WELCOME LOW – INVESTMENT PROJECTS
DEAR ALL,
Here are 53 Micro / SSI
units, requiring investment ranging between Irs 50 lakhs to Irs 2 crores, and are economically attractive, high on market demand and have very fast payback period.
1
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 2: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/2.jpg)
1. AIR AND OIL FILTERS
2
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 3: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/3.jpg)
1. AIR AND OIL FILTERS
LAND REQUIRED : 5,000 sq ft
PLANT CAPACITY : 120,000 / YEAR
COST OF PLANT, MACHINE
& WORKING CAPITAL : Depends
MANPOWER REQ’D : 15
PAYOUT PERIOD : 2 - 3 YEARS
3
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 4: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/4.jpg)
2. ALUMINIUM VENETIAN BLINDS
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 5: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/5.jpg)
2. ALUMINIUM VENETIAN BLINDS
LAND REQUIRED : 4000 sq ft
PLANT CAPACITY : 180,000 sq met / year
COST OF PLANT, MACHINE
& WORKING CAPITAL : 30 Lakhs
MANPOWER REQ’D : 8
PAYOUT PERIOD : 2 - 3 YEARS
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
5
![Page 6: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/6.jpg)
3. ALUMINIUM FOIL
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
6
![Page 7: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/7.jpg)
3. ALUMINIUM FOIL
LAND REQUIRED : 1000 sq ft
PLANT CAPACITY : / year
COST OF PLANT, MACHINE
& WORKING CAPITAL : 10 Lakhs
MANPOWER REQ’D : 5
PAYOUT PERIOD : 2 - 3 YEARS
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
7
![Page 8: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/8.jpg)
4. AUTO CONTROL CABLES
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 9: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/9.jpg)
4. AUTO CONTROL CABLES
LAND REQUIRED : 3000 sq ft
PLANT CAPACITY : 250,000 / year
COST OF PLANT, MACHINE
& WORKING CAPITAL : 50 Lakhs
MANPOWER REQ’D : 8
PAYOUT PERIOD : 2 - 3 YEARS
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected] 9
![Page 11: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/11.jpg)
5. BAKERY PRODUCTS
- LAND REQUIRED : 3,000 sq ft
- PLANT CAPACITY : 10 Lakhs / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 30 Lakhs
- MANPOWER REQ’D : 15
- PAYOUT PERIOD : 3 YEARS
11
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 13: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/13.jpg)
6. BARBED WIRE
- LAND REQUIRED : 2,000 sq ft
- PLANT CAPACITY : 600 T / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 50 Lakhs
- MANPOWER REQ’D : 10
- PAYOUT PERIOD : 3 YEARS
13
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 14: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/14.jpg)
7. BITUMEN MODIFIED ASPHALT
14
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 15: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/15.jpg)
7. BITUMEN MODIFIED ASPHALT
- LAND REQUIRED : 10,000 sq ft
- PLANT CAPACITY : 72000 / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 75 Lakhs
- MANPOWER REQ’D : 12
- PAYOUT PERIOD : 3 YEARS
15
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 16: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/16.jpg)
8. BELT FASTENERS
16
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 17: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/17.jpg)
8. BELT FASTENERS
- LAND REQUIRED : 3,000 sq ft
- PLANT CAPACITY : 36,000 BOXES / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 55 Lakhs
- MANPOWER REQ’D : 17
- PAYOUT PERIOD : 3 YEARS
17
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 18: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/18.jpg)
9. BOLTS AND NUTS
18
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 19: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/19.jpg)
9. BOLTS AND NUTS
- LAND REQUIRED : 4,000 sq ft
- PLANT CAPACITY : 3,000 T / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 175 Lakhs
- MANPOWER REQ’D : 20
- PAYOUT PERIOD : 3 YEARS max
19
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 20: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/20.jpg)
10. CARD BOARD BOXES
20
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 21: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/21.jpg)
10. CARD BOARD BOXES
- LAND REQUIRED : 2500 sq ft
- PLANT CAPACITY : 150,000 / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 55 Lakhs
- MANPOWER REQ’D : 15
- PAYOUT PERIOD : 3 YEARS max
21
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 22: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/22.jpg)
11. CATTLE & POULTRY FEED
22
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 23: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/23.jpg)
