Transcript of Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7...

Page 1: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR

Low Flow Trials –

learnings involving

innovative designs

Paul Wainwright

Page 2: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR
Page 3: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR

• Eleven trial sites established in

2015-16

• Marne, EMLR and WMLR

catchments

• Install and test a range of

different devices in different

settings

• Learn about construction and

management challenges

• Monitor hydrological

performance

Objectives

Page 4: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR

Criteria for selecting sites

• Landowner amenable/enthusiastic

• Accessibility for construction

• Accessibility for demonstration

• Variable landscape/infrastructure settings

• Where dams could be treated in a series

• Proximate to existing hydro/eco monitoring sites

Page 5: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR

Bugle Ranges

• 40ML dam on dairy farm

• TFR 0.7 L/s

• Concrete mechanical bypass

installed

Page 6: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR
Page 7: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR
Page 8: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR

Marne Catchment - Pipe Bypass – TFR 2L/s

Bypass weir

Low flow

release point

Page 9: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR
Page 10: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR
Page 11: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR
Page 12: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR
Page 13: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR

Controller, battery,

3G antenna, air pump

Dam wall

Water level

Inflows

Electric actuated fail

open vent valve

Electric actuated valve

and flow release outlet

0.1% accuracy

hydrostatic sensor

Inlet foot

valveFlow

meter

Macclesfield Trial Site –TFR 4.5L/s

Page 14: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR
Page 15: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR

• Today is the first step in the process of

implementing the Securing Low Flows

project

Page 16: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR
Page 17: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR

BYPASS DEVICES

• Non electronic

• Relatively cheap

• Robust

• Gravity based - requires minimum 2 degrees of fall

between weir and release point

• Tricky to install in wet/peaty watercourses

• Require maintenance to ensure they don’t block

Pro’s and Con’s of the different devices

Page 18: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR

RELEASE DEVICES

• Electronic

• Instrumentation can be expensive

• Reliability

• Quick to install/ can be partly off-site

• Can be installed in wet/adverse conditions

• Maintenance tends to be complicated

• Generally need protection from stock etc.

Pro’s and Con’s of the different devices

Page 19: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR

• Landholders generally supportive

• Understand the need to test concepts

• Open to sharing the idea with others

• Interested in the monitoring outputs

The community experience

Page 20: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR

1. Is the low flow device doing what it is supposed to do?

• Measure total inflow to dam/arriving at dam• Device what is delivered through the low flow device

Hydrometric monitoring for the low flow

trial sites

2. Reliability of supply for landholder

• Change in storage in dam• Bathymetric survey + water level• Compare low flow and non-low flow scenario

Page 21: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR