Los Angeles Counw Metropolitan TO: MTA BOARD OF DIRECTORS...
Transcript of Los Angeles Counw Metropolitan TO: MTA BOARD OF DIRECTORS...
Los Angeles Counw
Metropolitan
Transportation
AuthoriW
One Gateway Plaza
Los Angeles, CA
900[2
Hailing Address:
P.O. Box 194
Los Angeles, CA 90053
TO:
FROM:
SUBJECT:
February 23, 1996
MTA BOARD OF DIRECTORS
STANLEY G. PHERNAMBUCQ/~~/
MTA CONSTRUCTION NONCONFORMANCE REPORTS
Attached please find copies of the Nonconformance Reports (NCRs) receivedby the MTA Director of Quality Management for the period of February 15-22,1996.
If you have any questions, please call Bill Moore, Director of QualityManagement, at 213-244.-6109.
SGP:WRM:gg ~ ......
Attachments
John Adams, USG 18Dave Sievers, USG 18-05Charles Stark, USG 16-01Steve Polechronis, USG 16Elaine Stewart, USG 17Bill Moore, USG 24-03Kim Kimball; USG 25Judy Schwartz, USG 25-03AI Larado, USG 20-21
~JMA
Non-Conformance Report
May Affect ROD
Yes No NA
Initials Date
1. Line: Contract No.: Year: NCR No.:I11 RED C0301R 95 004
4. LocationMain Station
2. Contract Name:Hollywood / Highland Station & Tunnels
5. NCR Type: j 6. Contractor/Supplier:Steel Supports
I T-S/P
3. Date:11-30-95
7. Specification Section/Drawing No.:Spec. Sect. 01522 and Submittal No. 01522-1.3.B-2.01, Deck Section & Details D-2 & D-3.
8. Originator: Phone No.: Hold Tag No.Burke Mees 213-467-8783 N/A
9. Contract requirement and nonconformance description:Submittal No. 01522-1.3.B-2.01 details D-2 + D-3. Drawings cannot be checked without backup calculations.TSP is proceeding with the work without an approved drawing.
10. Lead Inspector: /,1
Will~
Date:4 Dec 1995
11. Reply requested from:Tudor-Saliba/Perini
12. Reply due date:11 Dec 1995
Root cause ~)f the problem and action(s) to prevent recurrence (completed by the contractor):
14. Corrective action(s) (completed by the contractor):
15. Prepared By:
18. Disposition status:
19. Engineer approval
Date: I 16. Implementation Date: t lf7 RE Approval: Date:
R~e~ ~Rework 0 Repair 0 Use-As-Is
Date:
21. Verification that nonconforming condition has been corrected:
22. Inspection:
Print Name Signature Date
Form 83 (11/95)
]Ills REPORT LISTS ALL LOGGED SUBMITTALS METRO SYSTEMSORTED BY SUBMITTAL NUMBER. R82 - Metro Red Line Seg-3 N. Hlwd.
SUBMITTAL STATUS LOG: MASTERRECEIVED DATE RANGE: ALL - ALL DATA AS OF: 02/08/96DATA SCOPE: R82C0301
REGISTER
CONTRACT: C0301 /HOLLYWOOD/HIGHLANDSTATIONAND TUNNELS COMPLETE CONTRACTOR: TUTOR-SALIBA-PERINI, J.V.
PROCESS DA TES:[1] = DA TES TO~FROM RE; [2] -- DATES TO~FROM REVIEWERSMARIGN TAGS :[~/] ~ COMPLETED; [11] = OVERDUE FROM CONTRACTOR; [#] = IN PROCESS; (.) = RESPONSE DUE (+) RESPONSE RECEIVEDDISPOSITION : APP = APPROVED ANR = APPROVED AS NOTED, RESUBMITTAL REQUIRED AN -- APPROVED AS NOTED 1NO I~ESUIYMITTAI) REJ ~ REJECTED FRO = FOR RECORD ONLY
SUBMITTAL TITLESUB # FROM SEQ ]-O FROM TO SEQ # SUB/VENDOR DISPOSITION AGEI1] C]R ~ # RE’VIEW EI~"~T~W C"-TR ~ REVIEW RESPONSIBILITY BALL IN COURT
CDRL#/TYPE 12] RE RED # REVIEW REVIEW RE DRE ~’
01522-1.35-2.02 DECKING & SHORING PLANS: 11117195 00626 11117195 12/12/95 12114195 0541 AN 27ICLCI DRAWINGS AND CALCULATIONS 11121195 11121195 12107195 12/07/95 EMC COMPLETE
O1530-1.4.B-1.00 WORKING DRAWINGS OF 05/15/95 00043 05116/95 06/07195 06/09195 43 ANR 25IWDI BARRIERS AT LA BREA SITE 05/19/95 05123/95 06/06/95 06107195 EMC CONTRACTORLa Brea Shaft Layout
01535-1.4.B-1.00 CONSTRUCTION FENCING- 05/15195 00041 05116/95 05131195 06101195 27 REJ 17IWDI LAYOUT & CONSTRUCTION 05/19/95 05/23/95 05130195 05/31/95 EMC COMPLETE
