LS2 Coordination 2015-2020 1 LS2 Coordination 2015-2020

Transcript of LS2 · LHC Update. LS2 Coordination 2015-2020 16 tus 7th y 2020 t ne 2.4 ... Resume gradually,...

Page 1: LS2 · LHC Update. LS2 Coordination 2015-2020 16 tus 7th y 2020 t ne 2.4 ... Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work

LS2Coordination

2015-2020

1

LS2Coordination

2015-2020

Page 2: LS2 · LHC Update. LS2 Coordination 2015-2020 16 tus 7th y 2020 t ne 2.4 ... Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work

LS2Coordination

2015-2020

2

• Introduction to the Long Shutdown 2 (LS2)

• Safety Coordination

• Achievements up to COVID-19 Safe mode

• Restarting CERN activities after Safe mode

• Schedules & Milestones

HL-LHC Civil EngineeringUS/UW57 cavern with entrance to

UR55 and UA57 galleries

Page 3: LS2 · LHC Update. LS2 Coordination 2015-2020 16 tus 7th y 2020 t ne 2.4 ... Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work

LS2Coordination

2015-2020

3

LS2 Scope – Main objectives

Perform major Maintenance & Infrastructure Consolidations

M&O activities

Increase Intensity & Brightness in the injectors to match HL-LHC requirements

LIU Project

Increase injector Reliability and Availabilityto cover HL-LHC run

Consolidation Project

Anticipate Civil Engineering works and beam equipment

HL-LHC Project

Page 4: LS2 · LHC Update. LS2 Coordination 2015-2020 16 tus 7th y 2020 t ne 2.4 ... Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work

LS2Coordination

2015-2020

4

LS2 Scope – LIU main activities

Page 5: LS2 · LHC Update. LS2 Coordination 2015-2020 16 tus 7th y 2020 t ne 2.4 ... Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work

LS2Coordination

2015-2020

5

LS2 Scope – LHC main activities

Page 6: LS2 · LHC Update. LS2 Coordination 2015-2020 16 tus 7th y 2020 t ne 2.4 ... Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work

LS2Coordination

2015-2020

6

Safety Coordination

Page 7: LS2 · LHC Update. LS2 Coordination 2015-2020 16 tus 7th y 2020 t ne 2.4 ... Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work

LS2Coordination

2015-2020

7

Frequency Rate:Accidents with absence per million hours workedSeverity Rate:Days of absence per thousand hours worked

Safety – LS2 Accidents

February 2020

Page 8: LS2 · LHC Update. LS2 Coordination 2015-2020 16 tus 7th y 2020 t ne 2.4 ... Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work

LS2Coordination

2015-2020

8

Equipment readiness, Schedules & Milestones

LS2 Dashboardhttps://acc-dashboard.web.cern.ch/ls2(CERN Single Sign On required)

Page 9: LS2 · LHC Update. LS2 Coordination 2015-2020 16 tus 7th y 2020 t ne 2.4 ... Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work

LS2Coordination

2015-2020

10

PSB Update

Page 10: LS2 · LHC Update. LS2 Coordination 2015-2020 16 tus 7th y 2020 t ne 2.4 ... Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work

LS2Coordination

2015-2020

11

Surface building and

TT2

• Most of the LS2 activities are on track or in advance• Individual Systems Tests (ISTs) already started in some specific locations • Most of ISTs will start with the availability of the water cooling the 3rd of March 2020

New refurbished bending magnets

B269 power converters installed and water circuit under final test

New RF transverse feedback system under installation

B365 power converters

Dummy loads

Page 11: LS2 · LHC Update. LS2 Coordination 2015-2020 16 tus 7th y 2020 t ne 2.4 ... Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work

LS2Coordination

2015-2020

12

PS Ring and PS

SwitchYard

New BusBars

New WireScanners

New F16 Beam Stoppers

BTP line connected, aligned and under vacuum

New RF10MHz cooling

Last MU back to the machine

SMH16 back to the machine

New WIC system

New rigid RF 40&80 MHz lines

BI line and LBS under vacuum connection

New Bumpers

• Most of the LS2 activities are on track or in advance• Galleries cleaning completed• Individual Systems tests (ISTs) will start soon for some specific equipment in the ring

Page 12: LS2 · LHC Update. LS2 Coordination 2015-2020 16 tus 7th y 2020 t ne 2.4 ... Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work