11. CATTLE & POULTRY FEED
- LAND REQUIRED : 12,000 sq ft
- PLANT CAPACITY : 2500 T / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 75 Lakhs
- MANPOWER REQ’D : 10
- PAYOUT PERIOD : 3 YEARS max
23
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 24: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/24.jpg)
12. CHAINLINK FENCING
24
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 25: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/25.jpg)
12. CHAINLINK FENCING
- LAND REQUIRED : 2,000 sq ft
- PLANT CAPACITY : 12 T / DAY
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 10 Lakhs
- MANPOWER REQ’D : 6
- PAYOUT PERIOD : 3 YEARS max
25
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 27: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/27.jpg)
13. CORN FLAKES
- LAND REQUIRED : 20,000 sq ft
- PLANT CAPACITY : 300 T / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 55 Lakhs
- MANPOWER REQ’D : 10
- PAYOUT PERIOD : 3 YEARS max
27
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 28: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/28.jpg)
14. CORRUGATED CEMENT SHEETS
SMB ENVIRONMENTAL PROJECTS P
LTD. Mobile: +9198602852
Email: [email protected]
![Page 29: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/29.jpg)
14. CORRUGATED CEMENT SHEETS
LAND REQUIRED : 10,000 sq ft
PLANT CAPACITY : 200 SHEETS / DAY
PLANT & MACH: 20 LAKHS
WORKING CAPITAL: 5 LAKHS
MANPOWER REQ’D: 15
PAYOUT PERIOD: 2.5 YEARS
29
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 30: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/30.jpg)
15. CORRUGATED FIBRE BOARD
30
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 31: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/31.jpg)
15. CORRUGATED FIBRE BOARD
- LAND REQUIRED : 40,000 sq ft
- PLANT CAPACITY : 16 Lakhs / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 105 Lakhs
- MANPOWER REQ’D : 10
- PAYOUT PERIOD : 3 YEARS max
31
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 32: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/32.jpg)
16. CORRUGATED MS SHEETS
32
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 33: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/33.jpg)
16. CORRUGATED MS SHEETS
- LAND REQUIRED : 5,000 sq ft
- PLANT CAPACITY : 30,000 / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 80 Lakhs
- MANPOWER REQ’D : 10
- PAYOUT PERIOD : 3 YEARS max
33
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 34: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/34.jpg)
17. DEHYDRATED ONION & GARLIC
34
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 35: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/35.jpg)
17. DEHYDRATED ONION & GARLIC
- LAND REQUIRED : 12,000 sq ft
- PLANT CAPACITY : 300 MT / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 35 Lakhs
- MANPOWER REQ’D : 15
- PAYOUT PERIOD : 3 YEARS max
35
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 36: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/36.jpg)
18. DETERGENT POWDER
36
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 37: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/37.jpg)
18. DETERGENT POWDER
- LAND REQUIRED : 3,000 sq ft
- PLANT CAPACITY : 15000 / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 40 Lakhs
- MANPOWER REQ’D : 8
- PAYOUT PERIOD : 3 YEARS max
37
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 38: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/38.jpg)
19. DIE CASTING UNIT
38
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 39: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/39.jpg)
19. DIE CASTING UNIT
- LAND REQUIRED : 4,000 sq ft
- PLANT CAPACITY : 100 MT / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 60 Lakhs
- MANPOWER REQ’D : 7
- PAYOUT PERIOD : 3 YEARS max
39
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 41: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/41.jpg)
20. EGG TRAYS
- LAND REQUIRED : 4,000 sq ft
- PLANT CAPACITY : 10 Lakhs / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 45 Lakhs
- MANPOWER REQ’D : 10
- PAYOUT PERIOD : 3 YEARS max
41
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 42: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/42.jpg)
21. ELASTIC TAPES
42
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 43: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/43.jpg)
21. ELASTIC TAPES
- LAND REQUIRED : 2,500 sq ft
- PLANT CAPACITY : 20 Lakh M / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 25 Lakhs
- MANPOWER REQ’D : 8
- PAYOUT PERIOD : 3 YEARS max
43
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 44: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/44.jpg)
22. ESSENCE EXTRACTION
44
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 45: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/45.jpg)
22. ESSENCE EXTRACTION
- LAND REQUIRED : 3,000 sq ft
- PLANT CAPACITY : 450 T / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 45 Lakhs
- MANPOWER REQ’D : 7
- PAYOUT PERIOD : 3 YEARS max
45
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 47: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/47.jpg)
23. EGG ALBUMIN
- LAND REQUIRED : 3,000 sq ft
- PLANT CAPACITY : 300 T / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 195 Lakhs
- MANPOWER REQ’D : 15
- PAYOUT PERIOD : 3 YEARS max
47
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 48: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/48.jpg)
24. FILE FASTENERS
48
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 49: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/49.jpg)
24. FILE FASTENERS
- LAND REQUIRED : 1,500 sq ft
- PLANT CAPACITY : 300,000 / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 15 Lakhs
- MANPOWER REQ’D : 8
- PAYOUT PERIOD : 3 YEARS max
49
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 50: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/50.jpg)
25. FLAVORED MINERAL WATER
50
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 51: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/51.jpg)
25. FLAVORED MINERAL WATER
- LAND REQUIRED : 7000 sq ft
- PLANT CAPACITY : 5000 lit / day
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 95 Lakhs
- MANPOWER REQ’D : 15
- PAYOUT PERIOD : 3 YEARS max
51
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 52: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/52.jpg)
26. FRUIT, JAM, JELLY
52
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 53: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/53.jpg)
26. FRUIT, JAM, JELLY
- LAND REQUIRED : 1,500 sq ft
- PLANT CAPACITY : 100,000 Kg / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 25 Lakhs
- MANPOWER REQ’D : 5
- PAYOUT PERIOD : 3 YEARS max
53
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 54: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/54.jpg)
27. GINGER GARLIC PASTE
54
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 55: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/55.jpg)
27. GINGER GARLIC PASTE
- LAND REQUIRED : 1,500 sq ft
- PLANT CAPACITY : 10,000 Kg / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 8 Lakhs
- MANPOWER REQ’D : 3
- PAYOUT PERIOD : 2 YEARS max
55
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 56: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/56.jpg)
28. HDPE WOVEN SACKS
56
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 57: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/57.jpg)
28. HDPE WOVEN SACKS
- LAND REQUIRED : 7,000 sq ft
- PLANT CAPACITY : 250 MT / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 95 Lakhs
- MANPOWER REQ’D : 20
- PAYOUT PERIOD : 3 YEARS max
57
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 58: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/58.jpg)
29. LAUNDRY SOAP
58
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 59: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/59.jpg)
29. LAUNDRY SOAP
- LAND REQUIRED : 6,000 sq ft
- PLANT CAPACITY : 150 MT / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 22 Lakhs
- MANPOWER REQ’D : 7
- PAYOUT PERIOD : 3 YEARS max
59
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 60: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/60.jpg)
30. LEATHER BELTS
60
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 61: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/61.jpg)
30. LEATHER BELTS
- LAND REQUIRED : 3,000 sq ft
- PLANT CAPACITY : 150,000 Pc / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 15 Lakhs
- MANPOWER REQ’D : 10
- PAYOUT PERIOD : 3 YEARS max
61
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 62: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/62.jpg)
31. LEATHER GARMENTS
62
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 63: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/63.jpg)
31. LEATHER GARMENTS
- LAND REQUIRED : 4,000 sq ft
- PLANT CAPACITY : 15,000 Pc / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 40 Lakhs
- MANPOWER REQ’D : 12
- PAYOUT PERIOD : 3 YEARS max
63
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 64: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/64.jpg)
32. LEATHER PURSES & HANDBAGS
64
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 65: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/65.jpg)
32. LEATHER PURSES & HANDBAGS
- LAND REQUIRED : 3,000 sq ft
- PLANT CAPACITY : 60,000 Pc / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 15 Lakhs
- MANPOWER REQ’D : 15
- PAYOUT PERIOD : 3 YEARS max
