London’s first Energy from Waste district heating network

23
www.southwark.gov.uk London’s first Energy from Waste district heating network Ian Smith Head of Sustainable Services London Borough of Southwark

Transcript of London’s first Energy from Waste district heating network

Page 1: London’s first Energy from Waste district heating network

www.southwark.gov.uk

London’s first Energy from Waste district heating network

Ian Smith

Head of Sustainable Services

London Borough of Southwark

Page 2: London’s first Energy from Waste district heating network

www.southwark.gov.uk

• Why

• How

• What

• Hurdles we’ve faced along the way

Page 3: London’s first Energy from Waste district heating network

www.southwark.gov.uk

Why

• Strong local and regional planning framework ensuring development of renewable solutions

• S.106 agreement, attached to new waste facility, for development of a community heating network

Page 4: London’s first Energy from Waste district heating network

www.southwark.gov.uk

Why• Southwark’s new waste facility

Page 5: London’s first Energy from Waste district heating network

www.southwark.gov.uk

Why

• Commitments from our Carbon Reduction Strategy

• Reduce carbon dioxide emissions across the borough by 80% by 2050

• In the shorter term, reduce emissions from the council housing stock by 15% by 2022, and help to reduce fuel poverty

Page 6: London’s first Energy from Waste district heating network

www.southwark.gov.uk

Why

• Golden opportunity right on our doorstep

Page 7: London’s first Energy from Waste district heating network

www.southwark.gov.uk

: Locations of estates benefiting

: Location of SELCHP

Page 8: London’s first Energy from Waste district heating network

www.southwark.gov.uk

Why

Established waste PFI relationship already in place with SELCHP operator Veolia

Page 9: London’s first Energy from Waste district heating network

www.southwark.gov.uk

How

Page 10: London’s first Energy from Waste district heating network

www.southwark.gov.uk

How• Project Team covering all aspects:

Page 11: London’s first Energy from Waste district heating network

www.southwark.gov.uk

How

It was complicated!

Page 12: London’s first Energy from Waste district heating network

www.southwark.gov.uk

What• Primary pipe network from SELCHP to five estates

Page 13: London’s first Energy from Waste district heating network

www.southwark.gov.uk

What• Heat hall equipment installation underway

Page 14: London’s first Energy from Waste district heating network

www.southwark.gov.uk

What

Page 15: London’s first Energy from Waste district heating network

www.southwark.gov.uk

What

Pumps ready for connection

Page 16: London’s first Energy from Waste district heating network

www.southwark.gov.uk

WhatUsing SELCHP to distribute heat to local estates is expected to reduce emissions by the equivalent of 7,716 tonnes of CO² per annum.

This is far more than the total annual carbon emissions of the new waste facility

Page 17: London’s first Energy from Waste district heating network

www.southwark.gov.uk

Hurdles met along the way

Page 18: London’s first Energy from Waste district heating network

www.southwark.gov.uk

Hurdles met along the way

• Getting high-level buy in

• Overcoming scepticism

Page 19: London’s first Energy from Waste district heating network

www.southwark.gov.uk

Hurdles met along the way

Crossrail construction

Page 20: London’s first Energy from Waste district heating network

www.southwark.gov.uk

Hurdles met along the way

• Required changes to pipe routes and design

Page 21: London’s first Energy from Waste district heating network

www.southwark.gov.uk

Hurdles met along the way

Page 22: London’s first Energy from Waste district heating network

www.southwark.gov.uk

Hurdles met along the wayConnecting new to old

Page 23: London’s first Energy from Waste district heating network

www.southwark.gov.uk

Contact:Ian SmithHead of Sustainable Services

Southwark CouncilPO Box 64529SE1P 5LX

[email protected] 7525 2484