LS2Coordination

2015-2020

14

SPS Update

New PPS BA1

Re-installation of magnets and RF cavities in LSS3

CE works in ECX5 complete on time. WP2, 3 & 4 installed in LSS5

WP1 installed in LSS6+aC coating about to start its final sector

LSS1 Re-installation

Page 13: LS2 · LHC Update. LS2 Coordination 2015-2020 16 tus 7th y 2020 t ne 2.4 ... Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work

LS2Coordination

2015-2020

15

Stat

us

7th

Feb

ruar

y2

02

0 w

rtb

asel

ine

2.4

LHC Update

Page 14: LS2 · LHC Update. LS2 Coordination 2015-2020 16 tus 7th y 2020 t ne 2.4 ... Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work

LS2Coordination

2015-2020

16

Stat

us

7th

Feb

ruar

y2

02

0 w

rtb

asel

ine

2.4

20th February 2020: Last Diode box consolidation (insulation + welds)

Page 15: LS2 · LHC Update. LS2 Coordination 2015-2020 16 tus 7th y 2020 t ne 2.4 ... Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work

LS2Coordination

2015-2020

17

• Sector 8-1 all works done•Diodes electrical insulation consolidation fully completed•DISMAC progression shows a small delay according to the baseline

Courtesy J.Ph.Tock + M Pojer

DISMAC

Page 16: LS2 · LHC Update. LS2 Coordination 2015-2020 16 tus 7th y 2020 t ne 2.4 ... Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work

LS2Coordination

2015-2020

18

FASER

Page 17: LS2 · LHC Update. LS2 Coordination 2015-2020 16 tus 7th y 2020 t ne 2.4 ... Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work

LS2Coordination

2015-2020

19

HL-LHC civil engineering

LHC P1

LHC P5

Page 18: LS2 · LHC Update. LS2 Coordination 2015-2020 16 tus 7th y 2020 t ne 2.4 ... Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work

LS2Coordination

2015-2020

20

HL-LHC civil engineering

HL-LHC Civil Works│ CERN Site Visit │ 18.02.2020

Page 19: LS2 · LHC Update. LS2 Coordination 2015-2020 16 tus 7th y 2020 t ne 2.4 ... Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work

LS2Coordination

2015-2020

21

S1 successfully qualified S2 & S4 @ SM18, cool down, being tested

S3 failed the test, back to workshops Bldg.180/SMI2 S5 in construction in LMFS3 preparing for coil replacement

Page 20: LS2 · LHC Update. LS2 Coordination 2015-2020 16 tus 7th y 2020 t ne 2.4 ... Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work

LS2Coordination

2015-2020

22

CERN going to Safe mode

Page 21: LS2 · LHC Update. LS2 Coordination 2015-2020 16 tus 7th y 2020 t ne 2.4 ... Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work

LS2Coordination

2015-2020

23

LS2 Ramping-up as of Phase 1 (or after t0)

A gradual and cautious re-start plan

toPhase 0 Phase 1 Phase 2

Safe-mode and otherurgent activities

Resume gradually, startingwith LS2, accelerator anddetector upgrades, urgentsite and building work

Ramp-up to “unlimited”access may be completed by mid-September

Number of people on sites includes CERN’s personnel as well as contractors.

Personnel involved in LS2, accelerator and detector upgrades, urgent site and building work will come back to site gradually as of 18 May.

The rest of personnel will come back gradually as of 2nd week of June.

Personnel will be called back by supervisors.

Special LS2C 8th

MayLS2 Day

12th June

End-June

Page 22: LS2 · LHC Update. LS2 Coordination 2015-2020 16 tus 7th y 2020 t ne 2.4 ... Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work

LS2Coordination

2015-2020

24

Preparatory phase – Reviewing pre-requisites

MS+AMS States Directives

CollaborationsIndustrial & Commercial

Partners

Host States Directives

Pre

par

ato

ry p

has

e

Progressive restart

scenario

LS2 & RUN 3 priorities

Show-stoppers & schedule

critical

Eligibility of Work Sites

Nature of activities

CERN additional

Safety Directives &

Recommendations

Methodology

Page 23: LS2 · LHC Update. LS2 Coordination 2015-2020 16 tus 7th y 2020 t ne 2.4 ... Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work

LS2Coordination

2015-2020

25

Getting prepared

Master Schedules

Linear Schedules

Preparation, Ramping-up and Prioritisations

Preparation

Ramping-up

Prioritization of activities

Forum of arbitrationsLS2 & EATSMB

LS2 activitiesForum of preparations

LS2C

Departments’ / Projects’ activities

Forum of discussionsATSMB & EATSMB

Methodology

Requests issued by LS2 Coordination

Requests issued by line

management & projects

Page 24: LS2 · LHC Update. LS2 Coordination 2015-2020 16 tus 7th y 2020 t ne 2.4 ... Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work

