase heat recuperation.
5) Cooler cooler ESP extenstion
Extend one more field for existing ESP
for additional amount of cooler waste gas
and reduce dust emission
6) Kiln feed system
New bucket elevator for kiln feed system
Client Name: Al Abbas Cement, Pakistan
LVT Role: EP Contract for plant upgrading from 500 TPD to 1000 TPD and 1000 to 1800 TPD (Actual achieve are 1,236 and 1,891 TPD)
Project period: 2005 - 2007
Main objective: To increase 2 plants capacity from 500 TPD to 1000 TPD and 1000 TPD to 1800 TPD
Job carried out :
1) Vertical Mill for raw material grinding
Installed new transportation equipment for support upgrading
capacity.
Power cement, Pakistan 2 Plants upgrading to 1000 TPD and 1800 TPD
1) Vertical Mill for raw material grinding (cont.)
Installed new raw vertical roller mill(LM32.4 with LVT Classifier,
normally this mill size can achieve the capacity below 200 TPH but
when operate with LVT Classifier can achieve the capacity up to
216 TPH)
2) New kiln feed system
Installed new kiln feed transportation machine for support
upgrading capacity.
Power cement, Pakistan 2 Kilns upgrading to 1000 TPD and 1800 TPD
3) Preheater system and clinker cooler modification
Installed the LVT top cyclones for improve the efficiency and
decrease the pressure drop of the preheater.
New kiln gear reducer for new kiln speed.
Tertiary Air Duct, clinker cooler, and fan system and dust collecting
system was modified.
4) Clinker storage and new cement grinding system
Installed the new clinker storage and transportation for increasing
the stock capacity.
Installed the new cement vertical mill system and modified the
existing cement ball mill by optimize ball charge and installed the
LVT Classifier system.
Power cement, Pakistan 2 Kilns upgrading to 1000 TPD and 1800 TPD
5) New cement packing system
Installed the new packing plant system for support new
upgrading capacity.
6) Coal grinding system modification
Installed the new coal vertical roller mill system (Raymond Mill)
with LV Classifier for support new upgrading kiln system.
Power cement, Pakistan 2 Kilns upgrading to 1000 TPD and 1800 TPD
Client Name: CEMEX Thailand
LVT Role: EP Contract for kiln upgrading from 900 TPD and 1200 TPD
Project period: 2003 - 2004
Main objective: To increase the plant capacity from 900 to 1,200 TPD
Cemex, Thailand
2 Kilns upgrading to 1200 TPD
Cemex, Thailand
2 Kilns upgrading to 1200 TPD
Job carried out :
New top stage cyclones
Top cyclones preheater will be replaced to the new LVT cyclones
(without refractory) for improving the efficiency. It can be
improved by installing a cylindrical part at the body of the
cyclone.
LVT suggest modifying the complete inlet duct section to the top
stage cyclones to LVT new design, to avoid the present ducting
“pinch point” at the cyclone inlets, where caking on tendency on
the roof has been observed. This will also reduce the pressure
drop over the top cyclone stage. The new cylindrical cyclone part
will also call for installation of an extra downcomer part.
Cemex, Thailand
2 Kilns upgrading to 1200 TPD
Modification of the 4 stage cyclone
Expand the riser duct after Pre-calciner and Enlarge the riser part of
the Pre-calciner
A small but not unimportant improvement can be done in the riser
part of the calciner. The expansion of the riser part was done on
the front side (towards the kiln) and on the right side (seen from the
kiln). The start of the riser expansion to the sides has been done
nearly horizontal, which has created “shelves” and areas for possible
turbulence resulting in downwards flow and undesired material
dropping directly to the kiln (along the walls).
