Lugo Marine Wind Cargo Presentation 2011

9
Scopes of Work For Windmill Components Design & Engineering Railcar Layout Installation of Tiedown Components Loading of Components Securing of Components as per AAR Regulations Maintenance of Components While In Storage Set Up of Railcar for Power Generation to Nacelles While in Transit

description

Lugo Marine Wind Cargo Presentation 2011

Transcript of Lugo Marine Wind Cargo Presentation 2011

Page 1: Lugo Marine Wind Cargo Presentation 2011

Scopes of Work For Windmill Components

Design & EngineeringRailcar Layout

Installation of Tiedown ComponentsLoading of Components

Securing of Components as per AAR RegulationsMaintenance of Components While In Storage

Set Up of Railcar for Power Generation toNacelles While in Transit

Page 2: Lugo Marine Wind Cargo Presentation 2011

Railcar Layout & Installation of BladeContainer Supports

Page 3: Lugo Marine Wind Cargo Presentation 2011

Railcar Layout & Installation of Nacelle BracketSystems

Page 4: Lugo Marine Wind Cargo Presentation 2011

Loading and securing of Nacelles

Page 5: Lugo Marine Wind Cargo Presentation 2011

Loading And Securing of Blade Containers

Page 6: Lugo Marine Wind Cargo Presentation 2011

Single Blade Railcar Setup

Page 7: Lugo Marine Wind Cargo Presentation 2011

Direct Discharge and Loading of Windmill

Hubs From Ship To Railcar.

Page 8: Lugo Marine Wind Cargo Presentation 2011

Direct Discharge and Loading ofWindmill Hubs From Ship To Railcar.

Page 9: Lugo Marine Wind Cargo Presentation 2011

For Rate Inquiries, Please Contact:

- Norbert LugoManaging Director-Operations & [email protected] (832) 349 - 5251

- Robert Lugo, Jr.Managing [email protected] (832) 423 - 4281