LOT 401, BAILEY AVENUE, RAYMOND TERRACE · lp t w w lp scale 1:300 @ a4 0 5 10 15 anticipated site...

21
401 627.4m² S S S S S P NBN P P P P P P P P P P P P P P P P P P P P P P P P P P P P NBN NBN NBN NBN NBN NBN NBN NBN NBN NBN NBN NBN NBN NBN NBN NBN GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS G W W W W W W W GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS S S 18.3 17.22 34.29 A1.08 (GB) 3 34.27 402 306 BAILEY AVENUE LP T W W LP SCALE 1:300 @ A4 0 10 5 15 Anticipated Site Classification - H1 Class TELSTRA /NBN PIT POWER POLE STOP VALVE SEWER MANHOLE HYDRANT LIGHT POLE LP PP KERB INLET PIT STORMWATER PIT SEWER MAIN WATER MAIN RISING MAIN TELSTRA /NBN OVERHEAD POWER UNDER GROUND POWER ELECTRICAL SUBSTATION STORMWATER PIPE S W RS NBN OHP P HD20 STAGE 4 MARKETING r1 7TH DECEMBER 2019 HIGH DEFINITION DESIGN PTY LTD PRELIMINARY SITE ANALYSIS PLAN STAGE PLAN LEGEND: DISCLAIMER/ NOTES: ELECTRICITY PILLAR STREET TREES GAS GAS MASTER PLAN RETAINING WALL LOT 401, BAILEY AVENUE, RAYMOND TERRACE RESTRICTIONS ON USE OF LAND AFFECT THE LOT (to be confirmed at completion of construction) AB VERTICAL "CHARCOAL" TIMBER LAPPED AND CAPPED FENCE SEWER JUNCTION POTTERS-LANE.COM.AU REVISION/S: DATE: BY: 1. Contours and proposed design levels are based on finished design levels and are subject to construction and Council certification and therefore should not be considered as final or as-built. 2. Location of utility services including but not limited to power, water, sewer, communications and gas are subject to construction and Supply Authority certification and therefore should not be considered as final or as-built. 3. Survey information such as boundary dimensions and areas, easements etc are subject to Final Survey. Purchasers should refer to the Deposited Plan and 88B Instrument contained in the Contract for Sale of Land for further detailed information. 4. Bushfire and Geotechnical classification are provided for convenience. Purchasers should refer to referenced detail specialist reports. 5. This Preliminary Site Analysis Plan has been collated from various sources of design information and is provided for convenience to assist Purchasers in obtaining quotations/tenders for dwelling construction. 6. This document does not form part of the Contract of Sale of the Land. PROPOSED DESIGN LEVEL RL 20.5 (GA) - EASEMENT FOR DRAINAGE OF WATER 2.5 WIDE (GB) - RESTRICTION ON THE USE OF LAND (AIRCRAFT NOISE) (GC) - RESTRICTION ON THE USE OF LAND 0.7 WIDE (GD) - EASEMENT FOR DRAINAGE OF WATER 1.5 WIDE

Transcript of LOT 401, BAILEY AVENUE, RAYMOND TERRACE · lp t w w lp scale 1:300 @ a4 0 5 10 15 anticipated site...

Page 1: LOT 401, BAILEY AVENUE, RAYMOND TERRACE · lp t w w lp scale 1:300 @ a4 0 5 10 15 anticipated site classification - h1 class telstra /nbn pit power pole stop valve sewer manhole hydrant

401

627.4m²

S

S

S

S

S

P

N

B

N

PP

PP

PP

PP

PP

PP

P

PP

PP

PP

PP

PP

PP

PP

P

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

S

G

A

S

WW

WW

WW

W

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

SS

18.3

17.22

34.29

A1.08

(

G

B

)

3

0

634.27

402

306

BA

IL

EY

A

VE

NU

E

LP

T

W

W

LP

SCALE 1:300 @ A40 105 15

Anticipated Site Classification - H1 Class

TELSTRA /NBN PITPOWER POLE

STOP VALVE

SEWER MANHOLE

HYDRANT

LIGHT POLELP

PP

KERB INLET PITSTORMWATER PIT

SEWER MAIN

WATER MAIN

RISING MAIN

TELSTRA /NBN

OVERHEAD POWER

UNDER GROUND POWERELECTRICAL SUBSTATION

STORMWATER PIPE

S

W

RS

NBN

OHP

P

HD20 STAGE 4 MARKETING r1

7TH DECEMBER 2019HIGH DEFINITION DESIGN PTY LTD

PRELIMINARY SITE ANALYSIS PLAN

STAGE PLAN

LEGEND:DISCLAIMER/ NOTES:

ELECTRICITY PILLAR

STREET TREES

GAS GAS

MASTER PLAN

RETAINING WALL

LOT 401, BAILEY AVENUE, RAYMOND TERRACE

RESTRICTIONS ON USE OF LAND AFFECT THE LOT(to be confirmed at completion of construction)

AB VERTICAL "CHARCOAL"TIMBER LAPPED AND CAPPED FENCE

SEWER JUNCTION

POTTERS-LANE.COM.AU

REVISION/S:

DATE:BY:

1. Contours and proposed design levels are based on finished design levels and are subject to construction and Councilcertification and therefore should not be considered as final or as-built.

2. Location of utility services including but not limited to power, water, sewer, communications and gas are subject toconstruction and Supply Authority certification and therefore should not be considered as final or as-built.

3. Survey information such as boundary dimensions and areas, easements etc are subject to Final Survey. Purchasersshould refer to the Deposited Plan and 88B Instrument contained in the Contract for Sale of Land for further detailedinformation.

4. Bushfire and Geotechnical classification are provided for convenience. Purchasers should refer to referenced detailspecialist reports.

5. This Preliminary Site Analysis Plan has been collated from various sources of design information and is provided forconvenience to assist Purchasers in obtaining quotations/tenders for dwelling construction.

6. This document does not form part of the Contract of Sale of the Land.

PROPOSED DESIGN LEVELRL 20.5

(GA) - EASEMENT FOR DRAINAGE OF WATER 2.5 WIDE(GB) - RESTRICTION ON THE USE OF LAND (AIRCRAFT NOISE)(GC) - RESTRICTION ON THE USE OF LAND 0.7 WIDE(GD) - EASEMENT FOR DRAINAGE OF WATER 1.5 WIDE

Page 2: LOT 401, BAILEY AVENUE, RAYMOND TERRACE · lp t w w lp scale 1:300 @ a4 0 5 10 15 anticipated site classification - h1 class telstra /nbn pit power pole stop valve sewer manhole hydrant

P

P

N

B

N

N

B

N

N

B

N

PP

PP

PP

PP

PP

PP

PP

PP

PP

P

NB

NN

BN

NB

NN

BN

PP

PP

PP

PP

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

N

W W W W

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

S

G

A

S

G

A

S

G

A

S

WW

WW

WW

WW

W

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

S

G

A

S

G

A

S

SS

SS

SS

S

18.3

34.27

18.3

(

G

B

)

402

626.8m²

34.235

BA

IL

EY

A

VE

NU

E

403

401

GA

SG

AS

GA

SG

AS

GA

S

W

SCALE 1:300 @ A40 105 15

Anticipated Site Classification - H1 Class

TELSTRA /NBN PITPOWER POLE

STOP VALVE

SEWER MANHOLE

HYDRANT

LIGHT POLELP

PP

KERB INLET PITSTORMWATER PIT

SEWER MAIN

WATER MAIN

RISING MAIN

TELSTRA /NBN

OVERHEAD POWER

UNDER GROUND POWERELECTRICAL SUBSTATION

STORMWATER PIPE

S

W

RS

NBN

OHP

P

HD20 STAGE 4 MARKETING r1

7TH DECEMBER 2019HIGH DEFINITION DESIGN PTY LTD

PRELIMINARY SITE ANALYSIS PLAN

STAGE PLAN

LEGEND:DISCLAIMER/ NOTES:

ELECTRICITY PILLAR

STREET TREES

GAS GAS

MASTER PLAN

RETAINING WALL

LOT 402, BAILEY AVENUE, RAYMOND TERRACE

RESTRICTIONS ON USE OF LAND AFFECT THE LOT(to be confirmed at completion of construction)

AB VERTICAL "CHARCOAL"TIMBER LAPPED AND CAPPED FENCE

SEWER JUNCTION

POTTERS-LANE.COM.AU

REVISION/S:

DATE:BY:

1. Contours and proposed design levels are based on finished design levels and are subject to construction and Councilcertification and therefore should not be considered as final or as-built.

2. Location of utility services including but not limited to power, water, sewer, communications and gas are subject toconstruction and Supply Authority certification and therefore should not be considered as final or as-built.

3. Survey information such as boundary dimensions and areas, easements etc are subject to Final Survey. Purchasersshould refer to the Deposited Plan and 88B Instrument contained in the Contract for Sale of Land for further detailedinformation.

4. Bushfire and Geotechnical classification are provided for convenience. Purchasers should refer to referenced detailspecialist reports.

5. This Preliminary Site Analysis Plan has been collated from various sources of design information and is provided forconvenience to assist Purchasers in obtaining quotations/tenders for dwelling construction.