New preheater ID Fan & Motor
New top stage
cyclones without
refractory
Modification of
the 4th stage
cyclone
Expand the riser duct
after Pre-calciner
Enlarge the riser part
of the Pre-calciner
New preheater ID Fan
& Motor
Cemex, Thailand
2 Kilns upgrading to 1200 TPD
*Final Acceptance Certification
Cemex, Thailand
2 Kilns upgrading to 1200 TPD
Guaranteed figure :
Description Present Pass Guaranteed
(FAC*)
Production (TPD) 900 1200
Hanil Cement (Danyang plant ), Korea
Kiln No.5upgrading to 4800 TPD
Client Name: Hanil Cement (Danyang plant), Korea
LVT Role: Engineering Service for kiln upgrading
Project period: November 2008 – April 2009
Main objective: To increase the kiln capacity from 4,320 to 4,800 TPD and increasing the waste firing upto 20%
In year 2008, Hanil cement at Danyang plant would like to upgrade plant capacity and they consult with LVT. After LVT team investigation, the LVT suggest that the Danyang plant can be upgraded to 4800 tpd from 4320 TPD as per the measured during pretest.
The operation by following the existing main equipment
In-Line Calciner (ILC) 5-stage preheater with swirl chamber
Kiln 4.57 x 67 m , slope 4 %
Kiln drive motor 522 kW
Fuller grate cooler (CIS-CFG-RFT)
Pillard kiln main burner
Hanil Cement (Danyang plant ), Korea
Kiln No.5upgrading to 4800 TPD
Job carried out :
1) Cyclone Preheater
The 4 existing top cyclones will be replaced by completely new LV Cyclones to reduce the pressure loss and to improve the top cyclone efficiency. This will lead to a bit higher pressure drop over the new LVT top stage cyclones. The cyclones are foreseen installed with 114 mm castable
Hanil Cement (Danyang plant ), Korea
Kiln No.5upgrading to 4800 TPD
2) Extension of the ILC calciner with New TAD inlet and new LVT mixing chamber
Hanil is firing approx. 20 % of waste fuel to the calciner. This leads to operational problems and CO formation in the calciner. Hanil possesses at the same time a strong desire to increase the waste firing to 30 %.
Hanil Cement (Danyang plant ), Korea
Kiln No.5upgrading to 4800 TPD
Extension of the ILC calciner
LVT therefore suggests extending the
existing calciner with a new square duct.
The result in the largest possible
extension of the calciner gas retention
time, which is crucial for the satisfying
completion of the combustion of the
waste fuel fired in the calciner.
The calciner a gas retention time of
approx. 4.6 seconds is achieved (at 4800
TPD)
Hanil Cement (Danyang plant ), Korea
Kiln No.5upgrading to 4800 TPD
New TAD inlet and
new mixing chamber
Installing a new LVT mixing
chamber and a modified TAD inlet to the
new mixing chamber. The reason is that
the existing swirl chamber is much too large (low gas velocity) and do not
facilitate a proper mixing of the calciner fuel (waste) and the combustion
air. The result is the observed CO problems out of the calciner.
With the new LVT mixing chamber we improve the start conditions for
the combustion of the calciner fuel (waste), and we are convinced that it
shall be possible to increase the %-waste fired from the existing 20 % –
even at the increased clinker production level to 4800 TPD.
Hanil Cement (Danyang plant ), Korea
Kiln No.5upgrading to 4800 TPD
3) New LVT material flap gates
Installation of new LVT material flap gates to minimize the amount of heat transfer bypass gas flows in the preheater.
Any amount of hot gas bypassing the heat transfer process stages leads to an increase in the kiln system heat consumption and to increased temperature profile and hereby to increased pressure drop and increased fan power consumptions
4) Modified inlets to the two bottom stage (C5) cyclones
Modification of the inlets to the two cyclone stage number 5 cyclones to minimize dust settlement and build up in these areas.
Hanil Cement (Danyang plant ), Korea
Kiln No.5upgrading to 4800 TPD
5) Material spreader boxes (distribution boxes)
The existing spreader boxes (distribution boxes) in the preheater are suggested replaced by new and more efficient spreader boxes of LVT design
Hanil Cement (Danyang plant ), Korea
Kiln No.5upgrading to 4800 TPD
*Final Acceptance Certification
**The heat consumption figure does not include (not constant)
the combustibles added in the raw mix.