65
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 66: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/66.jpg)
33. LEATHER SHOPPING BAGS
66
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 67: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/67.jpg)
33. LEATHER SHOPPING BAGS
- LAND REQUIRED : 2,000 sq ft
- PLANT CAPACITY : 20,000 Pc / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 12 Lakhs
- MANPOWER REQ’D : 10
- PAYOUT PERIOD : 3 YEARS max
67
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 68: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/68.jpg)
34. MICROCELLULAR SHEETS
68
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 69: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/69.jpg)
34. MICROCELLULAR SHEETS
- LAND REQUIRED : 7,000 sq ft
- PLANT CAPACITY : 75,000 sheets / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 55 Lakhs
- MANPOWER REQ’D : 25
- PAYOUT PERIOD : 3 YEARS max
69
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 70: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/70.jpg)
35. MS BINDING WIRE
70
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 71: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/71.jpg)
35. MS BINDING WIRE
- LAND REQUIRED : 4,000 sq ft
- PLANT CAPACITY : 720 MT / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 30 Lakhs
- MANPOWER REQ’D : 8
- PAYOUT PERIOD : 3 YEARS max
71
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 73: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/73.jpg)
36. OIL MILL
- LAND REQUIRED : 15,000 sq ft
- PLANT CAPACITY : 3000 T / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 225 Lakhs
- MANPOWER REQ’D : 12
- PAYOUT PERIOD : 4 YEARS max
73
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 74: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/74.jpg)
37. ORANGE SQUASH
74
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 75: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/75.jpg)
37. ORANGE SQUASH
- LAND REQUIRED : 5,000 sq ft
- PLANT CAPACITY : 36,000 Lit / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 30 Lakhs
- MANPOWER REQ’D : 10
- PAYOUT PERIOD : 3 YEARS max
75
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 76: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/76.jpg)
38. PAPER CUPS & GLASSES
76
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 77: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/77.jpg)
38. PAPER CUPS & GLASSES
- LAND REQUIRED : 2,500 sq ft
- PLANT CAPACITY : 50 Lakhs / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 7 Lakhs
- MANPOWER REQ’D : 8
- PAYOUT PERIOD : 3 YEARS max
77
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 78: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/78.jpg)
39. PAPER NAPKINS
78
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 79: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/79.jpg)
39. PAPER NAPKINS
- LAND REQUIRED : 2,500 sq ft
- PLANT CAPACITY : 300 MT / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 100 Lakhs
- MANPOWER REQ’D : 12
- PAYOUT PERIOD : 3 YEARS max
79
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 80: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/80.jpg)
40. PAPER PIN & GEM CLIPS
80
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 81: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/81.jpg)
40. PAPER PIN & GEM CLIPS
- LAND REQUIRED : 2,000 sq ft
- PLANT CAPACITY : 500 Pc / minute
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 25 Lakhs
- MANPOWER REQ’D : 10
- PAYOUT PERIOD : 3 YEARS max
81
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 82: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/82.jpg)
41. PLASTIC BLOW MOULDING
82
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 83: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/83.jpg)
41. PLASTIC BLOW MOULDING
- LAND REQUIRED : 4,000 sq ft
- PLANT CAPACITY : 150 T / year
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 75 Lakhs
- MANPOWER REQ’D : 8
- PAYOUT PERIOD : 3 YEARS max
83
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 84: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/84.jpg)
42. POLYETHEN COLLAPSIBLE TUBES
84
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 85: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/85.jpg)
42. POLYETHEN COLLAPSIBLE TUBES
- LAND REQUIRED : 3,000 sq ft
- PLANT CAPACITY : 72 Lakh Tubes / year
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 80 Lakhs
- MANPOWER REQ’D : 11
- PAYOUT PERIOD : 3 YEARS max
85
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 86: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/86.jpg)
43. POTATO / BANANA WAFERS
86
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 87: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/87.jpg)