6. This document does not form part of the Contract of Sale of the Land.

PROPOSED DESIGN LEVELRL 20.5

(GA) - EASEMENT FOR DRAINAGE OF WATER 2.5 WIDE(GB) - RESTRICTION ON THE USE OF LAND (AIRCRAFT NOISE)(GC) - RESTRICTION ON THE USE OF LAND 0.7 WIDE(GD) - EASEMENT FOR DRAINAGE OF WATER 1.5 WIDE

Page 3: LOT 401, BAILEY AVENUE, RAYMOND TERRACE · lp t w w lp scale 1:300 @ a4 0 5 10 15 anticipated site classification - h1 class telstra /nbn pit power pole stop valve sewer manhole hydrant

PP

PP

PP

PP

P

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

P

N

B

N

PP

PP

PP

PP

PP

PP

PP

PP

PP

P

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

N

W W W

WW

WW

WW

WW

W

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

S

G

A

S

G

A

S

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

SS

SS

SS

SS

S

S S S S

18.3

34.235

18.3

(

G

B

)

1v:4h

403

626.2m²

34.2

BA

IL

EY

A

VE

NU

E

404

402

T

W

W

W

WW

W

SCALE 1:300 @ A40 105 15

Anticipated Site Classification - H1 Class

TELSTRA /NBN PITPOWER POLE

STOP VALVE

SEWER MANHOLE

HYDRANT

LIGHT POLELP

PP

KERB INLET PITSTORMWATER PIT

SEWER MAIN

WATER MAIN

RISING MAIN

TELSTRA /NBN

OVERHEAD POWER

UNDER GROUND POWERELECTRICAL SUBSTATION

STORMWATER PIPE

S

W

RS

NBN

OHP

P

HD20 STAGE 4 MARKETING r1

7TH DECEMBER 2019HIGH DEFINITION DESIGN PTY LTD

PRELIMINARY SITE ANALYSIS PLAN

STAGE PLAN

LEGEND:DISCLAIMER/ NOTES:

ELECTRICITY PILLAR

STREET TREES

GAS GAS

MASTER PLAN

RETAINING WALL

LOT 403, BAILEY AVENUE, RAYMOND TERRACE

RESTRICTIONS ON USE OF LAND AFFECT THE LOT(to be confirmed at completion of construction)

AB VERTICAL "CHARCOAL"TIMBER LAPPED AND CAPPED FENCE

SEWER JUNCTION

POTTERS-LANE.COM.AU

REVISION/S:

DATE:BY:

1. Contours and proposed design levels are based on finished design levels and are subject to construction and Councilcertification and therefore should not be considered as final or as-built.

2. Location of utility services including but not limited to power, water, sewer, communications and gas are subject toconstruction and Supply Authority certification and therefore should not be considered as final or as-built.

3. Survey information such as boundary dimensions and areas, easements etc are subject to Final Survey. Purchasersshould refer to the Deposited Plan and 88B Instrument contained in the Contract for Sale of Land for further detailedinformation.

4. Bushfire and Geotechnical classification are provided for convenience. Purchasers should refer to referenced detailspecialist reports.

5. This Preliminary Site Analysis Plan has been collated from various sources of design information and is provided forconvenience to assist Purchasers in obtaining quotations/tenders for dwelling construction.

6. This document does not form part of the Contract of Sale of the Land.

PROPOSED DESIGN LEVELRL 20.5

(GA) - EASEMENT FOR DRAINAGE OF WATER 2.5 WIDE(GB) - RESTRICTION ON THE USE OF LAND (AIRCRAFT NOISE)(GC) - RESTRICTION ON THE USE OF LAND 0.7 WIDE(GD) - EASEMENT FOR DRAINAGE OF WATER 1.5 WIDE

Page 4: LOT 401, BAILEY AVENUE, RAYMOND TERRACE · lp t w w lp scale 1:300 @ a4 0 5 10 15 anticipated site classification - h1 class telstra /nbn pit power pole stop valve sewer manhole hydrant

PP

PP

PP

PP

P

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

PP

PP

PP

PP

PP

PP

PP

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

WW

WW

WW

W

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

S

SS

SS

S S S S S

18

.3

34.2

34.165

18

.3

(

G

B

)

1v:4h

404

625.5m²

BA

ILE

Y A

VE

NU

E

601

403

NBNNBNNBNNBNNBNNBNNBN

T

T

W

W

W

W

WW

W

LP

SCALE 1:300 @ A40 105 15

Anticipated Site Classification - H1 Class

TELSTRA /NBN PITPOWER POLE

STOP VALVE

SEWER MANHOLE

HYDRANT

LIGHT POLELP

PP

KERB INLET PITSTORMWATER PIT

SEWER MAIN

WATER MAIN

RISING MAINTELSTRA /NBN

OVERHEAD POWER

UNDER GROUND POWERELECTRICAL SUBSTATION

STORMWATER PIPE

S

W

RS

NBN

OHP

P

HD20 STAGE 4 MARKETING r1

7TH DECEMBER 2019

HIGH DEFINITION DESIGN PTY LTD

PRELIMINARY SITE ANALYSIS PLAN

STAGE PLAN

LEGEND:DISCLAIMER/ NOTES:

ELECTRICITY PILLAR

STREET TREES

GAS GAS

MASTER PLAN

RETAINING WALL

LOT 404, BAILEY AVENUE, RAYMOND TERRACE

RESTRICTIONS ON USE OF LAND AFFECT THE LOT(to be confirmed at completion of construction)

AB VERTICAL "CHARCOAL"TIMBER LAPPED AND CAPPED FENCE

SEWER JUNCTION

POTTERS-LANE.COM.AU

REVISION/S:

DATE:BY:

1. Contours and proposed design levels are based on finished design levels and are subject to construction and Councilcertification and therefore should not be considered as final or as-built.

2. Location of utility services including but not limited to power, water, sewer, communications and gas are subject toconstruction and Supply Authority certification and therefore should not be considered as final or as-built.

3. Survey information such as boundary dimensions and areas, easements etc are subject to Final Survey. Purchasersshould refer to the Deposited Plan and 88B Instrument contained in the Contract for Sale of Land for further detailedinformation.

4. Bushfire and Geotechnical classification are provided for convenience. Purchasers should refer to referenced detailspecialist reports.

5. This Preliminary Site Analysis Plan has been collated from various sources of design information and is provided forconvenience to assist Purchasers in obtaining quotations/tenders for dwelling construction.

6. This document does not form part of the Contract of Sale of the Land.

PROPOSED DESIGN LEVELRL 20.5

(GA) - EASEMENT FOR DRAINAGE OF WATER 2.5 WIDE(GB) - RESTRICTION ON THE USE OF LAND (AIRCRAFT NOISE)(GC) - RESTRICTION ON THE USE OF LAND 0.7 WIDE(GD) - EASEMENT FOR DRAINAGE OF WATER 1.5 WIDE

Page 5: LOT 401, BAILEY AVENUE, RAYMOND TERRACE · lp t w w lp scale 1:300 @ a4 0 5 10 15 anticipated site classification - h1 class telstra /nbn pit power pole stop valve sewer manhole hydrant

PP

PP

PP

PP

P

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

P

P

P

N

B

N

N

B

N

N

B

N

P P P P P P P P P P P P P P P P P P P P P

NBN NBN NBN NBN NBN NBN NBN NBN NBN NBN NBN NBN NBN NBN NBN NBN NBN NBN NBN NBN NBN

PP

PP

PP

PP

PP

PP

PP

PP

PP

P

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

WW

WW

WW

WW

W

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

S

GASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGAS

G

A

S

G

A

S

G

A

S

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

S

S S S S S S S S S S S S

31.5

18

5

.

6

5

5

27.5

22

(

G

B

)

1v:4h

405

685m²

BA

ILE

Y A

VE

NU

E

BUTTERCUP LANE

BUTTERCUP LANE

BUTTERCUP LANE

406

621

P

PP

P

NBNNBNNBNNBNNBNNBNNBN

T

NB

NN

BN

NB

N

GA

SG

AS

GA

S

W

W

W

W

WW

W

15.0

14.0

13.0

SCALE 1:300 @ A40 105 15

Anticipated Site Classification - H1 Class

TELSTRA /NBN PITPOWER POLE

STOP VALVE

SEWER MANHOLE

HYDRANT

LIGHT POLELP

PP

KERB INLET PITSTORMWATER PIT

SEWER MAIN

WATER MAIN

RISING MAINTELSTRA /NBN

OVERHEAD POWER

UNDER GROUND POWERELECTRICAL SUBSTATION

STORMWATER PIPE

S

W

RS

NBN

OHP

P

HD20 STAGE 4 MARKETING r1

7TH DECEMBER 2019

HIGH DEFINITION DESIGN PTY LTD

PRELIMINARY SITE ANALYSIS PLAN

STAGE PLAN

LEGEND:DISCLAIMER/ NOTES:

ELECTRICITY PILLAR

STREET TREES

GAS GAS

MASTER PLAN

RETAINING WALL

LOT 405, BAILEY AVENUE, RAYMOND TERRACE

RESTRICTIONS ON USE OF LAND AFFECT THE LOT(to be confirmed at completion of construction)

AB VERTICAL "CHARCOAL"TIMBER LAPPED AND CAPPED FENCE

SEWER JUNCTION

POTTERS-LANE.COM.AU

REVISION/S:

DATE:BY:

1. Contours and proposed design levels are based on finished design levels and are subject to construction and Councilcertification and therefore should not be considered as final or as-built.

2. Location of utility services including but not limited to power, water, sewer, communications and gas are subject toconstruction and Supply Authority certification and therefore should not be considered as final or as-built.

3. Survey information such as boundary dimensions and areas, easements etc are subject to Final Survey. Purchasersshould refer to the Deposited Plan and 88B Instrument contained in the Contract for Sale of Land for further detailedinformation.

4. Bushfire and Geotechnical classification are provided for convenience. Purchasers should refer to referenced detailspecialist reports.

5. This Preliminary Site Analysis Plan has been collated from various sources of design information and is provided forconvenience to assist Purchasers in obtaining quotations/tenders for dwelling construction.

6. This document does not form part of the Contract of Sale of the Land.

PROPOSED DESIGN LEVELRL 20.5

(GA) - EASEMENT FOR DRAINAGE OF WATER 2.5 WIDE(GB) - RESTRICTION ON THE USE OF LAND (AIRCRAFT NOISE)(GC) - RESTRICTION ON THE USE OF LAND 0.7 WIDE(GD) - EASEMENT FOR DRAINAGE OF WATER 1.5 WIDE

Page 6: LOT 401, BAILEY AVENUE, RAYMOND TERRACE · lp t w w lp scale 1:300 @ a4 0 5 10 15 anticipated site classification - h1 class telstra /nbn pit power pole stop valve sewer manhole hydrant

PP

PP

PP

PP

PP

PP

PP

PP

PP

P

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

PP

PP

PP

PP

PP

PP

PP

PP

PP

P

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

N

WW

WW

WW

WW

W

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

SSS

SS

SS

SS

S S

SS

32

18

.2

18

.2

(G

B

)

6

2

2

6

2

3

406

582.4m²

32

BU

TT

ER

CU

P L

AN

E

x

1

3

.

9

x

1

1

.

2

407

405

621

P

PP

P

PP

P

NBN NBNNBN

NBN NBNNBN

W

W

WW

13.0

12.0

11.0

(G

D

)

SCALE 1:300 @ A40 105 15

Anticipated Site Classification - H1 Class

TELSTRA /NBN PITPOWER POLE

STOP VALVE

SEWER MANHOLE

HYDRANT

LIGHT POLELP

PP

KERB INLET PITSTORMWATER PIT

SEWER MAIN

WATER MAIN

RISING MAIN

TELSTRA /NBN

OVERHEAD POWER

UNDER GROUND POWERELECTRICAL SUBSTATION

STORMWATER PIPE

S

W

RS

NBN

OHP

P

HD20 STAGE 4 MARKETING r1

7TH DECEMBER 2019HIGH DEFINITION DESIGN PTY LTD

PRELIMINARY SITE ANALYSIS PLAN

STAGE PLAN

LEGEND:DISCLAIMER/ NOTES:

ELECTRICITY PILLAR

STREET TREES

GAS GAS

MASTER PLAN

RETAINING WALL

LOT 406, BUTTERCUP LANE, RAYMOND TERRACE

RESTRICTIONS ON USE OF LAND AFFECT THE LOT(to be confirmed at completion of construction)

AB VERTICAL "CHARCOAL"TIMBER LAPPED AND CAPPED FENCE

SEWER JUNCTION

POTTERS-LANE.COM.AU

REVISION/S:

DATE:BY:

1. Contours and proposed design levels are based on finished design levels and are subject to construction and Councilcertification and therefore should not be considered as final or as-built.

2. Location of utility services including but not limited to power, water, sewer, communications and gas are subject toconstruction and Supply Authority certification and therefore should not be considered as final or as-built.

3. Survey information such as boundary dimensions and areas, easements etc are subject to Final Survey. Purchasersshould refer to the Deposited Plan and 88B Instrument contained in the Contract for Sale of Land for further detailedinformation.

4. Bushfire and Geotechnical classification are provided for convenience. Purchasers should refer to referenced detailspecialist reports.

5. This Preliminary Site Analysis Plan has been collated from various sources of design information and is provided forconvenience to assist Purchasers in obtaining quotations/tenders for dwelling construction.

6. This document does not form part of the Contract of Sale of the Land.

PROPOSED DESIGN LEVELRL 20.5

(GA) - EASEMENT FOR DRAINAGE OF WATER 2.5 WIDE(GB) - RESTRICTION ON THE USE OF LAND (AIRCRAFT NOISE)(GC) - RESTRICTION ON THE USE OF LAND 0.7 WIDE(GD) - EASEMENT FOR DRAINAGE OF WATER 1.5 WIDE(GD) - EASEMENT FOR ELECTRICITY & OTHER PURPOSES

3.3 WIDE

Page 7: LOT 401, BAILEY AVENUE, RAYMOND TERRACE · lp t w w lp scale 1:300 @ a4 0 5 10 15 anticipated site classification - h1 class telstra /nbn pit power pole stop valve sewer manhole hydrant

PP

PP

PP

PP

PP

PP

PP

PP

PP

P

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

PP

PP

PP

PP

PP

P

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

N

P

P

N

B

N

N

B

N

N

B

N

WW

WW

WW

W

W

W

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

G

A

S

G

A

S

G

A

S

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

S

S

S

S

SS

SS

S

18.38

5.205

A10.8

32

(G

B

)

(G

B

)

407

551.8m²

32.4

85

BU

TT

ER

CU

P L

AN

E

x

1

1

.

4

x

1

1

.

2

x

1

0

.

7

408

406

LP

WW

P

P

N

B

N

N

B

N

10.0

12.0

11.0

(G

D

)

SCALE 1:300 @ A40 105 15

Anticipated Site Classification - H1 Class

TELSTRA /NBN PITPOWER POLE

STOP VALVE

SEWER MANHOLE

HYDRANT

LIGHT POLELP

PP

KERB INLET PITSTORMWATER PIT

SEWER MAIN

WATER MAIN

RISING MAIN

TELSTRA /NBN

OVERHEAD POWER

UNDER GROUND POWERELECTRICAL SUBSTATION

STORMWATER PIPE

S

W

RS

NBN

OHP

P

HD20 STAGE 4 MARKETING r1

7TH DECEMBER 2019HIGH DEFINITION DESIGN PTY LTD

PRELIMINARY SITE ANALYSIS PLAN

STAGE PLAN

LEGEND:DISCLAIMER/ NOTES:

ELECTRICITY PILLAR

STREET TREES

GAS GAS

MASTER PLAN

RETAINING WALL

LOT 407, BUTTERCUP LANE, RAYMOND TERRACE

RESTRICTIONS ON USE OF LAND AFFECT THE LOT(to be confirmed at completion of construction)

AB VERTICAL "CHARCOAL"TIMBER LAPPED AND CAPPED FENCE

SEWER JUNCTION

POTTERS-LANE.COM.AU

REVISION/S:

DATE:BY:

1. Contours and proposed design levels are based on finished design levels and are subject to construction and Councilcertification and therefore should not be considered as final or as-built.

2. Location of utility services including but not limited to power, water, sewer, communications and gas are subject toconstruction and Supply Authority certification and therefore should not be considered as final or as-built.

3. Survey information such as boundary dimensions and areas, easements etc are subject to Final Survey. Purchasersshould refer to the Deposited Plan and 88B Instrument contained in the Contract for Sale of Land for further detailedinformation.

4. Bushfire and Geotechnical classification are provided for convenience. Purchasers should refer to referenced detailspecialist reports.

5. This Preliminary Site Analysis Plan has been collated from various sources of design information and is provided forconvenience to assist Purchasers in obtaining quotations/tenders for dwelling construction.

6. This document does not form part of the Contract of Sale of the Land.

PROPOSED DESIGN LEVELRL 20.5

(GA) - EASEMENT FOR DRAINAGE OF WATER 2.5 WIDE(GB) - RESTRICTION ON THE USE OF LAND (AIRCRAFT NOISE)(GC) - RESTRICTION ON THE USE OF LAND 0.7 WIDE(GD) - EASEMENT FOR ELECTRICITY & OTHER PURPOSES

3.3 WIDE

Page 8: LOT 401, BAILEY AVENUE, RAYMOND TERRACE · lp t w w lp scale 1:300 @ a4 0 5 10 15 anticipated site classification - h1 class telstra /nbn pit power pole stop valve sewer manhole hydrant

PP

PP

PP

PP

PP

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

P

P

P

P

P

NB

N

NB

N

NB

N

NB

N

N

BN

N

BN

N

B

N

N

B

N

N

B

N

N

B

N

NB

N

N

BN

N

B

N

PP

P

NB

NN

BN

P

P

N

B

N

N

B

N

N

B

N

WW

W

W

W

W

W

W

GA

SG

AS

GA

S

G

A

S

G

A

S

G

A

S

W

G

A

S

G

A

S

GA

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

GA

S

GA

S

GA

S

GA

S

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

S

S

S

S

S

S

S

S

S

9.92

32.4

85

A

16.58

A9.825

(G

B

)

(G

B

)

6

2

3

408

606.5m²

3

4

.4

1

BU

TT

ER

CU

P L

AN

E

x

1

0

.

7

x

9

.6

409

407

LP

W

W

W

W

P

P

N

B

N

N

B

N

10.0

SCALE 1:300 @ A40 105 15

Anticipated Site Classification - H1 Class

TELSTRA /NBN PITPOWER POLE

STOP VALVE

SEWER MANHOLE

HYDRANT

LIGHT POLELP

PP

KERB INLET PITSTORMWATER PIT

SEWER MAIN

WATER MAIN

RISING MAIN

TELSTRA /NBN

OVERHEAD POWER

UNDER GROUND POWERELECTRICAL SUBSTATION

STORMWATER PIPE

S

W

RS

NBN

OHP

P

HD20 STAGE 4 MARKETING r1

7TH DECEMBER 2019HIGH DEFINITION DESIGN PTY LTD

PRELIMINARY SITE ANALYSIS PLAN

STAGE PLAN

LEGEND:DISCLAIMER/ NOTES:

ELECTRICITY PILLAR

STREET TREES

GAS GAS

MASTER PLAN

RETAINING WALL

LOT 408, BUTTERCUP LANE, RAYMOND TERRACE

RESTRICTIONS ON USE OF LAND AFFECT THE LOT(to be confirmed at completion of construction)

AB VERTICAL "CHARCOAL"TIMBER LAPPED AND CAPPED FENCE

SEWER JUNCTION

POTTERS-LANE.COM.AU

REVISION/S:

DATE:BY:

1. Contours and proposed design levels are based on finished design levels and are subject to construction and Councilcertification and therefore should not be considered as final or as-built.

