Ludlow STP DECK (39)Alternatives Presentation MeetingVT 100 – Bridge #99 over Branch Brook
April 4, 2016
![Page 2: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/2.jpg)
Introductions
Jennifer Fitch, P.E.VTrans Scoping Project Manager
Todd Sumner, P.E.VTrans Design Project Manager
Shannon Beaumont, P.E.CLD Design Consultant
![Page 3: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/3.jpg)
Purpose of Meeting
Provide an understanding of our approach to the project Provide an overview of project constraints Discuss alternatives that were considered Discuss our recommended alternative Provide an opportunity to ask questions and voice
concerns
![Page 4: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/4.jpg)
Location Map
![Page 5: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/5.jpg)
Project Location
![Page 6: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/6.jpg)
Meeting Overview
VTrans Project Development Process Project Overview
– Existing Conditions– Alternatives Considered– Recommended Alternative
Maintenance of Traffic Schedule Summary Questions
![Page 7: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/7.jpg)
VTrans Project Development Process
Project Definition
Project Design Construction
ProjectFunded
ProjectDefined
ContractAward
Quantify areas of impact
Environmental permits
Develop plans, estimate and specifications
Initiated
Identify resources & constraints
Evaluate alternatives Public participation Build Consensus
Initiated
![Page 8: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/8.jpg)
Who are you representing?
A. Municipal OfficialB. ResidentC. Local BusinessD. Independent
OrganizationE. Emergency ServicesF. Other
A. B. C. D. E. F.
50%
29%
7%7%
0%
7%
![Page 9: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/9.jpg)
How often do you use this segment of VT 100?
A. DailyB. WeeklyC. MonthlyD. RarelyE. Never
Daily
Weekly
MonthlyRare
lyNev
er
33%
47%
0%0%
20%
![Page 10: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/10.jpg)
How often do you walk over the bridge?
A. DailyB. WeeklyC. MonthlyD. RarelyE. Never
Daily
Weekly
MonthlyRare
lyNev
er
7% 7%
50%
21%
14%
![Page 11: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/11.jpg)
How often do you bike over the bridge?
A. DailyB. WeeklyC. MonthlyD. RarelyE. Never
Daily
Weekly
MonthlyRare
lyNev
er
47%
27%
20%
7%
0%
![Page 12: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/12.jpg)
What is your reason for attending this meeting?
A. Specific concernB. General InterestC. Live in close vicinityD. Other
Specif
ic co
ncern
Genera
l Inter
est
Live in
close
vicin
ityOther
7%
47%
7%
40%
![Page 13: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/13.jpg)
Project Overview
Existing Conditions
Alternatives Considered
Recommended Alternative
![Page 14: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/14.jpg)
Description of Terms Used
![Page 15: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/15.jpg)
Existing Conditions – Bridge #99 Roadway Classification – Minor Arterial Bridge Type – 82’ Rolled Beam Constructed in 1966 Ownership – State of Vermont
Looking Along VT 100
![Page 16: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/16.jpg)
Existing Conditions – Bridge #99
Concrete deck has begun to delaminate
![Page 17: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/17.jpg)
Existing Conditions - Bridge #99 Deck Rating 5 (Fair) Superstructure Rating 7 (Good) Substructure Rating 7 (Good)
Cracks, Spalls, and Delamination
![Page 18: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/18.jpg)
Existing Conditions
![Page 19: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/19.jpg)
Truck Turning Movements/Limitations Design Speed of 40 mph (Stop Condition) Access to local businesses throughout construction
Design Criteria and Considerations
![Page 20: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/20.jpg)
No Action̶ Additional maintenance required within 10 years
Deck Patching– Least-up front cost
Full Deck Replacement– Longest service life
Alternatives Considered – Bridge #99
![Page 21: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/21.jpg)
Proposed Typical Section (Looking Toward VT-103) Proposed Curb to Curb = 35’-8” (Existing is 34’) Proposed Fascia to Fascia = 39’-8” (Existing is 38’-10”)
![Page 22: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/22.jpg)
Recommended Alternative - Bridge #99 Deck Replacement
– Replace Deck with precast concrete deck panels– Increase bridge width (10 inches)
![Page 23: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/23.jpg)
