INTHAI MINING LIMITED
THAILAND NATURAL DOLOMITE
LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS
![Page 2: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/2.jpg)
• Inthai Mining Limited : Overview• Our Mines Locations : Khao-in Mines , Tha-U-Tae Mines &
Tiptanapan Mines• Our Crushing Plants location : Khlong Lang• Transportation of Dolomite from Mines to Plant and Port• Production details• Dolomite Specification• Our Port details and operations• Analysis Certificates• Contacts
Index
![Page 3: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/3.jpg)
INTHAI MINING LIMITED, a JV between Singh Group and Santhad Group Company, is one of the best quality and low silica natural Dolomite producer and supplier with 30 years experience in the mining industry, having annual turnover of 350 million.
We are sourcing partner for high quality Dolomite to Integrated steel industries in Asian countries, specially in India , Japan & Korea.
Our annual production of dolomite, in different sizes, is about 2.7 million MT and have capacity to increase our production depending upon demand-supply.
We attribute our success to our high quality of products, customer centricity, meeting & exceeding client expectations & dedicated teams.
Inthai Mining Limited : An overview
![Page 4: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/4.jpg)
Singh Imperial Export Import Co.
Ltd.Santhad Group Co.
Ltd.
Inthai Mining Limited Sumpun Mining
Limited
Tiptanapan Mining Ltd 40% Equity
Exclusive Marketing Rights
50 %
50 %
100 %
60 %
![Page 5: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/5.jpg)
Inthai Mining Limited is a JV Company with 50:50 % partnership between Singh Imperial Export Import Co. Ltd and Santhad Group Co. Ltd.
Sumpun Mining Ltd (SML) owning Dolomite mines, is owned by Santhad Group Ltd and has given exclusive marketing rights to Santhad Group Co .Ltd who inturn has endorsed these rights to Inthai Mining Limited.
Tiptanapan Mining Ltd. owning Dolomite mines is 40% held by Inthai Mining Limited.
The companies mentioned here above have common directors
![Page 6: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/6.jpg)
Our Dolomite Mines Locations
![Page 7: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/7.jpg)
Ore Reserves- 18 Million Ton
Tha-U-Tae Mine
![Page 8: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/8.jpg)
569600 569700 569800 569900 570000 570100 570200 570300 5704001012200
1012300
1012400
1012500
1012600
1012700
1012800
1012900
1013000
0 50 100 150 200
S cale 1 : 4,000
m .
Tha U Tae Dolomite Mine
Minable ore reserve Area (188,729 sqm .)
Total Ore reserve Area (262,060 sqm .)
ML.No. 23174/14322
ML.No. 30217/15577
ML.No. 30234/15664
M L.23174/14322 38-2-96 ra i(69,984 m 2)
M L.30217/15577 100-0-39 ra i(160,156 m 2)M L.30234/15864 25-2-72 ra i(41,088 m 2)
Total Area 164-1-37 rai(271,228 m2)
![Page 9: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/9.jpg)
Ore Reserves- 40 Million Ton
Khao-In Mine
![Page 10: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/10.jpg)
579900 580000 580100 580200 580300 580400 580500 580600 580700 580800 5809001007400
1007500
1007600
1007700
1007800
1007900
1008000
1008100
1008200
1008300
1
2
3
45
6
7
8
9
10
1112
13
14
15
1
0 50 100 150 200
S cale 1 : 5,000
m .
Khao In Dolomite Mine
Total Dolomite Ore reserve Area (262,200 sqm.)
ML.No. 23225/14814Area 188-2-7 rai(301,628 m2)
Khao In Dolomite Mines
![Page 11: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/11.jpg)
Ore Reserves- 40 Million Ton
Tiptanapan Mine
![Page 12: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/12.jpg)
575900 576000 576100 576200 576300 576400 576500 576600 576700 576800 576900 5770001005200
1005300
1005400
1005500
1005600
1005700
1005800
1005900
1006000
1
2
34
5
6
7
8
9
10
11
1
S cale 1 : 5,000
m .
Mr. Term Dolomite Mine
Minable ore reserve Area (252,186 sqm.)
Total Ore reserve Area (278,976 sqm.)