2. Location of utility services including but not limited to power, water, sewer, communications and gas are subject toconstruction and Supply Authority certification and therefore should not be considered as final or as-built.

3. Survey information such as boundary dimensions and areas, easements etc are subject to Final Survey. Purchasersshould refer to the Deposited Plan and 88B Instrument contained in the Contract for Sale of Land for further detailedinformation.

4. Bushfire and Geotechnical classification are provided for convenience. Purchasers should refer to referenced detailspecialist reports.

5. This Preliminary Site Analysis Plan has been collated from various sources of design information and is provided forconvenience to assist Purchasers in obtaining quotations/tenders for dwelling construction.

6. This document does not form part of the Contract of Sale of the Land.

PROPOSED DESIGN LEVELRL 20.5

(GA) - EASEMENT FOR DRAINAGE OF WATER 2.5 WIDE(GB) - RESTRICTION ON THE USE OF LAND (AIRCRAFT NOISE)(GC) - RESTRICTION ON THE USE OF LAND 0.7 WIDE(GD) - EASEMENT FOR DRAINAGE OF WATER 1.5 WIDE

Page 9: LOT 401, BAILEY AVENUE, RAYMOND TERRACE · lp t w w lp scale 1:300 @ a4 0 5 10 15 anticipated site classification - h1 class telstra /nbn pit power pole stop valve sewer manhole hydrant

P

P

P

P

NB

N

NB

N

NB

N

NB

N

NB

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

NB

N

N

BN

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

W

W

W

W

W

W

W

W

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

AS

G

AS

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

AS

GA

S

GA

S

GA

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

3

4

.2

1

5

3

4

.4

1

A

1

5

.4

3

5

A

1

9

.7

8

5

(G

B

)

409

607.9m²

B

U

T

T

E

R

C

U

P

L

A

N

E

501

408

W

W

W

W

W

W

W

W

SCALE 1:300 @ A40 105 15

Anticipated Site Classification - H1 Class

TELSTRA /NBN PITPOWER POLE

STOP VALVE

SEWER MANHOLE

HYDRANT

LIGHT POLELP

PP

KERB INLET PITSTORMWATER PIT

SEWER MAIN

WATER MAIN

RISING MAIN

TELSTRA /NBN

OVERHEAD POWER

UNDER GROUND POWERELECTRICAL SUBSTATION

STORMWATER PIPE

S

W

RS

NBN

OHP

P

HD20 STAGE 4 MARKETING r1

7TH DECEMBER 2019HIGH DEFINITION DESIGN PTY LTD

PRELIMINARY SITE ANALYSIS PLAN

STAGE PLAN

LEGEND:DISCLAIMER/ NOTES:

ELECTRICITY PILLAR

STREET TREES

GAS GAS

MASTER PLAN

RETAINING WALL

LOT 409, BUTTERCUP LANE, RAYMOND TERRACE

RESTRICTIONS ON USE OF LAND AFFECT THE LOT(to be confirmed at completion of construction)

AB VERTICAL "CHARCOAL"TIMBER LAPPED AND CAPPED FENCE

SEWER JUNCTION

POTTERS-LANE.COM.AU

REVISION/S:

DATE:BY:

1. Contours and proposed design levels are based on finished design levels and are subject to construction and Councilcertification and therefore should not be considered as final or as-built.

2. Location of utility services including but not limited to power, water, sewer, communications and gas are subject toconstruction and Supply Authority certification and therefore should not be considered as final or as-built.

3. Survey information such as boundary dimensions and areas, easements etc are subject to Final Survey. Purchasersshould refer to the Deposited Plan and 88B Instrument contained in the Contract for Sale of Land for further detailedinformation.

4. Bushfire and Geotechnical classification are provided for convenience. Purchasers should refer to referenced detailspecialist reports.

5. This Preliminary Site Analysis Plan has been collated from various sources of design information and is provided forconvenience to assist Purchasers in obtaining quotations/tenders for dwelling construction.

6. This document does not form part of the Contract of Sale of the Land.

PROPOSED DESIGN LEVELRL 20.5

(GA) - EASEMENT FOR DRAINAGE OF WATER 2.5 WIDE(GB) - RESTRICTION ON THE USE OF LAND (AIRCRAFT NOISE)(GC) - RESTRICTION ON THE USE OF LAND 0.7 WIDE(GD) - EASEMENT FOR DRAINAGE OF WATER 1.5 WIDE

Page 10: LOT 401, BAILEY AVENUE, RAYMOND TERRACE · lp t w w lp scale 1:300 @ a4 0 5 10 15 anticipated site classification - h1 class telstra /nbn pit power pole stop valve sewer manhole hydrant

S

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

NB

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

NB

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

P

P

N

B

N

N

B

N

N

B

N

P

P

N

B

N

N

B

N

P

P

P

P

P

P

P

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

P

P

P

P

P

P

N

B

N

N

B

N

N

BN

NB

N

NB

N

NB

N

W

W

W

W

W

W

W

W

W

W

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

GA

S

GA

S

GA

S

W

W

W

W

W

W

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

GA

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

GA

S

GA

S

GA

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

634.8 m²

(G

A

)

S

S

S

S

S

S

S

S

S

S

S

S

S

S

A

1

9

.

4

4

5

A

2

0

.

1

4

7

.

0

1

5

.3

9

12.695

3

.2

5

5

(GB)

410

32.325

B

U

T

T

E

R

C

U

P

S

A

I

L

O

R

S

W

A

Y

L

A

N

E

1

0

.

7

x

x

9

.6

1

0

.

5

x

9.8

x

x

9

.

6

8

.

8

x

7

.

7

x

9

.

4

x

7

.

9

x

9

.

6

5

x

411

411

P

P

T

T

T

W

W

W

W

W

W

W

W

W

W

W

1

0

.

0

SCALE 1:300 @ A40 105 15

Anticipated Site Classification - H1 Class

TELSTRA /NBN PITPOWER POLE

STOP VALVE

SEWER MANHOLE

HYDRANT

LIGHT POLELP

PP

KERB INLET PITSTORMWATER PIT

SEWER MAIN

WATER MAIN

RISING MAIN

TELSTRA /NBN

OVERHEAD POWER

UNDER GROUND POWERELECTRICAL SUBSTATION

STORMWATER PIPE

S

W

RS

NBN

OHP

P

HD20 STAGE 4 MARKETING r1

7TH DECEMBER 2019HIGH DEFINITION DESIGN PTY LTD

PRELIMINARY SITE ANALYSIS PLAN

STAGE PLAN

LEGEND:DISCLAIMER/ NOTES:

ELECTRICITY PILLAR

STREET TREES

GAS GAS

MASTER PLAN

RETAINING WALL

LOT 410, BUTTERCUP LANE, RAYMOND TERRACE

RESTRICTIONS ON USE OF LAND AFFECT THE LOT(to be confirmed at completion of construction)

AB VERTICAL "CHARCOAL"TIMBER LAPPED AND CAPPED FENCE

SEWER JUNCTION

POTTERS-LANE.COM.AU

REVISION/S:

DATE:BY:

1. Contours and proposed design levels are based on finished design levels and are subject to construction and Councilcertification and therefore should not be considered as final or as-built.

2. Location of utility services including but not limited to power, water, sewer, communications and gas are subject toconstruction and Supply Authority certification and therefore should not be considered as final or as-built.

3. Survey information such as boundary dimensions and areas, easements etc are subject to Final Survey. Purchasersshould refer to the Deposited Plan and 88B Instrument contained in the Contract for Sale of Land for further detailedinformation.

4. Bushfire and Geotechnical classification are provided for convenience. Purchasers should refer to referenced detailspecialist reports.

5. This Preliminary Site Analysis Plan has been collated from various sources of design information and is provided forconvenience to assist Purchasers in obtaining quotations/tenders for dwelling construction.

6. This document does not form part of the Contract of Sale of the Land.

PROPOSED DESIGN LEVELRL 20.5

(GA) - EASEMENT FOR DRAINAGE OF WATER 2.5 WIDE(GB) - RESTRICTION ON THE USE OF LAND (AIRCRAFT NOISE)(GC) - RESTRICTION ON THE USE OF LAND 0.7 WIDE(GD) - EASEMENT FOR DRAINAGE OF WATER 1.5 WIDE

Page 11: LOT 401, BAILEY AVENUE, RAYMOND TERRACE · lp t w w lp scale 1:300 @ a4 0 5 10 15 anticipated site classification - h1 class telstra /nbn pit power pole stop valve sewer manhole hydrant

PP

PP

PP

PP

PP

PP

P

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

N

N

B

N

N

B

N

N

B

N

NB

N

PP

NB

NN

BN

PP

PP

PP

PP

PP

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

P

P

P

P

N

B

N

N

B

N

NB

N

NB

N

NB

N

W

W

WW

WW

WW

W

G

AS

GA

S

GA

S

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

G

A

S

G

A

S

GA

S

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

620.5 m²

411

(

G

A

)

S

S

S

S

S

S

S

S

S

A2.48

32.325

18.64

16.02

(

G

B

)

34.69

SA

ILO

RS

W

AY

503

1

0

.

5

x

9

.

4

x

7

.

9

x

9

.

6

5

x

9

.

5

5

x

1

0

.

7

x

x

9

.

4

8

.

