LUAS Cross City brochure June 2013
-
Upload
khumphreystd -
Category
Documents
-
view
215 -
download
0
Transcript of LUAS Cross City brochure June 2013
7/28/2019 LUAS Cross City brochure June 2013
http://slidepdf.com/reader/full/luas-cross-city-brochure-june-2013 1/14
iLu s Cross Cit
bringing the city
together
June 2013 - Edition 1
7/28/2019 LUAS Cross City brochure June 2013
http://slidepdf.com/reader/full/luas-cross-city-brochure-june-2013 2/14
ii Lu s Cross Cit
Th n w lin will h13 p nd ourntim of24 m n efromSt. St ph n’s Gr n toBroombridg St tion in C br
Cont ntsPro ct O r i w 1Lu s Cross Cit Rout M p 2List of wor ph s s 3Tim Lin 4C ll r Infill Wor s 6H rit g wor s 6Utiliti s Di rsion wor s 8Tr ffic M n g m nt 10Communic tions 11Dublin Cit Op n For Busin ss 11
Constructionst g willg n r t 800 obs
P ss ng rs r ic s tocomm ncin l t 2017
For the most up to date information please visit www.luascrosscity.ie
Will conn ct20,000 stud ntsto th n w DITc mpus
7/28/2019 LUAS Cross City brochure June 2013
http://slidepdf.com/reader/full/luas-cross-city-brochure-june-2013 3/14
1Lu s Cross Cit
PROjeCT OveRvIeWLu s Cross Cit construction will comm nc in jun 2013. This is on of th l rg stc pit l in stm nt pro cts b ing und rt n b th Go rnm nt o r th n xt f w
rs. Th cost of th pro ct is €368 million nd it is sch dul d to b op r tion l bth nd of 2017.
The Railway Procurement Agency is delivering the project with funding being provided bythe National Transport Authority. The project is being undertaken in close collaboration withDublin City Council who are the administrative body responsible for Dublin City.
This project will link together, for the first time, the two existing Luas lines in the City Centreand will connect Cabra (at Broombridge rail station) to St. Stephen’s Green, joining theexisting Luas line at this location. It will have 13 stops along its route, including serving thenew Dublin Institute of Technology campus at Grangegorman, which will have in excess of20,000 students when completed. The journey time from Broombridge Station in Cabra to St.Stephen’s Green will be approximately 24 minutes.
This new project will create up to 800 jobs during the construction phase with a further 60permanent jobs on completion.
To build a large scale project such as Luas Cross City in a busy city environment is a complextask, but every stage of the project will be managed to ensure that the city continues tooperate and flourish. Shoppers, commuters, workers and tourists will be able to continue toaccess and enjoy the city, while the construction is ongoing. And when the work is finishedthe public transport system of Ireland’s capital city will have a linked Luas network withconnections right into the heart of the city.
For the most up to date information please visit www.luascrosscity.ie
7/28/2019 LUAS Cross City brochure June 2013
http://slidepdf.com/reader/full/luas-cross-city-brochure-june-2013 4/14
2 Lu s Cross Cit
CustomHouse
GPO
Croke Park
NationalBotanic Gardens
GlasnevinCemetery
SaintPatrick's Park
College Park
Tolka Park
Tolka ValleyPark
MerrionSquare
DalymountPark
IveaghGardens
NationalConcert Hall
BlessingtonStreet Basin
Mater
HospitalMountjoySquare
IFSC
WiltonPark
SaintStephen's
Green
Garden of Remembrance
GuinnessStorehouse
GuinnessBrewery
yal Hospitallmainham
HeustonStation
Griffith Park
FitzwilliamSquare
MountBernardPark
Rose Garden
KILMAINHAM
PHIBSBOROUGH
DRUMCONDRA
GLASNEVIN
THE
LIBERTIES
STONEYBATTER
oenix Park
SMITHFIELD
CityHall
CivicOffices
Bank of Ireland
TrinityCollegeDublin
Leinster HouseHouses of
the Oireachtas
ScienceGallery
Ilac ShoppingCentre
BroadstoneBus Garage
NationalMuseum
NaturalHistoryMuseum
NationalGallery
Stephen’s GreenShopping Center
GaietyTheatre
TheGate
lino
NCAD
RoyalCa nal
RoyalCanal
yalnal
TolkaRiver
CamacRive r
L i f f e y
Lif fe y
HughLane
Gallery
KingsInns
RotundaHospital
McKee Barracks
CABRA
DublinCastle
Christ ChurchCathedral
ConnollyStation
AbbeyTheatre
BroombridgeStation
Luas Red Line
Luas Green Line
Luas Cross City(on street)Luas Cross City(off street)
Rail Line
Future Possible Stop
Direction of Luas onone way section
D*Proposed Depot
Rail Interchange