DETAILS La Brea Shaft- Layout PLan
01535-1.4.C-1.00 CONSTRUCTION FENCING- 05/11/95 00026 05/12195 06/01/95 0027 REJ 21IWDICLC WORKING DRAWINGS & O5/12/95 O5/17/95 05/26/95 05/26/95 EMC COMPLETE
INSTALLATION
01535-1.4.C-1.01 CONSTRUCTION FENCING AT LA 05/30/95 00072 05131195 06/09/95 06109195 42 ANR 10/WD/CLC BREA- WORKING DRAWINGS & 06/01/95 06/02/95 06/06/95 06/07/95 EMC COMPLETEINSTALLATION Sound Fencing @ La Brea Site (Resubmittal)
01535-1.4.C-1.02 CONSTRUCTION FENCING ATLA 06/22195 00167 06123195 07114195 07/14/95 0132 AN 22IWDICLC BREA- WORKING DRAWINGS & 06/26/95 06/28/95 07112/95 07/13195 EMC COMPLETE
INSTALLATION Sound Fencing @ La Brea Site (Resubmittal)
01545-1.3.B-1.00 WORKSITE SAFETY REQ.’S- 05116/95 00027 05/18195 08/09/96 08111195 0179 REJ 88/PRC/ TRAINING PROC. & EQUIPMENT CM CONTRACTORLIST TSP SAFETY MANUAL & TRAINING PROCEDURES FOR REVIEW
O1545-1.3.B-8.00 WORKSITE SAFETY 12106/95 00692 12107195 01103196 01108196 0622 AN 33/PRC/SFC REQUIREMENTS - SAFETY EMC COMPLETEENGINEER TUNNELS RESUME - SUEHOWARD
01545-1.3.C-1.O0 WORKSITE SAFETY REQ.’S- 05112195 00010 05117195 08/09/95 08111195 0177 ANR 91/PRC/SFC QUALIFICATIONS & CERT’S FOR MTA COMPLETEGAS DETECTION
01545-1.3.C-1.01 WORKSITE SAFETY REQ.’S- 08125195 00335 09/05/95 01/29/96 01129/96 0741 AN 157
QUERY: Include all records where (SUB->REC DTis greater than or equal to SDATE) and where (SUB->REC DTis less than or equal to EDATE)R£2 - C0301 PAGE 9 - DUNCAN LESTINA,,,v 2.2 o~f~sm,~ ~ SUBMITTAL REGISTER 02/08/96 11:53:54
Tu~or-Saliba-P~riNCO30t
DEC ! 9 1995
RECEIVED1717 N. Highland Avenue, Suite 711 [213] 464-1098 Contractors Ucense #428525
FAX [213) 469-3506
CONTRACTORS ENGINEERS
December 18, 1995
METROPOLITAN TRANSIT AUTHORITYC/O JMA JOINT VENTURE1717 North Highland AvenueSuite 701Hollywood, CA 90028
At-l:ention: William LeechResident Engineer
SERIAL LETTER NO.REFERENCE:
CO301-CRE-0739HOLLYWOOD/HIGHLAND STATIONCONTRACT C0301
SUBJECT: NONCONFORMANCE REPORT NCR NO 4 - STEEL SUPPORTS
Gentlemen:
We acknowledge receipt of JMA’s NCR No. 4 citing Tutor-Saliba-Perini for proceeding onwork without approval of Submittal #01522.1.3.B-2.01.
Please note that on the date your NCR was written (11-30-95), Tutor-Saliba-Perini hadalready resubmit-ted this submittal under 01522.1.3.B-2.02 on 11-13-95 (CRE-0626) and hadresponded t:o all EMC’s comments on the previously rejected submittal. Any work withwhich we are proceeding is based on the resubmittal ,~01522.1.3.B-2.02.
Please close out this NCR based upon the above information.
:Very truly yours,
TUTOR-SALIBA-PERINI
Project Manager
LM/MY/rssAttach ment
CC: D.L. RandallCorrespondence FileReading FileSub m i~al #01522.1.3.B-2.02
CM 1 22.1
Non-Conformance Report
12. May Affect ROD
5~idals Date JMA2. Hollywood / Highland Station & Tunnels
6. Contractor:
6. Sub/Supplier
Contr. St. Rep:
1. Seg. EI Red Line, Contract C0301R
Tutor-SalibalPerini Contract Day: 236
N/A Report Time: z~0o ~..
E. Ammons 8. Hold Tags: NO / YES ~ --
1. NCR No.: 83. Date: 12/22/95
Day: Friday
Nonconforming Item (Short Title):4. Location: La Brea Shafts Crosspassages No. 39A (AR)(AL)5. NCR Type (circle): Mech Conc Weld (Stl Sup) Elect Test Sys Other:9. Description of Non-Conformance and Contract Requirements (Include Specific Requirement Violated}:
In reference to Paragraph No. 4, Lines 1 and 2 of the attached page titled "Hollywood/HighlandStation C0301 Crosspassage Shoring" and Construction Work Plan. Item No. 5, intermediatestruts were not placed.
