Low Flow Trials –
learnings involving
innovative designs
Paul Wainwright
• Eleven trial sites established in
2015-16
• Marne, EMLR and WMLR
catchments
• Install and test a range of
different devices in different
settings
• Learn about construction and
management challenges
• Monitor hydrological
performance
Objectives
Criteria for selecting sites
• Landowner amenable/enthusiastic
• Accessibility for construction
• Accessibility for demonstration
• Variable landscape/infrastructure settings
• Where dams could be treated in a series
• Proximate to existing hydro/eco monitoring sites
Bugle Ranges
• 40ML dam on dairy farm
• TFR 0.7 L/s
• Concrete mechanical bypass
installed
Marne Catchment - Pipe Bypass – TFR 2L/s
Bypass weir
Low flow
release point
Controller, battery,
3G antenna, air pump
Dam wall
Water level
Inflows
Electric actuated fail
open vent valve
Electric actuated valve
and flow release outlet
0.1% accuracy
hydrostatic sensor
Inlet foot
valveFlow
meter
Macclesfield Trial Site –TFR 4.5L/s
• Today is the first step in the process of
implementing the Securing Low Flows
project
BYPASS DEVICES
• Non electronic
• Relatively cheap
• Robust
• Gravity based - requires minimum 2 degrees of fall
between weir and release point
• Tricky to install in wet/peaty watercourses
• Require maintenance to ensure they don’t block
Pro’s and Con’s of the different devices
RELEASE DEVICES
• Electronic
• Instrumentation can be expensive
• Reliability
• Quick to install/ can be partly off-site
• Can be installed in wet/adverse conditions
• Maintenance tends to be complicated
• Generally need protection from stock etc.
Pro’s and Con’s of the different devices
• Landholders generally supportive
• Understand the need to test concepts
• Open to sharing the idea with others
• Interested in the monitoring outputs
The community experience
1. Is the low flow device doing what it is supposed to do?
• Measure total inflow to dam/arriving at dam• Device what is delivered through the low flow device
Hydrometric monitoring for the low flow
trial sites
2. Reliability of supply for landholder
• Change in storage in dam• Bathymetric survey + water level• Compare low flow and non-low flow scenario