London Infrastructure Development Robert Kemp Head of System Development UK Power Networks Stephen...

22
London Infrastructure Development Robert Kemp Head of System Development UK Power Networks Stephen Bradley Head of Major Connections UK Power Networks

Transcript of London Infrastructure Development Robert Kemp Head of System Development UK Power Networks Stephen...

Page 1: London Infrastructure Development Robert Kemp Head of System Development UK Power Networks Stephen Bradley Head of Major Connections UK Power Networks.

London Infrastructure Development

Robert Kemp

Head of System

Development

UK Power Networks

Stephen Bradley

Head of Major Connections

UK Power Networks

Page 2: London Infrastructure Development Robert Kemp Head of System Development UK Power Networks Stephen Bradley Head of Major Connections UK Power Networks.
Page 3: London Infrastructure Development Robert Kemp Head of System Development UK Power Networks Stephen Bradley Head of Major Connections UK Power Networks.

Central Area Supergrid Substations

City of LondonWest End

Victoria

St Johns Wood City RoadHackney

West Ham

New CrossWimbledon

Bankside

Back Hill

Page 4: London Infrastructure Development Robert Kemp Head of System Development UK Power Networks Stephen Bradley Head of Major Connections UK Power Networks.

Central area supply network

City of LondonWest End

Victoria

St Johns Wood City RoadHackney

West Ham

New CrossWimbledon

15%

85%

30%

70%

20%80%

Bankside

Back Hill

Page 5: London Infrastructure Development Robert Kemp Head of System Development UK Power Networks Stephen Bradley Head of Major Connections UK Power Networks.

EHV (132kV) network enhancements

City of LondonWest End

Victoria

St Johns Wood City RoadHackney

West Ham

New CrossWimbledon

15%

85%

30%

70%

20%80%

Bankside

New Cross-Finsbury Market cable tunnel

Back Hill

FarringdonTunnel

Shorts Gardens Tunnel

Page 6: London Infrastructure Development Robert Kemp Head of System Development UK Power Networks Stephen Bradley Head of Major Connections UK Power Networks.

Increased Resilience

City of LondonWest End

Victoria

St Johns Wood City RoadHackney

West Ham

New CrossWimbledon

20%

Bankside

15% 30%

10%

45%

20%

60%

50%

50%

Back Hill

Islington+3 SGT’s

+1 SGT

+2 SGT’s

2017

2014

2011

Brunswick Wharf

Page 7: London Infrastructure Development Robert Kemp Head of System Development UK Power Networks Stephen Bradley Head of Major Connections UK Power Networks.

Work in Progress

Schemes in Progress

Existing no. rating Total IncreaseLimeburner Lane 132/11kV 0 3 66 198 198 2015Osborn Street 132/11kV 60 3 66 198 138 2016Kingsgate House 132/11kV 0 2 66 132 132 2015Moreton Street 'B' 132/11kV 0 2 66 132 132 2014Fisher Street 132/11kV 60 3 33.3 100 40 2015

640St Pancras 132/11kV 120 3 66 198 78 2017Newington House 20/11kV 45 4 25 100 55 2014Townmead Road * 66/11kV 45 1 30 30 30 2014Montford Place 'B' * 33/11kV 60 2 30 60 60 2013

223Net new transformer capacity (MVA) 863

Total Outter Circle

New Transformers MVASubstation

Total Central District

Forecast Completion

Page 8: London Infrastructure Development Robert Kemp Head of System Development UK Power Networks Stephen Bradley Head of Major Connections UK Power Networks.

Additional Requirements

• Additional operational sites

• Continue and enhance co-operation in gaining new sites within new and existing developments that can feed out onto the network.

• Third party consents for tunnels, new sub-station works and modifications to existing operational sites.

Page 9: London Infrastructure Development Robert Kemp Head of System Development UK Power Networks Stephen Bradley Head of Major Connections UK Power Networks.

Future: Calshot St Establish 132/11kV Substation

Page 10: London Infrastructure Development Robert Kemp Head of System Development UK Power Networks Stephen Bradley Head of Major Connections UK Power Networks.

Future: Farringdon satellite 11kV switchboard

Page 11: London Infrastructure Development Robert Kemp Head of System Development UK Power Networks Stephen Bradley Head of Major Connections UK Power Networks.

Wider EHV Network

City of LondonWest End

Victoria

St Johns Wood City RoadHackney

West Ham

New Cross

Wimbledon

20%

Bankside

15% 30%

10%

45%

20%

60%

50%

50%

Back Hill

Islington

+3 SGT’s

+1 SGT

+2 SGT’s

2017

2014

2011

Willesden+1 SGT 2016

White City

Isle of Dogs

VNEB

Fulham tunnel

Pimlico tunnel

Millennium tunnel

Proposed new Thames X’ing tunnel

Planned +240MVA SGT capacity 2018

Page 12: London Infrastructure Development Robert Kemp Head of System Development UK Power Networks Stephen Bradley Head of Major Connections UK Power Networks.

Central EHV Network: Summary

• 860MVA of new transformer capacity by 2016

• Matched by new National Grid supergrid exit capacity

• City of London supply diversity facilitated by the New Cross-Finsbury Market cable tunnel

• New resilient 33kV network to accommodate large point loads

• Planned new installations at Calshot St 86MW firm & Farringdon

• Further new substations being designed

• Further sites required, obtaining consents in a timely way.

