LOR-6-9.67 Prebid Meeting & Matchmaker January 4, 2018 US-6.… · LOR US 6-9.67 MATCHMAKER Sale...
Transcript of LOR-6-9.67 Prebid Meeting & Matchmaker January 4, 2018 US-6.… · LOR US 6-9.67 MATCHMAKER Sale...
![Page 1: LOR-6-9.67 Prebid Meeting & Matchmaker January 4, 2018 US-6.… · LOR US 6-9.67 MATCHMAKER Sale Date: January 25, 2018 Award Date: February 5, 2018 Construction Start: April 2, 2018](https://reader033.fdocuments.us/reader033/viewer/2022050216/5f627e0376cbe90101614110/html5/thumbnails/1.jpg)
1/5/2018
1
LOR-6-9.67 Prebid Meeting & Matchmaker
January 4, 2018
2 |
PROJECT OVERVIEW
LOR US 6-9.67 MATCHMAKER
Rehabilitation of Erie Avenue (US-6) Lift Bridge over the Black River, City of Lorain, Lorain county
Construction Project Number: 0002(18)
Project Identification Number (PID): 92013
Estimated Construction Cost: $24,400,000
![Page 2: LOR-6-9.67 Prebid Meeting & Matchmaker January 4, 2018 US-6.… · LOR US 6-9.67 MATCHMAKER Sale Date: January 25, 2018 Award Date: February 5, 2018 Construction Start: April 2, 2018](https://reader033.fdocuments.us/reader033/viewer/2022050216/5f627e0376cbe90101614110/html5/thumbnails/2.jpg)
1/5/2018
2
3 |
PROJECT OVERSITE
LOR US 6-9.67 MATCHMAKER
ODOT Project Team
Construction Field Engineer – James Wade, P.E.
Construction Area Engineer - Luke Wysocki, P.E.
District Construction Engineer – Mike Fair, P.E.
Design Project Manager - Shelley Pitcher, P.E.
Capital Programs Administrator – Bob Weaver, P.E.
4 |
PROJECT LOCATION
LOR US 6-9.67 MATCHMAKER
![Page 3: LOR-6-9.67 Prebid Meeting & Matchmaker January 4, 2018 US-6.… · LOR US 6-9.67 MATCHMAKER Sale Date: January 25, 2018 Award Date: February 5, 2018 Construction Start: April 2, 2018](https://reader033.fdocuments.us/reader033/viewer/2022050216/5f627e0376cbe90101614110/html5/thumbnails/3.jpg)
1/5/2018
3
5 |
PROJECT LOCATION
LOR US 6-9.67 MATCHMAKER
6 |
PROJECT DESCRIPTION
LOR US 6-9.67 MATCHMAKER
LOR 6 Bridge Rehabilitation
Superstructure steel strengthening & repairs
Wearing surface replacement
Mechanical & electrical replacement and/or
rehabilitation
![Page 4: LOR-6-9.67 Prebid Meeting & Matchmaker January 4, 2018 US-6.… · LOR US 6-9.67 MATCHMAKER Sale Date: January 25, 2018 Award Date: February 5, 2018 Construction Start: April 2, 2018](https://reader033.fdocuments.us/reader033/viewer/2022050216/5f627e0376cbe90101614110/html5/thumbnails/4.jpg)
1/5/2018
4
7 |
PROPOSED WORK
LOR US 6-9.67 MATCHMAKER
Superstructure
Girder, floorbeam & truss strengthening
Approach spans
Bascule span
Wearing surface replacement
Approach span
Sidewalk
Blasting & painting all structural steel
General repairs
Median
Curbs
Railing
8 |
PROPOSED WORK
LOR US 6-9.67 MATCHMAKER
Substructure
Concrete patching & repairs
Abutments
Piers
Masonry repairs
Pier buildings
Trunnion towers
Blasting & painting structural steel
Steel bents
Fender repairs
![Page 5: LOR-6-9.67 Prebid Meeting & Matchmaker January 4, 2018 US-6.… · LOR US 6-9.67 MATCHMAKER Sale Date: January 25, 2018 Award Date: February 5, 2018 Construction Start: April 2, 2018](https://reader033.fdocuments.us/reader033/viewer/2022050216/5f627e0376cbe90101614110/html5/thumbnails/5.jpg)
1/5/2018
5
9 |
PROPOSED WORK
LOR US 6-9.67 MATCHMAKER
Mechanical
Temporary operating system
Trunnion rehabilitation
Operating machinery replacement
Span lock machinery replacement
