lq'kklu
School of Good Governance And Policy Analysis
National Workshop onDisseminating Information on Good Practices in
Public Service Delivery June 5, 2009
Automated Meter Reading Project in MP East Discom: A Breakthrough in Automation
-Executive Director,
M.P. Poorva Kshetra Vidyut Vitaran Co. Ltd., Jabalpur
22
INTRODUCTION
• The Power Sector in India sustains a loss of over 25-30% because of pilferage of electricity.
• The weakest links in the distribution of power are: Easy accessibility of meters to consumers,
because of which a large no. of whom tamper with it.
Human element involved in Reading of the meters
• Note:-According to the CEA, during the financial year 2008-09, the Indian utilities could supply 689 billion kWh of electricity against requirement of 774 billion kWh, which represents shortfall of about 11.0%.
33
AUTOMATION AS A SOLUTION:
• A solution to this ever growing problem would be:Device a mechanism for for remote surveillance /
monitoring of meters.Automation of the meter readings.
• East DISCOM in MP took initiative in this direction. • The AMR Project initiated by the Discom has made a
breakthrough in the automation of Power utilities.
44
BACKGROUND
Previous Practice of Meter reading and billing:
Manual Reading. Billing through punching of manually
recorded reading data at billing centers. Decentralized database.
55
BILLING PROCESS PRIOR TO PROJECT
66
DRAWBACKS IN PREVIOUS PRACTICE
• Waste of highly skilled manpower .
• Expenses on conveyance.
• Likelihood of errors and manipulations.
• Time lag between reading and billing.
• Delay in detection and rectification of defects in the metering system.
7
Installation of Intelligent Electronic Meters
• The DISCOM took an initiative and provided modern static energy meters in respect of all its HT and LT high value consumers.
• These meters can store several kilobytes of metering data that can be used for billing and diagnostic purposes.
• This data can be downloaded to a handheld device called Meter Reading Instrument through the optical port ,which can be further uploaded to a PC for analysis.
• The process of billing through MRI downloads was introduced in Sep’06
7
88
Reading through MRIs
99
Initiation of AMR Project by the Discom
During billing Consumers through MRI downloads, it was observed that substantial amount of time & manpower was engaged in monthly meter reading of the consumers. In view of the above, it was decided by the company in Oct’06 that meter readings be managed remotely.This would save cost on valuable man power involved in meter reading activity.
10
STAGES OF AMR IMPLEMENTATION
STAGE-1
Installation of Electronic Meters with data storage feature in respect of all HT and LT high value consumers
STAGE-1STAGE-2
Billing through MRI downloads
STAGE-3
Remote Reading of Meters and Billing
11
Mode of Communication• GSM was chosen as the mode for communication.• The GSM is the most popular standard for mobile
phones in the world to cater voice services and data delivery.
• GSM network operates in two different frequency ranges in India - 900 MHz/ 1800 MHz.
• The max baud rate for data transfer over GSM is 9600 bps.
11
1212
PRINCIPAL DIAGRAM
13
DEPLOYMENT OF MODEMS
13
• Consumer End: GSM Modem (Transparent) with data enabled SIM.
• Server End: GSM Modem( Store and forward) with data enabled SIM.
• Communication Channel: GSM Network.
Meter connectivity (Optical port /RJ11)
1414
System Configurations- Outbound Dialing(For initiation of call from Central Station)
1515
System Configurations - Inbound Dialing (For initiation of call from Meter Modem)
1616
System Configurations - Event based Dialing (For initiation of call from Modem in case of occurrence of events)
17
Billing Process – Post AMR
17
18
INFORMATIONS RECEIVED FROM METER
• Instant parameters.
• Load & demand data.
• Energy values
• Tamper records.
• Transactions
18
19
What is a Meter Tamper?
• It is an intentional change in Electrical parameters such that it gives an advantage to the customer by registering less energy than actually consumed.
19
20
Tamper detection & Logging
• The meter analyses the electrical parameters and their relationships to make a judgement whether this is a situation which may happen due to normal load conditions or is artificially caused.
20
21
Commonly Logged Events
• Missing Potential.
• CT reversal.
• CT short or open.
• Current unbalance.
• Magnetic Tampers.
• Power off.
• Neutral Disturbance.
21
22
A CASE STUDY• Name of Consumer: M/s SECL,Arjuna Township,Kotma. Distt. Anuppur.• Meter No. : MPE56593• Event Observed: : CT Open.• Date of occurrence: 10.03.09.• Date of attending of Metering: 06.04.09.• Observation at site: CT of ME found open.• Confirmation with event observed: Yes• Reading at the time of occurrence: 1655600• Reading at the time of restoration: 1835200• Assessed units not recorded by meter: 40157• Recovery raised: Rs. 2.01 lac• Amt Recovered: Rs. 2.01 lac.
23
Phased Implementation
Phase Functionalities Target time period.
Phase-1 All HT Consumers. Dec’07
Phase-2All LT High value Industrial consumers above 25 HP.
Dec’08
Phase-3All LT High value consumers above 10 HP
Dec’0923
2424
OUT REACH OF THE PROJECT(IN TERMS OF GEOGRAPHICAL COVERAGE)
The Project covers complete Company area which is 1,35,162 sq kms (45% of the area of MP).