1

x

412

410

L

P

T

T

W

W

W

W

W

W

(

G

A

)

SCALE 1:300 @ A40 105 15

Anticipated Site Classification - H1 Class

TELSTRA /NBN PITPOWER POLE

STOP VALVE

SEWER MANHOLE

HYDRANT

LIGHT POLELP

PP

KERB INLET PITSTORMWATER PIT

SEWER MAIN

WATER MAIN

RISING MAIN

TELSTRA /NBN

OVERHEAD POWER

UNDER GROUND POWERELECTRICAL SUBSTATION

STORMWATER PIPE

S

W

RS

NBN

OHP

P

HD20 STAGE 4 MARKETING r1

7TH DECEMBER 2019HIGH DEFINITION DESIGN PTY LTD

PRELIMINARY SITE ANALYSIS PLAN

STAGE PLAN

LEGEND:DISCLAIMER/ NOTES:

ELECTRICITY PILLAR

STREET TREES

GAS GAS

MASTER PLAN

RETAINING WALL

LOT 411, SAILORS WAY, RAYMOND TERRACE

RESTRICTIONS ON USE OF LAND AFFECT THE LOT(to be confirmed at completion of construction)

AB VERTICAL "CHARCOAL"TIMBER LAPPED AND CAPPED FENCE

SEWER JUNCTION

POTTERS-LANE.COM.AU

REVISION/S:

DATE:BY:

1. Contours and proposed design levels are based on finished design levels and are subject to construction and Councilcertification and therefore should not be considered as final or as-built.

2. Location of utility services including but not limited to power, water, sewer, communications and gas are subject toconstruction and Supply Authority certification and therefore should not be considered as final or as-built.

3. Survey information such as boundary dimensions and areas, easements etc are subject to Final Survey. Purchasersshould refer to the Deposited Plan and 88B Instrument contained in the Contract for Sale of Land for further detailedinformation.

4. Bushfire and Geotechnical classification are provided for convenience. Purchasers should refer to referenced detailspecialist reports.

5. This Preliminary Site Analysis Plan has been collated from various sources of design information and is provided forconvenience to assist Purchasers in obtaining quotations/tenders for dwelling construction.

6. This document does not form part of the Contract of Sale of the Land.

PROPOSED DESIGN LEVELRL 20.5

(GA) - EASEMENT FOR DRAINAGE OF WATER 2.5 WIDE(GB) - RESTRICTION ON THE USE OF LAND (AIRCRAFT NOISE)(GC) - RESTRICTION ON THE USE OF LAND 0.7 WIDE(GD) - EASEMENT FOR DRAINAGE OF WATER 1.5 WIDE

Page 12: LOT 401, BAILEY AVENUE, RAYMOND TERRACE · lp t w w lp scale 1:300 @ a4 0 5 10 15 anticipated site classification - h1 class telstra /nbn pit power pole stop valve sewer manhole hydrant

PP

PP

PP

PP

PP

PP

PP

PP

P

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

N

PP

PP

PP

PP

PP

PP

PP

PP

PP

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

WW

WW

WW

WW

W

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

S

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

S

644.4 m²

412

(

G

A

)S

S

S

S

S

S

S

S

S

34.69

18.135

18

1v:4h

5

0

3

36.915

SA

ILO

RS

W

AY

9

.

5

5

x

1

0

.

7

x

1

0

.

9

x

9

.

8

x

x

9

.

4

x

9

.

6

8

.

1

x

8

.

2

x

413

411

503

506

P

L

P

P

P

P

P

P

P

P

T

W

W

W

W

W

1

0

.0

1

1

.0

SCALE 1:300 @ A40 105 15

Anticipated Site Classification - H1 Class

TELSTRA /NBN PITPOWER POLE

STOP VALVE

SEWER MANHOLE

HYDRANT

LIGHT POLELP

PP

KERB INLET PITSTORMWATER PIT

SEWER MAIN

WATER MAIN

RISING MAIN

TELSTRA /NBN

OVERHEAD POWER

UNDER GROUND POWERELECTRICAL SUBSTATION

STORMWATER PIPE

S

W

RS

NBN

OHP

P

HD20 STAGE 4 MARKETING r1

7TH DECEMBER 2019HIGH DEFINITION DESIGN PTY LTD

PRELIMINARY SITE ANALYSIS PLAN

STAGE PLAN

LEGEND:DISCLAIMER/ NOTES:

ELECTRICITY PILLAR

STREET TREES

GAS GAS

MASTER PLAN

RETAINING WALL

LOT 412, SAILORS WAY, RAYMOND TERRACE

RESTRICTIONS ON USE OF LAND AFFECT THE LOT(to be confirmed at completion of construction)

AB VERTICAL "CHARCOAL"TIMBER LAPPED AND CAPPED FENCE

SEWER JUNCTION

POTTERS-LANE.COM.AU

REVISION/S:

DATE:BY:

1. Contours and proposed design levels are based on finished design levels and are subject to construction and Councilcertification and therefore should not be considered as final or as-built.

2. Location of utility services including but not limited to power, water, sewer, communications and gas are subject toconstruction and Supply Authority certification and therefore should not be considered as final or as-built.

3. Survey information such as boundary dimensions and areas, easements etc are subject to Final Survey. Purchasersshould refer to the Deposited Plan and 88B Instrument contained in the Contract for Sale of Land for further detailedinformation.

4. Bushfire and Geotechnical classification are provided for convenience. Purchasers should refer to referenced detailspecialist reports.

5. This Preliminary Site Analysis Plan has been collated from various sources of design information and is provided forconvenience to assist Purchasers in obtaining quotations/tenders for dwelling construction.

6. This document does not form part of the Contract of Sale of the Land.

PROPOSED DESIGN LEVELRL 20.5

(GA) - EASEMENT FOR DRAINAGE OF WATER 2.5 WIDE(GB) - RESTRICTION ON THE USE OF LAND (AIRCRAFT NOISE)(GC) - RESTRICTION ON THE USE OF LAND 0.7 WIDE(GD) - EASEMENT FOR DRAINAGE OF WATER 1.5 WIDE

Page 13: LOT 401, BAILEY AVENUE, RAYMOND TERRACE · lp t w w lp scale 1:300 @ a4 0 5 10 15 anticipated site classification - h1 class telstra /nbn pit power pole stop valve sewer manhole hydrant

NB

N

NB

N

NB

N

NB

N

NB

N

PP

PP

PP

PP

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

N

PP

PP

PP

PP

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

N

NB

N

NB

N

NB

N

N

BN

WW

WW

WW

W

W

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

S

GA

S

GA

S

GA

S

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

S

GA

S

GA

S

GA

S

727.5 m²

413

S

SS

SS

SS

SS

S

S

S

S

S

S

S

S

S

36.915

12

.2

6

3

8

.8

2

5

15.96

A10.145

1v:4h

1

1

.2

6

9

.9

5

SA

ILO

RS

W

AY

1

0

.

9

x

9

.

8

x

x

9

.

6

8

.

2

x

8

.

3

x

x

9

.

8

518

412

506

507

P

P

P

P

P

P

P

P

T

T

W

W

W

W

W

W

W

W

W

W

1

0

.0

10.0

1

1

.0

SCALE 1:300 @ A40 105 15

Anticipated Site Classification - H1 Class

TELSTRA /NBN PITPOWER POLE

STOP VALVE

SEWER MANHOLE

HYDRANT

LIGHT POLELP

PP

KERB INLET PITSTORMWATER PIT

SEWER MAIN

WATER MAIN

RISING MAIN

TELSTRA /NBN

OVERHEAD POWER

UNDER GROUND POWERELECTRICAL SUBSTATION

STORMWATER PIPE

S

W

RS

NBN

OHP

P

HD20 STAGE 4 MARKETING r1

7TH DECEMBER 2019HIGH DEFINITION DESIGN PTY LTD

PRELIMINARY SITE ANALYSIS PLAN

STAGE PLAN

LEGEND:DISCLAIMER/ NOTES:

ELECTRICITY PILLAR

STREET TREES

GAS GAS

MASTER PLAN

RETAINING WALL

LOT 413, SAILORS WAY, RAYMOND TERRACE

RESTRICTIONS ON USE OF LAND AFFECT THE LOT(to be confirmed at completion of construction)

AB VERTICAL "CHARCOAL"TIMBER LAPPED AND CAPPED FENCE

SEWER JUNCTION

POTTERS-LANE.COM.AU

REVISION/S:

DATE:BY:

1. Contours and proposed design levels are based on finished design levels and are subject to construction and Councilcertification and therefore should not be considered as final or as-built.

2. Location of utility services including but not limited to power, water, sewer, communications and gas are subject toconstruction and Supply Authority certification and therefore should not be considered as final or as-built.

3. Survey information such as boundary dimensions and areas, easements etc are subject to Final Survey. Purchasersshould refer to the Deposited Plan and 88B Instrument contained in the Contract for Sale of Land for further detailedinformation.

4. Bushfire and Geotechnical classification are provided for convenience. Purchasers should refer to referenced detailspecialist reports.

5. This Preliminary Site Analysis Plan has been collated from various sources of design information and is provided forconvenience to assist Purchasers in obtaining quotations/tenders for dwelling construction.

6. This document does not form part of the Contract of Sale of the Land.

PROPOSED DESIGN LEVELRL 20.5

(GA) - EASEMENT FOR DRAINAGE OF WATER 2.5 WIDE(GB) - RESTRICTION ON THE USE OF LAND (AIRCRAFT NOISE)(GC) - RESTRICTION ON THE USE OF LAND 0.7 WIDE(GD) - EASEMENT FOR DRAINAGE OF WATER 1.5 WIDE

Page 14: LOT 401, BAILEY AVENUE, RAYMOND TERRACE · lp t w w lp scale 1:300 @ a4 0 5 10 15 anticipated site classification - h1 class telstra /nbn pit power pole stop valve sewer manhole hydrant

NB

N

NB

N

NB

N

NB

N

NB

N

PP

P

NB

NN

BN

NB

NN

BN

NB

NN

BN

PP

P

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

N

NB

N

NB

N

NB

N

NB

N

NB

N

WW

WW

W

W

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

S

GA

S

GA

S

GA

S

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

S

GA

S

GA

S

GA

S

634.6 m²

414

3

2

.0

9

6

.9

3

5

15

.5

55

4.3

55

S

S

S

S

SS

SS

S

A12.66

1v:4h

1

1

.2

6

5

1

9

32

SA

ILO

RS

W

AY

1

3

.

9

x

1

4

.

6

x

x

1

5

.

4

519

415

312

219

P

P

P

P

P

P

P

P

T

W

W

W

W

W

W

W

15.0

14.0

13.0

1

1

.0

SCALE 1:300 @ A40 105 15

Anticipated Site Classification - H1 Class

TELSTRA /NBN PITPOWER POLE

STOP VALVE

SEWER MANHOLE

HYDRANT

LIGHT POLELP

PP

KERB INLET PITSTORMWATER PIT

SEWER MAIN

WATER MAIN

RISING MAINTELSTRA /NBN

OVERHEAD POWER

UNDER GROUND POWERELECTRICAL SUBSTATION

STORMWATER PIPE

S

W

RS

NBN

OHP

P

HD20 STAGE 4 MARKETING r1

7TH DECEMBER 2019

HIGH DEFINITION DESIGN PTY LTD

PRELIMINARY SITE ANALYSIS PLAN

STAGE PLAN

LEGEND:DISCLAIMER/ NOTES:

ELECTRICITY PILLAR

STREET TREES

GAS GAS

MASTER PLAN

RETAINING WALL

LOT 414, SAILORS WAY, RAYMOND TERRACE

RESTRICTIONS ON USE OF LAND AFFECT THE LOT(to be confirmed at completion of construction)

AB VERTICAL "CHARCOAL"TIMBER LAPPED AND CAPPED FENCE

SEWER JUNCTION

POTTERS-LANE.COM.AU

REVISION/S:

DATE:BY:

1. Contours and proposed design levels are based on finished design levels and are subject to construction and Councilcertification and therefore should not be considered as final or as-built.

2. Location of utility services including but not limited to power, water, sewer, communications and gas are subject toconstruction and Supply Authority certification and therefore should not be considered as final or as-built.

3. Survey information such as boundary dimensions and areas, easements etc are subject to Final Survey. Purchasersshould refer to the Deposited Plan and 88B Instrument contained in the Contract for Sale of Land for further detailedinformation.

4. Bushfire and Geotechnical classification are provided for convenience. Purchasers should refer to referenced detailspecialist reports.

5. This Preliminary Site Analysis Plan has been collated from various sources of design information and is provided forconvenience to assist Purchasers in obtaining quotations/tenders for dwelling construction.

6. This document does not form part of the Contract of Sale of the Land.

PROPOSED DESIGN LEVELRL 20.5

(GA) - EASEMENT FOR DRAINAGE OF WATER 2.5 WIDE(GB) - RESTRICTION ON THE USE OF LAND (AIRCRAFT NOISE)(GC) - RESTRICTION ON THE USE OF LAND 0.7 WIDE(GD) - EASEMENT FOR DRAINAGE OF WATER 1.5 WIDE

Page 15: LOT 401, BAILEY AVENUE, RAYMOND TERRACE · lp t w w lp scale 1:300 @ a4 0 5 10 15 anticipated site classification - h1 class telstra /nbn pit power pole stop valve sewer manhole hydrant

SS

SS

NB

N

PP

PP

PP

PP

PP

PP

P

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

PP

PP

PP

PP

PP

PP

PP

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

A

N

E

F

2

0

2

5

WW

WW

WW

WW

W

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

S

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

S

582.4 m²

415

32

18

.2

18

.2

SS

SS

SS

SS

SS

1v:4h

32

SA

ILO

RS

W

AY

x

1

5

.

4

1

3

.

9

x

1

3

.

9

x

1

4

.

6

x

x

1

5

.

4

x

1

5

.

4

1

0

.

7

x

1

0

.

9

x

414

416

312

311

P

L

P

P

P

P

P

P

P

P

T

T

W

W

W

W

W

W

1

1

.0

SCALE 1:300 @ A40 105 15

Anticipated Site Classification - H1 Class

TELSTRA /NBN PITPOWER POLE

STOP VALVE

SEWER MANHOLE

HYDRANT

LIGHT POLELP

PP

KERB INLET PITSTORMWATER PIT

SEWER MAIN

WATER MAIN

RISING MAINTELSTRA /NBN

OVERHEAD POWER

UNDER GROUND POWERELECTRICAL SUBSTATION

STORMWATER PIPE

S

W

RS

NBN

OHP

P

HD20 STAGE 4 MARKETING r1

7TH DECEMBER 2019

HIGH DEFINITION DESIGN PTY LTD

PRELIMINARY SITE ANALYSIS PLAN

STAGE PLAN

LEGEND:DISCLAIMER/ NOTES:

ELECTRICITY PILLAR

STREET TREES

GAS GAS

MASTER PLAN

RETAINING WALL

LOT 415, SAILORS WAY, RAYMOND TERRACE

RESTRICTIONS ON USE OF LAND AFFECT THE LOT(to be confirmed at completion of construction)

AB VERTICAL "CHARCOAL"TIMBER LAPPED AND CAPPED FENCE

SEWER JUNCTION

POTTERS-LANE.COM.AU

REVISION/S:

DATE:BY:

1. Contours and proposed design levels are based on finished design levels and are subject to construction and Councilcertification and therefore should not be considered as final or as-built.

2. Location of utility services including but not limited to power, water, sewer, communications and gas are subject toconstruction and Supply Authority certification and therefore should not be considered as final or as-built.

3. Survey information such as boundary dimensions and areas, easements etc are subject to Final Survey. Purchasersshould refer to the Deposited Plan and 88B Instrument contained in the Contract for Sale of Land for further detailedinformation.

4. Bushfire and Geotechnical classification are provided for convenience. Purchasers should refer to referenced detailspecialist reports.

5. This Preliminary Site Analysis Plan has been collated from various sources of design information and is provided forconvenience to assist Purchasers in obtaining quotations/tenders for dwelling construction.

6. This document does not form part of the Contract of Sale of the Land.

PROPOSED DESIGN LEVELRL 20.5

(GA) - EASEMENT FOR DRAINAGE OF WATER 2.5 WIDE(GB) - RESTRICTION ON THE USE OF LAND (AIRCRAFT NOISE)(GC) - RESTRICTION ON THE USE OF LAND 0.7 WIDE(GD) - EASEMENT FOR DRAINAGE OF WATER 1.5 WIDE

Page 16: LOT 401, BAILEY AVENUE, RAYMOND TERRACE · lp t w w lp scale 1:300 @ a4 0 5 10 15 anticipated site classification - h1 class telstra /nbn pit power pole stop valve sewer manhole hydrant

SS

SS

SS

SS

SS

PP

PP

PP

PP

PP

PP

PP

P

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

N

N

B

N

NB

N

PP

NB

NN

BN

PP

PP

PP

PP

PP

PP

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

NB

NN

BN

P

P

NB

N

NB

N

NB

N

W

WW

WW

WW

WW

GA

S

GA

S

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

S

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

582.4 m²

416

32

18

.2

18

.2

SS

SS

SS

SS

(

G

B

)

32

SA

ILO

RS

W

AY

1

3

.

9

x

x

1

5

.

4

1

3

.

9

x

x

1

5

.

4

1

3

.

9

x

1

0

.

5

x

1

0

.

7

x

415

417

310

311

P

L

P

T

T

T

T

W

W

W

W

W

W

SCALE 1:300 @ A40 105 15

Anticipated Site Classification - H1 Class

TELSTRA /NBN PITPOWER POLE

STOP VALVE

SEWER MANHOLE

HYDRANT

LIGHT POLELP

PP

KERB INLET PITSTORMWATER PIT

SEWER MAIN

WATER MAIN

RISING MAINTELSTRA /NBN

OVERHEAD POWER

UNDER GROUND POWERELECTRICAL SUBSTATION

STORMWATER PIPE

S

W

RS

NBN

OHP

P

HD20 STAGE 4 MARKETING r1

7TH DECEMBER 2019

HIGH DEFINITION DESIGN PTY LTD

PRELIMINARY SITE ANALYSIS PLAN

STAGE PLAN

LEGEND:DISCLAIMER/ NOTES:

ELECTRICITY PILLAR

STREET TREES

GAS GAS

MASTER PLAN

RETAINING WALL

LOT 416, SAILORS WAY, RAYMOND TERRACE

RESTRICTIONS ON USE OF LAND AFFECT THE LOT(to be confirmed at completion of construction)

AB VERTICAL "CHARCOAL"TIMBER LAPPED AND CAPPED FENCE

SEWER JUNCTION

POTTERS-LANE.COM.AU

REVISION/S:

DATE:BY:

1. Contours and proposed design levels are based on finished design levels and are subject to construction and Councilcertification and therefore should not be considered as final or as-built.

2. Location of utility services including but not limited to power, water, sewer, communications and gas are subject toconstruction and Supply Authority certification and therefore should not be considered as final or as-built.

3. Survey information such as boundary dimensions and areas, easements etc are subject to Final Survey. Purchasersshould refer to the Deposited Plan and 88B Instrument contained in the Contract for Sale of Land for further detailedinformation.