Hanil Cement (Danyang plant ), Korea
Kiln No.5upgrading to 4800 TPD
Guaranteed figure :
Description Present
(Sep.07)
Present
(Sep.08)
Pass
Guaranteed
(FAC*)
Production (TPD) 4,461 4,320 (+) 4,800 (#)
Heat cons. (kcal/kg) 657** 710 (+) 657**
Specify power consumption
(kWh/t), kiln drive 1.75 2.08 (+) 1.75
Waste firing in calciner (%) Approx.20** Approx.13 (+) 20 at 4,800 TPD
Client Name : APIAI Brazil (Intercement group)
LVT Role: EP Contract for plant upgrading from 2200 TPD to 2850 TPD
Project period: 2009 - 2011
Main objective : To increase the plant capacity from 2200 to 2850 TPD
Job carried out
1) Kiln-Preheater section modification
The homogenizing silo replaced aeration system.
The kiln feeding added by new rotary feeder and belt weigh feeder
together with a new FULLER pump and blowers.
APIAI, Brazil Kiln upgrading from 2200 TPD to 2850 TPD
1) Kiln-Preheater section modification (cont.)
The kiln equipped with new four cyclones at top stage and 2nd stage
pre heater. The installation of LVT cyclone improved the efficiency of
the collection efficiency, decrease the pressure drop of the preheater
Modified inlet and new outlet of six cyclones at 3rd, 4th and 5th stage to
decrease the inlet velocity and thereby the pressure loss. This will
ensure the effective heat transfer between hot gas and raw meal.
Installed the new calciner placed inline on top of the kiln. The
retention time in the calciner will be about 2.5 s. The installation of the
calciner made the retention time and better burning of fuel in the
calciner.
APIAI, Brazil Kiln upgrading from 2200 TPD to 2850 TPD
1) Kiln-Preheater section modification (cont.)
The kiln shortened corresponding to the new lay out of the pre heater,
and a new kiln inlet seal was installed
A new ID fan with 15% reserve on the flow and 30% reserve on the
pressure was installed.
The gas conditioning tower was installed. Hot gases from the ID fan
was cooled in a conditioning tower to app. 200 dg. C, and at the
location of the existing ESP a new bag filter was installed. The existing
housing of the ESP can be re-used. For the de-dusting a new fan has
been included.
To make the cooler more efficient a new fixed inlet was installed with
a surface area of approximately 6 sqm. together with a new cooling fan
and the renovation of Grate 1.
APIAI, Brazil Kiln upgrading from 2200 TPD to 2850 TPD
2) New vertical mill for petcoke grinding
To install vertical mill (Ube mill) with LV classifier with gas handling
system for petcoke grinding
To install new feeding system to vertical mill
To install fine petcoke feeding to kiln system
3) Cement mill classifier
To install LV Classifier for existing cement mill system
APIAI, Brazil Kiln upgrading from 2200 TPD to 2850 TPD
Bodoquena, Brazil
Kiln upgrading to 1,900 TPD
Client Name: Bodoquena, Brazil (Intercement Group)
LVT Role: EP contract for Plant upgrading to 1,900 TPD
Project period: 2009 - 2010
Main objective : To increase the kiln capacity from 1,500 to 1,900 TPD
Job carried out :
1) Kiln-Preheater section modification
Change new ID fan to higher efficiency and bigger capacity
Fixed inlet of the cooler and modification of first grate
Extension of calciner to increase retention time, modification of triangular cut of 3nd and 4th cyclones, increase roof height of bottom cyclone and dividing gate
Addition BF for additional preheater waste gas to handle additional preheater waste gas
Bodoquena, Brazil
Kiln upgrading to 1,900 TPD
2) Coal mill modification to LV-MODE