7. Ref (SubmiEal No.s) 0231 2-1.4.R-3.01/01 460.1.4.A-1 2.00
8. Originator: J.C. Ja.r~o Phone No.: 213-467-8783
10. JMA Validation: (f’~,~f~y( Date: {.~_~/~Z.~ 12. TSP Reply Date:
Date: 12/22/95
1 3. Root Cause of Problem and Action(s) to Prevent Recurrences:
14. Corrective Action(s):
18. Disposition : r-I Use As Is [] Repair ~Rework [] Reject / Scrap [] Return to Supp15. TSP Prepared By (print/sign): .~<’~_~ ~/-’~’~’~"~--4/ "~ /~ ~ // -~ Date:
19. EMC Approval {for Use As Is and Rel~aif} (print/sign):,..~-.~.
. Date:
20. JMA Concurrence (print/sign): ~,.), ~"~AW~ ~,~~l~.~-~-. Date:~!:4~2~~"~’=.=~-~5:’~g:. (~, R E4 NSP E~O N:; & "(~O RRE~O NhVER~’~:A~=~-~ ~"~2~ =-’~’-~#5:)
Reinspected by TSP: Date: I ~ceote~ejected byD’S.PL ,
22. Reinspected by JMA~’~/£.~7~ate: /~-~A)’ X, L.2.2~’~ccep~/Re_~e.~’~;[ by JMA:
21. Correction Verification Comments:
;rigi~ato;:-//-~’/~/-~’~ Date: ~/~’~/~ I JMA Resident Enginee~ ~~&~-4 Date:
, / ¯ ....JMA QA/(~:~ ~_.~ Date: ~-~-~"-~" I TSP Prolect Manager: Date:
REVIEWER’S
{~[t-N~TT_A.CS: Lead Insp ~ RE ARE QMQC Group Page 1 of 3
cc: D. E~trada, MTA; N. Shiota, MTA; I. Hawley, JMA; B. Mee~, JM.A; O. Smiley, JMA
NCROO08.XLS Rev. 12/26/95
HOLLYWOOO / HIGHLAND STATION C0301CROSSPASSAGE SHORING
References: "Earth Tunneling with Steel Supports" and"Rock Tunneling with S~eel Supports"Both by Proctor & White
excessive deflection or movement of the support system.
Ddving and shoring a horizontal drift is more of an art than a science. If the standing time of anexcavation is greater than the time required to place the permanent support, shoring is notrequired. The following is standard practice in the mining and tunneling industry.
Place the tunnel lagging support frames in one tunnel. Open a four foot wide window adiacentto the crosspassage.
The following calculations show that the ribs and posts have more than adequate capadty tosupport the design loads. Calculation sheet 13 of 16 shows that the design load thrust in thearch rib is 71.1 kips. The horizontal thrust at the top of the post is 71.1 x Tan 40.3 - 7.4 = 52.9kips. This thrust is supported by hard wood blocking at the intersection of the arch rib and post.The vertical load to the post is 71.1 x Cos 49.7 = 46 kips. This load is supported by a l’-g"square x 6" concrete, fc’ = 4,000 psi footing block reinforced with 4 - #-4 Bottom each way.
The upper portion of the drift is mined to a distance of four feet. An arch fib and the upperportion of the post and a intermediate strut is placed. Before driving the upper portion of thedrift another four feet, the roof and walls shall be shotcreted between adiacent ribs and posts toa minimum thickness of 3.5 inches. The shotcrete shall be reinforced with 6x6 / W6xW6 VWVFwith 3/4 " minimum coverage. Drive heading to within four feet of the opposing tunnel.
From the odginal starting point, excavate the lower half of the drift for a distance of four feet.Place a wall beam if required to support the upper section of the post.the lower section of the post and the lower strut. Place shotcrete and Place the footing block,
6x6 / W6xW6 WWFbefore driving the drift an additional four feet. Continue the process until the drift is within fourfeet of the opposing tunnel.
Place the tunnel lagging support frames in the opposing tunnel. Open a four foot wide windowadjacent to the crosspassage. Complete,the excavation of the crosspassage. Place the HDPEliner.
Place the base slab of the crosspassage. After the base slab has gained strength, remove theupper strut and complete placement of the crosspassage.
As a contingency, material shall be available to add additional supports in the event of
12.
13.
14.
16.
17.
NOT~
. CROSS PASSAC~ CONSTRUCTION~is ~p outlines ~e sequence of even~, ccns~ion me~ods, respansibili~es and me.otis ofve~fying ~at sll work mee~ ~e Con~ Oo~men~ refluir8men~.
~ ~ Sumey Tunnels and la~ze posi~on of Cross ~ssages.
2. Ins~ll Cross Passage Breakou[ F~me in accor~snc~ wib~ aOpraved ~esignsubmi~l.
11. P[ace FooEing SIo~, lower
Instil wire mesh and shoCcrece.
ReDeaE S~eDs 9 £hrough 12 until mine¢ ~rough ¢o o~er ~nnel.
Place HDPE on lower Do,on ~o comolete cove~ge.
Remov.e.Ui3per Sr.ruts.
Complet:e Walls and Roof¯
The Tunnel SuperinI:endenEi~.as prirrra.,-y resi3d.nsibiliW t:o ensure conformance co al3prove~ design.
Sul3c/orC o’r-~xcavaEion designed ~y Con~-~or ~-.nd reviewed by Au~qcdW or its designee.
zvor~K is subje~ co ins~ec~on ~y Au~cfiC~ cr J~ designee.
. ~,,~ ~-~.~ ’~ ~- ~ ~"~ ~ - d ~,
Tutor-Saliba-Pcrini
1717 N. Highland Avenue, Suite 711 [213) 464-1098 Contractors license #428525FAX [213] 469-~506
CONTRACTORS ENGINEERS
January 29, 1996
METROPOLITAN TRANSIT AUTHORITYC/O JMA JOINT VENTURE1717 NOrth Highland AvenueSuite 701Hollywood, CA 90028
A~ention: John HawleyResident Engineer
SERIAL LETTER NO.REFERENCE:
CO301-CRE-0907HOLLYWOOD/HIGHLAND STATIONCONTRACT C0301
SUBJECT: NONCONFORMANCE REPORT
Gentlemen:
Please be advised this nonconformance condition has been corrected. The Intermediate struts havenow been placed in their required position in accordance with the approved submittals.
In light of this fact, please close out NCR #8.
Very truly yours,
TUTOR-SALIBA-PERINI
Project Manager/
LM/MY/rSs
CC: D.L. RandallCorrespondence FileReading FileNCR #8
CM 1 22.
Daily Inspection Report: Work SummaryHollywood / Highland Station & Tunnels
Contractor: Tutor-SalibalPerini Contract Day:Contr. St. Rep: :.~./4r~,n-~c-~ Shift Start:
Inspector: ~ ~’£~:4~:~ 0cc.~ Shi~ End:
Contract C0301R
Shift~ S’wing / Grave J
Activity No./REF Document~ * Summary of Work Performed Location
Prime /Subs
Re/erance documenL~ are contract plans & Necit.]~dons and contr~tor’s approved subgdr~.Is (sho.~work dra~vi~, proc,~Iures, etc.)
To ~e best of my knowledge, the above and attached reports are a written accurate a~ount of my inspections.
INITIALS: Lead Insp RE ARE QA/QC Group Page __ of__
OIR-WS.XLS Rev. 11/20/95
CM 1 22.1
Non-Conformance Report
12. May Affect ROD
Yes No N/A
Initials Date JMAHollywood / Hi~hland Station & Tunnels
6. Contractor: Tutor-Saliba/Perini Contract Day:
6. Sub/Supplier NIA Report Time:
Contr. St. Rep: E. kmmons 8. Hold Tags:
1. Seg. III Red Line, Contract C0301R
249 1. NCRNo.: 1 7
1530 3. Date: 1/4/96
NO Day: Thursday
Nonconforming Item (Short Title): Cross Passage Carrier Beam4. Location: La Brea Shaft - Crosspassage 39A (AR)(AL) 5. NCR Type (circle): Mech Conc Weld ~..~tl SuQ Elect Test Sys9. Description of Non-Conformance and Contract Requirements {Include Specific Requirement Violated):
NO carrier beam was installed on walls at upper section of crosspassage 39A;
Other:
see the attached drawing.
7. Ref (Plans Specs. and/or Subrnitta~ No.s): 02312-1.4.B-3.01 & 01460-1.9.B-10.01
8. Originator: J.C. JaramjJ, lo/1~-/~-c’~.-/~-~--~hone No.: 213-467-8783 Date: 1/4/96
1 3. Root Cause of Problem and Action(s) to Prevent Recurrances:
1 4. Corrective Action(s):
18. Disposition : [] Use As Is i~l Repair [~Rework [] Reject / Scrap [] Return to Supplier
15. TSP Prepared By (print/sign): ,~,~ ,/~/~.~A./ ,~’~ ~ ~ 7L~1 9. EMC Approval {for ~s~A~/s and Re~#ir} (pdrrt/sign):
Date:
Date:20. JMA Concurrence (print/sign): Date:
Reinspected by TSP: Date: Accepted/Rejected by TSP: Date:
22. Reinspected by JMAj~.,.0.~Date: 22.~,e~:gd by_JMA;4 , ~ Date~
21. Correction Veri~
Originator: ’
JMA QA/QC: ~
Date: JMA Resident Engineer:X~’~~ Date:
Date: Z~ ~-~’oz’ TSP Project Manager:~
""~ Date:
INITIALS: Lead Insp RE ARE QA/QCco: D. Estrada, MTA; F. Smith. MTA; J. Hawl°y. ~2~L-M B. M°es. TNL-M O. Smiloy. JMA
Group Page of__
NCR001 7.XLS Rev. 1/5/96
TUNNEL ~ET II(V!IIII
Tutor-Saliba-Perini
::gOD"-"
JAN g 9 1996
R~..CEYV E.D
1717 N. Highland Avenue. Suffe 711 [213] 464-10~8 Contractors Ucense #428,525FAX [2 ] 3] 469-3506
CONTRACTORS ENGINEERS
January 29, 1996
METROPOLITAN TRANSIT AUTHORITYC/O JMA JOINT VENTURE1717 Norl:h Higlqland AvenueSuite 70"1Hollywood, CA 90028
A~ention: Jolqn Hawley’~Resident Engineer~
SERIAL LETTER NO.REFERENCE:
CO301-CRE-0906HOLLYWOOD/HIGHLAND STATIONCONTRACT CO301
SUBJECT: NONCONFORMANCE REPORT #17
Gentlemen:
please be advised this nonconformance condition has been corrected. The Carrier Beam has beenplaced in accordance with 1:he approved submittals.
