E-rate Discounted Telecommunication and Network Projects Monthly Progress Report BFAT Committee September 2002 9-19-02 Los Angeles Unified School District Submitted by James Alther Director of Strategic Planning Information Technology Division ITD ITD

Transcript of Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14...

Page 1: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

E-rate Discounted Telecommunication and Network Projects Monthly Progress Report

BFAT CommitteeSeptember 2002

9-19-02

Los Angeles Unified School District

Submitted by James Alther

Director of Strategic Planning

Information Technology Division

ITDITD

Page 2: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

ProjectsInstall Telephone Equipment Pages 3 and 4Install Local Area Data Networks Page 5Install E-rate Funded LANs Pages 6 to 12Complete Full Network Integration Page 13

New Funding - Year 5 Page 14New Applications – Year 6 Page 15 and 16Attachments

Telephone System InstallationsSBC Cabinet Replacement SchedulesLAN Progress by Board Member and Site

2

Outline

Page 3: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

3

Project cost - $10.7 million with E-rate funding discounts covering $ 6. 9 million of the cost.

Vendor: Avaya

Project Start Date: July 31, 2002

Description of the Project:

Purchase and installation of new phone switches and phones in offices at 131 school sites.

Purchase and installation of Uninterruptible Power Supplies (UPS) to protect phone switches at 512 school sites from damage caused by power outages and surges.

Project – Install Telephone Equipment at 131 Schools

Page 4: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

4

40 schools received new phone switches and telephones phones as of September 9, 2002

91 schools scheduled to receive new phone switches and telephones.

Project – Install Telephone Equipment at 131 Schools

Page 5: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

Total Traditional

K-12 Schools

eligible for E-rate

Total LAN Contracts in

place or under

construction

Basic Connectivity to all classrooms

0% - In design 1-50% 51-75% 76%

Plus

662 604* 51* 9* 27* 117* 503

Construction Percentages

Progress to Date - All Local Area Networks: 9-9-02

* Includes BB Bond, Grant/Van Nuys E-rate, other LANs being installed using other funding sources, and E-rate years 2, 3, and 4. Some schools may have funding from more than one source and have E-rate funding for more than one year.

** Network is functioning, all sites have not have passed test and acceptance, and the vendors continue to correct deficiencies.

5

Project: Install Local Area Data Networks at all K-12 Schools.

Page 6: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

Vendor Total # of Schools

Project Closed

0% 1-25% 26-50% 51-75%

76% Plus

Network Complete*

Passed T & A

All Documents Submitted

IBM 126 0 0 0 0 0 126 126 126

SBCI 194 0 0 0 0 0 194 118 4

SBCII 101 0 7 19 19 12 44 44 6

Vector Yr3 29 0 0 0 0 0 29 29 29

Vector Yr4 37 0 1 2 4 2 28 28 0

Vector Yr4.5 26 26 0 0 0 0 0 0 0

Verizon Yr4.5 26 25 0 0 1 0 0 0 0

TOTAL 539 51 8 21 24 14 421 345 154

Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02

Construction Percentages

6* Deficiencies, that do not impact the network, need to be corrected

Project: Install Local Area Data Networks at Schools Receiving E-rate Discounts

Page 7: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

SBC estimates that all 194 schools will be completed and the contract closed by mid November. Current progress indicates that SBC is two weeks behind on their new schedules.

Cabinet Replacement

132 schools completed,

38 schools partially completed

24 schools remain to be completed

46 sites submitted for close out and SBC states are complete

All deficiencies cleared

All required documentation complete

SBC - Progress E-rate Year 2000 – 194 Sites

7

Page 8: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

Progress is improving. SBC states 63 school sites will be completed by 9/30/02. District staff

believes 63 will be functioning. However some sites will still have deficiencies and documentation to be submitted after 9/30/02.

44 of the 63 are tested and accepted. 13 of these have final documentation submitted.

Extension granted for the 38 sites that have Wareforce Inc. related deficiencies. SBC has committed to have as many as possible of these sites functioning by September 30. Legal issues will delay closing out these sites.

93 of the 101 sites have active construction.

SBC - E-rate Year 2000 Extended – 101 Sites

8

Page 9: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

District Project Management staff continue to:Request a more accurate scheduleWork to ensure Digital High School deadlines are metWork to complete as many schools as possible by September 30Meet almost daily with SBC to resolve issuesMeet weekly with SBC and Local District Facilities Directors and their

Project Managers.

Megan Klee, CIO, and District staff continue to meet with high level management from SBC weekly.

Extended SBC sites – District Actions

9

Page 10: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

Year 4 - 37 school sites, must be completed by 9/30/0237 schools under construction as of 8/5/02 28 schools fully functioning and tested and accepted

Year 4.5 - 44 school sites, must be completed by 9/30/03Ongoing site surveys at 26 sites with LAN installationClassroom switches installed at two sites, plan to install at remaining 16 sites by end of October.

Vector

10

Page 11: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

36 School Sites Funded, must be completed by 9/30/03Continue to prepare surveys for 25 sites Canoga Park High School 55% complete – Missed target date to

have a functioning network of 9/03/02Construction is to begin 9/16/02 at Mark Twain Middle School.Installed classroom switches at 8 sites.

Verizon

11

Page 12: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

Project Description: 342 schools to receive switches for classrooms with one data drop.

Progress:AMI provide all switches for all sites in their

contract. Finished all contract requirements as of August 30, 2002. Finished two contracts 13 months ahead of schedule.

For schools where SBC is completing LAN installation, SBC will install switches in all classrooms instead of media converters.

AMI – Progress E-rate Year 2001

12

Page 13: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

Project Description: 503 functioning sitesIntegrate all site networks and connect to the router and T1.Configure the router, switches, and servers.Install and configure the operating system that allows for end-to-end

interoperability.Connect all classrooms, instructional areas, labs, library, and offices the same

integrated network. Address all equipment.Install, connect, configure, and address classroom computers.

Progress: 119 school sites complete (see summary spreadsheet: End-to-End column)221 school sites have teams completing the above tasks 143 schools still need to be scheduled

Project: Fully Integrate LANs and Connect all Classroom Computers.

13

Page 14: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

E-rate Year 5 Funding

On Monday, September 9th , LAUSD received approximately $18 million in discounts for:

Basic telephone services for approximately 650 K-12 school sites.

T1 lines to 650 K-12 schools allowing physical connections to the Internet.

14

Page 15: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

E-rate Year 6 Potential Applications

As of Wednesday September 11th , the District released Requests for Information and Proposals for the following services:

LAN Installations and upgrades

LAN Maintenance and Configuration

Telephone Equipment Installation and Maintenance

Web Servers for Video Streaming

Email Accounts and Services15

Page 16: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

E-rate Year 6 Applications

In addition to the potential applications, the District will apply for the following services:

Basic Telephone

T1 Connectivity

Wide Area Network

Internet Service

16

Page 17: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

Telephone System Installations

Page 18: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

Telephone SystemsYear 3 E-Rate

9/13/20023:29 PM

Board MemberLocal Dist School Site PBX Status

Completion Date

G.Hudley-Hayes G 32nd St (THIRTY-SECOND ST. USC PERF) ScheduledJ. Huizar H ADAMS (JOHN) MIDDLE Scheduled

Andosal Elem 7/30/2002M. Lansing H ASCOT AVENUE ELEMENTARY ScheduledG.Hudley-Hayes G AUDUBON MIDDLE ScheduledM. Lansing K BANNEKER (BENJAMIN) SPECIAL ED ScheduledM. Lansing K BANNING (PHINEAS) SENIOR HIGH ScheduledM. Canter D BEETHOVEN STREET ELEMENTARY Scheduled 8/27/2002J. Huizar J BELL SENIOR HIGH ScheduledJ. Huizar F BELMONT SENIOR HIGH Scheduled 8/30/2002C. Young F BERENDO MIDDLE ScheduledJ. Korenstein C BIRMINGHAM SENIOR HIGH Scheduled 8/27/2002D. Tokofsky F BRAVO (FRANCISCO) MEDICAL MAGN ScheduledD. Tokofsky E BURBANK (LUTHER) MIDDLE ScheduledC. Young E BURROUGHS (JOHN) MIDDLE ScheduledD. Tokofsky B BYRD (RICHARD E.) MIDDLE ScheduledM. Canter A CANOGA PARK SENIOR HIGH Scheduled 8/26/2002M. Lansing K CARNEGIE (ANDREW) MIDDLE ScheduledM. Lansing K CARSON SENIOR HIGH ScheduledG.Hudley-Hayes H CARVER (GEORGE WASHINGTON) MID ScheduledM. Lansing K CATSKILL AVENUE ELEMENTARY ScheduledM. Canter A CHATSWORTH SENIOR HIGH Scheduled 8/26/2002M. Lansing G CLAY (HENRY) MIDDLE ScheduledJ. Korenstein C CLEVELAND (GROVER) HIGH ScheduledG.Hudley-Hayes G CRENSHAW SENIOR HIGH ScheduledM. Lansing K CURTISS (GLENN HAMMOND) MIDDLE ScheduledM. Lansing K DANA (RICHARD HENRY) MIDDLE ScheduledM. Lansing K DODSON M S ScheduledG.Hudley-Hayes G DORSEY (SUSAN MILLER) SENIOR H ScheduledJ. Huizar F DOWNTOWN BUSINESS HIGH ScheduledM. Lansing I DREW (CHARLES) MIDDLE ScheduledD. Tokofsky E EAGLE ROCK JUNIOR-SENIOR HIGH ScheduledM. Lansing I EDISON (THOMAS A.) MIDDLE ScheduledM. Canter A EL CAMINO REAL SENIOR HIGH Scheduled 8/26/2002D. Tokofsky F EL SERENO MIDDLE ScheduledJ. Huizar J ELIZABETH LEARNING CENTER K-12 ScheduledC. Young D FAIRFAX SENIOR HIGH Scheduled 8/27/2002G.Hudley-Hayes G FOSHAY LEARNING CENTER (K-12) ScheduledC. Young B FRANCIS (JOHN H.) POLYTECHNIC ScheduledD. Tokofsky E FRANKLIN (BENJAMIN) SENIOR HIG ScheduledG.Hudley-Hayes I FREMONT (JOHN C.) SENIOR HIGH ScheduledJ. Huizar J GAGE (HENRY T.) MIDDLE Scheduled 9/6/2002D. Tokofsky H GARFIELD (JAMES A.) SENIOR HIG ScheduledJ. Korenstein A GRANADA HILLS SENIOR HIGH ScheduledD. Tokofsky H GRIFFITH (DAVID WARK) MIDDLE ScheduledM. Canter D HAMILTON (ALEXANDER) SENIOR HI ScheduledG.Hudley-Hayes G HARTE (BRET) PREPATORY INTERME ScheduledJ. Korenstein A HENRY (PATRICK) MIDDLE ScheduledJ. Huizar H HOLLENBECK MIDDLE Scheduled 7/30/2002C. Young E HOLLYWOOD SENIOR HIGH Scheduled 9/6/2002J. Huizar J HUGHES (TERESA) ELEMENTARY ScheduledJ. Huizar J HUNTINGTON PARK SENIOR HIGH Scheduled

Independence Elem 7/30/2002

Page 19: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

Telephone SystemsYear 3 E-Rate

9/13/20023:29 PM

Board MemberLocal Dist School Site PBX Status

Completion Date

M. Lansing H JEFFERSON (THOMAS) S H ScheduledM. Lansing I JORDAN (DAVID STARR) SENIOR HI ScheduledJ. Korenstein A KENNEDY (JOHN F.) HIGH ScheduledM. Lansing I KING/DREW MEDICAL MAGNET HIGH ScheduledG.Hudley-Hayes H LA ACAD MS (JEFFERSON NEW M.S.) ScheduledJ. Huizar G LANTERMAN (FRANK D.) (TMR) ScheduledM. Canter A LAWRENCE (ERNEST) MIDDLE ScheduledC. Young E LE CONTE (JOSEPH) MIDDLE ScheduledJ. Korenstein C LEICHMAN (DIANE S.) SPECIAL ED Scheduled 8/26/2002D. Tokofsky F LINCOLN (ABRAHAM) SENIOR HIGH ScheduledM. Lansing I LOCKE (ALAIN LEROY) SENIOR HIG ScheduledJ. Korenstein C LOKRANTZ (SVEN) SPECIAL ED. CE ScheduledJ. Korenstein C LORNE STREET ELEMENTARY Scheduled 7/30/2002G.Hudley-Hayes D LOS ANGELES CENTER FOR ENRICHE Scheduled 8/27/2002C. Young E LOS ANGELES ELEMENTARY Scheduled 9/6/2002C. Young E LOS ANGELES SENIOR HIGH Scheduled 8/30/2002C. Young E LOS FELIZ ELEMENTARY ScheduledJ. Korenstein C LULL (FRED E.) SPECIAL ED. CEN Scheduled 7/30/2002J. Korenstein B MACLAY (CHARLES) MIDDLE ScheduledG.Hudley-Hayes G MANUAL ARTS SENIOR HIGH Scheduled 9/6/2002M. Canter D MAR VISTA ELEMENTARY Scheduled 7/30/2002M. Canter D MARK TWAIN MIDDLE Scheduled 8/27/2002M. Lansing I MARKHAM (EDWIN) MIDDLE ScheduledC. Young E MARSHALL (JOHN) SENIOR HIGH Scheduled 9/6/2002C. Young E MAYBERRY STREET ELEMENTARY ScheduledG.Hudley-Hayes D MCBRIDE (JAMES J.) SPECIAL ED. ScheduledJ. Korenstein C MILLER (JOAQUIN) SH SP ED ScheduledJ. Korenstein A MONROE (JAMES) HIGH ScheduledD. Tokofsky B MONTARA AVENUE ELEMENTARY ScheduledD. Tokofsky E MONTE VISTA STREET ELEMENTARY Scheduled 7/30/2002J. Korenstein B MOUNT GLEASON MIDDLE Scheduled 8/27/2002G.Hudley-Hayes E MOUNT VERNON MIDDLE ScheduledG.Hudley-Hayes G MUIR (JOHN) MIDDLE ScheduledJ. Korenstein C MULHOLLAND (WILLIAM) MIDDLE ScheduledM. Lansing K NARBONNE (NATHANIEL) SENIOR HI ScheduledJ. Huizar J NIMITZ (CHESTER W.) MIDDLE ScheduledM. Canter A NOBEL (ALFRED BERNHARD) MIDDLE ScheduledC. Young B NORTH HOLLYWOOD SENIOR HIGH Scheduled 8/26/2002J. Korenstein B OLIVE VISTA MIDDLE ScheduledJ. Huizar J PACIFIC BOULEVARD SPECIAL ED. Scheduled 7/30/2002M. Canter D PALISADES CHARTER SH ScheduledJ. Huizar J PARK AVENUE ELEMENTARY ScheduledD. Tokofsky H PEREZ (ALPHONSO B.) SPECIAL ED Scheduled

Polytechnic High Scheduled 8/26/2002J. Korenstein A PORTER (GEORGE K.) MIDDLE ScheduledJ. Korenstein C RESEDA ELEMENTARY ScheduledJ. Korenstein C RESEDA SENIOR HIGH ScheduledM. Canter D REVERE MIDDLE ScheduledD. Tokofsky H ROOSEVELT (THEODORE) S H Scheduled 8/30/2002G.Hudley-Hayes G SALVIN (SOPHIA T.) SPECIAL ED. ScheduledJ. Huizar J SAN ANTONIO ELEMENTARY ScheduledD. Tokofsky B SAN FERNANDO MIDDLE ScheduledD. Tokofsky B SAN FERNANDO SENIOR HIGH Scheduled 8/27/2002

Page 20: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

Telephone SystemsYear 3 E-Rate

9/13/20023:29 PM

Board MemberLocal Dist School Site PBX Status

Completion Date

J. Huizar J SAN MIGUEL ELEMENTARY Scheduled 7/30/2002M. Lansing K SAN PEDRO SENIOR HIGH ScheduledC. Young E SELMA AVENUE ELEMENTARY Scheduled 7/30/2002J. Korenstein A SEPULVEDA (FRANCISCO) MIDDLE Scheduled 8/27/2002M. Canter C SERRANIA AVENUE ELEMENTARY ScheduledJ. Korenstein C SHERMAN OAKS CTR. FOR ENRICHED Scheduled 7/30/2002J. Huizar J SOUTH GATE MIDDLE ScheduledJ. Huizar J SOUTH GATE SENIOR HIGH Scheduled 8/30/2002D. Tokofsky B SYLMAR SENIOR HIGH ScheduledM. Canter C TAFT (WILLIAM HOWARD) SENIOR H ScheduledM. Canter D TOPANGA ELEMENTARY ScheduledJ. Korenstein A TULSA STREET ELEMENTARY ScheduledJ. Huizar J TWEEDY ELEMENTARY ScheduledM. Canter D UNIVERSITY SENIOR HIGH ScheduledJ. Korenstein C VALERIO NEW PRIMARY CENTER Scheduled 7/30/2002J. Korenstein A VAN GOGH STREET ELEMENTARY Scheduled 7/30/2002M. Canter D VENICE SENIOR HIGH ScheduledJ. Korenstein B VERDUGO HILLS SENIOR HIGH Scheduled 8/26/2002G.Hudley-Hayes G VERMONT AVENUE ELEMENTARY Scheduled 7/30/2002J. Huizar J WALNUT PARK ELEMENTARY ScheduledM. Lansing G WASHINGTON (GEORGE) PREP HS ScheduledM. Canter D WESTCHESTER SENIOR HIGH ScheduledM. Lansing K WILLENBERG (ERNEST P.) SPECIAL ScheduledD. Tokofsky F WILSON (WOODROW) SENIOR HIGH Scheduled

