YPT. Energy Project Resources
e p r o
Project FramingMedan LPG Terminal 4 x 5000 M3 (4 x 2500 MT)
-
www.epro-resources.come p r o
Inisiatives History
Small team had been starting the preproject inisiatives since July 2011: Pre-Survey study for site selection:
Social economy Geographic Preiminary Bathimetry and Topography Survey Utility and access
Conceptual design study Lesson learn and best practise workshop (Benchmark to three (3)
LPG Terminal in Indonesia: Gresik, Makassar, and Semarang).
Spending budget by today USD 125,000
-
www.epro-resources.come p r o
Facility Description
The Medan LPG Terminal is built and designed with a capacity of 20,000 M3 (10,000 MT) to support LPG storage facility. The LPG terminal facility is completed with four spherical tanks with 5,000 M3 (2500 MT) capacity each and six filling points to truck as distribution facilities. In accordance with LPG need in Sumatera island which reaches 5,000 M3 (2,500 MT) per day, the LPG terminal is supposed to be able to store for 11-day need.
The LPG, which arrives by ship, is collected in the terminal facility for distribution. From the ship tanker, it is pumped on to the spherical tanks. Subsequently, the LPG level in the spherical tanks is measured by ship unloading metering package to monitor the level. The LPG received from ships are propane and/or butane and mixed in the spherical storage tanks by 40:60 ratio (propane=40%, butane=60%).
-
www.epro-resources.come p r o
LPG Product Properties
Parameters Units Propane LPG Butane LPG Mixed LPG (C3:C4 = 60:40)
Density (liquid) Kg/m3 506.4 572.1 546.5
Density (gas/vapor) Kg/m3 1.77 2.4 2.2Vapor pressure @ T-max (38.2 degC) barg 11 (max) 2.4 (max) 6.55 (max)Vapor Pressure @T-normal (28 degC) barg 9.0 1.5 4.85Vapor Pressure @T-min (17.8 degC) barg 6.5 (min) 0.83 (min) 3.45 (min)
Viscosity (liquid) cP 0.1 0.15 0.13
Viscosity (gas) cP 0.01 0.01 0.01
Gas MW Gr/mole 44 58 52.5Gas Compressibility Factor (Z)
0.98 0.97 0.975
Gas Coefficient (C) 330 335 333
-
www.epro-resources.come p r o
Cash Flow of LPG Capital and Operation
Interest(US$) 8.50% p.a. Salary 11,568,000,000Rp Onshoreoffshore $50,000,000 450,000,000,000RpCos tEscalation 6.00% p.a. Consumables 1,200,000,000Rp
LoanPeriod 7 years Maintenance 608,900,000RpUS$1= 9,000Rp Rent 180,000,000Rp Tota l
Thruputfee LAUT 29.50$ 265,500Rp Operations 636,000,000Rp 14,192,900,000RpThruputfee DARAT 22.00$ 198,000Rp
Days i nyear 312 Insta l lment1 10,745,307$ 96,707,764,478RpLoan 55,000,000.00$ 110%ofCAPEX
Year 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15MT/dayLAUT 300 300 300 300 300 300 300 300 300 300 300 300 300MT/yearLAUT 93,600 93,600 93,600 93,600 93,600 93,600 93,600 93,600 93,600 93,600 93,600 93,600 93,600MT/dayDARAT 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000MT/yearDARAT 312,000 312,000 312,000 312,000 312,000 312,000 312,000 312,000 312,000 312,000 312,000 312,000 312,000
CASHINLoan 360,000,000,000 135,000,000,000Thruputfee LAUT 24,850,800,000 24,850,800,000 24,850,800,000 24,850,800,000 24,850,800,000 24,850,800,000 24,850,800,000 24,850,800,000 24,850,800,000 24,850,800,000 24,850,800,000 24,850,800,000 24,850,800,000Thruputfee DARAT 61,776,000,000 61,776,000,000 61,776,000,000 61,776,000,000 61,776,000,000 61,776,000,000 61,776,000,000 61,776,000,000 61,776,000,000 61,776,000,000 61,776,000,000 61,776,000,000 61,776,000,000
TotalCashIn 360,000,000,000 135,000,000,000 86,626,800,000 86,626,800,000 86,626,800,000 86,626,800,000 86,626,800,000 86,626,800,000 86,626,800,000 86,626,800,000 86,626,800,000 86,626,800,000 86,626,800,000 86,626,800,000 86,626,800,000CASHOUTConstructionCost 270,000,000,000 180,000,000,000OperatingCost 14,192,900,000 15,044,474,000 15,947,142,440 16,903,970,986 17,918,209,246 18,993,301,800 20,132,899,908 21,340,873,903 22,621,326,337 23,978,605,917 25,417,322,272 26,942,361,609 28,558,903,305LoanPayment 96,707,764,478 96,707,764,478 96,707,764,478 96,707,764,478 96,707,764,478 96,707,764,478 96,707,764,478
TotalCashOut 366,707,764,478 276,707,764,478 110,900,664,478 111,752,238,478 112,654,906,918 113,611,735,464 114,625,973,723 18,993,301,800 20,132,899,908 21,340,873,903 22,621,326,337 23,978,605,917 25,417,322,272 26,942,361,609 28,558,903,305
Margin (6,707,764,478) (141,707,764,478) (24,273,864,478) (25,125,438,478) (26,028,106,918) (26,984,935,464) (27,999,173,723) 67,633,498,200 66,493,900,092 65,285,926,097 64,005,473,663 62,648,194,083 61,209,477,728 59,684,438,391 58,067,896,695CumulativeMargin (24,273,864,478) (49,399,302,956) (75,427,409,874) (102,412,345,338) (130,411,519,061) (62,778,020,862) 3,715,879,230 69,001,805,327 133,007,278,990 195,655,473,073 256,864,950,801 316,549,389,192 374,617,285,887
Monthlyexpenses 1,182,741,667 1,253,706,167 1,328,928,537 1,408,664,249 1,493,184,104 1,582,775,150 1,677,741,659 1,778,406,159 1,885,110,528 1,998,217,160 2,118,110,189 2,245,196,801 2,379,908,609
OperatingCos t CapexCos t
-
www.epro-resources.come p r o
Next Plan
No. Description By Who By When Estimated Cost
1. Location Down Payment Maris Sept-2012 USD 50,000
2. FEED Study Bambang Sept-2012 USD 250,000
3. Contract Awarding Strategy
Small Team Oct-2012 USD 50,000
4. Fund Strategy and Tactical Plan
Small Team Oct-2012 USD 50,000
5. Bidding Process and Contract
Small Team Nov-2012 USD 50,000
6. Project Execution Preparation
Small Team Dec-2012 USD 50,000
Total Estimated Cost
USD 500,000
-
www.epro-resources.come p r o
LPG Terminal MEM Gresik-P&ID
-
www.epro-resources.come p r o
LPG Terminal MEM Gresik - Plot Plan
-
www.epro-resources.come p r o
LPG Terminal Bosowa Makasar-P&ID
-
www.epro-resources.come p r o
LPG Terminal Bosowa Makasar - Plot Plan
-
www.epro-resources.come p r o
LPG Terminal Bosowa Makasar - Plot Plan
-
www.epro-resources.come p r o
LPG Terminal Optima Semarang-P&ID
-
www.epro-resources.come p r o
LPG Terminal Optima Semarang-Plot Plan
-
YPT. Energy Project Resources
e p r o
Company ProfilePT. Energy Project Resources
Address:Graha Simatupang 1st Building, 5 th floor D
Jl. Letjend. TB Simatupang Kav. 38 Jati Padang, Jakarta SelatanTelepon/Fax : +62 21 782 9157 / +62 21 782 9158
e-mail: [email protected]; [email protected]: www.epro-resources.com
-
www.epro-resources.come p r o
Welcome !