43. POTATO / BANANA WAFERS
- LAND REQUIRED : 3,000 sq ft
- PLANT CAPACITY : 150 T / year
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 50 Lakhs
- MANPOWER REQ’D : 7
- PAYOUT PERIOD : 3 YEARS max
87
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 88: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/88.jpg)
44. PVC PIPES & FITTINGS
88
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 89: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/89.jpg)
44. PVC PIPES & FITTINGS
- LAND REQUIRED : 4,000 sq ft
- PLANT CAPACITY : 150 T / year
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 45 Lakhs
- MANPOWER REQ’D : 12
- PAYOUT PERIOD : 3 YEARS max
89
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 90: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/90.jpg)
45. PVC WIRE & CABLE COATINGS
90
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 91: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/91.jpg)
45. PVC WIRE & CABLE COATINGS
- LAND REQUIRED : 3,000 sq ft
- PLANT CAPACITY : 100 T / year
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 60 Lakhs
- MANPOWER REQ’D : 8
- PAYOUT PERIOD : 3 YEARS max
91
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 92: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/92.jpg)
46. SCHOOL BAGS ( CANVAS)
92
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 93: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/93.jpg)
46. SCHOOL BAGS ( CANVAS)
- LAND REQUIRED : 1,500 sq ft
- PLANT CAPACITY : 15000 Pc / year
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 12 Lakhs
- MANPOWER REQ’D : 12
- PAYOUT PERIOD : 3 YEARS max
93
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 94: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/94.jpg)
47. SPECTACLE FRAMES
94
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 95: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/95.jpg)
47. SPECTACLE FRAMES
- LAND REQUIRED : 1,500 sq ft
- PLANT CAPACITY : 10 lakh Pcs / year
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 10 Lakhs
- MANPOWER REQ’D : 12
- PAYOUT PERIOD : 3 YEARS max
95
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 96: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/96.jpg)
48. THERMO FORM PLASTICS
96
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 97: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/97.jpg)
48. THERMO FORM PLASTICS
- LAND REQUIRED : 1,500 sq ft
- PLANT CAPACITY : 400 T / year
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 50 Lakhs
- MANPOWER REQ’D : 5
- PAYOUT PERIOD : 3 YEARS max
97
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 99: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/99.jpg)
49. WAX CANDLES
- LAND REQUIRED : 2,500 sq ft
- PLANT CAPACITY : 150 T / year
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 30 Lakhs
- MANPOWER REQ’D : 9
- PAYOUT PERIOD : 3 YEARS max
99
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 100: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/100.jpg)
50. WELDED WIRE MESH
100
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 101: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/101.jpg)
50. WELDED WIRE MESH
- LAND REQUIRED : 10,000 sq ft
- PLANT CAPACITY : 3600 T / year
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 175 Lakhs
- MANPOWER REQ’D : 15
- PAYOUT PERIOD : 4 YEARS max
101
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 102: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/102.jpg)
51. WHEAT FLOUR MILL
102
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 103: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/103.jpg)
51. WHEAT FLOUR MILL
- LAND REQUIRED : 2,500 sq ft
- PLANT CAPACITY : 150 T / year
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 25 Lakhs
- MANPOWER REQ’D : 10
- PAYOUT PERIOD : 4 YEARS max
103
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 105: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/105.jpg)
52. WIRE NAILS
- LAND REQUIRED : 5,000 sq ft
- PLANT CAPACITY : 600 T / year
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 40 Lakhs
- MANPOWER REQ’D : 7
- PAYOUT PERIOD : 4 YEARS max
105
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 106: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/106.jpg)
53. WOOD SCREWS
106
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
![Page 107: Low invest projects-191214](https://reader034.fdocuments.us/reader034/viewer/2022042818/55b1a222bb61eb404d8b46d8/html5/thumbnails/107.jpg)
53. WOOD SCREWS
- LAND REQUIRED : 7,000 sq ft
- PLANT CAPACITY : 9 Mil Pcs / year
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 25 Lakhs
- MANPOWER REQ’D : 10
- PAYOUT PERIOD : 4 YEARS max