Low Emission Strategies
Rob Pilling (Programme Manager)Sheffield, 15th September 2009
web: www.lowemissionstrategies.orgemail: [email protected]
![Page 2: Low Emission Strategies Rob Pilling (Programme Manager) Sheffield, 15 th September 2009 web: email: info@lowemissionstrategies.org.](https://reader035.fdocuments.us/reader035/viewer/2022081603/5697bf881a28abf838c8990f/html5/thumbnails/2.jpg)
Low Emission Strategies
• LES - using the planning system to reduce transport emissions
• LES Programme – Phase I (Jul 08 – Dec 09)
• LES Programme – Phase II (Sep 09 – Mar 11)
![Page 3: Low Emission Strategies Rob Pilling (Programme Manager) Sheffield, 15 th September 2009 web: email: info@lowemissionstrategies.org.](https://reader035.fdocuments.us/reader035/viewer/2022081603/5697bf881a28abf838c8990f/html5/thumbnails/3.jpg)
Current Emissions
Baseline
Business as usual
Target
Proposed Developmen
t
Low Emission
Development
Increasing acceptabilityof development
Fewer Journeys
Mode Shift
Technology
Trips
Residual Emissions
Options include: Hybrids, Electric, Biogas, Biofuel and Hydrogen
Options include:Travel planning,Smarter choicesPublic transport, Road charging
Using the planning system to reduce transport emissions
![Page 4: Low Emission Strategies Rob Pilling (Programme Manager) Sheffield, 15 th September 2009 web: email: info@lowemissionstrategies.org.](https://reader035.fdocuments.us/reader035/viewer/2022081603/5697bf881a28abf838c8990f/html5/thumbnails/4.jpg)
• Specification of minimum emissions standards to be achieved by service vehicles accessing the site
• Residential car parking with a graduated annual charge depending on Euro standard and/or vehicle VED rating
• Contributions to enhance provision of local public transport, supporting deployment of low emission technologies
• Provision of electrical vehicle charging points
• Provision of car club, deploying low emission vehicles
Some Key Planning Measures…
![Page 5: Low Emission Strategies Rob Pilling (Programme Manager) Sheffield, 15 th September 2009 web: email: info@lowemissionstrategies.org.](https://reader035.fdocuments.us/reader035/viewer/2022081603/5697bf881a28abf838c8990f/html5/thumbnails/5.jpg)
‘a package of policies & measures…’
‘secured through a combination of planning conditions & legal obligations…’
‘to mitigate the transport impacts of development by accelerating the uptake of low emission transport fuels and technologies in and around a new development…’
![Page 6: Low Emission Strategies Rob Pilling (Programme Manager) Sheffield, 15 th September 2009 web: email: info@lowemissionstrategies.org.](https://reader035.fdocuments.us/reader035/viewer/2022081603/5697bf881a28abf838c8990f/html5/thumbnails/6.jpg)
‘Encouraging wider adoption of low emission strategies by local authorities and supporting the effective use of associated policies and measures’
![Page 7: Low Emission Strategies Rob Pilling (Programme Manager) Sheffield, 15 th September 2009 web: email: info@lowemissionstrategies.org.](https://reader035.fdocuments.us/reader035/viewer/2022081603/5697bf881a28abf838c8990f/html5/thumbnails/7.jpg)
Peer Group Initiative
Policy & Guidance
Case studies & Dissemination
Beacons LES Guidance Workshops,
Training & Qualifications
Programme Board, Advisory Group and Independent Evaluation
Communications Strategy (website, newsletter, PR plan)
Low Emission Strategies Programme – Phase I (2008-09)
![Page 8: Low Emission Strategies Rob Pilling (Programme Manager) Sheffield, 15 th September 2009 web: email: info@lowemissionstrategies.org.](https://reader035.fdocuments.us/reader035/viewer/2022081603/5697bf881a28abf838c8990f/html5/thumbnails/8.jpg)
Mid-DevonSheffieldSeftonWandsworth
GreenwichSouth Cambs Leeds
SheffieldMid DevonGreenwich
Putting it into practice – Phase I
![Page 9: Low Emission Strategies Rob Pilling (Programme Manager) Sheffield, 15 th September 2009 web: email: info@lowemissionstrategies.org.](https://reader035.fdocuments.us/reader035/viewer/2022081603/5697bf881a28abf838c8990f/html5/thumbnails/9.jpg)
Spatial Planning Transport Policy Procurement
Extending the Reach of Low Emission Strategies
Putting it into practice – Phase II
![Page 10: Low Emission Strategies Rob Pilling (Programme Manager) Sheffield, 15 th September 2009 web: email: info@lowemissionstrategies.org.](https://reader035.fdocuments.us/reader035/viewer/2022081603/5697bf881a28abf838c8990f/html5/thumbnails/10.jpg)
The Low Emission Strategies Partnership – Phase II (2009-11)
![Page 11: Low Emission Strategies Rob Pilling (Programme Manager) Sheffield, 15 th September 2009 web: email: info@lowemissionstrategies.org.](https://reader035.fdocuments.us/reader035/viewer/2022081603/5697bf881a28abf838c8990f/html5/thumbnails/11.jpg)
• Principles of planning based low emission strategies well established (National practice guidance under preparation)
• Phase I programme into final stages. (projects heading to completion for end of 2009)
• Phase II will build on Phase I (Oct 09 – Mar 11)– The Low Emission Toolkit
– Regional Groups Initiative
– Re-launch of the Low Emissions Forum
Summary