Page 21: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

SBC Cabinet Replacements

Page 22: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

Total Ortronics Cabinets Replaced 9/9/2002

Cabinet Type Remaining Completion Percent School Name 24" 39" Total Cabinets Date Complete Status 2nd St Es 2 0 2 3 40.00% Adams (John) Ms 2 5 7 1 87.50% Belvedere Ms 3 4 7 1 87.50% Buchanan St Es 1 1 2 1 66.67% Budlong Ave Es 3 3 6 0 100.00% Working misc issues Burbank Ms 3 0 3 0 100.00% Working misc issues Castelar St Es 2 1 3 0 100.00% Working misc issues Eastman Ave Es 2 4 6 3 66.67% El Sereno Es 1 1 2 2 50.00% El Sereno Ms 7 1 8 0 100.00% Working misc issues Farmdale Es 2 2 4 1 80.00% Garfield Hs 1 3 4 1 80.00% Hoover St Es 2 0 2 0 100.00% Working misc issues Humphreys Ave Es 9 1 10 0 100.00% Working misc issues Lane Es 1 1 2 0 100.00% Working misc issues Logan St Es 5 3 8 0 100.00% Working misc issues Marshall Hs 1 0 1 2 33.33% Mayberry St Es 2 2 4 1 80.00% Muir Ms 1 0 1 2 33.33% Murchison St Es 1 0 1 1 50.00% Nightingale Ms 4 1 5 0 100.00% Working misc issues Ramona Opp Hs 2 1 3 2 60.00% Rosemont Ave Es 6 4 10 0 100.00% Working misc issues San Antonio Es 2 1 3 0 100.00% Working misc issues San Miguel Es 2 0 2 0 100.00% Working misc issues Sierra Park Es 1 0 1 1 50.00% South Gate Hs 2 0 2 0 100.00% Working misc issues South Gate Ms 6 0 6 1 85.71% South Shores Mag 2 0 2 0 100.00% Working misc issues Stanford Ave Es 2 0 2 0 100.00% Working misc issues State St Es 4 1 5 2 71.43% Trinity St Es 5 0 5 2 71.43% Utah St Es 6 0 6 0 100.00% Working misc issues Wadsworth Ave Es 5 0 5 3 62.50% Walnut Park Es 1 0 1 0 100.00% Working misc issues Weemes Es 2 3 5 0 100.00% Working misc issues Wilson Hs/Carlson Home Hosp 4 0 4 0 100.00% Working misc issues Yorkdale Es 2 2 4 0 100.00% Working misc issues Jordan HS - Phase 2 School 1 2 3 0 3/28/2002 100.00% Completed Aldama Es 2 2 4 0 4/9/2002 100.00% Completed Atwater Es 7 1 8 0 4/18/2002 100.00% Completed Hamasaki Es 2 2 4 0 4/18/2002 100.00% Completed 1st St Es 2 2 4 0 4/23/2002 100.00% Completed

Page 1 of 4

Page 23: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

Cabinet Type Remaining Completion Percent School Name 24" 39" Total Cabinets Date Complete Status 28th St Es 4 3 7 0 4/25/2002 100.00% Completed Bellagio Es 2 3 5 0 4/25/2002 100.00% Completed Commonwealth Ave Es 2 3 5 0 4/25/2002 100.00% Completed Nevin Ave Es 1 2 3 0 4/26/2002 100.00% Completed San Gabriel Ave Es 2 0 2 0 4/27/2002 100.00% Completed Arroyo Seco Alt 2 3 5 0 4/30/2002 100.00% Completed Emerson Ms 2 3 5 0 5/1/2002 100.00% Completed Loreto St Es 2 0 2 0 5/2/2002 100.00% Completed 49th St Es 1 3 4 0 5/3/2002 100.00% Completed Lincoln Hs 8 3 11 0 5/3/2002 100.00% Completed Pueblo De La Cont 2 0 2 0 5/3/2002 100.00% Completed Alexandria Ave Es 2 0 2 0 5/4/2002 100.00% Completed Hughes Es 4 3 7 0 5/4/2002 100.00% Completed 52nd Street Es 2 4 6 0 5/6/2002 100.00% Completed Gates St Es 2 2 4 0 5/6/2002 100.00% Completed Allesandro Es 2 0 2 0 5/7/2002 100.00% Completed Nueva Vista Es 2 1 3 0 5/7/2002 100.00% Completed Aragon Ave Es 2 2 4 0 5/8/2002 100.00% Completed Belmont Hs 4 1 5 0 5/8/2002 100.00% Completed Belmont Newcomer Ctr 2 0 2 0 5/8/2002 100.00% Completed Annandale Es 1 2 3 0 5/9/2002 100.00% Completed Victoria Ave Es 2 1 3 0 5/10/2002 100.00% Completed 9th Street Es 1 1 2 0 5/11/2002 100.00% Completed Albion Street Es 2 1 3 0 5/11/2002 100.00% Completed Fishburn Ave Es 2 2 4 0 5/15/2002 100.00% Completed Ann Street Es 2 0 2 0 5/30/2002 100.00% Completed Brooklyn Ave Es 2 3 5 0 6/3/2002 100.00% Completed Dorris Place Es 2 1 3 0 6/3/2002 100.00% Completed Johnson Opportunity HS 5 0 5 0 6/3/2002 100.00% Completed 20th St Es 2 0 2 0 6/4/2002 100.00% Completed Florence Ave Es 5 2 7 0 6/4/2002 100.00% Completed Belvedere Es 8 2 10 0 6/6/2002 100.00% Completed Dahlia Heights Es 2 2 4 0 6/6/2002 100.00% Completed Franklin Ave Es 1 0 1 0 6/10/2002 100.00% Completed Miles Ave Es 2 7 9 0 6/10/2002 100.00% Completed Breed St Es 3 0 3 0 6/11/2002 100.00% Completed Gage Ms 3 0 3 0 6/11/2002 100.00% Completed Los Feliz Es 0 3 3 0 6/12/2002 100.00% Completed Dena Es 2 4 6 0 6/14/2002 100.00% Completed Eagle Rock Es 5 1 6 0 6/17/2002 100.00% Completed Fletcher Dr Es 0 1 1 0 6/17/2002 100.00% Completed Foshay Learning Ctr 2 5 7 0 6/17/2002 100.00% Completed Martin Luther King ES 2 0 2 0 6/17/2002 100.00% Completed Clifford St Es 4 1 5 0 6/18/2002 100.00% Completed Roosevelt Hs/Boyle Hts 2 0 2 0 6/18/2002 100.00% Completed Vernon City Es 2 0 2 0 6/19/2002 100.00% Completed

Page 2 of 4

Page 24: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

Cabinet Type Remaining Completion Percent School Name 24" 39" Total Cabinets Date Complete Status Glen Alta Es 1 1 2 0 6/20/2002 100.00% Completed Ascot Ave Es 1 0 1 0 6/21/2002 100.00% Completed Los Angeles Es 3 0 3 0 6/21/2002 100.00% Completed 32nd St/Usc Mag 2 0 2 0 6/24/2002 100.00% Completed Bryson Avenue Es 2 0 2 0 6/24/2002 100.00% Completed Bushnell Way Es 1 0 1 0 6/25/2002 100.00% Completed Downtown Bus High 3 0 3 0 6/25/2002 100.00% Completed Rowan Ave Es 3 0 3 0 6/25/2002 100.00% Completed Esperanza Es 2 0 2 0 6/26/2002 100.00% Completed Loma Vista Ave Es 2 0 2 0 6/26/2002 100.00% Completed Delevan Dr Es 3 1 4 0 6/28/2002 100.00% Completed Huntington Park HS 1 0 1 0 6/28/2002 100.00% Completed Menlo Ave Es 6 0 6 0 6/28/2002 100.00% Completed Pacific Blvd Special Ed 6 2 8 0 6/28/2002 100.00% Completed Hollenbeck Ms 5 0 5 0 6/29/2002 100.00% Completed Garvanza Es 1 3 4 0 7/1/2002 100.00% Completed Griffin Ave Es 3 2 5 0 7/2/2002 100.00% Completed Elizabeth Learning Ctr 5 1 6 0 7/3/2002 100.00% Completed Hillside Es 2 2 4 0 7/3/2002 100.00% Completed Huntington Dr Es 2 4 6 0 7/3/2002 100.00% Completed Nimitz Ms 4 1 5 0 7/3/2002 100.00% Completed Odyssey Cont 2 0 2 0 7/8/2002 100.00% Completed 4th St Es 0 1 1 0 7/9/2002 100.00% Completed Franklin Hs 3 0 3 0 7/9/2002 100.00% Completed Lanterman Special Ed 5 4 9 0 7/11/2002 100.00% Completed Latona Ave Es 1 0 1 0 7/11/2002 100.00% Completed Park Ave Es 2 1 3 0 7/11/2002 100.00% Completed Salvin Special Ed 3 3 6 0 7/11/2002 100.00% Completed Independence Es 1 1 2 0 7/12/2002 100.00% Completed Plasencia Es 1 0 1 0 7/12/2002 100.00% Completed West Vernon Ave Es 6 2 8 0 7/13/2002 100.00% Completed Irving Ms 3 1 4 0 7/15/2002 100.00% Completed Ford Blvd Es 2 0 2 0 7/16/2002 100.00% Completed Sheridan St Es 5 0 5 0 7/16/2002 100.00% Completed Dayton Heights Es 2 0 2 0 7/17/2002 100.00% Completed Soto St Es 1 1 2 0 7/17/2002 100.00% Completed Glassell Park Es 1 0 1 0 7/18/2002 100.00% Completed Sierra Vista Es 1 1 2 0 7/19/2002 100.00% Completed Politi Es 2 1 3 0 7/20/2002 100.00% Completed Bright Es 2 0 2 0 7/24/2002 100.00% Completed Gratts Es 2 2 4 0 7/24/2002 100.00% Completed Carver Ms 4 3 7 0 7/25/2002 100.00% Completed Malabar St Es 2 0 2 0 7/25/2002 100.00% Completed Tweedy Es 2 0 2 0 7/25/2002 100.00% Completed Harrison St Es 3 1 4 0 7/26/2002 100.00% Completed Ivanhoe Es 2 2 4 0 7/26/2002 100.00% Completed

Page 3 of 4

Page 25: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

Cabinet Type Remaining Completion Percent School Name 24" 39" Total Cabinets Date Complete Status Lockwood Ave Es 0 2 2 0 7/26/2002 100.00% Completed Multnomah St Es 3 0 3 0 7/26/2002 100.00% Completed 10th St Es 1 1 2 0 7/29/2002 100.00% Completed Hooper Ave Es 1 0 1 0 7/29/2002 100.00% Completed Glenfeliz Blvd Es 2 2 4 0 7/30/2002 100.00% Completed Mt Washington Es 3 0 3 0 7/30/2002 100.00% Completed Hobart Blvd Es 2 0 2 0 7/31/2002 100.00% Completed Jefferson Hs 2 0 2 0 7/31/2002 100.00% Completed Micheltorena St Es 4 1 5 0 7/31/2002 100.00% Completed Stevenson Ms 2 0 2 0 7/31/2002 100.00% Completed Main St Es 3 0 3 0 8/2/2002 100.00% Completed Manual Arts Hs 1 0 1 0 8/2/2002 100.00% Completed Bridge St Es 1 0 1 0 8/5/2002 100.00% Completed Solano Ave Es 1 0 1 0 8/5/2002 100.00% Completed San Pedro St Es 2 1 3 0 8/6/2002 100.00% Completed Berendo Ms 2 0 2 0 8/8/2002 100.00% Completed Cahuenga Es 2 0 2 0 8/9/2002 100.00% Completed Perez Special Ed 4 0 4 0 8/9/2002 100.00% Completed Toland Way Es 2 1 3 0 8/9/2002 100.00% Completed Liberty Blvd Es 2 0 2 0 8/13/2002 100.00% Completed Monte Vista St Es 2 0 2 0 8/14/2002 100.00% Completed Virgil Ms 3 0 3 0 8/14/2002 100.00% Completed Evergreen Ave Es 6 1 7 0 8/15/2002 100.00% Completed Frost Ms 3 5 8 0 8/15/2002 100.00% Completed Marianna Ave Es 4 0 4 0 8/15/2002 100.00% Completed Kennedy Es 0 1 1 0 8/16/2002 100.00% Completed Norwood St Es 2 0 2 0 8/16/2002 100.00% Completed Thomas Starr King MS 6 3 9 0 8/16/2002 100.00% Completed San Pascual Es 1 0 1 0 8/19/2002 100.00% Completed Magnolia Ave Es 2 0 2 0 8/20/2002 100.00% Completed Vermont Ave Es 2 2 4 0 8/22/2002 100.00% Completed Euclid Ave Es 2 0 2 0 8/28/2002 100.00% Completed Bravo Medical Magnet 4 0 4 0 8/30/2002 100.00% Completed Corona Ave Es 5 2 7 0 9/6/2002 100.00% Completed Griffith Ms 3 4 7 0 9/6/2002 100.00% Completed Total Completed Cabinets 438 196 634

Total Schools worked 170 Completed Schools 132 Partially completed Schools 18 Cabinets complete, school not complete 20

Page 4 of 4

Page 26: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

School Site Local Area Network Status

The attached spreadsheet provides the following information:

Local District, Board Member, School Site

Status of the Network as of September 9, 2002

Internet Access

Yes means connectivity to all classrooms

No means no contract in place to network all classrooms. However, the school has Internet connectivity to some locations.

Progress means contract in place to network classrooms, limited Internet access in some locations.

Complete end to end – meets all requirements outline on slide 12.

Stu/Comp Ratio – Student to computer ratio – District goal 6 to 1

Date District tested and accepted the network as meeting contract requirements

Y4 Clrm Switch indicates date school received additional switch to allow for more than one computer in a classroom to be connected to the Internet.

Page 27: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

J. Alther (213) 241 1800 LAN Status 9/13/20023:51 PM

Local Dist

Board Member School Site LAN Status as September 9, 2002

Internet Access

All Rooms

Student/ Computer

Ratio

Date BB LAN

Tested Accepted

Complete End to

End (Magic)

Date Erate LAN

Tested & Accepted

Y4 Classroom

Switch Install

Erate Vendor Y3/Y4

E C. Young 3rd St (THIRD STREET ELEM) Y3 E-rate functioning - passed T & A yes 6.95 8/8/02 8/8/2002 SBC3.5E C. Young ALLESANDRO ELEMENTARY BB S & T 99% complete: add Y3 functioning yes 3.85 7/18/02 7/16/2002 SBC3D C. Young BANCROFT (HUBERT HOWE) MIDDLE Y3 E-rate functioning - passed T & A yes 15.77 8/26/02 8/26/2002 SBC3.5F C. Young BERENDO MIDDLE Y3 E-rate functioning - needs T & A yes 3.49 6/24/2002 SBC3E C. Young BLEND (FRANCES) SPECIAL ED. CE Y3 E-rate - 24% complete progress 42.00 SBC3.5B C. Young BURBANK BOULEVARD ELEM BB S & T and Y3 E-rate complete yes 5.16 1/9/2001 7/14/2002 12/21/01 5/6/2002 IBM3E C. Young BURROUGHS (JOHN) MIDDLE Y3 E-rate - 70% complete progress 12.69 SBC3.5F C. Young CAHUENGA ELEMENTARY Y3 E-rate functioning - needs T & A yes 7.94 6/24/2002 SBC3B C. Young CARLSON (BERENECE) HOME HOSPIT Y3 E-rate functioning - passed T & A (see Wilson) yes 10.63 8/12/2002 NoneE C. Young CHEREMOYA AVENUE ELEMENTARY Y3 E-rate - 30% complete progress 4.35 SBC3.5E C. Young CLIFFORD STREET ELEMENTARY Y3 E-rate functioning - passed T & A yes 7.00 7/16/2002 11/09/01 7/16/2002 SBC3C C. Young COLDWATER CANYON AVE ELem Grant/Van Nuys E-rate Y2 complete yes 5.25 9/28/2001 5/27/2002 VZN4.5B C. Young COLFAX AVENUE ELEMENTARY Y3 E-rate complete yes 5.94 02/01/02 5/22/2002 IBM3B C. Young EARHART (AMELIA) CONTINUATION Y3 E-rate complete yes 8.08 5/22/2002 07/11/01 5/3/2002 IBM3C C. Young ERWIN STREET ELEMENTARY Grant/Van Nuys E-rate Y2 complete yes 21.70 3/11/2002 09/28/01 Intertel2B C. Young FAIR AVENUE ELEMENTARY BB S & T and Y3 E-rate complete yes 6.01 5/8/2001 6/17/2002 10/4/01 5/21/2002 IBM3D C. Young FAIRFAX SENIOR HIGH Y3 E-rate - 92% complete progress 6.17 SBC3.5B C. Young FENTON CHARTER BB S & T complete yes 2.06 6/30/2000 NoneB C. Young FRANCIS (JOHN H.) POLYTECHNIC Y3 E-rate complete yes 2.70 03/08/02 5/17/2002 IBM3E C. Young FRANKLIN AVENUE ELEMENTARY BB S & T, Y2 E-rate 99% complete: Y3 E-rate complete yes 12.61 1/14/02 7/12/2002 SBC3E C. Young GARDNER STREET ELEMENTARY BB S & T and E-rate functioning - passed T & A yes 6.67 4/3/2000 7/5/02 7/5/2002 SBC3.5C C. Young GRANT (ULYSSES S.) SENIOR HIGH BB S & T and G/VNs Y2 E-rate complete yes 4.07 6/18/2002 11/01/01 Intertel2E C. Young GRANT ELEMENTARY Y3 E-rate - 75% complete progress 8.64 SBC3.5D C. Young HANCOCK PARK ELEMENTARY Y3 E-rate functioning - passed T & A yes 22.39 9/4/02 9/4/2002 SBC3.5E C. Young HOBART BOULEVARD ELEMENTARY BB S & T and Y2 E-rate 98%: Y3 E-rate complete yes 5.94 11/5/01 SBC3E C. Young HOLLYWOOD SENIOR HIGH Y3 E-rate - 95% complete - E-rate functioning yes 1.98 7/9/2002 SBC3.5F C. Young HOOVER STREET ELEMENTARY Y3 E-rate functioning - passed T & A yes 5.43 01/25/02 6/24/2002 SBC3E C. Young IVANHOE ELEMENTARY Y3 E-rate functioning - passed T & A yes 13.62 12/18/01 7/12/2002 SBC3C C. Young Kindergarden Learning Acad (Van Nuys PRI) completed in 1998 - backbone copper Y4 E-rate upgrade yes 0.00 12/1/1998 VZN4.5E C. Young KING (THOMAS STARR) MIDDLE Y3 E-rate functioning - needs T & A yes 5.67 7/12/2002 SBC3C C. Young KITTRIDGE STREET ELEMENTARY BB S & T and G/VNs Y2 E-rate - complete yes 3.44 VZN4.5B C. Young LANKERSHIM ELEMENTARY Y3 E-rate complete yes 7.07 5/16/2002 02/28/02 IBM3D C. Young LAUREL ELEMENTARY Y3 E-rate functioning - passed T & A yes 4.93 7/28/02 7/28/2002 SBC3.5E C. Young LE CONTE (JOSEPH) MIDDLE Y3 E-rate - 41% complete progress 5.31 SBC3.5B C. Young LEWIS (ROBERT H.) CONTINUATION Y3 E-rate complete yes 1.95 03/01/02 IBM3F C. Young LOGAN STREET ELEMENTARY Y3 E-rate functioning - needs T & A yes 11.62 SBC3C C. Young LONDON (JACK) CONTINUATION BB S & T and G/VNs Y2 E-rate - complete yes 3.14 6/18/2002 6/19/2002 10/24/01 Intertel2E C. Young LOS ANGELES ELEMENTARY Y3 E-rate functioning - needs T & A yes 9.32 8/5/2002 SBC3E C. Young LOS ANGELES SENIOR HIGH BB S & T and E-rate functioning - passed T & A yes 2.76 1/17/2001 02/15/02 SBC3.5E C. Young LOS FELIZ ELEMENTARY Y3 E-rate functioning - passed T & A yes 11.15 7/15/2002 6/17/02 7/9/2002 SBC3B C. Young LOWMAN (CHARLES LEROY) SPECIAL Grant/Van Nuys E-rate Y2 complete yes 5.14 07/24/01 Intertel2C C. Young MADISON (JAMES) MIDDLE Grant/Van Nuys E-rate Y2 complete yes 4.24 8/28/2002 10/19/01 Intertel2E C. Young MARSHALL (JOHN) SENIOR HIGH BB S & T complete: add Y3 functioning - need T&A and punchlist items completed yes 2.48 3/27/2001 6/12/2002 7/12/2002 SBC3E C. Young MAYBERRY STREET ELEMENTARY Y3 E-rate functioning - passed T & A yes 12.19 05/17/01 8/9/2002 SBC3D C. Young MELROSE AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 3.33 7/26/02 7/26/2002 SBC3.5E C. Young MICHELTORENA STREET ELEMENTARY Y3 E-rate functioning - passed T & A yes 6.83 12/18/01 7/12/2002 SBC3C C. Young MONLUX (JOHN B.) ELEMENTARY Grant/Van Nuys E-rate Y2 complete yes 13.88 8/27/2002 08/22/01 Intertel2B C. Young NORTH HOLLYWOOD SENIOR HIGH Y3 E-rate complete yes 2.59 07/11/01 5/6/2002 IBM3F C. Young POLITI (LEO) ELEMENTARY Y3 E-rate functioning - needs T & A yes 5.05 8/16/2002 6/24/2002 SBC3E C. Young RAMONA ELEMENTARY Y3 E-rate 52% complete progress 8.83 SBC3.5

Page 28: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

J. Alther (213) 241 1800 LAN Status 9/13/20023:51 PM

Local Dist

Board Member School Site LAN Status as September 9, 2002

Internet Access

All Rooms

Student/ Computer

Ratio

Date BB LAN

Tested Accepted

Complete End to

End (Magic)

Date Erate LAN

Tested & Accepted

Y4 Classroom

Switch Install

Erate Vendor Y3/Y4

B C. Young REED (WALTER) MIDDLE BB S & T, Y2 E-rate and: Y3 E-rate complete yes 7.47 12/21/01 5/23/2002 IBM3B C. Young RIO VISTA ELEMENTARY Y3 E-rate complete yes 5.09 03/27/02 5/22/2002 IBM3D C. Young ROSEWOOD AVENUE ELEMENTARY BB S & T and E-rate functioning - passed T & A yes 3.09 5/27/1999 7/22/02 7/22/2002 SBC3.5E C. Young SANTA MONICA BOULEVARD ELEM Y3 E-rate - 56% complete progress 4.40 SBC3.5B C. Young SATICOY ELEMENTARY Grant/Van Nuys E-rate Y2 complete yes 6.31 5/22/2002 08/22/01 Intertel2E C. Young SELMA AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 10.63 8/15/02 8/15/2002 SBC3.5B C. Young STRATHERN STREET ELEMENTARY Y3 E-rate complete yes 6.04 02/13/02 5/20/2002 IBM3E C. Young VALLEY VIEW ELEMENTARY Y3 E-rate functioning - passed T & A yes 6.75 8/28/2002 7/29/02 7/29/2002 SBC3.5D C. Young VAN NESS AVENUE ELEMENTARY Y3 E-rate - 46% complete progress 3.60 SBC3.5B C. Young VICTORY BOULEVARD ELEMENTARY Y3 E-rate complete yes 4.37 03/12/02 5/21/2002 IBM3D C. Young VINE STREET ELEMENTARY BB S & T and E-rate functioning - passed T & A yes 4.81 4/4/2000 7/02/02 7/2/2002 SBC3.5D C. Young WEST HOLLYWOOD ELEMENTARY Y3 E-rate functioning - passed T & A yes 2.83 9/3/02 9/3/2002 SBC3.5D C. Young WEST HOLLYWOOD OPPORTUNITY Y3 E-rate - 49% complete progress 0.00 SBC3.5D C. Young WHITMAN CONTINUATION HS Y3 E-rate - 90% complete progress 6.93 SBC3.5E C. Young WILTON PLACE ELEMENTARY Y3 E-rate - 32% complete progress 5.90 SBC3.5D C. Young WONDERLAND AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 7.26 7/29/02 7/29/2002 SBC3.5H D. Tokofsky 1STt ST (FIRST STREET ELEMENTARY) Y3 E-rate functioning - passed T & A yes 6.69 7/10/2002 05/03/01 6/10/2002 SBC3H D. Tokofsky 4th ST (FOURTH ST ELEM) Y3 E-rate functioning - passed T & A yes 7.60 7/16/2002 11/05/01 6/17/2002 SBC3F D. Tokofsky ALBION STREET ELEMENTARY Y3 E-rate functioning - passed T & A yes 4.83 4/2/2002 05/21/01 6/28/2002 SBC3E D. Tokofsky ALDAMA ELEMENTARY Y3 E-rate functioning - passed T & A yes 5.03 5/1/2002 06/12/01 SBC3E D. Tokofsky ANNANDALE ELEMENTARY Y3 E-rate functioning - passed T & A yes 7.25 7/21/01 7/23/2002 SBC3E D. Tokofsky ARAGON AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 5.06 2/18/2002 5/18/01 8/6/2002 SBC3B D. Tokofsky ARMINTA STREET ELEMENTARY Y3 E-rate complete yes 4.38 02/07/02 5/20/2002 IBM3E D. Tokofsky ARROYO SECO ALTERNATIVE Y3 E-rate functioning - passed T & A yes 3.54 5/21/2002 04/30/01 7/23/2002 SBC3E D. Tokofsky ATWATER AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 4.84 1/30/2002 05/17/01 7/16/2002 SBC3B D. Tokofsky BEACHY AVENUE ELEMENTARY BB S & T, Y2 E-rate 94%: Y3 E-rate complete yes 3.84 12/12/01 IBM3H D. Tokofsky BELVEDERE ELEMENTARY Y3 E-rate functioning - needs T & A yes 3.56 6/13/2002 SBC3H D. Tokofsky BELVEDERE MIDDLE Y3 E-rate functioning - needs T & A yes 6.26 6/10/2002 SBC3H D. Tokofsky BOYLE HEIGHTS CONT (Roosevelt) BB S & T complete: add Y3 passed T & A yes 4.63 7/18/2001 2/26/02 6/10/2002 SBC3F D. Tokofsky BRAVO (FRANCISCO) MEDICAL MAGN Y3 E-rate functioning - needs T & A yes 4.14 8/6/2002 SBC3B D. Tokofsky BROADOUS (HILLERY T.) ELEMENTA Y3 E-rate complete yes 3.98 03/19/02 5/10/2002 IBM3H D. Tokofsky BROOKLYN AVENUE ELEM Y3 E-rate functioning - passed T & A yes 7.03 7/23/02 6/13/2002 SBC3E D. Tokofsky BUCHANAN STREET ELEM Y3 E-rate functioning - passed T & A yes 4.51 11/05/01 7/23/2002 SBC3E D. Tokofsky BURBANK (LUTHER) MIDDLE Y3 E-rate functioning - needs T & A yes 8.03 7/18/2002 SBC3E D. Tokofsky BUSHNELL WAY ELEMENTARY BB S & T, Y2 E-rate 94% complete: Y3 E-rate complete yes 5.52 1/29/02 7/23/2002 SBC3B D. Tokofsky BYRD (RICHARD E.) MIDDLE Y3 E-rate complete yes 2.06 1/23/02 5/15/2002 IBM3E D. Tokofsky CALIFORNIA ACADEMY FOR LIBERAL need to go to bid no 3.00 NoneB D. Tokofsky CAMELLIA AVENUE ELEMENTARY Y3 E-rate complete yes 4.56 01/31/02 5/21/2002 IBM3F D. Tokofsky CITY TERRACE ELEMENTARY Y3 E-rate functioning - passed T & A yes 7.34 06/21/01 8/6/2002 SBC3E D. Tokofsky DAHLIA HEIGHTS ELEMENTARY Y3 E-rate functioning - passed T & A yes 13.41 8/1/2002 05/20/01 7/23/2002 SBC3E D. Tokofsky DELEVAN DRIVE ELEMENTARY Y3 E-rate functioning - passed T & A yes 9.98 9/14/01 7/23/2002 SBC3B D. Tokofsky DYER STREET ELEMENTARY Y3 E-rate complete yes 4.41 02/25/02 4/25/2002 IBM3E D. Tokofsky EAGLE ROCK ELEMENTARY Y3 E-rate functioning - passed T & A yes 10.52 8/27/2002 12/18/01 7/16/2002 SBC3E D. Tokofsky EAGLE ROCK JUNIOR-SENIOR HIGH BB S & T and Y2 E-rate complete: Y3 passed T&A yes 5.20 4/18/2000 8/21/2002 SBC3H D. Tokofsky EASTMAN AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 6.81 01/10/02 6/19/2002 SBC3B D. Tokofsky EL DORADO AVENUE ELEMENTARY Y3 E-rate complete yes 4.91 01/24/02 5/3/2002 IBM3F D. Tokofsky EL SERENO ELEMENTARY Y3 E-rate functioning - passed T & A yes 5.16 11/05/01 7/3/2002 SBC3F D. Tokofsky EL SERENO MIDDLE Y3 E-rate functioning - needs T & A yes 6.25 7/3/2002 SBC3H D. Tokofsky EVERGREEN AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 8.45 8/20/2002 12/18/01 6/10/2002 SBC3B D. Tokofsky EVERGREEN CONTINUATION Y3 E-rate complete yes 3.75 08/06/01 4/25/2002 IBM3

Page 29: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

J. Alther (213) 241 1800 LAN Status 9/13/20023:51 PM

Local Dist

Board Member School Site LAN Status as September 9, 2002

Internet Access

All Rooms

Student/ Computer

Ratio

Date BB LAN

Tested Accepted

Complete End to

End (Magic)