Tail lock machinery replacement
10 |
PROPOSED WORK
LOR US 6-9.67 MATCHMAKER
Electrical
Temporary operating system
Remote control operation
Motor Control Center (MCC)
replacement
Programmable Logic Controller (PLC)
replacement
Motor replacement
Span lock
Tail lock
Public Address (PA) system replacement
Miscellanous
Roadway lighting
HVAC replacement
Maintenance of Traffic
![Page 6: LOR-6-9.67 Prebid Meeting & Matchmaker January 4, 2018 US-6.… · LOR US 6-9.67 MATCHMAKER Sale Date: January 25, 2018 Award Date: February 5, 2018 Construction Start: April 2, 2018](https://reader033.fdocuments.us/reader033/viewer/2022050216/5f627e0376cbe90101614110/html5/thumbnails/6.jpg)
1/5/2018
6
11 |
PROJECT SCHEDULE
LOR US 6-9.67 MATCHMAKER
Sale Date: January 25, 2018
Award Date: February 5, 2018
Construction Start: April 2, 2018
Construction End: December 31, 2019
12 |
CONSTRUCTION WORK TYPES
LOR US 6-9.67 MATCHMAKER
Roadway Clearing & Grubbing (WT 01)
Incidental Grading (WT 06)Misc. Concrete (WT 38)
Erosion ControlErosion Control (WT 08)
Drainage (WT 35)Misc. Concrete (WT 38)
Landscaping (WT 46)
DrainageDrainage (WT 35)
PavementAggregate Bases (WT 09)Misc. Concrete (WT 38)
Traffic ControlMaintenance of Traffic (WT 39)
Pavement Markings (WT 45)
Structure RepairReinforcing Steel (WT 23)Structural Steel Painting (WT 26)
Expansion & Contraction Joints, Etc. (WT 27)Structure Repairs (WT 29)
Hydrodemolition (WT 30)Structural Steel Repairs (WT 31)
Highway Lighting (WT 43)Sealing of Concrete Surfaces (WT 57)
IncidentalsMaintenance of Traffic (WT 39)
![Page 7: LOR-6-9.67 Prebid Meeting & Matchmaker January 4, 2018 US-6.… · LOR US 6-9.67 MATCHMAKER Sale Date: January 25, 2018 Award Date: February 5, 2018 Construction Start: April 2, 2018](https://reader033.fdocuments.us/reader033/viewer/2022050216/5f627e0376cbe90101614110/html5/thumbnails/7.jpg)
1/5/2018
7
13 |
DISADVANTAGED BUSINESS ENTERPRISE (DBE)
LOR US 6-9.67 MATCHMAKER
DBE GOAL - 10%
CONTAINS THE PROPOSAL NOTE 013-DISADVANTAGED
BUSINESS ENTERPRISE (DBE) UTILIZATION PLAN AND
GOOD FAITH EFFORTS UPDATED 07/21/2017.
ALL BIDDERS SHALL SUBMIT A DBE UTILIZATION PLAN AT
THE TIME OF BID.
14 |
DISADVANTAGED BUSINESS ENTERPRISE (DBE)
LOR US 6-9.67 MATCHMAKER
THE PLAN SHOULD SET FORTH SPECIFIC INFORMATION
DEMONSTRATING HOW BIDDER WILL ACHIEVE DBE GOAL.
IDENTIFY DBE CERTIFIED FIRMS:
http://www.dot.state.oh.us/Divisions/ODI/SDBE/Pages/DB
E-Directory.aspx
![Page 8: LOR-6-9.67 Prebid Meeting & Matchmaker January 4, 2018 US-6.… · LOR US 6-9.67 MATCHMAKER Sale Date: January 25, 2018 Award Date: February 5, 2018 Construction Start: April 2, 2018](https://reader033.fdocuments.us/reader033/viewer/2022050216/5f627e0376cbe90101614110/html5/thumbnails/8.jpg)
1/5/2018
8
15 |
WHERE TO FIND US
LOR US 6-9.67 MATCHMAKER
ODOT District 3
906 Clark Street
Ashland, Ohio 44805
419.281.0513
Howard Huebner
District Deputy Director
16 |
QUESTIONS
LOR US 6-9.67 MATCHMAKER
?
![Page 9: LOR-6-9.67 Prebid Meeting & Matchmaker January 4, 2018 US-6.… · LOR US 6-9.67 MATCHMAKER Sale Date: January 25, 2018 Award Date: February 5, 2018 Construction Start: April 2, 2018](https://reader033.fdocuments.us/reader033/viewer/2022050216/5f627e0376cbe90101614110/html5/thumbnails/9.jpg)
1/5/2018
9
17 |
MATCHMAKER IMMEDIATELYFOLLOWING
PREBID MEETING
LOR US 6-9.67 MATCHMAKER