PT. ENERGY PROJECT RESOURCES (EPRO)Graha Simatupang 1st Building, 5 th floor DJl. Letjend. TB Simatupang Kav. 38 Jati Padang, Jakarta SelatanTelepon/Fax : +62 21 782 9157 / +62 21 782 9158e-mail: [email protected]; [email protected]: www.epro-resources.com
-
www.epro-resources.come p r o
Best Practice MomentV
A
L
U
E
Phase 1Opportunity
Identified
Phase 2Generate &
Select Alternatives
Phase 4Execute
Phase 5Operate
Value Identification Value Realization
Phase 3Develop Preferred
Alternative
Poor Project Definition
Good Project
Definition
Poor Project Execution
Good Project
ExecutionA
B
C
D
PM Impact on Asset/Project Value
PM Impact on Asset/Project Value
Source: Independent Project Analysis (IPA)
-
www.epro-resources.come p r o
Who is EPRO?
Vision
Mission
Value
OUR MISSIONTo create added value for our stakeholders: Customers: To be our customers' benchmark EPC and O/M Servicesimprovement. Employees: To be the employer of choice in the energy marketplace. Shareholders: To consistently deliver superior earnings growth and return on capital. Communities: To have a positive impact on the quality of life in all of the communities that we live.
OUR VALUESThese values are inherent in everything we do: Integrity: We live by the highest ethical standards, honest and dependable. Teamwork: We respect each other's perspective and share knowledge and resources to achieve High performance: Passion to excellent, deliver value, innovative and deliver quality services of unmatched value, constantly raising the bar on our performance. Diversity: Inclusive, respect for cultures Partnership: Collaborative and relationship
OUR VISIONTo be the EPC and OM Service Company by delivering world class services
OUR PERFORMANCEWe will continue to build excellent Performance by: A focus on the needs of our customers. Methods to capture, share, and apply our knowledge to deliver customer solutions. Tools to identify and manage behavior competency to the benefit of our stakeholders.
-
www.epro-resources.come p r o
EPRO Way
Continues Productivity Improvement
Performance Development and Monitoring
Continues Performance Improvement
Excellent Costumer Services Customer Value Added
Services Marketing and Sales Strategy
Innovation
Sales and Product Enhancement
Loss Reduction Strategy and Innovation
Continues Cost Reduction Program
Cost Reduction
Lesson learn and Best Practice Sharing Forum
Employee Training and Seminar
Knowledge Mgt Program
Continues Learning and People
Competencies Development
Operation Excellence(Word Class Services)
Profitable Growth
Strong Leadership
and Master
Company Plan
(Strategic and
Tactical)
Sustained Superior
Performance
PT. Energy Project Resources
e p r o
-
www.epro-resources.come p r o
Introduction (1)
FOREWORDEPRO is a national engineering consultant which established in 2007 with the objective of providing professional, high-quality, cost competitive engineering services that meet the expanding needs of the Indonesia oil and gas, petrochemical, infrastructure and other related energy industries. EPRO resources are consisted of experienced and competence man-powers who have completed many engineering projects for rapidly expanding industry for over the past 15 years.
The entire EPRO Organization is project based and designed to focus on efficient and dependable in what we do with a smart resources network to guarantee proximity to our customers.
OUR PURPOSETo create value added for our people and stakeholders.
-
www.epro-resources.come p r o
Introduction (2)
PHILOSOPHY OF EPRO COMPETENCY The experience and expertise of every member of the organization will be transformed into high quality products and services providing maximum benefit for the customer..
Based on a strong team spirit, new ideas and creativity will be supported, discussed and tested without friction. The management and staff retain a high level of responsibility instead of several bureaucratic decision levels.
Those organizations are structured in a Closed Control Loop to ensure the highest quality level through permanent improvement of process efficiency and maximization of customer satisfaction.
-
www.epro-resources.come p r o
Introduction (3)
QUALITY PHILOSOPHY OF PROJECT DELIVERABLEEPRO core expertise is its engineering and project management excellence and its approach to ensuring that the design and technology selected is right for its intended use.
Our excellence in the area of EPCCM is founded on the principle of do it right for the first time. The advantages to YOUR COMPANY of this EPCCM excellence include the delivery of improved lifecycle costs for the plant, ease of constructability and enhanced operation and maintenance, reliability, shorter construction schedules and an allied safer site.
Our philosophy is to be close to our client and his team. This integrated open approach works to deliver an excellent project. This will be particularly noted in the areas of industrial relations, heritage and environmental management. We will enthusiastically work to align ourselves and our values with those of YOUR COMPANY and its team.
-
www.epro-resources.come p r o
Introduction (4)
HEALTH, SAFETY AND ENVIRONMENT (HSE)Safety, and the whole gamut of modern HSE, is an extremely high priority for EPRO Project Team. Our safety performance is excellent and complemented by safety support systems. This will be primary in our approach and performance and is demonstrated by our experience on previous projects. Our large EPCCM project clients can, and will, enthusiastically vouch for our performance and enthusiasm for safety.
TEAM AND TEAMWORKOur team comprises very experienced and competent professionals who are used to working in a dynamic team and taskforce environment to deliver a project in a timely manner. We have used our l resources to ensure that the best people are in the team and can be an integral part of the project delivery. It will be seen that the quality of the team members is first class and experienced in the engineering, project execution and construction skills required.
-
www.epro-resources.come p r o
What is EPRO Process?
DataAnalyze
SynthesizeInformation
Insight
ExperienceIntelligence
Competitive Advantage
THE COMPETITIVE INTELLIGENCE CONVERSION PROCESS By synthesizing and analyzing
data, we can transform data into information.
Next we apply high levels of experience and insights to information, transforming it into intelligence.
And if we can act on the intelligence, then it is value added by helping us in strategic decision making.
-
www.epro-resources.come p r o
Organizational Capability
-
www.epro-resources.come p r o
Company OrganizationPT. Energy Project Resources
Strategic Business Unit 1(SBU-1)
Strategic Business Unit 3(SBU-3)
Strategic Business Unit 2(SBU-2)
PT.ENERGY PROJECT RESOURCES (HOLDING)
SBU 1Project Management andEngineering Consultant
Project Management
Multi-Disciplines Engineering
SBU 2Engineering Procurement Construction and
Installation (EPCI) Contractor
Engineering Procurement Construction/ InstallationCommissioning/
Startup
SBU 3Operation and
Maintenance Services
Maintenance Services
Operation Services
-
www.epro-resources.come p r o
Operation and Maintenance Services
SBU 3 Operation and Maintenance
Services
Operation Services
Operation Engineering
Man Power Supply
Process Equipment Rental
Maintenance Services
Tank and Machinery
Pipeline Maintenance
Field Instrumentation/
Metering/ Industrial Controls
-
www.epro-resources.come p r o
Scope of SupplyOperation Services
Operation Engineering
PIMS
Predictive/ Preventive Maintenance
Reliability Engineering
Operation Assurance
Operation Excellence
Man Power Supply
Operator
Technician
Engineer
Operation Management
Security
Operation Trainings
Process Equipment
Rental
Tank
Power Plant
Compressor/ Pump/ Separator/ Vessel
Processing Plant/ Terminal
-
www.epro-resources.come p r o
Scope of SupplyMaintenance Services
Pipeline Services(Onshore
/ Offshore)
ROW Clearing and Maintenance
On Site Painting
Pipeline Repair
Hydro Testing
Heavy Hauling
Hot tapping
Road Boring
Leak Detection
Pipeline Pigging, Cleaning and Drying
Pipeline Inspection
New Pipeline Installation
Tank and Machinery
Tank Cleaning
Tank Repair
Tank Painting
Machinery Lubrication
Field Instrumentation/
Metering/ Industrial Controls
Meter Skid Fabrication and Installation
PLC/ DCS/SCADA System Integrator
Field Instrument Calibration
-
www.epro-resources.come p r o
EPRO Scope of Services
-
www.epro-resources.come p r o
EPRO Scope of Service
Oil and Gas Plant
-
www.epro-resources.come p r o
Oil and Gas Plant(JO with Lima Bintang Jaya Abadi)
EPRO Scope of Service
-
www.epro-resources.come p r o
Oil and Gas Plant(JO with Lima Bintang Jaya Abadi)
EPRO Scope of Service
-
www.epro-resources.come p r o