4. Bushfire and Geotechnical classification are provided for convenience. Purchasers should refer to referenced detailspecialist reports.

5. This Preliminary Site Analysis Plan has been collated from various sources of design information and is provided forconvenience to assist Purchasers in obtaining quotations/tenders for dwelling construction.

6. This document does not form part of the Contract of Sale of the Land.

PROPOSED DESIGN LEVELRL 20.5

(GA) - EASEMENT FOR DRAINAGE OF WATER 2.5 WIDE(GB) - RESTRICTION ON THE USE OF LAND (AIRCRAFT NOISE)(GC) - RESTRICTION ON THE USE OF LAND 0.7 WIDE(GD) - EASEMENT FOR DRAINAGE OF WATER 1.5 WIDE

Page 17: LOT 401, BAILEY AVENUE, RAYMOND TERRACE · lp t w w lp scale 1:300 @ a4 0 5 10 15 anticipated site classification - h1 class telstra /nbn pit power pole stop valve sewer manhole hydrant

SS

SS

SS

SS

S

PP

PP

PP

NB

NN

BN

NB

NN

BN

NB

NN

BN

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

NB

N

PP

NB

NN

BN

PP

P

NB

NN

BN

NB

N

P

P

P

P

P

P

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

P

P

P

P

P

P

N

B

N

N

B

N

N

B

N

NB

N

NB

N

NB

N

W

W

W

W

W

W

WW

W

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

GA

S

GA

S

GA

SG

AS

GA

SG

AS

GA

SG

AS

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

GA

S

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

S

588.6 m²

417

32

18.2

5.525

SS

SS

S

S

S

S

S

A12.79

(

G

B

)

33.48SA

ILO

RS

W

AY

x

1

5

.

4

1

3

.

9

x

x

1

5

.

4

1

3

.

9

x

x

1

5

.

4

x

9

.6

1

2

.

0

x

1

0

.

5

x

9.8

x

1

0

.

7

x

416

418

P

T

T

T

T

W

W

W

W

W

W

1

0

.

0

SCALE 1:300 @ A40 105 15

Anticipated Site Classification - H1 Class

TELSTRA /NBN PITPOWER POLE

STOP VALVE

SEWER MANHOLE

HYDRANT

LIGHT POLELP

PP

KERB INLET PITSTORMWATER PIT

SEWER MAIN

WATER MAIN

RISING MAINTELSTRA /NBN

OVERHEAD POWER

UNDER GROUND POWERELECTRICAL SUBSTATION

STORMWATER PIPE

S

W

RS

NBN

OHP

P

HD20 STAGE 4 MARKETING r1

7TH DECEMBER 2019

HIGH DEFINITION DESIGN PTY LTD

PRELIMINARY SITE ANALYSIS PLAN

STAGE PLAN

LEGEND:DISCLAIMER/ NOTES:

ELECTRICITY PILLAR

STREET TREES

GAS GAS

MASTER PLAN

RETAINING WALL

LOT 417, SAILORS WAY, RAYMOND TERRACE

RESTRICTIONS ON USE OF LAND AFFECT THE LOT(to be confirmed at completion of construction)

AB VERTICAL "CHARCOAL"TIMBER LAPPED AND CAPPED FENCE

SEWER JUNCTION

POTTERS-LANE.COM.AU

REVISION/S:

DATE:BY:

1. Contours and proposed design levels are based on finished design levels and are subject to construction and Councilcertification and therefore should not be considered as final or as-built.

2. Location of utility services including but not limited to power, water, sewer, communications and gas are subject toconstruction and Supply Authority certification and therefore should not be considered as final or as-built.

3. Survey information such as boundary dimensions and areas, easements etc are subject to Final Survey. Purchasersshould refer to the Deposited Plan and 88B Instrument contained in the Contract for Sale of Land for further detailedinformation.

4. Bushfire and Geotechnical classification are provided for convenience. Purchasers should refer to referenced detailspecialist reports.

5. This Preliminary Site Analysis Plan has been collated from various sources of design information and is provided forconvenience to assist Purchasers in obtaining quotations/tenders for dwelling construction.

6. This document does not form part of the Contract of Sale of the Land.

PROPOSED DESIGN LEVELRL 20.5

(GA) - EASEMENT FOR DRAINAGE OF WATER 2.5 WIDE(GB) - RESTRICTION ON THE USE OF LAND (AIRCRAFT NOISE)(GC) - RESTRICTION ON THE USE OF LAND 0.7 WIDE(GD) - EASEMENT FOR DRAINAGE OF WATER 1.5 WIDE

Page 18: LOT 401, BAILEY AVENUE, RAYMOND TERRACE · lp t w w lp scale 1:300 @ a4 0 5 10 15 anticipated site classification - h1 class telstra /nbn pit power pole stop valve sewer manhole hydrant

S

S

S

S

S

S

S

S

S

S

SS

SS

SS

SS

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

P

N

BN

P

P

P

P

P

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

P

P

N

B

N

N

B

N

P

P

P

P

P

P

P

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

P

P

P

P

N

B

N

N

B

N

N

B

N

NB

N

W

W

W

W

W

W

W

W

W

W

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

GA

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

601.6 m²

418

3

8

.4

0

5

33.48

18.2

2

.4

S

S

S

S

S

S

S

A

1

3

.

5

3

5

(

G

B

)

(GC)

S

A

I

L

O

R

S

W

A

Y

x

1

3

.9

1

5

.4

x

1

3

.

9

x

x

1

5

.

4

1

3

.

9

x

x

1

5

.

4

1

1

.

4

x

1

2

.9

x

x 10.7

1

0

.

7

x

x

9

.6

x

9

.2

1

2

.

0

x

x

1

2

.

0

1

0

.

5

x

9.8

x

417

419

420

P

P

T

W

W

1

0

.

0

SCALE 1:300 @ A40 105 15

Anticipated Site Classification - H1 Class

TELSTRA /NBN PITPOWER POLE

STOP VALVE

SEWER MANHOLE

HYDRANT

LIGHT POLELP

PP

KERB INLET PITSTORMWATER PIT

SEWER MAIN

WATER MAIN

RISING MAIN

TELSTRA /NBN

OVERHEAD POWER

UNDER GROUND POWERELECTRICAL SUBSTATION

STORMWATER PIPE

S

W

RS

NBN

OHP

P

HD20 STAGE 4 MARKETING r1

7TH DECEMBER 2019HIGH DEFINITION DESIGN PTY LTD

PRELIMINARY SITE ANALYSIS PLAN

STAGE PLAN

LEGEND:DISCLAIMER/ NOTES:

ELECTRICITY PILLAR

STREET TREES

GAS GAS

MASTER PLAN

RETAINING WALL

LOT 418, SAILORS WAY, RAYMOND TERRACE

RESTRICTIONS ON USE OF LAND AFFECT THE LOT(to be confirmed at completion of construction)

AB VERTICAL "CHARCOAL"TIMBER LAPPED AND CAPPED FENCE

SEWER JUNCTION

POTTERS-LANE.COM.AU

REVISION/S:

DATE:BY:

1. Contours and proposed design levels are based on finished design levels and are subject to construction and Councilcertification and therefore should not be considered as final or as-built.

2. Location of utility services including but not limited to power, water, sewer, communications and gas are subject toconstruction and Supply Authority certification and therefore should not be considered as final or as-built.

3. Survey information such as boundary dimensions and areas, easements etc are subject to Final Survey. Purchasersshould refer to the Deposited Plan and 88B Instrument contained in the Contract for Sale of Land for further detailedinformation.

4. Bushfire and Geotechnical classification are provided for convenience. Purchasers should refer to referenced detailspecialist reports.

5. This Preliminary Site Analysis Plan has been collated from various sources of design information and is provided forconvenience to assist Purchasers in obtaining quotations/tenders for dwelling construction.

6. This document does not form part of the Contract of Sale of the Land.

PROPOSED DESIGN LEVELRL 20.5

(GA) - EASEMENT FOR DRAINAGE OF WATER 2.5 WIDE(GB) - RESTRICTION ON THE USE OF LAND (AIRCRAFT NOISE)(GC) - RESTRICTION ON THE USE OF LAND 0.7 WIDE(GD) - EASEMENT FOR DRAINAGE OF WATER 1.5 WIDE

Page 19: LOT 401, BAILEY AVENUE, RAYMOND TERRACE · lp t w w lp scale 1:300 @ a4 0 5 10 15 anticipated site classification - h1 class telstra /nbn pit power pole stop valve sewer manhole hydrant

S

S

S

S

S

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

P

P

P

N

B

N

N

B

N

N

B

N

P

P

P

P

P

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

P

P

N

B

N

N

B

N

P

P

P

P

PP

P

N

B

N

N

BN

NB

N

NBN

NBN NBN

NB

N

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

GA

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

AS

GA

S

GA

S

GAS

GAS

GA

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

598.7 m²

419

31.955

2

5

.

0

3

6

.

1

29

.4

4

S

S

S

S

21.89

A

4

.7

8

(

G

B

)

B

U

T

T

E

R

C

U

P

L

A

N

E

S

A

ILO

R

S

W

A

Y

1

1

.

4

x

1

2

.

9

x

x

1

2

.

9

x

1

1

.

4

x

1

1

.

2

x

1

0

.

7

x

1

0

.

7

1

0

.

7

x

x 9.6

x 9.2

1

2

.

0

x

x

1

2

.0

420

418

L

P

P

P

P

P

N

B

N

T

W

W

W

W

W

P

P

N

B

N

N

B

N

1

1

.

0

W

SCALE 1:300 @ A40 105 15

Anticipated Site Classification - H1 Class

TELSTRA /NBN PITPOWER POLE

STOP VALVE

SEWER MANHOLE

HYDRANT

LIGHT POLELP

PP

KERB INLET PITSTORMWATER PIT

SEWER MAIN

WATER MAIN

RISING MAIN

TELSTRA /NBN

OVERHEAD POWER

UNDER GROUND POWERELECTRICAL SUBSTATION

STORMWATER PIPE

S

W

RS

NBN

OHP

P

HD20 STAGE 4 MARKETING r1

7TH DECEMBER 2019HIGH DEFINITION DESIGN PTY LTD

PRELIMINARY SITE ANALYSIS PLAN

STAGE PLAN

LEGEND:DISCLAIMER/ NOTES:

ELECTRICITY PILLAR

STREET TREES

GAS GAS

MASTER PLAN

RETAINING WALL

LOT 419, BUTTERCUP LANE, RAYMOND TERRACE

RESTRICTIONS ON USE OF LAND AFFECT THE LOT(to be confirmed at completion of construction)

AB VERTICAL "CHARCOAL"TIMBER LAPPED AND CAPPED FENCE

SEWER JUNCTION

POTTERS-LANE.COM.AU

REVISION/S:

DATE:BY:

1. Contours and proposed design levels are based on finished design levels and are subject to construction and Councilcertification and therefore should not be considered as final or as-built.

2. Location of utility services including but not limited to power, water, sewer, communications and gas are subject toconstruction and Supply Authority certification and therefore should not be considered as final or as-built.

3. Survey information such as boundary dimensions and areas, easements etc are subject to Final Survey. Purchasersshould refer to the Deposited Plan and 88B Instrument contained in the Contract for Sale of Land for further detailedinformation.

4. Bushfire and Geotechnical classification are provided for convenience. Purchasers should refer to referenced detailspecialist reports.

5. This Preliminary Site Analysis Plan has been collated from various sources of design information and is provided forconvenience to assist Purchasers in obtaining quotations/tenders for dwelling construction.

6. This document does not form part of the Contract of Sale of the Land.

PROPOSED DESIGN LEVELRL 20.5

(GA) - EASEMENT FOR DRAINAGE OF WATER 2.5 WIDE(GB) - RESTRICTION ON THE USE OF LAND (AIRCRAFT NOISE)(GC) - RESTRICTION ON THE USE OF LAND 0.7 WIDE(GD) - EASEMENT FOR DRAINAGE OF WATER 1.5 WIDE

Page 20: LOT 401, BAILEY AVENUE, RAYMOND TERRACE · lp t w w lp scale 1:300 @ a4 0 5 10 15 anticipated site classification - h1 class telstra /nbn pit power pole stop valve sewer manhole hydrant

S

S

S

S

S

S

S

S

S

P

P

P

P

P

P

P

P

P

P

P

P

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

W

W

W

W

W

W

W

W

W

W

W

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

648.3 m²

420

42.29

2

0

.

6

5

5

S S S

16.52

(

G

B

)

(

G

C

)

B

U

T

T

E

R

C

U

P

L

A

N

E

x

1

3

.

9

1

5

.

4

x

x

1

5

.

4

x

1

3

.

9

x

1

3

.

9

1

5

.

4

x

1

3

.

9

x

1

1

.

4

x

1

2

.

9

x

x

1

2

.

9

x

1

1

.

4

x

1

2

.

0

418

419

307

421

L

P

P

P

P

P

P

P

P

T

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

W

W

W

W

31.9

55

SCALE 1:300 @ A40 105 15

Anticipated Site Classification - H1 Class

TELSTRA /NBN PITPOWER POLE

STOP VALVE

SEWER MANHOLE

HYDRANT

LIGHT POLELP

PP

KERB INLET PITSTORMWATER PIT

SEWER MAIN

WATER MAIN

RISING MAIN

TELSTRA /NBN

OVERHEAD POWER

UNDER GROUND POWERELECTRICAL SUBSTATION

STORMWATER PIPE

S

W

RS

NBN

OHP

P

HD20 STAGE 4 MARKETING r1

7TH DECEMBER 2019HIGH DEFINITION DESIGN PTY LTD

PRELIMINARY SITE ANALYSIS PLAN

STAGE PLAN

LEGEND:DISCLAIMER/ NOTES:

ELECTRICITY PILLAR

STREET TREES

GAS GAS

MASTER PLAN

RETAINING WALL

LOT 420, BUTTERCUP LANE, RAYMOND TERRACE

RESTRICTIONS ON USE OF LAND AFFECT THE LOT(to be confirmed at completion of construction)

AB VERTICAL "CHARCOAL"TIMBER LAPPED AND CAPPED FENCE

SEWER JUNCTION

POTTERS-LANE.COM.AU

REVISION/S:

DATE:BY:

1. Contours and proposed design levels are based on finished design levels and are subject to construction and Councilcertification and therefore should not be considered as final or as-built.

2. Location of utility services including but not limited to power, water, sewer, communications and gas are subject toconstruction and Supply Authority certification and therefore should not be considered as final or as-built.

3. Survey information such as boundary dimensions and areas, easements etc are subject to Final Survey. Purchasersshould refer to the Deposited Plan and 88B Instrument contained in the Contract for Sale of Land for further detailedinformation.

4. Bushfire and Geotechnical classification are provided for convenience. Purchasers should refer to referenced detailspecialist reports.

5. This Preliminary Site Analysis Plan has been collated from various sources of design information and is provided forconvenience to assist Purchasers in obtaining quotations/tenders for dwelling construction.

6. This document does not form part of the Contract of Sale of the Land.

PROPOSED DESIGN LEVELRL 20.5

(GA) - EASEMENT FOR DRAINAGE OF WATER 2.5 WIDE(GB) - RESTRICTION ON THE USE OF LAND (AIRCRAFT NOISE)(GC) - RESTRICTION ON THE USE OF LAND 0.7 WIDE(GD) - EASEMENT FOR DRAINAGE OF WATER 1.5 WIDE

Page 21: LOT 401, BAILEY AVENUE, RAYMOND TERRACE · lp t w w lp scale 1:300 @ a4 0 5 10 15 anticipated site classification - h1 class telstra /nbn pit power pole stop valve sewer manhole hydrant

S

S

S

S

S

S

P

P

N

B

N

N

B

N

N

B

N

P

P

P

P

P

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

P

P

P

N

B

N

N

B

N

N

B

N

P

P

P

P

P

P

P

P

P

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

P

P

P

P

P

P

N

B

N

P

P

P

P

P

P

P

P

P

P

P

P

P

P

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

N

B

N

W

W

W

W

W

W

W

W

W

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

GA

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

W

W

W

W

W

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

653.5 m²

421

25.565

(

G

A

)

S S

S

S

1

4

.

6

2

5

5

.6

5

5

3

1

.4

2

2

3

.

8

1

5

A

1

.

6

7

(GB)

B

A

I

L

E

Y

A

V

E

N

U

E

B

U

T

T

E

R

C

U

P

L

A

N

E

x

1

3

.

9

1

5

.

4

x

x

1

5

.

4

x

1

3

.

9

x

1

3

.

9

1

5

.

4

x

307

420

L

P

T

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

W

W

1

6

.0

SCALE 1:300 @ A40 105 15

Anticipated Site Classification - H1 Class

TELSTRA /NBN PITPOWER POLE

STOP VALVE

SEWER MANHOLE

HYDRANT

LIGHT POLELP

PP

KERB INLET PITSTORMWATER PIT

SEWER MAIN

WATER MAIN

RISING MAINTELSTRA /NBN

OVERHEAD POWER

UNDER GROUND POWERELECTRICAL SUBSTATION

STORMWATER PIPE

S

W

RS

NBN

OHP

P

HD20 STAGE 4 MARKETING r1

7TH DECEMBER 2019

HIGH DEFINITION DESIGN PTY LTD

PRELIMINARY SITE ANALYSIS PLAN

STAGE PLAN

LEGEND:DISCLAIMER/ NOTES:

ELECTRICITY PILLAR

STREET TREES

GAS GAS

MASTER PLAN

RETAINING WALL

LOT 421, BAILEY AVENUE, RAYMOND TERRACE

RESTRICTIONS ON USE OF LAND AFFECT THE LOT(to be confirmed at completion of construction)

AB VERTICAL "CHARCOAL"TIMBER LAPPED AND CAPPED FENCE

SEWER JUNCTION

POTTERS-LANE.COM.AU

REVISION/S:

DATE:BY:

1. Contours and proposed design levels are based on finished design levels and are subject to construction and Councilcertification and therefore should not be considered as final or as-built.

2. Location of utility services including but not limited to power, water, sewer, communications and gas are subject toconstruction and Supply Authority certification and therefore should not be considered as final or as-built.

3. Survey information such as boundary dimensions and areas, easements etc are subject to Final Survey. Purchasersshould refer to the Deposited Plan and 88B Instrument contained in the Contract for Sale of Land for further detailedinformation.

4. Bushfire and Geotechnical classification are provided for convenience. Purchasers should refer to referenced detailspecialist reports.

5. This Preliminary Site Analysis Plan has been collated from various sources of design information and is provided forconvenience to assist Purchasers in obtaining quotations/tenders for dwelling construction.

6. This document does not form part of the Contract of Sale of the Land.

PROPOSED DESIGN LEVELRL 20.5

(GA) - EASEMENT FOR DRAINAGE OF WATER 2.5 WIDE(GB) - RESTRICTION ON THE USE OF LAND (AIRCRAFT NOISE)(GC) - RESTRICTION ON THE USE OF LAND 0.7 WIDE(GD) - EASEMENT FOR DRAINAGE OF WATER 1.5 WIDE