Modification of the Classifier to an LV-type and an adjustment of the velocity profile in the mill so that the materials are accelerated to the classifier avoiding static classification in the mill body
With concept to control the entire flow of both material and air in the mill to be able to reduce the internal circulation of material in the mill
By modifying vertical mill to LV-MODE an increase in production of 18%, with a consequent power saving is possible
3) Cement mill modification
The gases from separator outlet shall go to LV cyclone to reduce dust load before bag filter inlet
Bodoquena, Brazil
Kiln-Preheater section modification
Guaranteed and expected figure :
Description Guaranteed Obtained (*PAC)
Clinker production
(TPD) 1,900 2,032.4
Bodoquena, Brazil
Mill modification with LV Cyclone
Guaranteed and expected figure :
Description Present Obtained (*PAC)
Cement production (TPH)
@Blaine 3065 cm2/g 107.57 123.3
Bodoquena, Brazil
Coal mill modification to LV-MODE
Guaranteed and expected figure :
Description Present Guaranteed
Fine coal production (TPH) 11 13
%Residue @90µm 2.5 2.5
HGI (Min.) Pet coke 35 35
HGI (Min.) Coal 55 55
Hoang Mai, Vietnam
Kiln upgrading to 4500 TPD
Client Name: Hong Mai, Vietnam
LVT Role: EP contract for Kiln upgrading to 4500 TPD
Project period: 2005-2007
Main objective : To increase the kiln capacity from 4,100 to 4,500 TPD
Job Carried out :
1) Kiln-Preheater section modification
New LVT top cyclones to improve the efficiency and decrease the pressure drop of the preheater
A triangular cut at the inlet to bottom stage cyclones to improve the collecting efficiency of the bottom stage cyclones by leading the gas and material away from the immersion tube
Extension of calciner to increase retention time
Addition filter fan (parallel existing fan) to handle the additional smoke gases
Hoang Mai, Vietnam
Kiln upgrading to 4500 TPD
2) Raw mill MPS5000B modification with LV Classifier
The modification of the Classifier to an LV-type and an adjustment of the velocity profile in the mill so that the materials are accelerated to the classifier avoiding static classification in the mill body
With concept to control the velocity of the air any point in the mill body from above the rollers. This system effectively separates the transport of the material rejected by the classifier from the air transport of material to the classifier
By increasing the efficiency of the entire classification process in the mill it is possible to reduce the specific power consumption of mill and fan
Hoang Mai, Vietnam
Kiln-Preheater section modification
Guaranteed and expected figure :
Description Present Guaranteed Achieved
Clinker production
(TPD) 4,150-4,200 4,500 4,580
Heat consumption
(kcal/kg) 800 N/A 775
∆P preheater
(mbar) 73 N/A 75
Hoang Mai, Vietnam
Raw mill modification with LV Classifier
Guaranteed and expected figure :
Description Present Expected
Raw meal production (TPH) 320-325 360
%Residue @90µm 12 <12
Mill Specific power
consumption (kWh/t) 8.6 8.5
Mill fan Specific power
consumption (kWh/t) 6.6 5.0
Total Specific power
consumption (kWh/t) 15.2 14
∆P fan (mmwg) 900 850
Fan flow (m3/h) 630,000 590,000
Chinfon, Vietnam
Kiln No.1 upgrading to 4,800 TPD
Client Name: Chinfon, Vietnam
LVT Role: Engineering supply for Kiln No.1 upgrading to 4,800 TPD
Project period: 2003-2005
Job Carried out :
1) Kiln upgrade to 4,800 TPH
Modification top cyclone to be LV cyclones to improve the efficiency and decrease the pressure drop of the preheater
Addition EP fan
2) Coal mill modification with LV Classifier
Chinfon, Vietnam
Kiln No.2 upgrading to 5,000 TPD