Maintenance of Traffic Options Considered
Short Term Road Closure w/ Offsite Detour– Signed by State – Passenger car/pedestrian route: 2.5 miles end-to-end– Regional truck detour route: 53.5 miles end-to-end– Truck through traffic:
Phased Construction– 1-Way alternating Traffic maintained by phasing with no pedestrian access
Temporary Bridge– Not considered since it isn’t economical for maintenance projects
![Page 24: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/24.jpg)
Road Closure Approx. 10 day bridge closure Detour route signed by State Shortest passenger car route available: 2.5 miles end-to-end
![Page 25: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/25.jpg)
Regional Detour Route for Trucks VT 103, to US Route 7,to US Route 4, to VT 100
End-to-End: 53.5 MilesThrough: 33.7 Miles
![Page 26: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/26.jpg)
Local Detour Route for Cars and Pedestrians
VT 100, Rod and Gun Club Rd, to Buttermilk Falls Rd, to VT 103
End-to-End: 2.5 Miles
![Page 27: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/27.jpg)
Phased Construction Alternating 1-way traffic Possible Truck Turn Around Bridge closed to pedestrians 12 weeks of construction Cycle length is approximately 2 min
![Page 28: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/28.jpg)
Phased Construction – Typical (Looking toward VT-103)
![Page 29: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/29.jpg)
Phased Construction - Phase 1
![Page 30: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/30.jpg)
Phased Construction - Phase 2
![Page 31: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/31.jpg)
Project Location
Truck Turn Around
![Page 32: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/32.jpg)
Which maintenance of traffic option do you prefer?
A. Phased ConstructionB. Closure
A. B.
63%
38%
![Page 33: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/33.jpg)
What would be the maximum acceptable length of closure for Bridge #99?
A. 5 DaysB. 10 DaysC. 2 weeksD. Not Acceptable
A. B. C. D.
0%7%
0%
93%
![Page 34: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/34.jpg)
Which time of year would be most acceptable for Bridge #99 to be constructed?
A. MayB. JuneC. JulyD. AugustE. SeptemberF. Other
A. B. C. D. E. F.
100%
0% 0%0%0%0%
![Page 35: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/35.jpg)
Recommended Scope
Deck replacement with new precast panels with traffic maintained onsite with phased construction– Increase width 10”– Summer 2017 or 2018
![Page 36: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/36.jpg)
Alternatives MatrixRecommended
Montgomery STP DECK (40)
Alt 1 Alt 2 Alt 3
Do Nothing Deck Patching Deck Replacement
N/A Phased Construction Phased Construction
Total Project Costs (Including Engineering and Contingencies)
$0 N/A $948,900
Town Share N/A N/A N/A
Project Development Duration
0 N/A 2 year
Construction Duration 0 N/A 4 months
Closure Duration (If Applicable)
N/A N/A N/A
Geometric Design Criteria
No Change No Change No Change
Alignment Change No No No
Utilities No Change No Change No Change
ROW Acquisition No No No
Design Life Less than 10 Years N/A 30-40 Years
![Page 37: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/37.jpg)
Additional Considerations
Coordinate with intersection and downtown closure projects Intersection scope Intersection Duration Intersection traffic impacts Mike Lacroix for contact info
![Page 38: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/38.jpg)
Which would you be most concerned about?
A. Construction DurationB. Bridge AestheticsC. Environmental ImpactsD. Recreational ImpactsE. Emergency ServicesF. Business ImpactsG. OtherH. Not really concerned
A. B. C. D. E. F. G. H.
50%
0%
7% 7%
0%
14%14%
7%
![Page 39: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/39.jpg)
Did you find this presentation to be?
A. Too technical in natureB. Too simplified C. Just about rightD. Not much use at all
Too tec
hnical
in nature
Too sim
plified
Just
about
right
Not much
use at
all
0% 7%
93%
0%
![Page 40: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/40.jpg)
Do you find the recommended scope of work satisfactory?
A. YesB. No
Yes No
0%
100%
![Page 41: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions.](https://reader036.fdocuments.us/reader036/viewer/2022071216/6046aeb29b2e2a32c51cb7c1/html5/thumbnails/41.jpg)
Ludlow STP DECK (39)Questions & CommentsVT 100 – Bridge #99 over Branch Brook
April 4, 2016
For more information: https://outside.vermont.gov/agency/vtrans/external/Projects/Structures/15b109