Date Erate LAN

Tested & Accepted

Y4 Classroom

Switch Install

Erate Vendor Y3/Y4

F D. Tokofsky FARMDALE ELEMENTARY Y3 E-rate functioning - passed T & A yes 6.83 12/18/01 7/3/2002 SBC3B D. Tokofsky FERNANGELES ELEMENTARY BB S & T and Y3 E-rate complete yes 3.60 11/2/2001 1/22/02 4/29/2002 IBM3E D. Tokofsky FLETCHER DRIVE ELEMENTARY Y3 E-rate functioning - passed T & A yes 8.93 1/21/2002 5/17/01 7/16/2002 SBC3H D. Tokofsky FORD BOULEVARD ELEMENTARY Y3 E-rate functioning - passed T & A yes 5.85 12/20/01 6/17/2002 SBC3E D. Tokofsky FRANKLIN (BENJAMIN) SENIOR HIG BB S & T 99% complete: add Y3 needs T&A yes 2.64 7/12/2002 SBC3H D. Tokofsky GARFIELD (JAMES A.) SENIOR HIG Y3 E-rate functioning - needs T & A yes 3.96 6/19/2002 SBC3E D. Tokofsky GARVANZA ELEMENTARY Y3 E-rate functioning - passed T & A yes 9.99 1/4/02 7/23/2002 SBC3F D. Tokofsky GATES STREET ELEMENTARY Y3 E-rate functioning - passed T & A yes 16.59 05/19/01 6/26/2002 SBC3E D. Tokofsky GLASSELL PARK ELEMENTARY BB S & T and Y2 E-rate complete: Y3 E-rate complete yes 3.38 4/6/2000 1/14/02 7/16/2002 SBC3E D. Tokofsky GLENFELIZ BOULEVARD ELEM Y3 E-rate functioning - passed T & A yes 11.61 12/18/01 7/16/2002 SBC3B D. Tokofsky GRIDLEY STREET ELEMENTARY BB S & T and Y3 E-rate complete yes 5.55 8/17/2000 7/16/2002 08/21/01 4/22/2002 IBM3F D. Tokofsky GRIFFIN AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 14.22 1/4/02 6/28/2002 SBC3H D. Tokofsky GRIFFITH (DAVID WARK) MIDDLE Y3 E-rate functioning - needs T & A yes 7.94 6/17/2002 SBC3B D. Tokofsky HADDON AVENUE ELEMENTARY Y3 E-rate complete yes 5.01 08/27/01 5/10/2002 IBM3H D. Tokofsky HAMASAKI (MORRIS K) ELEMENTARY Y3 E-rate functioning - passed T & A yes 7.37 8/21/2002 7/21/02 6/13/2002 SBC3H D. Tokofsky HAMMEL STREET ELEMENTARY BB S & T, Y2 E-rate 94% complete: Y3 E-rate complete yes 7.31 12/18/01 6/13/2002 SBC3B D. Tokofsky HARDING STREET ELEMENTARY Y3 E-rate complete yes 5.38 5/16/2002 08/17/01 4/30/2002 IBM3F D. Tokofsky HARRISON STREET ELEMENTARY Y3 E-rate functioning - passed T & A yes 3.37 10/18/01 7/9/2002 SBC3E D. Tokofsky HIGHLAND PARK CONTINUATION BB S & T complete: add Y3 functioning, needs T&A and punchlist yes 4.00 8/15/2002 SBC3F D. Tokofsky HILLSIDE ELEMENTARY Y3 E-rate functioning - passed T & A yes 3.87 7/16/2002 05/23/01 6/26/2002 SBC3H D. Tokofsky HUMPHREYS AVENUE ELEMENTARY Y3 E-rate functioning - needs T & A yes 4.07 6/19/2002 SBC3F D. Tokofsky HUNTINGTON DRIVE ELEMENTARY Y3 E-rate functioning - needs T & A yes 5.98 8/28/2002 6/26/2002 SBC3E D. Tokofsky IRVING (WASHINGTON) MIDDLE Y3 E-rate functioning - needs T & A yes 5.28 7/16/2002 SBC3H D. Tokofsky LANE (ROBERT HILL) ELEMENTARY BB S & T and Y2 E-rate complete: Y3 E-rate complete yes 3.12 7/7/2000 01/16/02 6/13/2002 SBC3F D. Tokofsky LATONA AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 12.27 04/28/01 8/2/2002 SBC3F D. Tokofsky LINCOLN (ABRAHAM) SENIOR HIGH Y3 E-rate functioning - passed T & A yes 3.54 6/18/2002 12/18/01 6/24/2002 SBC3F D. Tokofsky LORETO STREET ELEMENTARY BB S & T, Y2 E-rate 94% complete: Y3 E-rate complete yes 4.95 6/26/2002 SBC3H D. Tokofsky MALABAR STREET ELEMENTARY Y3 E-rate functioning - passed T & A yes 7.17 6/11/2002 05/31/01 6/13/2002 SBC3H D. Tokofsky MARIANNA AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 3.97 12/18/01 6/13/2002 SBC3B D. Tokofsky MISSION CONTINUATION Y3 E-rate complete yes 2.46 06/08/01 5/8/2002 IBM3B D. Tokofsky MONTAGUE SPECIAL ED Y3 E-rate complete yes 03/21/02 IBM3B D. Tokofsky MONTAGUE STREET ELEMENTARY Y3 E-rate complete yes 5.65 03/21/02 5/14/2002 IBM3B D. Tokofsky MONTARA AVENUE ELEMENTARY Y3 E-rate complete yes 4.12 01/17/02 IBM3E D. Tokofsky MONTE VISTA STREET ELEMENTARY BB S & T 99%: add. Y3 E-rate complete yes 6.85 7/16/2002 11/5/01 7/18/2002 SBC3H D. Tokofsky MONTEREY CONTINUATION BB S & T compl E-rate network functioning, passed T&A yes 3.9411/16/2000 11/05/01 6/19/2002 SBC3B D. Tokofsky MORNINGSIDE ELEMENTARY Y3 E-rate complete yes 9.55 01/11/02 5/3/2002 IBM3E D. Tokofsky MOUNT WASHINGTON ELEMENTARY Y3 E-rate functioning - needs T & A yes 6.38 7/18/2002 SBC3F D. Tokofsky MULTNOMAH STREET ELEM Y3 E-rate functioning - needs T & A yes 7.17 8/8/2002 SBC3F D. Tokofsky MURCHISON STREET ELEMENTARY Y3 E-rate functioning - needs T & A yes 5.05 8/8/2002 SBC3F D. Tokofsky NIGHTINGALE (FLORENCE) MIDDLE Y3 E-rate functioning - needs T & A yes 5.32 6/26/2002 SBC3B D. Tokofsky O'MELVENY ELEMENTARY Y3 E-rate complete yes 3.15 03/18/02 5/10/2002 IBM3B D. Tokofsky OSCEOLA STREET ELEMENTARY Y3 E-rate complete yes 4.57 02/15/02 5/3/2002 IBM3B D. Tokofsky OXNARD STREET ELEMENTARY Y3 E-rate complete yes 8.45 02/22/02 5/21/2002 IBM3B D. Tokofsky PACOIMA ELEMENTARY BB S & T and Y3 E-rate complete yes 6.56 9/13/2000 8/27/2002 2/28/02 4/26/2002 IBM3B D. Tokofsky PACOIMA MIDDLE Y3 E-rate complete yes 6.31 04/08/02 5/14/2002 IBM3H D. Tokofsky PEREZ (ALPHONSO B.) SPECIAL ED Y3 E-rate functioning - needs T & A yes 3.14 6/13/2002 SBC3F D. Tokofsky PUEBLO DE LOS ANGELES CONTINUA Y3 E-rate functioning - needs T & A yes 3.11 9/4/2002 6/28/2002 SBC3H D. Tokofsky RAMONA OPPORTUNITY HIGH (ALT.) Y3 E-rate functioning - passed T & A yes 2.10 8/13/2002 03/29/01 6/17/2002 SBC3E D. Tokofsky ROCKDALE ELEMENTARY Y3 E-rate functioning - passed T & A yes 5.30 09/04/01 8/12/2002 SBC3H D. Tokofsky ROOSEVELT (THEODORE) S H BB S & T complete: add Y3 functioning - need T&A yes 2.98 7/18/2001 6/10/2002 SBC3

Page 30: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

J. Alther (213) 241 1800 LAN Status 9/13/20023:51 PM

Local Dist

Board Member School Site LAN Status as September 9, 2002

Internet Access

All Rooms

Student/ Computer

Ratio

Date BB LAN

Tested Accepted

Complete End to

End (Magic)

Date Erate LAN

Tested & Accepted

Y4 Classroom

Switch Install

Erate Vendor Y3/Y4

B D. Tokofsky ROSCOE ELEMENTARY Y3 E-rate complete yes 6.29 02/26/02 IBM3H D. Tokofsky ROWAN AVENUE ELEMENTARY Y3 E-rate functioning - needs T & A yes 4.03 6/17/2002 SBC3B D. Tokofsky SAN FERNANDO ELEMENTARY Y3 E-rate complete yes 4.89 03/07/02 5/7/2002 IBM3B D. Tokofsky SAN FERNANDO MIDDLE BB S & T 99% and Y3 E-rate complete yes 5.40 3/22/02 5/7/2002 IBM3B D. Tokofsky SAN FERNANDO SENIOR HIGH Y3 E-rate complete yes 3.08 07/11/01 5/10/2002 IBM3A D. Tokofsky SAN JOSE STREET ELEMENTARY Y3 E-rate complete yes 9.91 02/08/02 5/21/2002 IBM3E D. Tokofsky SAN PASCUAL AVENUE ELEM Y3 E-rate functioning - needs T & A yes 11.19 7/23/2002 SBC3B D. Tokofsky SHARP AVENUE ELEMENTARY Y3 E-rate complete yes 4.11 03/18/02 5/13/2002 IBM3F D. Tokofsky SIERRA PARK ELEMENTARY Y3 E-rate functioning - needs T & A yes 7.70 7/3/2002 SBC3F D. Tokofsky SIERRA VISTA ELEMENTARY Y3 E-rate functioning - passed T & A yes 13.28 05/24/01 7/19/2002 SBC3B D. Tokofsky SUN VALLEY MIDDLE Y3 E-rate complete yes 16.67 02/25/02 5/7/2002 IBM3B D. Tokofsky SYLMAR SENIOR HIGH Y3 E-rate complete yes 4.16 03/18/02 4/29/2002 IBM3B D. Tokofsky TELFAIR AVENUE ELEMENTARY Y3 E-rate complete yes 6.90 03/26/02 5/10/2002 IBM3E D. Tokofsky TOLAND WAY ELEMENTARY Y3 E-rate functioning - passed T & A yes 12.48 06/05/01 7/18/2002 SBC3B D. Tokofsky TOLUCA LAKE ELEMENTARY Y3 E-rate complete yes 4.33 01/25/02 5/22/2002 IBM3B D. Tokofsky VAUGHN ELEMENTRY Charter complete yes 3.58 1/1/2000 NoneB D. Tokofsky VENA AVENUE ELEMENTARY Y3 E-rate complete yes 6.94 03/08/02 5/13/2002 IBM3F D. Tokofsky WILSON (WOODROW) SENIOR HIGH Y3 E-rate functioning - needs T & A yes 6.00 7/3/2002 SBC3E D. Tokofsky YORKDALE ELEMENTARY Y3 E-rate functioning - passed T & A yes 13.96 05/23/01 7/23/2002 SBC3E G.Hudley-Hayes 24th Street Elementary Y3 E-rate - 30% complete progress 4.21 SBC3.5G G.Hudley-Hayes 32nd St (THIRTY-SECOND ST. USC PERF) BB S & T complete: Y3 functioning passed T & A yes 3.26 8/9/2000 2/27/02 8/5/2002 SBC3G G.Hudley-Hayes 42nd ST (FORTY-SECOND ST ELEM) Y3 E-rate - 68% complete progress 13.42 SBC3.5H G.Hudley-Hayes 49th ST (FORTY-NINTH ST ELEM) Y3 E-rate functioning - needs T & A yes 5.58 6/10/2002 SBC3G G.Hudley-Hayes 52nd ST (FIFTY-SECOND ST ELEM) Y3 E-rate functioning - passed T & A yes 8.03 12/18/01 8/6/2002 SBC3G G.Hudley-Hayes 54th St (FIFTY-FOURTH ST ELEM) Y3 E-rate - 90% complete progress 3.36 SBC3.5G G.Hudley-Hayes 59th St (FIFTY-NINTH ST ELEM) Y3 E-rate - 75% complete progress 7.19 SBC3.5I G.Hudley-Hayes 61st ST (SIXTY-FIRST ST) Y3 E-rate functioning - passed T & A yes 12.32 8/6/02 8/6/2002 SBC3.5I G.Hudley-Hayes 66th ST (SIXT(Y-SIXTH ST) Y3 E-rate functioning - passed T & A yes 4.73 8/20/02 8/20/2002 SBC3.5I G.Hudley-Hayes 68th ST (SIXTY-EIGHTH ST) Y3 E-rate - 70% complete progress 4.69 6/27/2002 SBC3.5G G.Hudley-Hayes 6th Ave (SIXTH AVE ELEM) Y3 E-rate - 75% complete progress 6.27 SBC3.5G G.Hudley-Hayes 74th ST (SEVENTY-FOURTH ST ELEM) Y3 E-rate - 80% complete progress 6.23 SBC3.5I G.Hudley-Hayes 75th ST (SEVENTY-FIFTH ST) Y3 E-rate - 20% complete progress 10.23 6/27/2002 SBC3.5E G.Hudley-Hayes ALTA LOMA ELEMENTARY Y3 E-rate - 78% complete progress 4.22 SBC3.5G G.Hudley-Hayes ANGELES MESA ELEMENTARY Y3 E-rate - 64% complete progress 24.40 SBC3.5E G.Hudley-Hayes ARLINGTON HEIGHTS ELEM BB S & T and E-rate functioning - passed T & A yes 10.00 4/19/2001 7/25/02 7/25/2002 SBC3.5G G.Hudley-Hayes AUDUBON MIDDLE Y3 E-rate - 65% complete progress 13.09 SBC3.5G G.Hudley-Hayes BALDWIN HILLS ELEM Y3 E-rate - 80% complete progress 8.01 SBC3.5I G.Hudley-Hayes BETHUNE (MARY MCLEOD) MIDDLE BB S & T and YE-rate functioning - passed T & A yes 5.97 7/11/2001 7/25/02 7/1/2502 SBC3.5G G.Hudley-Hayes BRADLEY (Tom) ELEM BB S & T awarded: Y3 E-rate - 80%complete progress 7.65 SBC3.5G G.Hudley-Hayes BRIGHT (BIRDIELEE V) ELEMENTAR Y3 E-rate functioning - passed T & A yes 8.13 8/28/2002 05/24/01 8/6/2002 SBC3G G.Hudley-Hayes BUDLONG AVENUE ELEMENTARY Y3 E-rate functioning - needs T & A yes 7.39 8/13/2002 SBC3D G.Hudley-Hayes CARTHAY CENTER ELEMENTARY funded Y4 E-rate - Verizon - in design progress 8.28 VZN4.5H G.Hudley-Hayes CARVER (GEORGE WASHINGTON) MID Y3 E-rate functioning - needs T & A yes 3.25 6/10/2002 SBC3D G.Hudley-Hayes CHARNOCK ROAD ELEMENTARY BB S & T and Y2 E-rate complete - Y4 E-rate - upgrades yes 4.05 2/9/2001 4/28/2002 5/9/01 VZN4.5G G.Hudley-Hayes CIENEGA ELEMENTARY Y3 E-rate - 24% complete progress 5.29 SBC3.5G G.Hudley-Hayes COLISEUM STREET ELEMENTARY BB S & T and Y2 E-rate and E-rate functioning - passed T & A yes 5.22 8/20/1999 9/3/2002 7/25/02 8/5/2002 SBC3.5D G.Hudley-Hayes COMMUNITY SCHOOL (MAGNET) BB S & T Waiting for Local Dist FD and PM to put out to bid no 4.97 NoneG G.Hudley-Hayes CRENSHAW SENIOR HIGH Y3 E-rate - 95% complete - E-rate functioning yes 5.11 8/6/2002 SBC3.5G G.Hudley-Hayes DORSEY (SUSAN MILLER) SENIOR H BB S & T and Y2 E-rate complete: Y3 E-rate passed T & A yes 3.92 7/11/2001 8/22/02 8/22/2002 SBC3.5G G.Hudley-Hayes FOSHAY LEARNING CENTER (K-12) Y3 E-rate functioning - needs T & A yes 3.33 8/6/2002 SBC3

Page 31: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

J. Alther (213) 241 1800 LAN Status 9/13/20023:51 PM

Local Dist

Board Member School Site LAN Status as September 9, 2002

Internet Access

All Rooms

Student/ Computer

Ratio

Date BB LAN

Tested Accepted

Complete End to

End (Magic)