In light of this fact, please close out NCR ~17.
very truly yours,
TUTOR-SALIBA-PERINI
Lance McAfee /"Project Manager
LM/MY/rss
co: D.L. RandallCorrespondence FileReading FileNCR ,~17
.¢I 122
-Daily Inspection Report: Checklist & Remarks JMA
HoLl~ood / H.ighland Station & Tunnels
Contractor: Tutor-SalibalPerini Contract Day:
Contract C0301R
Day: ]Date: .~*,L/. /~/~5F
Shift: ~’~’)/Swing ) Grave
R~ad.A.RK~ CHECK~57" (Circle YES or NO {if YE.S, list remark No.}):
Accidents, Project/Public, Men or E~uip.~[~ YES . Vis~tors o " . ~
Unsafe Conditions or Acts
Environmental Concerns
Unusual Conditions or Events
Work NOT According to Plans & Specs.
Problems (Actual or Pctential)
Instructions Received from Supervisor
Ins~ctions Given to Contractor
YEs
Production Delays
Additional Attach. (Reports, Sketches)
LIST:
Weather:(Cimle)
To the best of my k.n%wledge, the above and attached
+__fs Signature: Z~ ~ A
REVIEWER’S "
~/INITIALS: Lead Insp .RE ~ ARE
DIR-CL.XLS
are a ~ accurate account of my inspecr4.ons. ̄
Report Page __
QA/QC of
Re1. 11121/95
Inspection Report: Work Summary/~ollywood / I-Eigah.lan~~-n 8~’~e1-7~ --i~’ Contractor: .Tutor-SalibalPerini Contract Day:
JMA
Activity No./
REF Documents* Summary of Work Performed LocationPrime /
Subs
¯ Rcferancc documen~ procedures, etc.)
To the beo--t of my knowledge, the abovA, ymd attached repo~/ts are a ~vri!ten a__,ccurate account of my inspections.
Report Page --~
REVZEWER’S
INITIALS: Lead Irmp ff RE ~ ARE QA/QC Group Page
DIR-WS.XLS ~ --- Rev. 11120195
JMA
Non-Conformance Report
May Affect ROD
Yes No NA
Initials Date
1. Line: Contract No.: Year:111 RED C0301R 96
4. LocationCrosspassage No. 39 A
NCR No.: 2. Contract Name:20 Hollywood / Highland Station and Tunnels
5. NCR Type: . 6. Contractor/SupplieRSteel Strut Tudor-Saliba/Pedni
3. Date:1/12/£6
7. Specification Section/Drawing No.: I 8. Originator: Phone No.:02312-1.4.B-3.01, 01460-1.4.A-12.00
I Alex Nistorescu
213 467-8783
9. Contract requirement and nonconformance description:Bottom steel strut was not installed at each post before advancing the lower portion of the ddft another four feet.
Hold Tag No.no
1/12/9611. Reply requested from: 12. Reply due date:
Root cause of the problem and action(s) to prevent recurrence (completed by the contractor):
14. Corrective action(s) (completed by the contractor):
15. Prepared By:
18. Disposition status:
Date: ] 16. Implementation Date: 17. RE Approval: Date:
[] Reject ~ Rework [] Repair [] Use-As-Is
19. Engineer approval(Repair and Use-As-Is):
Print Name: Signature: Date: 20. Lead Inspector:. Date:
21. Verification that nonconforming condition has been corrected:
22. inspection: /~ ~:,’-’x ¯ ~. ,,’~,~’v’7"~;>,~Z,~,/’~_4,¯
Print Name Signature
Form 83 (11/95) cc: F. Smith (MTA), J. Hawley (JMA), D. Estrada (MTA), B. Mees (JMA), O. Smiley (JMA), Int. Route
Tutor-Saliba-Pcrini
1717 N, Highland Avenue, Suite 711 [213] 464-I0~8 Contractors LJcen~e #428525FAX [213] 469-3,,’.,’.,’.,’.,’.~6
CONTRACTORS ENGINEERS
January 25, 1996
METROPOLITAN TRANSIT AUTHORITYC/O JMA JOINT VENTURE1717 North Highland AvenueSuite 701Hollywood, CA 90028
At--Ee n~:iO n: Jo.hn HawleyResident Engineer
SERIAL LETTER NO.REFERENCE:
CO301-CRE-0894HOLLYWOOD/HIGHLAND STATIONCONTRACT CO301
SUBJECT: NONCONFORMANCE REPORT #20
Gentlemen:
Please be advised that the BoEom Steel Struts have been installed at Crosspassage 59Aand 40 in accordance with approved submi~als.
Please revise the status of Nonconformance Report #20 to "Corrected" and close this issue.