LS2Coordination

2015-2020

26

Activities before t0

• 68 x BE department with 53 with interpersonal distancing• ABP (4), BI (11), CO (5), OP(1), RF (29), ICS (18)

• 28 x EN department, all with full distancing• CV (8), EA (4), EL (5), HE (3), MME (4), SMM (4)

• 129 x TE department with 80 with interpersonal distancing.• ABT (12), CRG (9), EPC (15), MPE (4), MSC (45), VSC (44) included DISMAC (14), HL-

LHC (22)

Staff

CERN

[FTE]

Staff

Contractor

[FTE]

Staff

CERN

[FTE]

Staff

Contractor

[FTE]

Number of people to

be added to existing

CERN access list

EN-CV 10 10 10 10 10

EN-EA 6 2 2 2 6

EN-EL 11 11 11 11 11

EN-HE 1 3 2 4 4

EN-MME 6 6 6

EN-SMM 8 4 8 4 9

Grand Total 42 30 39 31 46

On-site AM On-site PM

P1

Staff

CERN

[FTE]

Staff

Contractor

[FTE]

Staff

CERN

[FTE]

Staff

Contractor

[FTE]

Number of people to

be added to existing

CERN access list

ABT 12 10 11 10 12

TE-CRG 7 7 7 7 7

TE-EPC 15 9

TE-MPE 4 1 4

TE-MSC 75 65 40 33 49

TE-VSC 42 4 24 3 42

Grand Total 155 95 83 53 114

On-site AM On-site PM

P1

Staff

CERN

[FTE]

Staff

Contractor

[FTE]

Staff

CERN

[FTE]

Staff

Contractor

[FTE]

Number of people to

be added to existing

CERN access list

BE-ABP 4 4 4

BE-BI 11 11 11 11 11

BE-CO 5 5 5 5 5

BE-OP 1 1 1 1 1

BE-RF 27 1 26 1 29

BE-ICS 14 18 14 18 17

Grand Total 62 36 61 36 67

On-site AM On-site PM

Staff

CERN

[FTE]

Staff

Contractor

[FTE]

Staff

CERN

[FTE]

Staff

Contractor

[FTE]

L3 3 1

L4 8 2 5

PSB 25 19 8 8

PS 29 17 12 3

SPS 29 16 11 9

LHC 29 15 25 13

EXP 25 13 15 10

HL-LHC 46 29 43 28

INFRAS 21 16 19 14

SUPPORT 2 1 3 2

Grand Total 217 128 142 87

On-site AM On-site PM

36% Injectors/LIU

14% LHC

11% Host Lab

25% HL-LHC

14% Dept Infras

Beams Department

EngineeringDepartment

TechnologyDepartment

Page 25: LS2 · LHC Update. LS2 Coordination 2015-2020 16 tus 7th y 2020 t ne 2.4 ... Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work