Date Erate LAN

Tested & Accepted

Y4 Classroom

Switch Install

Erate Vendor Y3/Y4

I G.Hudley-Hayes FREMONT (JOHN C.) SENIOR HIGH Y3 E-rate - 95% complete - E-rate functioning yes 6.47 6/13/2002 SBC3.5D G.Hudley-Hayes GRAND VIEW BOULEVARD ELEM Y4 E-rate - 46% complete progress 7.56 VC4G G.Hudley-Hayes HARTE (BRET) PREPATORY INTERME Y3 E-rate complete yes 9.32 06/25/01 8/21/2002 VC3G G.Hudley-Hayes HILLCREST DRIVE ELEMENTARY Y3 E-rate - 88% complete progress 4.09 SBC3.5I G.Hudley-Hayes HOPE (JOHN) CONTINUATION Y3 E-rate - 95% complete - functioning needs T&A yes 4.38 6/13/2002 SBC3.5G G.Hudley-Hayes HYDE PARK BLVD. ELEMENTARY Y3 E-rate - 59% complete progress 3.73 SBC3.5G G.Hudley-Hayes KING (MARTIN LUTHER, JR) ELEME BB S & T complete: add Y3 functioning - need T&A yes 4.26 3/7/2000 6/4/2002 8/5/2002 SBC3H G.Hudley-Hayes LA ACAD MS (JEFFERSON NEW M.S.) BB S & T: add Y3 functioning - need T&A complete yes 5.4910/12/2001 3/14/2002 6/10/2002 SBC3G G.Hudley-Hayes LA SALLE AVENUE ELEMENTARY Y3 E-rate complete yes 6.67 7/17/2002 06/29/01 8/5/2002 VC3D G.Hudley-Hayes LOS ANGELES CENTER FOR ENRICHE BB S & T Waiting for Local Dist FD and PM to put out to bid no 6.16 NoneH G.Hudley-Hayes MAIN STREET ELEMENTARY Y3 E-rate functioning - needs T & A yes 5.94 6/10/2002 SBC3I G.Hudley-Hayes MANCHESTER AVENUE ELEMENTARY BB S & T and E-rate functioning - passed T & A yes 4.19 11/8/2000 7/9/2002 7/3/02 7/3/2002 SBC3.5G G.Hudley-Hayes MANHATTAN PLACE ELEMENTARY Y3 E-rate complete yes 5.99 6/4/2002 05/17/01 8/5/2002 VC3G G.Hudley-Hayes MANN (HORACE) JUNIOR HIGH Y3 E-rate - 28% complete progress 8.60 SBC3.5G G.Hudley-Hayes MANUAL ARTS SENIOR HIGH BB S & T complete: add Y3 functioning - need T&A and punchlist items completed yes 2.44 10/6/2000 8/2/2002 SBC3G G.Hudley-Hayes MARLTON (DEAF) Y3 E-rate - 50% complete progress 4.00 SBC3.5D G.Hudley-Hayes MARVIN ELEMENTARY Y4 E-rate - 91% complete progress 5.11 VC4D G.Hudley-Hayes MCBRIDE (JAMES J.) SPECIAL ED. Y4 E-rate functioning - passed T & A yes 17.30 8/16/02 8/16/2002 VC4I G.Hudley-Hayes MCKINLEY AVENUE ELEMENTARY BB S and T complete - Y3 Erate - passed T & A yes 18.00 5/29/2001 8/19/02 6/24/2002 SBC3.5G G.Hudley-Hayes MENLO AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 5.28 7/23/02 8/6/2002 SBC3G G.Hudley-Hayes MID CITY ALTERNATIVE Y3 E-rate - 3% complete progress 6.25 SBC3.5I G.Hudley-Hayes MILLER (LOREN) ELEMENTARY Y3 E-rate - 53% complete progress 9.79 SBC3.5E G.Hudley-Hayes MOUNT VERNON MIDDLE BB S & T 99% and YE-rate functioning - passed T & A yes 4.04 7/1/2002 7/2/02 7/2/2002 SBC3.5G G.Hudley-Hayes MUIR (JOHN) MIDDLE Y3 E-rate functioning - passed T & A yes 5.06 12/18/01 8/5/2002 SBC3G G.Hudley-Hayes NORMANDIE AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 3.33 9/17/01 8/5/2002 SBC3G G.Hudley-Hayes Owens Opportunity unknown 4.60 UnknownD G.Hudley-Hayes PALMS ELEMENTARY BB S & T complete - Y4 E-rate yes 7.90 4/19/2001 VZN4.5G G.Hudley-Hayes PARK/HUERTA PRI C (BUDLONG-MUIR) Y3 E-rate functioning - passed T & A yes 5/2/01 SBC3E G.Hudley-Hayes PIO PICO ELEMENTARY Y3 E-rate - 35% complete progress 7.00 SBC3.5E G.Hudley-Hayes QUEEN ANNE PLACE ELEMENTARY BB S & T and E-rate functioning - passed T & A yes 4.04 6/30/2000 8/5/02 8/5/2002 SBC3.5G G.Hudley-Hayes RAYMOND AVENUE ELEMENTARY Y3 E-rate complete yes 11.36 06/28/01 8/6/2002 VC3G G.Hudley-Hayes SALVIN (SOPHIA T.) SPECIAL ED. Y3 E-rate functioning - needs T & A yes 10.08 8/6/2002 SBC3D G.Hudley-Hayes SATURN STREET ELEMENTARY Y4 E-rate - 65% complete progress 4.13 VC4D G.Hudley-Hayes SHENANDOAH STREET ELEMENTARY BB S & T complete yes 6.99 2/9/2001 VZN4.5I G.Hudley-Hayes SOUTH PARK ELEMENTARY Y3 E-rate functioning - passed T & A yes 5.94 8/29/02 7/1/2002 SBC3.5G G.Hudley-Hayes VERMONT AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 4.64 11/05/01 8/12/2002 SBC3G G.Hudley-Hayes VIEW PARK CONT BB S & T and Y3 E-rate complete yes 1.91 7/11/2001 SBC3.5G G.Hudley-Hayes VIEW PARK PREP (Charter) No network no 23.79 NoneG G.Hudley-Hayes VIRGINIA ROAD ELEMENTARY BB S & T and E-rate functioning - passed T & A yes 5.15 7/11/2001 8/20/2002 07/05/02 7/5/2002 SBC3.5G G.Hudley-Hayes WEEMES (LENICIA B.) ELEMENTARY Y3 E-rate functioning - passed T & A yes 4.58 12/11/01 8/6/2002 SBC3H G.Hudley-Hayes WEST VERNON AVENUE ELEMENTARY Y3 E-rate functioning - needs T & A yes 6/10/2002 SBC3G G.Hudley-Hayes WESTERN AVENUE ELEMENTARY Y3 E-rate - 43% complete progress 5.32 SBC3.5E G.Hudley-Hayes WIDNEY (JOSEPH POMEROY) HIGH Y3 E-rate - 43% complete progress 4.72 SBC3.5E G.Hudley-Hayes WILSHIRE CREST ELEMENTARY Y3 E-rate functioning - passed T & A yes 5.58 8/26/02 8/26/2002 SBC3.5D G.Hudley-Hayes WINDSOR HILLS MATH SCI ELEM. BB S & T and Y2 E-rate complete - Y4 E-rate - upgrades yes 5.58 4/13/2000 6/4/2002 VZN4.5G G.Hudley-Hayes YOUNG (Crenshaw) CONTINUATION Y3 E-rate - 95% complete - E-rate functioning yes 1.79 8/6/2002 SBC3.5I G.Hudley-Hayes Youth Opportunities Unlimited unknown 16.81 8/6/2002 UnknownF J. Huizar 10TH St (TENTH STREET ELEMENTARY) Y3 E-rate functioning - passed T & A yes 5.47 9/3/2002 05/09/01 7/3/2002 SBC3H J. Huizar 20TH ST (TWENTIETH STREET ELEMENTARY) Y3 E-rate functioning - passed T & A yes 4.81 12/18/01 5/29/2002 SBC3H J. Huizar 28th ST (TWENTY-EIGHTH ST ELEM) Y3 E-rate functioning - passed T & A yes 5.95 7/1/2002 08/29/01 5/28/2002 SBC3

Page 32: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

J. Alther (213) 241 1800 LAN Status 9/13/20023:51 PM

Local Dist

Board Member School Site LAN Status as September 9, 2002

Internet Access

All Rooms

Student/ Computer

Ratio

Date BB LAN

Tested Accepted

Complete End to

End (Magic)

Date Erate LAN

Tested & Accepted

Y4 Classroom

Switch Install

Erate Vendor Y3/Y4

H J. Huizar 2nd ST (SECOND ST ELEM) Y3 E-rate functioning - passed T & A yes 10.16 3/18/2002 09/13/01 6/10/2002 SBC3F J. Huizar 9th St (NINTH STREET ELEM) Y3 E-rate functioning - passed T & A yes 4.29 4/2/2002 10/04/01 8/8/2002 SBC3H J. Huizar ADAMS (JOHN) MIDDLE Y3 E-rate functioning - passed T & A yes 4.86 04/06/01 5/28/2002 SBC3F J. Huizar ALEXANDRIA AVENUE ELEM BB S & T complete: add Y3 functioning yes 3.37 2/8/2001 3/14/2002 6/5/02 6/16/2002 SBC3F J. Huizar ANN STREET ELEMENTARY Y3 E-rate functioning - passed T & A yes 4.41 05/08/01 SBC3J J. Huizar BELL #3 NEW PRIMARY CENTER Complete - New Construction yes 2.86 7/1/2002 NoneJ J. Huizar BELL SENIOR HIGH BB S & T complete: add Y3 functioning - passed T&A yes 4.06 7/11/2001 6/12/02 SBC3F J. Huizar BELLEVUE AVENUE PRIMARY network complete when school opened yes 20.38 1/1/2000 NoneF J. Huizar BELMONT NEWCOMER CENTER Y3 E-rate functioning - passed T & A yes 3/20/2002 12/18/01 8/6/2002 SBC3F J. Huizar BELMONT SENIOR HIGH BB S & T complete:Y3 passed T & A yes 2.2911/16/2000 12/18/01 7/29/2002 SBC3F J. Huizar BELMONTH/HOLLYWOOD NEW PC #3 12.46H J. Huizar BREED STREET ELEMENTARY Y3 E-rate functioning - passed T & A yes 6.70 07/12/01 6/10/2002 SBC3H J. Huizar BRIDGE STREET ELEMENTARY BB S & T and Y2 E-rate 94%: Y3 E-rate complete yes 6.49 10/18/01 6/10/2002 SBC3J J. Huizar BRYSON AVENUE ELEMENTARY BB S & T complete: add Y3 passed T & A, yes 5.40 11/8/2000 6/4/2002 11/05/01 SBC3F J. Huizar CAMINO NUEVO CHARTER ACADEMY need to go to bid no 7.36 NoneF J. Huizar CASTELAR STREET ELEMENTARY Y3 E-rate functioning - passed T & A yes 8.10 5/17/01 6/28/2002 SBC3F J. Huizar CENTRAL CONT no 2.99 PbdroppedF J. Huizar City of Angels Indep Study unknown 7.85 NoneF J. Huizar COMMONWEALTH AVE ELEM Y3 E-rate functioning - passed T & A yes 3.84 4/15/2002 06/12/01 6/24/2002 SBC3J J. Huizar CORONA AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 5.39 01/08/02 SBC3E J. Huizar DAYTON HEIGHTS ELEMENTARY Y3 E-rate functioning - passed T & A yes 11.61 8/28/2002 06/06/01 7/12/2002 SBC3H J. Huizar DENA (CHRISTOPHER) ELEMENTARY Y3 E-rate functioning - passed T & A yes 3.66 11/09/01 6/10/2002 SBC3E J. Huizar DORRIS PLACE ELEMENTARY Y3 E-rate functioning - passed T & A yes 9.13 12/11/01 7/23/2002 SBC3F J. Huizar DOWNTOWN BUSINESS HIGH BB S & T and Y2 E-rate complete passed: Y3 passed T&A yes 2.42 6/30/2000 1/8/02 6/28/2002 SBC3J J. Huizar ELIZABETH LEARNING CENTER K-12 Y3 E-rate functioning - needs T & A yes 3.22 SBC3F J. Huizar ELYSIAN HEIGHTS ELEMENTARY Y3 E-rate functioning - passed T & A yes 4.26 11/05/01 6/24/2002 SBC3F J. Huizar ESPERANZA ELEMENTARY Y3 E-rate functioning - needs T & A yes 3.49 8/29/2002 7/3/2002 SBC3H J. Huizar EUCLID AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 5.72 11/28/01 6/10/2002 SBC3J J. Huizar FISHBURN AVENUE ELEMENTARY BB S & T and Y2 E-rate complete: add Y3 needs T & A yes 4.11 5/29/2001 7/1/2002 SBC3J J. Huizar FLORENCE AVENUE ELEMENTARY Y3 E-rate functioning - needs T & A yes 3.74 8/7/2002 SBC3J J. Huizar GAGE (HENRY T.) MIDDLE BB S & T complete: add Y3 functioning - need T&A yes 5.69 3/27/2001 SBC3I J. Huizar GRAHAM ELEMENTARY Y3 E-rate - 30% complete progress 3.91 SBC3.5F J. Huizar GRATTS (EVELYN THURMAN) ELEM Y3 E-rate functioning - needs T & A yes 3.61 8/8/2002 6/28/2002 SBC3J J. Huizar HELIOTROPE AVENUE ELEMENTARY BB S & T and Y2 E-rate complete: add Y3 passed T &a need to pass T&A & punchlist yes 3.98 11/8/2000 1/14/02 SBC3H J. Huizar HOLLENBECK MIDDLE Y3 E-rate functioning - needs T & A yes 3.27 6/10/2002 SBC3J J. Huizar HUGHES (TERESA) ELEMENTARY Y3 E-rate functioning - passed T & A yes 6.08 1/1/2000 8/8/2002 5/19/01 SBC3J J. Huizar HUNTINGTON PARK SENIOR HIGH BB S & T, Y2 E-rate complete: Y3 E-rate functioning - needs T & A yes 3.38 1/31/2002 SBC3F J. Huizar INDEPENDENCE ELEm (new SG Elem) BB S & T 1% complete: add Y3 functioning - need T&A yes 3.41 1/1/2000 SBC3F J. Huizar LAFAYETTE PRI (BELMONT/HWD #2) New Consc. School opened 10/01 network not complete - no electronics no NoneG J. Huizar LANTERMAN (FRANK D.) (TMR) Y3 E-rate functioning - passed T & A yes 2.56 06/13/01 8/6/2002 SBC3J J. Huizar LIBERTY BOULEVARD ELEMENTARY Y3 E-rate functioning - passed T & A yes 4.13 11/05/01 SBC3J J. Huizar LILLIAN STREET ELEMENTARY Y3 E-rate - 58% complete progress 7.94 6/24/2002 SBC3.5E J. Huizar LOCKWOOD AVENUE ELEMENTARY Y3 E-rate functioning - needs T & A yes 8.03 7/12/2002 SBC3J J. Huizar LOMA VISTA AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 3.52 12/11/01 SBC3H J. Huizar LORENA STREET ELEMENTARY Y3 E-rate functioning - passed T & A yes 6.01 04/30/01 6/10/2002 SBC3G J. Huizar MAGNOLIA AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 3.89 02/14/02 8/6/2002 SBC3F J. Huizar MCALISTER HIGH (OPPOR Y3 multiple sites all complete yes 5.76 8/12/2002 PbdroppedH J. Huizar METROPOLITAN CONTINUATION Y3 E-rate functioning - passed T & A yes 4.03 11/05/01 6/10/2002 SBC3J J. Huizar MIDDLETON STREET ELEM BB S & T and Y2 E-rate complete: add Y3 functioning, need to pass T&A & punchlist yes 7.13 11/8/2000 SBC3J J. Huizar MILES AVENUE ELEMENTARY Y3 E-rate functioning - needs T & A yes 5.53 8/21/2002 SBC3

Page 33: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

J. Alther (213) 241 1800 LAN Status 9/13/20023:51 PM

Local Dist

Board Member School Site LAN Status as September 9, 2002

Internet Access

All Rooms

Student/ Computer

Ratio

Date BB LAN

Tested Accepted

Complete End to

End (Magic)

Date Erate LAN

Tested & Accepted

Y4 Classroom

Switch Install

Erate Vendor Y3/Y4

F J. Huizar NEWMARK (HARRIS) CONT (Belmont) BB S & T and Y3 E-rate complete yes 2.4811/16/2000 3/20/2002 6/14/01 6/28/2002 SBC3J J. Huizar NIMITZ (CHESTER W.) MIDDLE Y3 E-rate functioning - passed T & A yes 7.03 07/12/01 SBC3G J. Huizar NORWOOD STREET ELEMENTARY BB S & T and Y2 E-rate 94%: Y3 E-rate complete yes 3.71 11/5/01 8/13/2002 SBC3J J. Huizar NUEVA VISTA ELEM (BEL?) Y3 E-rate functioning - needs T & A yes 5.26 SBC3J J. Huizar ODYSSEY CONTINUATION Y3 E-rate functioning - passed T & A yes 1.89 8/29/2002 05/26/01 SBC3J J. Huizar PACIFIC BOULEVARD SPECIAL ED. Y3 E-rate functioning - needs T & A yes 5.11 SBC3J J. Huizar PARK AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 4.23 12/18/01 SBC3F J. Huizar PLASENCIA (BETTY) ELEMENTARY BB S & T: Y3 E-rate complete yes 3.91 2/8/2001 6/2/2002 10/17/01 6/24/2002 SBC3F J. Huizar ROSEMONT AVENUE ELEMENTARY Y3 E-rate functioning - needs T & A yes 4.40 6/24/2002 SBC3J J. Huizar SAN ANTONIO CONT (HP) BB S & T complete: add Y3 functioning, needs T&A yes 3.20 1/31/2002 SBC3J J. Huizar SAN ANTONIO ELEMENTARY Y3 E-rate functioning - passed T & A yes 3.64 1/1/2001 4/5/2002 5/20/01 SBC3J J. Huizar SAN GABRIEL AVENUE ELEMENTARY BB S & T complete: add Y3 passed T & A yes 6.9512/15/2000 5/28/02 SBC3J J. Huizar SAN MIGUEL ELEMENTARY Y3 E-rate functioning - needs T & A yes 2.40 SBC3H J. Huizar SAN PEDRO STREET ELEMENTARY Y3 E-rate functioning - passed T & A yes 4.26 8/24/2002 12/18/01 5/28/2002 SBC3H J. Huizar SHERIDAN STREET ELEMENTARY Y3 E-rate functioning - passed T & A yes 6.80 11/05/01 6/10/2002 SBC3F J. Huizar SOLANO AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 4.84 05/29/01 7/3/2002 SBC3H J. Huizar SOTO STREET ELEMENTARY Y3 E-rate functioning - passed T & A yes 16.93 05/09/01 6/10/2002 SBC3J J. Huizar SOUTH GATE MIDDLE BB S & T 75% complete -E-rate functioning, passed T&A yes 4.38 12/18/01 SBC3J J. Huizar SOUTH GATE SENIOR HIGH BB S & T and Y2 E-rate complete: add Y3 functioning, need to pass T&A yes 4.19 7/12/2000 SBC3J J. Huizar STANFORD AVENUE ELEMENTARY Y3 E-rate functioning - needs T & A yes 6.42 SBC3J J. Huizar STATE STREET ELEMENTARY Y3 E-rate functioning - needs T & A yes 5.93 SBC3H J. Huizar STEVENSON (ROBERT LOUIS) MS BB S & T and Y2 E-rate complete: add Y3 functioning, need to pass T&A yes 5.52 8/14/2000 6/14/2002 SBC3H J. Huizar SUNRISE ELEMENTARY BB S & T complete: Y3 passed T & A yes 6.23 3/28/2001 3/5/2002 12/11/01 6/10/2002 SBC3F J. Huizar TRI-C COMMUNITY DAY unknown 0.00 NoneJ J. Huizar TWEEDY ELEMENTARY Y3 E-rate functioning - needs T & A yes 3.71 1/31/2002 SBC3F J. Huizar UNION AVENUE ELEMENTARY BB S & T complete: add Y3 functioning - need T&A yes 4.2712/22/1999 3/28/2002 6/28/2002 SBC3H J. Huizar UTAH STREET ELEMENTARY Y3 E-rate functioning - needs T & A yes 3.76 6/10/2002 SBC3J J. Huizar VERNON CITY ELEMENTARY Y3 E-rate functioning - needs T & A yes 3.76 SBC3J J. Huizar VICTORIA AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 9.28 7/25/2002 07/27/01 SBC3F J. Huizar VIRGIL MIDDLE BB S & T: Y3 passed T&A yes 6.90 6/6/2001 12/18/01 6/19/2002 SBC3J J. Huizar WALNUT PARK ELEMENTARY Y3 E-rate functioning - passed T & A yes 4.10 7/10/2002 12/11/01 SBC3F J. Huizar WHITE HOUSE PRIMARY CENTER Y3 E-rate functioning - passed T & A yes 4.99 06/11/01 6/19/2002 SBC3C J. Huizar WOODLAND HILLS ELEMENTARY BB S & T waiting for Local Dist F & PM to put out to bid progress 7.04 NoneJ J. Huizar WOODLAWN AVENUE ELEMENTARY BB S & T 92% complete and Y3 E-rate functioning needs T &A deficiencies yes 6.17 SBC3A J. Korenstein ADDAMS (JANE) CONT (Kennedy) BB S & T and Y3 E-rate complete yes 1.87 1/17/2002 2/18/2002 6/22/01 5/17/2002 IBM3C J. Korenstein ALISO HIGH (CONT.) Y3 E-rate complete yes 2.68 07/17/01 IBM3C J. Korenstein ANATOLA AVENUE ELEMENTARY Y3 E-rate complete yes 8.18 2/15/02 IBM3A J. Korenstein ANDASOL AVENUE ELEMENTARY BB S & T complete yes 6.03 3/13/2002 NoneB J. Korenstein APPERSON STREET ELEMENTARY Y3 E-rate complete yes 7.46 2/4/02 5/17/2002 IBM3A J. Korenstein BALBOA GIFTED/HIGH ABILITY MAG BB S & T 65% complete progress 4.36 NoneC J. Korenstein BASSETT STREET ELEMENTARY BB S & T and Y3 E-rate complete yes 3.94 6/9/1999 5/22/2002 1/16/02 IBM3C J. Korenstein BERTRAND AVENUE ELEMENTARY Y3 E-rate complete yes 6.34 03/11/02 IBM3C J. Korenstein BIRMINGHAM SENIOR HIGH Y3 E-rate complete yes 4.90 8/20/2002 04/01/02 IBM3C J. Korenstein BLYTHE STREET ELEMENTARY Y3 E-rate complete yes 9.40 7/7/2002 05/27/01 IBM3B J. Korenstein BRAINARD AVENUE ELEMENTARY Y3 E-rate complete yes 6.55 02/11/02 5/13/2002 IBM3A J. Korenstein BURTON STREET ELEMENTARY BB S & T and Y3 E-rate complete yes 4.17 4/24/2001 3/17/2002 1/3/02 5/23/2002 IBM3C J. Korenstein CALAHAN STREET ELEMENTARY BB S & T Waiting for Local Dist FD and PM to put out to bid no 9.60 NoneC J. Korenstein CANTARA STREET ELEMENTARY Y3 E-rate complete yes 7.37 01/23/02 IBM3B J. Korenstein CANTERBURY AVENUE ELEMENTARY Y3 E-rate complete yes 7.43 12/17/01 5/15/2002 IBM3B J. Korenstein CARPENTER AVENUE ELEMENTARY Y3 E-rate complete yes 3.81 02/27/02 IBM3