Very truly yours,
TUTOR-SALIBA-PERINI
Lance McAfee//Project Manager
LM/MY/rss
CO: D.L. RandallCorrespondence FileReading FileNCR ,~20
JMA
ShiffJlnspecgon Start:
Daily Inspection Report
~Contractor
Project ,~"~ "
ITe_mperature:
Safety Rep~_.
A.l. No. ~1. Loc. Brief Description Action Required Tyi3e A.I. ’St~tu’~
ContractSpecificationNo.
1. Type and Location of Work Being Performed A R 12. Drawings and Submittals Used for Inspection C E3. Acceptance Status with NCRs Identified C J .
Quant of Work AComp. & Pay/ CBid Item No. T
C0301R
JMAConstructionManager
Date: 17 January 1996Hie No: R82-C0301R - REC 0678
CM 122.1SQ 020.1
TO:T-SIP1717 North Highland Ave.Suite 711Hollywood, CA 90028ATTN: Lance McAfee
LETTER OF TRANSMITTAl,
ttolly~ood / Highland Station and Tunnel Project
SUBJ: Non-Conformance Report No. 20
FROM:Holl~vood & Highland CM Field Office1717North Highland Ave.Suite 701Hollywood, CA 90028Of: 213 - 467- 8783 Fax: 213- 469- 9649
We are sending you: [] Attached [] Under Separate Cover,Via: [] Mail [] Express Mail [] Hand Delivery [] Couder [] Fax
The Following items: [] Drawings [] Documents [] Specifications [][] Plans [] Calcs. [] Certifications [] Prints [] Schedule [] Log
Copy of Letter[] Report
Copies Date No. I Description
Non-Conformance Report No. 20 -"Steel Struts"
These are Transmitted:[] For Approval
[] For Your Use[] As Requested
[] For Your Record [] Review and Comment[] As Required [] Coordinate with 3rd Parties[] Return for Corrections [] Other:.
Remarks:
cc: [] A. Wattson, MTA Ref:[] Int. Route (C0301R)[] J. Hawley (JMA)
[] B. Mees (JMA)[] F. Smith (MTA)
, [] SI~ED: / 7 ~v96Wiiliam~e~/ch, Resident Engineer
C0301R Project
JMA
Non-Conformance Report
May Affect ROD
Initials Date
1. Line: Contract No.: Year:III RED C0301R 96
4. LocationCrosspassge No. 40
NCR No.: 2. Contract Name:23 Hollywood / Highland Station and Tunnels
3. Date:1/19/96
5. NCR Type:Steel Strut
6. Contractor/Supplier:Tudor-Saliba/Pedni
7. Specification Section/Drawing No.:02312-1.4.B-3.01/01460-1.4.A-12.00
8. Originator:J. C. Jaramillo
Phone No.:213/462-6783
Hold Tag No.No
9. Contract requirement and- nonconformance description:
Bottom steel strut was not installed at each post before advancing the lower portion of drift another four feet.
10. Lead Insp~ector: Date: I 11. Reply requested from: I 12. Reply due date:Ben Fard~//’..~/_..__~ ~ ~-/~
3. Root cause of the problem and action(s) to prevent recurrence (completed by the contractor):
14. Corrective action(s) (completed by the contractor):
15. Prepared By: Date: 16. Implementation Date:
18. Disposition status: [~ Reject [~r/Rework
19. Engineer approval(Repair and Use-As-Is):
Print Name: Signature:
J17. RE Approval: Date:
4--[~ Repair [~ Use-As-Is
Date: /~,n~ 2.D~/;://~ (~
21. Verification that nonconforming condition has been corrected:
22. Inspection: ~. ~, ~/~~~
Print Name
Form 83 (11/95) cc: F. Smith (MTA), J. Hawley (JMA), D. Estrada (MTA), B. Mees (JMA), O. Smiley (JMA), Int. Route
~JMA
Cont~ctodSubcontractor.Shift/Inspection Start:Weathe~
Daily Inspection ReportDate:
~.t. r~o. =ner uesc~paen I Action Requlred I Type A.I. Status
ContractSpecificationNo.
1. Type and Location of Work Being Performed2. Drawings and Submittals Used for Inspection3. Acceptance Status with NCRs Identified
Form143
ACC
R Quant of WorkE Comp. & Pay/J Bid Item No.
ICon~ct No:C~ ntractorlS u bco ntractor:.Shift/inspection Start:
Daily Inspection Report(Continuation Sheet)
t Date: ,~’~, ~.z’,/ /,~’~45"1 Day: /.~/~-~,#./’,
¯ ~’?,~’,/-4 ’ t Contract Day No:z~..’z~’~../¢’, I ShiffJlnspection End:
Project
ContractSpecificationNO.
1. Type and Location of Werk Being Performed2. Drawings and Submittals Used for Inspection3. Acceptance Status with NCRs Iden~ed
Form 143
(Signature & Date)
R Quant of WorkE Comp. & Pay/J Bid Item No.