Power Plant(JO with MedCom)
EPRO Scope of Service
-
www.epro-resources.come p r o
Transmission Distribution Pipeline(JO with Tonsco International and Hokasa Mandiri)
EPRO Project Application Notes
-
www.epro-resources.come p r o
EPRO Experience List
EPC, 20 MW Gas Turbine Power Plant, IPP Project, Tarakan, Cahaya Sakti/ Medcomm Power, 2012. PMC Services (Project Management and Engineering Services), Makassar LPG Terminal, 20.000 m3
capacity, Bosowa and Pertamina, 2010. PMC Services, Mixed Use Balikpapan Project, a Property Project, PT. Rumpaka Jaya, 2009. PMC Services (Project Management and Engineering Services), Santan Crude Terminal Safety Ugrade
(Fire Protection System), Chevron Indonesia company, with PT. Elnusa, 2009. PMC Services (Project Management and Engineering Services), Gresik LPG Terminal, 20.000 m3 capacity,
Maspion Energy Mitratama and Pertamina, 2009. PMC Services (Project Management and Engineering Services), FEED Design, Maspion Jetty Fire
Protection Improvement, HESS-Pangkah Indonesia, with PT. Promatcon Tepat Guna, 2008. Detail Instrument and Electrical Design, Area 12 North Duri Development, Chevron Pacific Indonesia, Riau,
Indonesia, with Truba Jaya, 2008. PMC Services (Project Management and Engineering Services), FEED Pondok Tengah, Oil and Gas
Production Facility, 20.000 BOPD, 15 MMSCFD Gas, including Water Treatment Plant, Oil and Gas Terminal, SPM and SPL and Power Plant, Fire Potection System, Pertamina EP, Indonesia, with Singgar Mulia, 2007.
FEED of Coal Fired Power Plant 2x7 MW Gorontalo, Wali Nusa Energi, Indonesia, with MLD/ DHV, 2007. Feasibility Study and FEED of Coal Fired Power Plant 2x100 MW, West Sumatra, PLN, Indonesia, with
PPGT, University of Indonesia Jakarta, 2007. Feasibility Study and FEED of Coal Fired Power Plant 2x100 MW, Lampung, PLN, Indonesia, with PPGT,
University of Indonesia Jakarta, 2007. Site Selection Study, Suban Gas Plant phase 3 project, ConocoPhillips, Indonesia, with MLD/ DHV, 2007-
2008.
-
www.epro-resources.come p r o
Selected EPRO Resources Experiences List
EPC Project, Well Surveillance SCADA Project Covering Instrument and Electrical Engineering Design, EPC, Commissioning and Start-up, included developing SCADA standard for the organization, US 12 MM.
EPC Project, Duri Central Gathering Station (CGS) 10 Project, PT. Oil and Gas Facility Pacific Indonesia, US 115 MM
EPC Project, Duri Automatic Well Test 10 Project, PT. Oil and Gas Facility Pacific Indonesia, US 10 MM EPC Project, Duri CGS Sand Plant Project, PT. Oil and Gas Facility Pacific Indonesia, US 28 MM EPC Project, Duri Automatic Well Test 8 project, PT. Oil and Gas Facility Pacific Indonesia, US 5 MM FEED Study, Reliability Improvement of Duri 13.8 KV Power Distribution Project, PT. Oil and Gas Facility
Pacific Indonesia, US 300 K SCADA of COGEN Power Plant Project, PT. Oil and Gas Facility Pacific Indonesia, US 100 K EPC Project, Minas 6D Power Substation Project, 2 x 28 MVA. Including the control room building, 115 KV/
13.8 KV Switchyard and its SCADA, PT. Oil and Gas Facility Pacific Indonesia, US 3 MM EPC Project, Minas Power Plant 9 Project, Gas Turbine, 33 MVA. Including the control room building, 115
KV/ 13.8 KV switchyard and its SCADA, PT. Oil and Gas Facility Pacific Indonesia, US 15 MM EPC Project, Minas Power Plant 10 Project, Gas Turbine, 33 MVA. Including the control room building, 115
KV/ 13.8 KV switchyard and its SCADA, PT. Oil and Gas Facility Pacific Indonesia, US 16 MM
-
www.epro-resources.come p r o
Projects Application Notes
Survey Earth Work
-
www.epro-resources.come p r o
Projects Application Notes
Piling and Concrete Works Fabrication Welding and Erection