Page 34: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

J. Alther (213) 241 1800 LAN Status 9/13/20023:51 PM

Local Dist

Board Member School Site LAN Status as September 9, 2002

Internet Access

All Rooms

Student/ Computer

Ratio

Date BB LAN

Tested Accepted

Complete End to

End (Magic)

Date Erate LAN

Tested & Accepted

Y4 Classroom

Switch Install

Erate Vendor Y3/Y4

C J. Korenstein CHANDLER ELEMENTARY Grant/Van Nuys E-rate Y2 complete yes 7.36 08/22/01 Intertel2A J. Korenstein CHASE STREET ELEMENTARY Y3 E-rate complete yes 6.03 2/5/02 5/23/2002 IBM3C J. Korenstein CLEVELAND (GROVER) HIGH BB S & T and Y3 E-rate complete yes 5.38 3/1/2002 3/22/02 IBM3C J. Korenstein COHASSET STREET ELEMENTARY Grant/Van Nuys E-rate Y2 complete yes 12.12 7/18/2002 09/04/01 Intertel2A J. Korenstein DANUBE AVENUE ELEMENTARY Y3 E-rate complete yes 9.69 08/07/01 5/20/2002 IBM3A J. Korenstein DEARBORN STREET ELEMENTARY BB S & T Waiting for Local Dist FD and PM to put out to bid no 11.31 NoneC J. Korenstein DIXIE CANYON AVENUE ELEM Grant/Van Nuys E-rate Y2 complete yes 6.14 3/11/2002 08/22/01 Intertel2A J. Korenstein DOUGLAS (W GRANADA CONT) BB S & T yes 2.53 3/22/2002 NoneA J. Korenstein EINSTEIN (ALBERT) CONTINUATION Y3 E-rate complete yes 5.69 02/20/02 5/24/2002 IBM3A J. Korenstein EL ORO WAY ELEMENTARY Y3 E-rate complete yes 7.09 11/26/01 5/20/2002 IBM3C J. Korenstein EMELITA STREET ELEMENTARY Y3 E-rate complete yes 7.86 03/21/02 IBM3C J. Korenstein ENCINO ELEMENTARY Y3 E-rate complete yes 7.10 03/01/02 IBM3A J. Korenstein FROST (ROBERT) MIDDLE Y3 E-rate functioning - passed T & A yes 5.25 12/12/01 8/21/2002 SBC3C J. Korenstein FULTON (ROBERT) MIDDLE Grant/Van Nuys E-rate Y2 complete yes 6.74 5/2/2002 10/19/01 Intertel2C J. Korenstein GARDEN GROVE ELEMENTARY Y3 E-rate complete yes 4.71 01/09/02 IBM3C J. Korenstein GAULT STREET ELEMENTARY Y3 E-rate complete yes 18.32 6/4/2002 02/28/02 IBM3A J. Korenstein GLEDHILL STREET ELEMENTARY BB S & T and Y3 E-rate complete yes 6.6211/14/2000 5/20/2002 12/7/01 5/22/2002 IBM3F J. Korenstein GLEN ALTA ELEMENTARY Y3 E-rate functioning - passed T & A yes 4.87 05/11/01 SBC3B J. Korenstein GLENWOOD ELEMENTARY BB S & T and Y3 E-rate complete yes 5.63 2/15/2001 2/14/2002 7/31/01 5/6/2002 IBM3A J. Korenstein GRANADA ELEMENTARY funded Y4 E-rate - Verizon - in design progress 10.96 VZN4.5A J. Korenstein GRANADA HILLS SENIOR HIGH BB S & T complete yes 4.46 3/22/2002 8/7/2002 NoneC J. Korenstein GREY (ZANE) CONTINUATION (Reseda) BB S & T and Y3 E-rate complete yes 4.83 5/9/2001 8/3/01 IBM3A J. Korenstein HASKELL ELEMENTARY Y3 E-rate complete yes 4.93 12/9/01 5/17/2002 IBM3C J. Korenstein HAZELTINE AVENUE ELEM Grant/Van Nuys E-rate Y2 complete yes 5.67 9/28/2001 6/13/2002 VZN4.5A J. Korenstein HENRY (PATRICK) MIDDLE funded Y4 E-rate - Verizon - in design progress 8.04 VZN4.5B J. Korenstein HERRICK AVENUE ELEMENTARY Y3 E-rate complete yes 5.52 6/10/2002 07/23/01 4/29/2002 IBM3A J. Korenstein HOLMES (OLIVER WENDELL) MIDDLE Y3 E-rate complete yes 6.41 03/25/02 5/22/2002 IBM3B J. Korenstein HUBBARD STREET ELEMENTARY Y3 E-rate complete yes 6.44 6/10/2002 08/17/01 4/30/2002 IBM3C J. Korenstein INDEPENDENCE CONTINUATION Y3 E-rate complete yes 4.58 01/09/02 IBM3A J. Korenstein KENNEDY (JOHN F.) HIGH BB S & T and Y3 E-rate complete yes 5.12 1/17/2002 7/17/01 5/17/2002 IBM3H J. Korenstein KENNEDY (ROBERT F.) ELEMENTARY Y3 E-rate functioning - passed T & A yes 7.87 12/18/01 6/17/2002 SBC3C J. Korenstein KESTER AVENUE ELEMENTARY Grant/Van Nuys E-rate Y2 complete yes 6.64 11/01/01 Intertel2A J. Korenstein KNOLLWOOD ELEMENTARY Y3 E-rate complete yes 5.55 02/06/02 5/20/2002 IBM3C J. Korenstein LANAI ROAD ELEMENTARY Y3 E-rate complete yes 5.96 01/10/02 IBM3A J. Korenstein LANGDON AVENUE ELEMENTARY Y3 E-rate complete yes 12.21 01/28/02 IBM3A J. Korenstein LASSEN ELEMENTARY Y3 E-rate complete yes 11.23 02/02/02 5/22/2002 IBM3C J. Korenstein LEICHMAN (DIANE S.) SPECIAL ED Y3 E-rate complete yes 2.12 07/17/01 IBM3C J. Korenstein LEMAY STREET ELEMENTARY Y3 E-rate complete yes 3.99 03/14/02 IBM3A J. Korenstein LIGGETT STREET ELEMENTARY Y3 E-rate complete yes 3.62 12/13/01 IBM3C J. Korenstein LOKRANTZ (SVEN) SPECIAL ED. CE Y3 E-rate complete yes 5.22 1/22/02 IBM3C J. Korenstein LORNE STREET ELEMENTARY BB S & T, Y2 E-rate and: Y3 E-rate complete yes 6.4611/12/1999 7/30/01 IBM3C J. Korenstein LULL (FRED E.) SPECIAL ED. CEN Y3 E-rate complete yes 2.85 08/20/01 IBM3B J. Korenstein MACLAY (CHARLES) MIDDLE Y3 E-rate complete yes 5.21 03/21/02 5/10/2002 IBM3B J. Korenstein MACLAY Primary Center Y3 E-rate complete yes 5.29 1/1/2000 08/14/01 IBM3A J. Korenstein MAYALL STREET ELEMENTARY Y3 E-rate complete yes 5.13 01/10/02 5/21/2002 IBM3C J. Korenstein MELVIN AVENUE ELEMENTARY Y3 E-rate complete yes 14.92 2/7/02 IBM3C J. Korenstein MILLER (JOAQUIN) SH SP ED Y3 E-rate complete yes 2.02 07/06/01 IBM3C J. Korenstein MILLIKAN (ROBERT A.) MIDDLE Grant/Van Nuys E-rate Y2 complete yes 9.43 09/28/01 Intertel2A J. Korenstein MONROE (JAMES) HIGH Y3 E-rate complete yes 3.62 02/21/02 5/24/2002 IBM3B J. Korenstein MOUNT GLEASON MIDDLE Y3 E-rate complete yes 7.06 03/07/02 5/16/2002 IBM3

Page 35: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

J. Alther (213) 241 1800 LAN Status 9/13/20023:51 PM

Local Dist

Board Member School Site LAN Status as September 9, 2002

Internet Access

All Rooms

Student/ Computer

Ratio

Date BB LAN

Tested Accepted

Complete End to

End (Magic)

Date Erate LAN

Tested & Accepted

Y4 Classroom

Switch Install

Erate Vendor Y3/Y4

B J. Korenstein MOUNT LUKENS CONT BB S & T and Y3 E-rate complete yes 4.21 3/13/2002 4/15/2002 6/22/01 IBM3B J. Korenstein MOUNTAIN VIEW ELEMENTARY BB S & T 99% and Y3 E-rate complete yes 9.58 8/20/2002 8/9/01 4/29/2002 IBM3C J. Korenstein MULHOLLAND (WILLIAM) MIDDLE BB S & T and Y3 E-rate complete yes 3.57 5/23/2001 2/14/02 IBM3C J. Korenstein NESTLE AVENUE ELEMENTARY Y3 E-rate complete yes 13.00 01/18/02 IBM3C J. Korenstein NEWCASTLE ELEM BB S & T and Y3 E-rate complete yes 3.71 1/1/2001 6/18/2002 1/28/02 IBM3A J. Korenstein NOBLE AVENUE ELEMENTARY BB S & T and Y3 E-rate complete yes 4.00 8/2/01 IBM3C J. Korenstein NORTHRIDGE MIDDLE Y3 E-rate complete yes 6.37 03/26/02 IBM3B J. Korenstein OLIVE VISTA MIDDLE Y3 E-rate complete yes 5.30 1/15/02 4/25/2002 IBM3A J. Korenstein PARTHENIA STREET ELEMENTARY Y3 E-rate complete yes 4.89 12/13/01 5/24/2002 IBM3B J. Korenstein PINEWOOD AVENUE ELEMENTARY Y3 E-rate complete yes 6.25 02/26/02 5/20/2002 IBM3B J. Korenstein PLAINVIEW AVENUE ELEM Y3 E-rate complete yes 6.60 02/28/02 5/15/2002 IBM3A J. Korenstein PLUMMER ELEMENTARY Y3 E-rate complete yes 3.06 03/22/02 7/25/2002 IBM3A J. Korenstein PORTER (GEORGE K.) MIDDLE BB S & T and Y3 E-rate complete yes 19.94 7/26/2001 12/27/01 5/21/2002 IBM3A J. Korenstein PRIM ACADFOR SUCCESS SCH (Monroe PC) completed - new construction yes 4.66 9/1/1999 NoneA J. Korenstein RANCHITO AVENUE ELEMENTARY Y3 E-rate complete yes 6.24 12/12/01 5/23/2002 IBM3C J. Korenstein RESEDA ELEMENTARY Y3 E-rate complete yes 9.35 01/09/02 IBM3C J. Korenstein RESEDA SENIOR HIGH BB S & T and Y2 E-rate complete yes 5.83 5/9/2001 1/15/02 IBM3C J. Korenstein RIVERSIDE DRIVE ELEMENTARY Grant/Van Nuys E-rate Y2 complete yes 9.85 07/23/01 Intertel2C J. Korenstein ROGERS (WILL) CONTINUATION Grant/Van Nuys E-rate Y2 complete yes 3.64 7/26/2002 07/16/01 Intertel2A J. Korenstein SEPULVEDA (FRANCISCO) MIDDLE Y3 E-rate complete yes 6.32 04/03/02 5/24/2002 IBM3C J. Korenstein SHERMAN OAKS CTR. FOR ENRICHED Y3 E-rate complete yes 7.28 8/23/2002 04/08/02 IBM3C J. Korenstein SHERMAN OAKS ELEMENTARY Grant/Van Nuys E-rate Y2 complete yes 9.41 1/24/2002 08/22/01 Intertel2C J. Korenstein SHIRLEY AVENUE ELEMENTARY Y3 E-rate complete yes 7.51 01/30/02 IBM3C J. Korenstein STAGG STREET ELEMENTARY Y3 E-rate complete yes 6.14 02/22/02 IBM3B J. Korenstein STONEHURST AVENUE ELEMENTARY Y3 E-rate complete yes 4.07 02/12/02 4/11/2002 IBM3B J. Korenstein SUNLAND ELEMENTARY Y3 E-rate complete yes 8.85 01/29/02 5/16/2002 IBM3B J. Korenstein SYLMAR ELEMENTARY BB S & T 88% and Y3 E-rate complete yes 3.96 3/11/02 4/22/2002 IBM3C J. Korenstein SYLVAN PARK ELEMENTARY Grant/Van Nuys E-rate Y2 complete yes 6.06 7/9/2002 07/25/01 Intertel2C J. Korenstein TARZANA ELEMENTARY Y3 E-rate complete yes 10.02 03/04/02 IBM3A J. Korenstein TULSA STREET ELEMENTARY funded Y4 E-rate - Verizon - in design progress 4.98 VZN4.5C J. Korenstein VALERIO NEW PRIMARY CENTER completed 3 years ago - copper backbone- Y4 E-rate - upgrade yes 4.69 12/1/1998 VZN4.5C J. Korenstein VALERIO STREET ELEMENTARY BB S & T, Y2 E-rate and G/VN E-rate completed yes 3.7412/20/2000 6/4/2002 VZN4.5C J. Korenstein VALLEY ALTERNATIVE Y3 E-rate complete yes 9.80 12/14/01 IBM3A J. Korenstein VAN GOGH STREET ELEMENTARY Y3 E-rate complete yes 4.74 8/6/01 5/20/2002 IBM3C J. Korenstein VAN NUYS ELEMENTARY Grant/Van Nuys E-rate Y2 complete yes 2.45 3/11/2002 10/15/01 Intertel2C J. Korenstein VAN NUYS MIDDLE Grant/Van Nuys E-rate Y2 complete yes 6.28 09/28/01 Intertel2C J. Korenstein VAN NUYS SENIOR HIGH Grant/Van Nuys E-rate Y2 complete yes 3.26 02/05/02 Intertel2C J. Korenstein VANALDEN AVENUE ELEMENTARY Y4E-rate functioning - passed T & A yes 7.20 8/2/02 8/2/2002 VC4B J. Korenstein VERDUGO HILLS SENIOR HIGH BB S & T and Y3 E-rate complete yes 4.42 3/13/2002 3/21/2002 01/22/02 4/30/2002 IBM3B J. Korenstein VINEDALE ELEMENTARY Y3 E-rate complete yes 6.29 02/22/02 5/15/2002 IBM3A J. Korenstein VINTAGE STREET Magnet ELEM BB S & T and Y2 E-rate complete yes 4.5212/20/2000 None y2C J. Korenstein WEST VALLEY SPECIAL ED. CENTER Y3 E-rate complete yes 2.79 12/13/01 IBM3D M. Canter 98th St (NINETY-EIGHTH ST) Y4 E-rate - 68% complete progress 5.36 VC4A M. Canter AGGELER (WILLIAM TELL) OPPORTU BB S & T Waiting for Local Dist FD and PM to put out to bid no 0.22 NoneA M. Canter BECKFORD AVENUE ELEMENTARY BB S & T awarded cons.to start progress 8.97 NoneD M. Canter BEETHOVEN STREET ELEMENTARY funded Y4 E-rate - Verizon - in design progress 22.18 VZN4.5D M. Canter BELLAGIO ROAD NEWCOMER CENTER Y3 E-rate functioning - passed T & A yes 5.89 4/28/2002 06/12/01 8/12/2002 SBC3D M. Canter BRADDOCK DRIVE ELEMENTARY Y4 E-rate functioning - passed T & A yes 9.05 8/26/02 8/26/2002 VC4D M. Canter BRENTWOOD SCIENCE BB S & T complete yes 5.65 5/14/2001 NoneD M. Canter BROADWAY ELEMENTARY Y4 E-rate functioning - passed T & A yes 3.45 8/22/02 8/22/2002 VC4