Tutor-Saliba-PCriniJ AN 2 9 1£96
R:CEt’VED] 717 N. Highland Avenue, Suite 711 [213] 464-1C~8 Contractors Uce~e #428525
FAX [213] 469-3506
CONTRACTORS ENGINEERS
January 29, 1996
METROPOLITAN TRANSIT AUTHORITYC/O JMA JOINT VENTURE1717 North Higl~land AvenueSuite 701Hollywood, CA 90028
Atl:ention: J o h__n HawleyResident Engineer
SERIAL LETTER NO.REFERENCE:
CO301-CRE-O905HOLLYWOOD/HIGHLAND STATIONCONTRACT CO301
SUBJECT: NONCONFORMANCE REPORT #23
Gentlemen:
Please be advised this nonconformance condition has been corrected. The BoCEom Steel Struts inCrosspassage #40 have now all been placed. There have been no negative effects due ~:o the delay intheir installation.
Due to the above stated facts, we request that you close this NCR #23.
Very truly yours,
TUTOR-SALIBA-PERINI
Lance McAfee /~Project Manager//
LM/MY/rss
co: D.L. RandallCorrespondence FileReading FileNCR ,~23
JMAConstructionManager
Date:
File No:
22 January 1996
C0301 - REC-0707
CM122.1
SQ 020.1
Hollywood/Highland CM Field Office1717 N. Hiqhland Ave.Suite 711Los Anqeles, CA 90028ATTN: Lance McAfee
Chartie Farnsworth
LETTER OF TRANSMITTAL
Hollywood / Highland Station and Tunnels
C0301
Subj: Non-Conformance Reports
From:
IHollywood/Highland CM Field Office1717 N. Highland Ave.Suite 701Los Ancjeles, CA 90028
We are sending youT [XX] Attached [ ] Under separate Cover
Via: [ ] Mail [ ] Express Mail [XX] Hand Deliver~ [ ] Couder [ ] FaxThe Following items: [ ] Shop drawings [ ] Prints [ ] Specifications [ ] Copy of Letter[ ] Plans [ ] Samples [ ] Change Order [X ] Non-Conformance Reports
Copies Date1 1 /12/96
1 1/18/96
1 1/19/96
These are Transmitted:
[ ] For your use [ ]
[ ] As requested [ ]
Ix]
Description
NCR - No. 21, North Soldier Pile at Main Station
NCR - No. 22, South Bulkhead at McCadden Place
NCR - No. 23, Crosspassage No. 40
Approved as noted
Retum for c6rrections
Review and comment [ ] Other:.
[ ] Submit
[ ] Retum~
copies for distribution
corrected prints
Remarks:
cc: [ ] Doc Control[ ] AI Wattson, MTA[ ] A. D.__.avidian, EMC
[]SIGNED:
Jo~n Ha~ley~sident Engir[eer
CM 122. i
JMA
Ron-~ort
May Affect ROD
Yes No NA
Initials Date
1. Line: Contract No.: Year. NCR No.:III RED C0301R 96 24
4. LocationNorth Soldier Piles at Main Station
2. Contract Name:Hollywood / Highland Station and Tunnels
3. Date:1/12/96
5. NCR Type:Concrete
6. Contractor/Supplier:Tudor-Saliba/Pedni
7. Specification Section/Drawing No.:03300-3.5.H
8. Originator. Phone No.: Hold Tag No.Sandor Dorogi 213 407-8783 no
9. Contract requirement and nonconformance description:Structural concrete for north soldier piles numbered 87, 89 and 91 were dropped into hole with the use of flexible pipe(elephant trunk). The end of elephant trunk reached to 38 feet from the hole bottom. The holes had 20 inches of waterin them prior to concrete placement. In accordance to Section 03300-3.5.H, deposit of concrete under water must beperformed by an approved tremie method.
10. Lead Inspector: Date:
13. Root cause of the problem and action(s)
11. Reply requested from: 12. Reply due date:Tutor-Saliba/Pedni 2_/16/96
prevent recurrence (completed by the contractor):
14. Corrective action(s) (completed by the contractor):
15. Prepared By: Date: 16. Implementation Date:
18. Disposition status: [~ Reject [~ Rework
19. Engineer approval Print Name: Signature:(Repair and Use-As-ls):
21. Verification that nonconforming condition has been corrected:
17. RE Approval: Date:
[] Repair [] Use-As-Is
Date: | 20. Lead Inspector. Date:
22. Inspection:
Print Name Signature Date
Form 83 (11/95) cc: F. Smith (MTA), J. Hawley (JMA), D. Estrada (MTA), B. Mees (JMA), O. Smiley (JMA), Int. Route
CN! 122.1
JMA
Non-Conformance Report
May Affect ROD
Yes No NA
Initials Date
1. Line: Contract No.:III RED C0301R
Year: NCR No.: 2. Contract Name:96 25 Hollywood / Highland Station and Tunnels
3. Date:2/20/96
4. LocationHollywood/Highland Station
5. NCR Type:Concrete Specimens
6. Contractor/Supplier:Tudor-Saliba/Perini
7. Specification Section/Drawing No.:3301-3.7.A; ASTM C31
8. Originator: Phone No.: Hold Tag No.Ben Fardi 213 467-8783 N/A
9. Contract requirement and nonconformance description:Contract requirement: Concrete specimens are required to be remained undisturbed for the initial cudng 24+/- 8 hr.(ASTM, C31, 9.2.1); Upon completion of initial curing,standard curing shall be started as specified in the ASTM, C31,9.2.2. Specimens were casted for the 2500 PSI structural concrete placed at the soldier pile toe on 1/3/96. A copy ofthe field made test specimens sheet is attached.Non-Conformance: Specimens were left unattended on job site many days after the casting date; the curingrequirements of specimens were never performed.
