LOI – Next Steps?

7
LOI – Next Steps? John Thomason

description

LOI – Next Steps?. John Thomason. ISIS Schedule. Experiments in R5.4 to show full operation of system with integration of ISIS LPRF, cure for oscillations in IA, etc. ISIS staff complete break-out box and cabling to - PowerPoint PPT Presentation

Transcript of LOI – Next Steps?

Page 1: LOI – Next Steps?

LOI – Next Steps?

John Thomason

Page 2: LOI – Next Steps?

ISIS Schedule

Page 3: LOI – Next Steps?

Possible Workplan (1)

Experiments in R5.4 to showfull operation of system with integration of ISIS LPRF, cure for oscillations in IA, etc.

ISIS staff complete break-out box and cabling tosynchrotron and prepare LOI HPD and water manifold for move to synchrotron SP6

First experiments with beam in synchrotron

January experiments go well 4 x ISIS 2RF systems fully commissioned ISIS management approval to operate so close to first real TS-2 beam

Assumes:

Page 4: LOI – Next Steps?

May/June 2008

Page 5: LOI – Next Steps?

Possible Workplan (2)

Experiments in R5.4 to showfull operation of system with integration of ISIS LPRF, cure for oscillations in IA, etc.

ISIS staff complete break-out box and cabling tosynchrotron and prepare LOI HPD and water manifold for move to synchrotron SP6

First experiments with beam in synchrotron

January experiments go well 4 x ISIS 2RF systems not fully commissioned No ISIS management approval to operate so close to first real TS-2 beam

Assumes:

Page 6: LOI – Next Steps?

August/September 2008

Page 7: LOI – Next Steps?

Possible Workplan (3)

More experiments in R5.4 needed 4 x ISIS 2RF systems fully commissioned ISIS management approval to operate so close to first real TS-2 beam

Assumes:

Experiments in R5.4 to showfull operation of system with integration of ISIS LPRF, cure for oscillations in IA, etc.

ISIS staff complete break-out box and cabling toSynchrotron SP6

First experiments with beam in synchrotron (to be decided after June experiments)

Further experiments in R5.4