A Novel Low Speed Wind Turbine for Electrification
in INDIA
By: Mahajan AnkurM.E. I&C, 3rd Sem.NITTTR Chandigarh
Thermal Power Plants, 66.44%
Hydro Power Plant, 19.13%
Nuclear Power Plant, 2.32% Rest , 12.09%
Installed capacity of INDIA
INTRODUCTION:
April 10, 2023 3
Udham
pur
Doda
Rajour
i
Poonc
h
Jam
mu
Kathu
a
Ramba
n
Kishtw
ar
Reasi
Anant
nag
Bandip
ora
Budga
m
Baram
ulla
Gan
derb
al
Kupwar
a
Srinag
ar
Pulwam
a15
389
45
153
6 3 3282 84 67 39
8817 3
118
4 13
Un- electrified Villages In Jammu & Kashmir
No. of Un-electrified Villages
DistrictsNeed of the Hour
rvekashmir.pdfrvejammu.pdfINTRODUCTION:
April 10, 2023 4
Objectives:Study of the various types of
concentrators available and the effect of the climatic conditions on their performance.
Simulation for comparison between the concentrator proposed by Shikha and proposed Venturi (AshVer).
Determination of Point of Maximum Power Tracking in the Venturi (AshVer).
Calculation of Power Output.April 10, 2023 5
Design Methodology:Literature Survey and Problem
Definition.MATLAB Simulation for comparison
between Concentrator and AshVer.Learning of ANSYS Software.Analysis of Point of Maximum
Power Tracking using ANSYS.Power Output Calculation using
Betz Formula.Thesis writing and publication.
April 10, 2023 6
Flowchart of Design Methodology:
April 10, 2023 7
START
Literature Survey
Problem Definition
Proposed Venturi
(AshVer)
Is AshVer better than
Concentrator
Calculation of Power Output
A
A
Determination of point of Max. Power
No
Thesis Writing and Publication
STOP
Yes
Future Scope:Exploring new structural
concepts.Developing custom
generators. Tailoring of turbines for
specific sites.Design of Intelligent Power
Converters.
April 10, 2023 8
Expected Outcomes:It will be possible to harness the
wind energy more efficiently in low wind speed areas.
Reduction in carbon foot prints.Stand alone system for un-
electrified villages.May bring changes in the policies
of the CWET.Helpful in increasing the power
output beyond the Betz limit in windy regions of INDIA.
April 10, 2023 9
Time Plan:
April 10, 2023 10
Sep-1
2
Oct-
12
Nov-1
2
Dec-1
2
Jan-
13
Feb-1
3
Mar
-13
Apr-1
3
May
-13
Jun-
130
20
40
60
80
100
120
Thesis Writing & PublicationCalculation of Power OutputTracking Point of Maximum PowerLearning ANSYS softwareMATLAB SimulationLiterature Survey & Problem Definition
April 10, 2023 11
?
April 10, 2023 12
April 10, 2023 13