It covers 4 commissionaries namely Jabalpur, Rewa, Sagar & Shahdol with 20 districts.
2525
25
OUT REACH OF THE PROJECT:(IN TERMS OF NO. OF CONSUMERS)
S. No.
Category of Consumers
Total No.
No. covered in the
Project
% Coverage Status/ Target for balance work
1. HT Consumers 752 752 100% -
2. LT Consumers above 25 hp
(INDUSTRIAL))
1775 1775 100% -
LT Consumers above 25 hp
(Commercial)
1835 200 11% Installation work of balance in progress, shall be covered by Dec’09
3. LT Consumers above 10 hp
12716 500 - Installation work in progress . Shall be covered by Dec’09
2626
26
OUTREACH OF THE PROJECT:(IN TERMS OF REVENUE)
Particulars No. Units Sold in MU
Demand in Cr. Rs.
% of Total Revenue
1. Total Consumers
2692716 5726.5 2540.17 -
2. HT & High Value LT Consumers
17037 3023.3 1626.25 64%
3. Balance Consumers
2675679 2703.2 913.92 36%
2727
27
OVERALL IMPACT OF THE PROJECT(A) PROTECTION OF REVENUE :• Protection of over 60% of Company’s revenue.
(Rs.1524 Cr. during the FY 08-09).• Reduction in billing cycle from 10-12 days to 1-2
days.
(B) REDUCTION IN EXPENSES :
Prior to AMR : Rs 7,00,000/ per month on meter reading After AMR : Rs 26,000/- per month.
2828
28
OVERALL IMPACT OF THE PROJECT(C) CLOSE SURVEILLANCE/VIGILANCE: Large No. cases of malpractice/theft detected: HT 102 cases Rs. 567 Lac Recovered. LT 140 cases Rs. 68 Lac Recovered.• Majority of these cases would have escaped
unnoticed .• Consumers using very advanced technology for
theft also brought to book.
2929
29
OVERALL IMPACT OF THE PROJECT(D) IMPROVEMENT IN CONSUMER SERVICES:• Elimination of errors in meter reading & data entry.
(Earlier it was around 10%.)• Continuous vision can be kept on the consumption
of consumers.• Quick restoration of supply.• In case of any defect in metering system immediate
rectification/replacement of same.• Email & SMS alerts for reminder of bill amounts &
due date of remittance.• No more botheration of presence during reading
process.
30
OVERALL IMPACT OF THE PROJECT
(E)REDUCTION IN LINE LOSS OF THE COMPANY
30
40.02
54.78
37.31
51.54
0
10
20
30
40
50
60
% L
oss
2007-2008 2008-2009
% Line loss during the year
With HT Without HT
3131
IMPROVEMENT IN MONITORING
Continuous Monitoring of :- Meter-data of consumers for tamper-events. Erratic functioning of metering system. Consumption/demand pattern. Supply position of these consumers with immediate
corrective
measures.
3232
SCREEN SHOTS:BILLS ON NET
3333
SCREEN SHOTS:BILLS ON NET
3434
Third Party Assessment/Awards
Recognition by GoMP.Rated best application in e-Governance initiatives by
Govt. of Madhya Pradesh for the year 2007-08 and awarded ‘AWARD OF EXCELLENCE’.
Recognition by Govt. of India.Exemplary usage of ICT by Public Sector undertaking.
National e-Governance awards 2008-09 by Govt. of India and Conferred with Silver Award.
3535
Third Party Assessment/Awards
Recognition by Regulatory Commission. The Project was cited & highly appreciated by the
State Regulatory Commission before the forum of regulators during their National meet held on 24-25th Sep’08 at Khajuraho.
MPERC has issued specific directives to other discoms in the state to implement AMR, based on our Project.
36
36
Third Party Assessment/Awards (C) Compliments received from Industry Chambers:
“MP East Discom have done a commendable work by remotely monitoring all its big consumers. This has paved way for improvement in supply conditions as the actual power supply parameters are monitored by the Senior officers, so the Industries now don’t have to take pain in conveying grievances at various levels/forums.
- Pt. B.D. Bajpai, President, Mahakoushal Chamber of Commerce & Industries.
“The greatest benefit to the consumers from Remote Metering by East Discom is accuracy in billing and elimination of errors in meter reading. Industry will definitely benefit from this initiative.”
-Mr. Arun Jain, Vice President FICCI.
37
37
Third Party Assessment/Awards (D) Appreciation received from some of
our respected Consumers:1. Mr. R.C. Saboo, MD, Rewa Gas Pvt. Ltd.,Waidhan.2. Mr. V.K. Mittal, Director, Vindhyachal Air Products
Ltd.,Waidhan.3. Mr. B.L. Chourasia, GM, Hindustan Lever
Ltd.,Chhindwara.4. Mr. A.D. Saxena, GM, Renusagar Power
Co.,Singrauli.5. Mr. Narendra Sommaiya, President, Mahakaushal
Udyog Sangh
38
38
OTHER CRITICAL INDICATORS In house development, without any external support. End to end automated metering and billing solution. Increase in Collection Efficiency by 1.5%. Reduction in grievances in respect of the consumers. Highly skilled manpower released for other productive
work. Facilitated MIS.