Page 13: London Infrastructure Development Robert Kemp Head of System Development UK Power Networks Stephen Bradley Head of Major Connections UK Power Networks.

33kV Network Delivery

• Dedicated Project Team to deliver the 33kV feeder infrastructure and dedicated services

• Frequent Client Liaison–Including Progress Reporting –Project Plans–Spend Profiles–Risk Management

• Close collaboration and assistance from CoL and TfL.

Page 14: London Infrastructure Development Robert Kemp Head of System Development UK Power Networks Stephen Bradley Head of Major Connections UK Power Networks.

33kV network feeder spines

Page 15: London Infrastructure Development Robert Kemp Head of System Development UK Power Networks Stephen Bradley Head of Major Connections UK Power Networks.

15

Central London – 33kV network

Comprises of 3 new feeder groups• Red

– Lights on Q3 2012, full functionality Q3 2013– Committed load, five customers, 59MVA

• Green– Lights on Q4 2012, full functionality Q4 2014– Committed load, five customers, 63.2MVA

• Blue– Osborn Street upgrade dependant, post 2017– Currently receiving enquiries

Page 16: London Infrastructure Development Robert Kemp Head of System Development UK Power Networks Stephen Bradley Head of Major Connections UK Power Networks.

Red Route Progress

• Ducts and cables installed from Back Hill to junction of Camomile Street.

• Final jointing in progress to energise from Back Hill• Switchgear for first customer has been manufactured -

delivery and commissioned within the next two months.• All switchgear has been ordered for the other customers.• Final section from Camomile Street to Finsbury Market

will be completed after the Olympics.

16

Page 17: London Infrastructure Development Robert Kemp Head of System Development UK Power Networks Stephen Bradley Head of Major Connections UK Power Networks.

Green Route Progress

• Ducts installed from Great Sutton Street to Fan Street. • Expected completion from Great Sutton Street through to

Finsbury Market by August 2012.• First two feeders to be live by end 2012 to connect one

customer via temporary circuit breakers.• The rest will be made live following the completion of the

new switchboard at Finsbury Market July 2013.• Excavation from Great Sutton Street to Back Hill to take

place in 2013.

17

Page 18: London Infrastructure Development Robert Kemp Head of System Development UK Power Networks Stephen Bradley Head of Major Connections UK Power Networks.

This excavation by Murphy Ltd in December 2010 was at the junction of Cheapside and King Street in the City of London and forms part of the Pinnacle 33kv route; as you can see there are many existing services present making trench excavation very difficult along with the installation of trench support prior to duct installation.

Page 19: London Infrastructure Development Robert Kemp Head of System Development UK Power Networks Stephen Bradley Head of Major Connections UK Power Networks.

This excavation in Cheapside was adjacent to St Mary-Le-Bow Church and shows the additional trench support required for a deep excavation along with steel beams and nylon straps to support existing services.The excavation at this point was moving from the Westbound carriageway into the Southbound carriageway; a shallow bank of approx 30 telecoms ducts with a concrete surround was uncovered in the middle of the road; beside this was a large Water main followed by a large Gas main therefore the only space available for our new ducts (26 in total) was a 250mm gap below the exposed mains and just above the Victorian brick built sewer approx 3.5 meters deep.The trench had to be extended to approx 5 meters wide to create enough room for the ducts to be installed in a flat formation by 3.5 meters deep; an excavation of this size required a temporary works design and this section alone took approx three weeks to complete.

Page 20: London Infrastructure Development Robert Kemp Head of System Development UK Power Networks Stephen Bradley Head of Major Connections UK Power Networks.

This excavation in Cheapside by Laing O’Rourke shows the four x 200mm and 6 x 89mm ducts for the Pinnacle 33kv scheme along with 16 x 11kv ducts installed as part of the One New Change scheme; the 4 x 200mm ducts laid flat in the trench are ready to be connected following the installation of a cement bound sand bed.

Page 21: London Infrastructure Development Robert Kemp Head of System Development UK Power Networks Stephen Bradley Head of Major Connections UK Power Networks.

This section of work in Worship Street Hackney was completed by Compass Infrastructure (formally Nacap) and shows 200mm ducts installed for four separate 33 kv schemes, 4 ducts for the Pinnacle Tower (red route); two ducts to Bishops Place (Green Route); two ducts to the Interxion Data centre at Brick Lane and four ducts for the Blue route; the 89mm ducts for the pilot cables were installed shortly after; all 12 33 kv ducts have been surrounded by cement bound sand.Also noticeable in the photo each side of the 200mm ducts is a layer of very hard dark coloured aggregate which is believed to be the original 17th century road construction as confirmed by the Museum of London archaeologist who visits site on a regular basis.

Page 22: London Infrastructure Development Robert Kemp Head of System Development UK Power Networks Stephen Bradley Head of Major Connections UK Power Networks.

This photo shows 24 x 500 metre drums of 33kv Copper cable recently delivered to our contractors Compass Infrastructure (formerly Nacap) and currently stored in Bishopsgate adjacent to the Pinnacle Tower; cable installation has now started and will continue into 2012.Compass did provide overnight and weekend security.