Proposed Stop
Proposed SingleDirection Stop
Luas Green Line
Dominick
Broadstone - DIT
Phibsborough
Grangegorman
Cabra
Parnell
Marlborough
O’Connell Upper
Westmoreland
Trinity
Dawson
St. Stephen’s Green
Broombridge
Luas Cross City
Luas Red Line
To Saggart/Tallaght
To Docklands/
The Point
To Brides Glen
O’Connell - GPO
Luas Cross City ROUTe MaPSt. St ph n’s Gr n - Broombridg
7/28/2019 LUAS Cross City brochure June 2013
http://slidepdf.com/reader/full/luas-cross-city-brochure-june-2013 5/14
3Lu s Cross Cit
LIST OF WORk PHaSeSTh construction of th Lu s Cross Cit pro ct is compl x und rt ing whichr quir s th in ol m nt of diff r nt sp ci lists t rious st g s. a numb r of worph s s r in ol d in th compl tion of this n w infr structur , th m in on s b ingth following:
1) The Heritage Works to temporarily remove various monuments and statues along the route of thescheme and put them into storage for the duration of the project;
2) The Cellars Infill Works to fill in the sections of cellars/basements which are under footpaths androadways needed for the diversion of utilities from under the proposed tram line;
3) The Utilities Diversion Works to divert the myriad of utilities in the path of the Luas tracks outof the area of the new tracks. This is being undertaken to avoid future service breakages, repairs ordiversions from affecting tram operations;
4) The Main Infrastructure Works, which is the main contract on the project for constructing the trambed, tracks, overhead system, and all of the other civil engineering elements of the works; and
5) The Electrical and Mechanical Systems which covers the installation of the various systemsassociated with powering and operating a light rail system.
For the most up to date information please visit www.luascrosscity.ie
7/28/2019 LUAS Cross City brochure June 2013
http://slidepdf.com/reader/full/luas-cross-city-brochure-june-2013 6/14
4 Lu s Cross Cit
UTILITY DIVERSION WORKS
CELLAR INFILL WORKS
2013 2014 2015
HERITAGE
H rit g Wor sThese works ensure the protection of theimportant statutes and street features onthe route of Luas Cross City. The removal ofstatues is necessary for their protection duringthe construction phase and they will be kept instorage and re-erected when the building workis complete.
MAIN
TIMe LINe
For the most up to date information please visit www.luascrosscity.ie
C ll r Infill Wor sIn Georgian Dublin it was common to buildcellars that extended under the street in front
of houses. Most of these cellars must be filledin prior to the construction of the Luas CrossCity to create space for the essential diversionof utilities.
Currently anticipated time frames for works (indicative only)
7/28/2019 LUAS Cross City brochure June 2013
http://slidepdf.com/reader/full/luas-cross-city-brochure-june-2013 7/14
5Lu s Cross Cit
NFRASTRUCTUREELECTRICAL AND MECHANICAL SYSTEMS
TESTING AND COMMISSIONING
LAUNCH OFPASSENGER SERVICES
2016 2017
el ctric l nd M ch nic l S st msElectrical power, signal controls and other
systems are needed to operate Luas trams.The overhead cables will be erected and themyriad of electrical and mechanical systems putin place to ensure safe operation of the system.
Utiliti s Di rsionDuring the construction of Luas Cross City itwill be necessary to divert underground pipesand cables and other services from underneaththe running tracks. This is to prevent futurerepair or maintenance work on these servicescausing tram disruptions.
M in Infr structur Wor sAfter the utilities have been diverted thenew Luas tracks can be constructed, thesupporting structure for the tracks built, newtrack laid and the surrounding roadway andfootpaths reinstated.
For the most up to date information please visit www.luascrosscity.ie
HERITAGE
7/28/2019 LUAS Cross City brochure June 2013
http://slidepdf.com/reader/full/luas-cross-city-brochure-june-2013 8/14
6 Lu s Cross Cit
For the most up to date information please visit www.luascrosscity.ie
CeLLaR INFILL WORkSM n cit str ts h c ll rs xt nding out und r th footp ths nd und r thro dw . Most of th s c ll rs r bric rch d structur s which w r us d to storco l nd oth r goods in b gon rs.