Page 36: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

J. Alther (213) 241 1800 LAN Status 9/13/20023:51 PM

Local Dist

Board Member School Site LAN Status as September 9, 2002

Internet Access

All Rooms

Student/ Computer

Ratio

Date BB LAN

Tested Accepted

Complete End to

End (Magic)

Date Erate LAN

Tested & Accepted

Y4 Classroom

Switch Install

Erate Vendor Y3/Y4

D M. Canter BROCKTON AVENUE ELEMENTARY funded Y4 E-rate - 30 % complete progress 16.53 VC4A M. Canter CALABASH STREET ELEMENTARY BB S & T Waiting for Local Dist FD and PM to put out to bid no 7.95 NoneC M. Canter CALVERT STREET ELEMENTARY BB S & T Waiting for Local Dist FD and PM to put out to bid no 8.40 NoneD M. Canter CANFIELD AVENUE ELEMENTARY funded Y4 E-rate - Verizon - in design progress 7.45 VZN4.5A M. Canter CANOGA PARK ELEMENTARY Y4 E-rate functioning - passed T & A yes 5.90 6/30/02 6/30/2002 VC4A M. Canter CANOGA PARK SENIOR HIGH Y4 E-rate - 55% complete progress 4.33 VZN4.5D M. Canter CANYON ELEMENTARY BB S & T bid, needs to be awarded LDFD Responsible no 4.94 NoneA M. Canter CAPISTRANO AVENUE ELEMENTARY funded Y4 E-rate - Verizon - in design progress 8.44 VZN4.5D M. Canter CASTLE HEIGHTS ELEMENTARY BB S & T bid LDFD responsible no 8.82 NoneA M. Canter CASTLEBAY LANE ELEMENTARY BB S & T 85% complete progress 8.09 NoneA M. Canter CHATSWORTH PARK ELEMENTARY BB S & T Waiting for Local Dist FD and PM to put out to bid no 10.55 NoneA M. Canter CHATSWORTH SENIOR HIGH BB S & T complete yes 4.14 3/13/2002 NoneD M. Canter CHEVIOT HILLS CONT (Hami) BB S & T complete yes 5.36 3/29/2001 NoneD M. Canter CLOVER AVENUE ELEMENTARY BB S & T 95% complete progress 6.03 NoneD M. Canter COEUR D'ALENE AVENUE ELEM BB S & T complete yes 4.12 12/4/2000 NoneA M. Canter COLUMBUS (CHRISTOPHER) MIDDLE BB S & T and Y2 E-rate complete - Y4 E-rate - upgrades yes 6.43 6/15/2001 VZN4.5C M. Canter COLUMBUS AVENUE EL (VAN NUYS) to open July 1, 2002 yes VZN4.5D M. Canter COMMUNITY CHARTER MIDDLE BB S & T Waiting for Local Dist FD and PM to put out to bid no NoneD M. Canter COWAN AVENUE ELEMENTARY BB S & T out to bid no 9.06 NoneD M. Canter CRESCENT HEIGHTS BLD ELE Y4 E-rate - in construction 45% complete progress 4.11 VC4A M. Canter DARBY AVENUE ELEMENTARY BB S & T 85% complete progress 8.98 NoneD M. Canter DEL REY CONT (Westchester) BB S & T complete yes 2.21 9/4/2001 None y2A M. Canter EL CAMINO REAL SENIOR HIGH BB S & T, Y2 E-rate complete yes 4.38 11/9/2001 None y2D M. Canter EMERSON (RALPH WALDO) MIDDLE Y3 E-rate functioning - passed T & A yes 5.12 5/22/02 7/9/2002 SBC3D M. Canter FAIRBURN AVENUE ELEM BB S & T Waiting for Local Dist FD and PM to put out to bid no 5.31 NoneC M. Canter FULLBRIGHT AVENUE ELEMENTARY Y4 E-rate functioning - passed T & A yes 20.16 8/9/02 8/9/2002 VC4A M. Canter GERMAIN STREET ELEMENTARY BB S & T Waiting for Local Dist FD and PM to put out to bid no 10.85 NoneA M. Canter HALE (GEORGE ELLERY) MIDDLE BB S & T Waiting for Local Dist FD and PM to put out to bid no 10.74 NoneD M. Canter HAMILTON (ALEXANDER) SENIOR HI BB S & T complete yes 4.27 3/29/2001 NoneA M. Canter HAMLIN STREET ELEMENTARY funded Y4 E-rate - Verizon - in design progress 7.52 VZN4.5A M. Canter HART STREET ELEMENTARY Y4 E-rate functioning - passed T & A yes 5.18 8/8/02 8/8/2002 VC4K M. Canter HAWAIIAN AVENUE ELEMENTARY BB S & T under construction - 98% Complete progress 5.04 VC4.5A M. Canter HAYNES ELEMENTARY BB S & T Waiting for Local Dist FD and PM to put out to bid no 3.62 NoneD M. Canter INDIAN SPRINGS CONT (UNI HS) BB S & T complete yes 1.88 7/27/1999 5/16/2002 NoneA M. Canter JUSTICE STREET ELEMENTARY BB S & T Waiting for Local Dist FD and PM to put out to bid no 6.56 NoneD M. Canter KENTER ELEMENTARY BB S & T Waiting for Local Dist FD and PM to put out to bid no 7.25 NoneD M. Canter KENTWOOD ELEMENTARY BB S & T bid LDFD responsible no 5.76 NoneA M. Canter LAWRENCE (ERNEST) MIDDLE funded Y4 E-rate - Verizon - in design yes 11.19 VZN4.5A M. Canter LEONIS (MIGUEL) CONT (El Camino) BB S & T and Y2 E-rate complete yes 4.17 11/9/2001 None y2A M. Canter LIMERICK AVENUE ELEMENTARY Y4 E-rate functioning - passed T & A yes 7.84 6/27/02 6/27/2002 VC4A M. Canter LOCKHURST DRIVE ELEMENTARY BB S & T Waiting for Local Dist FD and PM to put out to bid no 3.24 NoneD M. Canter LOYOLA VILLAGE ELEMENTARY BB S & T complete yes 12.15 7/11/2000 None y2D M. Canter MAR VISTA ELEMENTARY BB S & T and Y2 E-rate complete yes 5.18 5/4/1999 None y2D M. Canter MARINA DEL REY MIDDLE Y4 E-rate - 78% complete progress 6.59 VC4D M. Canter MARK TWAIN MIDDLE funded Y4 E-rate - Verizon - in design progress 9.35 VZN4.5D M. Canter MARQUEZ CHARTER SCHOOL ELEM BB S & T bid, not awarded LDFD and PM responsible yes 4.17 NoneC M. Canter NAPA STREET ELEMENTARY Y3 E-rate complete yes 4.13 5/22/2002 07/05/01 IBM3A M. Canter NEVADA AVENUE ELEMENTARY Y4 E-rate functioning - passed T & A yes 11.70 6/28/02 6/28/2002 VC4A M. Canter NOBEL (ALFRED BERNHARD) MIDDLE BB S & T Waiting for Local Dist FD and PM to put out to bid no 11.01 NoneD M. Canter OPEN Magnet - Center for Individual (Osage) ITD installed when school open yes 2.18 01/28/99 None

Page 37: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

J. Alther (213) 241 1800 LAN Status 9/13/20023:51 PM

Local Dist

Board Member School Site LAN Status as September 9, 2002

Internet Access

All Rooms

Student/ Computer

Ratio

Date BB LAN

Tested Accepted

Complete End to

End (Magic)

Date Erate LAN

Tested & Accepted

Y4 Classroom

Switch Install

Erate Vendor Y3/Y4

D M. Canter OVERLAND AVENUE ELEMENTARY BB S & T bid LDFD responsible no 5.29 NoneA M. Canter OWENSMOUTH CONT (Canoga Park) to be completed with Canoga Park HS progress 4.07 VZN4.5D M. Canter PACIFIC PALISADES ELEMENTARY BB S & T Waiting for Local Dist FD and PM to put out to bid no 3.61 NoneD M. Canter PALISADES CHARTER SH BB S & T complete yes 5.75 7/13/2001 NoneD M. Canter PALMS MIDDLE BB S & T Waiting for Local Dist FD and PM to put out to bid no 9.03 NoneC M. Canter PARKMAN (FRANCIS) MIDDLE BB S & T Waiting for Local Dist FD and PM to put out to bid no 7.28 NoneD M. Canter PASEO DEL REY NATURAL SCIENCE MAG BB S & T Waiting for Local Dist FD and PM to put out to bid no 5.92 NoneD M. Canter PHOENIX CONT (Venice) BB S & T 90% complete progress 2.06 NoneD M. Canter PLAYA DEL REY ELEMENTARY Y4 E-rate functioning - passed T & A yes 4.61 8/20/02 8/20/2002 VC4A M. Canter POMELO DRIVE ELEMENTARY BB S & T complete yes 9.24 6/13/2000 NoneC M. Canter PORTOLA(GASPER) M S Y3 E-rate complete yes 10.81 03/11/02 IBM3D M. Canter REVERE MIDDLE BB S & T complete yes 5.42 8/30/2001 NoneD M. Canter RICHLAND AVENUE ELEMENTARY BB S & T complete - Y4 E-rate 20% complete yes 5.61 4/17/2002 VC4D M. Canter ROSCOMARE ROAD ELEMENTARY BB S & T bid LDFD responsible no 5.83 NoneC M. Canter SERRANIA AVENUE ELEMENTARY BB S & T and Y2 E-rate complete yes 5.09 6/15/2001 None y2D M. Canter SHORT AVENUE ELEMENTARY BB S & T contract awarded waiting start date also Y4 E-rate Verizon progress 3.79 VZN4.5D M. Canter STERRY (NORA) ELEMENTARY Y4 E-rate functioning - passed T & A yes 4.03 8/28/02 8/28/2002 VC4D M. Canter STONER AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 5.73 8/23/02 8/23/2002 VC4A M. Canter STONEY POINT CONTINUATION BB S & T complete yes 2.32 3/13/2002 NoneA M. Canter SUNNY BRAE AVENUE ELEMENTARY Y4 E-rate functioning - passed T & A yes 9.14 8/5/02 8/5/2002 VC4A M. Canter SUPERIOR STREET ELEMENTARY funded Y4 E-rate - Verizon - in design progress 5.77 VZN4.5C M. Canter SUTTER (JOHN A.) MIDDLE Y3 E-rate complete yes 5.87 03/27/02 IBM3C M. Canter TAFT (WILLIAM HOWARD) SENIOR H BB S & T bid LDFD responsible no 4.39 NoneD M. Canter TEMESCAL CANYON HIGH (CONT) SCHOOL BB S & T complete yes 3.41 7/13/2001 NoneC M. Canter THOREAU (HENRY DAVID) CONT(Taft) BB S & T bid LDFD responsible no 3.75 NoneD M. Canter TOPANGA ELEMENTARY BB S & T Waiting for Local Dist FD and PM to put out to bid no 4.38 NoneA M. Canter TOPEKA DRIVE ELEMENTARY BB S & T Waiting for Local Dist FD and PM to put out to bid no 5.48 NoneD M. Canter UNIVERSITY SENIOR HIGH BB S & T and Y2 E-rate complete yes 4.11 7/27/1999 5/13/2002 None y2D M. Canter VENICE SENIOR HIGH BB S & T 90% complete progress 4.97 NoneD M. Canter Vine New Primary Center under construction progress NoneD M. Canter WALGROVE AVENUE ELEMENTARY Y4 E-rate functioning - passed T & A yes 11.69 8/21/02 8/21/2002 VC4D M. Canter WARNER AVENUE ELEMENTARY BB S & T 7% complete progress 10.55 NoneD M. Canter WEBSTER (DANIEL) MIDDLE Y4 E-rate - 73% complete progress 10.88 VC4A M. Canter WELBY WAY ELEMENTARY BB S & T 51% complete progress 6.84 NoneD M. Canter WESTCHESTER SENIOR HIGH BB S & T and Y2 E-rate complete yes 3.34 9/4/2001 None y2D M. Canter WESTMINSTER AVENUE ELEMENTARY Y4 E-rate functioning - passed T & A yes 3.64 8/30/02 8/30/2002 VC4D M. Canter WESTPORT HEIGHTS ELEMENTARY funded Y4 E-rate Verizon progress 14.67 VZN4.5D M. Canter WESTSIDE LEADERSHIP (ALT.) funded Y4 E-rate Verizon progress 6.52 VZN4.5D M. Canter WESTWOOD ELEMENTARY BB S & T Waiting for Local Dist FD and PM to put out to bid no 4.72 NoneC M. Canter WILBUR AVENUE ELEMENTARY BB S & T Waiting for Local Dist FD and PM to put out to bid no 8.77 NoneC M. Canter WINNETKA AVENUE ELEMENTARY Y3 E-rate complete yes 8.56 03/11/02 IBM3A M. Canter WOODLAKE AVENUE ELEMENTARY BB S & T 52% complete progress 13.76 NoneD M. Canter WRIGHT (ORVILLE) MIDDLE BB S & T Waiting for Local Dist FD and PM to put out to bid no 21.12 NoneI M. Lansing 107TH ST (ONE HUNDRED SEVENTH STREET EL) Y3 E-rate - 65% complete progress 7.96 6/24/2002 SBC3.5I M. Lansing 109THh St (ONE HUNDRED NINTH STREET EL) Y3 E-rate - 83% complete progress 6.07 6/24/2002 SBC3.5I M. Lansing 112TH ST (ONE HUNDRED TWELFTH STREET) ELE Y3 E-rate functioning - passed T & A yes 5.16 8/29/02 8/29/2002 SBC3.5I M. Lansing 116TH ST (ONE HUNDRED SIXTEENTH ST EL) Y3 E-rate functioning - passed T & A yes 6.15 8/7/02 8/7/2002 SBC3.5I M. Lansing 118TH ST (ONE HUNDRED EIGHTEENTH STREET) BB S & T and E-rate - passed T & A yes 6.33 8/24/2000 3/20/2002 7/17/02 7/17/2002 SBC3.5I M. Lansing 122ND St (ONE HUNDRED TWENTY-SECOND STREET) Y3 E-rate functioning - passed T & A yes 5.03 8/7/02 6/24/2002 SBC3.5K M. Lansing 135TH ST (ONE HUNDRED THIRTY-FIFTH STREET) Y3 E-rate complete yes 5.97 3/18/2002 06/28/01 VC3

Page 38: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

J. Alther (213) 241 1800 LAN Status 9/13/20023:51 PM

Local Dist

Board Member School Site LAN Status as September 9, 2002

Internet Access

All Rooms

Student/ Computer

Ratio

Date BB LAN

Tested Accepted

Complete End to

End (Magic)