10. Lead Inspector: Date: 11. Reply requested from: 12. Reply due date:Be~Fardi ,,. (’) 2/20/96 TSP 3/1/96
13. Root cause of the problem and action(s) to prevent recurrence (completed by the contractor):
14. Corrective action(s) (completed by the contractor):
15. Prepared By: Date: 16. Implementation Date:
18. Disposition status: [~ Reject
17. RE Approval: Date:
[] Rework [] Repair [] Use-As-Is
19. Engineer approval(Repair and Use-As-Is):
Print Name: Signature: Date: 20. Lead Inspector: Date:
21. Verification that nonconforming condition has been corrected:
22. Inspection:
Form 83 (11/95)
Print Name Signature Date
cc: F. Smith (MTA), J. Hawley (JMA), D. Estrada (MTA), B. Mees (JMA), O. Smiley (JMA), Int. Route
CM 122.
JMA
Non-Conformance Report
May Affect ROD
No NAYes
Initials Date
1. Line:I11 RED
Contract No.: Year: NCR No.: 2. Contract Name:C0301R 96 28 Hollywood / Highland Station and Tunnels
3. Date:2/20/96
4. LocationHollywood Highlland Station
5. NCR Type:Soldier Pile
6. Contractor/Supplier:Tudor-Saliba/Perini
7. Specification Section/Drawing No.:Contract Specificaion 02160
8. Originator: Phone No.: Hold Tag No.Ben Fardi 213 367-8783 N/A
9. Contract requirement and nonconformance description:
Contract requirement:: Submittal No. 02160-1.3.B-1.00 specifies the beam size of soldier piles numbered N77 and N79to be W30X211 and W30X191, respectively. Non-conformance: Contractor placed W30X2_11 as soldier pile No. N79and W30X191 as soldier pile 77. Both piles are the same length.
10. Lead !nspector: f~ Date:
ByZ~ ~ d"~---~"2/13/96
11. Reply requested from:Tutor-Saliba-Perini
12. Reply due date:3/1/96
13. Root cause of the problem and action(s) to prevent recurrence (completed by the contractor):
14. Corrective action(s) (completed by the contractor):
15. Prepared By: Date: 16.
18. Disposition status: [] Reject
19. Engineer approval(Repair and Use-As-Is):
Implementation Date:
[] Rework
Pdnt Name: Signature:
~. RE Approval: Date:
[] Repair [] Use-As-Is
Date: 20. Lead Inspector: Date:
21. Verification that nonconforming condition has been corrected:
22. Inspection:
Pdnt Name Signature Date
Form 83 (11/95) cc: F. Smith (MTA), J. Hawley (JMA), D. Estrada (MTA), B. Mees (JMA), O. Smiley (JMA), tnt. Route
Metropolitan Transportation Authority
Nonconformance Report
May Affect ROD
Yes No NA
In,dais Date
!. Line: Contract No.: Year:Red 351 96
4. LocationWest cap waler no. WCW13between SB. No. W60-W61.
NCR No.: 2. Contract Name:09 North Hollywood Station
i 5 NcR Type: 6. ContractortSuppiier:
i Earth Retention System Kajima / Ray Wilson.
3. Date:02-12-96
7. Specification Section/Drawing No.:02160
8. Originator:Frank Frascati
Phone No.:818-508-3210
Hoid Tag No.
cj. Contract requirement and nonconformance description:WCW13 passes over DWP duct bank (2 ea. 4"alia.. & 2ea. ~ dia.) b etween sotdier p ile n o.W60 &W61.KRW has cut a 4.5"X24" window out of bottom flange of waler 26" north of pile W60 to accomocate the conflictbetween the waler and duct bank.
10. Lead Inspector~ ~ Date: 11. Reply requested from:, 12. Reply due date:FrankJ=raS~ti, [.~" j/~2-12-96
I )~[;44a/’,/~,,/’
13. Root cause ~f ~he prol~lem and action(s) prevent recurrence (completed by the contractor):
14. Corrective action(s) (completed by the contractor):
15. Prepared By: Date: 16. Implementation Date: 17. RE Approval: Date:
18. Disposition status: {~ Reject [~ Rework [] Repair [] Use-As-Is
19. Engineer approval Print Name: Signature: Date: 20. Lead Inspector: Date:(Repair and Use-As-Is):
21. Verification that nonconforming condition has been corrected:
22. Inspection:
Print Name Signature Date
PARSO N S-Di LLI NG HAMDaily Inspection Report
(Continuation Sheet)Page of
IContract No.: l C351Contractor:. I KRW
Date: 102-12-96Contract Da, No. I 256
4.5"X 24" window cut out of bottom flange of West cap waler no. WCW13 at 26" NORTH of pile
In Comuliance with St3ec. Section/s: t 02160
Inspector’s Name: Frank Frascati(Print Name)
Form 143 (4/93)
i Yes: I No: X
Signature:
Time In: 0600 hr. I Time Out: ! Hours: