Luis gestoso sismos 2011- Bolzano Workshop

24
1

Transcript of Luis gestoso sismos 2011- Bolzano Workshop

Page 1: Luis gestoso sismos 2011- Bolzano Workshop

1

Page 2: Luis gestoso sismos 2011- Bolzano Workshop

2

TIME (UTC) DEPTH INTENSITY STRENGTH

15:05 2 VI 4,5 16:47 3 VII 5,1

Page 3: Luis gestoso sismos 2011- Bolzano Workshop

3

SEISMIC EMERGENCY PLAN OF CIVIL PROTECTION IN THE REGION OF MURCIA (SISMIMUR)

Page 4: Luis gestoso sismos 2011- Bolzano Workshop

4

GRUPO

ORDEN

GRUPO

LOGISTICO

GRUPO

SANITARIO

GRUPO

ACCION SOCIAL

GRUPO

INTERVENCIÓN GRUPO

ACCION SOCIAL

GRUPO

LOGISTICO

GRUPO

INTERVENCIÓN GRUPO

SANITARIO

GRUPO

ORDEN

CECOPAL

DIRECTOR Alcalde

COMITÉ ASESOR

(PEMU)

GABINETE DE PRENSA

(PEMU)

JEFE DE OPERACIONES (PEMU)

JEFE DE PUESTO DE MANDO AVANZADO

(PEMU)

GABINETE DE PRENSA Jefe de Gabinete de Prensa de

Consejería Presidencia

GABINETE DE PRENSA Jefe de Gabinete de Prensa de Consejería

de Presidencia y de Delegación de Gobierno

JEFE DE OPERACIONES Director de CECARM

CECOP

DIRECTOR Consejero de Presidencia

JEFE DE PUESTO DE MANDO AVANZADO

Jefe de Servicio de P.Civil

COMITÉ ASESOR

(según Plan SISMIMUR)

DIRECTOR Consejero de Presidencia y

Delegado del Gobierno

CECOP - CECOPI

COMITÉ ASESOR

(según SISMIMUR)

JEFE DE OPERACIONES Director de CECARM y Jefe de Unidad de P. Civil de Deleg. Gobierno

JEFE DE PUESTO DE MANDO AVANZADO

Jefe de Servicio de P.Civil CARM

NIVEL 0 NIVEL 1 NIVEL 2

GABINETE DE PRENSA

Jefe de Gabinete de Prensa de Delegación de Gobierno y Consejería Presidencia

CECOPI DIRECTOR

Delegado del Gobierno y Consejero de Presidencia

COMITÉ ASESOR

JEFE DE OPERACIONES Jefe de Unidad de P. Civil de Deleg. Gobierno y Director de CECARM

JEFE DE PUESTO DE MANDO AVANZADO

Jefe de Servicio de P.Civil CARM

NIVEL 3

GRUPO

EVALUACIÓN SÍSMICA GRUPO

RESTAURACIÓN SERVICIOS ESENCIALES

GRUPO

EVALUACIÓN SÍSMICA GRUPO

RESTAURACIÓN SERVICIOS ESENCIALES

PLAN

SISMIMUR

Page 5: Luis gestoso sismos 2011- Bolzano Workshop

5

•  Emergency state level 1 at 17:40, 35 minutes after the

first earthquake happened

•  Emergency state level 2 at 19:20, 33 minutes after

the second earthquake

Page 6: Luis gestoso sismos 2011- Bolzano Workshop

6

9 deceased

200 injured

Nearly 8000 attended calls by 112

Page 7: Luis gestoso sismos 2011- Bolzano Workshop

7

PUESTO DE MANDO AVANZADO

MANDO DEL GRUPO DE INTERVENCIÓN

COORDINADOR DEL GRUPO DE EVALUACIÓN

SÍSMICA

COORDINADOR DEL GRUPO DE

RESTABLECIMIENTO DE SERVICIOS ESENCIALES

COORDINADOR DEL GRUPO SANITARIO

MANDO DEL GRUPO DE ORDEN

COORDINADOR DEL GRUPO LOGÍSTICO

COORDINADOR DEL GRUPO ACCIÓN SOCIAL

Advanced Command Position

Intervention Team Command

Seismic evaluation team Coordinator

Essential recovery services group Coordinator

Health group Coordinator

Order group Command

Logistic group Coordinator

Social action group Coordinator

Page 8: Luis gestoso sismos 2011- Bolzano Workshop

8

Advanced Command Position

Military Emergency Unit

Page 9: Luis gestoso sismos 2011- Bolzano Workshop

9

MANDO DEL GRUPO DE INTERVENCIÓN

EQUIPO DE BOMBEROS

EQUIPO DE BÚSQUEDA Y RESCATE

EQUIPO DE CONTROL DE EDIFICIOS

Intervention group Command

Firefighters Team

Building control Team

Search&Rescue Team

Page 10: Luis gestoso sismos 2011- Bolzano Workshop

10

Page 11: Luis gestoso sismos 2011- Bolzano Workshop

11

COORDINADOR DEL GRUPO SANITARIO

EQUIPO ASISTENCIAL

EQUIPO DE SALUD PÚBLICA

Health Team Coordinator

Welfare Team

Public Health Team

Page 12: Luis gestoso sismos 2011- Bolzano Workshop

12

Page 13: Luis gestoso sismos 2011- Bolzano Workshop

13

COORDINADOR DEL GRUPO DE ORDEN

PATRULLA GUARDIA CIVIL

PATRULLA POLICÍA LOCAL

PATRULLA POLICÍA NACIONAL

EQUIPO FORENSE

State Police: 506 forces

GC Patrols: 445 forces

Police: 90 forces per day

Forensic Team; identification and autopsy of 8 victims in 24 hours

Page 14: Luis gestoso sismos 2011- Bolzano Workshop

14

COORDINADOR DEL GRUPO DE

RESTABLECIMIENTO DE SERVICIOS ESENCIALES

EQUIPO DE RESTABLECIMIENTO DE

AGUA POTABLE

EQUIPO DE RESTABLECIMIENTO DE

GAS

EQUIPO DE RESTABLECIMIENTO DE

ELECTRICIDAD

EQUIPO DE RESTABLECIMIENTO DE TELEFONÍA, RADIO Y TV

EQUIPO DE RESTABLECIMIENTO DE

CARRETERAS

EQUIPO DE RESTABLECIMIENTO DE

SANEAMIENTO

EQUIPO DE RESTABLECIMIENTO DE

VÍAS URBANAS

Coordinator

Drinkable water Team

Gas recovery Team

Phone, radio, TV recovery Team

Roads recovery Team

Streets & Lanes recovery Team

Water&Sanitation recovery Team

Electricity recovery Team

Page 15: Luis gestoso sismos 2011- Bolzano Workshop

15

TUNNEL: both viaducts on A-7 motorway over Guadalentín river were affected. It took 30 hours to repair. Motorway cut between km 593 and 595 TRAIN: railway between Lorca and Águilas kept closed since 11th to 25th May due to buildings collapse risk on the railway GAS: HC Energía, gas distributor in Lorca, closed 1.200 natural gas taps on the city. On May 17th service was recovered. HOSPITALS: Rafael Méndez Hospital, with capacity for 257 beds, was cleared for safety reasons, althoug not importants structural damages were detected. Emergency room was re-opened on May 13rd. Phone: On May 13rd Movistar and Vodafone repeaters were installed. They were requested since the second earthquake

Page 16: Luis gestoso sismos 2011- Bolzano Workshop

16

COORDINADOR DEL GRUPO LOGÍSTICO

EQUIPO DE MAQUINARIA CIVIL

EQUIPO DE ILUMINACIÓN Y CLIMATIZACIÓN

EQUIPO DE OTROS SUMINISTROS

EQUIPO DE AVITUALLAMIENTO

EQUIPO DE COMBUSTIBLES

EQUIPO DE APOYO LOGÍSTICO AÉREO

EQUIPO DE COMUNICACIONES

EQUIPO DE ALOJAMIENTO

Coordinator

Civil equipment Team

Provisioning Team

Supplies Team

Logistic air support Team

Communications Team

Lodging Team

Fuel Team

Ilumination&climate Team

Page 17: Luis gestoso sismos 2011- Bolzano Workshop

17

•  Some camps were established at the heavy damaged districts:

– Las Viñas, San Fernando, Sutullena, Instituto Ibáñez

•  The main camp were at “Huerto de la Rueda” trade fair. 4.000 people took refuge there

Page 18: Luis gestoso sismos 2011- Bolzano Workshop

18

Seismic researching team: IGN- IGM

Cultural Legacy damage evaluation Team: Technics from State, Region, City Councils

Housing damage evaluation Team: Téch people from CARM, City Councils, proffesional colleges, volunteers, UME COORDINADOR DEL

GRUPO DE EVALUACIÓN SÍSMICA

EQUIPO DE INVESTIGACIÓN SÍSMICA

EQUIPO DE EVALUACIÓN DE DAÑOS

EN VIVIENDAS

EQUIPO DE DERRIBO Y DESESCOMBRO

EQUIPO DE EVALUACIÓN DE DAÑOS

EN PATRIMONIO CULTURAL

Demolition and clear-up Companies

Page 19: Luis gestoso sismos 2011- Bolzano Workshop

19

Coordination of 200 arquitects, building engineers, volunteers, Regional and Local Administrations and Military Emergency Unit

•  80% buildings were damaged •  City divided in 29 sectors grid •  Initial evaluation for buildings structural

wellness. Colour code (green, yellow, red) about facilities access risks

Page 20: Luis gestoso sismos 2011- Bolzano Workshop

20

Page 21: Luis gestoso sismos 2011- Bolzano Workshop

21

Evaluation Check

Short-term works

Restoration

51 inmuebles

Page 22: Luis gestoso sismos 2011- Bolzano Workshop

22

Special group ready to take care of victims, specially in social aspects, related with the emergency situation

COORDINADOR DEL GRUPO DE ACCIÓN

SOCIAL

EQUIPO DE EVACUACIÓN Y

ALBERGUE

EQUIPO DE ATENCIÓN ESPECIAL

EQUIPO PSICOLÓGICO

EQUIPO DE SUMINISTRO DE ROPA

EQUIPO DE ALIMENTACIÓN

EQUIPO DE LIMPIEZA E HIGIENE

Evacuation&Acommodation

Feeding Team

Clothing supply Team

Psychological Team

Cleaning Team

Special attention team

Coordinator

Page 23: Luis gestoso sismos 2011- Bolzano Workshop

23

On May 18th, population with no home, registered in the city of Lorca, were lodged in a second camp, “La Torrecilla”.

Camp capacity was about 1800 people. 1580 were finally lodged.

Distribution of people per nationality

Page 24: Luis gestoso sismos 2011- Bolzano Workshop

24

Camp was closed October 30 2011