LS2Coordination

2015-2020

27

Activities after t0L3 L4 PS PSB SPS LHC Grand Total

BE-ABP 14 1 15

BE-ASR 1 1 1 3

BE-BI 4 7 6 15 118 150

BE-BI-TE-MSC 4 4

BE-CO 1 2 3

BE-ICS 1 1

BE-ICS 1 5 1 13 188 208

BE-OP 52 52

BE-RF 1 1

BE-RF 8 9 5 18 8 48

Total BE 20 11 23 15 50 366 485

EN-ACE 3 3

EN-CV 5 12 2 20 58 97

EN-EA 3 3 6

EN-EL 1 1 16 14 90 122

EN-EL-EPM 16 16

EN-EL-FC 14 14

EN-EL-FC-EPM 4 4

EN-HE 2 3 2 74 81

EN-SMM 1 2 15 13 149 180

EN-STI 2 2

EN-STI 1 3 1 8 51 64

Total BE 11 4 52 3 60 459 589

TE-ABT 6 11 15 20 52

TE-CRG 2 196 198

TE-EPC 1 1

TE-EPC 1 9 1 8 48 67

TE-EPC EN-CV 2 2

TE-EPC TE-MPE 1 1

TE-MPE 1 1

TE-MPE 2 2 2 85 91

TE-MSC 1 1

TE-MSC 1 1 12 10 13 47 84

TE-VSC 1 3 6 15 280 305

Total TE 8 1 32 33 53 676 803

SMB-SE 1 1

SMB-SE 11 7 18

SMB-SE 33 33

SMB-SIS 1 6 7

Total TE 1 1 11 0 13 33 59

HSE-HH 1 1

HSE-OHS 1 1

HSE-OHS, BE-BI 2 2

HSE-RP 1 1

Total HSE 2 3 0 0 0 0 5

IR-ECO 1 1

IT-CS 1 1 4 6

Grand Total 42 22 119 51 180 1534 1948

~1950 activities scheduled in LS2 !

Page 26: LS2 · LHC Update. LS2 Coordination 2015-2020 16 tus 7th y 2020 t ne 2.4 ... Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work

LS2Coordination

2015-2020

28

Monitoring the flow of Persons on Sites during Phase 1

Page 27: LS2 · LHC Update. LS2 Coordination 2015-2020 16 tus 7th y 2020 t ne 2.4 ... Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work

LS2Coordination

2015-2020

29

LS2 Master Schedule INWORK EDMS ACC-PM-MS-0002 v.2.6

LS2-LHC Frame evolution, status 20th May 2020

COVID-19 LHC Exp

Page 28: LS2 · LHC Update. LS2 Coordination 2015-2020 16 tus 7th y 2020 t ne 2.4 ... Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work

LS2Coordination

2015-2020

30

LHC LS2 Baseline V2.3 FRAME LHC-PM-MS-0018 v.2.3

Page 29: LS2 · LHC Update. LS2 Coordination 2015-2020 16 tus 7th y 2020 t ne 2.4 ... Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work

LS2Coordination

2015-2020

31

LHC LS2 Baseline V2.4 FRAME INWORK LHC-PM-MS-0018 v.2.4

2 months requested by LHC Experiments used for additional Training quenches

Page 30: LS2 · LHC Update. LS2 Coordination 2015-2020 16 tus 7th y 2020 t ne 2.4 ... Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work

LS2Coordination

2015-2020

32

Closing remarks

Injectors & LHC were on schedule…Few components on the critical path were followed closely.

No showstopper identified, full span of activities and resources.

Two additional months requested by LHC Experiments to be used for additional magnet training to see potential for operation @ higher energy.

CERN went on Safe mode due to COVID-19 mid-MarchAll equipment & infrastructures put on Safe mode within 2 weeks!

LS2Coordination

2015-2020

HL-

LHC

Civ

il En

gin

erin

gw

ork

sin

LH

C P

oin

t 5

Page 31: LS2 · LHC Update. LS2 Coordination 2015-2020 16 tus 7th y 2020 t ne 2.4 ... Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work

LS2Coordination

2015-2020

33

Closing remarks

LS2: the main driver of CERN Ramping-upPhase 0till mid-May: used to implement COVID-19 Safety measures, adapt

procedures, tools and schedules. Successful with intensive field coordination and safety follow-up (tunnel and surface).

Phase 1since mid-May: LS2 activities restarting according to new schedules. ~3 months impact of COVID-19 Safe mode → No snow-ball effect.

LN2 and LHe start deliveries mid-July’20 → LHC cool down to start mid-September’20.

Beams in Injectors by Spring’21 and in LHC by end-Summer’21

HL-

LHC

Civ

il En

gin

erin

gw

ork

sin

LH

C P

oin

t 5

LS2Coordination

2015-2020

• Special LS2 Committee (8th May)

• Prioritization review of Phase 1 re-start up to end-June.

• LHC accelerator and Experiments meeting (8th June)

• LS2 & Experiments status and Run 3.

• LS2 Day (12th June)

• Consolidate the LHC Experiments timeline and LS2 Master schedules.

• Update on resources availabilities including Support’s group and General Services for entire LS2.

• LHC Performance Workshop “Chamonix”, 28th Sept to 1st Oct

• Review and optimize the LS2 schedule and the Run 3.

Page 32: LS2 · LHC Update. LS2 Coordination 2015-2020 16 tus 7th y 2020 t ne 2.4 ... Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work

LS2Coordination

2015-2020

34

Warm thanks to:All Contributors to this presentation LS2C Representatives for their help in the LS2 preparation

and follow-up

Congratulation to: CERN Teams and Collaborators from Institutes and Universities Industrial Support Teams

Keep going! …and my warm thanks to the LS2 Team