Over the years many of these cellar extensions have been closed off by building owners and in somecases filled in. Therefore, it is not possible to identify all of the likely cellars under the roadway andfootpaths just by visiting the buildings along each street. While twenty five cellars have been identifiedalong the route of the Luas Cross City, it is likely that a large number of unknown cellars still exist.
These have to be located and properly treated to ensure that the later utilities diversion works on thestreet can proceed.
The Cellar Works will be commencing from June 2013. The streets affected are: » St. Stephens Green North » Dawson Street » Grafton Street Lower
» Westmoreland Street » Marlborough Street» Parnell Street » Dominick Street
HeRITaGe WORkSTo nsur th ir prot ction, rious monum nts nd st tu s of historic nd
rchit ctur l import nc long th rout will b t mpor ril r mo d during thconstruction wor s.
These items will be carefully recorded during dismantling and then put into secure storage during thebuilding activities. Once the construction works are completed, these items will be returned to thestreets and re-erected at locations to be agreed in the future. The key monuments and statues beingremoved are:
1. Lady Grattan Fountain and two associated stone horse troughs from St. Stephen’s Green North;2. The Steine Sculpture at D’Olier Street/College Street island;3. The Thomas Moore Statue and Ulysses Plaque at College Street;
4. The Molly Malone Statue on Grafton Street Lower; and5. Fr. Theobald Mathew Statue on O’ Connell Street.
Other items such as lamp posts, railings, bollards and antique paving will be removed temporarily.
7/28/2019 LUAS Cross City brochure June 2013
http://slidepdf.com/reader/full/luas-cross-city-brochure-june-2013 9/14
7Lu s Cross Cit
Cellars Infll WorksIndicative Arrangements on a Typical Street (Dawson Street)(For illustr ti purpos s onl ctu l d t ils m r )
2m
50mMax
DistanceVaries
2m
50mMax
TrafficDiverted
Anne St. South
Molesworth St.
KeyWorks Barriers
Traffic Direction
For the most up to date information please visit www.luascrosscity.ie
7/28/2019 LUAS Cross City brochure June 2013
http://slidepdf.com/reader/full/luas-cross-city-brochure-june-2013 10/14
8 Lu s Cross Cit
UTILITIeS DIveRSION WORkSTh purpos of th Utiliti s Di rsion Wor s is to r mo th multitud of xistingutiliti s from und r th propos d Lu s tr c s. This wor is b ing und rt n to nsurth t futur wor s to th s utiliti s will not ff ct tr m op r tions.
Given that there is a multiplicity of utilities – water, gas, sewers, power cables, communications cables– under the city streets, this is a significant and complex undertaking. It will involve significant trafficmanagement and will require arrangements that maintain accesses to premises and businesses.
Full excavation of footpaths will be necessary, together with significant parts of the roadway. It willinvolve close cooperation with all of the various utility owners to achieve the efficient relocation of theirservices.
The conclusion of this work will see all of the necessary services moved out of the way of the newLuas tracks, facilitating the later work for the installation of the tram tracks and systems. Giventhe significance of this work, great care and attention is being given to ensuring that the deliveryarrangements for this work are effective and efficient. It is intended that there will be extensivecommunication and engagement at individual street level during these works to ensure that the needsof businesses and premises are addressed.
T pic l Str t Cross-s ction
Services Removedfrom this Area
RelocationArea forServices
RelocationArea forServices
For the most up to date information please visit www.luascrosscity.ie
7/28/2019 LUAS Cross City brochure June 2013
http://slidepdf.com/reader/full/luas-cross-city-brochure-june-2013 11/14
9Lu s Cross Cit
Utilities Diversion WorksIndicative Arrangements on a Typical Street (Dawson Street)(For illustr ti purpos s onl ctu l d t ils m r )
Dawson St.
Anne St. South
Molesworth St.
St. Stephens Green
Anne St. South
Molesworth St.
St. Stephens Green
Phase 1: Showing Trafc Flow
N
Nassau St.
Dawson St.
Duke St.
Phase 6
Anne St. South
Molesworth St.
St. Stephens Green
Nassau St.
Dawson St.
Duke St.