Date Erate LAN

Tested & Accepted

Y4 Classroom

Switch Install

Erate Vendor Y3/Y4

K M. Lansing 153RD ST (ONE HUNDRED FIFTY-THIRD ST) Y3 E-rate complete yes 6.50 6/13/2002 06/11/01 VC3K M. Lansing 156TH ST (ONE HUNDRED FIFTY-SIXTH ST EL) Y3 E-rate complete yes 5.86 05/20/01 VC3K M. Lansing 15TH ST (FIFTEENTH ST ELEMENTARY) Y4 E-rate functioning - passed T & A yes 4.31 5/21/02 5/21/2002 VC4K M. Lansing 186TH St (ONE HUNDRED EIGHT-SIXTH ST EL) Y3 E-rate complete yes 13.16 5/20/2002 05/26/01 VC3K M. Lansing 232nd PL (TWO HUNDRED THIRTY-SECOND PL) Y4 E-rate Vector - in design progress 8.38 VC4.5K M. Lansing 7th ST (SEVENTH ST ELEM) BB S & T Waiting for Local Dist FD and PM to put out to bid no 6.34 NoneI M. Lansing 92nd ST (NINETY-SECOND ST ELEM) Y3 E-rate functioning - passed T & A yes 7.33 8/23/02 8/23/2002 SBC3.5I M. Lansing 93rd ST (NINETY-THIRD ST ELEM) Y3 E-rate functioning - passed T & A yes 7.36 9/4/02 9/4/2002 SBC3.5G M. Lansing 95th ST (NINETY-FIFTH ST ELEM) Y3 E-rate complete yes 4.40 7/17/2002 06/25/01 8/5/2002 VC3I M. Lansing 96th ST (NINETY-SIXTH ST ELEM) Y3 E-rate functioning - passed T & A yes 5.19 9/3/02 9/3/2002 SBC3.5I M. Lansing 99th ST (NINETY-NINTH ST ELEM) Y3 E-rate functioning - passed T & A yes 11.14 7/25/02 6/11/2002 SBC3.5H M. Lansing ACCELERATED CHARTER SCHOOL 11 rooms existing - BB S & T yes 3.97 NoneK M. Lansing AMBLER AVENUE ELEMENTARY Y4 E-rate Vector - in design progress 24.80 VC4.5K M. Lansing AMESTOY ELEMENTARY Y3 E-rate complete yes 4.69 05/29/01 VC3K M. Lansing ANGEL'S GATE (CONT.) (San Pedro) BB S & T complete yes 3.2212/22/2000 NoneK M. Lansing ANNALEE AVENUE ELEMENTARY Y4 E-rate Vector - in design progress 11.67 VC4.5H M. Lansing ARCO IRIS PRIMARY CENTER Y3 E-rate functioning - passed T & A yes 3.41 8/15/2002 06/06/01 6/10/2002 SBC3H M. Lansing ASCOT AVENUE ELEMENTARY BB S & T and Y2 E-rate complete: Y3 passed T&A yes 4.43 3/1/2000 4/14/2002 8/2/02 6/10/2002 SBC3K M. Lansing AVALON CONTINUATION BB S & T Waiting for Local Dist FD and PM to put out to bid no 4.83 NoneK M. Lansing AVALON GARDENS ELEMENTARY BB S & T and Y2 E-rate and: Y3 E-rate complete yes 3.08 8/31/1999 4/15/2002 6/21/01 VC3K M. Lansing BANDINI STREET ELEMENTARY Y4 E-rate Vector - in design progress 3.12 VC4.5K M. Lansing BANNEKER (BENJAMIN) SPECIAL ED Y3 E-rate complete yes 5.95 05/31/01 VC3K M. Lansing BANNING (PHINEAS) SENIOR HIGH BB S & T 23% Y4 E-rate progress 2.99 VC4.5I M. Lansing BARRETT (CHARLES W.) ELMENTARY Y3 E-rate functioning - passed T & A yes 9.44 8/1/02 6/11/2002 SBC3.5K M. Lansing BARTON HILL ELEMENTARY Y4 E-rate functioning - passed T & A yes 6.11 7/24/02 7/24/2002 VC4K M. Lansing BONITA STREET ELEMENTARY Y4 E-rate Vector - in design progress 15.21 VC4.5K M. Lansing BROAD AVENUE ELEMENTARY BB S & T complete yes 4.92 6/21/2001 1/29/2002 VC4.5K M. Lansing BROADACRES AVENUE ELEMENTARY Y4 E-rate Vector - in design progress 4.82 VC4.5K M. Lansing CABRILLO AVENUE ELEMENTARY Y4 E-rate functioning - passed T & A yes 11.56 5/24/02 5/24/2002 VC4K M. Lansing CARNEGIE (ANDREW) MIDDLE Y4 E-rate Vector - in design progress 15.28 VC4.5K M. Lansing CAROLDALE LEARNING CENTER Y4 E-rate Vector - in design progress 8.19 VC4.5K M. Lansing CARSON SENIOR HIGH BB S & T 93% complete yes 3.81 NoneK M. Lansing CARSON STREET ELEMENTARY Y4 E-rate functioning - passed T & A yes 7.60 6/6/02 6/6/2002 VC4K M. Lansing CATSKILL AVENUE ELEMENTARY BB S & T and Y2 E-rate complete yes 8.14 3/7/2001 VC4.5G M. Lansing CENTURY PARK ELEMENTARY BB S & T and Y3 E-rate complete yes 8.47 5/19/2000 5/17/01 8/5/2002 VC3K M. Lansing CHAPMAN ELEMENTARY Y3 E-rate complete yes 9.31 6/10/2002 05/27/01 VC3G M. Lansing CIMARRON AVENUE ELEM Y3 E-rate complete yes 8.29 06/20/01 8/5/2002 VC3G M. Lansing CLAY (HENRY) MIDDLE Y3 E-rate complete yes 9.27 06/28/01 VC3I M. Lansing COMPTON AVENUE ELEMENTARY Y3 E-rate - 77% complete progress 4.22 SBC3.5K M. Lansing COOPER (JAMES FENIMORE) OPPORT BB S & T Waiting for Local Dist FD and PM to put out to bid no 2.64 NoneK M. Lansing CRESTWOOD STREET ELEM BB S & T Waiting for Local Dist FD and PM to put out to bid no 5.74 NoneK M. Lansing CURTISS (GLENN HAMMOND) MIDDLE BB S & T Waiting for Local Dist FD and PM to put out to bid no 7.77 NoneK M. Lansing DANA (RICHARD HENRY) MIDDLE BB S & T and Y2 E-rate complete yes 5.93 8/16/2000 VC4.5K M. Lansing DEL AMO ELEMENTARY Y4 E-rate Vector - in design progress 7.08 VC4.5K M. Lansing DENKER AVENUE ELEMENTARY Y3 E-rate complete yes 7.99 2/14/2002 05/26/01 VC3K M. Lansing DODSON M S BB S & T 11% progress 13.81 NoneK M. Lansing DOLORES STREET ELEMENTARY Y4 E-rate Vector - in design progress 8.70 VC4.5K M. Lansing DOMINGUEZ ELEMENTARY BB S & T and Y2 E-rate complete yes 7.44 3/7/2001 VC4.5I M. Lansing DREW (CHARLES) MIDDLE Y3 E-rate - 35% complete progress 5.42 6/24/2002 SBC3.5K M. Lansing EAGLE TREE CONT (Carson) BB S & T 78% complete progress 2.33 None

Page 39: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

J. Alther (213) 241 1800 LAN Status 9/13/20023:51 PM

Local Dist

Board Member School Site LAN Status as September 9, 2002

Internet Access

All Rooms

Student/ Computer

Ratio

Date BB LAN

Tested Accepted

Complete End to

End (Magic)

Date Erate LAN

Tested & Accepted

Y4 Classroom

Switch Install

Erate Vendor Y3/Y4

I M. Lansing EDISON (THOMAS A.) MIDDLE Y3 E-rate - 83% complete progress 5.28 6/24/2002 SBC3.5G M. Lansing ELLINGTON (DUKE) CONT. (Wash) BB S & T and Y3 E-rate complete yes 8.71 5/24/2000 6/14/01 8/6/2002 VC3K M. Lansing ESHELMAN AVENUE ELEMENTARY Y4 E-rate functioning - passed T & A yes 7.85 04/29/02 4/29/2002 VC4I M. Lansing FIGUEROA STREET ELEMENTARY Y3 E-rate - 48% complete progress 5.12 SBC3.5K M. Lansing FLEMING (ALEXANDER) MIDDLE Y4 E-rate Vector - in design progress 9.64 VC4.5I M. Lansing FLOURNOY (LOVELIA P.) ELEMENTA Y3 E-rate - 89%complete progress 8.82 6/24/2002 SBC3.5K M. Lansing FRIES AVENUE ELEMENTARY BB S & T and Y2 E-rate complete yes 3.6711/21/2000 7/8/2002 VC4.5K M. Lansing GARDENA ELEMENTARY Y3 E-rate complete yes 5.28 5/16/2002 05/16/01 VC3K M. Lansing GARDENA SENIOR HIGH BB S & T 98% complete -Mod under construction: Y3 E-rate complete yes 5.61 6/29/01 VC3I M. Lansing GOMPERS (SAMUEL) MIDDLE Y3 E-rate functioning - passed T & A yes 7.96 9/5/02 9/5/2002 SBC3.5I M. Lansing GRAPE STREET ELEMENTARY Y3 E-rate functioning - passed T & A yes 17.98 7/29/02 7/29/2002 SBC3.5I M. Lansing GRIFFITH JOYNER (102nd) Y3 E-rate - 67% complete progress 4.48 SBC3.5K M. Lansing GULF AVENUE ELEMENTARY Y4 E-rate functioning - passed T & A yes 10.63 8/9/02 8/9/2002 VC4K M. Lansing HALLDALE ELEMENTARY Y4 E-rate Vector - in design progress 10.92 VC4.5K M. Lansing HARBOR CITY ELEMENTARY Y4 E-rate functioning - passed T & A yes 5.03 04/26/02 4/26/2002 VC4J M. Lansing HOLMES AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 5.88 8/28/02 8/28/2002 SBC3.5H M. Lansing HOOPER AVENUE ELEMENTARY BB S & T and Y2 E-rate complete: add Y3 passed T &A yes 5.0610/17/2000 4/4/2002 11/5/01 6/10/2002 SBC3H M. Lansing JEFFERSON (THOMAS) S H BB S & T and Y2 E-rate complete: add Y3 functioning, need to pass T&A yes 3.25 1/31/2001 5/29/2002 SBC3H M. Lansing JOHNSON (DOROTHY V.) OPPORT Y3 E-rate functioning - needs T & A yes 2.49 8/20/2002 5/29/2002 SBC3I M. Lansing JORDAN (DAVID STARR) SENIOR HI BB S & T and E-rate functioning - passed T & A yes 9.27 6/22/2001 5/23/02 6/13/2002 SBC3.5I M. Lansing KING/DREW MEDICAL MAGNET HIGH BB S & T and E-rate functioning - passed T & A yes 4.77 7/12/02 7/12/2002 SBC3.5K M. Lansing LEAPWOOD AVENUE ELEMENTARY Y4 E-rate Vector - in design progress 4.89 VC4.5K M. Lansing LELAND STREET ELEMENTARY Y4 E-rate Vector - in design progress 5.65 VC4.5I M. Lansing LOCKE (ALAIN LEROY) SENIOR HIG Y3 E-rate functioning - passed T & A yes 7.95 7/29/02 7/29/2002 SBC3.5K M. Lansing LOMITA MATH/SCIENCE MAGNET BB S & T Waiting for Local Dist FD and PM to put out to bid no 4.90 NoneI M. Lansing MARKHAM (EDWIN) MIDDLE BB S & T and E-rate functioning - passed T & A yes 9.35 8/22/2001 7/16/02 6/10/2002 SBC3.5K M. Lansing MEYLER STREET ELEMENTARY Y4 E-rate functioning, needs T & A yes 8.74 VC4G M. Lansing MIDDLE COLLEGE HIGH (ALT.) Y3 E-rate complete yes 2.69 06/25/01 VC3I M. Lansing MIRAMONTE ELEMENTARY Y3 E-rate - 50% complete progress 3.46 6/24/2002 SBC3.5K M. Lansing MONETA CONTINUATION BB S & T 98% complete - Y3 E-rate complete yes 3.35 5/26/01 VC3K M. Lansing NARBONNE (NATHANIEL) SENIOR HI BB S & T and Y2 E-rate complete yes 5.23 12/4/2001 None y2H M. Lansing NEVIN AVENUE ELEMENTARY BB S & T and Y2 E-rate 95% com: Y3 E-rate complete yes 4.80 7/28/02 5/29/2002 SBC3K M. Lansing NORMONT ELEMENTARY Y4 E-rate functioning - passed T & A yes 2.75 6/12/02 6/12/2002 VC4K M. Lansing PARK WESTERN PLACE ELEMENTARY Y4 E-rate Vector - in design progress 1.33 VC4.5I M. Lansing PARMELEE AVENUE ELEMENTARY Y3 E-rate - 42% complete progress 5.09 6/28/2002 SBC3.5K M. Lansing PATTON (GEORGE S.) CONT (Narbonne) BB S & T complete yes 4.67 12/4/2001 None y2K M. Lansing PEARY (ROBERT E.) MIDDLE Y3 E-rate complete yes 11.36 06/07/01 VC3K M. Lansing POINT FERMIN ELEMENTARY Y4 E-rate Vector - in design progress 6.77 VC4.5K M. Lansing PRESIDENT AVENUE ELEMENTARY Y4 E-rate Vector - in design progress 11.92 VC4.5K M. Lansing PURCHE AVENUE ELEMENTARY Y3 E-rate complete yes 8.95 06/11/01 VC3I M. Lansing RILEY (THOMAS) HIGH (ALT.) Y3 E-rate - 60% complete progress 7/2/2002 SBC3.5I M. Lansing RITTER ELEMENTARY BB S & T and E-rate functioning - passed T & A yes 5.8711/21/2000 6/4/2002 7/28/02 6/10/2002 SBC3.5I M. Lansing RODIA (SIMON) CONTINUATION BB S & T complete Y3 E-rate functioning yes 2.85 6/23/2001 SBC3.5I M. Lansing RUSSELL ELEMENTARY Y3 E-rate - 35% complete progress 7.52 6/24/2002 SBC3.5K M. Lansing SAN PEDRO SENIOR HIGH BB S & T and Y2 E-rate complete yes 8.13 4/22/2002 None y2K M. Lansing SELLERY (C. MORLEY) SPECIAL ED Y3 E-rate complete yes 2.93 05/19/01 VC3K M. Lansing SOUTH SHORES/CSUDH VISUAL & PE BB S & T complete: E-rate functioning: add Y3 passed T &At yes 3.96 8/24/2000 3/1/02 SBC3K M. Lansing TAPER AVENUE ELEMENTARY BB S & T Waiting for Local Dist FD and PM to put out to bid no 8.35 NoneK M. Lansing TOWNE AVENUE ELEMENTARY Y4 E-rate functioning - passed T & A yes 6.28 8/14/02 8/14/2002 VC4H M. Lansing TRINITY STREET ELEMENTARY Y3 E-rate functioning - passed T & A yes 8/15/2002 12/11/01 5/28/2002 SBC3

Page 40: Los Angeles Unified School District · Verizon Yr4.5 26 25 0 0 1 0 0 0 0 TOTAL 539 51 8 21 24 14 421 345 154 Status -Yr3,Yr4, Yr 4.5 - Created From Data Dated: 9-9-02 Construction

J. Alther (213) 241 1800 LAN Status 9/13/20023:51 PM

Local Dist

Board Member School Site LAN Status as September 9, 2002

Internet Access

All Rooms

Student/ Computer

Ratio

Date BB LAN

Tested Accepted

Complete End to

End (Magic)

Date Erate LAN

Tested & Accepted

Y4 Classroom

Switch Install

Erate Vendor Y3/Y4

I M. Lansing TRUTH (SOJOURNER) CONT Y3 E-rate functioning - passed T & A yes 5.90 7/29/02 6/30/2002 SBC3.5K M. Lansing VAN DEENE AVENUE ELEM Y4 E-rate functioning - passed T & A yes 11.95 6/7/02 6/7/2002 VC4H M. Lansing WADSWORTH AVENUE ELEMENTARY Y3 E-rate functioning - needs T & A yes 6.28 6/10/2002 SBC3G M. Lansing WASHINGTON (GEORGE) PREP HS BB S & T and Y2 E-rate and: Y3 E-rate complete yes 2.81 5/24/2000 6/14/02 8/6/2002 VC3I M. Lansing WEIGAND AVENUE ELEMENTARY Y3 E-rate - 90% complete progress 2.95 6/30/2002 SBC3.5G M. Lansing WEST ATHENS ELEMENTARY BB S & T and Y2 E-rate and: Y3 E-rate complete yes 4.59 7/12/2000 5/22/01 8/5/2002 VC3K M. Lansing WHITE (STEPHEN M.) MIDDLE BB S & T complete - Y4 E-rate upgrades yes 6.39 3/8/2001 VC4.5K M. Lansing WHITE POINT ELEMENTARY BB S & T construction started progress 4.53 NoneK M. Lansing WILLENBERG (ERNEST P.) SPECIAL Y4 E-rate functioning - passed T & A yes 3.88 8/6/02 8/6/2002 VC4K M. Lansing WILMINGTON MIDDLE Y4 E-rate functioning - passed T & A yes 7.17 8/29/02 8/29/2002 VC4K M. Lansing WILMINGTON PARK ELEMENTARY Y4 E-rate Vector - in design progress 18.37 VC4.5G M. Lansing WOODCREST ELEMENTARY Y3 E-rate complete yes 8.16 06/26/01 8/5/2002 VC3