Luce Bayou Interbasin Transfer Project - HoustonTransfer Project (LBITP) Houston City Council...

14
Construction Funding for Luce Bayou Inter-basin Transfer Project (LBITP) Houston City Council Committee for Transportation, Technology,& Infrastructure March 22, 2012

Transcript of Luce Bayou Interbasin Transfer Project - HoustonTransfer Project (LBITP) Houston City Council...

Page 1: Luce Bayou Interbasin Transfer Project - HoustonTransfer Project (LBITP) Houston City Council Committee for Transportation, Technology,& Infrastructure. March 22, 2012. ... (400 MGD

Construction Funding for Luce Bayou Inter-basin Transfer Project(LBITP)Houston City Council

Committee for Transportation, Technology,& Infrastructure

March 22, 2012

Page 2: Luce Bayou Interbasin Transfer Project - HoustonTransfer Project (LBITP) Houston City Council Committee for Transportation, Technology,& Infrastructure. March 22, 2012. ... (400 MGD

Luce Bayou Inter-basin Transfer Project (LBITP)Highlights

►Convey existing COH water supply from the Trinity River Basin to Lake Houston

► Key regional water supply strategy in the State’s Region H Water Plan since 2001

►Partnered effort of City with Coastal Water Authority (CWA)

►Estimated Project Cost: $297 million

Page 3: Luce Bayou Interbasin Transfer Project - HoustonTransfer Project (LBITP) Houston City Council Committee for Transportation, Technology,& Infrastructure. March 22, 2012. ... (400 MGD

Regional Importance

► Over 3600 square miles

► Ultimately, 9+ million people by 2060 (2011 State Water Plan)

► Right sizing and better connecting raw water delivery with treatment capacity for water supply to region

Page 4: Luce Bayou Interbasin Transfer Project - HoustonTransfer Project (LBITP) Houston City Council Committee for Transportation, Technology,& Infrastructure. March 22, 2012. ... (400 MGD

Project Description

► Capacity to convey 450,000 acre feet per year (400 MGD average daily flow) from the Trinity River to Lake Houston

► New 500 MGD pump station located on 90-acre parcel

► Approximately 3.6 miles of pipeline

► Settling basin and Maintenance Facility

► Approximately 23 miles of new canal

► Outfall structure at Lake Houston

Page 5: Luce Bayou Interbasin Transfer Project - HoustonTransfer Project (LBITP) Houston City Council Committee for Transportation, Technology,& Infrastructure. March 22, 2012. ... (400 MGD

Meeting State Mandates

► City of Houston (Area 3) and Harris County WA’s must convert to:► 30% surface water by 2010► 70% surface water by 2020► 80% surface water by 2030

► Fort Bend County must convert to:► 30% surface water by 2014► 60% surface water by 2025

► Lone Star Groundwater Conservation District regulates for Montgomery County

Page 6: Luce Bayou Interbasin Transfer Project - HoustonTransfer Project (LBITP) Houston City Council Committee for Transportation, Technology,& Infrastructure. March 22, 2012. ... (400 MGD

Demand for the Project

0

200

400

600

800

1000

1200

1400

1600

1800

2000

2010 2020 2030 2040

Surf

ace

Wat

er D

eman

d (M

GD

)

Year

City of Houston Regional Water Authorities

Total COH Water Rights

Page 7: Luce Bayou Interbasin Transfer Project - HoustonTransfer Project (LBITP) Houston City Council Committee for Transportation, Technology,& Infrastructure. March 22, 2012. ... (400 MGD

Projected Demand vs. Supplyin Lake Houston

0

50

100

150

200

250

300

350

400

450

500

550

600

2010 2020 2030 2040

MG

D

Year

City of Houston Lake Houston Water Demand Water Authorities Lake Houston Water Demand

Lake Houston Supply Before LBITP

Lake Houston Supply After LBITP

Page 8: Luce Bayou Interbasin Transfer Project - HoustonTransfer Project (LBITP) Houston City Council Committee for Transportation, Technology,& Infrastructure. March 22, 2012. ... (400 MGD

Progress to Date

► May 2005-COH requested CWA proceed with the initial development

► Apr 2006-Project evaluation initiated ► Jan 2009-COH/CWA agreement for acquisition, design

and construction► Jan 2011-Preliminary Engineering Report complete► Currently in progress(complete Dec 2012):

► Right of way acquisition► Environmental Impact Statement in progress by

USACE, Galveston District

Page 9: Luce Bayou Interbasin Transfer Project - HoustonTransfer Project (LBITP) Houston City Council Committee for Transportation, Technology,& Infrastructure. March 22, 2012. ... (400 MGD

Project Schedule

►Receive USACE permits by 1st Qtr 2013

►Begin final design March 2013

►Complete design December 2015

►Start construction June 2016

►Complete construction by 7/1/2019

Page 10: Luce Bayou Interbasin Transfer Project - HoustonTransfer Project (LBITP) Houston City Council Committee for Transportation, Technology,& Infrastructure. March 22, 2012. ... (400 MGD

Project Funding

Environmental Studies/Design Engineering:► Type: Texas Water Development Board (TWDB)

Water Infrastructure Fund Loans► $33m

Real Estate Acquisition► Type: SEALS/Direct► $20m

Construction► Type: State Participation Program ► $244m

Page 11: Luce Bayou Interbasin Transfer Project - HoustonTransfer Project (LBITP) Houston City Council Committee for Transportation, Technology,& Infrastructure. March 22, 2012. ... (400 MGD

State Participation Program

► Enables TWDB to assume a temporary ownership interest in a regional project when the local sponsors are unable to assume debt for the optimally sized facility

► Cost of the funding is repaid to the TWDB based upon purchase payments on a deferred timetable

► LBITP recognized as a participation project that creates a new supply of water

► TWDB funds up to 80% of costs/20% by sponsors

► At least 20% of the total capacity of the proposed project will serve existing needs

Page 12: Luce Bayou Interbasin Transfer Project - HoustonTransfer Project (LBITP) Houston City Council Committee for Transportation, Technology,& Infrastructure. March 22, 2012. ... (400 MGD

Financial Impact To City’s CIP and Utility Infrastructure

FY16 FY17 FY18 FY19 FY20 Later years

With State Participation Funding $ 9.35 $ 23.80 $ 22.10 $ 110.50

Without State Participation Funding $ 46.75 $ 119.00 - -

$Million

Page 13: Luce Bayou Interbasin Transfer Project - HoustonTransfer Project (LBITP) Houston City Council Committee for Transportation, Technology,& Infrastructure. March 22, 2012. ... (400 MGD

$2

$4

$5

$2

$5

$5

$15

$180

Prior Council actions—•Approval of COH-CWA agreement

•Approval of COH-RWA agreements

Upcoming action—Motion for Council support of CWA/Houston application (Apr 4)

Page 14: Luce Bayou Interbasin Transfer Project - HoustonTransfer Project (LBITP) Houston City Council Committee for Transportation, Technology,& Infrastructure. March 22, 2012. ... (400 MGD

Construction Funding for Luce Bayou Inter-basin Transfer Project(LBITP)