Phase 5
Anne St. South
Molesworth St.
St. Stephens Green
Nassau St.
Dawson St.
Duke St.
Phase 4
Anne St. South
Molesworth St.
St. Stephens Green
Nassau St.
Dawson St.
Duke St.
Phase 3
Anne St. South
Molesworth St.
St. Stephens Green
Nassau St.
Dawson St.
Duke St.
Phase 2
Anne St. South
Molesworth St.
St. Stephens Green
Nassau St.
Dawson St.
Duke St.
Phase 1
For the most up to date information please visit www.luascrosscity.ie
7/28/2019 LUAS Cross City brochure June 2013
http://slidepdf.com/reader/full/luas-cross-city-brochure-june-2013 12/14
10 Lu s Cross Cit
TRaFFIC MaNaGeMeNTjust o r h lf of Lu s Cross Cit will b construct d on-str t, r sulting in int rf c swith ll mod s of tr nsport curr ntl using th s str ts. Th r m ind r of throut will b construct d “off-str t”, long th corridor of th form r r ilw linb tw n Bro dston nd Broombridg r ilw st tion.
For the construction work on the city streets, effective management of traffic and transport will be akey objective of the project. A great deal of effort has gone into planning the delivery of the project ina manner which enables construction to proceed efficiently while minimising the level of inconvenienceand disruption that the work will cause. However, it is not possible to construct a project of this scalewithout requiring traffic lanes and portions of streets to be closed off at various times to allow theworks to be undertaken.
While overall plans have been developed, the final details of individual traffic arrangements at eachlocation will be developed by the individual contractors building the project. Each of their proposals willbe subject to detailed review and work will only be undertaken with the specific authorisation of DublinCity Council, in its role as the responsible body for the capital’s streets.
The principles that guide the development of the individual traffic management proposals are:
» Vehicular and pedestrian access to be maintained; » Vehicular access routes for servicing premises to be maintained; » Maintain access routes to the city centre public car parks; » Maintain bus services throughout the works to ensure the continued accessibility of the city centre
by public transport; » Maintain existing footpath widths where possible; and » Provide for kerbside uses including bus stops, loading bays, taxi ranks and parking.
F nf m n n gene l ff c, x , b e , l, L nd c p k ple e ee web e www.l c c . e nd he n p p v de .
For the most up to date information please visit www.luascrosscity.ie
7/28/2019 LUAS Cross City brochure June 2013
http://slidepdf.com/reader/full/luas-cross-city-brochure-june-2013 13/14
11Lu s Cross Cit
For the most up to date information please visit www.luascrosscity.ie
COMMUNICaTIONSTh Lu s Cross Cit pro ct is committ d to communic ting with r on wor ing,li ing nd isiting th cit . Communic tions will b cross ll dir ct d rtising,soci l m di nd onlin ch nn ls. It will incorpor t n int gr t d m r ting ndcommunic tions pl n b tw n th tr nsport pro id rs. Th inform tion will bpro id d in pro cti , inform ti nd ng ging m nn r. a d dic t d w bsit h sb n s t-up which will h ll of th l t st inform tion il bl on it t
www.l c c . e
DUBLIN CITy – OPeN FOR BUSINeSSDublin Cit is n incr dibl ibr nt pl c wh th r it is to wor in, li or isit. It h sm n ttr ctions including mus ums, th tr s, b rs, r st ur nts nd shops.
Luas Cross City will bring increased trade to businesses within the city, to shops, theatres andrestaurants, as this new mode of transport will make it much easier for commuters and tourists totravel into the heart of Dublin’s City Centre. For people that work in the city, life will be made easier withincreased options for public transport commuting.
The construction of Luas Cross City is a complex engineering and infrastructural project. A project ofthis type will always create a certain level of disruption during its construction, however, the city willremain open for everyone.
Every effort will be made during construction to limit the amount of disruption to any one area orbusiness. We will work closely with all the partners in the city every step of the way to create a betterand improved public transport system that Dublin and its people value.
7/28/2019 LUAS Cross City brochure June 2013
http://slidepdf.com/reader/full/luas-cross-city-brochure-june-2013 14/14
12 Lu s Cross Cit
d e s
i g n e
d
b y
For furth r inform tion pl s log on towww.l c c . e
Dún Scéin , I gh CourtH rcourt L n , Dublin 2
T l: 1800 303 653em il: info@lu scrosscit .i