ML.No. 23185/14418
0 50 100 150 200
TiptanapanDolomite Mines
![Page 13: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/13.jpg)
Dolomite Crushing Flowchart Dolomite Crushing Flowchart
Our Dolomite Crushing UnitProduction Details
![Page 14: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/14.jpg)
Khlong Lang Crushing Plant
![Page 15: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/15.jpg)
Loading at our crusher plant…
![Page 16: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/16.jpg)
Transportation : Mines to Plant & Port
KHLONG LANG KHANOM PORT
THA-U-TAE Mine (SPM) Kanchana Dit 27 47KHAO IN Mine (SPM) Kanchana Dit 20 40TIPTANAPAN MINES Kanchana Dit 25 45
DISTANCE TO (Km.)NAME OF DEPOSITS LOCATION
![Page 17: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/17.jpg)
Our Dolomite Specification…
1. CaO 30 % min 2. MgO 20 % min.
3. SiO2 0.50 % max. 4. Al2O3 0.50 % max
5. Alkali 0.20 % max 6. Moisture 2 % max
7.Phosphorous 0.1 % max 8. Sulphur 0.1 % max.
![Page 18: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/18.jpg)
Our DolomiteProduction Details
![Page 19: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/19.jpg)
Sl. No Name of the Crushing Unit MT/day MT/month MT/Year
1 Khalong Lang Crushing Plant #1 1,200 30,000 360,000
2 Khalong Lang Crushing Plant #1 1,200 30,000 360,000
3 Tiptanapan Crushing Plant 1,500 37,500 450,000
4 Khao-In Crusing Unit 800 20,000 240,000
Total 4,700 117,500
1,410,000
Production Report (SPM) For FY 2008 - 2009
![Page 20: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/20.jpg)
Sl. No Name of the Crushing Unit MT/day MT/month MT/Year
1 Khalong Lang Crushing Plant #1 1,500 37,500 450,000
2 Khalong Lang Crushing Plant #1 1,500 37,500 450,000
3 Tiptanapan Crushing Plant 2,000 50,000 600,000
4 Khao-In Crusing Unit 1,200 30,000 360,000
Total 6,200 155,000
1,860,000
Production Report (SPM) For FY 2009 - 2010
![Page 21: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/21.jpg)
Sl. No Name of the Crushing Unit MT/day MT/month MT/Year
1 Khalong Lang Crushing Plant #1 1,500 37,500 450,000
2 Khalong Lang Crushing Plant #1 1,500 37,500 450,000
3 Tiptanapan Crushing Plant 2,000 50,000 600,000
4 Khao-In Crusing Unit 1,200 30,000 360,000
5 Mr. Term Crusing Unit 3,000 75,000 900,000
Total 9,200 230,000 2,760,000
Production Report (SPM) For FY 2010 - 2011
![Page 22: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/22.jpg)
•ROM
•Jaw Crushers
•Grizzly (90 mm)+90 mm
- 90 mm Crushed Dolomite
Screening Plant
Production Method
![Page 23: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/23.jpg)
Top Deck – 50mm
Middle Deck – 30mm
Lower Deck – 10mm
Screening Plant – Triple Deck
![Page 24: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/24.jpg)
SL Products Size Actual Size
1 Calcining Plant Grade Lumps -90 +50mm 40mm-80mm
2 BF Grade Lumps -50mm +30mm 20mm – 40mm
3 Sinter Grade Chips -30mm + 10mm 5mm-25mm
4 Fines For Sinter/Agriculture -10 mm -10mm
Post Screen Products
![Page 25: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/25.jpg)
40-80, 30%
20-40 , 30%
5-25, 25%
-10 , 15% 40mm -80mm
20mm-40mm
5mm-25mm
(-10 mm)
Finished Goods : Production Ratio
![Page 26: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/26.jpg)
828,000
690,000
414,000
40mm - 80mm20mm-40mm5mm-25mm-10 mm
828,000
Finished Material Production (MT/Yr.)
![Page 27: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/27.jpg)
Production, Supply
Size Prodn. in MT/Yr Supply Surplus Remarks
40-80 mm 828,000 100,000 700,000This size is again re-crushed for smaller sizes as per market requirement.