Client Name: Chinfon, Vietnam
LVT Role: Engineering supply for Kiln No.2 upgrading to 5,000 TPD
Project period: July, 2009-2010
Job Carried out :
1) Kiln No.2 upgrade to 5,000 TPH
Modification top cyclone to be LV cyclones to improve the efficiency and decrease the pressure drop of the preheater
Addition EP fan (parallel existing fan)
Modification kiln feed bucket elevators by increasing speed
Installation new burner
2) Modification of LV Classifier by install LV-Pocket
Modification of LV Classifier for Raw mill No.2 (UM40.4)
Modification of LV Classifier for Coal mill (UM26.3)
Modification of LV Classifier for Cement mill (UM46.2+2)
Chinfon, Vietnam
Kiln No.2 upgrading to 5,000 TPD
Guaranteed and expected figure :
*With Modification of LV Classifier for Raw mill No.2 and Coal mill
*Power consumption covering mill, classifier and fan(s)
Description Present Guaranteed
Clinker production (TPD) 4,300 > 5,000
Description Raw mill No.2 Coal mill
(HGI 37) Cement mill
Production (TPH) ≥ Raw mill No.1 15% more than
UBE Guarantee
170
(@3600 cm2/g)
%Residue @90µm Same as Raw mill
No.1 Same as present N/A
Specific power
consumption (kWh/t)
0.5 kWh/t less than
Raw mill No.1 N/A
0.5 kWh/t less
than present
Client Name: APODI, Brazil
LVT Role: Engineering supply and supervision for Nozzle ring modification of Raw vertical mill
Project period: 2015
Main objective: Nozzle Ring Modification for upgrading vertical mill
Nozzle ring Before After
Capacity (tph) 290 320
Reject (tph) ~ 100 <20
Mill pressure diff. (mbar) - ↓12
Power saving (Kwh/t) - 0.5
Apodi, Brazil
Raw mill UBE38.4
Client Name: Holcim, Vietnam
LVT Role: Engineering supply and supervision for Nozzle ring modification of Raw vertical mill
Project period: 2015
Main objective: Nozzle Ring Modification for upgrading vertical mill
Nozzle ring Before After
Capacity (tph) 347 375
Reject (tph) ~ 100 <40
Mill pressure diff. (mbar) - ↓12
Power saving (Kwh/t) - -
Holcim, Vietnam
Raw mill LM46.4
Client Name: Viacha Cement Plant, Bolivia
LVT Role: Engineering supply and supervision for Nozzle ring modification of Raw vertical mill
Project period: 2016
Main objective: Nozzle Ring Modification for upgrading vertical mill , Additional Chute, Lowering the Dam Ring
Nozzle ring Before After
Capacity (tph) 155 180
Reject (tph) - -
Mill pressure diff. (mbar) - -
Power saving (kwh/t) - -
Viacha, Bolivia
Raw mill ATOX32.5
Client Name: Holcim Lugait Plant, Philippines
LVT Role: Engineering supply and supervision for Nozzle ring modification of Raw vertical mill
Project period: 2016
Main objective: Nozzle Ring Modification for upgrading vertical mill , Lowering the Dam Ring
Nozzle ring Before After
Capacity (tph) 305 320
Reject (tph) >100 <40
Mill pressure diff. (mbar) - ↓2
Power saving (Kwh/t) - -
Holcim, Philippines
Raw mill LM48.4
Client Name: TPI Polene PCL, Thailand
LVT Role: Engineering, supply of equipment and erection for cement ball mill no.1 upgradation
Project period: 2015-2016
Main objective: To improve the capacity of semi-finish grinding system by LV Classifier system
TPIPL, Thailand
Upgradation of Semi-Finish Grinding
Existing system consisting of roller press with 2x825kW (Polycom) and ball mill 4.8x14.5 m, 5400 kW.
Job carried out :
Installation of LV classifier for material outlet from roller press
Installation of LV cyclone
Installation of gas handling system of classifier circuit
Nozzle ring Before After
Capacity (TPH) 220 257.4
Blaine (cm2/g) 3785 3776
Sieve on 45 micron (%) 9.16 4.8
TPIPL, Thailand
Upgradation of Semi-Finish Grinding