20-40 mm 828,000 884,650 -56650 Japan
5 -25 mm 690,000 800,000 -110,000Japan / India (110,000 MT deficit is fulfilled by resizing 40-80 mm size )
-10 mm 414,000 414,000 0 Agriculture/ Construction and Local Market
Surplus
We have approx 533,350 MT of 40-80 mm Dolomite as surplus which can be resized and supplied to new client on continuous basis.
** The above production can be enhanced as per demand or business need.
![Page 28: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/28.jpg)
OUR KHANOM PORTNAKORN SRI THAMMARAT,
SOUTH OF THAILAND
![Page 29: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/29.jpg)
B.A. Chart No. 3963
Anchorage Position LAT 9๐ 12.5’ N / LONG 99๐ 54.5’ E Time Zone : GMT +7
Company KHANOM PORT Co.,Ltd. Berth Position About 1 mile from anchorage position. Name of berth Khanom Port
Jetties3 Jetties are available for loading
Khanom Port, Thailand
![Page 30: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/30.jpg)
Jetty 1 : This is small jetty with depth 7 - 8.5 m. , Far from shore 70 m., Port width 40 m., mooring buoy 6 nos, loading rate 500 MT/Hour 3500 MT/Day by Conveyer Belts, Air draft 10.5 m. and Shipment size 10,000 - 15,000 MT
Jetty 2 : This is a big jetty with depth 9 - 10.5 m. , Far from shore 180 m., Port width 20 m., Mooring buoy 8 nos, Loading rate 500 MT/Hour 6000 MT/Day by Conveyer Belts, Air draft 10.5 m. and Shipment size 20,000 - 30,000 MT
Jetty 3 : This jetty is meant for loading into Barge and equipped with crane . Depth : 5 m. , Far from shore : 14 m, Port width : 28 m, Loading by crane : 20 MT/hour
Jetties at our Khanom Port, Thailand
![Page 31: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/31.jpg)
Loading Rate : Hourly loading rate : 500 MTDaily loading rate : 6000 MT depending on stoppages for shifting
the vessel regularly and carefully checking of the draft.
Working Hours : 24 Hours AWWDSHINC inclusive of break and shift change time
Loading Rate at Khanom Port
![Page 32: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/32.jpg)
Stockyard & Jetties location at Khanom Port
![Page 33: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/33.jpg)
Inthai Mining Limited : Stockyard at port…
![Page 34: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/34.jpg)
Loading at Stockyard at Khanom Port
![Page 35: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/35.jpg)
Our Ground logistics…
![Page 36: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/36.jpg)
Dumping into Hopper at Jetty
![Page 37: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/37.jpg)
Loading Operation at our Khanom Port…
![Page 38: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/38.jpg)
Sample collection by Inspection Agency…
![Page 39: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/39.jpg)
Loading through conveyer at Jetty
![Page 40: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/40.jpg)
Loading at our Khanom Port…
![Page 41: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/41.jpg)
Loading operations at our port…
![Page 42: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/42.jpg)
Certificate of Analysis…
![Page 43: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/43.jpg)
• Jindal Steel Works, India
• Ispat Industries Limited, India
• Bhushan Power & Steel Ltd., India
• Kobe Steel Limited, Tokyo, Japan
• Nippon Steel Corporation, Japan
• Sumitomo Metal Industries Limted,
Japan
• Pacific Metals Co. Ltd, Korea
We Source for…
![Page 44: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/44.jpg)
![Page 45: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/45.jpg)
Head office : 210/5, Khu Bon RoadKhanna Yao, Bangkok 10220Thailand.Phone : +66 29433074+66 29433517E-Mail : [email protected] : www.singhgroup.net
Corporate Office:464, 2nd Floor,Ratchadapisek Road,Samsennok, Huay Kwang,Bangkok – 10310Thailand
Inthai Mining Limited : Contacts
![Page 46: LOW SILICA DOLOMITE SOURCING PROPOSAL FOR INTEGRATED STEEL PLANTS.](https://reader035.fdocuments.us/reader035/viewer/2022081518/55182c1655034691678b4d09/html5/thumbnails/46.jpg)
“Measure not the work until the day's out and the labor done”